HomeMy WebLinkAbout20201357 Ver 1_Starker_MY1_Report_2023_FINAL_reduced_20231214
Water & Land Solutions, L.L.C
(919) 614–5111 • info@waterlandsolutions.com
7721 Six Forks Road, Suite 130, Raleigh, NC 27615
www.waterlandsolutions.com
December 14, 2023
US Army Corps of Engineers: Wilmington District
Asheville Regulatory Field Office
Attn: Steve Kichefski
151 Patton Avenue, Suite 208
Asheville, NC 28801
RE: Starker Mitigation Project SAW-2020-01540, WLS Catawba 01 Umbrella Bank – Third Credit
Release Request
Dear Mr. Kichefski:
Water & Land Solutions (WLS) respectfully requests the third credit release on the Starker Mitigation
Project for 10% of the total stream credits per the WLS Catawba 01 UMBI approval letter dated 09/30/21.
This credit release amount would be 965.67 stream credits. Also included in this letter is the anticipated
bank credit release schedule per the USACE-Wilmington template.
The following items have been completed regarding completion of Task 3: Monitoring Year 1 (MY1) Report
and the monitoring financial assurance is active.
If you need any additional information, please contact me directly.
Sincerely,
Catherine Roland
Project Manager
7721 Six Forks Rd., Suite 130
Raleigh, NC 27615
Mobile Phone: 571-643-3165
Email: catherine@waterlandsolutions.com
Project Name:
Sponsor Name:
USACE Action ID:
NCDWQ Action ID:
Non-Forested
Wetland
Credits
Warm
Water
Cool
Water
Cold
Water
Riparian
Riverine
Riparian
Non-Riverine Non-Riparian Coastal
9,656.73
9,656.73
Scheduled
Releases
Warm
Water
Cool
Water
Cold
Water
Scheduled
Releases
Riparian
Riverine
Riparian
Non-Riverine Non-Riparian Scheduled
Releases Coastal
1 (Bank/Site Establishment)1, 2 15%1,448.51 15%15%1/30/2022 1/20/2022
2 (Year 0/As-Built)3 15%1,448.51 15%15%4/30/2023 8/17/2023
3 (Year 1 Monitoring)10%965.67 10%10%1/30/2024
4 (Year 2 Monitoring)10%965.67 10%15%1/30/2025
5 (Year 3 Monitoring)10%965.67 15%20%1/30/2026
6 (Year 4 Monitoring)5%482.84 5%10%1/30/2027
7 (Year 5 Monitoring)10%965.67 15%15%1/30/2028
8 (Year 6 Monitoring)5%482.84 5%NA NA 1/30/2029
9 (Year 7 Monitoring)10%965.67 10%NA NA 3/30/2030
Stream Bankfull Standard4 10%965.67 NA NA NA NA NA NA Varies4
Total Credits Release to Date 1,448.51
Date
Wilmington District Mitigation Bank Credit Release Schedule
4 - A 10% reserve of credits to be held back until the bankfull event performance standard has been met.
1 - The first credit release milestone is based on the potential credits stated in the approved mitigation plan.
2 - The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria:
1) Execution of the MBI or UMBI by the Sponsor and the USACE;
2) Approval of the final Mitigation Plan;
3) Mitigation bank site must be secured;
4) Delivery of the financial assurances described in the Mitigation Plan;
5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE;
6) 404 permit verification for construction of the site, if required.
3 - The second credit release is based on the credit totals from the as-built survey, and may differ slightly from the credit totals stated in the mitigation plan.
Contingencies (if any): None
Signature of Wilmington District Official Approving Credit Release
Starker (WLS Catawba 01 UMB)
Water & Land Solutions, LLC
SAW-2020-01540
2020-1357
Potential Credits from Mitigation Plan
Forested Wetland Credits
Total Potential Credits
Projected
Release Date
Actual Release
Date
Potential Credits from As-Built Survey
Stream Credits
Credit Classification
Non-Forested Wetland
CreditsForested Wetland CreditsStream Credits
Current and Future Credit Releases
Credit Release Milestone
Catawba
03050101
2020
12/14/2023
County:
8-Digit HUC:
Year Project Instituted:
Date Prepared:
Credits
Reserved
1/20/2022 1,448.51
4/20/2022 98.00 American Homes 4 Rent, LP Cramer Woods 2 SAW-2022-00353
6/29/2022 839.00 Strategic Real Estate Partners, LLC North Charlotte Commerce Center SAW-2021-02583
2/22/2023 457.00 Martin Marietta Materials, Inc Denver Quarry SAW-2021-00253
8/17/2023 1,448.51
9/14/2023 637.00 Mooresville BTR, LLC Pope-Templeton Trust SAW-2022-00337
Total 2,897.02 2,031.00 866.02 0.00
Project
Task 2 Credit Release
Permit Number
Task 1 Credit Release and Preservation Credits
WLS Catawba 01 Umbrella Mitigation Bank
STARKER STREAM CREDIT LEDGER (HUC 03050101), SAW-2020-01540
Warm Stream Credits
As of 12/14/2023
Sale/Release
Date
Credits Released to
Bank
Credits Debited from
Bank
Current Credit
Balance Purchaser
MY1 Monitoring Report
Starker Mitigation Project
WLS Catawba 01 Umbrella Mitigation Bank
Monitoring Year 1
Calendar Year of Data Collection: 2023
Private Commercial Mitigation Bank for
Stream Compensatory Mitigation Credits
Catawba River Basin (CU 03050101)
(Warm Water Thermal Regime)
USACE Action ID Number: SAW-2020-01540
Catawba County, NC
Data Collection Period: December 2023
Submission Date: December 14, 2023
Prepared for:
U.S. Army Corps of Engineers, Wilmington District
69 Darlington Avenue
Wilmington, North Carolina 28403-1343
Prepared by:
Table of Contents
1 Project Summary ................................................................................................................................... 1
1.1 Project Location and Description .................................................................................................. 1
1.2 Monitoring Schedule and Reporting ............................................................................................. 1
1.3 Project Goals and Objectives ........................................................................................................ 1
1.4 Project Success Criteria ................................................................................................................. 2
1.4.1 Single-Thread Streams .......................................................................................................... 2
1.4.2 Vegetation ............................................................................................................................. 3
1.4.3 Visual Assessment ................................................................................................................. 3
2 Project Mitigation Components ............................................................................................................ 4
2.1 Project Components ..................................................................................................................... 4
3 Monitoring Year 1 Assessment and Results .......................................................................................... 4
3.1 Morphological Assessment ........................................................................................................... 4
3.1.1 Stream & Longitudinal Profile and Horizontal Pattern ......................................................... 5
3.1.2 Stream Channel Dimension ................................................................................................... 5
3.2 Hydrology ...................................................................................................................................... 5
3.2.1 Stream Flow .......................................................................................................................... 5
3.2.2 Bankfull Events ...................................................................................................................... 6
3.3 Vegetation ..................................................................................................................................... 6
4 Methods ................................................................................................................................................ 7
LIST OF APPENDICES
Appendix A Background Tables
Table 1 Project Mitigation Components
Table 2 Project Activity, Reporting History, and Contacts
Table 3 Project Information and Attributes
Appendix B Visual Assessment Data
Figure 1a-c Current Condition Plan View (CCPV) and Index
Photos Stream Station Photographs (Cross-Sections and Photo Stations)
Vegetation Plot Photographs
Additional Photos
Appendix C Vegetation Plot Data
Table 4 MY0 Plant List
Table 5a Stem Counts and Densities Table
Table 5b Vegetation Performance Standards Summary Table
Appendix D Stream Measurement and Geomorphology Data
MY1 Cross-Sections
Table 6a Baseline Stream Data Summary
Table 6b Cross-Section Morphology Data
Appendix E Hydrology
Figure 2 Flow Gauge Installation Diagrams
Figure 3 Crest Gauge Installation Diagram
Figure 4 Flow Gauge and Crest Gauge Graphs
Table 7a-b Verification of Bankfull Events
Table 8 Rainfall Data Table
Appendix F Correspondence
MY0 IRT Comment Response Letter
1
1 Project Summary
1.1 Project Location and Description
The Starker Mitigation Project (“Project”) is a private commercial umbrella mitigation bank under the WLS
Catawba 01 Umbrella Mitigation Bank (“Bank”). The site directly abuts Interstate 40 (I-40) between mile
markers 133 and 135 in Conover within Catawba County, NC (35.727984, -81.176076). The Project is
located within the Upper Catawba 8-digit HUC 03050101, in the Upper Lake Norman 10-digit HUC
0305010111, in the Lyle Creek Watershed 12-digit HUC 030501011102, all within the Catawba River Basin.
The purpose of the Project is to provide stream mitigation credits to compensate for unavoidable impacts
to Waters of the U.S. authorized under sections 401 and 404 of the Clean Water Act, Section 10 of the
Rivers and Harbors Act, and all applicable state statutes. The Project is providing 9,656 warm thermal
regime stream mitigation credits and 29.91 acres of easement that will be protected in perpetuity. See
the mitigation plan for a detailed benefits summary and Table 1 for a summary of project assets. Figures
1a, 1b, and 1c illustrate the project mitigation components.
Monitoring Year 1 (MY1) activities occurred during December 2023. This report presents the data for MY1.
The Project meets the MY1 success criteria for stream horizontal and vertical stability, and vegetation.
One of the three flow gauges did not meet minimum consecutive flow criteria. Based on these results, the
Project is on trajectory to meet interim and final success criteria. For more information on the chronology
of the project history and activity, refer to Appendix A, Table 2. Relevant project contact information is
also presented in the appendices in Table 2, and project background information is presented in Appendix
A, Table 3.
1.2 Monitoring Schedule and Reporting
The Project will be monitored on a regular basis with physical inspections to occur a minimum of twice
per year throughout the seven-year post-construction monitoring period, or until performance standards
are met. The measure of stream restoration success will be documented by bankfull flows and no change
in stream channel classification. The measure of vegetative success for the Project will be the survival of
at least 210 seven-year-old planted trees per acre with an average height of 10 feet at the end of year
seven of the monitoring period. Site inspections and monitoring reports will also identify components and
features that require routine maintenance or adaptive management. The easement holder and long-term
steward is Unique Places to Save (UP2S). UP2S will be responsible for annual inspection of the Project
after close-out to ensure that restrictions in place required by the recorded Conservation Easement Deed
are being upheld.
1.3 Project Goals and Objectives
The Project will meet the goals and objectives described in the approved Final Mitigation Plan and will
address general restoration goals and opportunities outlined in the North Carolina Division of Mitigation
Services (DMS) Catawba River Basin Restoration Priorities (RBRP; NCEEP, 2007, amended 2013) and in the
Catawba River Basin wide Water Quality Plan (NCDWQ, 2010). Watershed goals and management
strategies will be met by:
• Restoring aquatic habitats that are currently degraded by cattle access and bank erosion.
• Improving water quality by excluding cattle.
2
• Restoring riparian buffers.
• Stabilizing streams that are part of a WS-IV watershed.
• Serving to continue existing water quality initiatives that are on-going in the watershed.
To accomplish these project-specific goals, the following objectives will be measured to document overall
project success:
• Provide a floodplain connection to the incised Project stream reaches by lowering bank height
ratios (BHRs) to less than 1.2, thereby promoting more natural floodplain storage and overbank
flood flows,
• Improve bedform diversity by increasing scour pool spacing and depth variability,
• Increase native species riparian buffer and native vegetation density/composition along
streambank and riparian areas,
• Improve aquatic habitat and fish species diversity and migration through the addition of in-stream
cover and native woody debris,
• Site protection through a 29.91-acre conservation easement with minimum 50-foot riparian
buffers from the top of banks along all streams in perpetuity.
1.4 Project Success Criteria
The success criteria for the Project will follow approved performance standards and monitoring protocols
from the final approved mitigation plan, which was developed in compliance with the USACE October
2016 Guidance, USACE Stream Mitigation Guidelines (April 2003 and October 2005), and the 2008
Compensatory Mitigation Final Rule. Cross-section and vegetation plot data will be collected in Years 0, 1,
2, 3, 5, and 7. Stream hydrology data and visual monitoring will be reported annually. Specific success
criteria components and evaluation methods are described below.
1.4.1 Single-Thread Streams
Stream Hydrology: Four separate bankfull or over bank events must be documented within the seven-year
monitoring period, and the stream hydrology monitoring will continue until four bankfull events have been
documented in separate years. Stream hydrology monitoring will be accomplished with pressure
transducers installed in pools and correlating sensor depth to top of bank elevation (see Appendix E for
installation diagrams). Recorded water depth above the top of bank elevation will document a bankfull
event. The devices will record water depth every 30 minutes and will be inspected quarterly. In addition to
the pressure transducers, visual indicators such as wrack lines and vegetation matting will be used to
document bankfull events.
Stream Profiles, Vertical Stability, and Floodplain Access: Stream profiles, as a measure of vertical stability
and floodplain access, will be evaluated by looking at Bank Height Ratios (BHR). In addition, observed
bedforms should be consistent with those observed for channels of the design stream type(s). The BHR
shall not exceed 1.2 along the restored Project stream reaches. This standard only applies to restored
reaches of the channel where BHRs were corrected through design and construction. Vertical stability will
be evaluated with visual assessment, cross-sections and, if directed by the IRT, longitudinal profile.
3
Stream Horizontal Stability: Cross-sections will be used to evaluate horizontal stream stability. There
should be minor change expected in as-built restoration cross-sections. If measurable changes do occur,
they should be evaluated to determine if the changes represent a movement toward a more unstable
condition (e.g., downcutting, erosion) or a movement towards increased stability (e.g., settling, vegetation
establishment, deposition along the streambanks, decrease in width/depth ratio). Cross-sections shall be
classified using the Rosgen Stream Classification method, and all monitored cross-sections should fall
within the quantitative parameters defined for channels of the design stream type.
Reference photo transects will be taken at each permanent cross-section. Lateral photos should not
indicate excessive erosion or continuing degradation of the streambanks. Photographs will be taken of both
streambanks at each cross-section. A survey tape stretched between the permanent cross-section
monuments/pins will be centered in each of the streambank photographs and as much of the streambank
as possible will be included in each photo. Photographers will attempt to consistently maintain the same
area in each photo over time.
Jurisdictional Stream Flow: Monitoring of stream flow will be conducted to demonstrate that the restored
stream systems classified as intermittent exhibit surface flow for a minimum of 30 consecutive days
throughout some portion of the year during years with normal or below normal rainfall conditions. Stream
flow monitoring will be accomplished with pressure transducers installed in pools and correlating sensor
depth to the downstream top of riffle elevation. If the pool water depth is at or above the top of riffle
elevation, then the channel will be assumed to have surface flow (see Appendix E for installation diagrams).
The devices will record water elevation twice per day and will be inspected quarterly to document surface
hydrology and provide a basis for evaluating flow response to rainfall events.
1.4.2 Vegetation
Vegetation monitoring will occur in the fall each required monitoring year, prior to leaf drop. Plots will be
monitored in years 0, 1, 2, 3, 5, and 7. Vegetative success for the Project during the intermediate
monitoring years will be based on the survival of at least 320, three-year-old planted trees per acre at the
end of Year 3 of the monitoring period, and at least 260, five-year-old planted trees per acre that must
average seven feet in height at the end of Year 5 of the monitoring period. The final vegetative restoration
success criteria will be achieving a density of no less than 210, seven-year-old planted stems per acre that
must average 10 feet in height in Year 7 of monitoring.
1.4.3 Visual Assessment
WLS will conduct visual assessments in support of mitigation performance monitoring. Visual assessments
of all stream reaches will be conducted twice per monitoring year with at least five months in between
each site visit for each of the seven years of monitoring. Photographs will be used to visually document
system performance and any areas of concern related to streambank and bed stability, condition of in-
stream structures, channel migration, active headcuts, live stake mortality, invasive plant species or animal
browsing, easement boundary encroachments, cattle exclusion fence damage, and general streambed
conditions. Permanent photo points will be at the cross-sections and crossings.
4
2 Project Mitigation Components
2.1 Project Components
The Project involved the restoration and permanent protection of nine stream reaches (S100 (North of I-
40, above crossing), S100 (North of I-40 below the crossing), S100 (South of I-40), S102, S101, S200 (North
of I-40), S200 (South of I-40, above crossing), and S200 (South of I-40, below the crossing)) as shown on
Figure 1. The design utilized a combination of Stream Restoration Priority I and Priority II activities, as
summarized in the table below.
Mitigation Plan Stream Mitigation Credits (SMCs)
Project Reach
Designation Type of Mitigation
Existing
Stream
Length
(LF)
Proposed
Creditable
Length
(LF)
Proposed
Uncreditable
Length (ft) Ratio
Stream
Mitigation
Credits (SMCs)
S100 (North of
I-40, above
crossing)
Stream Restoration
(PI/PII) 1,127 1,169.54 68.69 1:1 1,169.54
S102 Stream Restoration (PII) 110 98.96 25.44 1:1 98.96
S103 Stream Restoration (PII) 81 56.44 0 1:1 56.44
S100 (North of
I-40, below
crossing)
Stream Restoration
(PI/PII) 2,490 2,117.61 103.4 1:1 2,117.61
S100 (South of
I-40)
Stream Restoration
(PI/PII) 1,829 1,888.07 85.88 1:1 1,888.07
S101 Stream Restoration (PII) 96 79.57 0 1:1 79.57
S200 (North of
I-40) Stream Restoration (PII) 785 704.85 56.18 1:1 704.85
S200 (South of
I-40, above
crossing)
Stream Restoration (PII) 550 491.16 110.61 1:1 491.16
S200 (South of
I-40, below
crossing)
Stream Restoration
(PI/PII) 2,897 3,050.53 14.40 1:1 3,050.53
Totals 9,965 9,656.73 464.61 9,656.73
Note: No mitigation credits were calculated outside the conservation easement boundaries.
3 Monitoring Year 1 Assessment and Results
The dates of Year 1 activities are detailed in Appendix A, Table 2. All Year 1 monitoring data is presented
in this report and in the appendices. The Project is on track for meeting stream and vegetation interim
success criteria. All monitoring device locations are depicted on the CCPV (Figures 1a-1c).
3.1 Morphological Assessment
Morphological data for the Year 1 Monitoring Report was collected in December of 2023. Refer to
Appendices A, B, and D for summary data tables, stream photographs, and morphological data.
5
3.1.1 Stream & Longitudinal Profile and Horizontal Pattern
Visual assessment was utilized for assessment of MY1 horizontal and vertical stability. The visual
assessment for each stream reach documented MY1 stream channel pattern/longitudinal profiles and in-
stream structure location/function still closely match the profile design parameters and MY0 baseline
conditions (Appendix D). The MY1 planform geometry, or pattern, fell within acceptable ranges of the
design parameters for all restored reaches. Minor channel adjustments in riffle slopes, pool depths, and
pattern were observed based on natural sediment migration and stream bank vegetation establishment
but do not present a stability concern.
One stream problem area (SPA) was identified during December 2023 at the end of MY1.
• SPA-1 – At the December 2023 site visit, WLS staff noted an area of minor rilling on the left
floodplain hillslope near STA 50+50 of S200 south of I-40. This is most likely due to lower
herbaceous vegetation on the hillslope and an adjacent drainage entering the easement. WLS will
reseed this area and install coir wattles to slow overland flow at the beginning of MY2 and
continue to monitor for any additional rilling and vegetation re-establishment. There were no
issues observed with the streambanks and floodplain in this area.
All water quality drainage features (WQDFs) throughout the site are functioning as intended and remain
stable. Vegetation and live stakes are establishing well on all features. The minor headcut in the left
floodplain of S200 just above the crossing, noted by IRT on the June 21st, 2023 site visit, also appeared
stable throughout MY1.There are no other areas of concern in MY1, and WLS will continue to monitor this
area and all WQDFs in MY2.
3.1.2 Stream Channel Dimension
The MY1 stream channel dimensions generally match the design parameters and are within a stable range
of tolerance. 23 cross-sections were installed on restoration reaches, with 13 installed in riffles and ten
installed in pools. 12 of the 13 permanently installed riffle cross-sections show little to no change in BHR
or bankfull area when compared to as-built measurements, and all BHRs are less than 1.2. Riffle cross-
section 14, located on S200 north of I-40, has a BHR of 0.89. This BHR is due to the narrowing of the
channel due to herbaceous plant establishment on the stream banks. The stream reach remains close to
design parameters and pool cross-section 15, located just downstream, shows little change in BHR. It is
expected that over time that some pools may accumulate fine sediment and organic matter, however,
this is not an indicator of channel instability. Maximum riffle depths are expected to fluctuate slightly
throughout the monitoring period as the channels adjust to the restored flow regime.
3.2 Hydrology
3.2.1 Stream Flow
Three pressure transducers (flow gauges) were installed in January (FG-1 and FG-2) and March 2023 (FG-
3) in the restoration sections on reaches S101, S102, and S103 to document baseflow conditions. Two of
the three flow gauges documented that the stream exhibited surface flow for a minimum of 30
consecutive days during the monitoring year. FG-1 only recorded three consecutive days of stream flow.
WLS will continue to monitor in MY2 and develop an adaptive management plan if needed. See the chart
below and Appendix E for flow gauge information. Additionally, to determine if rainfall amounts are
normal for the given year, precipitation data was collected from an onsite rain gauge and the Oxford
weather station near Claremont, NC, approximately 3.7 miles north of the Project site. Rainfall has been
6
lower than the 30th percentile for five of the past twelve months of data collected in MY1 (Table 8). The
site has experienced abnormally dry conditions during the fall months (September-November 2023).
Flow Gauge Data
Flow
Gauge
Name
Flow
Gauge
Location
Longest Period of
Consecutive Flow
Total Days of
Cumulative
Flow
Total Days
of No
Flow
Longest
Period of
Consecutive
No Flow
FG-1 S103 3 days
4/7/2023-4/9/2023 7 days 320 days 99 days
FG-2 S102 155 days
6/29/2023-11/30/2023 324 days 3 days 1 day
FG-3 S101 159 days
3/15/2023-8/20/2023 184 days 82 days 68 days
3.2.2 Bankfull Events
Two crest gauges were installed in January (CG-2) and March 2023 (CG-1) to document bankfull events on
S100 (South of I-40) and S200 (South of I-40, below crossing). During MY1, bankfull events were recorded
on both pressure transducer crest gauges. CG-1 recorded eight events with a maximum event of 0.99 feet
above bankfull on June 19-20th, 2023. CG-2 recorded seven events with a maximum event of 0.96 feet
above bankfull on June 19-20th, 2023. The associated hydrologic data is in Appendix E, and gauge locations
can be found on Figures 1a-1c.
3.3 Vegetation
Monitoring of the 24 permanent vegetation plots was completed on December 6, 2023. Vegetation data
can be found in Appendix C, with the associated photos located in Appendix B. The MY1 average planted
density is 673 stems per acre, which exceeds the interim measure of vegetative success of at least 320
planted stems per acre at the end of the third monitoring year. Each vegetation plot currently meets
success criteria with 526-931 stems per acre. Volunteer sycamore, tulip poplar, and black willow were
noted in MY1, and more volunteers are expected to establish during the monitoring period. Visual
assessment of vegetation outside of the monitoring plots indicates that the herbaceous vegetation is
becoming well established throughout the Project.
In discussion with IRT members during the As-built site visit, four permanent vegetation plots will be
transitioned into mobile, random vegetation transects in MY2. Fixed plots 6, 13, 20, and 22 will transition
to random plots and be placed to better monitor areas of vegetative concern such as the saturated
floodplain, dense Juncus areas, and steep sloped areas on S200 north of I-40. As of MY1, all planted woody
vegetation located in the saturated areas of floodplain benches is doing well, and Juncus does not appear
to be suppressing vegetation growth.
Privet (Ligustrum sinense) and multiflora rose (Rosa multiflora) is present in small pockets on S100 and
S200 within the Project. Kudzu (Pueraria montana) is also present, predominately on S200 north of I-40.
During MY1, WLS staff cut and treated privet, multiflora rose, and kudzu on 8/15/23. Additional
treatments will continue to occur throughout MY2 and will be documented in future reports.
7
4 Methods
Stream cross-section monitoring was conducted using a Topcon Total Station. Three-dimensional
coordinates associated with cross-section data were collected in the field (NAD83 State Plane feet PIPS
3200). Morphological data was collected at 23 cross-sections. Survey data was imported into Microsoft
Excel® for processing and analysis.
The stage recorders include an automatic pressure transducer set in PVC piping in the channel. The
elevation of the bed and top of bank at each stage recorder location was recorded to be able to document
presence of water in the channel and out of bank events. Visual observations (i.e. wrack or debris lines)
will also be used to document out of bank events.
Vegetation success is being monitored at a total of 24 permanent vegetation plots. Vegetation plot
monitoring follows the CVS-EEP Level 2 Protocol for Recording Vegetation, version 4.2 (Lee et al. 2008)
and includes analysis of species composition and density of planted species. The data is processed using
the NCDMS ShinyApp tool. In the field, the four corners of each plot were permanently marked with PVC
at the origin and rebar at the other corners. Photos of each plot will be taken from the origin each
monitoring year. Tree species and height will be recorded for each planted stem.
Appendix A:
Background Tables
Table 1: Project Mitigation Components
Table 2: Project Activity, Reporting History, and Contacts
Table 3: Project Information and Attributes
Existing Mitigation
Footage Plan As-Built
or Footage or Mitigation Restoration Priority Mitigation Footage or
Project Segment Acreage Acreage Category Level Level Ratio (X:1) Acreage Comments
S100 (North of I-40,
above crossing)1,127 1,170 Warm R PI/PII 1.00000 1,176
Full channel restoration, planted buffer, permanent conservation
easement
S102 110 99 Warm R PII 1.00000 96
Full channel restoration, planted buffer, permanent conservation
easement
S103 81 56 Warm R PII 1.00000 73
Full channel restoration, planted buffer, permanent conservation
easement
S100 (North of I-40,
below crossing)2,490 2,118 Warm R PI/PII 1.00000 2,114
Full channel restoration, planted buffer, permanent conservation
easement
S100 (South of I-40)1,829 1,888 Warm R PI/PII 1.00000 1,866
Full channel restoration, planted buffer, permanent conservation
easement
S101 96 80 Warm R PII 1.00000 78
Full channel restoration, planted buffer, permanent conservation
easement
S200 (North of I-40)785 705 Warm R PII 1.00000 707
Full channel restoration, planted buffer, permanent conservation
easement
S200 (South of I-40,
above crossing)550 491 Warm R PI 1.00000 489
Full channel restoration, planted buffer, permanent conservation
easement
S200 (South of I-40,
below crossing)2,897 3,051 Warm R PI/PII 1.00000 3,053
Full channel restoration, planted buffer, permanent conservation
easement
Non-Rip Coastal
Warm Cool Cold Riverine Non-Riv Wetland Marsh
Restoration 9,656.73
Re-establishment
Rehabilitation
Enhancement
Enhancement I
Enhancement II
Creation
Preservation
Totals 9,656.73
**Credit totals from Final Starker Mitigation Plan
Restoration Level
Stream Riparian Wetland
Table 1. Starker Mitigation Project ‐ Mitigation Assets and Components
Project Credits
Table 2: Project Timeline and Contacts
Data Collection Task Completion or
Activity or Deliverable Complete Deliverable Submission
Project Instituted NA 2/20/2018
Mitigation Plan Approved NA 8/20/2020
Construction (Grading) Completed NA 3/15/2023
Planting Completed NA 3/14/2023
As-built Survey Completed NA 4/18/2023
MY-0 Baseline Report 4/18/2023 5/26/2023
MY1 Monitoring Report 12/12/2023 12/14/2023
Designer
Primary project design POC
Construction Contractor
Construction contractor POC
Survey Contractor
Survey contractor POC
Planting Contractor
Planting contractor POC
Seeding Contractor
Contractor point of contact
Seed Mix Sources
Nursery Stock Suppliers (Bare Roots)
Nursery Stock Suppliers (Live Stakes)
Monitoring Performers
Monitoring POC
Ripple Ecosolutions, LLC
Native Forest Nursery
Leah Farr (919) 971-4575
(704) 483-3397
Foggy Mountain Nursery
(336) 384-5323
Water & Land Solutions, LLC
215 Moonridge Rd, Chapel Hill, NC 27516
George Morris (919) 818-3984
7721 Six Forks Rd, Ste. 130, Raleigh, NC 27615
Wright Contracting, LLC
PO Box 545, Siler City, NC 27344
Dave Patton (919) 973-9255
Green Resource
(336) 588-6363
Starker Mitigation Project
1150 SE Maynard Road, Suite 140, Cary, NC 27511
Erin Bennett, PE (919) 388-0787
Wright Contracting, LLC
Marshall Wright (919) 469-3340
PO Box 545, Siler City, NC 27344
Dave Patton (919) 973-9255
WithersRavenel
115 Mackenan Drive, Cary, NC 27511
Ecosystem Planning & Restoration
S103
S100 (North
of I-40,
below
crossing)
S100 (South
of I-40)S101 S200 (North
of I-40)
S200 (South
of I-40,
above
crossing)
S200 (South
of I-40, below
crossing)
73 2,114 1,866 78 707 489 3,053
Confined Moderately
Confined Unconfined Confined Confined
Moderately
Confined Unconfined
2.5 193.0 252.0 12.0 84.0 115.2 166.4
IPP I PP P
"WS-IV" "WS-IV" "WS-IV" "WS-IV" "WS-IV" "WS-IV" "WS-IV"
-FB (functioning
as G)F B (functioning
as G)C B (functioning
as G)
B
(intermittent)C & B C & B
B
(intermittent)Step-pool & B C & Bc C & B
N/A N/A AE/X N/A N/A N/A AE/X
Supporting
Docs?
NWP27
NWP27
USFWS
(Corr. Letter)
SHPO (Corr.
Letter)
N/A
Permit
N/AEssential Fisheries Habitat No N/A
Coastal Zone Management Act (CZMA or CAMA) No N/A
FEMA Floodplain Compliance Yes Yes
Endangered Species Act Yes Yes
Historic Preservation Act Yes Yes
Water of the United States - Section 404 Yes Yes
Water of the United States - Section 401 Yes Yes
Regulatory Considerations
Parameters Applicable? Resolved?
FEMA classification N/A N/A
Project Area (acres) 29.91
Project Drainage Area Percentage of Impervious Area 4.16%
CGIA Land Use Classification
51% cultivated crops/hay, 26% Forest
(classes 41-43), 17% Developed (urban)
Land (classes 21-24), 4% Impervious, 1%
Shrubland, <1% Grassland
Project Coordinates (latitude and longitude) 35.727984, -81.176076
Planted Acreage (Acres of Woody Stems Planted) 27.7
Project Watershed Summary Information
River Basin Catawba
DWR Sub-basin
Physiographic Province Piedmont
Table 3. Project Background Information
Project Name Starker Mitigation Project
County Catawba
Reach Summary Information
Drainage area (Acres) 59.0 5.0
Perennial, Intermittent, Ephemeral P
Valley confinement (Confined, moderately confined,
unconfined)Confined Confined
I
Project Drainage Area (Acres and Square Miles) 418 acres, 0.653 sq. miles
Catawba River Headwaters
USGS Hydrologic Unit 8-digit 03050101
Stream Classification (proposed)Step-pool &
Bc
B
(intermittent)
Stream Classification (existing) Incised E
B (functioning
as G)
NCDWR Water Quality Classification "WS-IV" "WS-IV"
Parameters
S100 (North
of I-40,
above
crossing)
S102
Length of reach (linear feet)1,176 96
Appendix B:
Visual Assessment Data
Figure 1a-1c: Current Condition Plan View (CCPV)
Stream Station Photographs (Cross-Sections and Photo Stations)
Vegetation Plot Photographs
Additional Photographs
Figure 1a
Figure 1b
Figure 1c
Ro
c
k
B
a
r
n
R
d
N
E
§¨¦40
Access: 35.727799, -81.171815
Access: 35.717598, -81.178562
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
FIGURE
IndexStarker Mitigation ProjectCatawba County, North Carolina
NAD 1983 2011 State Plane
North Carolina FIPS 3200 FT US
USACE
Current Conditions Plan View
Monitoring Year 1
0 500 1,000
Feet
±
USACE Action ID Number:
SAW-2020-01540
December 2023
MY1
Conservation Easement
Map Index
")
")
")
")
!.
!<
!.!.S103
S102
S100
S100§¨¦40
Ro
c
k
B
a
r
n
R
d
PG-1
RG-1
FG-1
FG-2
XS-1
XS-2
XS
-
3
X
S
-
4
X
S
-
7
X
S
-
8
X
S
-
6
XS-5
X
S
-
9
XS
-
1
6
XS-1
7
XS
-
1
0
8
7
1
6
3
5
2
4
16
PS-2
PS-3
PS-5
PS-1
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
FIGURE1aStarker Mitigation ProjectCatawba County, North Carolina
NAD 1983 2011 State Plane
North Carolina FIPS 3200 FT US
0 250 500
Feet
±
Conservation Easement
Fence
Stream Mitigation
Restoration P1/P2
Restoration P2
Top of Bank
Culvert
Cross Sections (23)
!.Rain Gauge (1)
!.Pressure Gauge (1)
")Photo Station (6)
Vegetation Plot (24)
Success Criteria Met
Flow Gauge
!.Success Criteria Met
!<Success Criteria Not Met
USACE Action ID Number:
SAW-2020-01540
December 2023
MY1
USACE
Current Conditions Plan View
Monitoring Year 1
")
")
!.
!.
S100
S101
§¨¦40S100
FG-3
CG-1
X
S
-
7
X
S
-
8
X
S
-
6
XS-5
X
S
-
9
XS-
1
1
XS-12
XS
-
1
3
XS
-
1
0
8
76
9
5
11
13
12
10
PS-2
PS-3
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
FIGURE1bStarker Mitigation ProjectCatawba County, North Carolina
NAD 1983 2011 State Plane
North Carolina FIPS 3200 FT US
0 250 500
Feet
±
Conservation Easement
Fence
Stream Mitigation
Restoration P1/P2
Restoration P2
Top of Bank
Culvert
Cross Sections (23)
!.Crest Gauge (2)
")Photo Station (6)
Vegetation Plot (24)
Success Criteria Met
Flow Gauge
!.Success Criteria Met
USACE Action ID Number:
SAW-2020-01540
December 2023
MY1
USACE
Current Conditions Plan View
Monitoring Year 1
")
")
")
!.
XW
S200
S200
§¨¦40
CG-2
SPA-1
Minor rilling on
floodplain hillslope
X
S
-
8
XS-14
XS
-
1
6
XS-1
7
XS-
1
8
X
S
-
1
9
XS-20
XS
-
2
1
XS-
2
3
XS-22
XS
-
1
5
76
14
24
20
18
15
17
21
23
16 19
22
PS-4
PS-5
PS-6
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
FIGURE1cStarker Mitigation ProjectCatawba County, North Carolina
NAD 1983 2011 State Plane
North Carolina FIPS 3200 FT US
0 250 500
Feet
±
Conservation Easement
Fence
Stream Mitigation
Restoration P1/P2
Restoration P2
Top of Bank
Culvert
Cross Sections (23)
!.Crest Gauge (2)
XW Stream Problem Area
")Photo Station (6)
Vegetation Plot (24)
Success Criteria Met
USACE Action ID Number:
SAW-2020-01540
December 2023
MY1
USACE
Current Conditions Plan View
Monitoring Year 1
S103, XS‐1, Upstream (MY‐00)
S103, XS‐1, Downstream (MY‐00)
S103, XS‐1, Upstream (MY‐01)
S103, XS‐1, Downstream (MY‐01)
S103, XS‐1, Left Bank (MY‐01)
S103, XS‐1, Right Bank (MY‐01)
S103, XS‐1, Left Bank (MY‐00)
S103, XS‐1, Right Bank (MY‐00)
S102, XS‐2, Upstream (MY‐00)
S102, XS‐2, Downstream (MY‐00)
S102, XS‐2, Upstream (MY‐01)
S102, XS‐2, Downstream (MY‐01)
S102, XS‐2, Left Bank (MY‐01)
S102, XS‐2, Right Bank (MY‐01)
S102, XS‐2, Left Bank (MY‐00)
S102, XS‐2, Right Bank (MY‐00)
S100 North, XS‐3, Upstream (MY‐00)
S100 North, XS‐3, Downstream (MY‐00)
S100 North, XS‐3, Upstream (MY‐01)
S100 North, XS‐3, Downstream (MY‐01)
S100 North, XS‐3, Left Bank (MY‐01)
S100 North, XS‐3, Right Bank (MY‐01)
S100 North, XS‐3, Left Bank (MY‐00)
S100 North, XS‐3, Right Bank (MY‐00)
S100 North, XS‐4, Upstream (MY‐00)
S100 North, XS‐4, Downstream (MY‐00)
S100 North, XS‐4, Upstream (MY‐01)
S100 North, XS‐4, Downstream (MY‐01)
S100 North, XS‐4, Left Bank (MY‐01)
S100 North, XS‐4, Right Bank (MY‐01)
S100 North, XS‐4, Left Bank (MY‐00)
S100 North, XS‐4, Right Bank (MY‐00)
S100 North, XS‐5, Upstream (MY‐00)
S100 North, XS‐5, Downstream (MY‐00)
S100 North, XS‐5, Upstream (MY‐01)
S100 North, XS‐5, Downstream (MY‐01)
S100 North, XS‐5, Left Bank (MY‐01)
S100 North, XS‐5, Right Bank (MY‐01)
S100 North, XS‐5, Left Bank (MY‐00)
S100 North, XS‐5, Right Bank (MY‐00)
S100 North, XS‐6, Upstream (MY‐00)
S100 North, XS‐6, Downstream (MY‐00)
S100 North, XS‐6, Upstream (MY‐01)
S100 North, XS‐6, Downstream (MY‐01)
S100 North, XS‐6, Left Bank (MY‐01)
S100 North, XS‐6, Right Bank (MY‐01)
S100 North, XS‐6, Left Bank (MY‐00)
S100 North, XS‐6, Right Bank (MY‐00)
S100 North, XS‐7, Upstream (MY‐00)
S100 North, XS‐7, Downstream (MY‐00)
S100 North, XS‐7, Upstream (MY‐01)
S100 North, XS‐7, Downstream (MY‐01)
S100 North, XS‐7, Left Bank (MY‐01)
S100 North, XS‐7, Right Bank (MY‐01)
S100 North, XS‐7, Left Bank (MY‐00)
S100 North, XS‐7, Right Bank (MY‐00)
S100 North, XS‐8, Upstream (MY‐00)
S100 North, XS‐8, Downstream (MY‐00)
S100 North, XS‐8, Upstream (MY‐01)
S100 North, XS‐8, Downstream (MY‐01)
S100 North, XS‐8, Left Bank (MY‐01)
S100 North, XS‐8, Right Bank (MY‐01)
S100 North, XS‐8, Left Bank (MY‐00)
S100 North, XS‐8, Right Bank (MY‐00)
S100 South, XS‐9, Downstream (MY‐00)
S100 South, XS‐9, Upstream (MY‐00)
S100 South, XS‐9, Downstream (MY‐01)
S100 South, XS‐9, Upstream (MY‐01)
S100 South, XS‐9, Left Bank (MY‐01)
S100 South, XS‐9, Right Bank (MY‐01)
S100 South, XS‐9, Left Bank (MY‐00)
S100 South, XS‐9, Right Bank (MY‐00)
S100 South, XS‐10, Upstream (MY‐00)
S100 South, XS‐10, Downstream (MY‐00)
S100 South, XS‐10, Upstream (MY‐01)
S100 South, XS‐10, Downstream (MY‐01)
S100 South, XS‐10, Left Bank (MY‐01)
S100 South, XS‐10, Right Bank (MY‐01)
S100 South, XS‐10, Left Bank (MY‐00)
S100 South, XS‐10, Right Bank (MY‐00)
S100 South, XS‐11, Upstream (MY‐00)
S100 South, XS‐11, Downstream (MY‐00)
S100 South, XS‐11, Upstream (MY‐01)
S100 South, XS‐11, Downstream (MY‐01)
S100 South, XS‐11, Left Bank (MY‐01)
S100 South, XS‐11, Right Bank (MY‐01)
S100 South, XS‐11, Left Bank (MY‐00)
S100 South, XS‐11, Right Bank (MY‐00)
S100 South, XS‐12, Upstream (MY‐00)
S100 South, XS‐12, Downstream (MY‐00)
S100 South, XS‐12, Upstream (MY‐01)
S100 South, XS‐12, Downstream (MY‐01)
S100 South, XS‐12, Left Bank (MY‐01)
S100 South, XS‐12, Right Bank (MY‐01)
S100 South, XS‐12, Left Bank (MY‐00)
S100 South, XS‐12, Right Bank (MY‐00)
S101, XS‐13, Upstream (MY‐00)
S101, XS‐13, Downstream (MY‐00)
S101, XS‐13, Upstream (MY‐01)
S101, XS‐13, Downstream (MY‐01)
S101, XS‐13, Left Bank (MY‐01)
S101, XS‐13, Right Bank (MY‐01)
S101, XS‐13, Left Bank (MY‐00)
S101, XS‐13, Right Bank (MY‐00)
S200 North, XS‐14, Upstream (MY‐00)
S200 North, XS‐14, Downstream (MY‐00)
S200 North, XS‐14, Upstream (MY‐01)
S200 North, XS‐14, Downstream (MY‐01)
S200 North, XS‐14, Left Bank (MY‐01)
S200 North, XS‐14, Right Bank (MY‐01)
S200 North, XS‐14, Left Bank (MY‐00)
S200 North, XS‐14, Right Bank (MY‐00)
S200 North, XS‐15, Downstream (MY‐00)
S200 North, XS‐15, Upstream (MY‐00)
S200 North, XS‐15, Downstream (MY‐01)
S200 North, XS‐15, Upstream (MY‐01)
S200 North, XS‐15, Left Bank (MY‐01)
S200 North, XS‐15, Right Bank (MY‐01)
S200 North, XS‐15, Left Bank (MY‐00)
S200 North, XS‐15, Right Bank (MY‐00)
S200 South, XS‐16, Downstream (MY‐00)
S200 South, XS‐16, Upstream (MY‐00)
S200 South, XS‐16, Downstream (MY‐01)
S200 South, XS‐16, Upstream (MY‐01)
S200 South, XS‐16, Left Bank (MY‐01)
S200 South, XS‐16, Right Bank (MY‐01)
S200 South, XS‐16, Left Bank (MY‐00)
S200 South, XS‐16, Right Bank (MY‐00)
S200 South, XS‐17, Upstream (MY‐00)
S200 South, XS‐17, Downstream (MY‐00)
S200 South, XS‐17, Upstream (MY‐01)
S200 South, XS‐17, Downstream (MY‐01)
S200 South, XS‐17, Left Bank (MY‐01)
S200 South, XS‐17, Right Bank (MY‐01)
S200 South, XS‐17, Left Bank (MY‐00)
S200 South, XS‐17, Right Bank (MY‐00)
S200 South, XS‐18, Upstream (MY‐00)
S200 South, XS‐18, Downstream (MY‐00)
S200 South, XS‐18, Upstream (MY‐01)
S200 South, XS‐18, Downstream (MY‐01)
S200 South, XS‐18, Left Bank (MY‐01)
S200 South, XS‐18, Right Bank (MY‐01)
S200 South, XS‐18, Left Bank (MY‐00)
S200 South, XS‐18, Right Bank (MY‐00)
S200 South, XS‐19, Upstream (MY‐00)
S200 South, XS‐19, Downstream (MY‐00)
S200 South, XS‐19, Upstream (MY‐01)
S200 South, XS‐19, Downstream (MY‐01)
S200 South, XS‐19, Left Bank (MY‐01)
S200 South, XS‐19, Right Bank (MY‐01)
S200 South, XS‐19, Left Bank (MY‐00)
S200 South, XS‐19, Right Bank (MY‐00)
S200 South, XS‐20, Upstream (MY‐00)
S200 South, XS‐20, Downstream (MY‐00)
S200 South, XS‐20, Upstream (MY‐01)
S200 South, XS‐20, Downstream (MY‐01)
S200 South, XS‐20, Left Bank (MY‐01)
S200 South, XS‐20, Right Bank (MY‐01)
S200 South, XS‐20, Left Bank (MY‐00)
S200 South, XS‐20, Right Bank (MY‐00)
S200 South, XS‐21, Upstream (MY‐00)
S200 South, XS‐21, Downstream (MY‐00)
S200 South, XS‐21, Upstream (MY‐01)
S200 South, XS‐21, Downstream (MY‐01)
S200 South, XS‐21, Left Bank (MY‐01)
S200 South, XS‐21, Right Bank (MY‐01)
S200 South, XS‐21, Left Bank (MY‐00)
S200 South, XS‐21, Right Bank (MY‐00)
S200 South, XS‐22, Upstream (MY‐00)
S200 South, XS‐22, Downstream (MY‐00)
S200 South, XS‐22, Upstream (MY‐01)
S200 South, XS‐22, Downstream (MY‐01)
S200 South, XS‐22, Left Bank (MY‐01)
S200 South, XS‐22, Right Bank (MY‐01)
S200 South, XS‐22, Left Bank (MY‐00)
S200 South, XS‐22, Right Bank (MY‐00)
S200 South, XS‐23, Upstream (MY‐00)
S200 South, XS‐23, Downstream (MY‐00)
S200 South, XS‐23, Upstream (MY‐01)
S200 South, XS‐23, Downstream (MY‐01)
S200 South, XS‐23, Left Bank (MY‐01)
S200 South, XS‐23, Right Bank (MY‐01)
S200 South, XS‐23, Left Bank (MY‐00)
S200 South, XS‐23, Right Bank (MY‐00)
PS‐1 – S100 North, Downstream (MY‐01)
PS‐1 – S100 North, Downstream Left Bank (MY‐01)
PS‐1 – S100 North, Downstream (MY‐00)
PS‐1 – S100 North, Downstream Left Bank (MY‐00)
PS‐1 – S100 North, Upstream (MY‐00)
PS‐1 – S100 North, Upstream Left Bank (MY‐00)
PS‐1 – S100 North, Upstream (MY‐01)
PS‐1 – S100 North, Upstream Left Bank (MY‐01)
PS‐2 – S100 North, Downstream (MY‐00)
PS‐2 – S100 North, Downstream Left Bank (MY‐00)
PS‐2 – S100 North, Downstream (MY‐01)
PS‐2 – S100 North, Downstream Left Bank (MY‐01)
PS‐3 – S100 South, Upstream Left Bank (MY‐00)
PS‐3 – S100 South, Upstream (MY‐00)
PS‐3 – S100 South, Upstream Left Bank (MY‐01)
PS‐3 – S100 South, Upstream (MY‐01)
PS‐4 – S200 North, Downstream (MY‐00)PS‐4 – S200 North, Downstream (MY‐01)
PS‐5 – S200 South, Upstream (MY‐00)PS‐5 – S200 South, Upstream (MY‐01)
PS‐5 – S200 South, Upstream Left Bank (MY‐00)PS‐5 – S200 South, Upstream Left Bank (MY‐01)
PS‐6 – S200 South, Downstream (MY‐01)PS‐6 – S200 South, Downstream (MY‐00)
PS‐6 – S200 South, Downstream Left Bank (MY‐00)PS‐6 – S200 South, Downstream Left Bank (MY‐01)
PS‐6 – S200 South, Upstream (MY‐00)PS‐6 – S200 South, Upstream (MY‐01)
PS‐6 – S200 South, Upstream Left Bank (MY‐00)PS‐6 – S200 South, Upstream Left Bank (MY‐01)
Fixed Veg Plot 1 (MY‐00)
Fixed Veg Plot 2 (MY‐00)
Fixed Veg Plot 1 (MY‐01)
Fixed Veg Plot 2 (MY‐01)
Fixed Veg Plot 3 (MY‐01)
Fixed Veg Plot 4 (MY‐01)
Fixed Veg Plot 3 (MY‐00)
Fixed Veg Plot 4 (MY‐00)
Fixed Veg Plot 5 (MY‐00)Fixed Veg Plot 5 (MY‐01)
Fixed Veg Plot 6 (MY‐00)Fixed Veg Plot 6 (MY‐01)
Fixed Veg Plot 7 (MY‐01)
Fixed Veg Plot 8 (MY‐01)
Fixed Veg Plot 7 (MY‐00)
Fixed Veg Plot 8 (MY‐00)
Fixed Veg Plot 9 (MY‐00)Fixed Veg Plot 9 (MY‐01)
Fixed Veg Plot 10 (MY‐00)Fixed Veg Plot 10 (MY‐01)
Fixed Veg Plot 11 (MY‐01)
Fixed Veg Plot 12 (MY‐01)
Fixed Veg Plot 11 (MY‐00)
Fixed Veg Plot 12 (MY‐00)
Fixed Veg Plot 13 (MY‐00)Fixed Veg Plot 13 (MY‐01)
Fixed Veg Plot 14 (MY‐00)Fixed Veg Plot 14 (MY‐01)
Fixed Veg Plot 15 (MY‐01)
Fixed Veg Plot 16 (MY‐01)
Fixed Veg Plot 15 (MY‐00)
Fixed Veg Plot 16 (MY‐00)
Fixed Veg Plot 17 (MY‐00)Fixed Veg Plot 17 (MY‐01)
Fixed Veg Plot 18 (MY‐00)Fixed Veg Plot 18 (MY‐01)
Fixed Veg Plot 19 (MY‐01)
Fixed Veg Plot 20 (MY‐01)
Fixed Veg Plot 19 (MY‐00)
Fixed Veg Plot 20 (MY‐00)
Fixed Veg Plot 21 (MY‐00)Fixed Veg Plot 21 (MY‐01)
Fixed Veg Plot 22 (MY‐00)Fixed Veg Plot 22 (MY‐01)
Fixed Veg Plot 23 (MY‐01)
Fixed Veg Plot 24 (MY‐01)
Fixed Veg Plot 23 (MY‐00)
Fixed Veg Plot 24 (MY‐00)
SPA-1: Minor Rilling on the Left Floodplain Hillslope Near
STA 50+50 of S200 (South of I-40)S100 – North of I-40 above crossing (station 22+00)
S200 - South of I-40 vegetation establishmentS100 – North of I-40 vegetation establishment
Appendix C:
Vegetation Monitoring Plot
Data
Table 4: Redline Plant List
Table 5a: Stem Counts and Densities Table
Table 5b: Vegetation Performance Standards Summary Table
Scientific Name Common Name Wetland Indicator Mixed‐Mesic Forest Alluvial Forest Planted Total
Betula nigra River birch FACW 10%1,500
Fraxinus pennsylvanica Green ash FACW 4%4%850
Platanus occidentalis American sycamore FACW 15%15%2,950
Ulmus americana American elm FACW 5%300
Quercus michauxii Swamp chestnut oak FACW 16%10%2,250
Quercus alba White oak FACU 20%6%1,900
Quercus phellos Willow oak FAC 15%2,100
Quercus nigra Water oak FAC 15%2,100
Carya ovata Shagbark Hickory FACU 15%850
Diospyros virginiana Persimmon FAC 10%5%1,300
Liriodendron tulipifera Tulip poplar FACU 10%10%1,950
Alnus serrulata Tag alder OBL 10%1,350
Asimina triloba Pawpaw FAC 5%300
TOTAL 100%100%19,700
*No Deviations were made from Mitigation Plan Planting List
%Proposed by Zone
Table 4: Starker MY0 Planting List
23.8
2023‐03‐15
NA
NA
2023‐12‐06
0.0247
Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total
Alnus serrulata hazel alder Tree OBL 22442233 22 22
Asimina triloba pawpaw Tree FAC
Betula nigra river birch Tree FACW 2 2 111222223333
Carya ovata shagbark hickory Tree FACU 2211 33
Diodia virginiana Virginia buttonweed Shrub FACW
Diospyros virginiana common persimmon Tree FAC 2 2 1122 2211
Fraxinus pennsylvanica green ash Tree FACW 3 3 2222111111
Liriodendron tulipifera tuliptree Tree FACU 2 3 221122 11
Platanus occidentalis American sycamore Tree FACW 2222442211225544
Quercus alba white oak Tree FACU 11221144 331122
Quercus michauxii swamp chestnut oak Tree FACW 1122 111111
Quercus nigra water oak Tree FAC 221122 111122
Quercus phellos willow oak Tree FAC 3322 2222554411
Ulmus americana American elm Tree FACW 1111 11 22
Sum Performance Standard 20 21 13 13 16 16 19 20 13 13 17 17 22 22 16 16
Salix nigra black willow Tree OBL
Sum Proposed Standard 20 21 13 13 16 16 19 20 13 13 17 17 22 22 16 16
21 13 16 20 13 17 22 16
850 526 648 810 526 688 891 648
10 7 8 10 9 8 10 7
14 31 25 20 15 29 23 25
33322222
00000000
21 13 16 20 13 17 22 16
850 526 648 810 526 688 891 648
10 7 8 10 9 8 10 7
14 31 25 20 15 29 23 25
33322222
00000000
Table 5a: Planted Stems and Densities Table ‐ Starker Mitigation Site MY1
Species
Included in
Approved
Mitigation
Plan
Post
Mitigation
Plan Species
Mitigation
Plan
Performance
Standard
Post
Mitigation
Plan
Performance
Standard
Current Year Stem Count
Current Year Stem Count
Stems/Acre
Stems/Acre
Species Count
Species Count
Dominant Species Composition (%)
Dominant Species Composition (%)
Average Plot Height (ft.)
Average Plot Height (ft.)
% Invasives
% Invasives
Veg Plot 5 F Veg Plot 6 F Veg Plot 7 F Veg Plot 8 FIndicator
Status
Veg Plot 1 F Veg Plot 2 F Veg Plot 3 F Veg Plot 4 F
Date of Current Survey
Plot size (ACRES)
Scientific Name Common Name Tree/
Shrub
Planted Acreage
Date of Initial Plant
Date(s) of Supplemental Plant(s)
Date(s) Mowing
Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total
Alnus serrulata hazel alder Tree OBL 333311 11111122
Asimina triloba pawpaw Tree FAC 1 1
Betula nigra river birch Tree FACW 4422331122331122
Carya ovata shagbark hickory Tree FACU 11
Diodia virginiana Virginia buttonweed Shrub FACW 1 1
Diospyros virginiana common persimmon Tree FAC 2233 22111111
Fraxinus pennsylvanica green ash Tree FACW 2222112233 2211
Liriodendron tulipifera tuliptree Tree FACU 113311 2211 22
Platanus occidentalis American sycamore Tree FACW 2222111122442255
Quercus alba white oak Tree FACU 3 3 2222 2211
Quercus michauxii swamp chestnut oak Tree FACW 22111133111111
Quercus nigra water oak Tree FAC 2211111122221111
Quercus phellos willow oak Tree FAC 44112211115511
Ulmus americana American elm Tree FACW 1111 11 1111
Sum Performance Standard 22 22 23 23 13 13 14 14 17 17 16 16 16 16 15 15
Post
Mitigation
Plan Species
Salix nigra black willow Tree OBL
Sum Proposed Standard 22 22 23 23 13 13 14 14 17 17 16 16 16 16 15 15
22 23 13 14 17 16 16 15
891 931 526 567 688 648 648 607
10 11 10 8 11 9 10 8
18 17 23 21 18 25 31 33
22322232
00000000
22 23 13 14 17 16 16 15
891 931 526 567 688 648 648 607
10 11 10 8 11 9 10 8
18 17 23 21 18 25 31 33
22322232
00000000
Post
Mitigation
Plan
Performance
Standard
Current Year Stem Count
Stems/Acre
Species Count
Dominant Species Composition (%)
Average Plot Height (ft.)
% Invasives
Species
Included in
Approved
Mitigation
Plan
Mitigation
Plan
Performance
Standard
Current Year Stem Count
Stems/Acre
Species Count
Dominant Species Composition (%)
Average Plot Height (ft.)
% Invasives
Scientific Name Common Name Tree/
Shrub
Indicator
Status
Veg Plot 15 F Veg Plot 16 FVeg Plot 10 F Veg Plot 11 F Veg Plot 12 F Veg Plot 13 F Veg Plot 14 FVeg Plot 9 F
Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total
Alnus serrulata hazel alder Tree OBL 1 1 2211 22
Asimina triloba pawpaw Tree FAC 11
Betula nigra river birch Tree FACW 333333 11551111
Carya ovata shagbark hickory Tree FACU 11
Diodia virginiana Virginia buttonweed Shrub FACW
Diospyros virginiana common persimmon Tree FAC 2222112222 1111
Fraxinus pennsylvanica green ash Tree FACW 221111 2211
Liriodendron tulipifera tuliptree Tree FACU 2211111122
Platanus occidentalis American sycamore Tree FACW 5544347711334433
Quercus alba white oak Tree FACU 3311 33221111
Quercus michauxii swamp chestnut oak Tree FACW 1 1 1 1 1 1 2211
Quercus nigra water oak Tree FAC 1 1 1 1 1133
Quercus phellos willow oak Tree FAC 2211331133113333
Ulmus americana American elm Tree FACW 1 1 1 1 2 2
Sum Performance Standard 17 17 16 16 16 17 14 14 14 14 14 14 17 17 16 16
Post
Mitigation
Plan Species
Salix nigra black willow Tree OBL 4
Sum Proposed Standard 17 17 16 16 16 17 14 14 14 14 14 14 17 17 16 16
17 16 17 14 14 14 17 16
688 648 688 567 567 567 688 648
78979699
29 25 19 50 21 36 24 19
22322222
00000000
17 16 17 14 14 14 17 16
688 648 688 567 567 567 688 648
78979699
29 25 19 50 21 36 24 19
22322222
00000000
1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved.
2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) ,
species that have been approved in prior monitoring years through a mitigation plan addendum (regular font), and species that are not approved (italicized).
3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems.
Post
Mitigation
Plan
Performance
Standard
Current Year Stem Count
Stems/Acre
Species Count
Dominant Species Composition (%)
Average Plot Height (ft.)
% Invasives
Species
Included in
Approved
Mitigation
Plan
Mitigation
Plan
Performance
Standard
Current Year Stem Count
Stems/Acre
Species Count
Dominant Species Composition (%)
Average Plot Height (ft.)
% Invasives
Scientific Name Common Name Tree/
Shrub
Indicator
Status
Veg Plot 20 F Veg Plot 21 F Veg Plot 22 F Veg Plot 23 F Veg Plot 24 FVeg Plot 17 F Veg Plot 18 F Veg Plot 19 F
Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives
850 3 10 0 526 3 7 0 648 3 8 0
810 2 10 0 607 2 8 0 688 2 9 0
Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives
810 2 10 0 526 2 9 0 688 2 8 0
810 2 10 0 567 2 9 0 688 2 8 0
Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives
891 2 10 0 648 2 7 0 891 2 10 0
891 2 10 0 648 2 7 0 891 2 10 0
Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives
931 2 11 0 526 3 10 0 567 2 8 0
1012 2 11 0 607 2 11 0 607 2 8 0
Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives
688 2 11 0 648 2 9 0 648 3 10 0
688 2 11 0 729 2 9 0 648 2 10 0
Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives
607 2 8 0 688 2 7 0 648 2 8 0
607 2 8 0 729 2 8 0 648 2 8 0
Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives
688 3 9 0 567 2 7 0 567 2 9 0
688 2 9 0 567 2 7 0 567 2 9 0
Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives
567 2 6 0 688 2 9 0 648 2 9 0
567 2 6 0 810 2 9 0 688 2 10 0
Table 5b: Vegetation Performance Standards Summary Table
*Each monitoring year represents a different plot for the random vegetation plot "groups". Random plots are denoted with an R, and fixed plots with an F.
Veg Plot 19 FVeg Plot 20 FVeg Plot 21 F
Veg Plot 22 FVeg Plot 23 FVeg Plot 24 F
Veg Plot 13 FVeg Plot 14 FVeg Plot 15 F
Veg Plot 16 FVeg Plot 17 FVeg Plot 18 F
Veg Plot 6 F
Veg Plot 7 FVeg Plot 8 FVeg Plot 9 F
Veg Plot 10 FVeg Plot 11 FVeg Plot 12 F
Monitoring Year 5
Monitoring Year 3
Monitoring Year 2
Monitoring Year 1
Monitoring Year 0
Monitoring Year 3
Monitoring Year 2
Monitoring Year 1
Monitoring Year 0
Monitoring Year 7
Monitoring Year 2
Monitoring Year 1
Monitoring Year 0
Monitoring Year 7
Monitoring Year 5
Monitoring Year 1
Monitoring Year 0
Monitoring Year 7
Monitoring Year 5
Monitoring Year 3
Monitoring Year 0
Monitoring Year 7
Monitoring Year 5
Monitoring Year 3
Monitoring Year 2
Monitoring Year 7
Monitoring Year 5
Monitoring Year 3
Monitoring Year 2
Monitoring Year 1
Monitoring Year 7
Monitoring Year 5
Monitoring Year 3
Monitoring Year 2
Monitoring Year 1
Monitoring Year 0
Monitoring Year 7
Monitoring Year 5
Monitoring Year 3
Monitoring Year 2
Monitoring Year 1
Monitoring Year 0
Starker Mitigaiton Project
Monitoring Year 7
Monitoring Year 5
Monitoring Year 3
Monitoring Year 2
Monitoring Year 1
Monitoring Year 0
Veg Plot 1 FVeg Plot 2 FVeg Plot 3 F
Veg Plot 4 FVeg Plot 5 F
Appendix D:
Stream Measurement and
Geomorphology Data
MY1 Cross-Sections
Table 6a: Baseline Stream Data Summary
Table 6b: Cross-Section Morphology Data
Distance Elevation Features
0 920.003 TLP
1.17092186 919.778
3.36202454 919.62
5.92048216 919.322
8.10375796 919.011
9.62758978 918.656
11.3893567 918.106
13.6835236 917.738
15.5950783 917.499
17.698906 917.528
18.691434 917.616 TLB, BKF
19.4016219 917.271
19.8131611 917.13 THW
20.110384 917.216
20.4723459 917.157
21.2583365 917.23
21.5133353 917.454
22.5153231 917.654 TRB
23.7007749 917.599
25.0681376 917.529
25.9127422 917.984
26.7350743 918.413
27.7511269 918.807
29.1849124 919.341
30.929016 920.061
33.0775475 920.706
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7 34.6721705 921.366
Bankfull Elevation - Based on As-Built Bankfull Area 917.73 917.58 36.3302979 921.629
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 1.09 37.4024361 921.586
Thalweg Elevation 917.31 917.13 38.8067613 921.714
LTOB Elevation 917.73 917.62 40 921.832 TRP
LTOB Max Depth 0.422 0.486
LTOB Cross Sectional Area 0.91 1.05
Distance Elevation Features
0 912.869 TLP
1.20627692 912.609
3.71989382 912.367
5.20681284 912.369
6.61287003 912.449
8.08270066 912.398
8.6010207 912.319
10.1962358 912.253
11.2277168 912.198
12.4255223 911.753
13.4705886 911.465
14.9838241 911.046
16.521488 910.711
18.0342182 910.769
19.424839 910.77 TLB, BKF
21.0520261 910.543 THW
22.5371704 910.751
23.9934559 910.618
25.1752981 910.834 TRB
26.2509976 910.924
27.5465907 911.167
29.0002276 911.464
30.5549071 911.598
31.9836017 911.721
33.2404676 911.72
34.5831604 911.86
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7 36.6607771 911.859
Bankfull Elevation - Based on As-Built Bankfull Area 910.87 910.77 37.5284014 911.834
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 1.00 38.6009131 911.779
Thalweg Elevation 910.62 910.54 40 911.806 TRP
LTOB Elevation 910.87 910.77
LTOB Max Depth 0.256 0.227
LTOB Cross Sectional Area 0.55 0.55
Distance Elevation Features
0 907.502 TLP
1.04541092 907.311
4.37209618 907.366
7.84557104 907.412
11.4780272 907.391
14.643435 907.428
17.6721404 907.555
20.490819 907.595 TLB
21.7682599 907.387
22.5326042 907.108
23.3912616 906.993 THW
24.3434408 906.995
25.0741245 907.351
27.5184833 907.464
30.9796489 907.555 TRB, BKF
35.5602883 907.756
41.9152594 907.952
46.4810345 908.014
49.5826343 907.892
50 907.781 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 907.56 907.58
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 0.96
Thalweg Elevation 906.85 906.99
LTOB Elevation 907.56 907.56
LTOB Max Depth 0.712 0.562
LTOB Cross Sectional Area 2.34 2.09
Distance Elevation Features
0 907.312 TLP
1.65660436 907.086
3.83915368 907.049
6.05998556 906.788
8.77008837 907
12.4813 907.154
15.6545779 907.199 TLB, BKF
20.6609641 906.944
24.5136872 906.745
25.0349097 906.483
26.1222217 906.087
27.0845116 905.962
27.7903014 905.916 THW
28.3426097 906.763
31.0182853 907.287 TRB
34.5348454 907.19
38.6754781 907.604
42.7259778 908.391
43.6606684 908.369
48.1567787 909.042
50 909.64 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 907.34 907.10
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 1.08
Thalweg Elevation 906.01 905.92
LTOB Elevation 907.34 907.20
LTOB Max Depth 1.33 1.283
LTOB Cross Sectional Area 4.97 6.28
Distance Elevation Features
0 891.999 TLP
0.84708972 891.831
5.43613171 891.783
10.8706322 891.838
14.1529597 891.882
19.9415741 891.531 TLB
21.468921 891.035
21.8395725 890.758
22.9634928 890.554
23.7810924 890.476
24.8805974 890.32 THW
25.7130747 890.638
26.6898183 890.85
27.7138318 891.152
32.9269627 891.514 TRB, BKF
39.0599407 891.644
43.9136325 891.348
48.6831766 891.215
50 891.544 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 891.73 891.54
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 0.98
Thalweg Elevation 890.56 890.32
LTOB Elevation 891.73 891.51
LTOB Max Depth 1.169 1.194
LTOB Cross Sectional Area 6.97 6.67
Distance Elevation Features
0 894.539 TLP
1.438202 894.087
5.97263845 893.212
10.1508709 892.399
15.1101492 891.622
19.7584838 891.124 TLB, BKF
21.7638237 890.799
23.0192104 890.224
24.1204315 889.658
25.3269524 889.487 THW
26.446461 889.609
27.7610537 889.932
29.5135495 890.472
31.4857131 890.569
36.7489964 891.141 TRB
42.1292087 891.359
48.4678254 891.481
50 891.55 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 891.06 891.11
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 1.01
Thalweg Elevation 889.37 889.49
LTOB Elevation 891.06 891.12
LTOB Max Depth 1.69 1.637
LTOB Cross Sectional Area 11.78 12.04
Distance Elevation Features
0 884.174 TLP
1.18869214 884.007
6.99780594 884.1
13.3189289 884.02
20.0346013 883.819 TLB
21.2701464 883.551
22.056435 883.175
23.5183267 882.896
24.6254822 882.689 THW
25.6302379 882.797
26.6498898 882.732
27.3997117 882.737
27.9788695 883.209
28.8220641 883.552
32.4653305 883.819 TRB, BKF
37.3041816 883.893
42.9537016 883.936
48.7731454 883.889
50 884.046 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 883.86 883.85
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 0.97
Thalweg Elevation 882.65 882.69
LTOB Elevation 883.86 883.82
LTOB Max Depth 1.215 1.13
LTOB Cross Sectional Area 7.48 7.12
Distance Elevation Features
0 883.338 TLP
0.9332272 883.088
5.68042991 882.983
10.7389773 883.154
14.1450201 882.949
16.5946915 882.876
17.5645544 882.696 TLB
18.8315161 882.102
20.0703533 881.974
21.3535393 881.371
23.7967032 880.033
25.672946 879.605 THW
27.4058657 880.08
28.0120006 881.83
29.4397751 882.428
30.0102317 882.518 TRB, BKF
34.8242541 882.501
41.5940677 882.694
49.0945142 882.831
50 882.935 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 882.50 882.53
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 1.00
Thalweg Elevation 879.59 879.61
LTOB Elevation 882.50 882.52
LTOB Max Depth 2.90723 2.913
LTOB Cross Sectional Area 17.63 17.53
Distance Elevation Features
0 871.651 TLP
1.05818193 871.422
2.74378206 870.738
4.98374327 870.189
9.59001522 869.598
13.7795547 869.832
19.0393615 869.768 TLB
20.4594377 869.322
21.6124381 868.82
23.0420715 868.356
23.4211954 868.412
24.4481354 868.438
24.9578358 868.196 THW
25.8756436 868.355
27.3693253 868.922
28.9287211 869.442
32.8211238 869.539 TRB, BKF
36.4108514 869.603
41.0826657 869.657
44.7423495 869.624
48.4196273 869.754
50 869.949 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 869.43 869.49
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 1.03
Thalweg Elevation 868.29 868.20
LTOB Elevation 869.43 869.54
LTOB Max Depth 1.14 1.343
LTOB Cross Sectional Area 6.89 7.43
Distance Elevation Features
0 869.77 TLP
0.95255918 869.501
5.21996418 869.398
10.1638377 869.343
14.1847578 869.341
20.4151217 869.367 TLB, BKF
25.0069255 868.961
27.4549966 868.591
28.4573405 868.266
29.7153007 868.063
30.5309551 867.793
31.5297625 867.707
32.4213875 867.674 THW
32.9899593 868.524
36.8007214 869.274
39.7703564 869.428 TRB
43.8995383 869.526
48.8651667 869.528
50 869.563 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 869.37 869.39
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 0.99
Thalweg Elevation 867.75 867.67
LTOB Elevation 869.35 869.37
LTOB Max Depth 1.598 1.693
LTOB Cross Sectional Area 11.81 11.70
Distance Elevation Features
0 865.906 TLP
1.92035648 865.513
5.69033778 865.545
9.8452872 865.608
17.3940666 865.499 TLB, BKF
23.1295842 865.332
27.7652151 864.952
28.9023223 864.801
29.6811153 864.349
31.0783027 863.98
31.4390943 863.622
31.9687783 863.344
32.9767752 863.087
33.0434384 862.896
33.8871572 862.77 THW
34.0707534 864.419
35.9501121 865.807 TRB
37.895799 865.653
41.5318299 865.684
45.2318691 865.738
49.132892 865.826
50 865.991 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 865.80 865.63
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 0.95
Thalweg Elevation 863.78 862.77
LTOB Elevation 865.80 865.50
LTOB Max Depth 2.02355 2.729
LTOB Cross Sectional Area 15.30 12.96
Distance Elevation Features
0 865.848 TLP
0.79680675 865.645
4.54220926 865.422
9.88492671 865.398
14.2768234 865.407
16.4365247 865.279 TLB
18.4310314 864.815
20.1740277 864.181
21.3622581 864.099
22.6075751 863.962
23.6957482 863.901 THW
24.5114453 864.287
26.0494505 864.955
28.702706 865.251 TRB, BKF
33.2114356 865.374
38.9320911 865.078
44.4457914 865.165
48.3593715 865.101
50 865.255 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 865.30 865.34
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 0.94
Thalweg Elevation 863.86 863.90
LTOB Elevation 865.30 865.25
LTOB Max Depth 1.445 1.35
LTOB Cross Sectional Area 9.33 8.30
Distance Elevation Features
0 866.249 TLP
1.23738636 866.083
2.65170832 866.071
4.29029894 865.903
5.85946457 865.793
7.4934831 865.663
9.59291244 865.676
10.697739 865.683
12.1606059 865.525
13.9787971 865.071
15.7345127 864.778
17.0752335 864.48
18.4696619 864.246
20.531397 864.424
22.4364165 864.276 TLB
23.3019309 864.156
24.1581815 863.987
24.5754631 863.737
24.6832799 863.603
24.8975878 863.564 THW
25.2023334 863.594
25.4154342 863.766
25.5905014 864.023
26.3082102 864.177
27.3680333 864.27 TRB
28.9261116 864.314
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7 30.6891279 864.428
Bankfull Elevation - Based on As-Built Bankfull Area 864.27 864.28 32.0650229 864.457
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 0.98 33.5418374 864.355
Thalweg Elevation 863.80 863.56 35.3657653 864.39
LTOB Elevation 864.27 864.27 37.1295515 864.266
LTOB Max Depth 0.468 0.706 38.5593104 864.464
LTOB Cross Sectional Area 1.23 1.17 40.4488581 864.489
42.600549 864.494
44.210361 864.176
44.6298842 864.138
46.1379678 864.206
47.194386 864.334
48.8587963 864.652
50 864.946 TRP
Distance Elevation Features
0 921.019 TLP
1.05734952 920.502
2.94692738 920.021
4.32920224 919.305
5.11561775 918.617
6.4190479 917.93
7.4409787 917.555
8.57565583 916.606
9.58101691 915.986
10.9568392 915.277
12.5478153 914.751
14.4090059 914.467 TLB, BKF
15.2045344 914.3
16.3194403 914.106
17.2463082 914.026
18.2798624 913.958 THW
18.6571853 913.985
19.1288975 913.962
19.8023484 914.03
20.3252683 914.006
21.2711113 914.47 TRB
22.7804163 914.754
24.5064128 915.092
26.7366049 915.442
29.0965421 915.702
31.6693746 916.013
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7 34.1581724 916.354
Bankfull Elevation - Based on As-Built Bankfull Area 914.68 914.53 36.720998 916.744
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 0.89 38.0362401 917.039
Thalweg Elevation 914.05 913.96 38.8319557 917.569
LTOB Elevation 914.68 914.47 40 917.981 TRP
LTOB Max Depth 0.628 0.509
LTOB Cross Sectional Area 2.86 2.41
Distance Elevation Features
0 917.145 TLP
1.26455882 916.544
3.17054222 915.496
5.55963614 914.303
7.96206129 913.461
9.43464106 912.881 TLB
9.88968599 912.391
10.496832 911.628
11.5697539 910.984
12.0837061 910.507 THW
13.4432355 910.639
14.5334525 911.501
15.0148873 912.768 TRB, BKF
18.0497223 913.692
22.5216168 914.632
27.3324939 915.749
31.3316366 916.768
35.3740934 917.588
38.6508485 918.303
40 918.775 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 913.27 912.67
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 1.05
Thalweg Elevation 910.90 910.51
LTOB Elevation 913.27 912.77
LTOB Max Depth 2.372 2.261
LTOB Cross Sectional Area 7.74 8.27
Distance Elevation Features
0 902.879 TLP
1.4503634 902.289
5.05858261 901.177
9.87031236 899.803
14.8373087 898.223
19.9105141 897.549 TLB
20.7929409 896.941
21.2278321 896.525
22.0866245 896.488
23.1103205 896.403 THW
24.4198617 896.614
25.5229465 897.223
28.982667 897.485 TRB, BKF
34.8725324 897.631
39.8700686 897.71
45.6728298 897.686
48.3035159 897.675
50 897.9 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 897.43 897.53
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 0.96
Thalweg Elevation 896.46 896.40
LTOB Elevation 897.43 897.49
LTOB Max Depth 0.965 1.082
LTOB Cross Sectional Area 5.18 4.80
Distance Elevation Features
0 897.933 TLP
1.37334773 897.608
6.45005341 897.694
12.550652 897.425
19.1048131 897.598
22.786562 897.411 TLB, BKF
24.0693322 897.184
24.7742006 896.601
25.6647958 896.612
26.0688214 896.518 THW
26.7596069 896.815
28.5249668 897.177
32.587783 897.505 TRB
37.8879774 897.691
42.4086216 897.709
46.8405268 897.633
49.0999723 897.693
50 897.872 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 897.42 897.48
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 0.93
Thalweg Elevation 896.49 896.52
LTOB Elevation 897.42 897.41
LTOB Max Depth 0.924 0.893
LTOB Cross Sectional Area 3.77 3.16
Distance Elevation Features
0 890.632 TLP
1.14086327 890.321
3.40555693 890.41
5.67083248 890.475
7.5715956 890.508
9.72187739 890.58
12.0326559 890.527
14.1762571 890.522
16.4948803 890.336
19.3167588 890.429 TLB, BKF
21.0606555 890.264
21.9386929 889.953
22.8291165 889.774
24.0319784 889.572
24.6425327 889.444
25.2130372 889.266
25.789486 889.289
26.6916694 889.41
27.3478 889.207 THW
28.0229475 889.94
28.5017979 890.237
29.5834395 890.351
31.5122883 890.494 TRB
33.0843704 890.477
35.3353081 890.492
37.0753019 890.393
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7 38.7712234 890.341
Bankfull Elevation - Based on As-Built Bankfull Area 890.35 890.53 41.0061109 890.351
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 0.93 42.9466519 890.372
Thalweg Elevation 889.16 889.21 44.7452995 890.37
LTOB Elevation 890.35 890.43 47.5046795 890.312
LTOB Max Depth 1.189 1.222 48.9340686 890.2
LTOB Cross Sectional Area 7.42 6.31 50 890.235 TRP
Distance Elevation Features
0 891.312 TLP
0.94604704 891.067
5.42439646 890.694
10.3051631 890.201
14.4623373 889.909
17.2721649 889.984 TLB, BKF
18.7225683 889.023
19.9997644 888.612
20.8821614 888.519 THW
22.2206774 888.751
24.2360225 889.095
25.9528195 889.431
29.7042228 890.035 TRB
34.4501369 890.331
38.5767632 890.447
43.7121996 890.161
48.9938583 889.859
50 889.953 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 890.06 890.09
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 0.93
Thalweg Elevation 888.53 888.52
LTOB Elevation 890.06 889.98
LTOB Max Depth 1.528 1.465
LTOB Cross Sectional Area 10.80 9.57
Distance Elevation Features
0 880.922 TLP
1.37927517 880.73
5.65591487 880.795
10.8124408 880.705
16.6920005 880.652 TLB
21.3765193 880.131
22.3935466 879.788
23.8120143 879.452 THW
25.0136088 879.486
26.555171 879.741
27.9333528 880.019
31.6724676 880.279 TRB, BKF
35.2748476 880.336
40.3910642 880.362
45.7679198 880.463
49.1957701 880.341
50 880.503 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 880.32 880.28
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 1.00
Thalweg Elevation 879.54 879.45
LTOB Elevation 880.32 880.28
LTOB Max Depth 0.78203 0.827
LTOB Cross Sectional Area 4.42 4.39
Distance Elevation Features
0 881.307 TLP
1.13401102 881.063
3.01719622 880.436
7.07303506 880.368
11.2234545 880.322
16.5350882 880.445
19.9841982 880.147 TLB
21.3819128 879.249
22.4868068 878.895
23.7018717 878.285 THW
25.0280905 878.749
26.4454527 879.184
28.4608292 879.675
32.2799186 880.127 TRB, BKF
37.6066612 880.352
43.4739546 880.32
48.8390809 880.323
50 880.469 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 880.23 880.24
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 0.94
Thalweg Elevation 878.18 878.29
LTOB Elevation 880.23 880.13
LTOB Max Depth 2.045 1.842
LTOB Cross Sectional Area 11.07 9.68
Distance Elevation Features
0 873.743 TLP
1.47222722 873.463
5.34897906 873.593
9.96160158 873.799
16.0942519 873.623
21.0368839 873.283 TLB, BKF
23.1392516 872.714
24.20609 872.588
25.1834087 872.512
26.0571298 872.491 THW
27.0107797 872.722
28.7534847 873.284 TRB
32.5758319 873.124
36.7969375 873.08
41.0200808 873.188
45.7000295 872.908
49.3452341 872.999
50 873.113 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 873.22 873.36
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 0.91
Thalweg Elevation 872.33 872.49
LTOB Elevation 873.22 873.28
LTOB Max Depth 0.899 0.792
LTOB Cross Sectional Area 4.40 3.80
Distance Elevation Features
0 874.909 TLP
1.80157181 874.249
5.69337106 873.719
9.70612879 873.559
13.8881011 873.268 TLB
16.7394138 873.001
18.4726124 872.394
19.4455603 871.633
21.2641547 871.487 THW
22.538349 871.814
23.5147355 872.183
24.8314829 872.467
27.8366313 872.902
33.345814 873.091 TRB, BKF
39.490502 873.005
44.7761301 873.081
48.6284975 873.012
50 873.061 TRP
MY0 MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankfull Elevation - Based on As-Built Bankfull Area 873.13 873.17
Bank Height Ratio - Based on As-Built Bankfull Area 1.00 0.95
Thalweg Elevation 871.54 871.49
LTOB Elevation 873.13 873.09
LTOB Max Depth 1.596 1.604
LTOB Cross Sectional Area 11.62 10.21
Parameter
Riffle Only Min Mean Med Max n Min Max Min Max n Min Mean Med Max n Min Max Min Max n
Bankfull Width (ft) 6.1 5.8 8.8
Floodprone Width (ft) 10.9 9.1 14.3 14.1 13.9 21.8
Bankfull Mean Depth (ft) 0.4 0.4 0.8
Bankfull Max Depth (ft) 0.7 0.7 1.1
Bankfull Cross Sectional Area (ft2)2.6 2.4 6.7
Width/Depth Ratio 14.1 13.6 11.4
Entrenchment Ratio 1.8 1.4 2.2 8.7 1.6 2.2 >2.2
Bank Height Ratio 2.3 4.0
Max part size (mm) mobilized at Bankfull 23.9 32.0 82.0 32.4
Rosgen Classification
Bankfull Discharge (cfs)
Sinuosity (ft)
Water Surface Slope (Channel) (ft/ft)0.1356 0.0164
Other
Parameter
Riffle Only Min Mean Med Max n Min Max Min Max n Min Mean Med Max n Min Max Min Max n
Bankfull Width (ft) 7.3 11.2 12.2
Floodprone Width (ft) 14.4 14.9 >23.4 46.1 >50 4.7 7.2
Bankfull Mean Depth (ft) 1.2 0.6 0.8
Bankfull Max Depth (ft) 1.5 1.1 1.4
Bankfull Cross Sectional Area (ft2)8.5 6.9 9.3
Width/Depth Ratio 6.2 16.0 18.3
Entrenchment Ratio 2.0 1.4 >2.2 4.1 4.1 1.4 2.2
Bank Height Ratio 3.1
Max part size (mm) mobilized at Bankfull 32.9 32.9
Rosgen Classification
Bankfull Discharge (cfs)
Sinuosity (ft)
Water Surface Slope (Channel) (ft/ft)0.008
Other
Pre-Existing Condition Design MY0 (March 2023) Pre-Existing Condition Design MY0 (March 2023)
XS-3
Starker Mitigation Project, S100 (North of I-40, below crossing)
Pre-Existing Condition Design MY0 (March 2023)
32.4
Starker Mitigation Project, S101
32.4
B4 (functioning as a G) C4 C4
3.3
0.3
0.4
0.8
14.0
1.0
1.1
3.5
0.052-0.215 0.052-0.215
Starker Mitigation Project, S100 (South of I-40)
0.0405
1.22 1.29 1.26 1.34 1.07 1.08
19.0 3.4 3.419.019.0
XS-9, 12 XS-13
0.004 - 0.022 0.011 0.013-0.069 0.0423
32.9 - - -
10.6
0.8
1.1
0.009 - 0.018 0.009 - 0.011
0.3
0.4
0.8
14.0
B4 (functioning as a G) B4/C4 B4/C4 F4 B4 B4
Table 6a: Baseline Stream Data Summary (Restoration Reaches)
1.11 1.11
Pre-Existing Condition
Incised E4
MY0 (March 2023)Design
6.0
Step-pool/B4cStep-pool/B4c
32.0-82.0
Starker Mitigation Project, S100 (North of I-40, above crossing)
6.5
0.6
0.7
3.0
14.0
1.0 1.0
>50
6.06.0
1.11
8.0
14.0
1.0
10.3 - 10.5
>50
0.7
1.2
7.0
14.9 - 15.2
4.7 - 4.9
XS-5, 7
1.37
18.5 18.5 18.5
1.21 1.21
3.4
9.9
0.7
1.0
7.0
14.0
1.0
0.0105-0.0147
1.0
1.0 1.0
2.8
3.7
5.1
33.5
0.2
0.5
1.2
20.9
6.6
Parameter
Riffle Only Min Mean Med Max n Min Max Min Max n Min Mean Med Max n Min Max Min Max n
Bankfull Width (ft) 1.8 -4.5
Floodprone Width (ft) 2.2 3.4 5.2 - 3.4 5.2
Bankfull Mean Depth (ft) 0.2 -0.2
Bankfull Max Depth (ft) 0.4 -0.4
Bankfull Cross Sectional Area (ft2)0.4 -0.9
Width/Depth Ratio 7.7 - 22.1
Entrenchment Ratio 1.3 1.4 2.2 - 1.4 2.2
Bank Height Ratio 2.2 -
Max part size (mm) mobilized at Bankfull --
Rosgen Classification
Bankfull Discharge (cfs)
Sinuosity (ft)
Water Surface Slope (Channel) (ft/ft)0.184
Other
Parameter
Riffle Only Min Mean Med Max n Min Max Min Max n Min Mean Med Max n Min Max Min Max n
Bankfull Width (ft)
Floodprone Width (ft) 10.5 16.5 10.5 16.5
Bankfull Mean Depth (ft)
Bankfull Max Depth (ft)
Bankfull Cross Sectional Area (ft2)
Width/Depth Ratio
Entrenchment Ratio 1.4 2.2 2.2 >2.2
Bank Height Ratio
Max part size (mm) mobilized at Bankfull
Rosgen Classification
Bankfull Discharge (cfs)
Sinuosity (ft)
Water Surface Slope (Channel) (ft/ft)
Other
Not Classified
Pre-Existing Condition Design MY0 (March 2023)
-
B4
Starker Mitigation Project, S103
7.5
0.5
0.8
4.7
19.1
0.8
1.0
0.0144
9.0 9.0
0.0167
4.0
14.0
1.0
3.6
6.1
4.1
1.0
1.02 1.14 1.14
Table 6a: Baseline Stream Data Summary (Restoration Reaches)
B4
2.2
15.1 15.1 15.1
MY0 (March 2023)
15.1 15.1 15.1
B4 (functioning as a G) Step-pool/B4 Step-pool/B4
Starker Mitigation Project, S200 (South of I-40, above crossing)
C4 C4 C4
XS-14
Pre-Existing Condition Design MY0 (March 2023)
0.024-0.067 0.024-0.102 0.0738-0.0233 0.009 0.009 0.0091
XS-17
9.09.0 9.0 9.0
1.27 1.05 1.07
Pre-Existing Condition Design
2.0
3.3 1.0
8.0
15.8
0.4
0.8
3.3
19.6
2.2 2.2 2.2
1.03
BBB4 (functioning as a G)
2.4
0.2
0.3
0.4
14.0
1.0
3.4
12.0
20.4
3.5
1.0
0.2
0.3
0.6
1.08 1.04
0.011
2.4
0.2
XS-1
1.06 1.06 1.03
0.027 0.021-0.251
2.2 2.2
XS-2
Starker Mitigation Project, S102
Pre-Existing Condition Design MY0 (March 2023)
-
38.9 - 50
7.6
0.3
0.4
14.0
1.0
1.0
0.5
0.9
3.8
15.4
6.62.0
14.8
3.3
1.0
-
Starker Mitigation Project, S200 (North of I-40)
7.5
0.5
0.8
4.0
14.0
1.0
7.4
14.7
0.6
0.9
4.7
11.5
Parameter
Riffle Only Min Mean Med Max n Min Max Min Max n
Bankfull Width (ft) 7.2 8.1 11.4
Floodprone Width (ft) 11.3 10.9 20.3 50.0 >50
Bankfull Mean Depth (ft) 0.8 0.5 0.8
Bankfull Max Depth (ft) 1.1 0.8 1.2
Bankfull Cross Sectional Area (ft2)5.9 4.4 7.6
Width/Depth Ratio 8.6 13.1 29.6
Entrenchment Ratio 1.6 1.4 >2.2 4.4 6.2
Bank Height Ratio 1.7
Max part size (mm) mobilized at Bankfull 24.1 24.1
Rosgen Classification
Bankfull Discharge (cfs)
Sinuosity (ft)
Water Surface Slope (Channel) (ft/ft)0.00764 0.0184
Other XS-18, 20, 22
1.23 1.33 1.32
0.008 0.0086
B4 (functioning as a G) B4/C4 B4/C4
11.0 11.011.0
1.0 1.0
24.1
0.9
6.0
14.0
9.2
0.7
Table 6a: Baseline Stream Data Summary (Restoration Reaches)
Starker Mitigation Project, S200 (South of I-40, below crossing)
Pre-Existing Condition Design MY0 (March 2023)
MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+
Bankfull Elevation (ft) ‐ Based on AB‐Bankfull1 Area 917.73 917.58 910.87 910.77 907.56 907.58 907.34 907.10 891.73 891.54
Bank Height Ratio_Based on AB Bankfull1 Area 1.00 1.09 1.00 1.00 1.00 0.96 1.00 1.08 1.00 0.98
Thalweg Elevation 917.31 917.13 910.62 910.54 906.85 906.99 906.01 905.92 890.56 890.32
LTOB2 Elevation 917.73 917.62 910.87 910.77 907.56 907.56 907.34 907.20 891.73 891.51
LTOB2 Max Depth (ft)0.42 0.49 0.26 0.23 0.71 0.56 1.33 1.28 1.17 1.19
LTOB2 Cross Sectional Area (ft2)0.91 1.05 0.55 0.55 2.34 2.09 4.97 6.28 6.97 6.67
Entrenchment Ratio 3.30 3.60 3.50 2.10 8.70 4.80 4.10 2.90 4.90 3.90
MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+
Bankfull Elevation (ft) ‐ Based on AB‐Bankfull1 Area 891.06 891.11 883.86 883.85 882.50 882.53 869.43 869.49 869.37 869.39
Bank Height Ratio_Based on AB Bankfull1 Area 1.00 1.01 1.00 0.97 1.00 1.00 1.00 1.03 1.00 0.99
Thalweg Elevation 889.37 889.49 882.65 882.69 879.59 879.61 868.29 868.20 867.75 867.67
LTOB2 Elevation 891.06 891.12 883.86 883.82 882.50 882.52 869.43 869.54 869.35 869.37
LTOB2 Max Depth (ft)1.69 1.64 1.21 1.13 2.91 2.91 1.14 1.34 1.60 1.70
LTOB2 Cross Sectional Area (ft2)11.78 12.04 7.48 7.12 17.63 17.53 6.89 7.43 11.81 11.70
Entrenchment Ratio 2.70 2.20 4.70 4.00 4.20 4.10 4.10 4.30 3.40 2.70
MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+
Bankfull Elevation (ft) ‐ Based on AB‐Bankfull1 Area 865.80 865.63 865.30 865.34 864.27 864.28 914.68 914.53 913.27 912.67
Bank Height Ratio_Based on AB Bankfull1 Area 1.00 0.95 1.00 0.94 1.00 0.98 1.00 0.89 1.00 1.05
Thalweg Elevation 863.78 862.77 863.86 863.90 863.80 863.56 914.05 913.96 910.90 910.51
LTOB2 Elevation 865.80 865.50 865.30 865.25 864.27 864.27 914.68 914.47 913.27 912.77
LTOB2 Max Depth (ft)2.02 2.73 1.45 1.35 0.47 0.71 0.63 0.51 2.37 2.26
LTOB2 Cross Sectional Area (ft2)15.30 12.96 9.33 8.30 1.23 1.17 2.86 2.41 7.74 8.27
Entrenchment Ratio 2.40 2.70 4.10 4.10 6.60 7.20 2.00 1.90 1.50 1.60
MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+
Bankfull Elevation (ft) ‐ Based on AB‐Bankfull1 Area 897.43 897.53 897.42 897.48 890.35 890.53 890.06 890.09 880.32 880.28
Bank Height Ratio_Based on AB Bankfull1 Area 1.00 0.96 1.00 0.93 1.00 0.93 1.00 0.93 1.00 1.00
Thalweg Elevation 896.46 896.40 896.49 896.52 889.16 889.21 888.53 888.52 879.54 879.45
LTOB2 Elevation 897.43 897.49 897.42 897.41 890.35 890.43 890.06 889.98 880.32 880.28
LTOB2 Max Depth (ft)0.96 1.08 0.92 0.89 1.19 1.22 1.53 1.47 0.78 0.83
LTOB2 Cross Sectional Area (ft2)5.18 4.80 3.77 3.16 7.42 6.31 10.80 9.57 4.42 4.39
Entrenchment Ratio 3.70 3.90 6.60 5.30 5.00 4.10 3.40 3.60 4.40 4.30
MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+
Bankfull Elevation (ft) ‐ Based on AB‐Bankfull1 Area 880.23 880.24 873.22 873.36 873.13 873.17
Bank Height Ratio_Based on AB Bankfull1 Area 1.00 0.94 1.00 0.91 1.00 0.95
Thalweg Elevation 878.18 878.29 872.33 872.49 871.54 871.49
LTOB2 Elevation 880.23 880.13 873.22 873.28 873.13 873.09
LTOB2 Max Depth (ft)2.04 1.84 0.90 0.80 1.60 1.60
LTOB2 Cross Sectional Area (ft2)11.07 9.68 4.40 3.80 11.62 10.21
Entrenchment Ratio 3.50 3.90 6.20 6.50 3.50 2.50
Table 6b: Cross‐Section Morphology Data
Starker Mitigation Project (Data collected: MY1 ‐ 2023)
Cross‐Section 17 (Riffle ‐S200 (South of I‐40, above
crossing))
Cross‐Section 18 (Riffle ‐S200 (South of I‐40, below
crossing))
Cross‐Section 19 (Pool ‐ S200 (South of I‐40, below
crossing))
Cross‐Section 20 (Riffle ‐ S200 (South of I‐40, below
crossing))
Cross‐Section 13 (Riffle ‐ S101)Cross‐Section 14 (Riffle ‐ S200 (North of I‐40))
Cross‐Section 16 (Pool ‐S200 (South of I‐40, above crossing))
Cross‐Section 5 (Riffle ‐ S100 (North of I‐40, below crossing))
Cross‐Section 21 (Pool ‐S200 (South of I‐40, below crossing))
Cross‐Section 3 (Riffle ‐ S100 (North of I‐40, above crossing)) Cross‐Section 4 (Pool ‐ S100 (North of I‐40, above crossing))
Note: The smaller the channel the closer the survey measurements are to their limit of reliable detection, therefore inter‐annual variation in morphological measurement (as a percentage) is by default magnified as channel size decereases. Some of the variability above is the result of this factor and some is due to the large amount of depositional sediments observed.
Cross‐Section 23 (Pool ‐S200 (South of I‐40, below crossing))
Cross‐Section 15 (Pool ‐ S200 (North of I‐40))Cross‐Section 11 (Pool ‐S100 (South of I‐40))Cross‐Section 12 (Riffle ‐S100 (South of I‐40))
Cross‐Section 22 (Riffle ‐ S200 (South of I‐40, below
crossing))
Reach: S100 (North of I‐40, above crossing), S102, S103, S100 (North of I‐40, below crossing), S100 (South of I‐400), S101, S200 (North of I‐40), S200 (South of I‐40, above crossing), S200 (South of I‐40, below crossing)
Cross‐Section 10 (Pool ‐S100 (South of I‐40))Cross‐Section 8 (Pool ‐ S100 (North of I‐40, below crossing)) Cross‐Section 9 (Riffle ‐S100 (South of I‐40))
Cross‐Section 1 (Riffle ‐ S103) Cross‐Section 2 (Riffle ‐S102)
Cross‐Section 6 (Pool ‐ S100 (North of I‐40, below crossing)) Cross‐Section 7 (Riffle ‐ S100 (North of I‐40, below crossing))
The above morphology parameters reflect the 2018 guidance that arose from the mitigation technical workgroup consisting of DMS, the IRT and
industry mitigation providers/practitioners. The outcome resulted in the focus on three primary morphological parameters of interest for the
purposes of tracking channel change moving forward. They are the bank height ratio using a constant As‐built bankfull area and the cross sectional
area and max depth based on each years low top of bank. These are calculated as follows:
1 ‐Bank Height Ratio (BHR) takes the As‐built bankful area as the basis for adjusting each subsequent years bankfull elevation. For example if the
As‐built bankfull area was 10 ft2, then the MY1 bankfull elevation would be adjusted until the calculated bankfull area within the MY1 cross section
survey = 10 ft2. The BHR would then be calculated with the difference between the LOW top of bank (LTOB) elevation for MY1 and the thalweg
elevation for MY1 in the numerator with the difference between the MY1 bankfull elevation and the MY1 thalweg elevation in the denominator.
This same process is then carried out in each successive year.
2 ‐LTOB Area and Max depth ‐These are based on the LTOB elevation for each years survey (The same elevation used for the LTOB in the BHR
calculation). Area below the LTOB elevation will be used and tracked for each year as above. The difference between the LTOB elevation and the
thalweg elevation (same as in the BHR calculation) will be recroded and tracked above as LTOB max depth.
Appendix E: Hydrology
Figure 2: Flow Gauge Installation Diagrams
Figure 3: Crest Gauge Installation Diagram
Figure 4: Flow Gauge and Crest Gauge Graphs
Table 7a-b:Verification of Bankfull Events
Table 8: Rainfall Data Table
FLOW GAUGE FG-1 (S103)
FLOW
RIFFLE
POOL
RIFFLE
TOP OF FLOW GAUGE
ELEV. = 6.19
BASEFLOW SE
N
S
O
R
D
E
P
T
H
=
5.
6
0
ELEVATION OF DOWN
STREAM RIFFLE = 11.61
Flow Depth = (Top of Gauge + Sensor Depth) - Riffle
Flow Depth = (6.19 + 5.60) - 11.61
Flow Depth = 0.18 feet
FLOW GAUGE FG-2 (S102)
FLOW
RIFFLE
POOL
RIFFLE
TOP OF FLOW GAUGE
ELEV. = 3.05
BASEFLOW SE
N
S
O
R
D
E
P
T
H
=
5
.
65
ELEVATION OF DOWN
STREAM RIFFLE = 8.39
Flow Depth = (Top of Gauge + Sensor Depth) - Riffle
Flow Depth = (3.05 + 5.65) - 8.39
Flow Depth = 0.31 feet
FLOW GAUGE FG-3 (S101)
FLOW
RIFFLE
POOL
RIFFLE
TOP OF FLOW GAUGE
ELEV. = 3.65
BASEFLOW SE
N
S
O
R
D
E
P
T
H
=
5.
5
2
ELEVATION OF DOWN
STREAM RIFFLE = 8.74
Flow Depth = (Top of Gauge + Sensor Depth) - Riffle
Flow Depth = (3.65 + 5.52) - 8.74
Flow Depth = 0.43 feet
CROSS SECTIONAL VIEW OF STREAM
TOP OF CREST GAUGE
HEIGHT = 0.60
PRESSURE
TRANSDUCER
SE
N
S
O
R
D
E
P
T
H
=
6.
7
0
5.67 =
BANKFULL
DEPTH
Crest Gauge CG-1 (S100 South of I-40)
Bankfull Event Depth (for transducer) = (Top of Gauge + Sensor Depth) - Bankfull Depth
Bankfull Event Depth = 1.63
CROSS SECTIONAL VIEW OF STREAM
TOP OF CREST GAUGE
HEIGHT = 4.58
PRESSURE
TRANSDUCER
SE
N
S
O
R
D
E
P
T
H
=
5.
3
8.76 =
BANKFULL
DEPTH
Crest Gauge CG-2 (S200 South of I-40)
Bankfull Event Depth (for transducer) = (Top of Gauge + Sensor Depth) - Bankfull
Depth Bankfull Event Depth = 1.12
Figure 4: Flow Gauge and Crest Gauge Graphs
0
0.5
1
1.5
2
2.5
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
1/
1
/
2
0
2
3
1/
1
5
/
2
0
2
3
1/
2
9
/
2
0
2
3
2/
1
2
/
2
0
2
3
2/
2
6
/
2
0
2
3
3/
1
2
/
2
0
2
3
3/
2
6
/
2
0
2
3
4/
9
/
2
0
2
3
4/
2
3
/
2
0
2
3
5/
7
/
2
0
2
3
5/
2
1
/
2
0
2
3
6/
4
/
2
0
2
3
6/
1
8
/
2
0
2
3
7/
2
/
2
0
2
3
7/
1
6
/
2
0
2
3
7/
3
0
/
2
0
2
3
8/
1
3
/
2
0
2
3
8/
2
7
/
2
0
2
3
9/
1
0
/
2
0
2
3
9/
2
4
/
2
0
2
3
10
/
8
/
2
0
2
3
10
/
2
2
/
2
0
2
3
11
/
5
/
2
0
2
3
11
/
1
9
/
2
0
2
3
12
/
3
/
2
0
2
3
12
/
1
7
/
2
0
2
3
12
/
3
1
/
2
0
2
3
Da
i
l
y
R
a
i
n
f
a
l
l
(
i
n
c
h
e
s
)
St
r
e
a
m
D
e
p
t
h
(
F
e
e
t
)
Starker Flow Gauge FG-1 (S103)
Daily Rainfall Stream Depth Downstream Riffle
Jan
25th:
Start
of
MY1
Data
Dec
5th:
End
of
MY1
Data
Maximum Consecutive Days of Flow:
3 days - (4/7/2023 - 4/9/2023)
7 Cumulative Days of Flow
0
0.5
1
1.5
2
2.5
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
1/
1
/
2
0
2
3
1/
1
5
/
2
0
2
3
1/
2
9
/
2
0
2
3
2/
1
2
/
2
0
2
3
2/
2
6
/
2
0
2
3
3/
1
2
/
2
0
2
3
3/
2
6
/
2
0
2
3
4/
9
/
2
0
2
3
4/
2
3
/
2
0
2
3
5/
7
/
2
0
2
3
5/
2
1
/
2
0
2
3
6/
4
/
2
0
2
3
6/
1
8
/
2
0
2
3
7/
2
/
2
0
2
3
7/
1
6
/
2
0
2
3
7/
3
0
/
2
0
2
3
8/
1
3
/
2
0
2
3
8/
2
7
/
2
0
2
3
9/
1
0
/
2
0
2
3
9/
2
4
/
2
0
2
3
10
/
8
/
2
0
2
3
10
/
2
2
/
2
0
2
3
11
/
5
/
2
0
2
3
11
/
1
9
/
2
0
2
3
12
/
3
/
2
0
2
3
12
/
1
7
/
2
0
2
3
12
/
3
1
/
2
0
2
3
Da
i
l
y
R
a
i
n
f
a
l
l
(
i
n
c
h
e
s
)
St
r
e
a
m
D
e
p
t
h
(
F
e
e
t
)
Starker Flow Gauge FG-2 (S102)
Daily Rainfall Stream Depth Downstream Riffle
Maximum Consecutive Days of Flow:
155 days - (6/29/23 - 11/30/23)Jan
25th:
Start
of
MY1
Data
Dec
5th:
End
of
MY1
Data
320 CumulaƟve Days of No Flow
324 CumulaƟve Days of Flow 3 CumulaƟve Days of No Flow
0
0.5
1
1.5
2
2.5
0
0.2
0.4
0.6
0.8
1
1.2
1/
1
/
2
0
2
3
1/
1
5
/
2
0
2
3
1/
2
9
/
2
0
2
3
2/
1
2
/
2
0
2
3
2/
2
6
/
2
0
2
3
3/
1
2
/
2
0
2
3
3/
2
6
/
2
0
2
3
4/
9
/
2
0
2
3
4/
2
3
/
2
0
2
3
5/
7
/
2
0
2
3
5/
2
1
/
2
0
2
3
6/
4
/
2
0
2
3
6/
1
8
/
2
0
2
3
7/
2
/
2
0
2
3
7/
1
6
/
2
0
2
3
7/
3
0
/
2
0
2
3
8/
1
3
/
2
0
2
3
8/
2
7
/
2
0
2
3
9/
1
0
/
2
0
2
3
9/
2
4
/
2
0
2
3
10
/
8
/
2
0
2
3
10
/
2
2
/
2
0
2
3
11
/
5
/
2
0
2
3
11
/
1
9
/
2
0
2
3
12
/
3
/
2
0
2
3
12
/
1
7
/
2
0
2
3
12
/
3
1
/
2
0
2
3
Da
i
l
y
R
a
i
n
f
a
l
l
(
i
n
c
h
e
s
)
St
r
e
a
m
D
e
p
t
h
(
F
e
e
t
)
Starker Flow Gauge FG-3 (S101)
Daily Rainfall Stream Depth Downstream Riffle
Maximum Consecutive Days of Flow:
159 days - (3/15/23 - 8/20/23)
Mar 15th:
Start of
MY1 Data
Dec
5th:
End
of
MY1
Data
0
0.5
1
1.5
2
2.5
0
0.5
1
1.5
2
2.5
3
1/
1
/
2
0
2
3
1/
1
5
/
2
0
2
3
1/
2
9
/
2
0
2
3
2/
1
2
/
2
0
2
3
2/
2
6
/
2
0
2
3
3/
1
2
/
2
0
2
3
3/
2
6
/
2
0
2
3
4/
9
/
2
0
2
3
4/
2
3
/
2
0
2
3
5/
7
/
2
0
2
3
5/
2
1
/
2
0
2
3
6/
4
/
2
0
2
3
6/
1
8
/
2
0
2
3
7/
2
/
2
0
2
3
7/
1
6
/
2
0
2
3
7/
3
0
/
2
0
2
3
8/
1
3
/
2
0
2
3
8/
2
7
/
2
0
2
3
9/
1
0
/
2
0
2
3
9/
2
4
/
2
0
2
3
10
/
8
/
2
0
2
3
10
/
2
2
/
2
0
2
3
11
/
5
/
2
0
2
3
11
/
1
9
/
2
0
2
3
12
/
3
/
2
0
2
3
12
/
1
7
/
2
0
2
3
12
/
3
1
/
2
0
2
3
Da
i
l
y
R
a
i
n
f
a
l
l
(
i
n
c
h
e
s
)
St
r
e
a
m
D
e
p
t
h
(
F
e
e
t
)
Starker Crest Gauge CG-1 (S100 South)
Daily Rainfall Stream Depth Downstream Riffle
March 16th:
Start of MY1 Data
Dec
5th
End
of
MY1
Data
184 CumulaƟve Days of Flow 82 CumulaƟve Days of No Flow
0
0.5
1
1.5
2
2.5
0
0.5
1
1.5
2
2.5
1/
1
/
2
0
2
3
1/
1
5
/
2
0
2
3
1/
2
9
/
2
0
2
3
2/
1
2
/
2
0
2
3
2/
2
6
/
2
0
2
3
3/
1
2
/
2
0
2
3
3/
2
6
/
2
0
2
3
4/
9
/
2
0
2
3
4/
2
3
/
2
0
2
3
5/
7
/
2
0
2
3
5/
2
1
/
2
0
2
3
6/
4
/
2
0
2
3
6/
1
8
/
2
0
2
3
7/
2
/
2
0
2
3
7/
1
6
/
2
0
2
3
7/
3
0
/
2
0
2
3
8/
1
3
/
2
0
2
3
8/
2
7
/
2
0
2
3
9/
1
0
/
2
0
2
3
9/
2
4
/
2
0
2
3
10
/
8
/
2
0
2
3
10
/
2
2
/
2
0
2
3
11
/
5
/
2
0
2
3
11
/
1
9
/
2
0
2
3
12
/
3
/
2
0
2
3
12
/
1
7
/
2
0
2
3
12
/
3
1
/
2
0
2
3
Da
i
l
y
R
a
i
n
f
a
l
l
(
i
n
c
h
e
s
)
St
r
e
a
m
D
e
p
t
h
(
F
e
e
t
)
Starker Crest Gauge CG-2 (S200 South)
Daily Rainfall Stream Depth Downstream Riffle
Jan
13th
Start
of
MY1
Data
Dec
5th:
End of
MY1
Data
Monitoring
Year Date of Collection Date of Occurrence Method Notes/Photos
Measurement
above bankfull
(feet)
8/15/2023 4/27/2023 - 4/28/2023 Pressure Transducer Bankfull event as a result of 1.71" rainfall event 0.39
8/15/2023 5/28/2023 Pressure Transducer Bankfull event as a result of 0.1.14" rainfall event 0.02
8/15/2023 6/3/2023 Pressure Transducer Bankfull event as a result of 0.49" rainfall event 0.04
8/15/2023 6/19/2023 - 6/20/2023 Pressure Transducer Bankfull event as a result of 1.72" rainfall event 0.99
8/15/2023 8/7/2023 Pressure Transducer Bankfull event as a result 1.01"of rainfall event 0.29
12/6/2023 8/26/2023 Pressure Transducer Bankfull event recorded by pressure transducer 0.16
12/6/2023 8/28/2023 Pressure Transducer Bankfull event as a result of 0.18" rainfall event 0.28
12/6/2023 9/12/2023 Pressure Transducer Bankfull event as a result of 0.16" rainfall event 0.17
Table 7a: Verification of Bankfull Events - CG-1 on S100 South
Starker Mitigation Project
MY1
Monitoring
Year Date of Collection Date of Occurrence Method Notes/Photos
Measurement
above bankfull
(feet)
8/15/2023 1/25/2023 Pressure Transducer Bankfull event as a result of 1.28" rainfall event 0.25
8/15/2023 2/12/2023 Pressure Transducer Bankfull event as a result of 1.14" rainfall event 0.01
8/15/2023 2/17/2023 Pressure Transducer Bankfull event as a result of 0.79" rainfall event 0.12
8/15/2023 4/27/2023 - 4/28/2023 Pressure Transducer Bankfull event as a result of 0.77" rainfall event 0.26
8/15/2023 6/19/2023 - 6/20/2023 Pressure Transducer Bankfull event as a result of 1.99" rainfall event 0.96
8/15/2023 8/7/2023 Pressure Transducer Bankfull event as a result of 1.01" rainfall event 0.16
12/6/2023 8/28/2023 Pressure Transducer Bankfull event as a result of 0.18" rainfall event 0.11
Table 7b: Verification of Bankfull Events - CG-2 on S200 South
Starker Mitigation Project
MY1
Month 30th Percentile* 70th Percentile* Observed Monthly Rainfall
Dec-22 2.32 4.21 4.04
Jan-23 2.77 4.81 5.15
Feb-23 2.60 4.55 3.15
Mar-23 3.35 5.56 2.38
Apr-23 1.97 4.40 5.42
May-23 2.97 5.14 2.57
Jun-23 2.78 5.34 6.23
Jul-23 2.67 4.90 3.28
Aug-23 2.52 4.28 3.77
Sep-23 2.68 5.20 1.83
Oct-23 1.52 3.94 0.59
Nov-23 2.45 4.06 1.47
*30th and 70th percentile data collected from WETS Station: Hickory Faa Ap
Table 8: Monthly Rainfall Data
Starker Tributaries Mitigation Project
MY1 2023
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23
Ra
i
n
f
a
l
l
T
o
t
a
l
(
i
n
c
h
e
s
)
Monthly Rainfall
Observed Monthly Rainfall 30th Percentile*70th Percentile*
Appendix F: Correspondence
MY0 IRT Comment Response Letter
waterlandsolutions.com | 7721 Six Forks Rd, Ste 130, Raleigh, NC 27615 | 919-614-5111
WLS Memo
WLS Catawba 01 Umbrella Mitigation Banking Instrument
Starker Mitigation Site
USACE Action ID#: SAW-2020-01540
Subject: Starker As-Built (MY0) Credit Release Comments
Date Prepared: December 12th, 2023
This memo addresses the North Carolina Interagency Review Team (NCIRT) comments on the Starker As-
built (MY0) Credit Release. These comments were provided via email by Steve Kichefski on August 17,
2023. WLS is providing our written responses to the NCIRT’s review comments below. Each of the NCIRT
review comments is copied below in bold text, followed by the appropriate response from WLS in regular
text:
Erin Davis/Steve Kichefski, USACE
1. Several floodplain benches showed saturation/standing water with potential wetland
development. Closely monitor woody vegetation survival due to conditions wetter than anticipated
and the potential need for supplemental planting of wetter species. We recommend changing fixed
veg plots 6, 13, 20 and 22 into mobile/random veg plots to better monitor areas of vegetative
concern such as the saturated floodplain, dense juncus areas and steep sloped areas on S200 north
of I-40. WLS Response: WLS will transition plots 6, 13, 20, and 22 to random plots for MY2 monitoring
and place them in areas of vegetative concern discussed during the as-built (MY0) site visit.
2. Please correct the mislabel of Priority I restoration for S200 on the CCPV. WLS Response: WLS has
updated labeling of S200 to Priority II restoration from station 10+00 to the farm crossing at station
26+00.
3. Monitor the minor headcut in the left floodplain of S200 just above the crossing. WLS Response:
WLS will monitor the drainage on S200 above the crossing and include it in the discussion of water
quality treatment features in the report. This area is noted to be fully vegetated and stable at the time
of the MY1 fall site-walk.
4. The thick Juncus vegetation was an IRT concern for suppressing other vegetative growth on S100
north of I-40. We recommend one of the mobile veg plots be placed in this dense juncus floodplain
for the MY1 data collection. WLS Response: WLS will place a mobile vegetation plot within this area
in MY2. As discussed during the as-built site visit, the existing permanent plots were monitored in
MY1 to determine tree survivability from planting. WLS recommends allowing two growing seasons
through MY2 for planted stems to establish before any replanting of the site is proposed.
waterlandsolutions.com | 7721 Six Forks Rd, Ste 130, Raleigh, NC 27615 | 919-614-5111
5. Please monitor and include a discussion of the water quality treatment features located throughout
the site to the MY1 Report. WLS Response: WLS has added language to the MY1 report to discuss