HomeMy WebLinkAboutWQSV00003_Variance Request_20231220W,.�WK '�`� SVo0 003 DICKSON community infrastructure consultants December 14, 2023 Mr. Michael Montebello Division of Water Resources NCDEQ — Raleigh, NC Central Office 512 North Salisbury Street Raleigh, NC 27604 RECEIVED 15 2023 NCDEQUNRINPDES RE: Permit No. PWC2021-SO15 Phase V Annexation Project XV Construction Area 32 East Section I Sewer Variance Fayetteville Public Works Commission Fayetteville, North Carolina WKD Project No. 20180008.01.RA Dear Mr. Montebello: Fayetteville Public Works Commission (PWC) is hereby submitting a permit variance request for the Phase V Annexation Project XV Construction Area 32 East Section I (Area 32 East Section 1), which has been approved under the PWC permit number, PWC2021- S015. The purpose of this variance request is to address the installation of proposed sewer manholes, MH A9 and MH A10, located within 100 linear feet of an existing private irrigation well situated at 7221 Stoney Point Road (PIN 9494-39-4141) in Fayetteville, North Carolina. As per our evaluation and previous correspondence with NCDEQ officials, the existing conditions do not fully meet the separation requirements outlined in 15A NCAC 02T .0305 which states the following: "...for public or private wells, piping materials, testing methods, and acceptability standards meeting water main standards shall be used where these separations cannot be maintained. All appurtenances shall be outside the 100-foot radius of the well. The separation shall however not be less than 25 feet from a private well or 50 feet from a public well." Consequently, we are pursuing a permit variance to ensure the project's compliance with environmental regulations while addressing the unique circumstances of the private well location. To mitigate any potential risks associated with the proximity of the sewer manholes to the private well, we have implemented the following design modifications to the respective manhole design previously recommended by NCDEQ: 1. Manholes shall be provided with a watertight frame and cover with gasket 2. All manhole seams shall be externally taped/sealed. 720 Corporate Center Drive Raleigh, NC 27607 Tel. 919.782.0495 www.wkdickson.com Transportation • Water Resources 9 Urban Development • Geomatics North Carolina Department of Environmental Quality November 20, 2023 Page 2 3. Manholes shall be provided with a full waterproof interior coating/lining. 4. Watertight pipe connections shall be provided consisting of a flexible rubber boot or compression type connector. 5. Manholes shall be tested in accordance with ASTM C1244 "Standard Test Method for Concrete Sewer Manholes by the Negative Air Pressure (Vacuum) Test Prior to Backfill". 6. "Doghouse" type manholes shall not be used. Enclosed within this letter, you will find plans, details, and specifications that will further outline the requested variance. We emphasize that this variance is imperative as the project is currently under construction, and the private well owner has expressed the desire to have the well remains in place. We are available to provide any additional information or clarification that may be required to support the review process. Please do not hesitate to contact us if you have any questions or comments. We look forward to hearing back from you. Sincerely, W.K. Dickson & Co., Inc. Z 4 0- -: �- �-e - - - - �4e�� MacKenzie Perro, PE Project Engineer CC' Misty Manning, PW, FAYPWC Allan Riddle, PE, FAYPWC John Allen, PE, FAYPWC Michael Youngblood, PE, WK Dickson %D ICKSON State of North Carolina Department of Environment and Natural Resources Division of Water Resources -DWR 15A NCAC 02T .0105 — VARIANCE/ALTERNATIVE DESIGN REQUEST Division of Water Resources INSTRUCTIONS FOR FORM: VADC 10-23 & SUPPORTING DOCUMENTATION Plans, specifications and supporting documents shall be prepared in accordance with, 15A NCAC 02T .0100, 15A NCAC 02T .0300, Division Policies and good engineering practices. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the request. For more information, visit the Wastewater Branch's website at: http: //portal. ncdenr. org/web/wq/swp/ps/cs/ext General — When submitting a request, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Unless otherwise noted, submit one original and one copy of the request and supporting documentation. A. Cover Letter (Required for All Request Packages): ® List all items included in the request package and a brief description of the requested permitting action. ® Submit a detailed description of specific criteria that a variance request is submitted for. 15A NCAC 02T, Minimum Design Criteria (MDC) for the permitting of Gravity Sewers, & Minimum Design Criteria (MDC) for the Permitting of Pump Stations and Force Mains ® Submit a detailed description why the project cannot comply with 15A NCAC 02T or adopted design criteria. ® Submit a detailed description of how the alternative design will meet the requirements of 15A NCAC 02T .0105(n) B. Application Fee: ® Submit a check or money order in the amount of $600.00 dated within 90 days of application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ). C. Request Form (VADC 10-23) (Required for All Request Packages): ® Submit the completed and appropriately executed VADC 10-23 request form. ® The Applicant's certification of the request shall be signed in accordance with 15A NCAC 02T.106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T.0106(b). ® The Professional Engineer's Certification of the request shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. D. Engineering Plans (Required for All Request Packages): ® Submit one set of detailed plans that have been signed, sealed and dated by a North Carolina licensed Professional En igineer, pertinent to the variance request. Individual plan sheets related to the request may be submitted instead of complete plan sets. ® Plans shall represent a completed design and not be labeled with preliminary phrases (e.g., FOR REVIEW ONLY, NOT FOR CONSTRUCTION, etc.) that indicate they are anything other than final plans. However, the plans may be labeled with the phrase: FINAL DESIGN - NOT RELEASED FOR CONSTRUCTION. E. Specifications (Required for All Request Packages): ® Per 15A NCAC 02T .0304(b)(2), submit specifications that have been signed, sealed and dated by a North Carolina licensed Professional En ig neer, pertinent to the variance request. ® Specifications shall represent a completed design and not be labeled with preliminary phrases (e.g., FOR REVIEW ONLY, NOT FOR CONSTRUCTION, etc.) that indicate they are anything other than final specifications. However, the specifications may be labeled with the phrase: FINAL DESIGN - NOT RELEASED FOR CONSTRUCTION. F. Engineering Calculations (All Request Packages): ❑ Per 15A NCAC 02T .0305(b)(3), submit engineering calculations that have been signed, sealed and dated by a North Carolina licensed Professional En ig neer, pertinent to the variance request. INSTRUCTIONS FOR FORM: VADC 10-23 & SUPPORTING DOCUMENTATION Pagel of 2 G. Applicable Sewer Extension Application and Supporting Documentation (Required if submitted in conjunction with a variance request) ❑ Submit the completed and appropriately executed application if provided in conjunction with the request. ➢ This is exclusive to projects requiring a full technical review (ASEA 10-23 & SSEA 10-23). ➢ Submission of FTA 10-23 and supporting documents to the regional office is only allowed once the variance has been approved by the Central Office. Submission prior will result in the application being returned. 15A NCAC 02T.0105 — Select Code Related to Variance / Alternative Design Criteria (b)... The applicant shall provide adequate documentation to the Division to ensure that the proposed system will meet all design and performance criteria as required under this Subchapter and other applicable rules, be operated as a non -discharge system, and protect surface water and groundwater standards. Variances to this Subchapter or adopted design criteria must be specifically requested in the application and, if approved pursuant to Paragraph (n) of this Rule, incorporated into the permit. The Division may accept certification from a licensed or certified professional (e.g. Professional Engineers, Licensed Soil Scientist, Licensed Geologist, Technical Specialist) that the design meets or exceeds minimum design criteria applicable to the project. Division acceptance of certifications by the applicant or by licensed or certified professionals preparing reports for the application shall not constitute approval of a variance to this Subchapter or applicable minimum design and performance criteria unless specifically requested in the application and approved in the permit. (n) The Director shall approve alternative Design Criteria in cases where the applicant can demonstrate that the alternative design criteria will provide the following: (1) equal or better treatment of the waste; (2) equal or better protection of the waters of the state; and (3) no increased potential for nuisance conditions from noise, odor or vermin. THE COMPLETED REQUEST AND SUPPORTING DOCUMENTATION SHALL BE SUBMITTED TO: ATTENTION: PERCS UNIT SUPERVISOR By U.S. Postal Service: 1617 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1636 TELEPHONE NUMBER: (919) 807-6312 By Courier/Special Delivery: 512 N. SALISBURY ST. SUITE 925 RALEIGH, NORTH CAROLINA 27604 INSTRUCTIONS FOR FORM: VADC 10-23 & SUPPORTING DOCUMENTATION Page 2 of 2 State of North Carolina Department of Environment and Natural Resources DWR Division of Water Resources 15A NCAC 02T .0105 — VARIANCE/ALTERNATIVE DESIGN REQUEST Division of Water Resources VADC 10-23 & SUPPORTING DOCUMENTATION Application Number: (if applicable, to be completed byDWR) APPLICANT INFORMATION: wQ s voo 003 1. Applicant's name: Fayetteville Public Works Commission 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State ® Municipal ❑ County 3. Signature authority's name: Misty Manning, PE per 15A NCAC 02T .0106(b) Title: Water Resources Engineering Manager 4. Applicant's mailing address: 955 Old Wilmington Road City:Fayetteville State: NC Zip:28301- RECEI \/ -D 5. Applicant's contact information: DEC 15 2023 Phone number: (910) 223-4736 Email Address: misty.manning@faypwc.com II. PROJECT INFORMATION: KDEOID NRlNPDES 1. Project name: Phase V Annexation Project XV Construction Area 32 East Section I 2. Project status: ® Proposed ❑ Existing (if existing, Permit Number: ) III. CONSULTANT INFORMATION: 1. Professional Engineer: MacKenzie Perro, P.E. License Number: 052768 Firm: WK Dickson & Co., Inc. Mailing address: 720 Corporate Center Drive City: Raleigh State: NC Zip: 27607- Phone number: (919) 256-5631 IV. VARIANCE REQUEST: Email Address: mperroAwkdickson.com 1. Provide a detailed list of specific criteria that a variance request is submitted for: (e.g., NCAC 02T.0305(f) - Separation, MDC for Pump Stations / Force Mains 3.04(A)(1)(b) — Discharge Piping Velocity, etc) 15A NCAC 02T .0305 (2)(2) - for public or private wells, piping materials, testing methods, and acceptability standards meeting water main standards shall be used where these separations cannot be maintained. All appurtenances shall be outside the 100-foot radius of the well. The separation shall however not be less than 25 feet from a private well or 50 feet from a public well. The alternative testing method is being requested for the gravity sewer mains that are to be constructed per water main standards under this variance. The individual sewer main segments shall be hydrostatically tested to a pressure of 5.83 psi (MH A8 to MH A9) 4.87 psi (MH A9 to MH A10), and 7.11 psi (MH A10 to MH Al 1). The required testing pressure was calculated by taking the difference in elevation (in feet) between the invert out of the downstream manhole and the rim elevation of the upstream manhole dividing the difference in elevation by 2.31 psi per foot of change in elevation and then multinline that number by a xl .5 safetv factor. No allowable leakage is allowed over a two hour period. All tests shall be erformed in the presence of the Owner and/or Engineer. FORM: VADC 10-23 Pagel of 2 Applicant's Certification per 15A NCAC 02T .0106(b): I, M I.YMY rA, r1AAA1ACX E CA103ELIZIAG MA"CIM attest that this request for (Signature Authority's name & title from Request Item 1.3.) P}tA,-5E v AAAL"Tioa PAWCC-r AV AR A 3Z EAPT 6EMpol 1 (Project name from Request Item 11.1.) has been reviewed by me and is accurate and complete to the best of my knowledge. I also understand that if all required parts of this request package are not completed and that if all required supporting information and attachments are not included, this request package will be returned to me as incomplete. I understand that by certifying this variance request, I shall adhere to the requirements of the variance approval should it be approved and all permit conditions should the permit be approved. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any request package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well ascivilpenalties up to $25,000 per violation. % Signature: "/ / ► Date: Z �/ "2 d Z 3 Professional Engineer's Certification: I, lUl� 6eEi 2!11 PelL/LO , R� attest that this request for (Professional Engineer's name from Request Item 111.1.) PN►ML d Au4AEXXripA fleoafWr X / CVAS-ta%jct►a.4 AIMA. 37- EAST SErCTWA 1 (Project name from Request Item 11.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design. in accordance with 15A NCAC 02T.0105(n) will provide: equal or better treatment of the waste; eaual or better protection of the waters of the state: and no increased potential for nuisance conditions from noise, odor, o r vermin. I further attest as been prepared in accordance with this request package and its instructions, as well as all applicable regulations and statutes. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.66, any person who knowingly makes any false statement, representation, or certification in any request package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: fN rn rrnrrr ............�;�.......... ffl..... ..GI.p ....�.. ` GAR `''�-, .. .oQ.. oF............. S l p;�;.,:� 1715, '' enz.ie ............_...._.......S....'.UUIIf N...... ..........._.. FORM: VADC 10-23 Page 2 of 2 ENGINEERING PLANS (2) CAM LOCKS SEE DETAIL 1" LETTERING PICK BARS DETAIL COVER FA(F (2) CAM LOCKS (2) CAM LOCKS WITH (2) STAINLESS STEEL ROLL PINS (1/2" DIA. x 1-3/4") OR (2) WEDGE CAM LOCKS N.T.S I►---1-1/4" DIA. CO RUBBER........._._...' y i I?GASKET CAM LOCK 1 I 2s" DIA. CAM LOCK DETAIL N.T.S. 3-13/16" :t COVER SECTION N.T.S. . - I 5/8" DIA. SS ROD 27-3/8"-27-7/16" DIA.......,......................................+ 26-1/8"-26-1/4" DIA. PICK BAR AND GASKET GROOVE DETAIL 24" DIA-- 00 24-1/2" DIA. 26"-26-1/8" DIA. 34" DIA. FRAME SECTION N.T.S. N.T.S. APPROVED GASKET MATERIAL (4) EACH 5/8" 0 x 5-1/2" STAINLESS STEEL BOLTS WITH WEDGE ANCHORS. (SCORE THREADS TO PREVENT REMOVAL) I COVER N.T.S. NOTES: 1. MANHOLE FRAME AND COVER TO BE MADE OF GRAY CAST IRON CONFORMING TO ASTM SPEC. A48-83, CLASS 35, MANUFACTURED BY SAME MANUFACTURER. ALL CASTINGS SHALL CONFORM TO THE SHAPE AND DIMENSIONS SHOWN. ALL CASTINGS SHALL BE CLEAN AND FREE FROM DEFECTS. 2. CASTINGS SHALL BE UNPAINTED AND SHALL HAVE THE LETTERS "PWC-FAY-NC" AND "SANITARY SEWER" CAST INTO COVER. LETTERS SHALL BE RAISED AND CLEARLY VISIBLE. 3. MANHOLE RING AND COVER SHALL WITHSTAND H-20 VEHICULAR TRAFFIC. 4. MINIMUM AVERAGE WEIGHT: PLUS OR MINUS 5% RING 155LBS., COVER 160LBS., UNIT 315LBS. 5. PERFORATED COVERS WILL NOT BE ALLOWED. 6. SUPPLY SOCKET FOR TURNING CAM LOCK MECHANISM. ONE SOCKET PER PROJECT. 7. USE OF GRADE RINGS ARE NOT ALLOWED, UNLESS APPROVED BY THE FAYPWC PROJECT COORDINATOR. FOR MANHOLES OUTSIDE OF YARD OR LANDSCAPE AREAS, THE USE OF GRADE RINGS ARE NOT ALLOWED. 8. FOR MANHOLES IN YARD OR LANDSCAPED AREAS, THE RING AND COVER SHALL BE SET TO FINISHED GRADE. THE USE OF GRADE RINGS ARE ALLOWED TO SET THE MANHOLE TO FINISHED GRADE. FOR GRADE RINGS 4" OR LESS, THE RING AND COVER SHALL BE ANCHORED TO THE CONE USING 5/8" DIAMETER STAINLESS STEEL BOLTS WITH WEDGE ANCHORS. FOR GRADE RINGS OVER 4", THE RING AND COVER SHALL BE ANCHORED TO THE GRADE RING, USING 5/8" DIAMETER x 5-1/2" STAINLESS STEEL BOLTS WITH WEDGE ANCHORS. 9. FOR OUTFALL AREAS, THE RING AND COVER SHALL BE SET A MINIMUM OF 18" ABOVE FINISHED GRADE, UNLESS OTHERWISE APPROVED. 10. THIS DETAIL IS TO BE USED ON ALL MANHOLES LOCATED OUTSIDE OF PAVED AREAS, UNLESS OTHERWISE APPROVED. I. REFER TO FAYPWC STANDARD DETAIL S.17 FOR INSTALLATION OF VENT STACK. ruvur�r�u ivvly- I m/Arriu Hmt/-.\ MANHOLE RING AND COVER FAYETTEVILLE NO. DATE REVISION WITH WIPER GASKET AND CAM LOCK PUBLIC WORKS COMMISSION REVISED NOTES ON FRAME N.T.S. FAYETTEVILLE, N.C. � 1 07/09 SECTION/REVISED NOTE 3 SHEET NO. DWG. NO. S.6 DWG. BY: FAYPWC WATER RESOURCES 2 07117 ADDED NOTE ON WEDGE CAM LOCKS 1 OF 1 ENGINEERING DEPARTMENT DATE: JAN. 01, 2023 APPROVED BY: M.M.M. 3 01/18 UPDATED NOTES 7 AND 8 SPECIFICATIONS RE(;EjvE1) 15 2023 NCDEQIDWpjNPDES .XAVC3 F rc te H MEWN UTILITY TECHNICAL SPECIFICATIONS Cil6]� -0 FAYETTEVILLE ANNEXATION PHASE V, PROJECT XV, CONSTRUCTION AREA 32 EAST SECTION I FAYETTEVILLE PUBLIC WORKS COMNIISSION OF THE CITY OF FAYETTEVILLE NORTH CAROLINA September 2021 for Fayetteville Public Works Commission Water Resources Engineering PWC Operations Center 955 Old Wilmington Rd Fayetteville, NC 28301 910-223-4730 Prepared by: W. K. Dickson & Co., Inc. 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782-0495 NC License F-0374 ��1111111/��� CARO/// i'Z , 042116 = GINE�� //� 441V I I R \oo \\\ TABLE OF CONTENTS Section Pages VOLUME II DIVISION 2 - SITEWORK 02110 Site Clearing, (Utility) 02110 - 1 to 02110 - 2 02211 Grading, Utilities 02211 - 1 to 02211 - 3 02222 Excavation and Backfilling for Utility Systems 02222 - 1 to 02222 - 5 02272 Erosion Control - General Provisions 02272 - 1 to 02272 - 2 02273 Temporary Silt Fence 02273 - 1 to 02273 - 1 02274 Gravel Construction Entrance/Exit 02274 - 1 to 02274 - 1 02275 Block and Gravel Inlet Protection 02275 - 1 to 02275 - 1 02301 Boring and Jacking 02301 - 1 to 02301 - 3 02500 Traffic Control 02500 - 1 to 02500 - 5 02505 Adjustment of Existing Structures 02505- 1 to 02505 - 2 02573 Permanent Pavement Patch 02573 - 1 to 02573 - 2 02574 Temporary Pavement Patch (Type I-19.00) 02574 - 1 to 02574 - 2 02575 Driveway Replacement 02575 - 1 to 02575 - 3 02584 Roadway and Parking Lot Marking 02584 - 1 to 02584 - 1 02660 Water Distribution 02660 - 1 to 02660 - 13 02662 Fire Hydrant Painting 02662 - 1 to 02662 - 2 02730 Sanitary Sewer System 02730 - 1 to 02730 - 13 02732 Sewage Force Mains 02732 - 1 to 02732 - 8 02831 Chain Link Fencing 02831 - 1 to 02831- 3 02931 Lawns and Grasses (Sodding) 02931 - 1 to 02931 - 5 02933 Lawns and Grasses (Seeding) 02933 - 1 to 02933 - 4 02934 Seeding Wetlands 02934 - 1 to 02934 - 3 03301 Concrete Construction (Utility) 03301 - 1 to 03301 - 5 09801 Anti -Microbial Additive 09801 - 1 to 09801 - 2 09802 Special Coatings (Ceramic Epoxy) 09802 - 1 to 09802 - 2 09804 Special Coatings (Epoxy Lining Ductile Iron Pipe 09804 - 1 to 09804 - 5 and Fittings NOTE: ONLY APPLICABLE SECTIONS 02730, 03301, 09802, AND 09804 ARE INCLUDED WITH THIS VARIANCE REQUEST APPLICATION PACKAGE. PHASE V ANNEXATION 1 OF 2 TABLE OF CONTENTS APPENDICES Appendix A — AQUA Water Specification Appendix B — NCDOT Encroachment Appendix C — Erosion and Sedimentation Control Plan Appendix D — Easement Special Requirements Appendix E — Various Permits Appendix F — Soil Report Appendix G — Various Construction Related Forms APPENDICES NOT APPLICABLE TO VARIANCE REQUEST PHASE V ANNEXATION 2 OF 2 TABLE OF CONTENTS Revised February 2021 DIVISION 2 SITE WORK 02730 SANITARY SEWER SYSTEMS GENERAL Sanitary sewer lines and all appurtenant items shall be constructed of materials specified or indicated on the drawings. The intent and purpose of these specifications is to require a complete and satisfactory installation in every respect and any defect in material or workmanship shall be cause for the replacement and correction of such defect as directed by the Public Works Commission. RELATED SECTIONS A. 02211— Grading, Utilities B. 02222 — Excavation and Backfilling for Utility Systems C. 02732 — Sewage Force Mains MATERIALS SEWER MAINS Prior to shipment each joint of pipe shall be stamped by an independent testing laboratory, certifying compliance with the specifications stated therein. Pipe sizes indicated shall be understood to be nominal inside diameter of the pipe. All sewer pipe materials shall be either PVC (as specified herein) or ductile iron (as specified herein), unless otherwise approved in writing by the Public Works Commission. Written approval shall be obtained prior to installation. DUCTILE IRON PIPE The raw material from all ductile iron pipe and fittings shall have an average minimum content consisting of 90% recycled iron and steel. Ductile iron pipe and fittings shall be manufactured in the United States of America in accordance with ANSI/AWWA A21.51/C151. The manufacturer of the ductile iron pipe shall be a member of the Ductile Iron Pipe Research Association (DIPRA). All ductile iron pipe and fittings shall be in strict accordance with ANSI A21.51 and AWWA C151, Class 50 or Class 51, as applicable, in every respect. The working pressure shall be a minimum of 200 psi. Pipe shall be furnished in 18 or 20-foot lengths. All pipe joints used in open trench construction shall be furnished with "push -on" joints, unless otherwise indicated on the drawings or specified. All joints and fittings shall be in accordance with ANSI A21.11 and AWWA C111. All ductile iron interior surfaces shall be lined with two (2) coats of ceramic epoxy to produce a total minimum dry film thickness of 40 mils (Protecto401 or approved equal). The exterior pipe surfaces shall be protected with asphaltic coating as specified in AWWA C151 and C110. Specifications for the ceramic epoxy can be found in Specification Section 09802. PUBLIC WORKS COMMISSION 02730 - 1 OF 13 SANITARY SEWER SYSTEMS Revised February 2021 For aerial crossings which are 4 inches through 12 inches in diameter, manufactured restrained joint ductile iron pipe Class 53, or Class 53 flanged ductile iron pipe shall be utilized in accordance with the standard Public Works Commission detail for aerial crossings. Mega -lugs, field-lok, and gripper rings are not an allowable means of restraint for aerial crossings. For aerial crossings larger than 12 inches, or as noted specifically on the plans, flange joint ductile iron pipe, Class 53, shall be utilized in accordance with the standard Public Works Commission details. The location of flanges shall be specifically designed for each application. The flange pipe shall be in accordance with ANSI/AWWA C-I15/A21.15. Threads for threaded flange pipe shall be in accordance with ANSI B2.1, shop fabricated as outlined by AWWA 115 with serrated faces furnished on the pipe, completely factory installed. Welding of flanges to the body of the pipe will not be acceptable. Ductile iron fittings and flanges shall be in accordance with ANSI/AWWA C-110/A21.10 with a minimum working pressure of 250 psi. Gaskets shall be full faced SBR rubber per ANSI/AWWA C-1 I I/A21.11 with a minimum 1/8" thickness. Linings and coatings shall be as outlined for ductile iron pipe. If the Public Works Commission determines that an expansion coupling is required, it shall be installed as indicated on the drawings. The expansion coupling shall not be buried. For subsurface water crossings (i.e., streams, wetlands), restrained joint ductile iron pipe shall be utilized. No mechanical restraint systems (e.g., mega -lugs, field-lok gaskets, etc.) shall be utilized. The pipe shall be installed in a casing, in accordance with the approved Public Works Commission detail, unless otherwise specifically approved by the Public Works Commission. PVC PIPE PVC sewer pipe and fittings 4 inches thru 15 inches shall be in accordance with ASTM D-3034 with a standard dimension ratio (SDR) of 26 for sewer mains and laterals. Larger diameter pipe (18 inches through 27 inches) shall be in accordance with ASTM F-679, with a SDR of 26. Both pipe and fittings shall be made of PVC plastic having a cell classification of 12454 as specified in ASTM D-1784. Pipe joining shall be push on eastomeric gasket joints only and the joints shall be manufactured and assembled in accordance with ASTM D-3212. Elastomeric seals shall meet the requirements of ASTM F-477. The pipe shall be furnished with integral bells and with gaskets that are permanently installed at the factory and in accordance with ASTM D-3212 and contain a steel reinforcing ring. PVC sewer pipe shall be made by continuous extrusion of prime green unplasticized PVC and contain identification markings as required by the applicable ASTM standard. SEWER FITTINGS Ductile Iron Push -on Fittings: PUBLIC WORKS COMMISSION 02730 - 2 OF 13 SANITARY SEWER SYSTEMS Revised February 2021 Ductile iron sewer fittings on PVC mains shall be deep bell, gasketed joint, and air test rated. Gasket groves shall be machined in the factory. Material shall be ductile iron, in accordance with ASTM A536, Grade 65-45-12 and ASTM F1336. Wall thickness shall meet the requirements of AWWA C153. Gaskets shall have a minimum cross sectional area of 0.20 square inches, and conform to ASTM F477. All ductile iron fittings shall have an interior coating of Protecto 401, or approved equal. All ductile iron fittings on PVC pipe shall provide a flow line that provides a smooth transition between the materials. Ductile iron fittings shall be as manufactured by the Harrington Corporation (Harco), or approved equal. Mechanical Joint Fittings: Joints shall be installed in accordance with AWWA C-600 and shall conform to AWWA Standard C-111. Mechanical joints shall be of the stuffing box type and shall conform to ANSI A21.11 for four inch (4") pipe and larger. Fittings and specials shall be ductile iron and shall be manufactured in accordance with AWWA Standard C-110 (ANSI A21.11). Compact fittings shall be ductile iron in accordance with ANSI A 21.53 (AWWA C-153) for 4" thru 24" sizes only. Note: mechanical joint wyes are not included in the AWWA C-153 specification. Pressure rating shall be not less than 200 psi unless otherwise specified. All ductile iron fittings shall have an interior coating of Protecto 401, or approved equal. Mechanical joint fittings shall be utilized on ductile iron mains and ductile iron laterals. Mechanical joint fittings shall not be utilized on PVC mains, unless otherwise approved by the Public Works Commission. PVC Fittings: PVC fittings shall be manufactured in accordance with ASTM D-3034, F-1336, and F-679. Molded fittings shall be utilized in sizes from 4" to 8" (or larger, if available). Fabricated fittings shall only be utilized with prior approval from the Public Works Commission. Fabricated fittings are defined as those fittings that are made from pipe or a combination of pipe and molded components. All PVC fittings shall contain identification markings as required by the applicable ASTM standard. All PVC fittings shall be gasketed joint, except as indicated for interior drop structures. Plastic fittings shall be as manufactured by GPK Products, Inc., Plasti-Trends, the Harrington Corporation (Harco), or approved equal. Ductile Iron Pipe Size x SDR26 Transition Adapter: All ductile iron x PVC transition adapters shall be one (1) piece, bell x bell (gasket x gasket). Transition adapters shall range in size from four (4) inches through 12 inches. Transition adapters for pipe larger than 12-inches shall be as specified by the Public Works Commission. All transition adapters shall have a flow way tapered to allow a smooth transition between the ductile iron and PVC. Transition adapters shall be either PVC or ductile iron, in accordance with the following: PVC — All PVC transition fittings shall be made from DR 18 C900 pipe stock. The C900 pipe stock shall meet the requirements of AWWA C900/C905, and have a minimum cell classification of 12454 as defined in ASTM D 1784. The wall thickness shall meet or exceed DR 18. PVC transition fittings shall have SBR gaskets in accordance with ASTM F477. All six (6) inch and PUBLIC WORKS COMMISSION 02730 - 3 OF 13 SANITARY SEWER SYSTEMS Revised February 2021 eight (8) inch adapters shall be molded. Molded fitting joints shall be 235 psi rated, in accordance with ASTM D3139, and shall have SBR rubber gaskets. Four (4) inch, ten (10) inch and 12 inch transition adapters shall have SBR Rieber style gaskets meeting ASTM F477. Joints shall be 235 psi rated, in accordance with ASTM D3139 for the C900 (ductile iron) bell, and in accordance with ASTM D3212 for the sewer (SRD26) bell. Molded C900 bell depths shall comply with AWWA C907. Fabricated (4-inch, 10-inch and 12-inch) bell depths and molded sewer (SDR26) bell depths shall be in accordance with ASTM F1336. PVC transition adapters shall be manufactured by the Harrington Corporation (Harco), GPK Products, or approved equal. Ductile iron — Ductile iron transition fittings shall be deep bell, push -on joint, and air test rated. The ductile iron material shall comply with ASTM A536, Grade 65-45-12 or 80-55-06. The bell depth shall be in accordance with ASTM F1336. Gaskets shall be of SBR rubber, in accordance with ASTM F477. Transition gaskets are not allowed. All ductile iron transition fittings shall have an interior coating of Protecto401 or approved equal. Ductile iron transition fittings shall be manufactured by the Harrington Corporation (Harco) or approved equal. Saddles: Sewer service saddles may be utilized for sewer lateral installations. All sewer service saddles shall be ductile iron with stainless steel straps, bolts, nuts, and washers. The nuts shall be coated to prevent galling. The saddle body shall be ductile iron, in accordance with ASTM A536, Grade 65-45-12. The gasket material shall be SBR, in accordance with ASTM D2000. Saddles for PVC or DI laterals shall have an alignment flange. Sewer service saddles shall be as manufactured by Geneco, or approved equal. All stainless steel straps shall be pre -formed at the factory, to the specified outside diameters of the pipe. SEWER LATERALS Ductile iron laterals — For ductile iron mains, utilize mechanical joint fittings or an approved saddle with an alignment flange (Geneco or approved equal). For PVC mains, utilize an approved saddle with an alignment flange (Geneco or approved equal) or ductile iron fittings as specified above. PVC laterals — utilize a saddle with an alignment flange (Geneco or approved equal) on PVC or ductile iron mains; utilize a mechanical joint tee with SDR 35 transition gaskets on ductile iron mains; or utilize PVC fittings as specified above on PVC mains. The following table summarizes the materials to be utilized for sewer main to lateral connections: PVC Main DI Main DI Lateral DI fitting or approved saddle MJ fitting or approved saddle PVC Lateral PVC fitting or approved saddle MJ fitting with transition gasket or approved saddle PUBLIC WORKS COMMISSION 02730 - 4 OF 13 SANITARY SEWER SYSTEMS Revised February 2021 Sewer laterals shall be in accordance with these Specifications and PWC standard details S.10, S.11, and S.12. PRECAST CONCRETE MANHOLES Pre -cast circular reinforced concrete manhole units shall be in accordance with ASTM C-478. The tongue and groove ends of the manhole sections shall be manufactured for jointing with rubber gaskets (i.e., con -seal). An eccentric cone shall be utilized on all manholes, unless otherwise approved by the Public Works Commission. Manhole steps shall be placed in all manholes and shall be steel reinforced ('h" grade 60) copolymer polypropylene plastic steps in accordance with ASTM C-478 for material and design. The steps shall be spaced 16" on center with serrated treads and wide enough to stand on with both feet. Manhole frames and covers shall be made of gray cast-iron, and the iron shall possess a tensile strength of not less than 18,000 psi. Cast iron shall conform to ASTM Specification A 48-83 Class 35. The frame and cover shall be manufactured by the same manufacturer. All castings shall be in accordance with Public Works Commission standard details. Any defective castings shall be removed and replaced. Any special linings and coatings that are specified for a manhole and installed at the production facility, in the field, or during repairs, shall be applied in accordance with the applicable special coatings specification and the manufacturer's specifications for that material. Camlock ring and covers shall be in accordance with Public Works Commission standard details. Camlock bolt head shall be compatible with PWC standard tool for turning camlock mechanism. Camlock ring and covers shall be installed as indicated on the drawings, in accordance with PWC standard details. SELECT BEDDING MATERIAL Select bedding material shall be crushed stone (No. 57 or No. 5), in accordance with Public Works Commission standard details. Bedding material shall be provided for all pipe materials. INSTALLATION Pipe installation shall be in strict accordance with Specification Section 02222 — Excavation and Backfilling for Utility Systems and as outlined herein. PIPE LAYING Pipe installation shall be in accordance with the manufacturer's instructions. Proper equipment shall be utilized to perform the work in a manner satisfactory to PWC. All pipes and fittings shall be carefully lowered into the trench in such a manner to prevent damage to the protective coatings PUBLIC WORKS COMMISSION 02730 - 5 OF 43 SANITARY SEWER SYSTEMS Revised February 2021 and linings. Under no circumstances shall pipe materials be dropped or dumped into the trench. Pipe shall be carried into position and not dragged. All dust, dirt, oil, tar (other than standard coating), or other foreign matter shall be cleaned from the jointing surfaces, and the gasket, bell, and spigot shall be lubricated with lubricant recommended by the manufacturer. The pipe shall be laid upgrade, beginning at the lower end with the tongue or spigot ends pointing in the direction of the flow to the correct line and grade, unless otherwise approved by PWC. The pipe section to be installed shall be aligned by batter board or laser beam with the last installed pipe section. Mechanical equipment should not be used to assemble the pipe. Pipe shall be assembled in accordance with the pipe manufacturer's instructions. Any damage resulting from the use of mechanical equipment shall be replaced as directed by PWC. Adjustments in grade by exerting force on the barrel of the pipe with excavating equipment shall not be allowed. The Contractor shall verify line and grade after assembling each joint. At any time when pipe laying is not in progress, the open ends of the pipe shall be closed by a water tight plug or other means approved by the PWC Project Coordinator. If water is in the trench, the plug shall remain in place until the trench is pumped completely dry. No pipe shall be laid in water or where in the PWC Project Engineer's and/or PWC Project Coordinator's opinion trench conditions are unsuitable. Every precaution shall be taken to prevent material from entering the pipe while it is being installed. ALIGNMENT AND GRADE All pipe shall be installed to the required lines and grades. Structures shall be installed at the required locations. The lines and grades of the pipe will generally be indicated by stakes parallel to the line of the pipe. The Contractor shall be responsible for installing the pipe to proper line and grade. Pipe shall be visually inspected by shining a light between structures and /or by closed circuit television inspection. Any defects discovered, including poor alignment, shall be corrected as directed by the Public Works Commission. The bottom of the trench shall be excavated to a minimum of four inches (4") below the outside bottom of the pipe being installed to allow adequate placement and compaction of bedding material prior to installation. Select bedding material shall be placed a minimum of four inches (4") and a maximum of six inches (6") under the pipe for full width of the trench and halfway up the pipe on the sides. Bedding material shall be placed in layers not exceeding six inches (6") loose thickness for compacting by vibratory mechanical tamps under the haunches and concurrently on each side of the pipe for the full width of the trench. The final result shall be "Class B" bedding for rigid pipe. If the existing material under the pipe bedding material is unsuitable, the unsuitable material shall be removed PUBLIC WORKS COMMISSION 02730 - 6 OF 13 SANITARY SEWER SYSTEMS Revised February 2021 and replaced with select bedding material (No. 57 or No. 5 stone), as authorized and approved by the Public Works Commission Project Coordinator. The same material pipe shall be utilized from manhole to manhole, unless otherwise approved by PWC. If the section of pipe between manholes is 250 feet or less, no transitions will be allowed (either all PVC or all ductile iron). Should the length between manholes exceed 250 feet, only one transition will be allowed. Use of a C900 x SDR 26 adaptor shall be used to accomplish the transition. A transition is defined as the use of one C900 x SDR26 adaptor. No more than one (1) adaptor shall be utilized in any given manhole to manhole segment. All manholes shall be constructed to Public Works Commission's standards. Installation shall be in accordance with ASTM C-891 and PWC standards. Manholes shall be constructed of precast reinforced concrete circular sections installed on a base riser section with integral floor and shall be cored to accommodate the various pipe connections, as indicated on the drawings. Pipe connections to a manhole shall be by gasketed flexible watertight connections (boot for small diameter and A Loc for larger diameter pipe) or as approved by the Public Works Commission. The manhole size shall be in accordance with the following table, unless otherwise specified: Pipe Size Manhole Diameter ** 24" and less 48" 27" - 36" 60" 42" 72" * Where interior drop structures are required, use 60" diameter as required in the Public Works Commission standard details. ** Where multiple connections or acute angles are required, larger diameter manhole may be required as indicated on the plans. The invert channel shall be constructed of brick and mortar, in accordance with Public Works Commission standard details. Precast inverts are not allowed. The invert channel shall be smooth and semicircular in shape conforming to the inside of the connecting sewer section. Changes in direction of flow shall be made with a smooth curve as large as a radius as the size of the manhole will permit without a decrease in flow velocity. Changes in size and grade of the channel shall be made gradually and evenly. The invert channel walls shall be constructed to three quarters (3/4) of the height of the crown of the outlet sewer and in such a manner not to obstruct maintenance, inspection or flow in the sewers. The inverts shall have a minimum slope of one (1) percent across the bottom of the manhole. A shelf shall be provided on each side of any manhole invert channel. Inverts in manholes with standing water will not be acceptable. The shelf shall be sloped not less than 1:12 (min) and no more than 2:12 (max). The bottom of the boot for the new sewer main or lateral shall be set one inch above existing shelf unless otherwise indicated. When used in a paved street, the ring and cover shall be set in suitable mortar surrounded by a concrete collar in accordance with Public Works Commission standard details. When used in PUBLIC WORKS COMMISSION 02730 - 7 OF 13 SANITARY SEWER SYSTEMS Revised February 2021 places other than in a paved street, the ring and cover shall be set to the grade shown on the plans or directed by the Public Works Commission. In unpaved areas cam -lock ring and cover shall be used. Camlock ring and cover shall be installed in accordance with Public Works Commission standard details. The interior manhole riser joints, lift holes and grade adjustment rings shall be sealed with non - shrinking mortar to provide a watertight manhole. Lift holes sealed by the manufacturer with plastic caps do not require mortar seal. The hardened mortar shall be smooth to rub with no sharp edges. Use of grade rings with cam -lock ring and cover are not allowed, unless approved by the PWC Project Coordinator. Use of grade rings is not allowed for above grade adjustments. All exterior manhole riser joints, including the joint at the cone, shall be sealed with an external rubber sleeve. The sleeve shall be made of stretchable, self -shrinking rubber, with a minimum thickness of 30 mils. The back side of each wrap shall be coated with a cross -linked reinforced butyl adhesive. The butyl adhesive shall be a non -hardening sealant, with a minimum thickness of 30 mils. The seal shall be designed to stretch around the manhole joint and then overlap to create a fused bond between the rubber and butyl adhesive. The application shall form a continuous rubber seal for the life of the application. The sealing system shall be as manufactured by Concrete Sealants, Inc. (Con -Seal), Sealing Systems, Inc., or approved equal. The wrap shall be a minimum of six (6) inches in width, and shall be centered on the joint. All manhole joints (including the cone section to the last riser) shall be wrapped and sealed. Care shall be taken to prevent damage to the wrap during backfill operations. The manhole surface shall be prepared in accordance with manufacturer's specifications, prior to installing the joint wrap. Materials shall not enter the sewer line during construction of the manhole. The manhole shall be kept clean of any and all debris or materials. Any debris or material that entered the manhole shall be immediately removed. This condition shall be maintained until final acceptance of the work. CONNECTION TO EXISTING MANHOLES OR LIFT STATIONS All connections to existing manholes and/or lift stations shall be approved by the Public Works Commission. Where new mains are to be connected to existing active sanitary sewers, the active sewers shall remain in service. Unless otherwise indicated, where new lines are connected into existing manholes, all or such portion of the manhole invert as is necessary shall be removed and a new invert shall be constructed to accommodate both new and existing flows. All work shall conform to the requirements specified for new manholes. The existing structure connection shall be cored and a flexible watertight connection (i.e., boot) installed. The boot shall be installed in accordance with Public Works Commission standard details and requirements. The Contractor shall coordinate and cooperate with the Public Works Commission's Project Coordinator. PIPE TO MANHOLE CONNECTOR (BOOT) PUBLIC WORKS COMMISSION 02730 - 8 OF 13 SANITARY SEWER SYSTEMS Revised February 2021 A watertight, flexible pipe -to -manhole connector shall be utilized on all pipe to manhole connections, for both new and existing manholes and pipes, unless otherwise specifically authorized in writing by the Public Works Commission. The connector assembly shall be the sole element to provide a watertight seal of the pipe to the manhole or other structure. The connector shall consist of a rubber gasket, an internal compression sleeve, and one or more external take-up clamps. The connector shall consist of natural or synthetic rubber and Series 300 non-magnetic stainless steel. No plastic components shall be allowed. The rubber gasket shall be constructed of synthetic or natural rubber, and shall meet or exceed the requirements of ASTM C-923. The connector shall have a minimum tensile strength of 1,600 psi. The minimum cross -sectional thickness shall be 0.275 inches. The internal expansion sleeve shall be comprised of Series 300 non-magnetic stainless steel. No welds shall be utilized in its construction. Installation of the connector shall be performed utilizing a calibrated installation tool furnished by the connector manufacturer. Installation shall require no re -tightening after the initial installation. Installation shall be done in accordance with the manufacturer's instructions. The external compression take-up clamps shall be Series 300 non-magnetic stainless steel. No welds shall be utilized in its construction. The clamps shall be installed utilizing a torque -setting wrench furnished by the connector manufacturer. Installation shall be done in accordance with the manufacturer's instructions. The Contractor shall utilize the proper size connector in accordance with the connector manufacturer's recommendations. All dead-end pipe stubs shall be restrained in accordance with ASTM C-923. The finished connection shall provide a sealing to a minimum of 13 psi, and shall accommodate a minimum pipe deflection of seven (7) degrees without the loss of seal. The pipe to manhole connector shall be PSX: Direct Drive as manufactured by Press -Seal, or approved equal. INSIDE DROP MANHOLE STRUCTURE Inside manhole drop structures shall be constructed and installed in accordance with Public Works Commission standard details. CLEANING Prior to final inspection, all sanitary sewer laterals, mains, and manholes newly installed on the collection system shall be flushed and cleaned. During the flushing operation, the downstream PUBLIC WORKS COMMISSION 02730 - 9 OF 13 SANITARY SEWER SYSTEMS Revised February 2021 manhole shall be closed with a watertight plug to protect the existing sewer main. All water and debris shall be removed and properly disposed of by the Contractor. This condition shall be maintained until the Public Works Commission issues final acceptance for the project. TF.STTNG Completed sewers shall be tested in accordance with the provisions outlined below. The Contractor shall furnish all equipment, labor, materials, and pay all costs associated with the tests performed. The Contractor shall schedule all testing with the Public Works Commission's Project Coordinator, a minimum of 48 hours in advance. The Contractor shall cooperate with the Public Works Commission's Project Coordinator and furnish any needed assistance necessary to complete the required testing. For annexation and/or retrofit projects: No testing shall be conducted prior to successful completion of the compaction testing. For all other projects: No testing shall be completed until all utilities are installed, prior to preparation of the road subgrade The Contractor may elect to perform testing to satisfy them that the sewer utility is installed properly prior to commencing installation of other utilities. However, such testing shall not be construed as acceptance by PWC. The deflection/mandrel test shall not be performed until a minimum of thirty (30) calendar days after backfill operations are completed and the area graded to final contours. In lieu of waiting thirty (30) calendar days, the Contractor has the option to have an independent testing laboratory verify that compaction has been completed to achieve the maximum density as shown in the detail. The location and elevation of the compaction testing shall be determined reviewed and approved by the Public Works Commission's Project Coordinator. The Contractor shall provide the Public Works Commission with a copy of the density testing results. Compaction testing shall be done in accordance with Specification Section 02222 — Excavation and Backfillina for Utility Systems. Vacuum Testing Manholes: All precast sanitary sewer manholes installed by the Contractor shall be vacuum tested for leakage. This test shall be done in accordance with ASTM C-1244 and in the presence of a Public Works Commission Project Coordinator. The Contractor shall be responsible for providing all the necessary labor, materials, equipment, testing apparatus, and all other incidentals necessary to complete the vacuum test. All testing equipment utilized shall be approved for use in vacuum testing manholes. Each manhole shall be tested after assembly. All lift holes shall be plugged with an approved non - shrink grout. All lines, including laterals, entering the manhole shall be temporarily plugged. The Contractor should take care to ensure that the pipes and plugs are secure in place to prevent them being drawn into the manhole. The test head shall be placed directly on top of the concrete surface PUBLIC WORKS COMMISSION 02730 -10 OF 13 SANITARY SEWER SYSTEMS Revised February 2021 of the manhole following the manufacturer's recommendations, rather than to the cast iron seating ring. Manholes may be tested either prior to backfill or post backfill at the contractor's option. For pre- backfill testing, a vacuum of 10 inches of Mercury (inches Hg) shall be drawn on the manhole, the valve on the vacuum line of the test head closed, and the vacuum pump shut off. The time shall be measured for the vacuum to drop to 9 inches of Mercury (inches Hg). The manhole is acceptable if the time for the vacuum reading to drop from 10 inches of Mercury to 9 inches of Mercury meets or exceeds the values indicated below: Diameter of Manhole Manhole Depth 4' Diameter 5' Diameter 6' Diameter 10' or less 25 sec 33 sec 41 sec 11' to 15' 38 sec 49 sec 62 sec 16' to 20' 50 sec 65 sec 81 see 21' to 25' 62 sec 82 see 101 sec 25' to 30' 74 sec 98 sec 121 sec Vacuum testing backfilled manholes is not recommended in the presence of groundwater. Vacuum testing a backfilled manhole that is subjected to hydrostatic pressure may exceed the design limits of the flexible connecters and could lead to failure of the structure, joints, and/or connectors. Where groundwater is present a reduction in the vacuum pressure applied to the manhole will be required. The vacuum shall be reduced by 1 inch of Mercury for every 1 foot of hydrostatic head between 12 feet and 21 feet. A vacuum test should not be performed when the hydrostatic head exceeds 22 feet. See the chart below: Hydrostatic Head (ft)* 112 13 14 15 16 17 18 19 20 21 22 Vacuum Pressure in H 10 9 8 7 6 5 4 3 2 1 1 ** *Hydrostatic head above the critical connector (critical connector is bottom most flexible connector) **Do not perform vacuum test If the manhole fails the initial test, the manhole shall be repaired by an approved method until a satisfactory test is obtained. All repair methods shall be approved by the Public Works Commission prior to being utilized. Retesting shall be performed until a satisfactory test is accomplished. Mandrel Testing: Deflection tests shall be performed on all PVC pipe installations. PVC pipe's maximum deflection after backfilling shall not exceed five (5) percent. The rigid ball or mandrel used for the deflection test shall have a diameter not less than 95 percent of the base inside diameter or average inside diameter of the pipe depending on the type of pipe manufactured and the applicable ASTM PUBLIC WORKS COMMISSION 02730 -11 OF 13 SANITARY SEWER SYSTEMS Revised February 2021 Standard. The PVC pipe shall be measured in compliance with ASTM D2122 "Standard Test Method of Determining Dimensions of Thermoplastic Pipe and Fittings". The Contractor shall supply all labor, equipment and materials necessary to perform the test in the presence of the Public Works Commission's Project Coordinator. The test shall be performed without mechanical pulling devices. The mandrel shall be constructed so as to preclude any yield in diameter, and with a pull line on each end to facilitate withdrawal. If the deflection exceeds the allowable, the Contractor shall remove and replace the pipe. Air Testiniz: Air testing shall be performed on all mains and laterals to determine acceptability. The length of sewer subject to an air test shall be the distance between two adjacent manholes. The tests shall be conducted in accordance with the appropriate ASTM standard. The air test shall be coordinated with the Public Works Commission. The Contractor is required to supply all equipment, labor, materials and pay all costs associated with the test performed. Air Test for PVC Pipe The low pressure air test on PVC pipe shall be performed with satisfactory results in accordance with ASTM F1417 "Standard Test Method for Installation Acceptance of Plastic Gravity Sewer Lines Using Low -Pressure Air". The pipe, including lateral assemblies, shall be plugged and air added slowly until the internal pressure of the line is raised to 4.0 psi. After the pressure of 4.0 psi is obtained, regulate the air -supply so that the pressure is maintained between 3.5 and 4.0 psi for at least two (2) minutes, depending on air/ground temperature conditions. The pressure will drop slightly until equilibrium is obtained; however, a minimum of 3.5 psi is required. Once the 3.5 psi is maintained, the test will begin. If the pressure drops 1.0 psi within the time indicated below, the test fails. Pipe Dia. in Minimum Time minutes Length for Min Time ft Time for Longer Length sec 4 3:46 597 0.380L 6 5:40 398 0.854L 8 7:34 298 1.520L 10 9:26 239 2.374L 12 11:20 199 3.418L 15 14:10 159 5.342L 18 17:00 133 7.692L 21 19:50 114 10.470L 24 22:40 99 13.674L 27 25:30 88 17.306L 30 28:20 80 21.3661, 33 31:10 72 25.852L 36 34:00 66 30.768L PUBLIC WORKS COMMISSION 02730 -12 OF 13 SANITARY SEWER SYSTEMS Revised February 2021 The Contractor shall observe all safety precautions to include allowing no one in the manholes during testing, securing all plugs and providing additional plug bracing. The Contractor shall be required to furnish, install and remove after testing at no additional cost, a temporary glue cap/plug to be airtight for all cleanout stacks to accomplish air testing. The air pressure shall never exceed 8 psi. All gauges shall be accessible outside of the manholes. HYDROSTATIC TESTS After the ductile iron sewer pipe has been laid within the "protected" area and backfilled to finished grade, the pipe shall be subjected to a hydrostatic pressure test. All laterals within the "protected" area shall be ductile iron. All sewers subject to hydrostatic testing shall include (1) sewers entering or crossing streams, (2) sewers located less than 100 feet from any public or private water supply source including any WS-I waters or Class I or Class II impounded reservoirs, (3) where the minimum 18 inch vertical and 10 feet horizontal separation cannot be maintained between sewers and water mains (see NC DENR Regulations), or (4) as specified and/or indicated on the drawings. The Contractor will furnish all labor and material, including test pumps, plugs, and all other incidentals for making hydrostatic tests. Hydrostatic pressure testing shall be conducted on the completed main, including the laterals. The duration of the pressure test shall be at least one hour or longer, as directed by the Public Works Commission. The hydrostatic pressure shall be 150 psi. Each section of pipe shall be slowly filled with water and the specified test pressure based on the elevation of the lowest point of the line or section under test and corrected to the elevation of the test gauge, shall be applied by means of a pump connected to the pipe in a manner satisfactory to the Public Works Commission. Before applying the specified test pressure, all air shall be expelled from the pipe. All joints showing visible leaks shall be made tight. Cracked or defective pipe, joints, laterals, and fittings discovered in consequence of the pressure test shall be removed and replaced with sound material, and the test shall be repeated until the test results are satisfactory. The requirement for the joints to remain exposed for the hydrostatic test may be waived by the Public Works Commission in certain situations. The test shall be repeated until satisfactory to the Public Works Commission. The results of the pressure tests shall be satisfactory as specified. All replacement, repair, or retesting shall be accomplished by the Contractor. All repairs shall be reviewed and approved by the Public Works Commission prior to backfill. The use of couplings, sleeves, etc. shall be reviewed and approved by the Public Works Commission prior to use. PUBLIC WORKS COMMISSION 02730 -13 OF 13 SANITARY SEWER SYSTEMS DIVISION 2 03301 CONCRETE CONSTRUCTION (UTILITY) GENERAL Concrete construction specified in this section shall be applicable to all "site work" and is not intended to cover general building specifications. The concrete work shall include all furnishing, hauling, fine grading and subgrade, form work, etc. and all incidentals necessary for completion of the work as it pertains. MATERIALS Concrete The Contractor shall furnish and place concrete in strict accordance with the requirements of ACI 318 (most recent edition). Ready -mixed concrete from an approved mixing plan shall be used throughout the work and conform to the requirements of ASTM C-94 for batch, mixing, and transporting. Concrete shall be in accordance with the following requirements: A. Under Ground - Regular Weight Concrete 28-day compressive strength 3000 psi Coarse aggregate 1 '/2" max. size stone Slump 2" minimum, 4" maximum Air Entrainment No requirement B. Walls, Slabs, Sidewalks, Curb and Gutter - Regular Weight Concrete 28-day compressive strength 3000 psi Coarse aggregate 3/4" max. size stone Slump 2" minimum, 4" maximum Air Entrainment 5 more or less 1 The Contractor shall submit for approval mix designs, designed and tested by an approved testing laboratory, following the requirements of ACI 318 for each class of concrete to be used on this project. Mix designs in excess of one year old shall be verified. The Contractor will be responsible for all costs involved in the mix design. Material suppliers and material proportions incorporated in the mix design and certification shall not change without written permission from the Public Works Commission. Admixtures used to produce entrained or air shall be sulforated hydrocarbons or neutralized vinsol resins conforming to ASTM C-260. Calcium chloride, other accelerators, or "anti -freeze" shall not be used without written approval by the Public Works Commission. PUBLIC WORKS COMMISSION 03301-1 OF 4 CONCRETE CONSTRUCTION (UTILITY) Reinforcing Steel Reinforcing bars shall be new billet stock and shall conform to ASTM A-615, Grade 60. Bars shall be deformed to conform to ASTM A-305. The Contractor shall check and submit for approval four (4) sets of shop and erection drawings prepared by the fabricator. Reinforcement detailing and placement shall conform to ACI 318. All reinforcing bars shall be tied in place according to approved erection drawings, using bar supports and accessories conforming to ACI 315. Laps or splices shall conform to ACI 318, and consist of the following minimum dimensions: Tension Splices 36 Bar Diameters Compression Splices 30 Bar Diameters All reinforcing bars shall be tagged and stored in such manner as to be readily available at the time needed. Tag mark substitutions will not be made. Welded wire mesh fabric reinforcing shall conform to the requirements of ASTM A-185. Lap splices shall be at least one full mesh plus 2" staggered to avoid continuous laps in either direction and securely wired or clipped. GRADING The Contractor shall use every effort to observe any possible misalignments in line or grade of the installed forms and will call such to the attention of the Public Works Commission promptly. The Contractor is cautioned that he shall be responsible for any damage to utility lines caused by his negligence. The Public Works Commission or his representative shall then inspect the forms and if approved, pouring operations may begin. Where unstable material exists, the Contractor shall remove such material to a depth required to provide a stable subgrade at no additional cost to the Public Works Commission. FORM WORK Metal forms shall be used throughout the work except for short, odd length sections and in accordance with ACI 301 and ACI 347 (most recent editions). Earth cuts may be used as forms for unexposed vertical surfaces on footings, provided the soil and workmanship allow an accurate and curable excavation. Forms shall be kept in good condition at all times. Any forms which have become out of shape or otherwise unsuitable shall be removed from the work. Forms shall be of such section and design that they will adequately support the concrete and any construction equipment used in the work. Form sections shall be provided with interlocking joints to ensure that the forms are tightly jointed together free from movement. Forms shall be held in place by metal pins, not less than eighteen (18) inches in length, with fastenings of metal and wedges to insure a correct, rigid setting. Forms shall be of the dimension required for the designed cross-section shown on the plans. Built up sections to attain the required depth will not be permitted. Forms shall be set true to the lines and grades established by the Design Engineer or as indicated on the plans. PUBLIC WORKS COMMISSION 03301- 2 OF 4 CONCRETE CONSTRUCTION (UTILITY) Forms shall be held rigidly in position and shall be of sufficient strength to resist springing out of line when concrete is placed. PLACING CONCRETE Prior to placing concrete, the subgrade shall be moistened and the contact side of the forms shall be cleaned and coated with a heavy oil. The Contractor shall not place any concrete without the forms, reinforcing steel and subgrade being inspected and approved by the Design Engineer. Placing of concrete is to be in accordance with ACI 304 (most recent edition). Water shall be removed from the excavation before placing concrete and water shall be diverted to prevent washing over freshly deposited concrete. Concrete shall be placed as not to disturb concrete already in place and in such a manner as to require the minimum amount of lateral movement. Concrete shall be deposited in the forms without segregation. A tremie shall be used when the fall exceeds five (5) feet. Care shall be taken not to upset any forms during the concrete pouring operations. Any concrete showing misalignment due to form movement shall be removed and replaced at no additional cost to the Public Works Commission. All concrete shall be consolidated in accordance with ACI 309 (most recent edition). Mechanical vibrators shall be operated by experienced workmen. Spading and rodding may be required to supplement mechanical vibration. Consolidation shall be adequate to remove any voids and after removal of the forms, no honeycomb shall be present. Should any honeycomb be present, the Design Engineer shall determine if the honeycomb is of a minor nature, the voids may be filled with mortar as approved by the Design Engineer. All concrete within forms shall be brought to true section by the use of an approved straight edge and shall be tamped with straight edge to bring mortar to the surface, after which it shall be floated smooth by means of wood floats. No steel floats will be permitted. After true surface of section has been obtained, and after initial set has taken place, the entire surface shall be brushed with a dampened brush. All joints and all exposed edges shall be rounded off with approved jointing and edging tools. The type of finish required will be specified in the specific item of work specified or indicated on the drawings. All exposed surfaces of retaining walls, structures, etc. shall be given a Class 2 finish with `/4 inch chamfered edges. No more concrete shall be laid than can be properly finished and covered during the daylight, unless adequate artificial light satisfactory to the Design Engineer is provided. Immediately after finishing operations have been completed, the entire surface of the concrete shall be sprayed with an approved curing compound. The use of liquid retarding agents shall conform to standards specified by current AASHTO or ASTM Specifications. Cold weather concreting shall be in accordance with ACI 306 (most recent edition) and hot weather concreting shall be in accordance with ACI 305 (most recent edition). Concreting shall be done when weather conditions are favorable unless otherwise directed by the Design PUBLIC WORKS COMMISSION 03301- 3 OF 4 CONCRETE CONSTRUCTION (UTILITY) Engineer. Concrete operations shall be discontinued when the temperature of 40 degrees Fahrenheit is reached on a falling thermometer. No concreting shall be attempted when local weather bureaus indicate temperatures below freezing within the ensuing 24 hours unless proper precautions are made to protect concrete by covering with straw or other thermal insulation satisfactory to the Design Engineer. The Contractor shall be responsible for the quality and strength of the concrete laid during cold weather or hot weather and any concrete damaged by frost action or freezing shall be removed and replaced as directed by the Design Engineer and/or the Public Works Commission at the Contractor's expense. Forms shall not be removed from the concrete for a minimum of 7 days, unless approved by the Design Engineer. The Contractor shall apply a curing compound or provide measures to maintain moisture for proper curing at his expense, if early form removal is approved. Immediately after the forms have been removed, all honeycomb areas shall be repaired (with one -part cement and two parts sand) and earth backfill material shall be placed adjacent to the finished concrete and smoothed off to prevent an accumulation of standing water, subgrade saturation or under wash in the event of rain. Both pedestrian and vehicle traffic shall be excluded from crossing the concrete for a period of 14 days by the erection and maintenance of suitable barricades. Contractor shall be responsible for any damage resulting from traffic within the 14-day period and he shall remove and replace any concrete damaged as directed by the Design Engineer and/or Public Works Commission. MASONRY MATERIALS Brick shall be in accordance with ASTM C-32 Grade MS laid in full beds of mortar with shove joints. Concrete masonry blocks shall be in accordance with ASTM C-139. Blocks shall be at least 5", but not more than 8" in thickness nor less than 8" in length and of such shape that the joints can be effectively sealed and bonded with cement mortar. Cement mortar for brick work shall be in accordance with ASTM C-270, Type M. Use Type IIA cement in accordance with ASTM C-150. TESTING The requirements of ACI318 (most recent edition) shall be used to control the evaluation of all concrete strengths. The strength is to be checked during construction by four (4) cylinders at the option and cost of the Public Works Commission, of which 1 shall be broken at 7 days, 2 at 28 days. If the specified strength is not achieved in 28 days, 1 reserved shall be stored and broken as specified by the Design Engineer. Cylinders shall be made and stored in accordance with ASTM C-13. Cylinders shall be for each day concrete is poured in excess of 10 cubic yards of each different type of concrete, as determined by the Design Engineer. All additional expenses required because of the failure of the materials to meet routine testing requirements, or poorly scheduled concrete deliveries, shall be borne by the Contractor. PUBLIC WORKS COMMISSION 03301- 4 OF 4 CONCRETE CONSTRUCTION (UTILITY) DIVISION 2 SITE WORK 09802 SPECIAL COATINGS - CERAMIC EPDXY GENERAL The interior surfaces of all ductile iron pipe and fittings shall be full coated with a ceramic epoxy lining. The ceramic epoxy lining shall be applied to ductile iron pipe free of any other interior lining material. The finish coat shall be applied to yield a minimum dry film thickness of 40 mils for a complete lining. MATERIALS The lining material shall be an amine cured novalac epoxy containing at least 20% by volume of ceramic quarts pigment. The epoxy material shall meet the following minimum performance requirements: Permeabili Rating: 0.00 perms when tested according to ASTM E-96 Procedure A with a test duration of 30 days. ASTM 6-95 Cathodic Disbandment: 1.5 volts at 77' F. ASTM B-117 Salt Spray: 0.00 undercutting after one year. Immersion Testing ASTM D-714 Duration 20% Sulfuric Acid 1 Year 25% Sodium Hydroxide at 1400 F 1 Year 160' F Distilled Water 1 Year 120' F Tap Water 1 Year The above requirements shall be verified and tested by an approved testing laboratory. Copies of the laboratory test showing that the lining conforms to the specifications shall be furnished to the Public Works Commission, certified by the Supplier. APPLICATION OF LININGS Surface Preparation: All interior barrel and joint surface areas which will be exposed to the sewer liquids and gases shall be prepared for lining by removing all laitance form oil and other loose, foreign or deleterious materials which would adversely affect the bond of the lining compound of the pipe surface. All areas to receive the protective coating shall be abrasive blasted using compressed air nozzles with sand or grit media. The entire surface to be lined shall be struck with blast media so that all rust, loose oxides, etc., are removed from the surface. Any area where rust appears before lining must be re -blasted. PUBLIC WORKS COMMISSION 09802 -1 OF 2 SPECIAL COATINGS - CERAMIC Qualification of Applicator and Workmen: The lining shall be applied by a competent firm with a five-year history of lining sewer pipe. The workmen employed by the applicator shall be experienced and competent in the application and inspection of the lining compound to be applied. The Public Works Commission shall have the right to require the applicator to furnish bonds covering proper performance and guaranteeing the payment of all obligations arising as a result of improper materials and workmanship. Equipment: All application equipment shall be as recommended by the suppliers of the lining compound. Application Technique: After the surface has been thoroughly prepared for application, the interior of the pipe shall be coated with the ceramic epoxy to a minimum dry film thickness of 40 mils. No lining shall take place when the substrate or ambient temperature is below 40 degrees F. The surface must be dry and dust free. The number of coats of lining material applied shall be as recommended by the lining manufacturer, but in no case shall it be applied above the dry film thickness per coat recommended by the lining manufacturer. The time between coats shall be that specified by the lining manufacturer. Repair: All damaged areas or test areas shall be repaired in accordance with the manufacturer's recommendation, so that the repaired areas are equal to the undamaged lined areas in all respects. Inspection: All pipe linings shall be checked for thickness using a magnetic film thickness gauge, the thickness testing shall be done in accordance with the method outlined in SSPC-PA-2 film thickness rating. The interior linings shall also be tested for pinholes with a non-destructive 2,500- volt test. Any defects found shall be repaired as noted above. Markings: Each joint, manhole unit, or pipe bend special shall be marked with the date of application of the coating system, the date of inspection, and the numerical sequence of application on that date. Shipping and Handling: Equipment used to handle and transport the lined pipe shall be suitably designed and operated not to damage the lining. Any damage which does occur shall be repaired prior to the installation of the pipe in accordance with the manufacturer's recommendations, so the repaired area is equal to the undamaged lining in all respects. PUBLIC WORKS COMMISSION 09802 - 2 OF 2 SPECIAL COATINGS - CERAMIC DIVISION 2 SITE WORK 09804 SPECIAL COATINGS — EPDXY LINING DUCTILE IRON PIPE AND FITTINGS GENERAL The interior surfaces of all ductile iron pipe and fittings in sanitary sewer service shall be fully coated with a ceramic epoxy lining. The lining system shall be a two component, amine cured novalac epoxy. The ceramic epoxy lining shall be applied to ductile iron pipe free of any other interior lining material. The finish coat shall be applied to yield a minimum dry film thickness of 40 mils for a complete lining. Any defects in the lining shall result in the pipe or fitting being replaced, at no additional cost to the Public Works Commission. RELATED SECTIONS A. 02730 — Sanitary Sewer Systems B. 02732 — Sewage Force Mains REFERENCES A. ASTM B 117 — Standard Practice for Operating Salt Spray (Fog) Apparatus B. ASTM C 413 — Standard Test Method for Absorption of Chemical -Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes C. ASTM C 868 — Standard Test Method for Chemical Resistance of Protective Linings D. ASTM D 714 — Standard Test Method for Evaluating Degree of Blistering of Paints E. ASTM D 870 — Standard Practice for Testing Water Resistance of Coatings Using Water Immersion F. ASTM D 1308 — Standard Test Method for Effect of Household Chemicals on Clear and Pigmented Organic Finishes G. ASTM D 1653 — Standard Test Methods for Water Vapor Transmission of Organic Coatings H. ASTM D 2240 — Standard Test Method for Rubber Property — Durometer Hardness I. ASTM D 2370 — Standard Test Method for Tensile Properties of Organic Coatings J. ASTM D 2583 — Standard Test Method ofr Indentation Hardness of Rigid Plastics by Means of a Barcol Impressor K. ASTM D 2794 — Standard Test Method for Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact) L. ASTM D 4060 — Standard Test Method for Abrasion Resistance of Organic Coatings by the Taber Abraser M. ASTM D 4400 — Standard Test Method for Sag Resistance of Paints Using a Multinotch Applicator N. ASTM D 4541 — Standard Test Method for Pull -Off Strength of Coatings Using Portable Adhesion Testers PUBLIC WORKS COMMISSION 09802 - I OF 5 SPECIAL COATINGS - EPDXY LINING DUCTILE IRON PIPE AND FITTINGS O. ASTM G 8 — Standard Test Methods for Cathodic Disbonding of Pipeline Coatings P. ASTM G 95 — Standard Test Method for Cathodic Disbondment Test of Pipeline Coatings Q. ASTM G154 — Standard Practice for Operating Fluorescent Ultraviolet Lamp Apparatus for Exposure of Nonmetallic Materials Unless otherwise specified, references to documents shall mean the documents in effect at the time of bid. If the referenced document(s) have been discontinued by the issuing organization, references to those documents shall mean the replacement documents or the last version of the document before it was discontinued. Where conflicts exist between the standards and this specification, the more stringent shall apply. MATERIALS All ductile iron pipe and fittings shall be in accordance with the Public Works Commission standard specification 02730 — Sanitary Sewer Systems, Public Works Commission standard specification 02732 — Sewage Force Mains, and these Contract Documents. The lining material shall be an amine cured novalac epoxy containing at least 20% by volume of ceramic quartz pigment (no silica fume, fly ash, or alumina dust). The lining shall be both coal tar (polycyclic aromatic hydrocarbons) free and hazardous air polluting solvents (RAPS) free. The lining system shall be 100% solids by volume. The ceramic epoxy lining system shall be the Perma-Shield PL Series 431 as manufactured by Tnemec Company, Inc., Permox-CTF as manufactured by Permite Corporation, or approved equal. The ceramic epoxy lining system shall meet the following minimum performance requirements: A. Abrasion (ASTM D 4060, CS-17 wheel, 1,000 grams) — 76 mg loss B. Adhesion (ASTM D 4541) — not less than 1,860 psi C. Severe Wastewater Analysis Test (150oF, 500 ppm 112S, 4,000 ppm NaCl, 10% sulfuric acid, EIS Permeation Analysis) — Initial impedance of 11.2 (log-z). No blistering, cracking, checking, or loss of adhesion. Reduction in electrical impedance of 0.5 after 28 days of exposure. D. Cathodic Disbondment (ASTM G 8, 1.5 V, Classification Group A) — no more than 0.000 inch disbanded equivalent circle diameter. E. Dielectric Strength (ASTM D 149) — greater than 600 V per mil F. Hardness (ASTM D 2240) — Shore D hardness of 79 G. Impact (ASTM D2794) — No visible cracking or delamination after 160 inch -pounds direct impact. H. Chemical resistance by immersion testing, in accordance with ASTM D 714, as outlined in the following table: PUBLIC WORKS COMMISSION 09802 - 2 0 F 5 SPECIAL COATINGS - EPDXY LINING DUCTILE IRON PIPE AND FITTINGS 20% Sulfuric Acid at 770 F 2 years, no effect 25% Sodium Hydroxide at 140' F 2 years, no effect 5% Sodium Chloride at 770 F 2 years, no effect Distilled Water at 1600 F 2 years, no effect I. Salt Spray (ASTM B 117) — No blistering, cracking, rusting, or delamination of film. No rust creepage at scribe after 1,000 hours. J. Sag Resistance (ASTM D 4400) — Not less than 90 mills wet film thickness. K. Water Absorption (ASTM C 413) — 0.0 percent water absorption L. Water Vapor Transmission (ASTM D 1653, Method B, Wet Cup, Condition C) — 1.25 g/m2 per 24 hour water vapor transmission and 0.09 perms water vapor permeance. The above requirements shall be verified and tested by an approved testing laboratory. Copies of the laboratory test showing that the lining conforms to the specifications shall be furnished to the Public Works Commission upon written request and certified by the Supplier. QUALITY ASSURANCE The manufacturer of the specified coating system shall have a minimum of 10 years' experience in manufacturing high performance epoxy coating systems. The epoxy coating material shall be from a single manufacturer. Application of the ceramic epoxy lining system shall be in accordance with the manufacturer's requirements. Preparation of the ductile iron pipe to be lined shall be completed by an installer approved by the lining system manufacturer. SUBMITTALS In accordance with these Contract Documents, the Contractor shall submit the following: 1. Manufacturer's certification that the coatings comply with the specified requirements and are suitable for the intended application. 2. Product data sheet. 3. Material Safety Data Sheet. 4. Copies of test data for all the physical, chemical, and permeation properties listed within this specification. WARRANTY The ceramic epoxy lining manufacturer shall warranty its products as free from material defects for a period of five (5) years. The Public Works Commission will solely determine whether the pipe should be replaced if any defects are discovered in the lining within the warranty period. PUBLIC WORKS COMMISSION 09802 - 3 OF 5 SPECIAL COATINGS - EPDXY LINING DUCTILE IRON PIPE AND FITTINGS All costs to replace the pipe or fitting, including but not limited to, bypass pumping, excavation, and traffic control shall be the manufacturer's responsibility. APPLICATION OF LININGS Application of the ceramic lining system shall be completed by an installer approved by the manufacturer of the lining system. Surface Preparation: All interior barrel and joint surface areas which will be exposed to the sewer liquids and gases shall be prepared for lining by removing all laitance, form oil and other loose, foreign or deleterious materials which would adversely affect the bond of the lining compound of the pipe surface. All areas to receive the protective coating shall be abrasive blasted using compressed air nozzles with sand or grit media. The entire surface to be lined shall be struck with blast media so that all rust, loose oxides, etc., are removed from the surface. Any area where rust appears before lining must be re -blasted. Qualification of Applicator and Workmen: The ceramic epoxy lining shall be applied by a competent firm with a ten (10) year history of lining sewer pipe. The workmen employed by the applicator shall be experienced and competent in the application and inspection of the lining compound to be applied. The Public Works Commission shall have the right to require the applicator to furnish bonds covering proper performance and guaranteeing the payment of all obligations arising as a result of improper materials and workmanship. Equipment: All application equipment shall be as recommended by the suppliers of the lining compound. Application Technique: After the surface has been thoroughly prepared for application, the interior of the pipe shall be coated with the ceramic epoxy to a minimum dry film thickness of 40 mils. No lining shall take place when the substrate or ambient temperature is below 40°F. The surface must be dry and dust free. The number of coats of lining material applied shall be as recommended by the lining manufacturer, but in no case shall it be applied above the dry film thickness per coat recommended by the lining manufacturer. The time between coats shall be that specified by the lining manufacturer. Repair: All damaged areas or test areas shall be repaired by the lining manufacturer prior to shipment, in accordance with the manufacturer's recommendation, so that the repaired areas are equal to the undamaged lined areas in all respects. Inspection: All pipe linings shall be checked for thickness using a magnetic film thickness gauge. The thickness testing shall be done in accordance with the method outlined in SSPC-PA- 2 film thickness rating. The interior linings shall also be tested for pinholes with a non- destructive 2,500 volt test. Any defects found shall be repaired as noted above. All ceramic epoxy lined pipe and fittings shall be visually inspected for any defects, including runs, sags, or debris within the lining. All repairs shall be performed by the manufacturer prior to shipment. PUBLIC WORKS COMMISSION 09802 - 4 0 F 5 SPECIAL COATINGS - EPDXY LINING DUCTILE IRON PIPE AND FITTINGS Markings: Each joint, manhole unit, or fitting shall be marked with the date of application of the coating system, the date of inspection, and the numerical sequence of application on that date. Shipping and Handling: Equipment used to handle and transport the lined pipe shall be suitably designed and operated not to damage the lining. Any damaged pipe or fitting shall be replaced at no cost to the Public Works Commission. INSTALLATION Cutting Pipe: The Contractor shall cut the pipe without damaging the pipe or interior ceramic epoxy coating. All cuts shall be at right angles to the pipe axis. All cut ends shall be dressed with a power grinder to remove all sharp edges. The cut ends of push -on joint pipe shall be beveled in accordance with the pipe manufacturer's instructions. All field cuts shall be coated and sealed prior to installation. Application of the lining shall be done in accordance with the ceramic epoxy lining manufacturer's recommendations. Handling: All ceramic epoxy lined pipe and fittings shall be handled only from the outside. No forks, chains, straps, hooks, cables, or other equipment shall be placed inside the pipe and fittings for lifting, positioning, or installation. The pipe and fittings shall not be dropped or unloaded by rolling. The pipe and fittings shall not strike sharp objects while moving or unloaded. Ductile iron pipe shall not be placed on grade utilizing hydraulic pressure from machinery or hammers. The use of nylon straps or other similar lifting devices are to be used. Pipe Installation: All pipe and fittings shall be installed in accordance with PWC standard specifications 02222 — Excavation, Trenching, and Backfilling for Utility Systems, 02730 — Sanitary Sewer Systems, 02732 — Sewage Force Mains, and these Contract Documents. PUBLIC WORKS COMMISSION 09802 - 5 OF 5 SPECIAL COATINGS - EPDXY LINING DUCTILE IRON PIPE AND FITTINGS