Loading...
HomeMy WebLinkAboutR-3300B - Hampstead BypassGood Morning Yall, Ben Meyer reported t he following losses and attached are images of the losses described below. They are active removing material that they can access and waiting for the water to recced in other locations to complete assessment and clean-up. I will follow-up with yall once the repairs and clean up have been completed. See below documenting reportable losses after 2.8" rain event Sunday 12-17-2023. Sta. 19+50 Rt./Lt. -Y30RPD-   ~1CY loss at both the inlet and outlet of C8. Sta. 611+81 Lt. -L1-          ~2 CY loss into wetland. Sta. 632+34 Lt. -L1-         ~1CY loss into wetland. Sta. 712+50 Lt. -L1-         ~1CY loss into wetland at outfall of C13. All losses into wetlands are actively being addressed by contractor. All losses in wetlands are being removed by hand. Certain losses such as the loss at C13 and around C8 will be addressed as soon as water level allows. Let us know if you need any additional information.  Sincerely, Jon Jon W. Giles Jr. Division Environmental Officer – Division 3 North Carolina Department of Transportation 910 341 2040 Office 910-902-0244 Mobile 910 675 0143 Fax jwgiles1@ncdot.gov <mailto:jwgiles1@ncdot.gov> 5501 Barbados Blvd. Castle Hayne, NC 28429 ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.