Loading...
HomeMy WebLinkAbout20181232 Ver 2_Correspondence_20231218Homewood, Sue From: Homewood, Sue Sent: Monday, December 18, 2023 2:50 PM To: Kotheimer, Joshua L.; 'Dailey, Samantha J CIV USARMY CESAW (USA)'; 'Perez, Douglas J CIV (USA)' Cc: Hoy, Amie Subject: RE: [External] SAW-2016-02435; DWR # 20181232 - Proposed corrective measure for culvert installation Hi Joshua, Sorry for the delayed response, things around the holidays get a little busy. DWR and USACE have discussed this and while we agree with the overall concept, we believe that a typical design for a cross vane structure would be appropriate. Cross vane structures have been used in stream restoration design for decades and more likely to ensure a permanent solution. I believe you should be able to find a typical detail easily enough. Thanks, Sue Homewood (she/her/hers) 401 & Buffer Permitting Branch Division of Water Resources sue.homewood@deg.nc.gov please note my new email address 336 813 1863 mobile 919-707-3679 office Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Kotheimer, Joshua L. <Joshua.Kotheimer@stvinc.com> Sent: Wednesday, November 22, 2023 8:42 AM To: 'Dailey, Samantha J CIV USARMY CESAW (USA)' <Samantha.J.Dailey@usace.army.mil>; 'Perez, Douglas J CIV (USA)' <Doug.J.Perez@usace.army. mil> Cc: Hoy, Arnie <amie.hoy@deq.nc.gov>; Homewood, Sue <sue.homewood@deq.nc.gov> Subject: RE: [External] SAW-2016-02435; DWR # 20181232 - Proposed corrective measure for culvert installation CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello All —The designer on this project has provided me a drawing of a proposed corrective measure for the perched culvert. Please see the attached sketch of the proposed end treatment, basically two dikes creating a step pool. The front half of the dike would be impermeable clay faced with cobble. The back half would be compacted earth with filter fabric and boulders. Native streambed soil would be used to fill in-between. I would assume that they would need to monitor and provide documentation that it is working and not washing out or flowing subsurface. Would this be an acceptable solution to the perched culvert? Please let me know your thoughts Thanks, Joshua Kotheimer, PWS Environmental Science Manager (o) 704.816.2519; (c) 704.574.9416 Joshua. Kotheimera-stvinc.com I stvinc.com N* From: Kotheimer, Joshua L. Sent: Monday, July 10, 2023 10:56 AM To: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>; Perez, Douglas J CIV (USA) <Doug.J.Perez@usace.army. mil> Cc: Hoy, Amie <amie.hoy@deq.nc.gov>; Homewood, Sue <sue.homewood@deq.nc.gov> Subject: RE: [External] SAW-2016-02435; DWR # 20181232 - Proposed corrective measure for culvert installation Hey Doug/Sam — I hope ya'II are doing well. Meagan said she will no longer be with the Corps and that this project was transitioning to a new project manager. I had provided her with some information on the project which has some description of our issues regarding the permitted culvert impact and I wanted to make sure you had it so I have attached it. I have also included Sue Homewood and Amie Hoy at DWR as they are also aware of the issue with the culvert burial and have previously provided some comments. Please let me know if you have any input at this time or if you need any additional information. Thanks, Joshua Kotheimer, PWS Environmental Science Manager (o) 704.816.2519 1 (c) 704.574.9416 0oshua.kotheimera-stvinc.com I stvinc.com From: Jolly, Karanda M CIV USARMY CESAW (USA) <K.M.Jolly@usace.army.mil> Sent: Thursday, July 6, 2023 9:28 AM To: Homewood, Sue <sue.homewood@deg.nc.gov>; Kotheimer, Joshua L. <Joshua.Kotheimer@stvinc.com> Cc: Hoy, Amie <amie.hov@deg.nc.gov>; Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailev@usace.army.mil>; Perez, Douglas J CIV (USA) <Doug.J.Perez@usace.army.mil> Subject: RE: [External] SAW-2016-02435; DWR # 20181232 - Proposed corrective measure for culvert installation up This project will transition to a different Corps project manager, as tomorrow is my final day with the Corps. Please direct all correspondence with the Corps to Doug Perez and Sam Dailey (both cc'd). Thanks to all! Meagan Jolly Regulatory Specialist U.S. Army Corps of Engineers Charlotte Regulatory Field Office Mobile: (704) 578-4506 K.M.Jolly@usace.army.mil From: Homewood, Sue <sue.homewood@deg.nc.gov> Sent: Thursday, July 6, 2023 8:15 AM To: Kotheimer, Joshua L. <Joshua.Kotheimer@stvinc.com>; Jolly, Karanda M CIV USARMY CESAW (USA) <K. M.Jol ly@ usace.a rmy. mi I> Cc: Hoy, Arnie <amie.hoy@deg.nc.gov> Subject: [URL Verdict: Neutral][Non-DoD Source] RE: [External] SAW-2016-02435; DWR # 20181232 - Proposed corrective measure for culvert installation Hi Joshua, So sorry for the long delay, things have been a bit insane lately. DWR has concerns that the proposed solution will not provide for aquatic passage with regards to water levels. In our experience, raising the bed with unconsolidated material, on such a slope, causes the water to go subsurface and the portion where you are proposing smooth cobble apron will end up dry. Is there a reason you didn't want to install a couple crossvanes/sills below the culvert outlet to create a step pool sequence? That's what I traditionally see and I asked someone else for their input and they thought that would be a better option too. If you'd like we can schedule time to talk about this next week. Ps: I'm adding Amie Hoy to the discussion. She's our new 401 reviewer in MRO. Thanks, Sue Homewood (she/her/hers) 401 & Buffer Permitting Branch Division of Water Resources sue.homewood@deg.nc.gov please note my new email address 336 813 1863 mobile 919-707-3679 office Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Kotheimer, Joshua L. <Joshua.Kotheimer@stvinc.com> Sent: Monday, June 26, 2023 9:39 AM To: Jolly, Karanda M CIV USARMY CESAW (USA) <K.M.Jolly@usace.army.mil>; Homewood, Sue <sue. homewood @deg. nc.gov> Subject: [External] SAW-2016-02435; DWR # 20181232 - Proposed corrective measure for culvert installation CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Meagan/Sue — I spoke with both of you back in April in regards to a permitted culvert that was not buried as specified during installation. I have attached a document with project information related to the culvert. The culvert was installed at the elevation specified in the project design and it appears there was a bust in the survey which led to the perched condition of the culvert. We would like to request a culvert burial waiver and are proposing a solution that would retain the upstream and downstream connectivity by placing a boulder weir at the downstream end and transitioning down to the natural stream bed elevation utilizing a smooth cobble apron. We hope that what we have proposed would be an acceptable solution. Please let me know if you need any additional information once you are able to review the provided materials. Thanks, Joshua Kotheimer, PWS Environmental Science Manager (o) 704.816.2519 1 (c) 704.574.9416 0oshua.kotheimera-stvinc.com I stvinc.com Please consider the environment before printing this e-mail. Redesigned and rebuilt: visit our new website at www.stvinc.com The information contained in this electronic message is intended only for the use of the individual or entity to which it is addressed and may contain information that is privileged, confidential and exempt from disclosure under applicable law. If the reader of this message is not the intended recipient, you are informed that any dissemination, copying or disclosure of the material contained herein, in whole or in part, is strictly prohibited. If you have received this transmission in error, please notify STV and purge this message. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 2' v I v 1.5' 2' oc:4" COBBLE STONE -- ----- 18"BOULDER v v 64 LF OF 66" CL III RCP Ccu. -1.44% ------------------ ----------------------------------------------------- ---------------------------------------------------- v .6' SANITARY SEWER FROM MH-8 10" DI INV: 617.84 COMPACTED EARTH NATIVE STREAM SOIL IMPERMEABLE LAYER NATIVE STREAM SOIL U*fo U*5U U*zo