From: Erin Binkley <EBinkley@FandR.com>
Sent: Friday, December 15, 2023 11:29 AM
To: Elks, Katharine B CIV USARMY CESAW (USA)
Cc: Turlington, Chad; Elias Ruhl
Subject: [External] RE: SAW-2020-00952 Big Rockfish Creek SS outfall- Additional Information
Needed
Attachments: D.1a 2023.10.05_BRCO C2 Impact Maps -Revision 2.pdf
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Hi Katherine,
Please find the attached revised plans for contract 2. Additionally, please see below (client response in red):
The 50-foot LOD is necessary because the outfall depth of the sewer is deep (24"). Thus, they need bigger equipment
with larger reaches and larger tracks, including a heavy track hoe excavator, room to operate with trench box or other
shoring materials, and the necessity to excavate and store native soils adjacent to the trenched areas, to reduce impact
to wetlands and keep native soil profile. Additionally, if groundwater is high, they need room for pumps and hoses to
pump out groundwater (dewatering equipment).
Diameter
Total (LF)
24
11,200
18
3,600
14,800
Please find responses to your requests below:
Could you provide revisions or more information for the following:
The impacts for W1 on the PCN do not match the impacts listed on the attached set of plans. - I've looked at this
and found the following:
a. The temporary and permanent impact totals for W1 on the cover page are incorrect. Agree and
updating Table
b. The temporary impact total on page 16 for W1 is also incorrect. Updated. For 1321.82 SF Temp impact
on sheet 13, the AC conversion is incorrect (SF call out correct). Attached version address
c. The detail on page 13 for W1 impacts shows that some of the impacts listed are for contract 3. It looks
like they added the contract 3 temporary and permanent impacts on page 13 into the total for contract
2, except instead of adding 0.146 acres of temporary impact from contract 3, they added 0.0146.
Updated. For 1321.82 SF Temp impact on sheet 13, the AC conversion is incorrect (SF call out
correct). Attached version address
d. So, according the correct total impacts for W1 in Contract 2 are as follows:
i. Temporary - 0.1261 acres
ii. Permanent - 0.0353 acres
2. Similarly, the totals for wetland temporary and permanent impacts on the PCN don't match the plan set. -I've
looked at this and found the following:
a. With this adjustment the correct total wetland impacts for Contract 2 are very close to the previously
listed totals on the PCN, as follows:
b. Temporary - 2.7668 acres
c. Permanent — 0.7119 acres
d. Total Wetland Impact — 3.4787 acres
e. Please let me know if this seems right to you. Not updating as numbers work once the AC conversion
item was addressed.
f. S9 has zero impacts — should it be removed? It looks like the stream origin point is at the edge of the
LOD. Do you know when or who established that point? Will white out callouts to S9.
3. Please update the total linear feet of 24" and 18" pipe that will be installed with Contract 2. The narrative lists
the total for the whole project, which is fine but my authorization needs to include the pipe installation
authorized for only Contract 2. Summary breakdown table provided in e-mail above.
4. Also, to verify consistency with the regional conditions, please let me know the width of the LOD. Updated
drawings to show 50' LOD. Provided explanation for exceeding 40' wide on the phone call (Equipment to
install 24", depth of sewer and safe trench practice, storage of excavated native soil, and trench dewatering
equipment.
5. Please revise the plans to reflect the accurate impacts, please add dimensions to the LOD area (width), and date
the plans to reflect the revision. See Attached
Thank you,
Erin Binkley, CE, WPIT
Environmental Scientist
FROEHLING & ROBERTSON
310 Hubert Street Raleigh, NC 27603
T 919.828.3441 1 D 919.719.1086
EBinklev@FandR.com
www.FandR.com
The content of this email is the confidential property of Froehling & Robertson, Inc. (F&R) and should not be copied, modified, retransmitted, or used for any
purpose except with F&R's written authorization. If you are not the intended recipient, please delete all copies and notify the sender immediately.
From: Elks, Katharine B CIV USARMY CESAW (USA) <Katharine.B.Elks@usace.army.mil>
Sent: Wednesday, December 13, 2023 9:47 AM
To: Erin Binkley <EBinkley@FandR.com>
Cc: chad.turlington@ncdenr.gov; Elias Ruhl <ERuhl@FandR.com>
Subject: RE: SAW-2020-00952 Big Rockfish Creek SS outfall- Additional Information Needed
[EXTERNAL]
Hi Erin,
We need accurate Plans of Record to be attached with the permit verification. Please revise the plans to reflect the
accurate impacts, please add dimensions to the LOD area (width), and date the plans to reflect the revision.
Respectfully,
Katharine Elks
Regulatory Specialist
US Army Corps of Engineers
69 Darlington Ave
Wilmington, NC 28403
910-251-4567 (office)
910-473-7034 (cell)
E-PCN-Submittal
https://edocs.deg.nc.gov/Forms/Pre-Construction Notification Form
PJDs, Wetland Delineation Concurrence &JD's.
http://saw-reg. usace. a rmy. m i l/J D/F I NALSAW-J D-R EQU EST-FORM-20170508. pdf
Submittal You may submit requests via e-mail in PDF format to
WilmingtonNCREG@usace.army.mil
Automated Data sheets for Atlantic & Gulf Coastal Plain Data Form Version 2.0
https://usace.contentd m.ocic.org/uti Is/getfi le/col lection/pl602lco119/id/2566
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at:
https://regulatorV.ops.usace.army.mil/customer-service-survey/
Thank you for taking the time to visit this site and complete the survey.
From: Erin Binkley <EBinklev@FandR.com>
Sent: Tuesday, December 12, 2023 10:30 AM
To: Elks, Katharine B CIV USARMY CESAW (USA) <Katharine.B.Elks@usace.army.mil>
Cc: chad.turlington@ncdenr.gov; Elias Ruhl <ERuhl@FandR.com>
Subject: [Non-DoD Source] RE: SAW-2020-00952 Big Rockfish Creek SS outfall- Additional Information Needed
Hi Katherine,
1. The temporary and permanent impact totals for W1 on the cover page are incorrect. The temporary impact total
on page 16 for W1 is also incorrect. The detail on page 13 for W1 impacts shows that some of the impacts listed
are for contract 3. They added the contract 3 temporary and permanent impacts on page 13 into the total for
contract 2, except instead of adding 0.146 of temporary they added 0.0146. So, according to their detail plan,
the correct total impacts for W1 in Contract 2 are as follows:
a. Temporary— 0.1116 acres
b. Permanent— 0.0353 acres
2. With this adjustment the correct total wetland impacts for Contract 2 are very close to the previously listed
totals on the PCN, as follows:
a. Temporary— 2.7525 acres
b. Permanent— 0.712 acres
c. Total Wetland Impact— 3.4646 acres
Do you need them to submit corrected plans or can you work with this information?
Thank you,
Erin Binkley, CE, WIT
Environmental Scientist
FROEHLING & ROBERTSON
310 Hubert Street Raleigh, NC 27603
T 919.828.3441 1 D 919.719.1086
EBinklev@FandR.com I www.FandR.com
The content of this email is the confidential property of Froehling & Robertson, Inc. (F&R) and should not be copied, modified, retransmitted, or used for any
purpose except with F&R's written authorization. If you are not the intended recipient, please delete all copies and notify the sender immediately.
From: Elks, Katharine B CIV USARMY CESAW (USA) <Katharine.B.Elks@usace.army.mil>
Sent: Monday, December 11, 2023 1:44 PM
To: Erin Binkley <EBinklev@FandR.com>
Cc: chad.turlington@ncdenr.gov
Subject: RE: SAW-2020-00952 Big Rockfish Creek SS outfall- Additional Information Needed
[EXTERNAL]
Good morning Ms. Binkley,
I've continued to sort through the application materials and there are several inconsistencies I need clarified.
Could you provide revisions or more information for the following:
- The impacts for W1 on the PCN do not match the impacts listed on the attached set of plans.
- Similarly, the totals for wetland temporary and permanent impacts on the PCN don't match the plan set.
- S9 has zero impacts — should it be removed? It looks like the stream origin point is at the edge of the LOD. Do
you know when or who established that point?
- Please update the total linear feet of 24" and 18" pipe that will be installed with Contract 2. The narrative lists
the total for the whole project, which is fine but my authorization needs to include the pipe installation
authorized for only Contract 2.
I've attached the permit plans for reference. Also to verify consistency with the regional conditions please let me know
the width of the LOD.
Thanks,
Katharine Elks
Regulatory Specialist
US Army Corps of Engineers
69 Darlington Ave
Wilmington, NC 28403
910-251-4567 (office)
910-473-7034 (cell)
E-PCN-Submittal
https://edocs.deg.nc.gov/Forms/Pre-Construction Notification Form
PJDs, Wetland Delineation Concurrence &JD's.
http://saw-reg. usace.a rmy. m i l/J D/FI NALSAW-J D-REQU EST-FORM-20170508. pdf
Submittal You may submit requests via e-mail in PDF format to
WilmingtonNCREG@usace.army.mil
Automated Data sheets for Atlantic & Gulf Coastal Plain Data Form Version 2.0
https://usace.contentd m.ocic.org/uti Is/getfi le/col lection/pl602lco119/id/2566
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at:
https://regulatorV.ops.usace.army.mil/customer-service-survey/
Thank you for taking the time to visit this site and complete the survey.
From: Elks, Katharine B CIV USARMY CESAW (USA)
Sent: Thursday, December 7, 2023 4:24 PM
To: Erin Binkley <EBinkley@FandR.com>
Subject: RE: SAW-2020-00952 Big Rockfish Creek SS outfall- Additional Information Needed
Hello,
I've received your materials but I'm still going through the application, the permit process is moving forward. I was
looking through the materials to see if I could find the width of the limit of disturbance to be sure it meets NWP Regional
Condition 10 (b). I see the width of the maintained easement is 10'. Is the width of the LOD listed on the plans
anywhere?
For reference:
Regional Condition 10.
b. The work area authorized by this permit, including temporary and/or permanent fills, will be minimized to the
greatest extent practicable. Justification for work corridors exceeding forty (40) feet in width is required and will be
based on pipeline diameter and length, size of equipment required to construct the utility line, and other
construction information deemed necessary to support the request. The permittee is required to provide this
information to the Corps with the initial PCN package.
Thanks,
Katharine Elks
Regulatory Specialist
US Army Corps of Engineers
69 Darlington Ave
Wilmington, NC 28403
910-251-4567 (office)
910-473-7034 (cell)
E-PCN-Submittal
httos://edocs.dea.nc.2ov/Forms/Pre-Construction Notification Form
PJDs, Wetland Delineation Concurrence &JD's.
http://saw-reg. usace. a rmy. m i l/J D/F I NALSAW-J D-R EQU EST-FORM-20170508. pdf
Submittal You may submit requests via e-mail in PDF format to
WilmingtonNCREG@usace.army.mil
Automated Data sheets for Atlantic & Gulf Coastal Plain Data Form Version 2.0
https://usace.contentd m.ocic.org/uti Is/getfi le/col lection/pl602lco119/id/2566
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at:
https://regulatory.ops.usace.army.mil/customer-service-survey/
Thank you for taking the time to visit this site and complete the survey.
From: Erin Binkley <EBinkley@FandR.com>
Sent: Thursday, December 7, 2023 2:14 PM
To: Elks, Katharine B CIV USARMY CESAW (USA) <Katharine.B.Elks@usace.army.mil>
Subject: [Non-DoD Source] RE: SAW-2020-00952 Big Rockfish Creek SS outfall- Additional Information Needed
Hi Katherine,
I am following up on the below. Can you please confirm you have everything you need to continue the permitting
process?
Thank you,
Erin Binkley, CE, WIT
Environmental Scientist
FROEHLING & ROBERTSON
310 Hubert Street Raleigh, NC 27603
T 919.828.34411 D 919.719.1086
EBinkleygFandR.com I www.FandR.com
The content of this email is the confidential property of Froehling & Robertson, Inc. (F&R) and should not be copied, modified, retransmitted, or used for any
purpose except with F&R's written authorization. If you are not the intended recipient, please delete all copies and notify the sender immediately.
From: Erin Binkley
Sent: Tuesday, December 5, 2023 11:26 AM
To: 'Elks, Katharine B CIV USARMY CESAW (USA)' <Katharine.B.Elks@usace.army.mil>
Cc: 'chad.turlington@ncdenr.gov'<chad.turlington@ncdenr.gov>; Elias Ruhl <ERuhl@FandR.com>
Subject: RE: SAW-2020-00952 Big Rockfish Creek SS outfall- Additional Information Needed
Hi Katherine,
Please find the attached enlarged Contract 2 area to address question 5. Can you please provide confirmation that you
received all the materials?
Thanks,
Erin
From: Erin Binkley
Sent: Wednesday, November 29, 2023 4:27 PM
To: Elks, Katharine B CIV USARMY CESAW (USA) <Katharine.B.Elks@usace.army.mil>
Cc: chad.turlington@ncdenr.gov; Elias Ruhl <ERuhl@FandR.com>
Subject: RE: SAW-2020-00952 Big Rockfish Creek SS outfall- Additional Information Needed
Hi Katherine,
Please find the below additional responses from the client:
1. Please find the attached impact maps for Phase/Contract 1, which is finalized.
5. The client is working on providing this.
6. Responses -See A through D below.
a. Wetland B-See snapshot below that clarified why tip of WL#B is impacted. Alignment was based on
minimizing deeper sewer installation that would have otherwise increased the cut depth by 4 to 6
feet
TEMP. TO�+E OdTLET # �:{ a TMP. CONEINATIOM S9LT
tiRM SHO") TREE PRO
TECTIIx,I MCE + * +
I/rM-10 Orr SWET TvP, `+,HERE ) ' . +'TEMP. '
{,+ D-B FOR DETILS ,. EC-8 on SHEET i a..• (1�
r F`OR DEVILS, , SHA
f . TETdP. STONH OUTLET + .
[1•YP_ 'DER£ SF101hH
[ )
� x �E EC=TQ ON SET �.
{ D-M FOR DETAILS ti
A FENCE ' +
KTAJLS
TEMP. W£TL CROSSNq;SEE EC—I� ON
T C�$ fOR DETI
PROM= MN97 - E.D. TEMP. HIGH HAZARD SILT FD
STATION 241+19.72 _YEC4' C4k NON-TR►MC AAM+XE -h#Md D-0
W CAMLOCK FONG AND 09VIM f . FOR DETAILS
L 7� -
b. Wetland 18-See snapshot below that clarifies why tip of WL#18 is impacted. Alignment was based
on maintaining sufficient separation from existing outbuilding and lakeshore to avoid riparian
impact.
..1.,.r'� YCJ! r;Y15 �c�. a5it7G wL4�
NIECE' ' +rRf A {}CNSTRLICTTCFI. WSTALL G+111: —� �+IA i JT `94"!Lk?� r (ilP. Ti�tCRC 5FN'IMI
OF LASE 4(1I9p MINN PUE Y11diF{ OF CwATE5 Y_ SIM EC-10 ON �'
SKALLJ, CLWOM 10 DETAIL Y.17 OR SMELT {T—� 0-0 FOR UET►,OLS
` MAINTAINING x
• SEPARATION
` FFgOui,ATxESoiORE
tow
J4P_91 L TT:1MP. TM PROT[CTICMI .
(TIP, ARE SHOMfw STATOON W+M91 .
SEE EC-7 ON SMWI 0-f V 01A. NON-TRAMC VAMI XE
FOUR DETA&S W/ CAMLOCIC RM AND COYER
$ff Barr , I,nkINTniNMG ' (rw. *,Am spxnm). .
ru SEPAAATK)N
{ FROM EX � I
OU T$U4!LDPW.1MVF
J ,
I
.gat C F I
nsx �
c. Wetland 26-See snapshot below that clarifies why WL#26 is impacted. Alignment was based on
maintaining sufficient separation from existing slab, driveway/parking area, existing well and
apparent septic drain field, which overlays driveway//Wetland 29- See snapshot below that clarifies
8
why WL#26 is impacted. Alignment was based on minimizing impact to properties by running
parallel to existing property line, resulting in a more negotiable and less costly easements.
9n 1iA1RCiA u I VARCrJ
797 LULNN1U
r. 7476 949Q-19- 96- 1 9#1 19-0i2
EX OT
JOA-a `
#x S{wg �
SWAM
STASRJZA 10M
r I SEE EC-22 ON
STREAu CR05SINC
ITS OF WrORDAMM/ D--iC F#q O --
CL,EARNG LnTS ki 1
Izi oT -7140- W/ CAINLOCK WO An COVM
ru�oEL N #11
WAMURR
r+R
(IN TRY1 T TEN T) i &S IE
MAt WL O KEK
510 ROM
VREAM BANK
STA AIION TYP.)
SEE EC-22 ON SKET
D-ID FOR OETNLS
/ TREE PODTECnM
TY1', '1111ERE SH M9
x EC-9 ON SHEE D-i
FOR DE-FPJLS
PROPOWD W69 -- E.9.
SYA71ON 191+07.95
V CIA. NON--TRAM4T MANAOL9
1Y/ CAM1.00K MNG AND COVER r
146 &
1E1NP. WETLAND CROMto
�00 (YYP.) SEE EC-15 ON
wxd-on y E d-9 FOR DETAILS
�q •.
! SEiIP_ TREE PROTECTION FENIC£
f
x WET ; {TYFr- MEP S-I009
w,a :ra rr7n. r+[:• C-7 SKEE P"8
d. Wetland C-See snapshot below that clarifies why WL#C is impacted. Alignment was based on best
location for transitioning out of the existing neighbor, crossing Camden Road and landing an ideal
location for making this trenchless crossing. The enlarged temporary impact is necessitated for
construction of the jacking pit for the trenchless crossing.
9
Af RAND
LUXIONM PIT 2 7 (000 TR PAS[ LOGO
ell
f Ek?ArhW - APPRO )29.07,
7103 wOWORs .
PARM i 15 w ,fry
1EMP, �iR1k5EL .� a fi T '. X p ti r
Cir+
P1RAflL'E
STATiOM 229+U.93
' { V DIX TRAMC 10A"H LE
q
M Yr STIEL CA5 C P� E V
i tP - ZEUP, T�iW,LW
From: Elias Ruhl <ERuhl@FandR.com>
Sent: Tuesday, November 21, 2023 9:31 AM
To: Elks, Katharine B CIV USARMY CESAW (USA) <Katharine.B.Elks@usace.army.mil>
Cc: chad.turlington@ncdenr.gov; Erin Binkley <EBinkley@FandR.com>
Subject: RE: SAW-2020-00952 Big Rockfish Creek SS outfall- Additional Information Needed
Katherine,
See responses highlighted in yellow below. Note that there are a few items that we are waiting for from the design
engineer and we will provide that information/documents once they are received. Please let us know if you have
questions or need additional info regarding the info provided. Thanks!
Eli
Elias N. Ruhl
Branch Manager
FROEHLING & ROBERTSON
310 Hubert Street Raleigh, NC 27603
T 919.828.34411 D 919.719.1973
ERuhl@FandR.com I www.FandR.com
10
From: Elks, Katharine B CIV USARMY CESAW (USA) <Katharine.B.Elks@usace.army.mil>
Sent: Wednesday, November 15, 2023 9:52 AM
To: Elias Ruhl <ERuhl@FandR.com>
Cc: chad.turlington@ncdenr.gov
Subject: SAW-2020-00952 Big Rockfish Creek SS outfall- Additional Information Needed
Good morning,
After my initial review of the permit request I have a few comments and requests for more information.
1. 1 see the expired permit for all the impacts that were separated into 4 contracts. Please show on a separate
figure any parts of the project that were completed and the impacts associated. Awaiting additional figures
from the design engineer. Will send ASAP.
2. The narrative indicates there was some or all mitigation paid previously. Please send the executed Mitigation
Transfer Form showing what was purchased. If there were partial mitigation purchases please indicate which
impacts these were for. See the signed MTF and DMS receipt of payment attached.
3. Stream impacts in the ePCN do not match the impacts stated in the letter request dated November 3,
2023. Also, stream impacts should also be shown in acres as well as LF please. Impact numbers on the Cover
Letter have been updated to reflect the ePCN and the Impact Maps. See attached.
4. It is not clear if further mitigation is needed. The letter mentions splitting credits as needed based on availability
and I do not have an executed MTF. If more mitigation is required please obtain an updated acceptance letter
from the appropriate Bank or DMS. See the signed MTF and DMS receipt of payment attached.
5. Please submit a zoomed in project figure that shows only the area of Contract 2 with the impacts. Awaiting
additional figure from the design engineer. Will send ASAP.
6. There are several places the alignment could be straightened or slightly shifted to avoid impacts. Please provide
information as to why the alignment can't be tweaked for further minimization. I understand that a minimum
grade is needed, but please take a look at these and let me know if potential adjustments can be made.
Awaiting additional info from the design engineer. Will send ASAP.
a. Sheet 12 — Wetland WB: appears that straightening the alignment or angling differently could avoid the
tips of the wetland
b. Sheet 9—Wetland W18
c. Sheet 10—Wetlands W26-29
Sheet 11- Wetland WC: Shifting the alignment at the western manhole could avoid the wetland, also
there are temporary impacts wider than 10' in a small area. Why is that needed?
Thank you,
Katharine Elks
Regulatory Specialist
US Army Corps of Engineers
69 Darlington Ave
Wilmington, NC 28403
910-251-4567 (office)
910-473-7034 (cell)
E-PCN-Submittal
https://edocs.deg.nc.gov/Forms/Pre-Construction Notification Form
PJDs, Wetland Delineation Concurrence &JD's.
http://saw-reg.usace.army.mil/J D/FI NALSAW-J D-REQUEST-FORM-20170508. pdf
Submittal You may submit requests via e-mail in PDF format to
WilmingtonNCREG@usace.army.mil
Automated Data sheets for Atlantic & Gulf Coastal Plain Data Form Version 2.0
https://usace.contentd m.ocic.org/uti Is/getfi le/col lection/pl602lco119/id/2566
11
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at:
https://regulatory.ops.usace.army.mil/customer-service-survey/
Thank you for taking the time to visit this site and complete the survey.
12