Loading...
HomeMy WebLinkAboutNCC223728_Annual Fee NOD Letter (2023 Fee)_20231216 ROY COOPER Govemor ELIZABEIH S.BISER t�. Secretary WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interne Director EnWonmental Quality 12/16/2023 Clayton Properties Group Inc. Attn:Chris Simmering 2521 Schieffelin Rd suite#116 Apex, NC 27502-4400 Subject: Notice of Deficiency-Failure to Pay Annual Fee Invoice No. NCC223728-2023 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of$120 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee was billed on 11/1/2023 and was due on 12/1/2023.The annual fee applies to the following construction site: Amber Ridge Subdivision 5913 LANGPORT DR,5908 LANGPORT DR 5905 LANGPORT DR 5901 LANGPORT DR 5853 LANGPORT DR 5849 LANGPORT DR 5845 LANGPORT DR 5841 LANGPOR, Mark's Creek, NC Wake County Certificate of Coverage No. NCC223728 NC Reference No. NCG01-2022-3728 If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date, please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact me at toby.vinson@deq.nc.gov. Sincerely, William E.Vinson,Jr., PE,CPESC,CPM Interim Director Division of Energy, Mineral,and Land Resources D_E Q� Nrnlh Cara7ina Department o1 Cnvi,nment:J Qwlily Drvisiv.,ul Cnrryy.Mineral urwl LarW Frsovices Sl2 Nurlh Salisbury Slrrel I loll Mail Se s,ceCmte 0.ek i9h.North Caroline Tib991612 919.7079200