Loading...
HomeMy WebLinkAbout20230990 Ver 1_Design/Maps/Site Plans_20231220c c c c i a r U Q m Z Q ry n z O Q O U) w w W U O Q I: I : I : I : I : I i z Zz OHO D J z LU U DO _� Lu �U� m U � w z O J>O U z O U z0 v� Z)z O m LL 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 H CAR ESS� SEAL 02�5 IN Y D. DATE: 9/6/2023 SCALE (34"X22"): 1 " = 750' SCALE (17"X11"): 1" = 1500' 0 750' 1500' SCALE IN FEET SHEET NUMBER 1.1 21 M 0 M N O N a� E a) CL a) co a) a) 0 w 0 J a m U uj J Q U co Q 0 i w Lo M O 0 M N 0 N E a) Q_ a) U) m cn a) 0 w a U) ry U GENERAL PROJECT NOTES AND SPECIFICATIONS 1. DEFINITIONS: 1.1. CONSTRUCTION DOCUMENTS: THE CONTRACT AND APPLICABLE DRAWINGS, DETAILS, SPECIFICATIONS, PERMIT(S), AND/OR ANY OTHER DOCUMENTS (MEETING MINUTES, PUNCH LISTS, BID TABS, ETC.) FOR COMPLETE INFORMATION ABOUT THE REQUIRED WORK. ANY ONE OF THESE PARTS OF THE MAY NOT CONTAIN ALL OF THE INFORMATION REQUIRED TO COMPLETE THE PROJECT WORK. 1.2. PROJECT MANAGER: RESOURCE INSTITUTE, INC. 1.3. ENGINEER: JENNINGS ENVIRONMENTAL PLLC 1.4. SURVEYOR: N/A 2. THE WORK ON THIS PROJECT SHALL ADHERE TO THE FOLLOWING SPECIFICATIONS, STANDARDS AND/OR REGULATIONS: 2.1. NC DEMLR'S "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" (2013) 2.2. NC DEMLR'S CONSTRUCTION GENERAL PERMIT NUMBER NCGO1000 2.3. GENERAL, REGIONAL AND SPECIAL CONDITIONS OF USACE'S 404 NATIONWIDE PERMIT NUMBER 27 2.4. GENERAL AND SPECIAL CONDITIONS OF NCDWR'S 401 WATER QUALITY CERTIFICATION 4134 2.5. THE CONSTRUCTION DOCUMENTS 3. NOT ALL EXISTING UTILITIES ARE SHOWN. SOME LOCATIONS MAY BE APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY LOCATION AND COORDINATION. ANY UTILITIES SHOWN ON THE CONSTRUCTION DOCUMENTS ARE FOR INFORMATIONAL PURPOSES ONLY AND IN NO WAY RELIEVES THE CONTRACTOR FROM COORDINATING, VERIFYING AND PROTECTING EXISTING UTILITIES. 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. 5. THE CONTRACTOR IS RESPONSIBLE FOR THE PROJECT AREA UNTIL COMPLETION AND FINAL ACCEPTANCE BY THE ENGINEER AND PROJECT OWNER. THE CONTRACTOR SHALL CONFINE ALL ACTIVITIES, INCLUDING EQUIPMENT STORAGE, TO THE LIMITS OF DISTURBANCE, STAGING AREAS, AND DESIGNATED CONSTRUCTION ACCESS POINTS. 6. THE MANNER IN WHICH THE CONTRACTOR DEALS WITH PEOPLE AND THEIR PROPERTIES WHILE PERFORMING THIS WORK IS EXTREMELY IMPORTANT. THEREFORE, THE CONTRACTOR AND THE CONTRACTOR'S REPRESENTATIVES SHALL MANIFEST A SPIRIT OF FRIENDLINESS AND COOPERATION WHEN DEALING WITH PROPERTY OWNERS AND THE GENERAL PUBLIC WHILE PERFORMING WORK ON THE SITE. 7. EXTREME CARE AND DILIGENCE SHALL BE EXERCISED BY THE CONTRACTOR TO ASSURE THE SAFETY OF PERSONS, ANIMALS, AND PROPERTY. IF AT ANY TIME THE OWNER OR ENGINEER DETERMINES THAT THE CONTRACTOR'S METHODS OR EQUIPMENT ARE INADEQUATE FOR SECURING THE SAFETY OF THE CONTRACTOR'S EMPLOYEES OR THE PUBLIC, THE DESIGNATED REPRESENTATIVE MAY DIRECT THE CONTRACTOR TO TAKE SPECIFIC ACTIONS TO ENSURE SAFETY. THE CONTRACTOR SHALL IMPROVE METHODS AS DEEMED APPROPRIATE BY THE DESIGNATED REPRESENTATIVE WITHOUT ADDITIONAL COST TO THE PROJECT OWNER, SO AS TO ASSURE COMPLIANCE WITH SAFETY CONCERNS. FAILURE OF THE DESIGNATED REPRESENTATIVE TO MAKE THIS DEMAND SHALL NOT RELIEVE THE CONTRACTOR OF ANY OBLIGATION TO ENSURE THE SAFE CONDUCT OF ITS WORK. 8. THE CONTRACTOR SHALL MAINTAIN ALL LIGHTS, GUARDS, SIGNS, TEMPORARY PASSAGES, OR OTHER PRECAUTIONS NECESSARY FOR THE SAFETY OF ALL PERSONS. THE CONTRACTOR SHALL ABIDE BY ALL SAFETY RULES AND CONSTRUCTION CONDITIONS REQUIRED BY GOVERNMENTAL AUTHORITIES AND OTHER ENTITIES, INCLUDING RAILROADS, SO THE PUBLIC IS SAFEGUARDED FROM ACCIDENTS AND DELAYS. GUARDS AND FLAGS REQUIRED BY GOVERNMENTAL OR RAILROAD AUTHORITIES SHALL BE PROVIDED AT THE CONTRACTOR'S EXPENSE, UNLESS DIRECTED OTHERWISE BY THE DESIGNATED REPRESENTATIVE. CONTRACTOR SHALL AT NO TIME COMPROMISE EITHER SAFETY OR ENVIRONMENTAL REQUIREMENTS. 9. THE CONTRACTOR SHALL ONLY USE ACCESS PATHS AND STAGING AREAS SHOWN ON THE DRAWINGS. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY THE ENGINEER AND PROJECT OWNER PRIOR TO USE. 10. NO NON -PERMITTED FILL IN WETLANDS MAY OCCUR. ALL EXCESS SOILS FROM STABILIZATION AND GRADING WORK SHALL BE PLACED IN DESIGNATED AREAS ON THE SITE. 11. SITE SHOULD BE "STORM READY" AT THE END OF EACH WORKDAY AND WORKWEEK. 12. PRIOR TO CONSTRUCTION, DIGGING, OR EXCAVATION THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES (PUBLIC OR PRIVATE) THAT MAY EXIST AND CROSS THROUGH THE AREA(S) OF CONSTRUCTION, WHETHER INDICATED ON THE PLANS OR NOT. CALL "811" A MINIMUM OF 72 HOURS PRIOR TO DIGGING OR EXCAVATING. REPAIRS TO ANY UTILITY DAMAGED RESULTING FROM CONSTRUCTION ACTIVITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. TOPOGRAPHIC NOTES AND SPECIFICATIONS 13. HORIZONTAL DATUM IS NAD83(2011) & VERTICAL DATUM IS NAVD88. ALL COORDINATES ARE BASED ON NAD83(2011) AND ALL ELEVATIONS ARE BASED ON NAVD88. 14. A TOPOGRAPHIC SURVEY HAS NOT BEEN COMPLETED. 15. THE DESIGN ELEVATIONS AND GRADES SHOWN IN THE DRAWINGS ARE BASED ON NC SPATIAL DATA DOWNLOAD DIGITAL ELEVATION MODEL DATA FROM WHICH ALL COMPUTATIONS OF CUT AND FILL ARE BASED. DISCREPANCIES BETWEEN THE EXISTING GROUND SURFACE AND FIELD CONDITIONS AT THE TIME OF CONSTRUCTION CAN RESULT IN VARIATIONS OF TOTAL EXCAVATED QUANTITIES. THESE VARIATIONS SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. STREAM RESTORATION NOTES AND SPECIFICATIONS 16. FIELD CONDITIONS MAY REQUIRE ADAPTATION OF THE DESIGN AND/OR DETAILS PROVIDED IN THE DRAWINGS. MINOR VARIATION(S) OR ADAPTATION(S) OF THE PROPOSED WORK SHOWN IN THE DRAWINGS AND DETAILS ARE CONSIDERED INCIDENTAL TO THE WORK. THE ENGINEER WILL WORK WITH THE CONTRACTOR TO ADDRESS ANY FIELD CHANGES. 17. IN -STREAM ROCK STRUCTURES MAY BE SUBSTITUTED WITH WOOD STRUCTURES WITH WRITTEN APPROVAL FROM THE ENGINEER. 18. THE CONTRACTOR SHALL MARK THE LOCATIONS OF BANK STABILIZATION STRUCTURES USING SURVEY GRADE GPS EQUIPMENT FOR REVIEW BY THE ENGINEER BEFORE BEGINNING EXCAVATION AND GRADING. 19. CONTRACTOR SHALL MINIMIZE, TO THE MAXIMUM EXTENT POSSIBLE, IMPACTS TO ADJACENT SIGNIFICANT TREES. 20. CONTRACTOR SHALL USE AN EXCAVATOR WITH A HYDRAULIC THUMB TO INSTALL BANK STABILIZATION STRUCTURES. 21. DESIGN ELEVATIONS SHALL BE CONSTRUCTED WITHIN 0.1' (VERTICAL). WIDTHS AND DEPTHS MUST FALL WITHIN RANGES SHOWN IN THE DRAWINGS AND DETAILS. 22. IF THE EXISTING GROUND IS LESS THAN 0.2' HIGHER THAN THE PROPOSED BANKFULL ELEVATION, IT IS NOT NECESSARY TO EXCAVATE TO THE PROPOSED ELEVATIONS AND GRADES IN THE CONSTRUCTION DOCUMENTS. 23. BANK STABILIZATION STRUCTURES SHALL BE INSTALLED AS SHOWN IN THE DRAWINGS AND DETAILS. ALL STRUCTURES SHALL BE FINISHED TO A SMOOTH SURFACE IN ACCORDANCE WITH THE LINES, GRADES AND ELEVATIONS SHOWN IN THE DRAWINGS AND DETAILS. THE FINISHED STRUCTURE SLOPES AND GRADES SHALL BE WITHIN 0.1' OF DESIGN ELEVATIONS. 24. AFTER THE STRUCTURE IS COMPLETE AND NORMAL FLOW IS RESTORED TO THE CHANNEL, SOME ADJUSTMENT TO THE STRUCTURE OR ADDITIONAL STABILIZATION MEASURE MAY BE NECESSARY TO ACHIEVE THE DESIRED FUNCTION. 25. THE GRADED RIVER BANKS SHALL BE STABILIZED AS SOON AS POSSIBLE BY TEMPORARY AND PERMANENT SEEDING, ADDING STRAW MULCH TO BARE SOIL AND INSTALLING EROSION CONTROL MATTING AS SHOWN IN THE DRAWINGS AND DETAILS. PRIOR TO INSTALLING THE EROSION CONTROL MATTING, PREPARE THE SOIL SURFACE BY LOOSENING 3 - 6" OF SOIL OR APPLYING 3 - 6" OF TOPSOIL TO THE DESIGN ELEVATIONS AND APPLY TEMPORARY AND PERMANENT SEED AND THEN STRAW MULCH. SEED SHALL BE BROADCAST EVENLY OVER THE AREA USING A BROADCAST SPREADER PRIOR TO COVERING WITH THE EROSION CONTROL MATTING. THE MATTING SHALL BE ROLLED OUT IN THE DIRECTION OF ANTICIPATED RUNOFF. INSTALL MATTING IN ACCORDANCE WITH THE DETAIL INCLUDED IN THE DRAWINGS. MATTING USED FOR STREAMBANK STABILIZATION MUST BE CERTIFIED WEED -FREE STRAW OR OTHER NATURAL WEED -FREE / NON -PROPAGATING VEGETATIVE MATERIALS. REWORKING OF AREAS THAT DO NOT ESTABLISH VEGETATION OR BECOME UNSTABLE SHALL BE NECESSARY IN THE MATTING SEPARATES FROM THE SOIL. 26. TOPSOIL SHALL BE REMOVED FROM EXCAVATION AND FILL AREAS PRIOR TO EXCAVATION AND GRADING AND RE -APPLIED TO AREAS AFTER ROUGH GRADING IS COMPLETE. 2 - 4" OF TOPSOIL SHALL BE PLACED ON DISTURBED AREAS TO THE ELEVATIONS AND GRADES INCLUDED IN THE DRAWINGS. EROSION AND SEDIMENTATION CONTROL NOTES AND SPECIFICATIONS. 27. ALL CONSTRUCTION ACTIVITIES SHALL ADHERE TO THE CONDITIONS AND REQUIREMENTS OF NCDEML'S NG01 CONSTRUCTION GENERAL PERMIT. 28. ALL TREES, UTILITIES AND OTHER SITE FEATURES SHALL BE PROTECTED UNLESS MARKED FOR REMOVAL OR RELOCATION. 29. ALL WETLANDS AND STREAMS LOCATED WITHIN 50 FEET OF THE CONSTRUCTION AREA ON THE PROJECT SITE SHALL BE CLEARLY MARKED (EXAMPLE- ORANGE FABRIC FENCING) PRIOR TO ANY LAND DISTURBING ACTIVITIES AND MUST BE MAINTAINED ON THE PROPERTY UNTIL THE PROJECT PHASE IS COMPLETED [15A NCAC 02H .0506 (13)(2)]. 30. THE CONTRACTOR SHALL USED A STANDARD CONSTRUCTION ENTRANCE AT ALL SITE ACCESS POINTS TO PREVENT SEDIMENT FROM BEING TRACKED ONTO PUBLIC ROADS. 31. THE CONTRACTOR SHALL USED TEMPORARY SILT FENCE ALONG THE DOWNSLOPE SIDE OF ALL STAGING AREAS AND TEMPORARY STOCK PILE AREAS. 32. THE TURBIDITY STANDARD OF 50 NTUS (NEPHELOMETRIC TURBIDITY UNITS) SHALL NOT BE EXCEEDED AS DESCRIBED IN 15A NCAC 02B .0200. APPROPRIATE SEDIMENT AND EROSION CONTROL PRACTICES MUST BE USED TO MEET THIS STANDARD. [15A NCAC 02B .0211 (21)]. 33. EQUIPMENT SHALL BE WELL -MAINTAINED, CLEANED PRIOR TO MOBILIZATION, AND CHECKED DAILY FOR LEAKS OF PETROLEUM PRODUCTS. FUELING, LUBRICATION AND GENERAL EQUIPMENT MAINTENANCE SHOULD NOT TAKE PLACE WITHIN 50 FEET OF A WATERBODY OR WETLANDS TO PREVENT CONTAMINATION BY FUEL AND OILS. [15A NCAC 02H .0506 (13)(3) AND 15A NCAC 02B.0211(12)]. 34. CONSTRUCTION SHALL BE TIMED TO OCCUR DURING TIMES OF LOW FLOW. 35. THE DESIGNER OR HIS DESIGNEE SHALL SUPERVISE THE INSTALLATION OF IN -STREAM STRUCTURES. [15A NCAC 02H .0506(B)(1) AND (2)]. 36. THE STREAM BANKS, IN -STREAM STRUCTURES AND WORK AREA MUST BE STABILIZED AT THE END OF EACH DAY BEFORE THE TEMPORARY IN -STREAM DIVERSIONS AND PUMP AROUNDS ARE REMOVED AND FLOW IS RETURNED THE FULL CHANNEL. 37. EROSION CONTROL MATTING THAT INCORPORATES PLASTIC MESH AND/OR PLASTIC TWINE SHALL NOT BE USED ALONG STREAMBANKS OR WITHIN WETLANDS. DISTURBED AREAS SHOULD BE SEEDED, MULCHED, AND/OR MATTED AS SOON AS POSSIBLE, PREFERABLY AT THE END OF EACH WORKDAY. [15A NCAC 02B .0201] 38. IF BORROW OR WASTE MATERIAL IS REQUIRED OR GENERATED DURING GRADING OPERATIONS, AN APPROVED EROSION AND SEDIMENT CONTROL PERMIT MUST BE SECURED FOR THE BORROW OR WASTE MATERIAL SITE PRIOR TO INITIATION OF ANY LAND DISTURBING ACTIVITY. [15A NCAC 04B .0110]. QUANTITIES AND MATERIALS NOTES AND SPECIFICATIONS. 39. THE CONTRACTOR SHALL FURNISH ALL MATERIALS NECESSARY TO COMPLETE THE PROPOSED WORK UNLESS OTHER PROVISIONS HAVE BEEN AGREED UPON PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL DELIVER ALL MATERIALS TO THE DESIGNATED ACCESS POINTS AND STAGING AREAS. MATERIAL QUANTITIES, DIMENSIONS AND SIZES SHALL CONFORM TO THE NOTES AND SPECIFICATIONS PROVIDED IN THE CONSTRUCTION DOCUMENTS. THE ENGINEER MAY INSPECT AND APPROVE ALL MATERIALS PRIOR TO CONSTRUCTION. IF MATERIALS DO NOT MEET THE MINIMUM REQUIREMENTS SPECIFIED IN THE CONSTRUCTION DOCUMENTS, THE ENGINEER SHALL REJECT THE MATERIALS. 40. COSTS INCURRED DUE TO PROJECT DELAYS RESULTING FROM FAILURE OF THE CONTRACTOR TO MEET THE REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS SHALL BE THE EXPENSE OF THE CONTRACTOR. QUANTITIES LISTED ARE ESTIMATES ONLY AND SHALL BE CONFIRMED BY THE CONTRACTOR. 41. THE EROSION CONTROL MEASURES DEPICTED ON THE DRAWINGS SHALL BE INSTALLED AS NEEDED TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. ADDITIONAL EROSION CONTROL MEASURES (ABOVE THOSE SHOWN ON THE DRAWINGS) MAY BE REQUIRED IN ORDER TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE PROJECT OWNER AND ENGINEER PRIOR TO INSTALLATION OF ADDITIONAL EROSION CONTROL MEASURES. 42. ANY ADDITIONAL GRADING OTHER THAN WHAT IS SHOWN ON THE PLANS SHALL REQUIRE PRIOR APPROVAL FROM THE PROJECT OWNER AND ENGINEER. 43. THE USE OF ANY BRAND NAMES/MANUFACTURERS OR MODELS IS INTENDED SOLELY TO DENOTE THE QUALITY STANDARD OF THE DESIRED PRODUCT. ANY USE OF BRAND NAMES IS NOT INTENDED TO RESTRICT BIDDERS TO A SPECIFIC BRAND, MAKE, MANUFACTURER, OR NAME. THE BRAND NAMES / MANUFACTURERS OF MODELS ARE INTENDED TO CONVEY THE GENERAL STYLE, TYPE, CHARACTER, AND QUALITY OF PRODUCT. EQUIVALENT PRODUCTS WILL BE ACCEPTABLE IF THE PROJECT OWNER OR ENGINEER HAS GIVEN APPROVAL OF THE SPECIFIC PRODUCT IN WRITING. 44. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROVIDING STORAGE AREAS FOR CONSTRUCTION MATERIALS AND EQUIPMENT. THE MATERIAL AND EQUIPMENT STORAGE SHALL COMPLY WITH THE CONSTRUCTION DOCUMENTS AND ALL LOCAL, STATE AND FEDERAL REGULATIONS THROUGHOUT THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL RESTORE THE STORAGE AREA TO ITS ORIGINAL (OR BETTER) CONDITION UPON COMPLETION OF THE PROJECT OR UPON SUCH TIME AS DIRECTED BY THE PROJECT OWNER AND ENGINEER. SUCH RESTORATION SHALL BE AT NO ADDITIONAL COST TO THE PROJECT OWNER. THE CONTRACTOR SHALL WARRANTY ALL MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF ACCEPTANCE OF BY THE PROJECT OWNER AND SHALL REPLACE ANY PORTIONS THAT FAIL DUE TO FAULTY MATERIALS OR WORKMANSHIP, AT NO ADDITIONAL COST TO THE PROJECT OWNER. A SIX (6) MONTH AND ELEVEN (11) MONTH INSPECTION WILL BE PERFORMED DURING THE WARRANTY PERIOD. THE CONTRACTOR SHALL IMMEDIATELY REPAIR ALL ITEMS DETERMINED BY THE PROJECT OWNER OR AUTHORIZED REPRESENTATIVE TO BE DEFECTIVE UPON NOTIFICATION. THE CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE FAILED ITEMS UPON NOTIFICATION BY THE PROJECT OWNER. SEASONALLY INSTALLED ITEMS SHALL BE REPAIRED OR REPLACED DURING THE NEXT AVAILABLE INSTALLATION PERIOD. ITEMS REPAIRED OR REPLACED UNDER THIS PROVISION SHALL HAVE AN ADDITIONAL ONE (1) YEAR WARRANTY PERIOD FROM THE NEW DATE OF ACCEPTANCE. AREAS AND/OR OTHER WORK DISTURBED WHILE ACCESSING AND/OR REPAIRING/REPLACING WARRANTY COVERED ITEMS SHALL BE STABILIZED. a r U Q m z Q ry 0 i n n z 0 Q 0 C) Lu L.L L L] L L] U 2 00 Cn Q I: I : I : I : I : I i i I i I i I i I i I i I i � Q Z Z 00 U m U z0 M) z W U) z 0 Q U_ L.L U Lu a- Z coo Z 0 ~ Q O� Lu C) O Z Jz0 Z I_ U � W � �O O� n J Q Lu Z W 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 H CA R Q) ESS� O` SEAL 14, 02�.5 IGI ,, CRY D DATE: 9/6/2023 SHEET NUMBER 1.2 G N 0 LID M N O N E CL co 0 w 0 J CL w J Q U W Q Of 0 w LO M O 0 LO M N 0 N E 1- U) Cn 0 w a U) U GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER SANDBAGS (TYP.) OR STAPLES 10 MIL SILT FENCE 1:1 PLASTIC SANDBAGS (TYP.) SIDE SLOPE LINING OR STAPLES (TYP.) Z X Q 10' HIGH MIN SANDBAGS (TYP.) COHESIVE & B OR STAPLES LOW FILTRATION HIGH SOIL BERM 10 MIL COHESIVE & CLEARLY MARKED SIGNAGE SECTION A -A CONCRETE NOTING DEVICE (18"X24" MIN.) WASHOUT NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. PLAN 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE 0 0 0 0 } PLASTIC LINING LOW FILTRATION 11 SIDE SLOPE SOIL BERM O 0 ��TYP ) 0 0 x¢ 0 0 Oo o t SECTION B-B B SANDBAGS TYP.) NOTES: OR STAPLES 1. ACTUAL LOCATION DETERMINED IN FIELD CLEARLY MARKED SIGNAGE 2. THE CONCRETE WASHOUT STRUCTURES CONCRETE NOTING DEVICE (18"X24" MIN.) SHALL BE MAINTAINED WHEN THE LIQUID WASHOUT AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. PLAN 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. U d Q m Z Q 0 X Z M 0 W Y U _ U n 0 Q � Z 0 Q 0 I- Cn LU L.L W W U 2 0 2 Cn Q ZZ OO U m U O� ZO Z) Z IM W J 12� Z OLU0 Z W ~ - O U D O�O� Z J Z 0 U EL- U)0 Z IL 0 U 0 CD U Z 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 0\\1111II11////// H CA R Q) ESS� SEAL 02;r cIN D //////IIIIIII\� DATE: 9/6/2023 SHEET NUMBER 1.3 21 0 M N 0 N `m E a) a a) co a) c a) 0 w O J tl m U w J Q U W Q 0 i w IL LO M 0 0 LO M N 0 N E a) Q_ U) c� Cn Cn 0 w Q U) ry U PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours S. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of Stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G. ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the tmeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment ■ Within 24 hours, an oral or electronic notification. deposition in a . Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. ■ If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and . Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated w A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated ■ Within 24 hours, an oral or electronic notification. bypasses [40 CFR * Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance ■ Within 24 hours, an oral or electronic notification. with the conditions ■ Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 12_2.41(1)(6). ■ Division staff may waive the requirement for a written report on a case -by -case basis. U � Q m Z Q 0 X Z 0 m Lu , = o U n n Z 0 Q 0 Cn LU L.L LL I W U 0 Cn Q Z Z 00 U m U G = Z0 Z) Z m LU J 112� Z OLU0 Z W ~ - (DU D �O0-0 I- Z J0 Z 0 U EL- U)0 Z LL 0 U T_ O U Z 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 H CAR O''% ESS � `/yq SEAL 02 5 IN 0 D DATE: 9/6/2023 SHEET NUMBER 1.4 21 N Lq 0 c'M N O N E CL co a) 0 w 0 J CL U w J Q U W Q w IL LO M O O LO M N O N E Q_ a) U) Cn 0 w Q U) ry U WORK QUANTITIES & NRCS PRACTICE CODES LIST OF MATERIALS ITEM # DESCRIPTION CITY UNIT EROSION AND SEDIMENTATION CONTROL 1 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT 5 EA 2 TEMPORARY SILT FENCE 450 LF 3 TEMPORARY STREAM CROSSING 4 EA BANK STABILIZATION 4 STREAM BANK GRADING 41104 LF 5 WOOD TOE PROTECTION WITH SOIL LIFTS 1,105 LF 6 BOULDER TOE 125 LF 7 BED AND BANK GRADING - EXCAVATION N/A CY 8 BED AND BANK GRADING - FILL N/A CY 9 SOIL SPREADING 5,000 CY STREAM RESTORATION STRUCTURES 10 LOG VANE - UT1 & UT2 (15 - 20 FT) 13 EA 11 LOG VANE-ASHWORTH CR (40 FT) 16 EA 12 BOULDER J-HOOK (ASHWORTH CR) 11 EA 13 BOULDER J-HOOK (UT1 & UT2) 6 EA 14 BOULDER RIFFLE (ASHWORTH CR) 4 EA 15 HABITAT STRUCTURE BOULDER 22 EA 16 ISTREAM CROSSING - 30' OF 54" CULVERT 1 EA RE -VEGETATION 17 LIMITS OF DISTURBANCE 11.33 AC 18 PERMANENT SEEDING - ZONE 1 AND ZONE 2 5.31 AC 19 ZONE 1- LIVE STAKES 1.65 AC 20 ZONE 2 - BAREROOT SEEDLINGS 3.66 AC PLAN LEGEND w - - - COMP DESIGN STREAM CENTERLINE DESIGN BANKFULL DESIGN MAJOR CONTOUR DESIGN MINOR CONTOUR EXISTING STREAM CENTERLINE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR EXISTING TOP OF BANK PROPERTY LINE BUILDING FOOTPRINT ROAD CENTERLINE RIGHT OF WAY IRRIGATION LINE OVERHEAD COMMUNICATIONS BRIDGE OUTLINE EXISTING CULVERT MORPHOLOGIC CHARACTERISTICS TABLE Drainage Area: 4 sq mi = 2,560 ac Existing Proposed Proposed Ranges e/ 1. Stream Type G4c C4 C4 2. Bankfull Area - Sq Ft aj 50 - 8❑ 49 46 - 52 3. Bankfull Width - Ft a/ 28 - 42 30 28 - 32 4. Avg Bankfull Depth -- Ft a� 1.5 - 2.5 1.7 1.5 - 1.8 5. Maximum depth - Ft a/ 2.5 - 3.5 2.8 2.5 - 3.2 6. Estimated Bankfull Velocity (ft/sec) `/ 3.2 - 4.2 3.1 2.8 - 3.4 7. Estimated Bankfull Discharge (cu.ft%sec) 150 - 220 150 140 - 160 8. Width/Depth Ratio - Range 16-19 17.6 16-19 9. Floodprone Width - ft 30 - 45 90 80 - 120 10. Entrenchment Ratio e/ 1.1 - 1.6 3.0 2.5 - 4.0 11. Bank Height Ratio 12. Sinuosity 1.8 - 2.5 1.10 1.0 1.10 1.0 1.10 13. Avg Water Surface Slope - Ft/Ft 0.0033 0.0033 0.0033 14. Riffle Slope - Ft/Ft 0.004 - 0.008 0.005 0.004 - 0.007 15. Riffle Length (Range) - Ft 22 - 55 45 - 6❑ 3-4 45 - 60 16.Max depth pool -Ftb/ 3.5-5.7 3-4 17. Pool to Pool Spacing (Range) - Ft 100 - 240 120 - 180 120 - 180 18. Pool Length (Range) - Ft 45 - 9❑ 80 - 120 80 - 120 19. Inner Berm Area - Sq Ft a� 12 - 22 15 12-18 20. Inner Berm Width - Ft a/ 10 - 25 14 11-17 21. Avg Inner Berm Depth - Ft a� 1.0 - 1.5 11 0.9 - 1.3 22. Inner Berm maximum depth - Ft a� 1.1 - 2.0 1.3 1.1 - 1.5 a/ Measured at typical riffle el Measu red at typical pool `/ Attach velocity and discharge calculations d/ Bank height divided by Bankfull ❑epth measured at same section e/ Channel width measured at two times the Max. Bankfull Depth divided by the Bankfull width Velocity Calculation using Manning Equation, v = 1.486 R2/3S1/2/ n with n = 0.04 Discharge Calculation using Continuity Equation, Ct = v A STRUCTURE LEGEND f&M TOE WOOD PROTECTION STREAMBANK GRADING BOULDER TOE PROTECTION PROFILE LEGEND LEGEND DESIGN STREAM THALWEG DESIGN BANKFULL EXISTING GROUND LOG J-HOOK VANE DESIGN RIFFLE i LOG VANE LOG VANE CULVERT STREAM CROSSING 0' LOG J-HOOK VANE BOULDER) -HOOK CONSTRUCTED BOULDER RIFFLE HABITAT STRUCTURE CULVERT STREAM CROSSING OUTFALL STILLING BASM SEDIMENT COMPETENCE CALCULATION TO ASSESS BED STABILITY Stream: Ashworth Creek -Reach: Perl.111"011 Observers: Greg Jennings Date: 12/2/2022 Enter Required Information 10 D5t, Riffle bed material D50 (mm) 5 D , Bar sample D50 (mm) 0.10 D=„.,\ Largest particle from bar sample ( tt) 30 mm 304.8 mm/foot 0.0033 S Bankl'ull water sttrf'ace slope (ftlft) 1.7 d Bankfull mean depth (ft) 1.65 ,�s Submerged specific weight of sediment Select the appropriate equation and calculate critical dimensionless shear stress 2.0 D7c,ID';�r Range 3-7 Use Equation l : z* = 0.0834(D5(y1D',t))-«.s7' 3.0 DIT13N/D,n Range 1.3-3.0 Use Equation 2: z = 0.0384(D„,9,.IDs0 )-().997 0.014 T" Bankfull Dimensionless Shear Stress Equation used: ? Calculate bankfull mean depth required for entrainment of largest particle in bar sample 0.71 d Required bankfull mean depth (tt) d = z* ys D„,,,x / S Stable Aggrading Degrading - Calculate bankfull water surface slope required for entrainment of largest particle in bar sample 0.0014 S Required bank -full water surface slope (ft/ft) S = c* ys Dlna.1 d Stable Aggrading Degrading Sediment competence using dimensional shear stress 0.35 Bankfull Shear Stress T = y d S 0blft2 ) 20 Moveable particle size (min) at bank -full shear stress (Shields Diagram) 0.5 Predicted shear stress required to initiate movement of D,,,\ (mm) (Shields Diagram) 2.4 Predicted mean depth required to initiate movement ofDi13x (mtn) d = T 1 y S 0.0047 Predicted slope required to initiate movement of D(mm) S = z /7 d EROSION AND SEDIMENTATION CONTROL LEGEND goo LIMITS OF DISTURBANCE SF SILT FENCE TD TEMPORARY IN -STREAM DIVERSION STAGING AND STORAGE AREA STABILIZED CONSTRUCTION ENTRANCE CONSTRUCTION ACCESS ROUTE TEMPORARY STREAM CROSSING WORKAREA� TEMPORARY PUMP AROUND P RE -VEGETATION PLAN LEGEND ZONE 1 - STREAMBANKS 00000000 ZONE 2-RIPARIAN BUFFER U � Q m z Q 0 X z 0 m w , = o U 0 a a Q w � Z W Z O 0 LLJ 0 < 07 Z O >_ - W LU(DZ � Z z O CO O LU O J z a 00 0� 00 U 3~Z0 0� Q Q W m U Q U) 2 Z � U _ 0 Z Q O = U z z U ~ O IL Q O O� J Z = OW Q 0 2 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 0 A ESsio,� tiy' SEAL 02;r 1yIIDi I I\J DATE: 9/6/2023 M-11 CHANNEL PLUG SHEET NUMBER 1.5 r` 0 N 0 N O N a� E a a� U) m a� c a� 0 w O J a m U w J Q U co a c� w� N 0 0 Lo co N O N m a) CL cU U) c m 0 w Q U) U) U r FILL DISPOSAL AREA. 2.9 ACRES TO BE GRADED 1.1' ABOVE EXISTING GROUND SURFACE. APPROX 5,000 CU. YDS. OF FILL. 1 RAMSEY NATHAN C; RAMSEY FRANKLIN BARTLETT \ v RAMSEY NATHAN C; 9695386792 RAMSEY FRANKLIN BARTLETT 9695386792 - 77 HAMILTON WILLIA — o � \ HAMILTON SUSIE S 9695476718 i yy V� UT1 -2.10� l UT1 CULVERT CROSSING. SEE SHEET 2.12 - �� _ _ — i HAMILTON S C; — \ — — — - - � � � � � HAMIL ILLIA 5 7 7 �I S0 ��,_ \ ,�� LYNCH MYRA STEWART 9695572575 cp GodGj NCH MYRA STEWART 9695575858 LYNCH MYRA STEWART 9695576716 � LYNCH RID LYNCH P 9695 r r / r r r r r "R LYNCH RIDG LYNCH PP 96955' LYNCH NATHAN PATRICK 9695681150 r r r �' r LYNCH THOMAS P; PALERMO ROBERT ,/ 9695579970 i -SUN ltiAIAH; PERKINSON ANNIE LOUISE 9695661729 LY H REBECCA . 969 62741_ •�o ��� Vim_ � � �,�",� r Q (( THE ELFRETA MCBRAYER \ FRADY REVOCABLE TRUST 9695780115 ,�. h � LYN WILLI M M; REED BR LYNCH RINE - — - ANCH-2.8 9695563 l �BEECHTREE F NC LLC r 9695569 f' o v w, p \~ CAMERON TTY w / 9695650831 Lu �. O . Q / i n n WE O > a w Q z 0 Q 0 I— Lu LJJ LJJ U 0 Cn Q i I I I I I I I I I I I I I i i I i I i I i I i I i I i I I z z D J 00 U 0� m U 0� z0 Z)z m z J Lu J z (D z U LJJ 0 � z Qw0 z W U � U � =0 LL I..L 00 2 C!) Q 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 Quo SEAL 024A5 %� R IN DATE: 9/6/2023 SCALE (34"X22"): 1 " = 150' SCALE (17" X11 "): 1 " = 300' 0 150 300 SCALE IN FEET SHEET NUMBER 1 2.1 I Y 2265 0+00 2260 2255 2250 2245 t � i CAMERON BETTY 9695650831 i NOTES: • 580 BIO - STREAMBANK GRADING. SEE DETAIL, SHEET 4.1 • ` ° III 580 WOOD _ 584 VANE 584 RIFFLE 580 BIO �" J k0ram-r- j _ ——_. _ / �� �+ v /—-- v t �/J « y% a+ k / o� \` 8 580 BIO 2+5 REED BRANCH. v A V 00— — ,r i � f � � / / / �• k 'ram" . t -, ; • SEE SHEET 2.8 395 ROCK 580 WOOD ��%f 580 BIO ���z� % \� , � 584 J-HOOK CHANNEL PLUG j l 1 N J I � 1+nn 9+nn q+nn a+nn R+nn 6+00 2265 1.6 N �> U d O LLr) N J w co 4 d cM LLf N J W NN U-)> U d 6) LLn J W I � � L � — I -1.47% \ RA E BREAK EL STA V = 3+7 225 6.61 .864 '2.51 N aw N >>> w N ow �w u N O I N w N +> aw co N w O �'> ow �w N N 0+00 1+00 2+00 3+00 4+00 PR ASHWORTH CREEK - SCALE: HOR 1" =30'; VERT 1"= 3' o+uu 2260 2255 2250 2245 580 WOOD - TOE WOOD. SEE DETAIL, SHEET 4.1 580 STRUCTURAL - BOULDER TOE. SEE DETAIL, SHEET 4.1 584 J-HOOK - LOG J-HOOK VANE. SEE DETAIL, SHEET 4.2 584 VANE - LOG VANE. SEE DETAIL, SHEET 4.2 584 RIFFLE - CONSTRUCTED RIFFLE. SEE DETAIL, SHEET 4.2 584 BLDR RIFFLE - BOULDER RIFFLE. SEE DETAIL, SHEET 4.2 578 CULVERT - CULVERT CROSSING. SEE DETAIL, SHEET 4.3 395 ROCK - STREAM HABITAT IMPROVEMENT CHANNEL PLUG - CHANNEL PLUG. SEE DETAIL, SHEET 4.3 U Q m z Q 0 X z 0 LILJ m a m ; w w U � nWE 0 d Q Z 0 Q 0 0 w LU LU U N� 00 2 0 Z Z D J 00 U 0� m U 0� z0 Z) Z m O 0 O OZ O z�c) - � U LU J LU Z Qv0 Z_Uy N0 I..L LL 00 2 N � rvoo InI..L 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 Q , SEAL 0215 DATE: 9/6/2023 SCALE (34"X22"): 1 " = 30' SCALE (17"X11"): 1" = 60' 0 30 60 SCALE IN FEET SHEET NUMBER NOT TO SCALE 2.2 J — NOTES: 7 J� c \\ • 580 BIO - STREAMBANK GRADING. SEE DETAIL, SHEET 4.1 � c\ c �1 L N' CA T rIE - 580 B I O MAINTAIN EX. FORD CROSSING— , 584 J-HOOK 580 WOOD 584 RIFFLE 584 RIFFLE -, �580BIO' -580 BI\ _ 584 VANE 580 WOOD � / � /� n v ; ;� 0� - 580 BIO - "o - - • 7+0 < 580 WOOD - - - - 584 VANE V .a .} ' 1^* \ •� O ` / 8.'.O / �/ _ -- - - -' - \ l / / t Ifs 1 >>r -- __ . • k Q Pry �. 1 Jam, >>��-� �A i —� �%�/ \ t7 lid s>>,I�-`--_��_. ll� XQ��\ 1 ,\/ \ _/ l +v b`b�� .i . -.__• � / � � (� / � ^- � � � - 1 c ` v ) 00 r / N ! ✓ Y Y ` \ 580 BIO 5 5810 -� 1 �`- 395 ROCK s 580 WOOD 1 — _ - _ - ���i�� — ` 3 ROCK - _ _ � a' • L - _ 584 BLDR RIFFLE. - - - CAN BE REPLACED WITH;a- 1 a CONSTRUCTED RIFFLE 584 VANE — ' 9ROCK _ — PER ENGINEERS - 3 5 RO _ C K ' RECOMMENDATION. - - = CHANNEL PLUG :5 = _ _ i Y 2260 2255 2250 2245 2240 6+00 7+nn R+nn o+nn 1n+nn li+nn 12+00 �N p �o> aw CA Lo N w co cl' I- �> U aw III N N J CjN I;> a_ 00 Lo N W Lu 00 �> U ww C0 p Lo N N J 0? pN co> dw (7) co Lo cV w p 0�N c> U �w 00 m N w co cjcq N m> �w CO p Lo N w J + -0.71 -2.00 -1.50% ��o -1.50 gg°I° 4J010 ��� `69 1 �N p f0 �-: aw Lo � N > Lu w �N I` p U aw Lq p N > w w Ch �N + � pw �w 0) ti N > w _ 0)N �t Il �-: aw N p N > w w oo P- U ww ti 0 N N w w pN + � pw— CY) � CjN N - > 00 w w ww O� m N > w w 0iN It 00 U aw N 0) N > w w N 000N + 00 pw 04 OR 00 N w w CO �N N Ly m w w ww +nn 7+nn s+nn n+nn 1n+nn 1 r PR ASHWORTH CREEK - SCALE: HOR 1" =30'; VERT 1"= 3' 2260 2255 2250 2245 2240 I 580 WOOD - TOE WOOD. SEE DETAIL, SHEET 4.1 580 STRUCTURAL - BOULDER TOE. SEE DETAIL, SHEET 4.1 584 J-HOOK - LOG J-HOOK VANE. SEE DETAIL, SHEET 4.2 584 VANE - LOG VANE. SEE DETAIL, SHEET 4.2 584 RIFFLE - CONSTRUCTED RIFFLE. SEE DETAIL, SHEET 4.2 584 BLDR RIFFLE - BOULDER RIFFLE. SEE DETAIL, SHEET 4.2 578 CULVERT - CULVERT CROSSING. SEE DETAIL, SHEET 4.3 395 ROCK - STREAM HABITAT IMPROVEMENT CHANNEL PLUG - CHANNEL PLUG. SEE DETAIL, SHEET 4.3 a U Q m z Q X z o LLJ m a w w U � n n WE 0 d Q Z O Q O Cn Lu L.L i W W U L.L O �2 C) N O O + Z c0O _ Z Q ~ — � U L.L 0 Lu z Jw0 Z U U EL�O LL O '2 V i NQ I//. y n 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 Q , SEAL 02�5 DATE: 9/6/2023 SCALE (34"X22"): ill = 30' SCALE (17"X11"): 1" = 60' 0 30 60 SCALE IN FEET SHEET NUMBER NOT TO SCALE 2.3 i LYNCH WILLIAM M; LYNCH CATHERINE E Mir\- 9695563802 I I � r •11■■111•/I �/� wV■%11�•/I�Gr �I • , • • - • • i1%■/11 ­411,--m pf ■ ► rr11111.1111.11111■p■I418 If �•111•f111• ■11 •man rlff•9r.•f/p•■■vppppl•■pf•• ��� � ��•�ri411ii11i1i11i1i1 fr11•°�fii•frri•■■�i•Ifii•rrii/�■■ • - • iiliiii11iii1iiii1iii11 !frr/�r11 ■ifr ffrr ■�11 ljrr •/ • • .■ ■11 f11 /11 ■111 f ifr■ /11 .-� ffiii•■iiii•iiii• •iiiii•11r ` / `' ■I� ■ffr •/�11•Ilfiif 1ii■■iii■riNOR ��/�■��IIf��1�rr•r :1 : • I r1 f 11 r■ ■ f i f 11 I 1 /I ■ ■111 f11 f111 ■■1 pf pre • �. oI .-: ` 11 /11 /■1 fIf pr /1 111 ■■11.1111.1111--jIIIIf1r . , I/rl�falrrr�fr■I;r■•f11/f�■ /111 •f . ■IIf ■■111 ••p1 ■GII • �! pi/1I pry /Ir1 ■I■rr�1 •■rI1I1j ■■III • .%fir �IAAsk■1 p:/�r1 r/r /: ■1 I- � \ /I■ IIf /11 /I 11 ■11 /I P �A 1 11 I■ ■ . 1 11 11 � .+ � Ilppl I v II • f11 111 111 •�11 •11 ■11 f1 ■� � � � � 1 i � � �. rr pr11 111 •111 •pp ■wf 111 pI ■ ■ 1 ■ .I VS i ■ 1/ 11 1 p t ■ r1 - • � 1 11 ■ ■ •■ 11 4 fr / \ ���1��i • \ �' �� � /1 1 11 1 11 11 e. o � 1 1.� r prlfrlp•pp•prr-■■.f •f 1 � 1 • � -� � /f■/rr1���Iri��/■��r■If�Inr • -� fr r• If rr rC � � � � � � III I im �i`• �! III � • I � 1I���' � � ��J�,I�. � 1 ' • 1 ffr1■ ��i I Riii �i • • � ��� �� � .� `�i'0�� ® � Rim •1 III ;�•.� ;: f. �,��;,�� 'I�,� � � � III � ■ r .ap rp J 1•■ fr■ r1■ • r r■ /f / 4IIf •r �' �% � 1 • ■ ■ rr■ /r1� ■i rf / ar ■a1 Iff frr i ■f ►�► • y� • - /IIf ■ffr Ifr ■ffrrrl a ■e: ■'f- ffr pf Ifr �/f ifr pr ■p p • p f pc f/ 1 �fl� � �� p ■ 11 ■1 ■ffr f111 •/11.11■�rr11 •11 • � 1 �4 • � 1 1•■■11■■ If■If■■If�•fr ■f c•■��ii■�►i:/ii!p /FI�■fir■i�■ ., �.V • /I�■iii •f�i�f/i�p���1i���lii�plf�Ipf� f. �■ ■pr 9r- IC■'•■I I f■11 ■■1 p1 ��. L. fr rp ■1 ■11 p 11 pr p 11 p'■11 IIf••/fI f/1••p1•■■11 p1 /p•■■11•■f1 �� /� 1 • �► 4 • ■ ■ Iff• p ■ ■ 1 �. f IlfrppVAN ■IIf••frrff■Ifr ff I■rflp■Ip1f �,: • . _ f it ■1 ► p / ■ ; i / if p ■ rir 11 ■ Iii•■Iii•rri•rr��■11■ffrr�/■■���If���fr��/r ��� �. ' iii i�� rff ii�� ��■i �i !!�r���1►���fr���/i� i�� p fp ■p ■■r fp r1 pr •fp ■1 p p /��?��� • pr p p • ■ r • ►r ■ • I� Ir■ f1- /�11 ■■11••/r ■■1 ■/ Ifr /11 , i• I/ • 11 11 ■ 11 • ■ ■ •ffrrli'/r-■■uii•.rea•f■I•■■fi•rfrirrriiiiliiiff i � �C � .� a i■ ■ i Iff it ■ ► p ■ • ii i 11 ■1 � • - f■11•■11►p1%111���!�i�� �i■Ii� 11%�i i1%Ii%i�111 �IIIii■%11 �IIj1% ■1111.1111 11•�' • 1 . • 11111�•�Iii■111�•/I�IIji�!Iii��11��■Ili■11►�■I�����t��■11�■f1%�11�1 ■1111•Irf1■Iff■ >' ■�11��/Ir11�1�L'i111��/%�iillii�l%1���111■■/i11i��111�i/Iiii■Iri�1•�■1/1 • 111j11• �11.1111.1�rl�1/1111••fi1•IIII■■1%j■f■Iii/�Iji�i11��/I�►i■ 111 ■�11 •/11 f■11 ■IIf f1 f ■�•!� 111 111 Ifi■III��flei■■1►I••f1�•■I/i■■111•��r1 ■IIf /Ifr f/I� ■ r1•I■!�■IIf•■111••11 f■II IIII �■11 •111 f111 ■IIf ■Ifr f�r1 ■111 IIII IIII ■IIf ■/�I /IIf ■111 /I r1111111 III�I���f�i,■GI%1�!• 11 I Ir II � • I /I 11 f rff- •J 1 iiilfr�Iff�i/I■f�11rr�11111111fI1jfr•111 ■IIf 1/f 111 /11 I� 11■ ■1 1 I - 1j1111•■■111••11�•■%�■■%Iff■•1�•■1••//Iii■■111•II�f/ - • • • ■I ■ I Ilfr !� 11■ f 1 /rIfr Ir11 ■ 1■rr./ ■ ■If 11 r: /1 I� 11 • ■.■ r1j111•■■I■■Ilfr/! it Ir■■■11•IIri11■liflff�ll.�11111•■■I••/11•f/11•■■11 11 ffr ■ ■ Ir 11 11 11 11 ■11 • �11 •f11.1■11 IIII 1■f f■=a ■IIf ifr ffrl ii•• �i•r iw: ri1 rff I�r1 frrl•■■I.■■fr••■If■■ffr i■■Ifi■■rrifrll � . • ■•�Ico■rff■ irr• r11■Iffiifrriaae.■ ■Iii•f/rff ■■i IIi i� /i• ■Iff f/i IIG11f.11�ir111111111 •.IIII •■■/IIIIIIIr1� � 11111111111■■IIi■■■11•61901 1 I•f/I%i■•O%111f•■f1� �r ■ f ■ ■ • ■ If !i I ■ 11 f �- II■f111f111��f�ifl�lf�./Ir111■ffrlf11111r1 ■I�f1•rr11•■IIIIIf IlfrlrlrLf'I■■/Iiif1 11 ► 111 Irf ■11 ifr IIt� /11 ■111•IIII/■f�•1111.1111■■■11••/11fr'.If-■r• ■ -9 �■■Iff••1111111/I■ff11rf1►f!� IIf/r�r11 ■■1 11 • . • . - - i�1/11�1111�1■■1�1j/111r111r1111■■r�l���/Ilffllrrrllrlj/!�f 11/f ■Ir1 ■11 IIf 11■ r11111•■Ifri1f11rr11.1111•I/11 1j11.1111•■1 f. . • • . • . . ,•IIII ■111 f►11 •7f�i�1111■■■I•■Iff■•111•■■I•■11/■■IIr•/111f■■1_1■f11�•/111■111■■111 11•� 1� f11�f 111�■111 �/ �1111■ •■11•■�!�■f 1� If 11 ■ ■ . 11 11 I ■ 1 11 ■ irllftii1if111••■11•■111•�f11f�.:1•� 1•• 11•■•1j■■f1�• 11•f •1•■ 1i•• 11if I•I f111 _ _ _ ��f111•■■11�■ a1••/11•■■1•■111••IIIG��i11■./ IIII •/11 ■■� ■111 f111 f■� fCG111■f11I1 ■■■11■•11111eg 11■•%1111�111 p111.1� ■i • • - IIII •A■ �1111 11f •/11•f/11� IIf■ �!./ IIf/ 11. 111•�■/ •I rr11 f111•Ir �lplplff pfrl/ f111 111 IIf IIIr 111 Iff- /fg 111 If IIf 111 11 IIr ■11 IIf /ff1 /11 11 1■ I/ 11 rf� I•■ 11 11 rff- ■11 /11 f/1■ ■ ► r11 IIr ■fir /rff Iff,ii■■■ii••fri•'�1:r■.a11•r.11:■■ii■■/i1�/r1�/IIi1■�ii�•/ •friii�■1:■ffil�fri ■fir fr 11 fr■ ii �!. IIf Iff 11■ 11 ffr /r1 IIf ■11 11 r /1 11 11 /� 11 ■1 ■ r1. f ■f--ifr-►■r- r91__ ■fIf I/ 1 . . . . ;f.11:Iffrlfrr rr11 11rf ffr f-ai ■r f ffrl r■Ir ►■ffr frrl r1�1 Iff fllif 111j ` - /1■__11 ■ 11 . • • . ,/IIII /11 ■Iff•1111.1111■■■11.1/1 •rrf I.If_■ffr /111 ■!► 1 1j11■1111.1111■•flr� fi �r11ir11i l441 f*4 ii i1�1ii 1ii ■ ■■11•■ffr•■■f :■�■ ■IIr./111 ■■� ■■Ifr•frrl'a■� rlfr ffrl fir rff If fr ■ Iff •/� �1 If fry ■� r1 i • . . . ii11e■-'•ii�iii�ii �iiiiClliir�1ii11 �e-'a'oii�11�i11�i�ii�i1111i �1:11yii1�1ii�1��:�iiilli�il 1r■►_11�i i1i11i�1ii�fi��fi1� r 11f iilril�l v1i111�ii�l=ai:!■iii:/ii�1!i� a■iii:•i�111�1111i1�fii�1/iii liii•i�i/i�1111�ii1ii1fr1C1f■��I 1 ■■111 •f/11 •■■1 •■If1 ••111 •■■ 1 ••/11 •I 111 ■•/1 �11111•■■IIII 111 I•■■11••f 1•■■11•• - . Ii111C:��1 �1i1111j1111� �11�11111�11.11��1�11�1111111�1/,11■■1%11�11i/■111■•11�ff!71�■111jf11■ ■•�••fr1•�rf1 rill■■iii1f1ftir�lir�111ii1 ripi•111i • ■fr1•r1�1:■ ■IIf fr11/�■rf1• . �■�ff■ffrrf-'. /Ifr■frr/■■1/■Iff■•Irf f/rI11111r■�11i•Irf•■i■■ff11•Ir1C�■11■■/f■■frr/C:1�■ICE re �f NOW! • ff ■ If frr /� �ii•ii�1'11i1 �iifipi::li'�11i iiii:rr•�� �a1:liiiiiiiiii111i ��i111�fi1�1r11�°j::1��11�ii�i1■iiilf � ri111111j1•�ff1■fr■�/r11/rff ■ rr■ IIf • IIf f/I •III ■11 ■If f111 ■■I •f11 f/11 • . 1I 11 • 11 1I 1 11 /1 11 Ifr //1 fIf frr /�- ID •/11 rrf • /IIII■1j.1■ffrl•11r1■■If1!I■ /rri.•fi■Iffla-- oft-r�•r11111 f ■ ■i rr ■f fr 1 ff r1 • iiii!i1■liii•1ii:•1ii•iii:/iiiiiii•Ii111iiii►iiifr1111.1 lfriii•■ �iifiiifri111ji1"'►iiffili •■/•f■r1/■■If••fr1•■�Ii�■If1■�/%r��f1�1��1ffri1rr11�•�f • rail■■►ii•fi1�°t'o1�1ii11/i�1i•11ir 11�■!�1■IIII IIfr1--m �1r■■i11ff11fr1�/r■11 �11•■11fr■1fr111r1jf1ffrl�frllr■■fflfrrrfrrl ■Ifr I�rr r11 fr rr 11 ■ /iii•■ii'i•-1ii•rii►•iii• frlii•�1ii•ilir�iil■■■ ':■ii••tilt/iirr/i�!■tiff:►riff•■ii�•�ii••/ii•■ii•■■ii1!fii• Ifili�i::•■i11■i111fiii°f��1:11111f - ■ r ii111o11111i1i11i11■ii1 11iii1if�lliii•11i ii•ffiii■iiiiiiCifriii■■iilriiiiiiliiiiil■�i11/ii°iry i�ilfiill■1i1i=i1:1�ii11i �lliiiife ffrrf IIf ■ffr f■If ■Ifflffrrfrrll■■I►f■ffrrf/r11-■ff�■a. Ifrliffl�/�■11•Ifllffrl�/r■11rff111�i�i fir r•rf�■Ifr farr1111 ■■1j /11 ■1/f�Ifr■■/ep1■■I i■ • • ■ f • ■ ■ • ■ ■ • frrf/r1 /rlffl/fr1■ 11■i:�/Ifr/I /■If I ij■■111■1111111�11j11�1i1L■,f11i�r�11�•1111f11�rr�11•IIII.11111r11•�■�IIf11•Il��rf�111ff11•1r�ffiCa■�1/1■IIr ■���r■�_,>�41■i��INo a Y 12+00 2255 2250 2245 2240 2235 1 i+oo 14+nn 1 15+UU -14+UU "15+UU PR ASHWORTH CREEK - SCALE: HOR 1" =30'; VERT 1"= 3' 1 F+nn 17+nn 18+00 2255 2250 2245 2240 2235 NOTES: • 580 BIO - STREAMBANK GRADING. SEE DETAIL, SHEET 4.1 • 580 WOOD - TOE WOOD. SEE DETAIL, SHEET 4.1 • 580 STRUCTURAL - BOULDER TOE. SEE DETAIL, SHEET 4.1 • 584 J-HOOK - LOG J-HOOK VANE. SEE DETAIL, SHEET 4.2 U Q m z Q 0 X z 0 UJ m a o ; w w U � • 584 VANE - LOG VANE. X SEE DETAIL, SHEET 4.2 m w • 584 RIFFLE - CONSTRUCTED RIFFLE. SEE DETAIL, SHEET 4.2 • 584 BLDR RIFFLE - BOULDER RIFFLE. SEE DETAIL, SHEET 4.2 • 578 CULVERT - CULVERT CROSSING. SEE DETAIL, SHEET 4.3 • 395 ROCK - STREAM HABITAT IMPROVEMENT • CHANNEL PLUG - CHANNEL PLUG. SEE DETAIL, SHEET 4.3 a w ; Q z O L.L O Lu I..L W NW 0. U N� L.L O '2 vJ zz_ OO U � W Q 05o U G O� z O Z) z m C) 00 Ir- F_ O + z 04 r O Z U co Z) 1 0 C/) LU z Jw0 z� U _ U L.L LL O r2 V ) N � rvoo am 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 ,�IIII1111IL.,,,,, Q , SEAL 02�5 DATE: 9/6/2023 SCALE (34"X22"): ill = 30' SCALE (17"X11"): 1" = 60' 0 30 60 SCALE IN FEET SHEET NUMBER NOT TO SCALE 2.4 IL rn N N O ch N 0 N CD ) 0- (1) U) m U) C 0 W 0 J a m U w U Q ry UI W a N O 0 Lo cM N O N O N N Q N m N C 0 W Q U) U �< 1, 4 I l v v v 584 VANE 580 WOOD 584 AN - - — n',.1;;'J �Y - 80 BIO �� 580 WOOD VANE ; ,9' k N, x ' x� 5 O l�) _ — 580 WOOD = — o 395 ROCK \ of - - �: 580 BIO 00 \ \\0 \ X � l t - - of 80 BI 580 BIO ` 5 O%—— 584 BLDR RIFFLE. \�\ � \ \�� 580 WOOD � \ ` \ � \ \ - CAN BE REPLACED WITH L 0 584 VANE— _ CONSTRUCTED RIFFLE PER ENGINEERS \ 1 — — — — — - RECOMMENDATION. - �� \ \\ l\ \ \ \L�= 1 i / _\ UO \ \ \ \ \ \\ 1 1� 2255 2250 2245 2240 2235 3+00 19+00 20+00 21+00 22+00 23+00 24+C 18+00 J I y+uu LU+uu L "I +uu PR ASHWORTH CREEK - SCALE: HOR 1" =30'; VERT 1"= 3' LL+UU L,S+UU 0 2255 2250 2245 2240 2235 24+00 NOTES: • 580 BIO - STREAMBANK GRADING. SEE DETAIL, SHEET 4.1 • 580 WOOD - TOE WOOD. SEE DETAIL, SHEET 4.1 • 580 STRUCTURAL - BOULDER TOE. SEE DETAIL, SHEET 4.1 • 584 J-HOOK - LOG J-HOOK VANE. SEE DETAIL, SHEET 4.2 a U a Q m z Q 0 X z 0 m W = o U • X 584 VANE -LOG VANE. SEE DETAIL, SHEET 4.2 m W • 584 RIFFLE - CONSTRUCTED RIFFLE. SEE DETAIL, SHEET 4.2 • 584 BLDR RIFFLE - BOULDER RIFFLE. SEE DETAIL, SHEET 4.2 • 578 CULVERT - CULVERT CROSSING. SEE DETAIL, SHEET 4.3 • 395 ROCK - STREAM HABITAT IMPROVEMENT CHANNEL PLUG - CHANNEL PLUG. SEE DETAIL, SHEET 4.3 o a w Q � z 0 Q 0 Cn W w LIJ U 0 �2 zz_ 00 U 0� m U 0� z0 Z)z m O CV 0 O + z 000 z Q ~ — � U w z Jw0 Z U U L.L _ �0 L.L 0 �2 V ) ry a_ 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 H C A R O c N �OF ESS� SEAL 024A 5 GINE CRY D nn iiiui DATE: 9/6/2023 SCALE (34"X22"): ill = 30' SCALE (17"X11"): 1" = 60' 0 30 60 SCALE IN FEET SHEET NUMBER NOT TO SCALE 2.5 580 WOOD foai%:i�•i%•:i�� 1�• 1�•:1�•:Ij•:1�•�1 584 VANE 04 ► 1:1• ��1::G1j/11•1:�11:� • •1 : • 0-1 Wm 11.E = • ' 580 BIO 584 RIFFLE 1�•• •1�:•1�•i11• n Y rrrr err it 2 2250 2245 2240 2235 2230 2 --------_--_ �- ��-- NOTES: _- -� - -_7i -__ - - - - - - - - - _ _ =� —_ - • 580 BIO - STREAMBANK GRADING. _� __ _- SEE DETAIL, SHEET 4.1 -�- - • 580 WOOD - TOE WOOD. } _ _ _ -- - - - - _ SEE DETAIL, SHEET 4.1 r J S • 580 STRUCTURAL - BOULDER TOE. ✓ SEE DETAIL, SHEET 4.1 580 BIO 584 J-HOOK 580 WOOD . 584 J-HOOK - LOG J-HOOK VANE. 584 VANE 395 ROCK SEE DETAIL, SHEET 4.2 580 B I O 580 WOOD 584--- 395 ROCK RIFFLE BIO � CHANNEL PLUG _-580 _ _ ---------------------------- ------ 584 VANE -LOG VANE. SEE DETAIL, SHEET 4.2 584 VANE 580 WOOD 584 RIFFLE 4�1584 RIFFLE - CONSTRUCTED RIFFLE. SEE DETAIL, SHEET 4.2 e 584 BLDR RIFFLE - BOULDER RIFFLE. p� I SEE DETAIL, SHEET 4.2 578 CULVERT - CULVERT CROSSING. SEE DETAIL, SHEET 4.3 7p NOR �1100_ ' • .1���� ��` ��� ���.`�_•��1�,��� �: � � o, � �. Gee ��������� III'i�395 ROCKIMPROVEMENT 1:�� .� ����`� ��•'•�����'s ' `j/` �j A III '' "�- �� - ��i ����:�� CHANNEL PLUG - CHANNEL PLUG. '00, 580 WOOD 580 BIO 7584 VAN11 IF •• ••i•••1 "o, CHANNELPLUG to ®��. ; i���.1�,�1�/ a - � �Ii��1i:�11i�11i��1i��1i��1����•.� 1 _ WIXA J UT1 TO ASHWORTH CREEK. SEE SHEET 2.10 HAMILTON WILLIAM G; HAMILTON SUSIE S C 9695476718 Iuu 15+UU 1b 11 +UU 2(1uu 2b+Iuu 1y+UU M 1 L Lo + N U aw N CO co N N w J N + H 0-w � <rj N N Lo N + N M lvj N N w J M � + co H aw N O frj N N w J I� 000 + N U aw m 00 N N N W J Lq � + Nw aw d� Qp N N N J M 0) + N U aw O Lf) N N N w J Lo + N aw O M N N N w J M = + N U aw M N N N w J �O 00 + NN aw CO Lf) r- N N w J w J U aw -0.68% I � 70/. �/ r -0.60% -o.72% / rOolo 6� 7 + N> U �w (D 00 CD N w J pp N ow �w c0 CDN 't N w J N� + L0 N> U rZw Lo CD N w J CO 00 (` O O fV> U rZw N O O N w J (p O� ti N pw �w u') M N > J p + I� N> � aw ffl O a) co N w J M� + � N> U dw M c0 M N w J N �� N °0 pw �w O N N > J r� LnN + 00 N> aw c0 N w J M0') O �j + O CV U aw N N co N > L. J ti cl? (o (') + 0) CIA ow �w N N > J M p0N + O N> aw 0 °0 o) co00 N w J M 0 M p N + Lf> > N> J � aw °0 0) L N pw �w O M N > J M } co N> �_: dw N O "t N w J LtC4 i+nn 9.c;+nn +nn 97+nn 9R+nn 9a+nn m+r PR ASHWORTH CREEK - SCALE: HOR 1" =30'; VERT 1"= 3' ❑1 2250 2245 2240 2235 2230 0 U Q m z Q 0 X Z m w O a = o U X i 0o 0 w 0 d Q af z z OO U m U o� ZO Z) Z m O M O I— 0 Z ONO Z Q U w J W Z QUO Z U E _ 1_ O Ld_ LL O Q ry a_ 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 ,�11111111IL.,,,,, Quo SEAL 0215 GINS` DATE: 9/6/2023 SCALE (34"X22"): ill = 30' SCALE (17"X11"): 1" = 60' 0 30 60 SCALE IN FEET SHEET NUMBER NOT TO SCALE 2.6 MEN■SOEM■S.ESN.► a ME a on am a mommommomi so no ■■■■■■■■MEN OEM ■■■ ■mulummommi ■■■■■■■■■■■■■■■ ■■■ n.■■■■■■■■■ ........... ....■■■■■■■■■■EE.NEM.E■E .....::.. ........... ................MEMO... :ENSSE.N■ ........... ....l==iSMES■MENFE00 E■■SEE ..SS■SSEso 0 SMSSES■ as an" OF ;!EiE.e7ir� ■ -NirEENlE7i ..MEMO.■:.. ...................■...... 584 J-HOOK ..... ......... SN.SES■S .M.ES .SSE.■SEES■SSE■N.SSSNSMESESN • ........ ............................. . .....■...E.■..................................... .....4 RIFFLE Mae :::::::::::::::::::::::::::::::::::::::::: ................................................ ........:............................................ ............................................... ....580 BIO ...■...................................... ■■■■ ■■■NEE■■. ■EE■■EEE■■EME■■.M■EEEN■■■■■■■ ■SEE ■..E.■E.E■ .EEE.NEMEEE.■EEE.■E.EEN.EEEN .... .OSM.S■SN.E•l ....■..................... 584 J-HOOK MEEMMEME EMEMEMMENE wommangiiiiii ■r-- MEMMEMMEMEM ■NEE■MEMO■OEMNEE■■■EEEN■■ ■.Ei .....................■. ism .. ...............■....MEMO... ...SEMEN ..............■... • ::::::::::::::ii:::::00 ow .MSS■S■SMESNSSS ■EEEE.EM S.NSN.S■ :::SEEN. EE _ .. • • • -- i —z � \ /_— i v>,l UT2 TO ASHWORTH CREEK. / 1 \ \ SEE SHEET 2.11 580 STRUCTURAL. CAN BE \\� REPLACED WITH 580 WOOD PER a'j o _ \ ENGINEERS RECOMMENDATION. CHANNEL PLUG �s J i /i(J0 �;. 00Q o\v-o�\/i/ �� ► �v� �L�AV/L / lj 1 �i �= p1 - i�� � G��\� vA � \ , -T � , � i � � _ i /� �/� fear TIE OUT TO EX. i .i \ Div`• ` / / / i � \\��\ \ � \ �/ � — \ / / / d // — � \ =- *- -K;z_ /\ \ \\\ — _ 580 WOOD /�\� �L� ,��� _ _ = — _ 3�k l �J — — s \ 584 RIFFLE _�— _ � � v NOTES: • 580 BIO - STREAMBANK GRADING. SEE DETAIL, SHEET 4.1 • 580 WOOD - TOE WOOD. SEE DETAIL, SHEET 4.1 • 580 STRUCTURAL - BOULDER TOE. SEE DETAIL, SHEET 4.1 • 584 J-HOOK - LOG J-HOOK VANE. SEE DETAIL, SHEET 4.2 U Q m z Q X z O UJ m a w w U � • X 584 VANE -LOG VANE. SEE DETAIL, SHEET 4.2 m w • 584 RIFFLE - CONSTRUCTED RIFFLE. SEE DETAIL, SHEET 4.2 • 584 BLDR RIFFLE - BOULDER RIFFLE. SEE DETAIL, SHEET 4.2 • 578 CULVERT - CULVERT CROSSING. SEE DETAIL, SHEET 4.3 • 395 ROCK - STREAM HABITAT IMPROVEMENT "� \ _ / — — CHANNEL PLUG -CHANNEL PLUG. • i ,���,ti'� - -____ �� rji�� �fi �O/� �j �/-7 _-_�� SEE DETAIL SHEET4.3 .I on I ......................E ...� .......................■.. ............ on............ MENEEMEMEM ............................ on.NEE.■ . MMISS SSME.ESN.SES■SEES■S. HiMMUffiffi 0000 ummommNINUM sommusmi,N:"lm,nmm Cox on _ .S■SMSSES■M.ESN.SES■SEES■SOEM no ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ on MmIII ..■■■ME.NEN.EOS■E......OE■S.EEN.ME. .................................. IL a) n Y 3 2250 2245 2240 2235 2230 3 CHANNEL PLUG > 580 BIO 580 BIO 584 RIFFLE �� \�l\1�7� CHANNEL PLUG— _� LOpl/ co ram/ J+UU 31 +UU 31+UU 33+UU 34+UU JS+UU Jb N + cM> aw N N N w a?O N + OM> aw W N 7 O + cM> Q_w L O It N COO n + M> aw � j CO N -0.79% -1.36% r -1.60 oho -1.42 (q I� N + M> d 00-- N N co CDLf) M LO N + N O .. CO w p w co-- 00 M N N w w O C'j + OM> d O N W cM N N w w I O — + <)> dI CO M N N W w co O + M> p u') O CO N N w w O nj — + M> a_ I- cM N N W w L ll 1+nn i1 +nn '19+nn i'i+nn '14+nn 'i.r;+nn +F PR ASHWORTH CREEK - SCALE: HOR 1" =30'; VERT 1"= 3' 0 2250 2245 2240 2235 2230 x a w ; Q Z 0 0 C� W LJJ L1J U 0 2 Cn Q Z z_ D J OO U m U 0� z0 Z)z m O �l J M 0 I— O O Z 0�0 Z Q U 0 LJJ (1) J W z Q 0 Z U E _ �0 L.L 0 Q ry a_ 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 DATE: 9/6/2023 SCALE (34"X22"): ill = 30' SCALE (17"X11"): 1" = 60' 0 30 60 SCALE IN FEET SHEET NUMBER NOT TO SCALE 2.7 O N 0 ui M N O N w (D a) ;z U) co 0 w 0 J a m U uj a U U) Q w a N N O O LO M N O N O a� E am a am U) ca cn a� c m w a U) U C� 2 U Z om 0 w w U) ( NOTES: a a \ \ �\ \—� 1S�Jf (i ems\ \ 1 � J J • 580 BIO - STREAMBANK GRADING. v Q m _ —�4i �JrJr� 80� �� 1 �� -tom SEE DETAIL, SHEET 4.1 fr ` \ _ J� 3Xp�z` \,- -�- 1 J� \ f` • 580 WOOD - TOE WOOD. SEE DETAIL, SHEET 4.1 o ` I / ' / \��� �= ~ • 580 STRUCTURAL - BOULDER TOE. m 0 \� _ = SEE DETAIL SHEET 4.1LLJ a _ ASHWORTH CREEK. CO w SEE SHEET 2.2 � - • 584 J-HOOK - LOG J-HOOK VANE. SEE DETAIL, SHEET 4.2 w � � X 1 \ \ - j / S / / -- ` �`� `� v \ • 584 VANE - LOG VANE. _ o - 580 BIO \ SEE DETAIL, SHEET 4.2 co Lu REED BRANCH l `�� / 1 \ - • 584 RIFFLE - CONSTRUCTED RIFFLE. 0 > O, \ ��,� ��� ��� �� SEE DETAIL, SHEET 4.2 CL Q J �� 1 '� — > v' _ / pp ==r �� -- �\` \ ` t • 584 BLDR RIFFLE - BOULDER RIFFLE. c-\ \ SEE DETAIL, SHEET 4.2 / �� / ��- ��� /� << ���/ ` I ' 1 _ - ((1 V� \ �\\� • 578 CULVERT - CULVERT CROSSING. SEE DETAIL, SHEET 4.3 kjf 580 BIO �— �� 7+ _ _ oo • - 395 ROCK STREAM HABITAT IMPROVEMENT 0LO + —_ _ N ,6+00 CHANNEL PLUG = v — v� - = �� y v • CHANNEL PLUG - CHANNEL PLUG. Q O > _ - \ \�� SEE DETAIL, SHEET 4.3 z / TIE OUT TO ASHWORTH CREEK v / ����� la W Z U �� _ � 00 O O ) Q W Q 0� U) W Q U \ — — _ — — — — / ' v O W 00 LL — THE ELFRETA MCBRAYER / _ _ _ _ _ _ / FRADY REVOCABLE TRUST — — — — — \ = W W — 9695780115 — — _ \ (n Q 0+00 1+00 2+00 3+00 2265 2265 Environmental'Jennings 2260 2260 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 2255 2255 CARO -0.38 /o Q ky < SEAL = 025 GRADE BRE AX S A = +62.39 2250 ELE = 2 52.236 2250 ,, � ciNE �.,� ORY GRADE BREAK S A = +50 98J ELE = 251. 01 �������niDiin DATE: 9/6/2023 SCALE (34"X22"): ill = 30' 0+00 SCALE (17"X11 "): 1" = 60' 1 +00 2+00 3+00 REED BRANCH - SCALE: HOR 1" =30'; VERT 1"= 3' 0 30 60 SCALE IN FEET SHEET NUMBER NOT TO 2.8 SCALE O 0 co O LIi n N O N co 0 N U) M CA W O J a m U ul J U r�rn VI W C� G M O O Ln (M N O N co a) E a) a a) U) a3 a) c a� 0 w Q U) U C� 0 D U) NOTES: a_ ; HAMILTON SUSIE C; • 580 BIO - STREAMBANK GRADING. Q m HAMILTON WILLIAM G , __/ II 1 `' `� ^;> c `! SEE DETAIL SHEET 4.1 9695472179 n I I A v- — / /� / / / �� �♦two t <1 vi♦,1�>�. ; l • 580 WOOD - TOE WOOD. /I �� t ' �' SEE DETAIL SHEET 4.1 \ a t 7 60t, i-% 580 STRUCTURAL - BOULDER TOE. o SEE DETAIL SHEET 4.1LLJ 0 VANE. •�::.. T -'".` � �-',..,'„- _� -� SEEJDEOTAOIL SHEET ET 400K \ 1 t t ♦ � � /' ♦ r 584 VANE - LOG VANE. X f580 � BIO ` SEE DETAIL, SHEET 4.2 m 584 RIFFLE %� - �� �. �, tt y `� �,.��,, ?- o 584 VANE Xo�� -- '°.'♦.'� 0 �—v� �. -_:/� • 584 RIFFLE -CONSTRUCTED RIFFLE. r 584 VANE 584 RIFFLE t �� '`�: t`�' �� SEE DETAIL, SHEET 4.2 � ' ���---.,--__ -- _ _r_-_ Q i � ` -- —n l \ = < — --� �` \ — \ J ' -V L \// \// r / .- '`" ` ,-_'ter fiI/ /„ 1. % , - s `- �_ / ' o v J Y 7 r� Gj- A 7♦ , • - DER RIFFLE. SEE DETAIL, SHEET 64.2L t _ — - } 0p_// \ J\- r / \ — — pp r / / � -L 4 ♦ __ > _--__._-.- _ - --b - _7�''da 4 �. _ _ ._ / ti-- i2♦ Ren i� --- f- -r----i S; 1- - i' l ki- ( 4 J-••. / 1 a, ) Jz�` �_ -_ tr I A w y -�1 > !! ♦ ? l !i� _ ~6+ ��- `3 T — J� 1 " % Y. Y _ �.far, -' � ?' it � CD \ � \ - / \ N ^ -- J -J '` \ � / — � � _ . . _ �, ` i - v T' , C a-,- -,� ♦p.I� �. ♦ n i V \ J ) aY /O 'i` , r . ♦ l.J . ♦ ' - h7%f C :V d.- J kL- I , , l Cd:y 11•-.-' ` % i,� a p> .. 'i � �.f' � � C 1 l � _tea w _a Cam'; -►y -� >> _ �,♦gt�Q, Z� t - .r.=---- e- . 1.3 • / j > lr y i - / I . '- � \f , V /-<./ '__ p 0� /, r — ' - \ / \ <R �- _._ g o-,�� 1� al _�. . �> c: ��-� _ _- — — y>'.y ;_; - ��; .-_ �� �-.�= S-yL-y , ; - :..� , , ,, ,/ ,`v�-_ — ✓' —- L�� _-_ 1/r � r - J - i '> 10 T-__-k`-i.1 7 .1e N/...af _ ,.. -::1 - I �7I , i , _ I i -_ -� r_.".. • - CROSSING. 578 CULVERT CULVERT -\ \ ✓- "` � � . ,w i ! 7 % / / -.r to ' � , x / / 1 SEE DETAIL SHEET 4.3 ti �'' _ � /- I I ,< _ , L , _ l T - >f r - 578 CULVERT. 4.5 DIAMETER. -� -'--� _ -_---__77 ---� -- -_- - _- - ' ---- -` _ �� 1___ �__ _�.____t- `- -- , - - -- - ----- ____ --_--_--- 395 ROCK - STREAM HABITAT IMPROVEMENT SEE SHEET 2.12 584 RIFFLE _ ,' � - _- � C) p 395 ROCK � / • CHANNEL PLUG -CHANNEL PLUG. < + INV. IN ELEV = 2251.336' - 395 ROCK 395 ROCK / � I SEE DETAIL, SHEET 4.3 Z - - 584 RIFFLE 584 RIFFLE 580 BIO �' �� -- �� 0 Q 1 INV. OUT ELEV = 2251.036 584 VANE __--_--_-.-- r� -----=--------------------= — w J U U LL] LLJ Q ' U Z) z 0 � LL I..L 0+00 1+00 2+00 3+00 4+00 2260 2260 GRADE RE K STA = 1 +10. 9 M "' N �`� O N C° C°"' � �`n N �`O w O °Q`O ao (q O � O `n`n LO `- O �� co a) O � O 'IT N N O I� M LEV= 2 57.1 2 `n f�N UjN INN (pN InN _N `o f�N LoN ON NN InN pN ulN + tiN + O)N + NN + IN + ON + f__N + ON + ON + �N + u')N + `V)> 00N + RA EB EAKSTA-0+ - 8.67 w �> w �> W —> N> W Ni N>—N> w w w N> M> w w M> HJ w UJ w M> w HJ ELEV - - 225 .232 UJ aw HJ 0-w UJ ww F-J aw UJ aw HJ aw UJ ww �J aw UJ aw i aW aW aw 2255 2255 'Jennings 1 Environmental RA E B EA STA = 0+ 6.27 1 ELEV = 225 .022 7 SAMUEL ASHE DRIVE -300� -300% ASHEVILLE, NC 28805 2250 '3 0, 2250 -1.58% v 3, 2� a ° GRADE BREAK S A= 1 +22. 3 I '3 68% ° LE =252.07 -34 / ° GRADE BREAK S A= 1+33. 9 LE =250.53 tt\�NICAIR�Iii GRADE BREAK STA 1+ 4.66 2245 EL V = 225 .696 2245 N SEAL � 02�5 IN ttt . c�RY/ I IDI I � IIJ`\ M N M o � (D 00 c 2240 2240 M M N � � CO o � N , O M "t O 0 O �; "t ao O o6 - O O � O 0, In N N N N N N N N N N N 0, N N N N N N � N N N DATE: 9/6/2023 N -i > > w w > > w w > N w > > w N > > > > J W _I W J W > J W w J > w W W SCALE (34"X22"): 1 " = 30' J W J W J LLI J W w . w J W w w W J W W w W O � M a0 W O W N I� SCALE �� �� ill _ (17 X11 ): 1 60 Co + O f� O + O N O + O ti ti co + O O O O N + N u O ti O + co + + + N + N + N N + N + N N + N + co M + + CM M + co 30 60 M 1 +00 PR UT1 TO ASHWORTH 2+00 CR - SCALE: HOR 1" =30'; VERT 1"= 3' 3+00 SCALE IN FEET 0+00 4+00 SHEET NUMBER NOT TO 2.9 SCALE d I jai♦i♦i♦i♦i♦i♦iai♦iai♦i♦iai♦i♦i ♦°�♦i♦iai♦oai♦i♦i0♦i♦iai♦iai♦�♦ai♦iai♦i� I I►. '01, f" %s I Lill -'••���-♦-♦•nisi♦iaiai♦i♦i�i�����%%%%%%i%%%%%%%i�NoMw ♦♦♦♦♦♦�♦aaa♦♦♦♦iiiiiiii ♦iai♦i♦i♦iai0♦i♦i♦i♦ia♦i♦i♦i♦iai♦i♦i0♦♦♦♦♦♦♦♦�♦�♦� '' ' 00♦ ♦a♦♦♦♦♦♦O♦i♦i♦i'�iiiiiiiiiiiii� •••���•I�� �♦�♦iai♦iai♦iai♦i♦iai`�♦�♦♦iai♦i♦i♦iai♦ia♦♦�' i♦iai♦i♦♦♦♦ ♦♦ai♦i♦i♦iai♦i♦iai♦iai♦i♦iai ♦♦♦♦♦♦♦♦ NOTES: �\ `� �\ \\�� \ �� `��\\\�\l�\ • 580 BIO - STREAMBANK GRADING. SEE DETAIL, SHEET 4.1 T \ \ \ \\ \ - `\ o \� \ \\ \� \ \�o \�\ �\ \- • 580 WOOD TOE WOOD. SEE DETAIL, SHEET 4.1 \� �� \\\\\\ ` \�\\\�\\\� \ • 580 STRUCTURAL - BOULDER TOE. 0�\\1_1\X SEE DETAIL, SHEET 4.1 �vvvvV` • 584 J-HOOK - LOG J-HOOK VANE. \\ 2j* \ \ \\\ \ \ \\\\�� SEE DETAIL, SHEET 4.2 X"\ 584 VANE LOG VANE. SEE DETAIL, SHEET 4.2 N, \ \ TIE OUT TO ,� \\� \ \\� �� • 584 RIFFLE - CONSTRUCTED RIFFLE. 584 VANE \ 395 ROCK �\ \ \\� \�\ �� SEE DETAIL, SHEET 4.2 \\� \ ASHWORTH CREEK \\\ \ \ \ �� ��+� I �\ vv� �v • 584 BLDR RIFFLE - BOULDER RIFFLE. Op - \ ASHWORTH CREEK. \\ \ \ SEE DETAIL, SHEET 4.2 SEE SHEET 2.6 J �\ \ ► \ �'\\\\ \\ \ • 578 CULVERT - CULVERT CROSSING. •♦aa000♦iai♦iai♦iai♦i♦i♦i♦♦♦♦♦a♦♦♦a♦♦ ,z5.r�'SEE DETAIL, SHEET 4.3 ►a♦♦as♦a♦aa♦♦♦♦a♦♦♦ai♦i♦i♦iai♦i♦i♦i♦i _- _ ►�< 0 395 ROCK - STREAM HABITAT IMPROVEMENT i♦iaip♦i♦iai♦ia�a�a�a�a�a�a. + : . _ ,•►�� • gNO 584 RIF LE 395 ROCmil-. J• _�� > ` ���>�• �� �> ► ►CHANNEL _LUG PLUG. CHANNEL i ��;1�,7!9 � � 1 - -�i.I . � � _ _ �► i%s`7,�`c�.����YYY-,-" � ay�.� �-•7,� � � � 395 ROCK pf I r I,�y► -1- -_ - _ vf:�a584 RIFFLE 580 BIO _�- y�a� �- -- 5 584 VANE �/ O .i •- r : , ----, ---r- I - 39 ROCK _ ? " w �.q--_ »--- ' ♦♦♦♦♦ai♦i♦i♦iai♦iai♦i`b♦� s r 584 VANE < l 4+00 2255 O t U a 2250 - 2245 - 2240 - 2235 -N > w J w U a 4+00 5+00 6+00 7+00 PR UT1 TO ASHWORTH CR - SCALE: HOR 1" =30'; VERT 1 "= 3' 5+,00 1 3 HAMILTON WILLIAM G; \ \ �, HAMILTON SUSIE S C 6+90 7+90 8+00 2255 00 14� I__ O Ln r_� 1,- 00 r*- (0 (D N co O (•M Lfl Lo N 6 Ct Lo I N � (M Lf, d (O 00 I` d � ti T O't co co co � ti't co V) co 1 L17 � d? d d 4 � N" M M— It N— N N N N N M N M N N I` �t N N ti N O N O N N dj p N (n N N N (y N N't N LO N M N N N N 00 N N O ('1O n- N N L() M N f� CN N N O N O N+ N O N + > � > + 't > + � + > � > + Ln + > Lo -+ > m + 5 Lr) + > Ln t > Lo > + CO + i (1) > + (D + O + > C4 i 0 > I- W J w J U W J W J U W J W J U w J � w J U W J W J U w J— u•• U W J W. J U J �- w' J U W J W J w aw aw aw-aw aw aw-aw-aw (Lwow auaw aw-aw—awaw aw I 4 p�/ 29'a IrO�golo 4 0 ft ,3 3% -0.29% -0.62% v O N (O O � 00 r M f� O C> N 000 -O 00 ti N It N CO L(j O O ? U) O O co M 00 N O 't O 00 O 00 � N � � O "t N O � O 't LC) Ln t � -4 Ln � L6 � It N r- N M Ln N N 't N It N N � � N I N N N N N C,4 N N N NI N N N N N N N N N N N N N N N N M N N N N N N N N N N N N N N N w > > w > > N > > > N > > > w N N > W > N N w > > w > > w > > J W W J W W w W ul w W W J � Lu J W > J W ul J W Lu J W w W J W J w W J W J w J J W J w J J W J w W W J w W J W W w J W J W w J W J w W W W (O O N 00 W O O(o w ti OR (j J W O Nj O J w N N Lo O L~ � O + M (M ti O + Iz O O O + O O O N CO + N � CO + M ti N 00 O + r O O N + Lo M I'- � Lo + (O O I- 00 + O N t t t t Ln + Ln t Lfl + Lf) t Ln + Ln + �% U) + CO t (fl (O + CO + (o (O + CO + (O co - + + t` H U H U H U H U� U� C. o � U o� U H -� a a a a a a a s 2 a a s 2 a w - 2250 - 2245 - 2240 - 2235 U Q m Z Q 0 X Z m LU 0 a w 2 w 0 U X 0o 0 w ° a Q > L0 ti z O O ~ O Q �z �O z �J z � z (� w D O U � � � U � LLJ w w U OUP z0U z0 -3� Z)z =O O oo Q LL O Q D N ry 0- 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 Fv_s o���'yy'' Quo SEAL 071- %� R GINS` DATE: 9/6/2023 SCALE (34"X22"): ill = 30' SCALE (17"X11"): 1" = 60' 0 30 60 SCALE IN FEET SHEET NUMBER NOT TO SCALE 2.10 M 0 LO cM N O N (.0 a N U) co 0 w 0 J a m U w J U W O 0 u) (M N O N CO N E a) a 0) U) co cn 0) c a� 0 w Q U) U C� 0 N H U) \ \ -4 1 11� NOTES: a � a ; °I 1111)\\1 • 580 BIO - STREAMBANK GRADING. SEE DETAIL, SHEET 4.1 C Q m v, ,,� , V � `� III �+ �, ,, �,�,v , / I ,v I II,� �1,,�1a ��� Ill / z ICI Po I �` J c `� `�� ���� v I I I l/ (II��'S • 580 WOOD - TOE WOOD. SEE DETAIL, SHEET 4.1 x x ����` �"��1� /�ll�11 l\11 / (I -j /� 1.ti-- z , / /// // I I �/� / l i l I /� • 580 STRUCTURAL - BOULDER TOE. o / �1 Imo\ SEE DETAIL, SHEET 4.1 o w a � , III I� ,/ �� ,� �1 ��� �, _�I I I ���'/� J �� r�i��� ��� l / I ��l I �l 584 J-HOOK - LOG J-HOOK VANE. w w \I 1\11f /Ill I ` = o / ��/ l i l l I) SEE DETAIL, SHEET 4.2 580 WOOD �_ I CHANNEL PLUG �// - / / I _ _ / f �/� /� \ I // �i�/,' 584 _- _ -�- VANE `� � - - / s << ��-:� =58 BIO 584 VANE LOG VANE. SEE DETAIL, SHEET4.2 m -==�,�i — —= �— `- ` ii/ / 584 RIFFLE \ .��,� -ti ._ �1111` /�� i 584 RIFFLE - CONSTRUCTED RIFFLE. _ /�I \ ,�y/-I�I�I/ �/ I //%�"--580 BIO I',- TIE OUT TO �� �� `� \ SEE DETAIL, SHEET 4.2 0- Q w , 584 RIFFLE f ASHWORTH CREEK 0�\� �\\ � 584 BLDR RIFFLE -BOULDER RIFFLE. ,-_ /r�IlV II// / / % := 1/�/III II 1 Vil/ll//I - �/ �� ASHWORTH CREEK. SEE DETAIL, SHEET 4.2 —� �, 1�4 ,✓�,III 2+00 _ SEE SHEET 2.7 � ,� 3�yk �!^ ;y �, l o� \� \ • 578 CULVERT -CULVERT CROSSING. M + N I� 584 RIFFLE SEE DETAIL, SHEET 4.3 M o= z ��II /� 580 BIO 395 ROCK - STREAM HABITAT IMPROVEMENT //111I / 1 L� Ill I I � � p ti> /� /fI�(I I 11 I Il I , �� v o • CHANNEL PLUG - CHANNEL PLUG. SEE DETAIL, SHEET 4.3 Q + z 1 �� Q 11 l l ; 584 VANE IIlII/1 / �l 395 ROCK - �I \ l �v\� I , i %� / / �� ) � \� � \ � � i I � 1 � � � \� \ � \\��l \� Q z Z (� Z � O � 580 WOODo /' LU J U U Q W LJJ W l� / _l i N 1 Icy \� \ / // / / / �// \ \ 2 = J � z 17 A �oA O U i�(l /iil1 U z O z /� � LL � � /V /,/ / /I I //„� cNI I..L 0+00 1+00 2+00 3+00 3+50 2255 2255 N 6? CD O f-- O Lq co N N> N MN N LON N �N aw W 0-w W aw W N aw W 2250 2250 'Jennings Environmental 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 2245 2245 — EX. 6' X 6' BOX CULVERT. INVERT ELEVATIONS ARE APPROXIMATE YO 2240 2240 OFESS/p �i'y i A -BREAK TA 1+7 .06 '2.34 j -2' -€L = 2239.931 -1.36% SEAL GRADE BREAK STA = 1 + 2.86 I = 025 REAK STA = 3+14.09 238.196 '%,��i�oRY�INE,�����'. E EV = 223 .857 J I GRADE ELE = D. � 00 0 M f C\! (h M M O O 2235 2235 GRADE BREAK TA 1+9 .15 EL V = 2237 828 Co N N N co N CN N N N M N DATE: 9/6/2023 RA E BREAK TA 2+0 .53 EL V = 2239.618 w J w w -j W SCALE (34"X22"): 1 " - - 30' w N W w w w o w SCALE (17"X11"): 1" = 60' O N N+ N co N N co N O N 0 30 60 a 0 a a � a 2+00 3+00 3+50 SCALE IN FEET p+pp 1 +pp PR UT2 TO ASHWORK CR - SCALE: HOR 1" =301; VERT 1"= 3' SHEET NUMBER NOT TO 2.11 SCALE m H U w J U w a M O O C6 (M N O N co N E a) a N U) co y N c N W Q cn U) U U 0 �I U) NOTES: a ; • 580 BIO - STREAMBANK GRADING. C Q m SEE DETAIL, SHEET 4.1 • 580 WOOD -TOE WOOD. SEE DETAIL SHEET 4.1 • 580 STRUCTURAL - BOULDER TOE. 0 SEE DETAIL SHEET 4.1LLJ a • 584 J-HOOK - LOG J-HOOK VANE. z o SEE DETAIL, SHEET 4.2 OUTFALL STILLING / '�\ �� c �% _ _ — — _ 584 VANE - LOG VANE. X r�� / BASIN -�r� F _--� / �� �� �� ,— SEE DETAIL, SHEET 4.2 m C) — l — --, — zx 0+pp — J �, ,�/ JrLu i — i i �' • 584 RIFFLE - CONSTRUCTED RIFFLE. k�6 _ _,_- SEE DETAIL, SHEET 4.2 Q 1 � �— _ _ 584 BLDR RIFFLE - BOULDER RIFFLE. — J�o� / , � �( — _ _ _ — SEE DETAIL, SHEET 4.2 /��� l / /� J _ , — — _ — _ / — — _ • 578 CULVERT - CULVERT CROSSING. TYP. 12' WIDTH //� % / — _ _ . — —' / �' _ _ _ SEE DETAIL, SHEET 4.3 Z \ / ( CULVERT CROSSING. SEE SHEET r 2.9 AND DETAIL SHEET 4.3 395 ROCK - STREAM HABITAT IMPROVEMENT UT1 SEE TO ASHWORTH CREEK. SHEET 2.9 _ _ _ — — • CHANNEL PLUG - CHANNEL PLUG. Q (� SEE DETAIL SHEET 4.3 Z _ z zLu Q Lu 00 U (� LLJ > Z >/ IZ LL - O LL_ O ch M t O I I Q M O Y0 Lq Q I` + — W �N in N II Q W II Qw C0� YIq W LW7 LO a'N Jennings 0+00 � + 1+00 oN 2260 w62260 a Environmental a� J U' w— 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 2255 2255 4.5' CORRUGATED PE CULVERT. SEE SHEET 2.9 o���yq'-% ,.��°��`�oFEss Q , SEAL 2250 2250 025 12" OF RIFFLE MATERIAL INSTALL BEDDING PER MANUFACTURERS SPECIFICATIONS DATE: 9/6/2023 0+00 1 +00 1 +26 SCALE (34"X22"): ill = 30' PR UT1 CROSSING - SCALE: HOR 1" =30'; VERT 1'= 3' SCALE (17"X11"): 1" = 60' 0 30 60 SCALE IN FEET SHEET NUMBER NOT TO 2.12 SCALE a M M O Lo M N O N O L a) E a) m (3 cn a) c m 0 Lu O J a m U LLI J Q U Q I Lu 75 a N O O Lo co N O N CO a� a) a) U) c6 cn a) c 0 Lu Q ry 2 U I FLOODPLAIN WIDTH VARIES PER PLAN TIE TO EXISTING W BKF PER GRADING PLAN / PROPOSED EROSION I i/ FLOODPLAIN TYP. CONTROL MATTING INNER ( 20.1) _ SEE DETAIL, SHEET 4.1 DMAX BERM FLOODPLAIN (TYP. 20:1) / - / BKF WSE I 01 WIB ----- - - - - - - - IB WSE / RIFFLE CROSS-SECTION SUMMARY PROPOSED GRADE DMAX-IB MAX DEPTH AT CENTER OF RIFFLE CROSS-SECTION PROPOSED CENTERLINE ALIGNMENT TYPICAL ASHWORTH CREEK RIFFLE CROSS-SECTION PARAMETER PARAMETER ABKF (FT2) 48.8 AIB (FT2) 15.4 WBKF (FT) 29.6 WIB (FT) 13.8 DBKF (FT) 1.7 DIB (FT) 1.1 DMAX (FT) 2.8 DMAX-IB (FT) 1.5 W/D 17.9 WIB/DIB 1.4 DMAX/DBKF 1•7 DMAX-IB/DIB 1.3 So (FT/FT) .006 AIB/ABKF .32 NOT TO SCALE TYPICAL CROSS-SECTION NOTES 1. CONSTRUCT CROSS -SECTIONS TO THE LINES, ELEVATIONS AND GRADES SHOWN ON THE PLAN, PROFILE, AND DETAILS. 2. INSTALL STREAM RESTORATION STRUCTURES IN PROPOSED CHANNEL TO THE ELEVATIONS AND GRADES SHOWN ON THE PLAN, PROFILE AND DETAILS. RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN -STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. 3. INSTALL EROSION CONTROL MATTING ON ALL GRADED OR DISTURBED STREAMBANKS. OR It 24 I I I I I I I I I I I I i FLOODPLAIN WIDTH VARIES PER PLAN tij I TIE TO EXISTING z WPOOL PER GRADING PLAN 0 / I PROPOSED EROSION / _ CONTROL MATTING (TYP. 20:1) FLOODPLAIN (TYP• 20'1) / FLOODPLAIN SEE DETAIL, SHEET 4.1 Q / • �/ / / / // BKF WSE _ - / 0� � Z 0 Q (� POINT BAR ' I POOL CROSS-SECTION SUMMARY U) Z z � 2 40 � DMPOOL PARAMETER ui J z U AAPOOL 84.2 0 0 U 2.8' 3.2' / WPOOL 35.5 Q Lu 16.4' DPOOL 2.4 LLJ m U U) DMPOOL 5.2 ^/ J z / ApOOL/ABKF 1.72 �„j�r< 0 4.1' (, WPOOL/WBKF 1.20 v 0 < �J DMPOOL/DBKF 3.15 = U z_ U � PROPOSED CENTER LINE ALIGNMENT z0 m z LL >_ — 0 TYPICAL ASHWORTH CREEK POOL CROSS-SECTION NOT TO SCALE 0 FLOODPLAIN WIDTH VARIES PER PLAN PROPOSED 700 GRAM COIR EROSION CONTROL MATTING TIE TO EXISTING SEE DETAIL, SHEET 4.1 WBKF PER GRADING PLAN �,LL FLOODPLAIN (TYP. 20:1 FLOODPLAIN (TYP. 20:1) / DMAX ) BKF WSE / PROPOSED GRADE MAX DEPTH AT CENTER OF RIFFLE CROSS-SECTION PROPOSED CENTERLINE ALIGNMENT TRIBUTARY CROSS-SECTION SUMMARY PARAMETER ABKF (FT 2) 4.9 WBKF (FT) 8.1 DBKF(FT) 0.6 DMAX (FT) 0.9 W/D 13.5 DMAX/DBKF 1.5 So (FT/FT) .015 TYPICAL UT1 TO ASHWORTH CREEK RIFFLE CROSS-SECTION NOT TO SCALE FLOODPLAIN WIDTH VARIES PER PLAN PROPOSED 700 GRAM COIR EROSION CONTROL MATTING TIE TO EXISTING SEE DETAIL, SHEET 4.1 I WBKF PER GRADING PLAN FLOODPLAIN (TYP. 20:1) BKF WSE DMAX FLOODPLAIN (TYP. 20:1) PROPOSED GRADE MAX DEPTH AT CENTER OF RIFFLE CROSS-SECTION PROPOSED CENTERLINE ALIGNMENT TRIBUTARY CROSS-SECTION SUMMARY PARAMETER ABKF (FT2) 19.0 WBKF (FT) 17.2 DBKF(FT) 1.1 DMAX (FT) 1.5 W/D 15.6 DMAX/DBKF 1.4 So (FT/FT) .008 PROPOSED 700 GRAM COIR EROSION CONTROL MATTING SEE DETAIL, SHEET 4.1 FLOODPLAIN WIDTH VARIES PER PLAN TIE TO EXISTING / WPOOL PER GRADING PLAN o•L:y FLOODPLAIN (TYP. 20:1) BKF WSE I FLOODPLAIN (TYP. 20:1) / //6,1 / /• / / / DMPOOL POINT BAR / I / / TRIBUTARY CROSS-SECTION SUMMARY PROPOSED CENTER LINE ALIGNMENT TYPICAL UT1 TO ASHWORTH CREEK POOL CROSS-SECTION PARAMETER APOOL 8.3 WPOOL 10.1 DPOOL 0•8 DMPOOL 1.8 APOOL/ABKF 1.7 WPOOL/WBKF 1.25 DMPOOL/DBKF 2•0 _ FLOODPLAIN WIDTH VARIES PER PLAN PROPOSED 700 GRAM COIR EROSION CONTROL MATTING TIE TO EXISTING SEE DETAIL, SHEET 4.1 WPOOL PER GRADING PLAN / FLOODPLAIN (TYP. 20-1 I FLOODPLAIN (TYP. 20:1) ) BKF WSE / 77 /// / $ Z \ DMPOOL POINT BAR / / / I TRIBUTARY CROSS-SECTION SUMMARY NOT TO SCALE PROPOSED CENTER LINE ALIGNMENT PARAMETER APOOL 29.2 WPOOL 20.7 DPOOL 1.4 DMPOOL 3•0 APOOL/ABKF 1.54 WPOOL/WBKF 1.20 DMPOOL/DBKF 2•0 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 ESS� SEAL 02�5 IN 0 D DATE: 9/6/2023 TYPICAL UT2 TO ASHWORTH CREEK RIFFLE CROSS-SECTION NOT TO SCALE TYPICAL UT2 TO ASHWORTH CREEK POOL CROSS-SECTION NOT TO SCALE SHEET NUMBER 3.1 7 W M co O U-) M N O N O L �C C N CL ( U) (0 U) c p W O J IL m U W J Q U U) U I W 75 W M In O O coLID N O N L QC i 2 iL N U) cu cn a) c p W Q U) U) ry 2 U TOE WOOD (TW) PROTECTION WITH SOIL LIFT SPECIFICATIONS EROSION CONTROL MATTING SPECIFICATIONS2i tY LIVE STAKES AND BARE - U 0- Q ROOT PLANTINGS 1. WOODY MATERIAL USED IN THE BRUSH TOE SHALL CONSIST OF LOGS, LARGE BRANCHES AND WOODY DEBRIS RANGING IN DIAMETER FROM 1" TO 12". LARGE VOIDS SHALL BE FILLED WITH FINE WOODY MATERIAL AND DEBRIS. ALL MATERIALS 1. EROSION CONTROL MATTING IS USED TO PROTECT RECENTLY CONSTRUCTED STREAM BANKS FROM EROSION. } m ARE TO BE APPROVED BY THE ENGINEER. WOODY MATERIAL SHALL BE INSTALLED IN 1.0' LIFTS. EACH LIFT SHALL BE THE MATTING WILL REMAIN INTACT WHILE THE BANK AND RIPARIAN VEGETATION MATURES, PROVIDING CRITICAL BANK PROTECTION. y COMPACTED WITH THE EXCAVATOR BUCKET AND COVERED WITH A LAYER OF ALLUVIUM OR MIXED SOIL AND GRAVEL TO FORM A DENSE LAYER OF WOODY MATERIAL AND ALLUVIAL TO LINES, ELEVATIONS AND GRADES IN THE DRAWINGS. A A' Q 2. STREAM BANK EROSION CONTROL MATTING MATERIAL SPECIFICATIONS: < 2. TOE WOOD SHALL EXTEND INTO THE DOWNSTREAM RIFFLE MIN. 10.0' BEYOND THE P.T. 2.1. MACHINE DIRECTION TENSILE STRENGTH: 77 LB/IN p 2.0' MAX 3. UNCONSOLIDATED GRAVEL AND TOPSOIL SHALL BE INSTALLED ABOVE WOODY MATERIAL BEFORE THE LIVE CUTTINGS 2.2. CROSS MATCH DIRECTION TENSILE STRENGTH: 86 LB/IN 2.3. APPARENT OPENING SIZE: 0.59" x 0.67" AND SOIL LIFTS ARE INSTALLED. 4. PLACE LAYER OF LIVE CUTTINGS (MIN. 4' LENGTH) A 2.0' O.C. ON THE GRAVEL AND TOPSOIL LEVELING COURSE SUCH BANKFULL 2.4. PERCENT OPENING: 49% X r� -L 'J'r� THAT APPROXIMATELY 6 INCHES TO 1 FOOT OF EACH LIVE BRANCH WILL BE EXPOSED AND THE REMAINDER (2' TO 4') OF 2.5. MASS: 700 G/M2 X Z EACH LIVE BRANCH WILL BE COVERED BY THE SOIL LIFT. LIVE BRANCHES SHALL BE AN EQUAL FRACTION OF BLACK INNER BERM O/ SOIL GEOLIFTS TO BANKFULL STAGE \� `��` �� �' J e� � r\ � \ /•�''�� �� � � � y\' ea WILLOW (SALIX NIGR T SILKY WILLOW (SALIX SERICEA) AND SILKY DOGWOOD (CORNUS AMOMUM) AND APPROVED BY THE ENGINEER PRIOR TO INSTALLATION. _ 3. BEFORE INSTALLING EROSION CONTROL MATTING, RAKE SOIL LEVEL, ADD TEMPORARY AND PERMANENT SEED, SOIL PREPARATION AND MULCH. 00 p W H d �` sa LIVE CUTTINGS 5. INSTALL A SOIL LIFT ABOVE THE LIVE CUTTINGS. THE SOIL LIFT SHALL NOT EXCEED 1.0' THICKNESS. LIFTS SHALL INCLUDE 4. EROSION CONTROL MATTING SHALL BE PLACED ALONG THE LENGTH OF THE NEW CHANNEL FROM THE TOE OF Y U U ALL SOIL PREPARATION, TEMPORARY AND PERMANENT SEEDING AND MULCH. SOIL LIFTS SHALL USE TWO LAYERS OF BIODEGRADABLE MATTING: 700 G/M2 COIR MATTING (OUTER) AND 320 G/M2 EROSION CONTROL BLANKET (INNER). EROSION CONTROL PRODUCTS USED FOR SOIL LIFTS SHALL BE MADE OF 100% NATURAL FIBERS AND MATERIALS AND BE TOE OF SLOPE / SLOPE AT THE INNER BERM TO THE BANKFULL STAGE. W _ U Wp BIODEGRADABLE UNDER NORMAL CLIMATE CONDITIONS. EROSION CONTROL MATTING CONTAINING PLASTICS OR 5. SECURE MATTING IN PLACE BY STAKING AND OVERLAPPING AT THE SEEMS WITH A SHINGLE -TYPE METHOD PLASTIC BASED MATERIALS SHALL NOT BE USED. _� SUCH THAT THE OVERLAPPING PIECE IS IN THE SAME DIRECTION AS THE STREAM FLOW AS SHOWN IN THE / DETAIL. ADDITIONAL STAKING SHALL BE APPLIED BY THE CONTRACTOR AT NO ADDITIONAL COST IF THE WOODY 6. LIVE TRANSPLANTS AVAILABLE ON THE SITE MAY REPLACE SOIL LIFTS AS DIRECTED BY THE ENGINEER. MATTING SEPARATES FROM THE SOIL MORE THAN ONE INCH UNDER A REASONABLE PULL. MATERIAL 7. GRADE THE RIVER BANK AT 3:1 TO THE EXISTING GROUND. SEE BANK GRADING DETAIL ON THIS SHEET. 6. EROSION CONTROL MATTING USED ON ALL STREAM BANKS SHALL BE MADE OF 100% NATURAL FIBERS AND X 8. KEY EROSION CONTROL MATTING IN BENEATH BANK GRADING AREA AND INSTALL MATTING ON ALL DISTURBED RIVER BANKS. MATERIALS AND BE BIODEGRADABLE UNDER NORMAL CLIMATE CONDITIONS. EROSION CONTROL MATTING CONTAINING PLASTICS OR PLASTIC BASED MATERIALS SHALL NOT BE USED. m p I\ ' °�/ �6� 9. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINESGRADESAND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR W > O POINT BAR ON INSIDE BEND , , ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED OR APPROVED BY THE ENGINEER. > - - C ° EROSION CONTROL MATTING FROM TOE OF d W 10. RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN STRUCTURES AND SHALL BE CONSIDERED INCIDENTALTO CONSTRUCTION. SLOPE AT INNER BERM TO BANKFULL STAGE Q BANKFULL -STREAM DETAILED PLAN NOT TO SCALE DETAILED PLAN NOT TO SCALE Z VERTICAL OVERLAP MIN. 6" WITH O LIVE STAKES AND BARE ROOT PLANTINGS DOUBLE ECO-STAKES OR A SINGULAR 2' LONG 2" x 2" WOOD STAKES. SECURE MATTING WITH 6" OVERLAP AND BANKFULL STAGE DOUBLED ECO-STAKES, OR A SINGULAR 2' LONG 2" 2" x WOOD STAKES WITH 3" GALVANIZED SOIL LIFTS SHALL USE TWO LAYERS OF 2, ROOFING NAIL AT THE TOP TO SECURE MATTING 0/ Z I O BIODEGRADABLE MATTING: 700 G/MZ EDGE OVERLAP MIN. 6" WITH EROSION CONTROL MATTING BANKFULL STAGE < '^ V, O EXCAVATION LIMITS COIR MATTING (OUTER) AND 320 G/MZ EROSION CONTROL BLANKET (INNER). DOUBLE ECO-STAKES AT 2' O.C. OR 2' LONG 2" x 2" WOOD STAKES. BANKFULL STAGE / // // // // / / / / / INNER BERM / // ////////////////////j//% 7 7 L L 2" X 2" X 18" - 36" WOOD STAKE 7W/ LIVE CUTTINGS MATTING i /// /// / EXISTING GROUND// OUNCONSOLIDATED GRAVEL AND TOPSOIL / i// ECO-STAKE MIN 12" LENGTH, OR 2' LONG 2" x 2" U [). LIJ COMPACTED BACKFILLTOP OF WOODY MATERIAL = +0.5'����ABOVE WOOD STAKES WITH 3" GALVANIZED ROOFING NAIL AT THE TOP TO SECURE MATTING W DOWNSTREAM PT ELEV. - _ SINGLE 12" ECO STAKES w WOODY MATERIAL( INSTALLED IN 1.0' LIFTS •\�-�_` L�� -`_ `_ - "i.- ,^ -, APPROXIMATE DOWNSTREAM PT ELEV. OFFSET ROWS AT - 2'3' O.C. KEY IN MATTING WITH STAKES OR BY TUCKING UNDERNEATH ui n/ RIFFLE SUBSTRATE. LL O J Lu O c`\ U Q i V� /7/ \- Z / WIDTH OF WOODY MATERIAL / STREAM BED AT DETAILED STAKING PLAN ' DETAILED SECTION A - A 2 z O MAX POOL DEPTH Y3 WBKF OR GREATER NOT TO SCALE NOT TO SCALE � U)O DETAILED SECTION A - A O NOT TO SCALE TOE WOOD PROTECTION WITH SOIL LIFT EROSION MATTIN CONTROL CO O G l/=^/ v / LIVE STAKES AND BAREROOT PLANTINGS PER RE -VEGETATION PLAN, DETAILS, AND SCHEDULES MIN. 8.0' LIVE STAKES AND BARE BOULDER TOE NOTES STREAMBANK GRADING SPECIFICATIONS ROOT PLANTINGS 1. ALL BOULDERS SHALL BE STRUCTURAL STONE, CUBICAL OR RECTANGULAR IN SHAPE. BOULDERS AVAILABLE 1. ALL BANK GRADING WORK SHALL TAKE PLACE DURING DRY WORKING CONDITIONS. THE CONTRACTOR SHALL 9 ONSITE MAY BE USED IF APPROVED BY THE ENGINEER. BOULDERS SHALL BE 3.0' X 5.0' X 2.5' (W X L X H) +/- 0.5'. MINIMUZE THE EXPORT OF SEDIMENT TO ADJACENT SURFACE WATERS TO THE MAXIMUM EXTENT PRACTICABLE THE MINIMUM ACCEPTABLE BOULDER THICKNESS (H) IS 2.0'. BOULDERS LONGER (L) THAN 5.5' WILL BE BY USING ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES AS NEEDED OR AS DIRECTED BY THE ACCEPTED. ENGINEER ONSITE. A A' 2.0' MAX 2. A BEDDING COURSE CONSISTING OF 70% NCDOT CLASS B AND 30% NCDOT CLASS A SHALL BE INSTALLED BELOW 2. FOR IMPLEMENTATION, THE CONTRACTOR SHALL GRADE THE RIVER BANK FROM THE EXISTING TOE OF SLOPE AT THE FIRST ROW OF BOULDERS. IF BEDROCK IS ENCOUNTERED ONSITE, THE FIRST LIFT OF BOULDERS SHALL BE 3:1 TRANSITIONING TO A 10:1 SLOPE (OR FLATTER) TO THE ELEVATIONS AND GRADES MATCHING THE PLACED DIRECTLY ON THE BEDROCK. ALL BOULDERS SHALL FIT TIGHTLY TOGETHER. INSTALL EACH LIFT OF SURROUNDING AREA. ALL EXCAVATED MATERIAL SHALL BE HAULED AND PLACED IN DESIGNATED AREAS ONSITE. BOULDERS WITH A 1.0' SETBACK FROM THE FRONT EDGE OF THE PREVIOUS LIFT OF BOULDERS. 3. IF STREAMBANK MATERIAL IS NOT SUITABLE FOR PLANTING AND RE -VEGETATION, INSTALL LIVE TRANSPLANTS AS SOIL GEOLIFTS TO 3. UNCONSOLIDATED GRAVEL AND TOPSOIL SHALL BE INSTALLED ABOVE WOODY MATERIAL BEFORE THE LIVE OFFSET ROWS OF LIVE STAKES AND BAREROOT DIRECTED BY THE ENGINEER ONSITE. BANKFULL STAGE CUTTINGS AND SOIL LIFTS ARE INSTALLED. PLANTINGS PER RE -VEGETATION PLAN AND DETAILS 4. TRANSPLANTS AVAILABLE ONSITE MAY BE INSTALLED IN THE TOPSOIL AS DIRECTED BY THE ENGINEER ONSITE. Jennings LIVE CUTTINGS 4. PLACE LAYER OF LIVE BRANCHES (MIN. 4' LENGTH) ON THE GRAVEL AND TOPSOIL SUCH THAT APPROXIMATELY I z Q 6 INCHES TO 1 FOOT OF EACH LIVE BRANCH WILL BE EXPOSED AND THE REMAINDER (2, TO 4') OF EACH LIVE o a 5. THE SURFACE OF THIS FEATURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE y, BRANCH WILL BE COVERED BY THE SOIL LIFT. LIVE BRANCHES SHALL BE OF THE SPECIES SPECIFIED FOR LIVE a WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. a STAKES OR APPROVED BY THE ENGINEER. v Lu Environmental z 6. STABILIZATION OF THE WORK AREA WITH TEMPORARY AND PERMANENT SEEDING AND MULCHING IS REQUIRED 5. INSTALL SOIL LIFTS FROM THE LIVE CUTTINGS UP TO THE BANKFULL STAGE. LIFTS SHALL NOT EXCEED 1.0' U coa FOLLOWING GRADING OF THE STREAMBANK. INSTALL WOODY PLANTING AND VEGETATION AS SHOWN ON THE BOULDER TOE THICKNESS. LIFTS SHALL INCLUDE ALL SOIL PREPARATION, TEMPORARY AND PERMANENT SEEDING AND O a = APPROVED RE -VEGETATION PLAN. PROTECTION MULCH. SOIL LIFTS SHALL USE 2 LAYERS OF MATTING: 260Z. / YDZ COIR MATTING (OUTER) AND 11.2 OZ/YDZ w ( COCONUT FIBER BLANKET (INNER). M "w 7 SAMUEL ASHE DRIVE e 6. LIVE TRANSPLANTS AVAILABLE ON THE SITE MAY REPLACE SOIL LIFTS AS DIRECTED BY THE ENGINEER. ASH EVI LLE, NC 28805 7. PLACE SOIL BACKFILL UP TO THE LIFT HEIGHT SPECIFIED OF NO GREATER THAN 1.0 FT BEING CAREFUL NOT TO POINT BAR ON INSIDE BEND PUSH/PULL OR TEAR THE FABRIC PREVIOUSLY PLACED. ,A BANKFULL 8. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED OR APPROVED BY THE ENGINEER. 9. DETAILED PLAN RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN -STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. NOT TO SCALE LL I J J J TIE TO EXISTING �CAIRo z/ LIVE STAKES AND BARE ROOT PLANTINGS TOE OF SLOPE I I GRADE AT 10:1 INSTALL EROSION CONTROL MATTING ��� O� �\ �OFESS��/�/ ON ALL DISTURBED STREAM BANKS BANKFULL STAGE = SEAL = DETAILED PLAN 02 5 SOIL LIFTS SHALL USE TWO LAYERS OF BIODEGRADABLE MATTING: 700 G/M2 NOT TO SCALE �� \ ��' COIR MATTING (OUTER) AND 320 G/Mz C EXCAVATION LIMITS EROSION CONTROL BLANKET (INNER). TI MATTING N ////� �IIID 1.0' MAX TRANSPLANTS AS D BY ENGINEER WOOD STAKE 2" - 4" LAYER OF LIVE CUTTINGS ON ALL DISTURBED STREAMBANKS. BLEND GRADING TO EXISTING 2" X 2" X 18" - 36" GROUND AT 10:1 SLOPE (OR FLATTER) COMPACTED BACKFILL UNCONSOLIDATED GRAVEL AND TOPSOIL EXISTING GRADE 10:1 �� TOP OF BOULDERS =+0.5' ABOVE DOWNSTREAM PT ELV. ............................ LOW FLOW WSEL PREPARE THE SOIL SURFACE BY LOOSENING 2 - RIVER BANKIS NOT DATE: 9/6/2023 NCDOT CLASS A � ` \\ \\ \ SUITABLE RE-VEGETATION AND PLANTING, INSTALL LIVE TRANSPLANTS AS ROCK BACKFILLAND APPROXIMATE DOWNSTREAM PT ELV. BEDDING COURSE ����� EXISTING � \� \��\ \\/ \ DIRECTED BY THE ENGINEER ONSITE. BOULDERS CHANNEL NON -WOVEN / �L FILTER FABRIC / / /� , /�� /� / / , SREAMBED AT MAX POOL DEPTH GRADE EXISTING /\\//%\/�/��\��\\��/\ 2 BOULDER WIDTHS EXISTIINGLOW FLOW WATER SURFACE AT 3:1 NTS PLACE BOUNDERS ON ROCK BEDDING AND DETAILED SECTION A - A LEVELING COURSE NOT TO SCALE DETAILED SECTION A - A' SHEET NUMBER BOULDER TOE NOT TO SCALE STREAMBANK GRADING 4.1 7 M 0 in co N O N L (D E a) cn ca cn (D c W O J 11 00 U W Q U U) Q I W 75 D- 0 (M O O LO co N 0 N CO L QC i 2 1L a) U) co U) p c 0 W Q U) U) _ U m LOG VANE (LV) SPECIFICATIONS LOG J-HOOK VANE SPECIFICATIONS BURY LOGS INTO STREAMBED 1. ALL LOGS SHALL BE RELATIVELY STRAIGHT AND LIMBS AND BRANCHES SHALL BE TRIMMED FLUSH. LOGS SHALL BURY LOGS INTO °7 1. ALL LOGS SHALL BE RELATIVELY STRAIGHT AND LIMBS AND BRANCHES SHALL BE TRIMMED FLUSH. LOGS SHALL U Q MIN. 5.0' AND ANCHOR IN PLACE p HAVE MINIMUM DIAMETER OF 1.5'. VANE LENGTH SHALL BE AS FOLLOWS: ASHWORTH CREEK - 40 FEET, UT1 - 15 STREAMBED MIN. 5.0'. HAVE MINIMUM DIAMETER OF 1.5'. VANE LENGTH SHALL BE AS FOLLOWS: ASHWORTH CREEK - 40 FEET, UT1 - } m WITH BOULDERS U/S AND D/S. FT, UT2 - 20 FT. HEADER LOGS SHALL BE UNDERLAIN BY FOOTER LOGS TO PROVIDE A SILL UNLESS OTHERWISE 0 15 FEET. HEADER LOGS SHALL BE UNDERLAIN BY FOOTER LOGS TO PROVIDE A SILL UNLESS OTHERWISE 15 20° DIRECTED THE ENGINEER. HEADER LOGS SHALL BE OFFSET SLIGHTLY DOWNSTREAM OF THE FOOTER THE DIRECTED BY THE ENGINEER. HEADER LOGS SHALL BE OFFSET SLIGHTLY DOWNSTREAM OF THE FOOTER LOG. 1z/3 Z j HEADER LOG OF THE VANE ARE SHALL TIE INTO THE STREAMBANK AT %z TO z/3 BANKFULL STAGE. THE LOG VANE SELECT BACKFILL 20 - 300 FIT BOULDERS TIGHTLYTOGETHER THE HEADER LOG BANKFULL STAGE. THE LOG THE VANE ARE SHALL TIE INTO THE STREAMBANKTEND Q ARM SHALL EXTEND INTO THE OUTSIDE STREAMBANK AND STREAMBED A MINIMUM OF 10.0 FT ON EACH END. BEHIND STRUCTURE VANE ARM SHALL EXTEND INTO THE OUTSIDE STREAMBANK AND STREAMMBEED A MINIMUM OF 5.0 FT ON EACH A � ALL GAPS/VOIDS LARGER THAN 1 INCHES BETWEEN THE HEADER AND FOOTER LOGS SHALL BE CHINKED WITH I END. ALL GAPS/VOIDS LARGER THAN 1 INCHES BETWEEN THE HEADER AND FOOTER LOGS SHALL BE CHINKED 0 LIMBS AND/OR BRUSH ON THE UPSTREAM SIDE PRIOR TO PLACEMENT OF THE GEOTEXTILE. WITH LIMBS AND/OR BRUSH ON THE UPSTREAM SIDE PRIOR TO PLACEMENT OF THE GEOTEXTILE. EXTEND BOULDER SILL INTO GRAVEL AND COBBLE BACKFILL 2. ALL BOULDERS USED FOR THE STRUCTURE SHALL BE STRUCTURAL STONE, CUBICAL OR RECTANGULAR IN SHAPE. THE ENGINEER MUST APPROVE THE USE OF BOULDERS THAT MAY BE AVAILABLE ONSITE. BOULDERS DIMENSIONS STREAMBANK MIN 10.0' OR THREE FULL (3) BOULDER LENGTHS 2. ALL BOULDERS USED FOR THE STRUCTURE SHALL BE STRUCTURAL STONE, CUBICAL OR RECTANGULAR IN SHAPE. THE ENGINEER MUST APPROVE THE USE OF BOULDERS THAT MAY BE AVAILABLE ONSITE. BOULDERS SHALL BE X Z BEHIND LOG SHALL BE 3.0' X 5.0' X 2.0' (W X L X H) ± 0.5 FT. THE MINIMUM ACCEPTABLE BOULDER THICKNESS (H) IS 1.5'. 0 0 3.0' X 5.0' X 2.5' (W X L X H) +/- 0.5'. THE MINIMUM ACCEPTABLE BOULDER THICKNESS (H) IS 2.0'. BOULDERS } O BOULDERS LONGER (L) THAN 5.5' WILL BE ACCEPTED. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY O LONGER (L) THAN 5.5' WILL BE ACCEPTED. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING 00 d FITTING BOULDERS TOGETHER AND PLUGGING WITH NC DOT CLASS A ROCK OR CHINKING STONE APPROVED BY 0 ° BOULDERS TOGETHER AND PLUGGING WITH NC DOT CLASS A ROCK OR CHINKING STONE APPROVED BY c) I I I I I I I I q� ENGINEER. HEADER BOULDERS SHALL BE UNDERLAIN BY FOOTER BOULDERS TO PROVIDE A FOUNDATION UNLESS 0 0 ENGINEER. HEADER BOULDERS SHALL BE UNDERLAIN BY FOOTER BOULDERS TO PROVIDE A FOUNDATION Y U OTHERWISE DIRECTED BY THE ENGINEER. HEADER BOULDERS SHALL BE OFFSET 1.0 FT UPSTREAM OF THE q UNLESS OTHERWISE DIRECTED BY THE ENGINEER. HEADER BOULDERS SHALL BE OFFSET 1.0 FT UPSTREAM OF U U) - FOOTER. THE FOOTER. W W 0 SCOUR HIGH DENSITY 0 POOL PLANTING 3. SET BOULDER INVERTS AT ELEVATION SHOWN ON THE PLAN AND PROFILE SHEETS. NO ELEVATIONS OF THE BOULDERS MAY VARY FROM THE PLAN SHEETS WITHOUT DIRECTION FROM THE ENGINEER. O SCOUR 0 POOL O ° HIGH DENSITY 3. SET BOULDER INVERTS AT ELEVATION SHOWN ON THE PLAN AND PROFILE SHEETS. NO ELEVATIONS OF THE BOULDERS MAY VARY FROM THE PLAN SHEETS WITHOUT DIRECTION FROM THE ENGINEER. = U q 0 4. ON THE UPSTREAM SIDE OF THE STRUCTURE A LAYER OF NON -WOVEN GEOTEXTILE FABRIC SHALL BE PLACED AS PLANTING 1 0 0 \\\ ° q' 4. ON THE UPSTREAM SIDE OF THE STRUCTURE A LAYER OF NON -WOVEN GEOTEXTILE FABRIC SHALL BE PLACED AS X X SHOWN IN THE DETAIL ALONG THE ENTIRE LENGTH OF THE LOG VANE AND BOULDER J-HOOK. SECURE ALL 0 0 O SHOWN IN THE DETAIL ALONG THE ENTIRE LENGTH OF THE LOG VANE AND BOULDER J-HOOK. SECURE ALL 0 GEOTEXTILE FABRIC ON TOP OF FOOTER LOG USING 3 INCH 10D GALVANIZED COMMON NAIL ON 12 IN SPACING GEOTEXTILE FABRIC ON TOP OF FOOTER LOG USING 3 INCH 10D GALVANIZED COMMON NAIL ON 12 IN SPACING ALONG LOG. NAIL NON -WOVEN GEOTEXTILE TO EDGE OF HEADER LOG AND BACKFILL. 0 O O ALONG LOG. NAIL NON -WOVEN GEOTEXTILE TO EDGE OF HEADER LOG AND BACKFILL. Q ° O 5. GRAVEL MATERIAL CONSISTING OF A WELL -GRADED BLEND OF NCDOT CLASS A RIP -RAP AND ASTM #57 ROCK % 0 0 HIGH DENSITY 5. GRAVEL MATERIAL CONSISTING OF A WELL -GRADED BLEND OF SURGE STONE AND ASTM #57 ROCK MIXED Lu 0 0 MIXED WITH EARTH SHALL BE USED TO BACKFILL THE STRUCTURE. BACKFILL MATERIAL SHALL BE COMPACTED PLANTING WITH EARTH SHALL BE USED TO BACKFILL THE STRUCTURE. BACKFILL MATERIAL SHALL BE COMPACTED SUCH O SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. O THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. d EXTEND VANE ARM 0 W 6. PLACE BOULDERS UPSTREAM AND DOWNSTREAM OF THE LOG VANE ARM IN THE STREAMBANK. THE FINISHED INTO STREAMBANK 6. PLACE BOULDERS UPSTREAM AND DOWNSTREAM OF THE LOG VANE ARM IN THE STREAMBANK. THE FINISHED Q ELEVATION OF THE BOULDERS SHALL BE BELOW THE FINISHED GRADE OF THE ADJACENT FLOODPLAIN AND MIN. 5.0' ELEVATION OF THE BOULDERS SHALL BE BELOW THE FINISHED GRADE OF THE ADJACENT FLOODPLAIN AND SHALL NOT PROTRUDE OUT OF THE STREAMBANK. 0 SHALL NOT PROTRUDE OUT OF THE STREAMBANK. BANKFULL ANCHOR LOGS IN -PLACE ° 7. DIMENSIONS AND SLOPES OF STRUCTURES DESCRIBED IN THE DETAIL MAY BE ADJUSTED BY DESIGN ENGINEER BANKFULL 7. DIMENSIONS AND SLOPES OF STRUCTURES DESCRIBED IN THE DETAIL MAY BE ADJUSTED BY DESIGN ENGINEER WITH ROOT WAD TO FIT CONDITIONS ONSITE. / TO FIT CONDITIONS ONSITE. O ° DETAILED PLAN 8. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE 0 8. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE 0 0 NOT TO SCALE WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF EXTEND VANE ARM FINISH FOR INVERT ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED. ANCHOR LOGS IN -PLACE 0 ( DETAILED PLAN FINISH FOR INVERT ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED. 0 INTO STREAMBANK m ° 0 9. RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING WITH BOULDERS U/S AND D/S 0 0 0 NOT TO SCALE 9. RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN -STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTALTO CONSTRUCTION. CIOINSTALLATION OF IN -STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. Z O I- BANKFULL Q BANKFULL-,,,,",0. \\\ ` r z � 1-Q HEADERLOG VANE ARM INTO STREAM I- z z 1•-��U)O V J _ HEADER LOG ROOT BALL VANE ARM INTO STREAM BANK @ Y2 TO Y3 BKF STAGE W < U BANK @ z TO � BKF STAGE � SCOUR POOL / // / ARM SLOPE = HEADER BOULDER (SILL) 1-2% 0. O ////''���� SCOUR POOL / / ARM SLOPE GRAVEL AND COBBLE / / BACKFILL MATERIAL �, BELOW STRUCTURE � U 0 GRAVEL AND COBBLE/��j '� BELOW STRUCTURE BACKFILL MATERIAL / = 1 _ o�/�� 2� /� . _ _ i //� // // �/� lT // // NON WOVEN / // 7// /� i / / / / �� /// ///i j/r /// // // /// //7Lu LOG LENGTH VARIES. �/� /�/ �i %� /� / /� , /��/ / / ' , // , i// // / / /� / /%% SEE NOTE 1ui Z /� �� "el �/ // /� / // /�/ // /�/ /// /� ///�i 7� , FILTER FABRIC // / // / // // // / / / / FOOTER BOULDER (SILL) NON WOVEN // FILTER FABRIC FOOTER LOG ANCHOR BOULDER// / / / // / / / // / /� /� %/ / // // / // // / /� / // / / / / // / / // / BACKER LOG / W BACKER 7 D Z O DETAILED SECTION A - A DETAILED SECTION B - B DETAILED SECTION A - A DETAILED SECTION B - B 0 m LL NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE LOG VANE LOG J-HOOK VANE l/_^/ v / CONSTRUCTED RIFFLE SPECIFICATIONS BOULDER RIFFLE SPECIFICATIONS 1. FOR INSTALLATION, THE CONTRACTOR SHALL OVER EXCAVATE THE LENGTH OF THE RIFFLE AND BACKFILL THE 1. ALL BOULDERS USED FOR THE BOULDER CASCADE SHALL BE STRUCTURAL STONE, CUBICAL OR RECTANGULAR IN TRENCH WITH THE SPECIFIED RIFFLE SUBSTRATE MATERIAL TO THE ELEVATIONS SHOWN ON THE PROPOSED SHAPE. BOULDERS SHALL BE 3.0' X 5.0' X 2.5' (W X L X H) +/- 0.5'. THE MINIMUM ACCEPTABLE BOULDER PROFILE. EXTEND BOULDER SILL INTO THICKNESS (H) IS 2.0'. BOULDERS LONGER (L) THAN 5.5' WILL BE ACCEPTED. DIMENSIONS AND SLOPES OF 2. RIFFLE MATERIAL SHALL EXTEND A MINIMUM OF 3 WBKF U/S OF THE P.T. INTO THE GLIDE AND A MINIMUM OF STREAMBANK MIN 10.0' OR THREE (3) FULL STRUCTURES DESCRIBED IN THE DETAIL MAY BE ADJUSTED BY THE ENGINEER TO FIT CONDITIONS ONSITE. W 3 WBKF D/S OF THE P.C. INTO THE RUN. p7 BOULDER LENGTHS 2. CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TOGETHER TIGHTLY. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER AND PLUGGING WITH NC DOT CLASS A ROCK OR CHINKING 3. THE RIFFLE MATERIAL SHALL BE PLACED AT A UNIFORM THICKNESS SUCH THAT, IN CROSS-SECTION, ITS LOWEST STONE APPROVED BY ENGINEER. HEADER BOULDERS SHALL BE UNDERLAIN BY FOOTER BOULDERS TO PROVIDE RIFFLE LENGTH VARIES ELEVATION OCCURS IN THE CENTER OF THE CHANNEL. BOULDER A FOUNDATION UNLESS OTHERWISE DIRECTED BY THE ENGINEER. HEADER BOULDERS SHALL BE OFFSET 1 FT PER PLAN STEP UPSTREAM OF THE FOOTER BOULDERS WHERE MICROPOOLS ARE ANTICIPATED TO FORM AS SHOWN IN THE EXTEND RIFFLE 4. EXTEND RIFFLE RIFFLE MATERIAL SHALL BE COMPACTED USING AN EXCAVATOR BUCKET SUCH THE DEEPEST POINT OF THE CHANNEL IS ALONG THE CENTERLINE AND THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A EXTEND RIFFLE EXTEND RIFFLE DETAIL. SUBSTRATE INTO SUBSTRATE INTO MINIMUM. MATERIAL INTO - MATERIAL INTO RUN 3. SET BOULDER INVERTS AT ELEVATION SHOWN ON THE PLAN AND PROFILE SHEETS. NO ELEVATIONS OF THE GLIDE MIN. 3 WBKF RUN MIN.3 WBKF GLIDE MIN. 3 WBKF MIN. 3 WBKF BOULDERS MAY VARY FROM THE PLAN SHEETS WITHOUT DIRECTION FROM THE ENGINEER. THE BOULDER 5. CONSTRUCTED RIFFLES SHALL BE BACKFILLED WITH RIFFLE MATERIAL CONSISTING OF QUARRIED STONE. RIFFLE ARMS SHALL EXTEND UP TO THE STREAMBANK AT A 1% - 2% SLOPE AND INTO THE STREAMBANK A MINIMUM A A' MATERIAL SHALL BE PLACED AT A UNIFORM THICKNESS SUCH THAT, IN CROSS-SECTION, ITS LOWEST ELEVATION A \F`''A' OF 10.0' OR TWO FULL BOULDER LENGTHS. MAXIMUM ELEVATION DROP OVER EACH BOULDER IS STEP IS 0.3' - OCCURS IN THE CENTER OF THE CHANNEL. RIFFLE MATERIAL SHALL BE COMPACTED USING AN EXCAVATOR aW `ow 05. Jennings BUCKET SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. ; P.T. STATION FLOW P.C. STATION 4. ON THE UPSTREAM SIDE OF THE BOULDERS, NON -WOVEN GEOTEXTILE FABRIC SHALL BE PLACED ON THE PER PLAN PER PLAN 6. CONSTRUCTED RIFFLE MATERIAL SPECIFICATIONS: ENTIRE LENGTH OF THE STRUCTURE. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER • NCDOT CLASS 1 - 70% BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. Environmental • NCDOT CLASS B - 30% RIFFLE MATERIAL SHALL BE USED AS BACKFILL MATERIAL AROUND THE OFFSET BOULDER STEPS AND STREAMBANK TOE OF SLOPE 7. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE TOE OF SLOPE o 30- 40 MICROPOOLS SHALL BE ESTABLISHED BELOW EACH STEP. WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF 5. BOULDER RIFFLES SHALL BE BACKFILLED WITH RIFFLE MATERIAL CONSISTING OF QUARRIED STONE. RIFFLE BANKFULL STAGE FINISH FOR INVERT ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED. BANKFULL MATERIAL SHALL BE PLACED AT A UNIFORM THICKNESS SUCH THAT, IN CROSS-SECTION, ITS LOWEST ELEVATION 7 SAMUEL ASHE DRIVE OCCURS IN THE CENTER OF THE CHANNEL. RIFFLE MATERIAL SHALL BE COMPACTED USING AN EXCAVATOR W 8RE-DRESSING OF CHANNEL AND BANKFULL /OLOWING w BUCKET SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. ASH EVI LLE, NC 28805 INSTALLATIONOF IN -STREAM STRUCTURES ANDS HALL BECONSIDERED INCIDENTAL TO CONSTRUCTION 9. CONSTRUCTED RIFFLE CAN BE REPLACED WITH WOODY RIFFLE PER ON -SITE ENGINEER RECOMMENDATION. MOST DOWN STREAM STRUCTURE AT 8. BOULDER RIFFLE MATERIAL SPECIFICATIONS: NCDOT CLASS 1 - 100% PC MAY BE BOULDER J-HOOK VANE OR BOULDER CROSSVANE PER PLAN AND DETAILS 9. RIFFLE MATERIAL SHALL EXTEND A MINIMUM OF'3 WBKF U/S OF THE P.T. INTO THE GLIDE AND A MINIMUM OF 3 WBKF D/S OF THE P.C. INTO THE RUN. DETAILED PLAN 10. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE DETAILED PLAN WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF NOT TO SCALE FINISH FOR INVERT ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED. NOT TO SCALE RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN -STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. N CAR ESS/po`��'y�'% SEAL 025 BANKFULL BANKFULL EROSION CONTROL MATTING /�r/YIIIDI1111,��\\\\\\\ //// EROSION CONTROL MATTING BOULDER STEP BANKFULLPER P.T. ELEVATION PROFILE BANKFULL BOULDER RIFFLE SLOPE VARIES RIFFLE SLOPE VAR GLIDE VARIES PER PROFILE STEP PER PROFILE GLIDE j///� SLOPE = 1- 2% P.C. ELEVATION PER PROFILE//� / // �� // STREAMBED OFFSET HEADER RUN // / //� ELV = 0.3' 0.4' BOULDERS 1.0' U/S / / �/, DATE: 9/6/2023 /� / i /���/i�i �ii�iii�i; / RUN // /i , KEY MATTING INTO RIFFLE TRENCH �i%/�j�/�///� // // / MICROPOOL i i ,/////�/////////// RIFFLE MATERIAL RIFFLE MATERIAL PER NOTES RIFFLE MATERIAL STREAMBED RIFFLE MATERIAL RIFFLE MIN. 2.0' BELOW RIFFLE SUBSTRATE / /� ' '/i/ j j ji MIN. 2.0' BOULDER SILL PER NOTES MATERIAL STEP RIFFLE DEPTH MIN. = 2.0' EXTEND INTO STREAMBANK MIN PER NOTES MATERIAL 10.0' OR THREE (3) FULL BOULDER LENGTHS NTS DETAILED SECTION A - A' DETAILED SECTION B - B' DETAILED SECTION A - A' DETAILED SECTION B - B' NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE SHEET NUMBER CONSTRUCTED RIFFLE BOULDER RIFFLE 4.2 w EXTEND RIFFLE MATERIAL INTO GLIDE MIN.3 WeKF \\\\ A RIFFLE LENGTH VARIES PER PLAN EXTEND RIFFLE MATERIAL INTO RUN fn /// MIN. 3 WBKF P.T. STATION) � /I;� \\\ P.C. STATION PER PLAN PER PLAN / �� m STREAMBANK TOE OF SLOPE BANKFULL STAGE DETAILED PLAN NOT TO SCALE WOODY RIFFLE SPECIFICATIONS 1. FOR INSTALLATION, THE CONTRACTOR SHALL OVER EXCAVATE THE LENGTH OF THE RIFFLE AND BACKFILL THE TRENCH WITH THE SPECIFIED RIFFLE SUBSTRATE MATERIAL TO THE ELEVATIONS SHOWN ON THE PROPOSED PROFILE. 2. RIFFLE MATERIAL SHALL EXTEND A MINIMUM OF 3 WeKF U/S OF THE P.T. INTO THE GLIDE AND A MINIMUM OF3' WeKF D/S OF THE P.C. INTO THE RUN. 3. THE RIFFLE MATERIAL SHALL BE PLACED AT A UNIFORM THICKNESS SUCH THAT, IN CROSS-SECTION, ITS LOWEST ELEVATION OCCURS IN THE CENTER OF THE CHANNEL. 4. WOODY RIFFLES SHALL BE BACKFILLED WITH RIFFLE MATERIAL CONSISTING OF QUARRIED STONE. RIFFLE MATERIAL SHALL BE PLACED AT A UNIFORM THICKNESS SUCH THAT, IN CROSS-SECTION, ITS LOWEST ELEVATION OCCURS IN THE CENTER OF THE CHANNEL. RIFFLE MATERIAL SHALL BE COMPACTED USING AN EXCAVATOR BUCKET SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. 5. CONSTRUCTED RIFFLE MATERIAL SPECIFICATIONS: • NCDOT CLASS 1 - 70% • NCDOT CLASS B - 30% 6. WOODY MATERIAL 3" - 6" IN SIZE SHALL BE INTEGRATED INTO THE RIFFLE SUBSTRATE TO ENHANCE FLOW DIVERSITY AND HYPORHEIC EXCHANGE. WOODY MATERIAL SHALL PROTRUDE 1" - 3" ABOVE THE FINISHED RIFFLE SUBSTRATE. 7. RIFFLE MATERIAL SHALL BE COMPACTED USING AN EXCAVATOR BUCKET SUCH THE DEEPEST POINT OF THE CHANNEL IS ALONG THE CENTERLINE AND THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. 8. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR INVERT ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED. 9. RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN -STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. A LENGTH VARIES PER PLAN _ 14 I I I - COMPACTED _ FILL MATERIAL 111-111=111- 1 11-111= 'OLD CHANNEL TOP OF BANK OLD CHANNEL TOE OF SLOPE DETAILED PLAN NOT TO SCALE CHANNEL PLUG NOTES 1. ALL CHANNEL WORK SHALL TAKE PLACE DURING DRY WORKING CONDITIONS. THE CONTRACTOR SHALL MINIMIZE THE EXPORT OF SEDIMENT TO ADJACENT SURFACE WATERS TO THE MAXIMUM EXTENT PRACTICABLE BY USING E&SC MEASURES AS NEEDED. 2. FOR INSTALLATION, THE CONTRACTOR SHALL PLACE SUITABLE CLAY FILL MATERIAL IN THE EXISTING CHANNEL UP TO THE TOP OF BANK. FILL MATERIAL SHOULD BE LOCATED WITHIN THE SITE AND APPROVED FOR USE BY THE ENGINEER. THE CHANNEL PLUG SHALL BE COMPACTED AS DIRECTED AND UNTIL APPROVED BY THE ENGINEER ON SITE. 3. TOP SOIL SUITABLE FOR ESTABLISHING NATIVE VEGETATION SHALL BE INSTALLED ON TOP OF THE COMPACTED FILL MATERIAL TO A MINIMUM DEPTH OF 0.5' ABOVE THE COMPACTED FILL MATERIAL. 4. TRANSPLANTS AVAILABLE ONSITE MAY BE INSTALL IN THE TOP SOIL AS DIRECTED BY THE ENGINEER ON SITE. 5. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. 6. RE -DRESSING AND STABILIZATION OF THE SURROUNDING WORK AREA WITH TEMPORARY AND PERMANENT SEEDING AND MULCHING WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF THE DITCH PLUG AND SHALL BE CONSIDERED INCIDENTALTO CONSTRUCTION. U Q X Z } O cl 00 d Y0/ i U) 2 � U FOR TF R O 0_ W Q � C z N EJ JJ TOP SOIL MIN. 1.0' J OLD CHANNEL MIN. 1.0' O z 1 TOP OF BANK z (� J z BANKFULL rn 0 7] EROSION CONTROL MATTING 'v i z P.T. ELEVATION LJJ V PER PROFILE RIFFLE SLOPE VARIES PER PROFILE 1" - 3" ABOVE RIFFLE MATERIAL J GLIDE BANKFULL PLUG SLOPE TO LINES,1T____I �' '' Q P.C. ELEVATION GRADES AND ELEVATIONS LJJ n PER PROFILE COMPACTED DEPTH VARIES- Q / SHOWN IN THEPLANS FILL MATERIAL W a A/ • RUN / / / / / /, I I III ui L.L JJ 3" 6" WOODY MATERIAL AND BRUSH / // / / // / / // WORKED INTO RIFFLE MATERIAL // i// .////// ///////// // ///// ////// // . i/,//� /�// j//i/j j// j///�i/�///�; 1" - IF PROTRUSION STREAMBED / - / / /// / i/ / /� / // // / / O RIFFLE KEY MATTING INTO RIFFLE TRENCH OLD CHANNEL BOTTOM O U � z � U z 0 1 RIFFLE MATERIAL MATERIAL RIFFLE MATERIAL PER NOTES �p MIN. 2.0' EXISTING GROUND FL Z Q LL n DETAILED SECTION A - A' DETAILED SECTION B - B' O yNOT TO SCALE NOT TO SCALE DETAILED SECTION A - A' WOODY RIFFLE NOT TO SCALE CHANNEL PLUG = U) Q SEE PLAN AND PROFILE SHEET BANKFULL CONSTRUCTED RIFFLE AT CULVERT ENTRANCE 54" CORRUGATED PE CULVERT CULVER LENGTH PER PLAN AND PROFILE DETAILED PLAN NOT TO SCALE SEE PLAN AND PROFILE SHEET SEE PROFILE FOR EXIT STRUCTURE CULVERT CROSSING SPECIFICATIONS 1. ALL CULVERT INSTALLATION WORK SHALL TAKE PLACE DURING DRY WORKING CONDITIONS. THE CONTRACTOR SHALL MINIMIZE THE EXPORT OF SEDIMENT TO ADJACENT SURFACE WATERS TO THE MAXIMUM EXTENT PRACTICABLE BY USING E&SC MEASURES AS NEEDED. 2. THE BOTTOM OF THE 54" CORRUGATED PE CULVERT SHALL BE BURIED 1.0' WITH A SLOPE OF 0.01 FT/FT TO SUPPORT ECOSYSTEM CONNECTIVITY AND AQUATIC ORGANISM PASSAGE. 3. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. 4. RE -DRESSING AND STABILIZATION OF THE SURROUNDING WORK AREA WITH TEMPORARY AND PERMANENT SEEDING AND MULCHING WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF CULVERT CROSSING AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. 5. INSPECT THE STREAM CROSSING, APPURTENANCES, APPROACHES, AND ASSOCIATED FENCE AND EXCLUSION 6. GATES AT LEAST ANNUALLY AND AFTER EACH MAJOR STORM EVENT. MAKE REPAIRS, IF NEEDED. 7. REMOVE ACCUMULATED ORGANIC MATERIAL, WOODY MATERIAL, OR EXCESS SEDIMENT. 8. REPLACE SURFACING STONE FOR LIVESTOCK CROSSING AS NEEDED. CROSSING CREST ELEVATION PER PLAN o 54" CULVERTvOo NC DOT CLASS 1 RIPRAP INV. ELV=2252.34' FSSTABILIZATION BANKFULL Eat, 54" CULVERT INV. ELV = 2252.04' THALWEG / CULVERTSLOPE=0.01FT/FT- 54" p p p p CORRUGATED p p p PE CULVERT NC DOT CLASS 1 RIPRAP 54" CORRUGATED PE CULVERT BURY BOTTOM OF 60" CONSTRUCTED RIFFLE AT STABILIZATION INV. ELV = 2251.34' CULVERT 1.5' CULVERT ENTRANCE AND SEE PROFILE FOR EXIT 54" CORRUGATED PE CULVERT DETAILED SECTION A - A' INV. ELV=2251.04' DETAILED SECTION B - B' NOT TO SCALE NOT TO SCALE 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 DATE: 9/6/2023 NTS SHEET NUMBER 4.3 CULVERT CROSSING a i i 0 0 i5 M N O N O N E a) 0- cn a) 1= w a� 0 0 J m U w J Q U U) Q c� I w 1 0 0 LO co N 0 N (0 `m E co In a) a� 0 w Q co U) 2 U I U d I Q I I m I I I Z _ I I 1 I I X I � O Lu I I I Q a I 0 w w I U I = � I U N I I / I. X LLI � I I THE ELFRETA MCBRAYE LJ FRADY REVOCABLE TRU o 2 9695780115 w ° o U I Lu w I d z J I I I U I II UO \ \ i I I II O / r � / z PROP. LIMITS OF / / / _ LOD LOD !l l�S /!�� / I J LJ� J �,�� �� 1 ,/� �, \ =�� (1 I j �� DISTURBANCE �% —LOD / v� v LOD = 11.33 AC. / ��6 1� /i�� ij//� LYNCH MYRA STEWART - / \� 9695572575 �S -- + I — , _ TEMP. CONSTRUCTION. W m U - I / LYNCH REBECCA — \ \ i i — Tyr 9695562741 _ , . � � ACCESS ROUTE°i 1 _-- ---- — - \ —_------- —_— -- —�-OB }0 �0 LQD LOD/ UTILIZE TEMPORARY °b % IN -STREAM DIVERSION AT ALL TIMES WORKING �� f`����f � -/ ' ✓r t 0 IN ASHWORTH CREEK. — RR R-r- Lori--- — —/LoD r — 1 i z — ��� LOD LOD O LOD LOD LOD _j _ OD �Qo LOD LOD LOD / TEMP. CONSTRUCTION I l ° LOD / ENTRANCE/EXIT V I r� / r c s SEE DETAIL, SHEET 5.3 II S 1 r { I 1 _ TEMPORARY STREAM f a — CROSSING (TYP.) F SEE DETAIL, SHEET 5.4LOD LOD - } J �-LOD I � D � \LOD LOD _ - LOD g Ic z LOD LOD = BEECHTREE OF NC LLC II O ~J L D --' TEMP. SILT FENCE 9695569899 1 0 LOD LOD LOD �� -� � 1 I w o o 00 © LYNCH WILLIAM M; TEMP. STAGING AND ° i o I ! I ! I z a_ J 0 zz 00 z z U �0� 0 J z z QUO z LL �w0 U) L.L W z 0 0 0. LJJ O > LYNCH CATHERINE I- STORAGE AREA - _ } j D �7 I j II 1 - - - >9695563802 -_ _ 7 SAMUEL ASHE DRIVE �J_k�o ���r> II j I , ASHEVILLE, NC 28805 - - TEMP. CONSTRUCTION I � ENTRANCE/EXIT l o� � \ o p -' 1 SEE DETAIL, SHEET 5.3 z o 1� /(911 �( O s��� h tf �A� ° ---- _ _ \ - �__ SEAL COMM - - - _ ---=-- -__-- --- --�- ---- - ---- ---� -_ -- - ---- -— —_ - _ _-- `- --- -- - ---- �--- -- ---- -- 1 f - -- II GIN 5 OCOMMComm� Comm COMM- -74 D _ — COM ---cool —CQMMS foll - �`tee =— — _ f=------ -- ------ - � - -- - -_ s — _ MNl• — iL� �-C ----- Om - COMM - --I -- - ----- -- -- — DATE: 9/6/2023COM- ------ Comm- — MM CO'MM SCALE (34"X22"). 50' �X11 - SCALE 17L(Q , ti SCALE IN FEET OJ SHEET NUMBER J� - 5.1 0 c) (N O N O a) a) 0- a) m a) c a) 0 w 0 J O O L0 ('') N O N O Q a) n3 U) a) a) 0 w Q U) U --- LOD \L�O� - _ _ _� j s TEMP. CONSTRUCTION ,l �o S ��� j �' ACCESS ROUTE O� �f� D w '� v —I / % Lo7 I v __ _ -- _ 4Qo i gyp., - � Lri s 1 - — —— II ------------- - w (z Lu J<iA A z TEMP. STAGING AND' pp STORAGE AREA _ �� �� v\ C) J UTILIZE TEMPORARY PUMP �� %� / Q FRAY NATHAN C; S �/ J _ /� AROUND AT ALL TIMES WORKING \ FRANKLIN BARTLETT �? 1 �// — � -- ._ � A� � 9695386792 � �� ,// / � � O � p IN UT1. LOCATION OF PUMP - /�' TEMP. SILT FENCE AROUND TO VARY THROUGHOUT \ CONSTRUCTION SEQUENCE. SEE DETAIL SHEET 5.4 \ � o o HAMILTON SUSIE C; HAMILTON WILLIAM G TEMP. CONSTRUCTION 9695472179 �r1 v - A �%r \ r ENTRANCE/EXIT SEE DETAIL, SHEET 5.3 � HAMILTON WILLIAM G; HAMILTON USI S C � I �^ 5✓v % Z �1 ��\VA\ — 1 ---- --- _ UTILIZE TEMPORARY IN -STREAM DIVERSION- --///---- _�,, LOD z AT ALL TIMES WORKING I.ARMIT R. SOME I� G•i - - ! III , `i — _ C ��`� ! �. �_��� `�/ ® -�'�►�•���7IM 64 ���� P Ur • _ � o � • o `v _ psi' % �.tii / _ row, ► . � , CIS - ��04: i0 i `I ► ..lLu� tP •� �� � � �, R 1S>``` a ID -��:.. Bill ♦ o� ♦ ♦ r . ./f.3� ♦ ��. /r �� �, a �� ,,I, ` �, s e�E C p QD Ii' m. �. Yc� '�>� ���e` _�.!°�I<o1i ® �'-•�Ir<:{��t:'I` f,I �! s �� i> i !C IC • e;� Irv. �� � �, � � _ I � ti. ►_! � C : • I � � �CvvIlI. !/! `eQ�! ►i� �L0 -pop,s� . 'i1 i1►`� ��' Ial�� ®`1/1. . �G ' ICICICiCIC► • IE /♦ i - , ♦ . • ��C♦���� ► .Ji1. A. �► :7�� �s� itiv 5C9 is ���l 5 ® IglgiIC!CE,�� � AEI e ♦ `` /v ,.ti � t i' <,� � �- i. e i �►♦ � •�4i i�IPl` �,yi �!!1 ` �< �6�4i ►i`t.�i >1,(1l►`� �,. ��- % fl,.-- � �j - I@'���7`� s�'.7 � ► �.w17��I''�®A ♦, ��✓ �, ♦ �/�..^ems. �:•</I <�i `♦a`� .�`� �. � a�.- , G •� ! - - '` � � •I�?:— �� _d irk ��i /.. � d_-- - w ♦ G• 1 Vti �, �+®i '�._.' , � :�v ` ► _ ' �i► ! � , 1 � 1 ._�� �� „ . ..r.�.. �W���. • �°�/.ray .y �. `� _'��.���_��.� ,vvy � p C A/�, ,a , • �����;� �, 1�� _ .• �� �A✓e +C�� , � A���=c3��tJ !v� �w.�ii� 7.�i., i � � �so,:.� �� ,,-r .�...��.g' _'"•\� yP-- a�'���� � !C •, �► � \��, � „ � �•i♦��� � I ��' �la � •f J -ti1p �• v � A y..�I� , ...>�/�'i'�%���� } �t - �'��C�i� � �� Q1�i=�9� n ��iZ �.. _ � �'� '�Tq p! I�tIt ,I i'• J tD .`- *' . ril 3�� *"op. �/- i DD LOD LOD LOD LOD _ SOD LOD LOD / I - LOD — — LOD c� �(� LOD LOD - J - y r 1O D ? )� f �O ���II�IIS / I \ PROP. LIMITS OF Lop CONTRACTOR TEMPORARY STREAM TO AVOID 1, pa 1 CROSSING (TYP.) � D� ' PICNIC AREA DISTURBANCE LO ' �\ SEE DETAIL, SHEET 5.4 LOD ( ) _ - �h l i \o 1 - _ -- -- _ - _ _ _ TEMP. CONSTRUCTION v _- — -�OVM — �- — - - — - - _ - _ _ SEE DETAIL, SHEET 53 0 0 - ENTRANCE/EXIT� o ARLOTTE - — — —— — — - -- -- _/ Come--_COMM �HWY— UTILIZE TEMPORARY PUMP r J� - - - - _ - _ _ - -- - — M COIVI AROUND AT ALL TIMES WORKING*COMM — COA4M — ___ --�_-- /�0�� �l }�111��11 IN UT2. LOCATION OF PUMP COMM _ _ lool i I�� AROUND TO VARY THROUGHOUTComm — —�= CQM _ _ - CONSTRUCTION SEQUENCE. � I/ ry - _ _ _ _= =�� — _—__ _ - COMM COMM SEE DETAIL, SHEET 5.4 r - - �_ _ _ _ = _ - _ _ - - cC�MM — r —COMM A\ o \\I� \ \ o / /// / 1 1 1 1 I L r U Q m z Q 0 X z O m � Y U) 2 LLI � U n n o a w Q � z 0 Q 0 U) Lu L1J LLJI L.L U 2 00 Cn zz_ D J 00 U m U 0� z0 D z m z J a_ J 0 z z 00 0 U F_ z z U 3:0� Q Q Cn Jzz QUO z_ Q �w0 U) L.L 06 z 0 � VJ 0 0. L1J 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 o�� CAR Ol �OF ESS SEAL 02445 GINE /////III I lW\\\` DATE: 9/6/2023 SCALE (34"X22"): 1 " = 50' SCALE (17"X11"): 1" = 100' 0 50 100 SCALE IN FEET SHEET NUMBER 5.2 Co 0 co N 0 N E a) iz a� a3 to a� 0 w 0 J tl m U W J Q U U) Q c� I w a 0 0 LO co N O N co N E a) a) U) ca Cn a) w Q W 2 U EROSION AND SEDIMENTATION CONTROL NOTES Q AND SPECIFICATIONS CONSTRUCTION SEQUENCE m z / 1. ALL CONSTRUCTION ACTIVITIES SHALL ADHERE TO THE CONDITIONS AND 1. OBTAIN AND REVIEW THE ASHWORTH CREEK RESTORATION EROSION AND REQUIREMENTS OF NCDEMLR'S NG01 CONSTRUCTION GENERAL PERMIT. SEDIMENTATION CONTROL PLAN AND ALL OTHER APPLICABLE PERMITS. / 2. ALL TREES, UTILITIES AND OTHER SITE FEATURES SHALL BE PROTECTED UNLESS 2. FLAG THE WORK LIMITS AND STAKE OUT THE LIMITS OF DISTURBANCE (LOD) MARKED FOR REMOVAL OR RELOCATION. OF THE PROJECT. THE TOTAL PROJECT LOD IS 11.33 AC. X z 0 3. ALL WETLANDS AND STREAMS LOCATED WITHIN 50 FEET OF THE 3. LOCATE ALL UNDERGROUND UTILITIES WITHIN THE WORK AREA. m o / CONSTRUCTION AREA ON THE PROJECT SITE SHALL BE CLEARLY MARKED 4. NOTIFY INSPECTOR FROM DEQ REGIONAL OFFICE PRIOR TO DISTURBANCE. UJ (EXAMPLE- ORANGE FABRIC FENCING) PRIOR TO ANY LAND DISTURBING 5. POST CERTIFICATE OF APPROVAL FOR LAND DISTURBANCE AT SITE. v (nn o ACTIVITIES AND MUST BE MAINTAINED ON THE PROPERTY UNTIL THE PROJECT 6. INSTALL RAIN GAUGE AND PREPARE INSPECTION FORMS. = PHASE IS COMPLETED. [15A NCAC 02H .0506 (13)(2)] 7. HOLD PRE -CONSTRUCTION MEETING WITH THE PERMITTEE, ENGINEER AND SO"M�n 4. THE TURBIDITY STANDARD OF 50 NTUS (NEPHELOMETRIC TURBIDITY UNITS) CONTRACTOR PRIOR TO STARTING ANY LAND DISTURBING ACTIVITIES. or 0 o TrontSHALL NOT BE EXCEEDED AS DESCRIBED IN 15A NCAC 02B .0200. APPROPRIATE 8. INSTALL ALL AND CONTROL AS x } ofyo �__ A--- ENTRANCESOWN ANDIN D ETAILSDINSTALLCION ONSTRUCT ONBIVIPS SEDIMENT AND EROSION CONTROL PRACTICES MUST BE USED TO MEET THIS THE DRAWINGSOANON m 0 0 0 0 0 4Se STANDARD. [15A NCAC 02B .0211 (21)] STREAM CROSSINGS AT THE DESIGNATED CONSTRUCTION ACCESS POINTS ASLu / 5. EQUIPMENT SHALL BE WELL -MAINTAINED, CLEANED PRIOR TO MOBILIZATION, SHOWN ON SHEETS 5.1 AND 5.2 AND IN THE DETAILS ON SHEETS 5.3 AND 5.4. o Q Q_ Q. AND CHECKED DAILY FOR LEAKS OF PETROLEUM PRODUCTS. FUELING, 9. INSTALL SILT FENCE ALONG THE DOWN SLOPE SIDE OF THE STAGING AREA AS a w ; LUBRICATION AND GENERAL EQUIPMENT MAINTENANCE SHOULD NOT TAKE SHOWN IN THE DETAIL ON SHEET 5.3. Q PLACE WITHIN 50 FEET OF A WATERBODY OR WETLANDS TO PREVENT 10. INSPECT EROSION PREVENTION AND SEDIMENT CONTROL BMPS DAILY AND CONTAMINATION BY FUEL AND OILS. [15A NCAC 02H .0506 (B)(3) AND 15A AFTER SIGNIFICANT RAINFALL EVENTS. MAKE NEEDED REPAIRS IMMEDIATELY. NCAC 02B .0211(12)] KEEP ALL LOGS AND RECORDS UP-TO-DATE. 6" Min. 6. CONSTRUCTION SHALL BE TIMED TO OCCUR DURING TIMES OF LOW FLOW. 11. ACQUIRE AND STORE MATERIALS FOR SITE (E.G. ROCK, LOGS, EROSION (n / 7. THE DESIGNER OR HIS DESIGNEE SHALL SUPERVISE THE INSTALLATION OF CONTROL MATTING AND FILTER FABRICS) IN THE TEMPORARY STAGING AREA. W a IN -STREAM STRUCTURES. [15A NCAC 02H .0506(B)(1) AND (2)]. 12. CLEAR EXISTING VEGETATION REQUIRED TO COMPLETE THE WORK TAKING ~ O I 8. THE CONTRACTOR SHALL TAKE ALL REASONABLE MEASURES TO CONSTRUCT CARE NOT TO DISTURB DESIRABLE VEGETATION TO REMAIN INTACT. Z Z 2-3" Course Aggregate Q� IN -STREAM STRUCTURES WHILE KEEPING HEAVY EQUIPMENT OUT OF THE RIVER 13. GRADE THE RIVER BANKS AND INSTALL BANK STABILIZATION STRUCTURES O J CHANNEL. ONLY EQUIPMENT THAT IS BEING USED TO INSTALL STRUCTURES OR ACCORDING TO THE PLANS AND DETAILS. WHEN POSSIBLE, PERFORM WORK O REMOVE DEBRIS BLOCKAGES MAY ENTER THE RIVER CHANNEL. EQUIPMENT FROM THE RIVER BANKS TO MINIMIZE TIME SPENT WORKING IN THE F___ SHALL ACCESS THE RIVER AT THE CLOSEST POINT POSSIBLE TO REDUCE IMPACTS CHANNEL. < LJJ Construction: Maintenance: TO THE RIVER BED. THE MAJORITY OF FLOW SHALL BE DIVERTED AROUND 14. WHEN WORKING IN AN ACTIVE STREAM CHANNEL, UTILIZE A TEMPORARY 0 Z U Z 1. Clear the entrance and exit area of all vegetation, roots, and other objectionable 1. Per NCG-01 inspect at least once a week and after each 1 inch or greater rainfall; WORK AREAS USING A TEMPORARY DIVERSION. ALL REASONABLE STEPS MUST DIVERSION. � Q ~ Z Z CD O material and properly grade it. make any required repairs immediately. BE TAKEN TO LIMIT THE AMOUNT OF DISTURBANCE IN THE CHANNEL AND TO 15. INSTALL TEMPORARY SEEDING, PERMANENT SEEDING AND EROSION CONTROL Z (n Z ( ) w 2. Place the gravel to the specific grade and dimensions shown on the plans, and 2. Maintain the gravel pad in a condition to prevent mud or sediment from leaving the THEREFORE REDUCE DOWNSTREAM TURBIDITY DURING CONSTRUCTION. MATTING ON ALL DISTURBED RIVER BANKS AND GRADED SLOPES AS SHOWN ON SHEET 5.3. � J W O - Z U smooth it. construction site. This may require periodic topdressing with 2 inch stone. 9. THE RIVERBANKS, IN -STREAM STRUCTURES AND WORK AREA MUST BE 16. ONCE THE WORK AREA IS STABILIZED AND CONSTRUCTION ACTIVITIES ARE � 0 C > (� � 3. Provide drainage to carry water to a sediment trap or other suitable outlet. 3. Immediate) remove all objectionable materials spilled, washed or tracked onto public y J p p STABILIZED AT THE END OF EACH DAY BEFORE THE TEMPORARY IN -STREAM � - LLJ 4. Use geotextile fabrics in order to improve stability of the foundation in locations roadways. DIVERSIONS ARE REMOVED AND FLOW IS RETURNED THE FULL CHANNEL. COMPLETED, REMOVE AND DISPOSE OF ALL NON -BIODEGRADABLE EROSION W W Q 0� F--- W subject to seepage or high water table. 10. EROSION CONTROL MATTING THAT INCORPORATES PLASTIC MESH AND/OR AND SEDIMENTATION CONTROL BMPS. W m C 0 < 06 Z PLASTIC TWINE SHALL NOT BE USED ALONG STREAMBANKS OR WITHIN 17. NOTIFY PERMITEE AND THE ENGINEER FOR A FINAL INSPECTION AND WALK = J WETLANDS. DISTURBED AREAS SHOULD BE SEEDED, MULCHED, AND/OR THROUGH TO VERIFY FINAL STABILIZATION OF THE SITE. U Q W J O MATTED AS SOON AS POSSIBLE, PREFERABLY AT THE END OF EACH WORKDAY. 18. WHEN SEASONALLY APPROPRIATE, INSTALL PERMANENT PLANTINGS ON RIVER IV Z U 2 STANDARD CONSTRUCTION ENTRANCE EXIT [15A NCAC 02B .0201] BANKS AND WITHIN THE RIPARIAN ZONES AS SHOWN ON SHEETS 6.1 AND 6.2. Z 0 - � � 11. IF BORROW OR WASTE MATERIAL IS REQUIRED OR GENERATED DURING Z)Z W O GRADING OPERATIONS, AN APPROVED EROSION AND SEDIMENT CONTROL 0 � 0LL PERMIT MUST BE SECURED FOR THE BORROW OR WASTE MATERIAL SITE PRIOR TO INITIATION OF ANY LAND DISTURBING ACTIVITY. {15A NCAC 04B .0110}. _06 0 Z Q O �_/ (/ ) Overlap Overcut channel 2" Longitudinal �, Stakes at 6" Min. to allow bulking Anchor Trench Wire Fence Filter Fabric O 3'-5' Intervals during seedbed preparation LU Steel Post Plastic or Design Depth I1+ 8' Max. Standard Strength fabric with wire fence Wire Backfill trench 6' Max. Extra strength fabric without wire fence Wire Fence and Compact ��, :::4 0 e G� thoroughly Steel Post Check Slots at 25' intervals Upslope I I �� r Typical installation with erosion control Plastic or 18-24" 4ings Wire ties 8" Min. blankets or turf Environmental / v u reinforcement mats n. Initial channel anchor trench Terminal slope and channel 6" Min. 24" R+�'EF�Fl F anchor trench Intermittent check slot Longitudinal anchor trench .......... Single -lap spliced ends or begin new ........................... 1111i I T 8" down & 4" 7 SAMUEL ASHE DRIVE .................................. ----.---.......... roll In an Intermittent check sot 3" Min. ............................... forwardg a onthe ' NC 28805 ................. Anchor 6"x6" Overlap min. Trench 24" trench 6" Min. and staple at Overlap 12 intervals Prepare soil and apply seed before FLOW ==-------- Filter Fabric CROSS SECTION VIEW ................... installing blankets, mats or other Construction: Staple Overlaps --�--�----------temporary channel liner systems ----------------- .................................... ....... 1. Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics. ............................... Max. 5" spacing ................... ........ 2. Ensure that the height of the sediment fence does not exceed 24 inches above the ground. (Higher fences may ........................... Bring material down to a level area, turn the end under 4" and staple at impound volumes of water sufficient to cause failure of the structure) Maintenance: NOTES: 12" intervals. 3. Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are 1. Inspect sediment fences at least once a week and after each 1 HICA RO 1. Lime, fertilize and seed before installation. Planting of shrubs, trees, etc. should occur after installation. necessary, securely fasten the filter cloth only at a support post with 4 feet minimum overlap to the next post. inch or greater rainfall. Make any required repairs immediately. 2. Slope surface shall be smooth before placement for proper soil contact. P p p P 4. Support standard strength filter fabric b wire mesh fastened secure) to the upslope side of the posts. Extend the 2. Should the fabric of a sediment fence collapse, tear,FESS/p'yy';; p p g Y Yp p � Quo 3. Design velocities exceeding 2 feet/second require temporary blankets, mats or similar liners to protect seed and soil until vegetation becomes wire mesh support to the bottom of the trench. Fasten the wire reinforcement, then fabric on the upslope side of the decompose, or become ineffective, replace it promptly. SEAL established. fence post. Wire or plastic zip ties should have a minimum 50 pound tensile strength. 3. Remove sediment deposits as necessary to provide adequate = 0') 44 5 4. Terminal anchor trenches are required at RECP ends and intermittent check slots must be constructed across channels at 25 foot intervals. MAINTENANCE: 5. Terminal anchor trenches should be a minimum of 12 inches in depth and 6 inches in width. Intermittent check slots should be 6 inches deep 1. Inspect Rolled Erosion Control Products at least weekly and 5. When a wire mesh support fence is used, space posts a maximum of 8 feet apart. Supports should be driven securely storage volume for the next rain and reduce pressure on the � and 6 inches wide. after each rain of 1 inch or greater; repair immediately. into the round a minimum of 24 inches. fence. Take care to avoid undermining the fence during g %,,Fc GINE ''%,�!�Y JE�\�` 6. For installation on a slope, place RECP 2-3 feet over the top of the slope and into an excavated end trench measuring approximately 12 2. Good contact with the ground must be maintained, and 6. Extra strength filter fabric with 6 foot post spacing does not require a wire mesh support fence. Securely fasten the cleanouts. D. inches deep by 6 inches wide. Pin the RECP at 1 foot intervals along the bottom of the trench, Backfill and compact. Unroll the RECP down erosion must not occur beneath the RECP. filter fabric directly to posts. Wire or plastic zip ties should have a minimum of 50 pound tensile strength. 4. Remove all fencing materials and unstable sediment deposits"" the slope maintaining direct contact between the soil and RECP. Pin using staples or pins in a 3 feet center -to -center pattern. 3. Any areas of the RECP that are damaged or not in close 7. Excavate the trench approximately 4 inches wide and 8 inches deep along the proposed line of the posts and upslope and bring the area to grade and stabilize it after the contributing 7. 11 gauge, at least 6 inch by 1 inch staples or 12 inch minimum length wooden stakes are recommended for anchoring. contact with the ground shall be repaired and stapled. drainage area has been properly stabilized. from the barrier. g p p Y 8. Grass -lined channels with design velocities exceeding 6 feet/second should include turf reinforcement mats 4. If erosion occurs due to poorly controlled drainage, the 9. Check slots to be constructed per manufacturers specifications. problem shall be fixed and the eroded area protected. 8. Place 12 inches of fabric along the bottom and side of the trench. 10. Staking or stapling layout per manufacturers specification. 5. Monitor and repair the RECP as necessary until ground cover 9. Backfill the trench with soil placed over the filter fabric and compact. Thorough compaction of the Backfill is critical to DATE: 9/6/2023 11. If there is a berm at the top of slope, anchor upslope of the berm. is established. silt fence performance. 12. Do not stretch blankets/matting tight, allow the rolls to conform to any irregularities. 10. Do not attach filter fabric to existing trees. 13. For slopes less than 3H:1 V, rolls may be placed in horizontal strips. ROLLED EROSION CONTROL PRODUCTS (RECP) TEMPORARY SILT FENCE SHEET NUMBER 5.3 I APPROVED SEDIMENT FILTERING DEVICE (SEDIMENT FILTER BAG). PROVIDE POSITIVE DRAINAGE FROM SEDIMENT FILTER BAG TO STREAM. DISCHARGE ONTO STABLE RIPRAP PAD TO PREVENT SCOUR HOLE FLOW— _ _111111— EARTHERN BERM TEMPORARY PUMP AROUND SEQUENCE STREAM DIVERSION PUMP DISCHARGE HOSES 41111 DEWATERING PUMP INTAKE HOSE P /� STREAMBANK FLOW, — INTAKE � �- %\\ EARTHERN HOSE �j SUMP -HOLE FOR POOL \\ BERM \\\ _ (12" TO 18" DEEP, 2-FT DIAMETER) WORK AREA LENGTH NOT TO EXCEED THAT _ WHICH CAN BE COMPLETED IN ONE DAY 1. SET UP PUMP WITH SUCTION AND DISCHARGE HOSE. 2. INSTALL UP -STREAM SANDBAG DAM. 3. INSTALL DOWN -STREAM SANDBAG DAM. 4. THE PUMP MUST RUN CONTINUOUSLY WHILE WORKING IN THE STREAM 5. STREAMBANKS MUST BE STABILIZED AT THE END OF EACH DAY. 1 ��► i7iI:Z�:�'�1i1► i7_�:T�li1►I7�L��� 1 BERMS SHALL BE SITUATED AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE WORK AREA, AND STREAM FLOW SHALL BE PUMPED AROUND THE WORK AREA. THE PUMP SHOULD DISCHARGE ONTO A STABLE VELOCITY DISSIPATER CONSTRUCTED OF RIPRAP OR SANDBAGS. DIVERSION PUMP DISCHARGE SHALL NOT GENERATE SCOUR, EROSION, OR THE EXPORT OF EXCESS SEDIMENT TO SURFACE WATERS. 2. WATER FROM THE WORK AREA SHALL BE PUMPED TO A SEDIMENT FILTERING MEASURE SUCH AS A SEDIMENT BAG OR OTHER APPROVED DEVICE. THE MEASURE SHALL BE LOCATED SUCH THAT THE WATER DRAINS BACK INTO THE CHANNEL BELOW THE DOWNSTREAM SANDBAG DIKE WITHOUT CAUSING FURTHER EROSION BETWEEN THE SEDIMENT FILTER BAG AND THE STREAMBANK. 3. THE CONTRACTOR SHALL SIZE THE PUMP AROUND SYSTEM SUFFICIENTLY FOR A RANGE OF POSSIBLE BASEFLOW DISCHARGES AND THE SYSTEM SHALL RUN CONTINUOUSLY WHILE WORKING IN THE STREAM. 4. THE STREAMBANKS AND WORK AREA MUST BE STABILIZED AT THE END OF EACH DAY BEFORE THE PUMP AROUND SYSTEM IS SHUT DOWN AND BEFORE FLOW IS RETURNED THE CHANNEL. TEMPORARY PUMP AROUND // �- , 777777 TEMPORARY GRAVEL/COBBLE FLOW, — BERM RIVER BANK WORK AREA WORK AREA LENGTH NOT TO EXCEED THAT WHICH CAN BE COMPLETED IN ONE DAY DETAILED PLAN Ito] mromyell■a RNER BANK FLOW — a- U a Q I I I I I I I I m z Q 0 X z O m a LLJ w w U � i Ti WE d I I I I I I I I Q 1. ALL WORK IN OR ADJACENT TO THE RIVER SHALL BE CONDUCTED SUCH THAT FLOW DOES NOT COME IN CONTACT WITH THE DISTURBED WORK AREA. 7 z 0 2. CONSTRUCT A TEMPORARY DIVERSION USING BOULDER TO CREATE A DIVERSION THAT DIRECTS FLOW AROUND THE WORK AREA SUCH THAT FLOW DOES NOT INTERACT WITH DISTURBED EARTH AND CONSTRUCTION MATERIALS. Q/ 3. CONSTRUCTION SHALL BE TIMED TO OCCUR DURING TIMES OF LOW FLOW. 0. 0 4. CONSTRUCTION SCHEDULING AND STAGING SHALL BE TIMED TO MINIMIZE THE AMOUNT OF � TIME SPENT WORKING IN THE RIVER CHANNEL. �� v! 5. THE RIVERBANKS, IN -STREAM STRUCTURES AND WORK AREA MUST BE STABILIZED AT THE w END OF EACH DAY BEFORE THE TEMPORARY DIVERSION IS REMOVED AND FLOW IS RETURNED TO THE FULL CHANNEL. 6. AFTER THE WORK AREA IS STABILIZED, REMOVE THE BOULDERS USED TO CONSTRUCT THE w TEMPORARY DIVERSION AND RETURN THE RIVERBED TO THE PRE -CONSTRUCTION CONDITION. Lu U 2 0 TEMPORARY IN -STREAM DIVERSION DETAIL � Q 5.0' MAXIMUM BANK ACCESS RAMP HEIGHT SECTION 5:1 IIIII �y I ����'' I MAXIMUM SLOPE III��I 11��I14�1� I � lilili IIII ��°i DIVERSION ^/�`\ of o IIII IIII ��� / III Ilolll IIIII +y CHANNEL y I� oo/ I 6 o°p/ coo °Ills^I ACCESS RAMP WITH °O'�°oDio 0 0 ° ICI NC DOT CLASS A o i,o STONE 11 �I �1,� °° o,o° _ — 00 I y GRAVEL AND IVuI COBBLE FROM RIVER G� l SURFACE FLOW DIVERSION q =1—i i I —I 11=1 11=1 11=1 11=1 I I —I 11= I-ll-' T—II1-1II=n��`III Ill. I— Ill — ARMOUR ACCESS RAMP WITH NC DOT CLASS A STONE DETAILED PLAN NOT TO SCALE ORIGINAL RIVER BANK RIVER CHANNEL GRAVEL AND COBBLE FROM RIVER DETAILED CROSS-SECTION SURFACE FLOW 1� DIVERSION TEMPORARY FORD CROSSING NOTES AND SPECIFICATIONS 1, KEEP CLEARING AND EXCAVATION OF THE RIVER BANKS AND APPROACH SECTIONS TO A MINIMUM. 2. DIVERT ALL SURFACE WATER FROM THE SITE ONTO UNDISTURBED AREAS NEXT TO THE RIVER. 3. KEEP CROSSING AT A RIGHT ANGLE (PERPENDICULAR) TO THE RIVER. 4. ALIGN ROAD APPROACHES WITH THE CENTERLINE OF THE CROSSING FOR A MINIMUM DISTANCE OF 30 FT. 5. STABILIZE ALL DISTURBED AREAS SUBJECT TO FLOWING WATER INCLUDING THE RIVER BANKS AND PLANNED OVERFLOW AREAS. 6. ALL STREAMBANKS AND BED MATERIAL DISTURBED DURING INSTALLATION OF THE CROSSING SHALL BE STABILIZED WITH TEMPORARY SEEDING AND EROSION CONTROL MATTING OR RIPRAP. COIR EROSION CONTROL WATTLES SHALL BE INSTALLED AT ALL INGRESS AND EGRESS POINTS AS SHOWN IN THE DRAWINGS. 7. REMOVE TEMPORARY STREAM CROSSINGS IMMEDIATELY WHEN THEY ARE NO LONGER NEEDED. RESTORE THE STREAM CHANNEL TO IT ORIGINAL CROSS-SECTION, AND SMOOTH AND APPROPRIATELY STABILIZE ALL DISTURBED AREAS. S. RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING REMOVAL OF THE CROSSING AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. 9. SEE SECTION 6.70.1 OF NC DEMLR'S EROSION AND SEDIMENT CONTROL DESIGN MANUAL (2013) FOR ADDITIONAL INFORMATION, NOTES, AND SPECIFICATIONS. Z Z D J 00 U W Q m U O� U � z0 Z)z m U) Lu 0 J 0N Z Z 000 Z U U Z 0 Q0FZ 0 Q Jz0 z w U Z ADO LLI LL 06 Z 0 W 0 ry LLJ 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 ��Ivinl I Iuiii��� \k CAR Q , SEAL 024A 5 R DATE: 9/6/2023 NOT TO SCALE TEMPORARY FORD STREAM CROSSING DETAIL SHEET NUMBER 5.4 I I I I I I CUMULATIVE AREAS: I , ZONE 1: STREAMBANKS = 1.65 AC ZONE 2: RIPARIAN BUFFER = 3.66 AC I I I I I I I I � I � I O I I � I I I I I I N I I 0 Lu I U Lu y "' I I I LLI I I I E z ' 2 I I o co Q I O n \ LYNCH MYRA STEWART I 9695572575 LYNCH REBECCA 9695562741 _ \ - _ - - --- /------� / Jam} X X Z ma 0 L U I U � I w LIJ I U I X THE ELFRETA MCBRAYE } FRADY REVOCABLE TRU 00 9695780115 Lw 0 I a a < /-10 I / ) " �rf ZONE 2: RIPARIAN BUFFER O _ (TYP) — b� i, z O Q 0 U) Lu Ill Ill U 2 I..L 0 — — - vj - - - .- /L �\ �Z - O — - --J/ 1 --� s(j��� \ J O OU Q�/ f �O o � 3 � \ O (� OQ 1 - — - - — ��\✓>/ t -� — /' c 'c t \ ? III I L r/ O O 9 f O O �/� O vv_O�D��QOOO �O QO O OO� � I--�ZONE 1: STREAMBANKS �o(i I s IS I 1 `—' O i / � ------ �—�<— (TYP) sj� (�) - - — O Q Q ( / 2BEECHTREE OF NC LLC 9695569899 r i 1 4 t LYNCH WILLIAM M; w w i I I I I I I I I I I I I I I i I I I I I ! I ! I ! I I Z Z 00 U 0� m U 0� z0 M) z W Zz JO Z 0— ~ — Z C) 3:o 0 J Lu Z Q00 Z W LL>� 0 I..L LL jj o Is I �7 � o I j II � 7 SAMUEL ASHE DRIVE > -,�-� � ^ s - -- � 9695563802 _ — _ � � ' ASHEVILLE NC 28805 I _ — Cp v Q CA— _ 7- SEAL = COMM �- ------ - _-- — --- _- -C� - _- �- _-_ - \ _- S L f -r r / / ��� f = 02 5 n COMM --- _ _ _ _ _ — — --_ __---___— C0�1M— -� —Comm CID- ——__ —O -a- _ US-74 — y — — — — — _ _— _ _-t �5 ��_ _ _ _ �� / / / / �/ / \ i���/Q! _— _ - COMM— — —COMM— — _�(y�M�/j �l - �- - — /-__- ^__�- ����^--_-�= ) 1/I iiiiiniinn���� CQMM � -- ss—_ —_--_v_-7' ---=== �/ —Comm rO—MM�---_CO—MM_•— --_—_—_---_—__ = G�COMMi -- %COMM—COMM /_ 11� COMM - -.— COMM — — — OMM - �� �r DATE: n �, 1 r > f �� r __ _ =-_- _ _— — — _ �L _ f � �t� \ _— _ , L \ — COMM— — co SCALE (34"X22"): -SCALE (17"X11 ") \ Jr / — 9/6/2023 ill 150 11, = 100' �1�i 0 50 100 SCALE IN FEET O0 SHEET NUMBER n I � 6.1 CUMULATIVE AREAS: // / \ \ - J / / , / / I 0 ( 5 ZONE 1: STREAM BAN KS = 1.65 AC _ / \ / / ZONE 2: RIPARIAN BUFFER = 3.66 AC \_— � l \ _ / / / / r of ��//� f — , \--0+00 j \mooLu IPcj s a s 10 CL a) ASEY NATHAN C; FRANKLIN BARTLETT -� i) � f � 9695386792 e a `-�� ZONE 2: RIPARIAN BUFFER �\ / r/ / \� (TYP) \ \1-1 0 L \� �� \ \ I , t HAMILTON SUSIE C; HAMILTON WILLIAM G 9695472179 n / f / r f// /%O / l �f y HAMILTON WILLIAM G; `/ \ �/ HAMILTON SUSIE S C I / / — ` \ \ \ \ \ \ \ \ 1 I ( I \ 9695476718 \^ 5� / /) \ 1 �\ `� — c ! Cj ri r — / ,/� �� i1 )s ZONE 1: STREAMBANKS o— \ 1 (TYP) J X 0 Z / —� n � - _ +0 cn OMMI O _�— /� \ Vif >> \ \ GO 1 —.- — HARLOTTE HWY Comm MM�COMM�ol l}jr11i�oJ/Il� , c ��\— _ — - _ COMM _ — Comm \\\l�\-77 jrlryll�((1ti'//1 CAM ---CO M_ -Comm— L//j/ �--���; can I � \ 1 Y Y Q n \ 1 O a w Q iI i i i i i i I 1 i I i I i I i I i I i I i I � Q Z Zz O O J Z U 00 OZ) Lu U Q C'o _ W Z O QC9OU z>� ZO �w0 Z)Z 00 ()� LL_ 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 \\\\unI I III///,/, 5- s o���'yy'� �O �i Q , SEAL k 02145�) GINS 77 .1 0,,y DE� DATE: 9/6/2023 SCALE (34"X22"): 1 " = 50' SCALE (17"X11 "): 1 " = 100' 0 50 100 SCALE IN FEET SHEET NUMBER 6.2 GENERAL RE -VEGETATION AND PLANTING NOTES 1. FINAL VEGETATION SPECIES SELECTION MAY CHANGE DUE TO REFINEMENT OR SPECIES AVAILABILITY AT THE TIME OF PLANTING. SPECIES SUBSTITUTIONS WILL BE COORDINATED BETWEEN THE BANK MANAGER, ENGINEER AND PLANTING CONTRACTOR PRIOR TO THE PROCUREMENT OF PLANT/SEED STOCK. 2. LARGER NATIVE TREE SPECIES TO BE PRESERVED WILL BE FLAGGED BY THE ENGINEER PRIOR TO CONSTRUCTION ACTIVITIES. ANY TREES HARVESTED FOR WOODY MATERIAL WILL BE UTILIZED TO PROVIDE BED AND BANK STABILIZATION AND COVER OR NESTING HABITAT ON THE FLOODPLAIN. ANY EXCESS WOODY MATERIALS MAY USED TO BACKFILL OLD CHANNELS. 3. ALL DISTURBED AREAS WILL BE STABILIZED USING TEMPRORY AND PERMERMANET SEEDING AS DEFINED IN THE SEEDING SCHEDULE AND THE APPROVED E&SC PLANS. 4. SUPPLEMENTAL PLANTING ACTIVITIES MAY BE REQUIRED WITHIN THE CONSERVATION EASEMENT. TEMPORARY SEEDING AND MULCHING NOTES 5. TEMPORARY SEEDING AND MULCHING SHALL BE APPLIED TO ALL AREAS AND ACCESS ROUTES DISTURBED DURING CONSTRUCTION. 6. ALL SEED AND SEED VARIETIES MUST BE FREE OF STATE AND FEDERALLY LISTED NOXIOUS WEED SEED AND INVASIVE SPECIES. 7. ALL DISTURBED AREAS WILL BE SEEDED WITH TEMPORARY SEED AND MULCHED WITH WHEAT STRAW. SEEDING WILL BE PERFORMED USING A BROADCAST SPREADER. OTHER METHODS MAY BE USED BUT MUST BE APPROVED BY ENGINEER IN ADVANCE OF INSTALLATION. 8. MAINTENANCE OF SEEDED AREAS SHALL CONSIST OF WATERING, WEED AND PEST CONTROL, FERTILIZATION, EROSION REPAIR, RESEEDING, AND INCIDENTAL OPERATIONS AS NECESSARY TO ESTABLISH A HEALTHY, VIGOROUS, WEED FREE AND DISEASE FEE UNIFORM STAND OF GRASS. ALL AREAS WHICH FAIL TO SHOW A UNIFORM STAND OF GRASS FOR ANY REASON SHALL BE TREATED REPEATEDLY UNTIL A UNIFORM STAND OF AT LEAST 90% COVERAGE IS ATTAINED WITH NO BARE AREA GREATER THAN FIVE (5) SQUARE FEET. PERMANENT SEEDING NOTES 9. PERMANENT SEEDING SHALL OCCUR IN CONJUNCTION WITH TEMPORARY SEEDING WHERE APPLICABLE. IDEALLY, PERMANENT SEEDING SHALL OCCUR DURING THE PLANTING SEASON FOR EACH SEED TYPE. AREAS FERTILIZED FOR TEMPORARY SEEDING SHALL BE SUFFICIENTLY FERTILIZED FOR PERMANENT SEEDING; ADDITIONAL FERTILIZER IS NOT REQUIRED FOR PERMANENT SEEDING. 10. ALL SEED AND SEED VARIETIES MUST BE FREE OF STATE AND FEDERALLY LISTED NOXIOUS WEED SEED AND INVASIVE SPECIES. 11. THE CONTRACTOR SHALL LOOSEN THE SOIL TO A MINIMUM DEPTH OF 4-INCHES AND GRADE TO A SMOOTH, EVEN SURFACE WITH A LOOSE, UNIFORMLY FINE TEXTURE. THE AREAS TO BE SEEDED ARE THEN TO BE ROLLED AND RAKED TO REMOVE RIDGES AND FILL DEPRESSIONS TO MEET FINISH GRADES. THE CONTRACTOR IS TO LIMIT SUB GRADE AND FINISH GRADE PREPARATION TO AREAS THAT WILL BE PLANTED IMMEDIATELY. PREPARED AREAS ARE TO BE RESTORED IF ERODED OR OTHERWISE DISTURBED AFTER FINE GRADING AND BEFORE PLANTING. 12. SEED SHALL BE SOWN WITH A SPREADER OR A SEEDING MACHINE. SEED IS NOT TO BE BROADCAST OR DROPPED WHEN WIND VELOCITY EXCEEDS 5 MPH. SEED SHALL BE EVENLY DISTRIBUTED BY SOWING IN TWO DIRECTIONS AT RIGHT ANGLES TO EACH OTHER. WET SEED OR SEED THAT IS MOLDY OR OTHERWISE DAMAGED IN TRANSIT OR STORAGE IS NOT TO BE USED. AFTER BEGIN SOWN, THE SEED SHALL BE RAKED INTO THE TOP 1/4 INCH OF THE TOPSOIL, LIGHTLY ROLLED, AND WATERED WITH FINE SPRAY. SEEDED AREAS ON STREAM BANKS SHALL BE PROTECTED WITH COIR FIBER MATTING. ZONE 1: STREAMBANK 13. LIVESTAKES AND HERBACEOUS PLUGS LISTED IN THE PLANTING SCHEDULE SHALL BE PLANTED IN OFFSET ROWS AT A DENSITY OF 4,840 STEMS PER ACRE (3.0' O.C.) FROM TOE OF THE RESTORED CHANNEL TO 3.0' OUTSIDE THE BANKFULL STAGE. HERBACEOUS PLUGS SHALL BE PLANTED ALONG THE TOE OF THE CHANNEL IN THE OUTSIDE OF THE POOL MEANDER BENDS. ZONE 2: RIPARIAN BUFFER 14. WOODY SPECIES LISTED IN THE PLANTING SCHEDULE SHALL BE PLANTED IN OFFSET ROWS AT A DENSITY OF 440 STEMS PER ACRE (10.0' O.C.) FROM 3.0' OUTSIDE THE BANKFULL STAGE TO THE GRADING LIMITS. EXACT PLACEMENT OF THE SPECIES SHALL BE DETERMINED BY THE CONTRACTOR'S VEGETATION SPECIALIST PRIOR TO SITE PLANTING AND BASED ON THE WETNESS CONDITIONS OF PLANTING LOCATIONS. SOIL SPREADING 15. AREAS OF SOIL SPREADING SHALL BE STABILIZED USING TEMPORARY SEEDING AS DEFINED IN THE SEEDING SCHEDULE AND THE APPROVED EROSION AND SEDIMENTATION CONTROL PLANS. SEEDING SCHEDULES TEMPORARY SEEDING DATE TYPE APP. RATE (LBS / AC) JAN 1 - APR 30 RYE GRAIN (Secale cereale) 120 COMMON OATS (Avena sativ) 100 RED CLOVER (Trifolium incarnatum) 20 GROUND AG. LIMESTONE 2,000 10-10-10 FERTILIZER 750 STRAW MULCH 4,000 MAY 1 - JUL 31 GERMAN MILLET (Setaria italica) 50 COMMON OATS (Aveno sativ) 100 RED CLOVER (Trifolium incarnatum) 20 GROUND AG. LIMESTONE 2,000 10-10-10 FERTILIZER 750 STRAW MULCH 4,000 AUG 1- DEC 31 RYE GRAIN (Secale cereale) 120 WINTER WHEAT (Triticum aestivum) 100 RED CLOVER (Trifolium incarnatum) 20 GROUND AG. LIMESTONE 2,000 10-10-10 FERTILIZER 750 STRAW MULCH 4,000 PERMANENT RIPARIAN SEEDING - 25 LBS / AC SPECIES COMMON NAME PERCENT Juncus effusus COMMON RUSH 5% Coreopsis lanceolato LANCE LEAF TICKSEED 10% Agrostis perennons AUTUMN BENTGRASS 5% Elymus virginicus VIRGINIA WILDRYE 10% Andropogon gerardi BIG BLUESTEM 10% Schizachyrium scoparium LITTLE BLUESTEM 5% Ponicum virgatum SWITCH GRASS 15% Tripsocum doctyloides EASTERN GAMAGRASS 5% Sorghastrum nutans INDIAN GRASS 5% Rudbeckia hirta BLACK-EYED SUSAN 10% Chamaecristo (Cassia) fasciculata SHOWY PARTRIDGE PEA 10% Bidens aristosa SHOWY BIDENS 5% Helianthus angustifolius SWAMP SUNFLOWER 5% TOTAL r 100% ZONE 1: STREAMBANKS ZONE 1 - STREAMBANK - 3' O.C. (4,840 STEMS / AC) SPECIES COMMON NAME % OF STEMS LIVE STAKES Cornus amomum SILKY DOGWOOD 40% Salixsericea SILKY WILLOW 30% Sambucus canadensis ELDERBERRY 15% Physocarpus opulifolius NINEBARK 15% TOTAL 100% HERBACEOUS PLUGS Juncus effusus COMMON RUSH 60% Carex alata BROADWING SEDGE 40% TOTAL 100% ZONE 2: BUFFER RE-ESTABLISHMENT SPECIES COMMON NAME % OF STEMS OVERSTORY Platanus occidentalis SYCAMORE 15% Acer rubrum RED MAPLE 15% Nyssa s yl vatica BLACK GUM 10% Liriodendron tulipifera YELLOW POPLAR 10% Betula nigra RIVER BIRCH 5% Quercus stellata POST OAK 5% Quercus alba WHITE OAK 5% UNDERSTORY Carpinus caroliniana IRONWOOD 10% Prunus serotina BLACK CHERRY 5% Asimina triloba PAWPAW 5% Hamamelis virginiana WITCH HAZEL 5% Lindera benzoin SPICEBUSH 5% Alnus serrulata HAZEL ALDER 5% TOTAL 100% U � Q m z Q 0 X z o m w = o U X m 0 w O a a Q z 0 Q 0 0 Lu LLJ W U 0 2 Q w z 0 U W 000 G 0 U z m Q Z_ J 0 Q U 2 0 z Lu J 0 LLI 2 U C� 0 z Q U) Lu 0 z z 0 Q LLJ CD LLJ W 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 DATE: H CAR ''% ' IZ) ESS� O`/yq% SEAL 02�5 IN ,, CRY D NTS z 0 I- U Z) z 0 U 0 LL 9/6/2023 SHEET NUMBER 6.3