HomeMy WebLinkAbout20231709 Ver 1_ePCN Application_20231213DW R
DHlsloo of Water Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
October 2, 2023 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?
Yes No
Is this project a public transportation project?*
Yes No
Change only If needed.
Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or
fuel, including natural gas, diesel, petroleum, or electricity?
Yes No
BIMS # Assigned Version# *
20231709 1
Is a payment required for this project?*
No payment required
What amount is owed?*
Fee received
$240.00 $570.00
Fee needed - send electronic notification
$323.00 $767.00
Reviewing Office*
Select Project Reviewer*
Mooresville Regional Office - (704) 663-1699
Andrew Pitner:andrew.pitner
Information for Initial Review
1a. Name of project:
Lakeside Reserve
1a. Who is the Primary Contact?*
Ken Foster and William Niblock
1b. Primary Contact Email:* 1c. Primary Contact Phone:*
jrobertson@atlasenvi.com (704)634-9756
Date Submitted
12/13/2023
Nearest Body of Water
Cold Water Creek
Basin
Yadkin-PeeDee
Water Classification
C
Site Coordinates
Latitude: Longitude:
35.386695-80.527182
A. Processing Information
Is this project connected with ARPA funding?
Yes No
County (or Counties) where the project is located:
Cabarrus
Is this a NCDMS Project
Yes No
Is this project a public transportation project?*
Yes No
1a. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
1b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
29 - Residential Developments
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application? *
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
401 Water Quality Certification - Express
Riparian Buffer Authorization
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
Niblock Homes LLC
2b. Deed book and page no.:
14315/0144,14315/0144,14315/0144,15200/0152
2c. Contact Person:
Ken Foster and William Niblock
2d.Address
Street Address
759 Concord Parway Suite 20
Address Line 2
City
State / Province / Region
Concord
North Carolina
Postal / Zip Code
Country
28027
USA
Yes No
Yes No
2e. Telephone Number:
(704)634-9756
2g. Email Address:'
wniblock@niblockhomes.com
4. Agent/Consultant (if applicable)
4a. Name:
Jennifer Robertson
4b. Business Name:
Atlas Environmental Inc.
4c.Address
Street Address
338 S. Sharon Amity Road #441
Address Line 2
City
Charlotte
Postal / Zip Code
28211
4d. Telephone Number:
(704)512-1206
4f. Email Address:"`
jrobertson@atlasenvi.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
Lakeside Subdivision
1c. Nearest municipality / town:
Concord
2. Project Identification
2f. Fax Number:
State / Province / Region
North Carolina
Country
USA
4e. Fax Number:
2a. Property Identification Number:
5549-69-0093, 5549-59-2272, 5640-70-5379,
2b. Property size:
5549-49-9161
93.215
2c. Project Address
Street Address
2183 Heglar Road
Address Line 2
City
State / Province / Region
Concord
North Carolina
Postal / Zip Code
Country
28025
USA
3. Surface Waters
3a. Name of the nearest body of water to proposed project:"
Cold Water Creek
3b. Water Resources Classification of nearest receiving water:"
C
3c. What river basin(s) is your project located in?"
Yadkin-PeeDee
3d. Please provide the 12-digit HUC in which the project is located.
030401050202
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: *
The site has primarily been used as farmland but has grown up over time. A large pond sits near the center of the review area. All previous buildings have been torn down or destroyed.
a
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?
Yes No Unknown
If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000).
SAW-2022-02562
4f. List the total estimated acreage of all existing wetlands on the property:
2.024
4g. List the total estimated linear feet of all existing streams on the property:
919
4h. Explain the purpose of the proposed project: *
The purpose of this project is for the construction of a residential development that includes 135 lots, associated parking, utilities, and infrastructure.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: *
The project will require land clearing and grading using heavy equipment for the preparation and construction of the lots and associated infrastructure. The project will have two
unavoidable impacts to Waters of the United States, consisting of one stream and one wetland impact. Both impacts are needed for the construction and grading of a road. Impact S1
consists of -197 linear feet (0.008 acres) of intermittent stream impact for the installation of a culvert pertaining to the construction of a road. Impact W1 consists of -0.016 acres of
wetland impact for fill pertaining to the construction/grading of a road.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes No Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
SAW-2022-02562
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Atlas Staff
Agency/Consultant Company: Atlas Environmental Inc.
Other:
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
The AJD was issued on March 09, 2023.
6. Future Project Plans
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
no, this is a single and complete project
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries a Buffers
Open Waters Pond Construction
2. Wetland Impacts
O
2a1 Reason (?)
2b. Impact type* (?)
2c. Type of W.*
2d. W. name
2e. Forested*
2f. Type of Jurisdicition *
(?)
2g• Impact
area *
ff-7]
fill/road construction
P
Seep
WL 1000
No
Both
0.017
(acres)
2g. Total Temporary Wetland Impact
0.000
2g. Total Wetland Impact
0.017
21. Comments:
Three isolated wetlands will be filled. All were deemed non -jurisdictional in the issued AJD.
2g. Total Permanent Wetland Impact
0.017
3. Stream Impacts
❑
3a. Reason for impact (?)
3b.lmpact type"
3c. Type of impact*
3d. S. name*
3e. Stream Type*
?)
3f. Type of
Jurisdiction*
3g. S. width
3h. Impact
length*
S1
road construction
Permanent
Culvert
CH 100
Intermittent
Both
Averege (feet)
208
(linear feet)
3i. Total jurisdictional ditch impact in square feet:
0
31. Total permanent stream impacts:
208
3i. Total stream and ditch impacts:
208
3j. Comments:
3i. Total temporary stream impacts:
0
E. Impact Justification and Mitigation O
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Impacts have been reduced by the proposed design and location of the buildings, positioning of parking, and the design of stormwater basins and
control measures. Approximately 77 % of the stream features onsite are not being impacted, along with 10.42 acres of impoundments. Three isolated
wetlands are being impacted, however 99.8 % of jurisdictional wetlands have been preserved.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Retaining walls are being constructed to minimize impacts to Waters of the US. Buffers have been placed on specific features including vegetative
setbacks.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
The project does not exceed thresholds, so no mitigation is being proposed.
F. Stormwater Management and Diffuse Flow Plan (required by DWR) O
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
If no, explain why:
Not adjacent to state protected riparian buffers
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program?
Yes No
N/A - project disturbs < 1 acre
2d. Which of the following stormwater management program(s) apply:
Local Government State
Local Government Stormwater Programs
Phase II NSW USMP Water Supply
Please identify which local government stormwater program you are using.
Concord
Comments:
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
Yes No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?
Yes No
3b. If you answered "no," provide a short narrative description.
This is a single and complete project.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?"
Yes No N/A
4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a
treatment plant, list the capacity available at that plant.
Project will connect to municipal sewer
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?"
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?"
Yes No
5c. If yes, indicate the USFWS Field Office you have contacted.
Asheville
5d. Is another Federal agency involved?*
Yes No Unknown
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
IPAC and NHP
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
NOAA Essential Fish Habitat Mapper
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?"
NC HPO Buffer Map
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?"
Yes No
8c. What source(s) did you use to make the floodplain determination?"
FEMA National Flood Hazard Layer
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
Lakeside Reserve epcn documents compressed.pdf 16.37MB
File must be PDF or KMZ
Comments
Signature
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Allyson Sinclair
Signature
Date
12/13/2023