Loading...
HomeMy WebLinkAbout20231449 Ver 1_CAMA Application_20231026Permit Application Report Application ID Application Type Submitted App Complete Deadline Decision Expiration PA-1148 DCM Major Permit 10-02-2023 10-18-2023 01-06-2024 Primary Applicant Information Applicant Type Title Business Name Name Email Business Phone Mobile Phone Individual Michele Ball lightsunlimited30@gmail.com Physical Address Mailing Address Street 1 City State Zip Street 1 City State Zip 1117 canal drive carolina beach north carolina 28428 1117 canal drive carolina beach north carolina 28428 Registered Agent Information Agent Type Title Business Name Name Email Business Phone Mobile Phone Individual Mr. Donnie Overby dcoc0302@yahoo.com 910-443-0467 910-443-0467 Physical Address Mailing Address Street 1 City State Zip Street 1 City State Zip 8691 River Road Wilmington NC 28412 8691 River Road Wilmington NC 28412 Project Information Project Name Project Type Disturbed Land Area (Scl Ft/Acres) 1117 Canal Drive Private/Community Sq. Ft. / Acres Is proposed project located in national registered historic district or national register listed/eligible: False List of previous state or federal permits for work on project tract: 10-23CB Project Location Information Address County River Basin Subdivision County Parcel ID Latitude Longitude 1117 Canal Dr Carolina Beach, NC 28428 New Hanover 34.04878 -77.88703 Project Discharges to State Waters Discharge Type Surface Sanitary Runoff Wastewater Industry/Commercial Effluent vessel Wash Down Residential Other Wastewater/Stormwater Discharged Into Wetland? Discharge Same Salinity as Receiving Waters Is There Any Mitigation Proposed False True False Detailed Description of the Existing Development Located on the Property Existing Man -Made Features: Dock, Bulkhead and House. Existing Land Uses: Residential Existing Wastewater Treatment/Disposal: Town of CB Solid Waste/Fish Offal/Trash Disposal: Town of CB Use and Daily Operations of the Project When Complete Proposed Development Purpose: New Bulkhead construction Buildings/Facilities/Units/Structures: Use & Daily Operations: Residential Construction Methodology & Equipment: Vinyl Bulkhead to be built water ward of existing one. Development Activities Narrative Specifics: Clean Fill Sand to be used. Proposed new bulkhead to be 2' water ward of existing one, filling 22 Sg ft of submerged lands & 100 sq ft of coastal wetlands. The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time Application Narrative: Build a proposed bulkhead 2' waterward of existing one, filling 22 sq ft of submerged lands and 100 sq ft. of coastal wetlands. Face of bulkhead is upper limits of coastal wetland vegetation. The proposed length including wing walls would be 70 feet. The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time Boat Ramp Development Activity Included: False Shoreline Stabilization Development Activity Included: True Has There Been Erosion in the Preceding 12 Months Amount of Erosion (Feet Within the Past 12 Months) False Source of Erosion Amount Information Shoreline Stabilization Type of Stabilization Describe "Other" Stabilization Bulkhead Type of Stabilization Material Describe "Other" Stabilization Material Vinyl Length Width Avg Distance Waterward of NWH/NWL Max Distance Waterward of NHW/NWL 70 2 2 2 Sq Ft of Fill to be Placed Below Water Level Type of Fill Material Source of Fill Material 22 1 Sand Inland How Will Fill Material be Kept on Site and Erosion Controlled Silt Fence Will Wetlands be Crossed in Transporting Equipment to Project Site Explain Steps Taken to Avoid/Minimize Environmental Impact False Living Shoreline Development Activity Included: False Piers & Docking Facilities Development Activity Included: False Excavation Development Activity Included: False Bridges & Culverts Development Activity Included: False Oceanfront Erosion Control Development Activity Included: False Temporary Structures Development Activity Included: False Utility Crossings Development Activity Included: False Freestanding Moorings, Buoys & Bird Nesting Poles Development Activity Included: False Log Removal/Marine Debris Development Activity Included: Yes/No Navigational Aids Development Activity Included: False Other Fill Below Water Level Development Activity Included: False Stormwater Structures Development Activity Included: False "Upland Development" Development Activity Included: False Energy Facilities Development Activity Included: False Aquaculture Development Activity Included: False Submerged Lands Mining Development Activity Included: False General Development Activity Details Required Marina Development Activity Details Required