From: Chandler, Rebecca D
Sent: Monday, November 20, 2023 4:49 PM
To: David Brame
Cc: Richard.G.Harmon@usace.army.mil
Subject: Friddle Rd Development additional info DWR#20231311 - SAW-2022-01355
Hi David, I've completed my initial review of the subject property but require additional information before issuance.
Please respond within 30 days of this email, and note that the application will be on hold until a response is received:
Please describe how the headwaters of stream "SC" will be protected. From the figure Sheet 6 of 38 "Master
Site Plan", it appears that the headwaters will be impacted by road fill at the very least and should be included in
the total impacts of the project.
Please provide a drainage/grading figure to indicate that "SC" will be properly protected during grading
activities.
3. Explain why the length of the riprap pad needs to be nearly as long as the culvert itself. It seems that the total
impacts could be reduced by reducing the size of the riprap outlet.
In order to document that the project meets the definition and design requirements for Low Density, please provide:
a. A detailed plan sheet showing the built upon area and the total project area including calculations (from
the engineer) of percent BUA shown/used in the application. Also, a map or drawing that clearly
delineates or color shades all of the BUAs and total project area shall be provided.
b. A detailed stormwater drainage plan including all stormwater drainage patterns and outlets to clearly
show that the project meets 15A NCAC 02H .1003(2)(b) "Stormwater shall be designed to maximize
dispersed flow through vegetated areas and minimize channel flow".
c. A detailed stormwater drainage plan to clearly show that the project meets 15A NCAC 02H .1003(2)(c)
"Stormwater that cannot be released as dispersed flow shall be transported by vegetated
conveyances". Please provide design plans and calculations for all vegetated conveyances such as
swales, and/or level spreader, etc.
Thank you,
Rebecca Chandler
Environmental Program Consultant
Division of Water Resources
North Carolina Department of Environmental Quality
Winston-Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston-Salem, NC 27105-7401
336-776-9705 office
336-354-2284 cell
336-776-9797 fax
rebecca.chandler(@deq.nc.gov "PLEASE NOTE NEW EMAIL ADDRESS"
aEQ�
oopart @n.iM&vl�o—ntal Ouawtv
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
Chandler, Rebecca D
From: Harmon, Richard G CIV SAW <Richard.G.Harmon@usace.army.mil>
Sent: Tuesday, December 19, 2023 10:01 AM
To: David Brame; Chandler, Rebecca D
Subject: [External] RE: [Non-DoD Source] RE: Friddle Rd Development additional info DWR#20231311 -
SAW-2022-01355
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
David and Rebecca:
We are cool with the potential of having to extending the RPOT to 180 days, if needed. Besides, the new rule allows it. I
understand about re -design and a new engineer (have been there, I have the T-shirt and coffee cup to prove it). As you
develop/revise plans, let me know. To help with the process, I'm willing to look early in hopes of saving time in the long
run.
Thank you for the update.
Regards,
Dicky Harmon
Regulatory Specialist, Raleigh Field Office
U.S. Army Corps of Engineers — Wilmington District
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: 919.801.8990
Email: Richard.e.harmon(@usace.armv.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0
Thank you for taking the time to visit this site and complete the survey.
From: David Brame <dbrame@pilotenviro.com>
Sent: Tuesday, December 19, 2023 9:08 AM
To: Chandler, Rebecca D <rebecca.chandler@deq.nc.gov>
Cc: Harmon, Richard G CIV SAW <Richard.G.Harmon@usace.army.mil>
Subject: [Non-DoD Source] RE: Friddle Rd Development additional info DWR#20231311- SAW-2022-01355
Rebecca/Dicky,
Good morning. Some additional survey is required to adequately address these comments. We are not going to be able
to address them within the 30 days. We are hoping to address them prior to the "reasonable period of time" deadline
of January 18, 2024. There is a new engineer and a decent amount of re -engineering that is having to be done. Please
bear with us.
Dicky,
Is it possible to push the reasonable period of time out to 180 days for this one if needed based on the new rules?
Thanks,
David Brame, PWS
336.708.4617 (c)
336.310.4527 (o)
www.pilotenviro.com
dbrame@pilotenviro.com
From: Chandler, Rebecca D <rebecca.chandler@deg.nc.gov>
Sent: Monday, November 20, 2023 4:49 PM
To: David Brame <dbrame@pilotenviro.com>
Cc: Richard.G.Harmon@usace.army.mil
Subject: Friddle Rd Development additional info DWR#20231311 - SAW-2022-01355
Hi David, I've completed my initial review of the subject property but require additional information before issuance.
Please respond within 30 days of this email, and note that the application will be on hold until a response is received:
1. Please describe how the headwaters of stream "SC" will be protected. From the figure Sheet 6 of 38 "Master
Site Plan", it appears that the headwaters will be impacted by road fill at the very least and should be included in
the total impacts of the project.
2. Please provide a drainage/grading figure to indicate that "SC" will be properly protected during grading
activities.
3. Explain why the length of the riprap pad needs to be nearly as long as the culvert itself. It seems that the total
impacts could be reduced by reducing the size of the riprap outlet.
In order to document that the project meets the definition and design requirements for Low Density, please provide:
a. A detailed plan sheet showing the built upon area and the total project area including calculations (from
the engineer) of percent BUA shown/used in the application. Also, a map or drawing that clearly
delineates or color shades all of the BUAs and total project area shall be provided.
b. A detailed stormwater drainage plan including all stormwater drainage patterns and outlets to clearly
show that the project meets 15A NCAC 02H .1003(2)(b) "Stormwater shall be designed to maximize
dispersed flow through vegetated areas and minimize channel flow".
c. A detailed stormwater drainage plan to clearly show that the project meets 15A NCAC 02H .1003(2)(c)
"Stormwater that cannot be released as dispersed flow shall be transported by vegetated
conveyances". Please provide design plans and calculations for all vegetated conveyances such as
swales, and/or level spreader, etc.
Thank you,
Rebecca Chandler
Environmental Program Consultant
Division of Water Resources
North Carolina Department of Environmental Quality
Winston-Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston-Salem, NC 27105-7401
336-776-9705 office
336-354-2284 cell
336-776-9797 fax
rebecca.chandler0deq.nc.gov "PLEASE NOTE NEW EMAIL ADDRESS"
Email correspondence to and from this address is subject to the North
Carolina Public Records taw and may be disclosed to third parties.
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
Chandler, Rebecca D
From: David Brame <dbrame@pilotenviro.com>
Sent: Tuesday, December 19, 2023 9:08 AM
To: Chandler, Rebecca D
Cc: Richard.G.Harmon@usace.army.mil
Subject: [External] RE: Friddle Rd Development additional info DWR#20231311 - SAW-2022-01355
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Rebecca/Dicky,
Good morning. Some additional survey is required to adequately address these comments. We are not going to be able
to address them within the 30 days. We are hoping to address them prior to the "reasonable period of time" deadline
of January 18, 2024. There is a new engineer and a decent amount of re -engineering that is having to be done. Please
bear with us.
Dicky,
Is it possible to push the reasonable period of time out to 180 days for this one if needed based on the new rules?
Thanks,
David Brame, PWS
336.708.4617 (c)
336.310.4527 (o)
www.Dilotenviro.com
dbrame@pilotenviro.com
From: Chandler, Rebecca D <rebecca.chandler@deq.nc.gov>
Sent: Monday, November 20, 2023 4:49 PM
To: David Brame <dbrame@pilotenviro.com>
Cc: Richard.G.Harmon@usace.army.mil
Subject: Friddle Rd Development additional info DWR#20231311 - SAW-2022-01355
Hi David, I've completed my initial review of the subject property but require additional information before issuance.
Please respond within 30 days of this email, and note that the application will be on hold until a response is received:
1. Please describe how the headwaters of stream "SC" will be protected. From the figure Sheet 6 of 38 "Master
Site Plan", it appears that the headwaters will be impacted by road fill at the very least and should be included in
the total impacts of the project.
2. Please provide a drainage/grading figure to indicate that "SC" will be properly protected during grading
activities.
3. Explain why the length of the riprap pad needs to be nearly as long as the culvert itself. It seems that the total
impacts could be reduced by reducing the size of the riprap outlet.
In order to document that the project meets the definition and design requirements for Low Density, please provide:
a. A detailed plan sheet showing the built upon area and the total project area including calculations (from
the engineer) of percent BUA shown/used in the application. Also, a map or drawing that clearly
delineates or color shades all of the BUAs and total project area shall be provided.
b. A detailed stormwater drainage plan including all stormwater drainage patterns and outlets to clearly
show that the project meets 15A NCAC 02H .1003(2)(b) "Stormwater shall be designed to maximize
dispersed flow through vegetated areas and minimize channel flow".
c. A detailed stormwater drainage plan to clearly show that the project meets 15A NCAC 02H .1003(2)(c)
"Stormwater that cannot be released as dispersed flow shall be transported by vegetated
conveyances". Please provide design plans and calculations for all vegetated conveyances such as
swales, and/or level spreader, etc.
Thank you,
Rebecca Chandler
Environmental Program Consultant
Division of Water Resources
North Carolina Department of Environmental Quality
Winston-Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston-Salem, NC 27105-7401
336-776-9705 office
336-354-2284 cell
336-776-9797 fax
rebecca.chandlerPdeq.nc.gov "PLEASE NOTE NEW EMAIL ADDRESS"
Ole'
DE Q>
aeoaromem m emTronm 1 ouai.nl
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.