HomeMy WebLinkAboutSWA000173_Construction Sequence_20231220 Post-Construction Stormwater Management
ATC Permit No. SWA000173
Attachment A
Fast Track Construction Commencement Form
ATC Permit No. SWA000173
Wolfspeed Temporary Substation
Chatham & Randolph Counties
Complete and submit this form (NO SUBSTITUTES) to the Raleigh Regional Office
The undersigned Oereby notifies the agency below that the construction of this project is expected to
12co? ence on oI/IZltot3 (mm-dd/yyyy) and is expected to be completed by
Zot4 (mm/dd/yyyy). I understand that this project shall not be considered complete until
the ivision has received the final Fast-Track Stormwater Permit Application Form and all
required supporting documentation.
(/k h /
2 iiti2 3
Sig a of Permit older Title Of any) Date
Designer's Certification
I, 52). t)o,! a KwcA as a duly re•i tered Licensed Professional in the State of
North Carolina, having been authorized to observe (0 periodically, 7 weekly, fl full time) the
construction of the subject project on behalf of the Permittee. I hereby state that, to the best of my
abilities, due care and diligence will be used such that the project and all stormwater control measures
(SCMs) shall be constructed to meet all applicable requirements of 15A NCAC 02H Section .1000-
.1062, including the Minimum Design Criteria (MDC).
North Carolina Licensed Professional Seal, signature, °°1- FOSS/v"*O iS
and date: ` 0 SO y'' ''/ "
K ‘'''' .
I� 02747 golk. il
It is highly recommended that this notification be sent in a manner that provides proof of receipt by the
Division. The Division does not acknowledge receipt of Fast Track Construction Commencement Notification
Forms.
Submit this form to the following Office:
Division of Energy, Mineral and Land Resources c/o Thad Valentine
Post-Construction Stormwater Management Program
Raleigh Regional Office
3800 Barrett Drive
Raleigh, NC 27609
Page 1 of 1