Loading...
HomeMy WebLinkAbout090025_routine_20231207I ype of visa: U %-ompnance inspection U operation Review U Structure Evaluation U Technical Assistance I Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: ) 7 2 S Arrival Time: Departure Time: County: Farm Name: W� 11VIM U u I- d 7 f f m J Owner Email: Owner Name: 0 h on GOM Phone: Mailing Address: Physical Address: Facility Contact: �Dn Title: Onsite Representative: Certified Operator: S q Me Back-up Operator: Location of Farm: Latitude: Region: Phone: Integrator: �M It afipj q. Certification Number: qqq till Certification Number: Longitude: Design current _ - Design Current _ Design Current Swine Capacity °, n Pop Wet Poultry , Capacity, Pop Cattle 'a x Capacity :Pop .. Wean to Finish ILayer ° Dairy Cow Wean to Feeder I INon-Layer I Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean =Design Current Dry Cow ' Farrow to Feeder ` ° Dry,,; Pon try ° o- Capacity Pop.- Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Z4, YTurkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes M No ❑ NA ❑ NE ❑ Yes] No ❑ Yes No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes NO No ❑ NA 0 NE ❑ Yes No ❑ NA ❑ NE ❑ Yes �'No ❑ NA ❑ NE Page 1 of 3 511212020 Continued Facility Number: jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes )] No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes -"fg No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: — E Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? —�`— ❑ Yes 4!� No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes g� No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes �-- No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require Yes ❑ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes V__1_1 No ❑ NA ❑ NE maintenance or improvement? _ 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes] No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes DO No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes] No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes T No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes U No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �, No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [ ] No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes �j No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes N No Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWW? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? Comments (refer to question #)' ° Explain any'XES answers and/or any additional'recommer Use drawings of facility to'b 1 , aean Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 out Pt"Pe LaUr al pages as 9 to 2 ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑ Yes N No ❑ NA ❑ NE ❑ Yes N No ❑ NA [:]NE ❑ Yes � No ❑ NA ❑ NE ❑ Yes N1 No ❑ NA ❑ NE ❑ Yes] No ❑ NA ❑ NE ❑ Yes [ No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE wvf wjge: 11301n 'bI►IZ-3 erg l�br ON -7p144 ; OV4.9-e 2022 � "I ; Phone: 9 IMI�N" 511212020 -$Iivision of Water Resources Facility Number 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: E)Tompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance <Zeason for Visit: ,f)-Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: a a3 Arrival Time: .%U Departure Time: County: Farm Name: Owner Email: Owner Name: 92�c� Phone: Mailing Address: Physical Address: Facility Contact:i%C,tcx� Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Latitude: Region: Phone: Integrator: Certification Number: Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. 1/0 �`I ILayer Non -Layer Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Design Current Dry Poultry Capacity Pon. Layers Non -Layers Pullets Turkeys Turkey Pouets Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow El Yes No ❑ NA ❑ NE a. Was the conveyance man-made? El Yes No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? El Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page l of 3 5/1212020 Continued Facility Number: - / Date of Inspection: 7 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 7_1No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes o ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 - Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No /I ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes V1 No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes 0 No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes FXNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 0 No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ElYes ❑ NA ❑ NE �'No ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc. ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Vo the receiving crops litter trom those aesignatea in the UAWMY'! U Yes No U NA U Nh 15. Does the receiving crop and/or land application site need improvement? ..�es ❑ No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes O No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes Pfl No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste ansfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �] No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes /�— No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: - Date of Inspection: t.;z 7 TD 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ZNo 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes y�j No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ,Q No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes P�No Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ,E�j No ❑ NA ❑ NE ❑ Yes V No ❑ NA ❑ NE [:]Yes VI No ❑ NA ❑ NE ❑ Yes ;] No ❑ NA ❑ NE ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes �ffNo ❑ NA ❑ NE Lam'_✓i 7�,,, 7— Phone: Date: / Ib--71a'� 511212020