Loading...
HomeMy WebLinkAbout820122_30 day poa_20231219PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-122 Facility Name Ernest Odum I & II County: Sampson Certified Operator Name: Ashley Odum Operator Number 20044 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 2 N N 17 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste 12/22/2023 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Ernest Odum Farms Facility Owner/Manager (print) Facility Owner/Manager (signature) Phone: 910-214-4986 Date: 12/20/2023 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1 line m = 416.1 lb PAN 2. Structure ID: 2 line m = 135.4 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 551.5lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 11407 101 small grain overseed 2.96 100.00 296.0 Oct -Feb 114071 104 small grain overseed 3.64 100.00 364.0 Oct -Feb 11407 105 small grain overseed 1.94 100.00 194.0 Oct -Feb 11407 106 small grain overseed 3.40 100.00 340.0 Oct -Feb 11407 107 small grain overseed 4.53 100.00 453.0 Oct -Feb 11407 111 small grain overseed 2.88 100.00 288.0 Oct -Feb 11407 112 small grain overseed 2.83 100.00 283.0 Oct -Feb 11407 113 small grain overseed 2.60 100.00 260.0 Oct -Feb 11407 114 small grain overseed 2.69 100.00 269.0 Oct -Feb 3283 232 small grain overseed 1.42 100.00 142.0 Oct -Feb 3283 233 small grain overseed 3.30 100.00 330.0 Oct -Feb 3305 234 rye 4.53 72.00 326.2 Sep -Apr 3305 235 rye 4.64 72.00 334.1 Sep -Apr 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3879.2 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 551.5 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 3879.2 lb. PAN y. Overall PAN balance (w - x) _ -3328 lb. PAN PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 11 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 85952 1ft2 e. line c/12 x line d x 7.48 gallons/ft3 107153 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 118684 1ft3 h. current herd # 3600 certified herd # 3600 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 10/24/2023 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 118684 ft3 0 ft3 50139 Jft3 210466 gallons 1.31 Ibs/1000 gal. 416.1 Ibs. PAN PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 12 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker I 17.0 inches b. designed 25 yr./24 hr. storm & structural freeboard I 19.0 inches c. line b - line a (inches in red zone) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 13064 1ft2 e. line c/12 x line d x 7.48 gallons/ft3 16286 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design F 180 days g. volume of waste produced according to structural design 580 33.5 W h. current herd # 2425 certified herd # 2425 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 10/24/2023 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 58024 ft' 0W 76211 W 81837 gallons 1.38 Ibs/1000 gal. 135.4 Ibs. PAN PoA (30 Day) 2/21 /00