HomeMy WebLinkAboutNCC233592_ESC Approval Submitted_20231215 till G rnail Wyatt Edsel<wyatt@edselengineering.com>
NC DEMLR - FROF Application Approval CRM:0179013
11 messages
SVC_DoNotReply-DEQPermits<DoNotReply-DEQPermits@deq.nc.gov> Tue, Nov 28,2023 at 9:16 AM
To:Wyatt Edsel<wyatt@edselengineering.com>,"Dirtcraft Organics, LLC"<livingsoil@dirtcraftorganics.com>
Cc: "Shell, Chayden"<chayden.shell@deq.nc.gov>
4Q/ tESTATF4.
41111*
'5 1 iii r fliA-\,-.9,,,
51\- : i re .,
esst
QUAM vkVi
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
11-28-2023
LETTER OF APPROVAL
Dirtcraft
Organics, LLC
4276
Rector Corner Road
Marshall, North
Carolina 28753
RE: Project Name: Dirtcraft Composting Facility
Acres Approved:2
Application ID: PA-001282
Permit Number: MADIS-2024-0100
Address: Rector Corner Road
City: Marshall
County: Madison
River Basin: French Broad
Stream Classification: C:Aquatic Life, Secondary Contact Recreation, Fresh water
Plan Type: Commercial
Dear Dirtcraft
Organics, LLC,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter
of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall expire three(3)years following the date of
approval, if no land-disturbing activity has been undertaken,as is required by Title 15A NCAC 4B .0129.
As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI)form requesting
a Certificate of Coverage(COC) under the NCG010000 Construction Stormwater General Permit. After the form is reviewed and found to be
complete,you will receive a link with payment instructions for the$120 annual permit fee. After the fee is processed,you will receive the
COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to
commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the
eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the
new responsible party must obtain a new COC.
Title 15A NCAC 4B.0118(a)and the NCGO1 permit require that the following documentation be kept on file at the job site:
1.The approved E&SC plan as well as any approved deviation.
2.The NCGO1 permit and the COC,once it is received.
3. Records of inspections made during the previous 12 months.
Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved
plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and
adjoining properties. If,following the commencement of this project,the erosion and sedimentation control plan is inadequate to meet the
requirements of the Sedimentation Pollution Control Act of 1973(North Carolina General Statute 113A-51 through 66),this office may
require revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and
rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility/Ownership Form,
which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition,
it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
Sincerely,
North Carolina Department of Environmental Quality
Division of Energy, Mineral&Land Resources
Land Quality Section
D_E Q,)) North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Asheville Regional Office I2090 U.S.70 Highway I Swannanoa NC,28778-8211
828-296-4500
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.
Certificate of Approval-Tuesday, November 28,2023 909 AM.pdf
106K
Wyatt Edsel<wyatt@edselengineering.com> Tue, Nov 28,2023 at 9:50 AM
To: Brian James<brian@edselengineering.com>
Brian,
Dirtcraft ESC was approved by NC DEQ. Can you start the NCGO1 process when you have time?
Thank you,
[Quoted text hidden]
Wyatt Edsel, PE
Principal Engineer
Edsel Engineering, PLLC
(C)828-707-6120