Subject: Industrial Facility Inspection
Fessler&Bowman
Dear Travis Belill:
On November 30, 2023, Kelly Hendrix and Jacob Stark of Charlotte-Mecklenburg Storm
Water Services (CMSWS) conducted an inspection of the above referenced facility as a
requirement of the City of Charlotte's NPDES Permit,NCS000240,Part II, Section H. Inspection
authority is granted by Charlotte City Code Chapter 18, Article III, Section 18-82. At the time of
inspection, the facility was observed to be in compliance with the City of Charlotte Storm Water
Pollution Control Ordinance.
The inspection was also conducted as part of a cooperative working agreement between
Mecklenburg County and the North Carolina Department of Environmental Quality (NCDEQ) —
Division of Energy,Mineral and Land Resources(DEMLR). NCDEQ—DEMLR has been copied
on this report and made aware of the following observations regarding the facility's NPDES
stormwater permit:
1) Stormwater Pollution Prevention Plan (SWPPP)
A Stormwater Pollution Prevention Plan (SWPPP) has been developed, recorded, and
implemented.However,the SWPPP has not been reviewed and updated. The facility should review
and update the SWPPP annually per the NCG080000 Permit, Section B-1 S.
2) Qualitative Monitoring
The facility has not conducted qualitative monitoring as required. The facility should conduct and
document qualitative monitoring per the NCG080000 Permit, Section D.
Thank you for the assistance and cooperation with the site inspection. The attached
report provides details about inspection observations and should be self-explanatory. Please
contact me at(704) 641-8370 if you have any questions or need additional information. For
questions specifically regarding your State-issued NPDES Stormwater Certificate of Coverage
NCG081016, please contact Jerry Eplin with NCDEQ—DEMLR at(704) 663-1699.
•
>:�i 2145 Suttle Avenue 600 East 4th Street
Charlotte,NC 28208 Charlotte,NC 28202
charlottenc.gov
Travis Belill, Director of Construction- Civil
December 4,2023
Page 2
Thank you,
h�4Y
Kelly Hendrix
Environmental Specialist II
Charlotte-Mecklenburg Storm Water Services
cc: Andrew DeCristofaro, Charlotte Storm Water Services
Zahid Khan,NCDEQ—DEMLR
Jeffrey Chandler,NCDEQ—DEMLR
Jerry Eplin,NCDEQ—DEMLR
Attachment
ChmrfoN-M4cA4nburg
ji / STORM Facility Inspection
Wi E 5tormW ate r.Cho rMeck.org
SuviceS
Facility Name: Fessler and Bowman Inspection#: 80732
Contact: Travis Belill, Director of Construction-Civil Permit#: NCG081016
Inspector: Kelly Hendrix Receiving Stream:
Inspection Date: 11/30/2023 Entry Time: 10:00 am Exit Time: 11:30 am SIC#:
SUMMARY
Facility Description: Fessler& Bowman is located at 10616 Westlake Drive on approximately 6.231 acres of property in
Charlotte.This facility provides concrete and civil infrastructure construction services.
File Review/History:The facility has not been previously inspected by Charlotte-Mecklenburg Storm Water Services (C
MSWS).
Inspection Summary: During the inspection,the facility was found to be in compliance with the City of Charlotte Storm
Water Pollution Control Ordinance. Please refer to the report for recommendations and deficiencies.
Site Inspection Deficiency Comments
Stormwater system (catch basins, Satisfactory Stormwater conveys through the site via sheet flow to a
inlets, outfalls, etc.) series of catch basins,which discharge to a dry detention
SCM, before discharging through one outfall. No stormwater
pollution issues were observed.
Erosion issues Satisfactory No stormwater erosion issues were observed onsite during
the inspection.
Structural stormwater control Satisfactory One dry detention SCM was observed onsite. No stormwater
measures(SCMs) pollution issues were observed.
Illicit discharges/connections Satisfactory No illicit discharges/connections were observed onsite during
the inspection.
Aboveground storage tank(s)(ASTs) Satisfactory A complete list of ASTs, totes, and other storage containers
and any associated venting and/or was observed in the SPCC and SWPPP.The lists contain
dispenser(s)—list tank size(s)and the containers'contents, capacities, and secondary
contents containment measures. No stormwater pollution issues were
observed.
Underground storage tank(s)(USTs) N/A
and any associated fill port area(s)
and dispenser(s)—list tank size(s)
and contents
Outdoor material storage area(s) Satisfactory Various materials for civil construction projects, including
rebar, concrete forms,wood pallets and lumber, pipes, and
manhole and storm drain covers were observed being stored
outdoors. No stormwater pollution issues were observed.
Outdoor processing area(s) N/A
Loading/unloading area(s) Satisfactory No stormwater pollution issues were observed.
Vehicle/equipment area(s)-fueling, Satisfactory Per facility staff, no vehicle/equipment washing occurs onsite.
maintenance,washing, storage, etc. Vehicle maintenance occurs inside the shop.Vehicles and
equipment are stored indoors and outdoors. Vehicles are
fueled onsite at the outdoor AST area. No stormwater
pollution issues were observed.
To report pollution or drainage problems call: 31 1 :T
QARLOTTE_ http://stormwater.charmeck.org
12/4/2023 9:34:26AM Page 1 of 3
Site Inspection Deficiency Comments
Oil/water separator and/or N/A
pretreatment
Waste storage/disposal area(s)- Satisfactory One municipal waste container was observed outdoors with
open tops,waste containers, scrap its rain flaps in place. Used and sealed 55-gallon drums were
metal bins, etc. observed awaiting disposal outdoors. One open top scrap
wood container was observed outdoors. No stormwater
pollution issues were observed.
Food service area(s) N/A
Indoor material storage area(s) Satisfactory Various construction materials and vehicle maintenance
equipment were observed inside the shop. No stormwater
pollution issues were observed.
Indoor processing area(s) Satisfactory Per facility staff,vehicle maintenance occurs inside the shop.
No stormwater pollution issues were observed.
Floor drains N/A
Spill response equipment Satisfactory Spill response equipment was observed throughout the
facility.
SWPPP Section Observed Comments
Does the facility have a Stormwater Satisfactory
Pollution Prevention Plan (SWPPP)?
Reviewed and updated annually Deficiency The SWPPP has not been reviewed and updated. The facility
should review and update the SWPPP annually per the
NCG080000 Permit, Section B-15.
Responsible party Satisfactory
General location (USGS)map Satisfactory
Detailed site map Satisfactory
Narrative description of industrial Satisfactory
processes
Feasibility study Satisfactory
Evaluation of stormwater outfalls(non Satisfactory A non-stormwater discharge evaluation was conducted on 1/4
-stormwater discharge evaluation) /2022 and was documented in the SWPPP.
Stormwater best management Satisfactory
practice(BMP)summary
Secondary containment plan (all Satisfactory
necessary secondary containment
provided and documented)
Records on every release from a N/A The ASTs stored outdoors are double walled.
secondary containment system (for
the last 5 years)
Spill prevention and response Satisfactory
procedures(SPRP)
List of significant spills or leaks(for Deficiency Per facility staff, no significant spills or leaks have occurred
the last 3 years) for the last 3 years; however,the spill log was not filled out.
The facility should maintain a spill log per the NCG080000
Permit, Section B-10(f).
Solvent management plan (SMP) Satisfactory
Preventative maintenance and good Satisfactory
housekeeping program (PMGHP)
Facility inspections conducted as Satisfactory The facility conducts and documents facility inspections as
required required.The most recent facility inspections occurred on 1/1
/2023, 5/1/2023, 7/1/2023, and 9/1/2023.
dxTo report pollution or drainage problems call: 311
CHARLOTTE_ http://stormwater.charmeck.org �� ..
12/4/2023 9:34:26AM Page 2 of 3
SWPPP Section Observed Comments
Employee training (provided and Deficiency The facility has not conducted employee training.The facility
documented) should provide and document employee training per the NCG
080000 Permit, Section B-13.
Qualitative/Analytical Monitoring Observed Comments
Qualitative monitoring conducted as Deficiency The facility has not conducted qualitative monitoring as
required required.The facility should conduct and document qualitative
monitoring per the NCG080000 Permit, Section D.
Analytical monitoring conducted as N/A Per facility staff, less than 55 gallons of new motor oil and/or
required hydraulic oil are used per month at the facility.
Analytical monitoring for onsite N/A Per facility staff, less than 55 gallons of new motor oil and/or
vehicle and equipment maintenance hydraulic oil are used per month at the facility.
as required
Permit and Outfalls Observed Comments
Copy of permit and certificate of Recommendation The facility maintains a copy of the General Permit onsite;
coverage onsite however,the certificate of coverage(COC)could not be
located.The facility should maintain a copy of the COC
onsite.
All outfalls observed Yes No stormwater pollution issues were observed.
Number of Outfalls Observed 1
Representative outfall status N/A
documented by DEMLR
Annual no-exposure self re-certificatio N/A
n documented
(& To report pollution or drainage problems call: 311
CHARLOTTE_ http://stormwater.charmeck.org
12/4/2023 9:34:26AM Page 3 of 3