HomeMy WebLinkAboutNCC205349_Annual Fee Unpaid Email with NOD_20231216Holloman, Tevye L
From: lase rfiche.ncdenr.gov@mccicloud.io
Sent: Saturday, December 16, 2023 12:57 AM
To: randy.veltri@duke-energy.com
Cc: Tran, Kieu M; Georgoulias, Bethany; Holloman, Tevye L; ryan.kormaik@duke-
energy.com
Subject: [External] Notice of Deficiency: Unpaid Permit Fee for NCC205349
Attachments: Notice of Deficiency.pdf
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
This email is to convey a Notice of Deficiency for failure to pay the 2023 annual permit fee per the requirements of NC
General Statute 143-215.3D(a)(4). Please be sure to coordinate payment with other parties copied on this e-mail to avoid
duplicate payments.
Your Certificate of Coverage (COC) under the Construction Stormwater NPDES General Permit was not renewed because
the annual fee payment (Invoice No. NCC205349-2023) was not received. The payment is 15 day(s) overdue. A Notice of
Deficiency is attached.
Please contact the Stormwater Program at tev.holloman@deq.nc.gov or (919) 707-3649. Please reference:
COC no. NCC205349
This COC is for Spindale 44kV Rebuild in Rutherford County, issued to Duke Energy Carolinas, LLC.
Annual fee payment can be made through this website:
https://deq.nc.gov/sw-epayments
If this project has been closed -out or sold, it is important that you submit a Notice of Termination request here:
https://edocs.deq.nc.gov/Forms/NCGOI-Termination
Please visit https://deg.nc.gov/NCG01 for more information about this permit.
The NC DEMLR Stormwater Program
512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612
This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not
monitored.