HomeMy WebLinkAboutNCG030033_DMR Upload Review_20231219 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 12/15/2023 10:24:14 AM (DMR Submittal)
Submit by Brittany.Cook 12/19/2023 8:09:24 AM(DMR Submittal Review)
• The task was assigned to DEMLR SW Admin for DMRs 12/15/2023 10:24:15 AM
• Brittany.Cook assigned the task to Brittany.Cook 12/18/2023 12:00:29 PM
[rftDQ
DMR Submittal from 12/15/2023
Permit and Facility Information:
..............................................................................................................................................
Permit Number* Enter COC or Individual Permit Number
NCG030033
Must begin with NCS or NCG
Facility Name:* Isometrics Incorporated-Plant 1
Owner/Operator Isometrics Inc
Name:*
County:* Rockingham
Note: Facility name and county are used to help the reviewer verify the permit number entered,and to display the
Regional Office address on the submitter's form(not here).These metadata details will be pulled from current BIMS
information after the DMR(s)are filed. If the submittal is accepted,simply note any errors in the reviewer's comments.
Reason for not yet If applicable:
reporting data The registration was"lost"and now I have had zero response on the packet that
through eDMR for was sent again for this registration.
this permit:
Monitoring Period Information:
..............................................................................................................................................................................................................................................................................................................................................................................................
Monitoring Period What is the YEAR of the sample date(s)?
Year:* 2023
DMR Upload* Click the upload button or drag and drop files here to attach document.
Isometrics Plant 1 -signed November Tier III DMR
468.47K6
Report 2023.pdf
Only PDFs are accepted.
Comments: This is 1 of 3 sampling events below the action limits after entering Tier III Response
for Copper.eDMR registration has been sent in twice now. I have also emailed a
copy to Mrs Tran to review before mailing it this time but would like this resolved.
* By checking the box and signing box below, I certify that:
d I have given true,accurate,and complete information on this form;
o I agree that submission of this Discharge Monitoring Report(DMR)Upload form is a"transaction"subject to Chapter 66,
Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes
(the"Uniform Electronic Transactions Act");
o I understand that an electronic signature on this upload form has the same legal effect and can be enforced in the same
way as a written signature;AND
o I intend to electronically sign and submit this DMR Upload form.
Full Name:* John Parker Alvis
Name of person submitting this form
Email Address:* palvis@ei1.com
Phone Number:* 9802412469
Signature:
r/AfA'C��GE�-t
Date:* 12/15/2023
Review
Review Date: 12/19/2023
Confirm Permit No.* Correct the permit ID number if needed.
NCG030033
Confirm DMR Year* 2023
Multiple DMRs will be automatically filed in a subfolder denoting the sampling year entered above.
Can submittal be Yes
accepted?* No(Explain why below)
Do Central Office No
staff need to be Yes
alerted?*
Do Regional Office No
staff need to be Yes
alerted?
Type of Permit* General
Ensures DMR(s)filed correctly.