Loading...
HomeMy WebLinkAboutSWA000173_Construction Sequence_20231220 Post-Construction Stormwater Management ATC Permit No. SWA000173 Attachment A Fast Track Construction Commencement Form ATC Permit No. SWA000173 Wolfspeed Temporary Substation Chatham & Randolph Counties Complete and submit this form (NO SUBSTITUTES) to the Raleigh Regional Office The undersigned Oereby notifies the agency below that the construction of this project is expected to 12co? ence on oI/IZltot3 (mm-dd/yyyy) and is expected to be completed by Zot4 (mm/dd/yyyy). I understand that this project shall not be considered complete until the ivision has received the final Fast-Track Stormwater Permit Application Form and all required supporting documentation. (/k h / 2 iiti2 3 Sig a of Permit older Title Of any) Date Designer's Certification I, 52). t)o,! a KwcA as a duly re•i tered Licensed Professional in the State of North Carolina, having been authorized to observe (0 periodically, 7 weekly, fl full time) the construction of the subject project on behalf of the Permittee. I hereby state that, to the best of my abilities, due care and diligence will be used such that the project and all stormwater control measures (SCMs) shall be constructed to meet all applicable requirements of 15A NCAC 02H Section .1000- .1062, including the Minimum Design Criteria (MDC). North Carolina Licensed Professional Seal, signature, °°1- FOSS/v"*O iS and date: ` 0 SO y'' ''/ " K ‘'''' . I� 02747 golk. il It is highly recommended that this notification be sent in a manner that provides proof of receipt by the Division. The Division does not acknowledge receipt of Fast Track Construction Commencement Notification Forms. Submit this form to the following Office: Division of Energy, Mineral and Land Resources c/o Thad Valentine Post-Construction Stormwater Management Program Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 Page 1 of 1