HomeMy WebLinkAboutWQ0035207_Staff Report_20231221State of North Carolina
Division of Water Resources
Water Quality Regional Operations Section
Staff Report
December 21, 2023
To: DWR Central Office — WQ, Non -Discharged Application No.: W00035207
Attn: Erick Saunders Facility name: Svnagro DCAR
From: Caitlin Caudle
Winston-Salem Regional Office
Note: This form has been adapted from the non -discharge facility staff report to document the review of both non -discharge and NPDES permit applications and/or renewals. Please complete all sections m they are applicable.
I. GENERAL AND SITE VISIT INFORMATION
1. Was a site visit conducted? ❑ Yes or ® No
II. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS
1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ❑ Yes ❑ No ® N/A
2. Are the design, maintenance, and operation of the treatment facilities adequate for the type of waste and disposal
system? ® Yes or ❑ No
3. Is the residuals management plan adequate? ® Yes or ❑ No
4. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or ❑ No
5. Are there any setback conflicts for existing treatment, storage, and disposal sites? ❑ Yes or ® No
6. Has a review of all self -monitoring data been conducted (e.g., AR, NDMR, NDAR, GW)? ® Yes or ❑ No
Please summarize any findings resulting from this review: NOV issues last year for exceeding permitted da tons
for Siler City WTP, NOV-2023-PC-0177.
7. Has a review of compliance history been completed (CEI's)? ® Yes or ❑ No
8. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ❑ No
9. Check all that apply:
❑ No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC
® Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium
Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.) See
attached NOV_
10. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit?
❑ Yes ®No❑N/A
If yes, please explain: Increased dry tonnage for Siler City WTP will resolve the most recent NOV.
FORM: WQROSSR 04-14 Page 1 of 2
III. REGIONAL OFFICE RECOMMENDATIONS
1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No
2. List any items that you would like the NPDES Unit or Non -Discharge Unit Central Office to obtain through an
additional information request:
Item
Reason
The phone number for the Mooresville Regional Office is not included in the
Update Spill Plan
Spill Plan reporting section on pg. 14. Kerr Lake WTP also needs to be added to
the reporting list. A table may be a more effective way to display the
information.
Complete RSC for Siler
pages 1 and 2 are missing.
City WTP
The reported SAR is 1.41, I calculated SAR to be 0.94. The reported PAN
surface application and injection/incorporation is 22,006 mg/kg and 25,766
PAN and SAR calculations
mg/kg. I calculated 11,003 mg/kg and 12,883 mg/kg respectively. Am I
calculating something wrong? I normally have discrepancies in calculated
values when reviewing S na ro facilities.
Siler City WTP Label for
Land Application
Should the label be updated to reflect all items listed in Permit Condition III.8?
Clarification of Kerr Lake
WTP storage
Do the decant basins total 500,000 gallons, or are they both 500,000 gallons?
Complete RSC for Kerr
pages 3 — 5 are missing.
Lake WTP
Update Residual Sampling
The Residuals Sampling Plan on pg. 78 is titled Siler City WTP. TCLP
Plan for Kerr Lake WTP
frequency is also listed as once per permit. Will this need to be updated to
reflect annual TCLP sampling?
Kerr Lake WTP Label for
Land Application
Should the label be updated to reflect all items listed in Permit Condition 111.8?
Kerr Lake WTP
The last sentence lists Siler City WTP.
Marketability Statement
3. Recommendation: ® Hold, pending receipt and review of additional information by regional office
❑ Hold, pending review of draft permit by regional office
❑ Issue upon receipt of needed additional information
❑ Issue
❑ Deny (Please state reasons: )
/—DocuSigned by:
4. Signature of report preparer:
Signature of regional supervisor:
Date: 12/21/2023
IV. ADDITIONAL REGIONAL STAFF REVIEW ITEMS
4. _!�
0D2D3CF3F1 B7456.._
The most recent Att. A was issued 3/10/2021. Siler City WTP is currently permitted for 125 dry tons/yr not 250 dry
tons/ .
FORM: WQROSSR 04-14 Page 2 of 2
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
NORTH CAROLINA
Environmental Quality
May 1, 2023
CERTIFIED MAIL No. 7019 1120 0001 5505 1763
RETURN RECEIPT REQUESTED
Robert N. Roth, Technical Services Manager
Synagro Central, LLC
284 Boger Road
Mocksville, NC 27028
SUBJECT: Notice of Violation (NOV-2023-PC-0177)
Synagro Central DCAR
Permit No. WQ0035207
Davie County
Dear Mr. Roth:
On April 26, 2023, Division of Water Resources staff Caitlin Caudle completed a review of the
2022 Annual Report. This review reflected noncompliance with the subject permit. The following
violation was noted:
A. The dry tons reported for Siler City WTP was 233.68 tons. The most recent Attachment A
issued March 10, 2021, lists Siler City WTP with a permitted dry tons per year of 125 tons.
This is an exceedance of the permitted dry tonnage for Siler City WTP. If the dry
tonnage is expected to exceed 125 tons on a regular basis, a permit modification
application should be submitted.
The following items of concern were noted:
• For Hood Creek WTP, staff calculated plant available nitrogen (PAN) for 4/20/2022 to be
5,672mg/kg, for 7/20/2022 to be 3,157 mg/kg, and 10/17/2022 to be 7,003.9 mg/kg. The
application method during this time frame was incorporation. Staff used a volatilization
rate (VR) of 1.0 and a mineralization rate (MR) of 0.4. For Mebane WTP, staff calculated
PAN for 1/18/2022 to be 11,130 mg/kg. The application method used during this time
frame was surface application. Staff used a VR of 0.5 and MR of 0.4. For Siler City WTP,
staff calculated PAN for 3/2/2022 to be 7,288 mg/kg. The application method used during
this time frame was surface application. Staff used a VR of 0.5 and MR of 0.4. Moving
forward, please ensure PAN calculations are correct. Please provide an explanation
for these reported values to Ms. Caudle.
• Annual sampling for Siler City WTP was completed on 3/2/2022. The lab report showed
that the majority of parameters were beyond hold time. Please provide an explanation
for this qualifier on the lab report.
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105
NoanicaaouNn
oep.m.m or em�nmen� Qualm
336.776.9800
Please refer to the enclosed inspection report for additional comments and observations. If you
have any questions, please contact Ms. Caudle at the letterhead address and phone number, or
by email at Caitlin.caudle(a)ncdenr.gov.
Sincerely,
DocuSigned by:
OD2D3CE3F167456...
Jennifer F. Graznak, Assistant Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ — WSRO
Enc: Inspection Report
Cc: Davie County Environmental Health (electronic copy)
D North Carolina Department of Environmental Quality I Division of Water Resources
✓ Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 1 Raleigh, North Carolina 27105
NORTH CAROLINA 336.776.9800
naparMeM of EmironmanW 9uallly