Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
090141_routine_20231010
rnvrsmn of No 0 Other Agency Type of Visit: mipliance Inspection Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: �o- l7 routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: !iv i��Ll Arrival Timer Departure Time: `3'p County: Farm Name: 7-r{�t_=�� Owner Email: Owner Name: �j(`YS'�r�J/ Tier^#1S ZHr Phone: Mailing Address: Physical Address: Facility Contact: jy�l., Title: 7• / Onsite Representatiivvee:�'--ALIZ.— Ida_ � Certified Operator: Ti/"�in y �bd r ✓1." 0— Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish raarrowto Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Latitude: !� Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Capacity Pop, Wet Poultry Capacity Pop. Layer Non-Lascr Design Current Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure Application Field Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Region: E2 D Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes [' o ❑ NA ❑ NE ❑ Yes ❑ No NA 0 NE ❑ Yes ❑ No NA 0 NE ❑ Yes ❑ No ❑ NA ONE ❑ Yes E31G NA NE ❑ Yes Q-N5 NA NE Page I of 511212020 Continued Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? [-]Yes ©-l<o ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): t 1� _ - 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes O No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes E'b']o ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑'(o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Ergo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes Io ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes E31go ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 21 o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area AWindow 12. Crop Type(s): IAOC / L. 13. Soil Type(s): e, Ila r•/ 14. Do the receiving crops differ from those designated in the CAW P? ❑ Yes B-N-6 ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes Q'No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes 0-Iqo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ Wo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes Q-Nor ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes Lg-No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ®'N-o ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other. 21. Does record keeping need improvement? If yes, check the appropriate box below. [-]Yes Q-1go ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes Io ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �o ❑ NA ❑ NE Page 2 of 3 511212020 Continued Lw. "to me racurty ran to ca iorate waste app icatron equipment as required by the permit? L Yes L:'No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑'Po ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes Io ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑Yes �o ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes Io ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes Eo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes D No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes B No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 0 No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes [7Ko ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional Daees as necessarv). Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: 2V Date: S11212020