Loading...
HomeMy WebLinkAboutWest Lumberton Flood Gate EARLY NOTICE FLOODPLAIN and WETLANDS MAPS rdcdWEST LUMBERTON FLOOD GATE AT VFW ROAD AND RAILROAD UNDERPASS EARLY NOTICE FLOODPLAIN AND WETLANDS MAPS  Proposed Project Location Maps, Robeson County Parcel Data, and Site Plans  FEMA FIRMette, NEPAssist FEMA FIRMs, PFIRMs, NFIP Community Status Book, and Hydrologic and Hydraulic Analysis  USFWS National Wetlands Inventory (NWI) Map, Total Wetlands Area Map, and USACE Correspondence Proposed Project Location Maps Robeson County Parcel Data Site Plans Laclaire R d SESE H i l t o n S t CoxRd Heste r D r W 5 t h S t Hect or M a c l ean H w y Hector Mac l ean Hw y VF W R d H a c k e t t S t C ivi t a n R d Laclaire R d Cr y s t a l R d He ct or M a c lea n H w y SE VFW R d No rr i s S t Nation al A v e Re s e rv oir S t B u r ke S t Co x Rd Hacke t t S t Se alsSt Cryst a l R d W 5 t h S t W 5th St He ctor M a c l e a n H wy West Lumberton Flood Gate - Aerial Map NC CGIA, Maxar, Esri Community Maps Contributors, State of North Carolina DOT, © OpenStreetMap, Microsoft, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, EPA, NPS, US Census Bureau, USDA, EPA OEI WLFG Project Action Area 550 VFW Rd #938189443052 2306 W 5th St #938189201500 2400 Cox Rd #938179684407 2460 Cox Rd #938179143700 VFW & Hackett #938280300700 Railroads December 1, 2023 0 0.06 0.120.03 mi 0 0.1 0.20.05 km 1:4,514 Laclaire R d SE SE 95 H i l t o n S t C ox Rd H ester D r W 5 th S t He c tor M a c l e a n H w y H ecto r M ac lea n Hwy V F W Rd H a c kett S t Ci v i t a n R d Laclaire R d Cr ys t al R d Hecto r Macl ean H wy Hecto r M ac l ean H wy 72 72 VFW R d No rr isSt Nationa l A v e Re s e r voirSt B u r ke St Co x Rd Hacke t t S t Se als S t Cryst a l R d W 5 t h S t He ctor M a c l ean H wy West Lumberton Flood Gate - Street Map Esri Community Maps Contributors, State of North Carolina DOT, © OpenStreetMap, Microsoft, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, EPA, NPS, US Census Bureau, USDA, EPA OEI WLFG Project Action Area 550 VFW Rd #938189443052 2306 W 5th St #938189201500 2400 Cox Rd #938179684407 2460 Cox Rd #938179143700 VFW & Hackett #938280300700 Railroads December 1, 2023 0 0.06 0.120.03 mi 0 0.1 0.20.05 km 1:4,514 West Lumberton Flood Gate - Topographic Map Copyright:© 2013 National Geographic Society, i-cubed, EPA OEI WLFG Project Action Area 550 VFW Rd #938189443052 2306 W 5th St #938189201500 2400 Cox Rd #938179684407 2460 Cox Rd #938179143700 VFW & Hackett #938280300700 Railroads December 1, 2023 0 0.06 0.120.03 mi 0 0.1 0.20.05 km 1:4,514 Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Tel: Fax: +1 (919) 876-6888 +1 (919) 876-6848 3608 18th Street Suite 200 Metairie, LA 70002 www.LHJunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel: NC Firm License # C-0459 CONSTRUCTION DO NOT USE FOR - FOR REVIEW PURPOSES ONLY - 95% SUBMITTAL VICINITY MAP P: \ 2 0 1 9 \ 1 9 . 0 3 0 0 4 - A T K I N S N O R A - W E S T L U M B E R T O N F L O O D G A T E \ D R A W I N G S \ S H E E T S \ G - 0 0 1 C O V E R . D W G P L O T D A T E 6 / 1 6 / 2 0 2 3 4 : 0 5 P M C A R O L I N E H E A T H C O A T WEST LUMBERTON FLOODGATE AT VFW ROAD AND RAILROAD UNDERPASSCITY OF LUMBERTON ROBESON COUNTY, NORTH CAROLINA APRIL 2023 DIVISION VALUE = FEETGRAPHIC SCALE 200 100 200 400 200 0 CONSTRUCTION DO NOT USE FOR - FOR REVIEW PURPOSES ONLY - 95% SUBMITTAL 22x34 Date DesignedScale Drawing Title Project Title Drawing Status Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES SCHEDULE OF DRAWINGS CHCH DS MH --/--/----/--/----/--/-- --/--/-- NTS S0 100068207-G-002 0 FOR INFORMATION 00 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal NOT TO SCALE  LEGEND GENERAL CONSTRUCTION NOTES GENERAL EROSION CONTROL NOTES NORTH CAROLINA LAND QUALITY SECTION EROSION CONTROL NOTES CONSTRUCTION DO NOT USE FOR - FOR REVIEW PURPOSES ONLY - 95% SUBMITTAL 22x34 Date DesignedScale Drawing Title Project Title Drawing Status Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES NOTES AND LEGEND CHCH DS MH --/--/----/--/----/--/-- --/--/-- NTS S0 100068207-CG-003 0 FOR INFORMATION 00 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal NOT TO SCALE CSX GENERAL NOTES Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Tel: Fax: +1 (919) 876-6888 +1 (919) 876-6848 Rev. Date Description By Chk'd App'd 3608 18th Street Suite 200 Metairie, LA 70002 www.LHJunius.com Tel:Fax:+1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Drawing Title Project Title Drawing Status Client Seal NOT TO SCALE CONSTRUCTION DO NOT USE FOR - FOR REVIEW PURPOSES ONLY- 95% SUBMITTAL 22x34 Date DesignedScale Date Date Date Drawn Checked Authorized Original Size Drawing Number Revision WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES NCDEQ NCG01 GENERAL PERMIT NOTES CHCH DS MH --/--/----/--/----/--/-- --/--/-- NTS S0 100068207-CG-004 0 FOR INFORMATION 00 Seal Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Tel: Fax: +1 (919) 876-6888 +1 (919) 876-6848 Rev. Date Description By Chk'd App'd 3608 18th Street Suite 200 Metairie, LA 70002 www.LHJunius.com Tel:Fax:+1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Drawing Status Client Seal NOT TO SCALE CONSTRUCTION DO NOT USE FOR - FOR REVIEW PURPOSES ONLY- 95% SUBMITTAL Seal 22x34 Date DesignedScale Drawing Title Project Title Date Date Date Drawn Checked Authorized Original Size Drawing Number Revision WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES NCDEQ NCG01 GENERAL PERMIT NOTES CHCH DS MH --/--/----/--/----/--/-- --/--/-- NTS S0 100068207-CG-005 0 FOR INFORMATION 00 DIVISION VALUE = FEETGRAPHIC SCALE 40 0 20 40 80 40 0 CONSTRUCTION DO NOT USE FOR - FOR REVIEW PURPOSES ONLY - 95% SUBMITTAL 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES EXISTING CONDITIONS (PRE- I-95 CONSTRUCTION) CHCH DS MH --/--/----/--/----/--/-- --/--/-- 1"=40' S0 100068207-C-101 0 FOR INFORMATION 00 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal DIVISION VALUE = FEETGRAPHIC SCALE 40 0 20 40 80 40 0 CONSTRUCTION DO NOT USE FOR - FOR REVIEW PURPOSES ONLY - 95% SUBMITTAL 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES EXISTING CONDITIONS (POST- I-95 CONSTRUCTION) CHCH DS MH --/--/----/--/----/--/-- --/--/-- 1"=40' S0 100068207-C-102 0 FOR INFORMATION 00 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel:Fax:+1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal DIVISION VALUE = FEETGRAPHIC SCALE 40 0 20 40 80 40 0 NOTES: 1. OFFSET WATERLINE AS NEEDED DURING CONSTRUCTION TO MINIMIZE INTERRUPTION OF SERVICE. MAXIMUM ALLOWABLE INTERRUPTION OF SERVICE IS 4 HOURS. REFER TO DETAIL 3 SHEET C-301. 2. WATERLINE OFFSET CAN BE USED AS TEMPORARY OF FINAL LOCATION OF PIPE. FINAL PIPE PENETRATION THROUGH WALL SHALL BE PER DETAIL PROVIDED IN STRUCTURAL SHEETS. 3. ALL PIPES SHALL BE DUCTILE IRON. 4. PROVIDE CITY OF LUMBERTON AT LEAST TWO WEEKS NOTICE AHEAD OF INTERRUPTION OF SERVICE AND COORDINATE WITH CITY ON LOCATION AND OPERATION OF CUTOFF VALVES. 5. STEEL CASINGS, SPACERS, AND CARRIER PIPE SHALL BE RESTORED AS EXISTING, IN SAME LOCATION. NO OFFSET IS OLLOWED. 6. STEEL CASING SHALLE BE WELDED AT CUT LOCATIONS. MECHANICAL JOINTS SHALL BE USED TO RESTRAIN CARRIER PIPE. 7. MAXIMUM ALLOWABLE INTERRUPTION OF SERVICE FOR WATERLINE INSIDE STEEL CASING IS TWO WEEKS. CONSTRUCTION DO NOT USE FOR - FOR REVIEW PURPOSES ONLY - 95% SUBMITTAL 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES SITE PLAN CHCH DS MH --/--/----/--/----/--/-- --/--/-- 1"=40' S0 100068207-C-201 0 FOR INFORMATION 00 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel:Fax:+1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal                                                    DIVISION VALUE = FEETGRAPHIC SCALE 40 0 20 40 80 40 0 CONSTRUCTION DO NOT USE FOR - FOR REVIEW PURPOSES ONLY - 95% SUBMITTAL 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES EROSION CONTROL PLAN CHCH DS MH --/--/----/--/----/--/-- --/--/-- 1"=40' S0 100068207-C-202 0 FOR INFORMATION 00 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal SECTION SCALE: HORIZ. 1"= 40' VERT. 1"= 20' CONSTRUCTION DO NOT USE FOR - FOR REVIEW PURPOSES ONLY - 95% SUBMITTAL 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES CROSS SECTIONS CHCH DS MH --/--/----/--/----/--/-- --/--/-- S0 100068207-C-301 0 FOR INFORMATION 00 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal SILT FENCE1NOT TO SCALE SILT FENCE - OUTLET NOT TO SCALE TEMPORARY CONSTRUCTION ENTRANCE NOT TO SCALE RIP RAP CHECK DAM NOT TO SCALE 2 3 8 GRAVEL ROAD TURNOUT NOT TO SCALE TYPICAL GRAVEL ACCESS ROAD CROSS-SECTION NOT TO SCALE4 5 CONSTRUCTION DO NOT USE FOR - FOR REVIEW PURPOSES ONLY - 95% SUBMITTAL NOT TO SCALE GROIN PROTECTION RIPRAP NOT TO SCALE6 TYPICAL THRUST BLOCKS NOT TO SCALE9 22x34 Date DesignedScale Drawing Title Project Title Drawing Status Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES DETAILS 1 OF 2 CHCH DS MH --/--/----/--/----/--/-- --/--/-- NTS S0 100068207-C-501 0 FOR INFORMATION 00 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal WATER MAIN OFFSET NOT TO SCALE7 CONSTRUCTION DO NOT USE FOR - FOR REVIEW PURPOSES ONLY - 95% SUBMITTAL NOT TO SCALE 22x34 Date DesignedScale Drawing Title Project Title Drawing Status Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES DETAILS 2 OF 2 CHCH DS MH --/--/----/--/----/--/-- --/--/-- NTS S0 100068207-C-502 0 FOR INFORMATION 00 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal STEEL NOTES:CONCRETE NOTES: 1.1. 2. 3. 4. 5. 6. 7. 8. 10. 11. 12. 13. 2. 3. 4. 5. ALL WELDING SHALL BE ELECTRIC WELDING. WORKMANSHIP AND TECHNIQUE, WHERE APPLICABLE, SHALL CONFORM TO THE AMERICAN WELDING SOCIETY (SEE SPECS.)STRUCTURAL WELDING CODE. WELDING SYMBOLS SHOWN ARE THOSE ADOPTED BY THE AMERICAN WELDING SOCIETYAND INDICATE ONLY SIZE AND TYPE OF WELDS REQUIRED. DETAILED INFORMATION SHALL BE SHOWN ON THE SHOP DRAWINGS AND SUBMITTED BY THE CONTRACTOR FORAPPROVAL. DIMENSIONS SHOWN OR CALLED FOR ARE THE FINAL DIMENSIONS; ALLOWANCES MUST BEMADE FOR MACHINING. ITEMS MARKED C.R.S. SHALL BE CORROSION RESISTANT STEEL (STAINLESS STEEL),SEE SPECIFICATIONS. STEEL SHEET PILING SHALL CONFORM TO ASTM A572, GRADE 50. STEEL H-PILES SHALL CONFORM TO ASTM A572, GRADE 50. 6. 9. CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH (F'c) OF 4000 PSI AT 28 DAYS (90 DAYS IF POZZOLAN IS USED), UNLESS OTHERWISE NOTED. STABILIZATION SLAB CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH (F'c) OF 2500 PSI AT 28 DAYS (90 DAYS IFPOZZOLAN IS USED). REINFORCING STEEL SHALL HAVE A MINIMUM YIELD STRENGTH (Fy) OF60,000 PSI. CONSTRUCTION JOINTS SHALL BE PROVIDED WHERE SHOWN. WHERE NOTSHOWN, CONSTRUCTION JOINTS SHALL BE PLACED AT LOCATIONS LEAST LIKELY TO IMPAIR THE INTEGRITY OF THE CONCRETE STRUCTURE. CONSTRUCTIONJOINT LOCATIONS NOT OTHERWISE SHOWN ON THE PLANS SHALL BE APPROVED BY THE CONTRACTING OFFICER. UNLESS OTHERWISE NOTED, PROVIDE 3/4" CHAMFER AT ALL EXPOSED JOINTS, EDGES, EXTERNAL CORNERS, AND VERTICAL EXPANSION JOINTS. UNLESS NOTED OTHERWISE, CLEAR COVER SHALL BE: 2" FOR SECTIONS EQUAL TO OR LESS THAN 12" THICK 3" FOR SECTIONS GREATER THAN 12" AND LESSTHAN 24" THICK 4" FOR SECTIONS GREATER THAN 24" THICK ALL BENDS OF REINFORCEMENT AND ALLBAR SPACERS AND SUPPORTS SHALL BE IN ACCORDANCE WITH SP-66, AMERICAN CONCRETE INSTITUTE DETAILING MANUAL - 2004. REINFORCING BAR DESIGNATION NUMBERS CONFORM TO THE NUMBERING SYSTEM OF THE CONCRETE REINFORCING STEELINSTITUTE. REINFORCING BARS SHALL BE CONTINUOUS AT ALL CORNERSUNLESS OTHERWISE NOTED. REINFORCEMENT, WHERE NECESSARY TO AVOID OPENINGS, PIPES, EMBEDDEDITEMS AND OTHER OBSTRUCTIONS, SHALL BE BENT OR SHIFTED AS DIRECTED BY THE CONTRACTING OFFICER. THE EMBEDMENT AND SPLICE TABLE SHALL BE USED IN DETERMINING LAP SPLICES AND EMBEDMENT LENGTHS WHERE LENGTHS ARE NOT OTHERWISE INDICATED. SPLICE LENGTHS SHALL BE BASED ON THE SMALLER BAR BEING LAPPED. THE CONTRACTOR WILL BE ALLOWED TO MAKE SPLICES IN ADDITION TO THOSE INDICATED IN THE DRAWINGS, WHERE ESSENTIAL TO CONSTRUCTIBILITY, SUBJECT TO APPROVAL BY THE CONTRACTING OFFICER. SPLICES OTHER THAN THOSE SHOWN ON THE DRAWINGS AND OTHER THAN ANY ADDITIONAL SPLICES REQUIRED BY THE CONTRACTING OFFICER, WILL BE AT THE CONTRACTOR'S EXPENSE. ALL EXTERIOR FORMED SURFACES NOT COVERED BY BACK FILL SHALL BE CLASS ''A'' FINISH AND SURFACES COVERED BY BACK FILL SHALL BE CLASS ''D'' FINISH, UNLESS OTHERWISE NOTED. FOR "T-WALL" STEMS, CONCRETE PLACEMENT SHALL BE BY PUMP / TREMIE OR THE CONTRACTOR SHALL EMPLOY TEMPORARY ''WINDOWS'' IN THE FORMS TO FACILITATE CONCRETE PLACEMENT AND CONSOLIDATION. ABBREVIATIONS MAX MIN SST TYP EXISTING FAR FACE GALVANIZED INSIDE FACE MAXIMUM MINIMUM MISCELLANEOUS NEAR FACE OUTSIDE FACE ON CENTER STAINLESS STEEL TOP AND BOTTOM TYPICAL UNLESS NOTED OTHERWISE UNDERGROUND APPROXIMATE ALTERNATE WITH ALUMINUM BITUMINOUS BOTTOM CURB & GUTTER CONSTRUCTION JOINT CONCRETE DIAMETER EACH FACE BOT C/L C&G CMP CORRUGATED METAL PIPE EXPANSION JOINT ELEVATION EACH WAY DRAWING HEIGHT NUMBER SAN SANITARY SPECIFICATIONS MIRR MIRRORED * UNLESS OTHERWISE NOTED ON EACH SHEET APPROX ALT W/ ALUM BITUM CENTER LINE CLR CLEAR CJ CONC EJ FF GALV HT IF MISC NF OF NO OC SPEC T&B UNO UGND FES FLARED END SECTION WATER MAINWM R/W LONG LANDWARDL/W LG W/ WITH E.W. EXIST. DIA., Ø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x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES GENERAL NOTES -------- --/--/----/--/----/--/-- --/--/-- -- S0 100068207-G-001 0 FOR INFORMATION 00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. SHEET TITLESHEET NO. G G-001 G-002 S S-101 S-102 S-103 S-104 S-105 S-106 S-107 S-108 S-109 S-110 S-111 S-112 S-113 S-114 S-115 S-301 S-302 S-303 S-304 S-305 S-306 S-307 S-308 S-309 S-310 S-311 S-312 S-501 S-502 S-503 S-504 S-505 S-506 S-507 S-508 S-509 S-510 S-511 S-512 S-513 S-514 S-515 S-516 S-517 S-518 S-519 S-520 S-521 S-522 S-523 S-524 S-525 S-526 S-527 S-528 CS CS-100 CS-101 CS-102 CS-103 CS-104 CS-105 STRUCTURAL - GATE BAY AND T-WALLS OVERALL FOUNDATION PLAN AND PROFILE VIEW (1 OF 2) OVERALL FOUNDATION PLAN AND PROFILE VIEW (2 OF 2) MONOLITH 1 PLAN VIEW MONOLITH 2 PLAN VIEW MONOLITH 3 PLAN VIEW MONOLITH 4 PLAN VIEW MONOLITH 5 PLAN VIEW MONOLITH 6 PLAN VIEW MONOLITH 7 PLAN VIEW MONOLITH 8 PLAN VIEW MONOLITH 9 PLAN VIEW MONOLITH 10 PLAN VIEW I-WALL 1 PLAN VIEW I-WALL 2 PLAN VIEW RAILROAD PLAN VIEW MONOLITH 1 SECTION MONOLITH 2 SECTION MONOLITH 3 SECTION MONOLITH 4 SECTION MONOLITH 5 SECTION MONOLITH 6 SECTION MONOLITH 7 SECTION MONOLITH 8 SECTION MONOLITH 9 SECTION MONOLITH 10 SECTION I-WALL 1 SECTION I-WALL 2 SECTION GATE ELEVATION SWING GATE DETAIL (1 OF 3) SWING GATE DETAIL (2 OF 3) SWING GATE DETAIL (3 OF 3) SWING GATE LOWER HINGE DETAIL (1 OF 6) SWING GATE LOWER HINGE DETAIL (2 OF 6) SWING GATE LOWER HINGE DETAIL (3 OF 6) SWING GATE LOWER HINGE DETAIL (4 OF 6) SWING GATE LOWER HINGE DETAIL (5 OF 6) SWING GATE LOWER HINGE DETAIL (6 OF 6) SWING GATE UPPER HINGE DETAIL SWING GATE LATCHING DETAIL LATCHING DETAIL (1 OF 2) LATCHING DETAIL (2 OF 2) LADDER DETAIL (1 OF 3) LADDER DETAIL (2 OF 3) LADDER DETAIL (3 OF 3) MISCELLANEOUS DETAILS SETTLEMENT DETAILS SWING GATE SEAL DETAILS (1 OF 2) SWING GATE SEAL DETAILS (2 OF 2) SCOUR PROTECTION DETAIL (1 OF 2) SCOUR PROTECTION DETAIL (2 OF 2) DRAINAGE AND UTILITY DETAILS T-WALL JOINT DETAILS RAILS AND COMPONENT PART DETAIL (1 OF 2) RAILS AND COMPONENT PART DETAIL (2 OF 2) TYPICAL PILE DETAIL RAILROAD TRS RAILROAD TRS (1 OF 6) RAILROAD TRS (2 OF 6) RAILROAD TRS (3 OF 6) RAILROAD TRS (4 OF 6) RAILROAD TRS (5 OF 6) RAILROAD TRS (6 OF 6) GENERAL GENERAL NOTES SHEET INDEX 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES SHEET INDEX -------- --/--/----/--/----/--/-- --/--/-- -- S0 100068207-G-002 0 FOR INFORMATION 00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. -NOT INCLUDED IN SET -NOT INCLUDED IN SET -NOT INCLUDED IN SET -NOT INCLUDED IN SET -NOT INCLUDED IN SET -NOT INCLUDED IN SET -NOT INCLUDED IN SET -NOT INCLUDED IN SET -NOT INCLUDED IN SET -NOT INCLUDED IN SET -NOT INCLUDED IN SET -NOT INCLUDED IN SET -NOT INCLUDED IN SET -NOT INCLUDED IN SET -NOT INCLUDED IN SET MAT C H L I N E A - A S T A . 1 0 0 3 + 2 9 . 4 3 I-W A L L 1 20'- 0 " MON O L I T H 1 20'- 0 " MON O L I T H 2 20'- 0 " MONOLITH 3 32'-3" (C/L OF WALL) MONOLITH 4 (DRAINAGE MONOLITH) 25'-0" MONOLITH 5 (GATE) 53'-0" MONOLITH 6 (DRAINAGE MONOLITH) 25'-0" MONOLITH 7 35'-0" MONOLITH 8 29'-3" (C/L OF WALL) M O N O L I T H 1 0 2 0 ' - 0 " M O N O L I T H 9 2 0 ' - 0 " I- W A L L 2 2 5 ' - 0 " 10 0 0 + 0 0 10 0 1 + 0 0 10 0 2 + 0 0 10 0 3 + 0 0 EXISTING RAILROAD TRACKS CL PROPOSED SLUICE GATE PROPOSED SLUICE GATE REQ'D SHEET PILE FACES OF FLOOD WALL SLOPE PAVEMENT 20'- 0 " PROTECTED SIDE FLOODSIDE EMBANKMENT CROWN BEGIN STA. 1000+00.60 PROPOSED ORIFICEPROPOSED ORIFICE I-WALL 1 20'-0" MONOLITH 1 20'-0" MONOLITH 2 20'-0" MONOLITH 3 32'-3" MONOLITH 4 25'-0" MONOLITH 5 53'-0" MONOLITH 6 25'-0" MONOLITH 7 35'-0" MONOLITH 8 29'-3" MONOLITH 9 20'-0" MONOLITH 10 20'-0" I-WALL 2 25'-0" M1 M10 BOTTOM OF SHEET PILE EL. 102.50 BOTTOM OF SHEET PILE EL. 96.75 BOTTOM OF SHEET PILE EL. 101.00 BOTTOM OF SHEET PILE EL. 105.75 BOTTOM OF SHEET PILE EL. 101.00 SLOPE PAVEMENT S-522 M2 M3 M4 M5 M6 M7 M8 M9 S-523 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. PLAN VIEW SCALE: 1"=20' PROFILE VIEW SCALE: 1"=20' 1001+00 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend 60 70 80 90 100 110 120 130 140 150 160 170 180 60 70 80 90 100 110 120 130 140 150 160 170 180 1002+00 1002+00 1 inch = 20 ft. ( IN FEET ) 0 10 20 40 60 WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES OVERALL FOUNDATION PLAN VIEW (1 OF 2) -------- --/--/----/--/----/--/-- --/--/-- 1"=20' S0 100068207-S-101 0 FOR INFORMATION 00 M A T C H L I N E A - A S T A . 1 0 0 3 + 2 9 . 4 8 10 0 4 + 0 0 10 0 5 + 0 0 10 0 6 + 0 0 I-WA L L 2 25'-0 " SLOPE PAVEMENT REQ'D SHEET PILE I-95 EMBANKMENT 10 ' - 0 " EMBANKMENT CROWN EMBANKMENT TOE EMBANKMENT TOE ST A . 1 0 0 3 + 8 2 . 3 3 BOTTOM OF SHEET PILE EL. 105.75 I-WALL 2 25'-0"256'-0" SHEET PILE CUT OFF EL. 126.00 PROPOSED GRADE EL. 134.00 SLOPE PAVEMENT EXIST. GRADE 20 ' - 3 " S-523 PLAN VIEW SCALE: 1"=20' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend 1 inch = 20 ft. ( IN FEET ) 0 10 20 40 60 WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES OVERALL FOUNDATION PLAN VIEW (2 OF 2) -------- --/--/----/--/----/--/-- --/--/-- 1"=20' S0 100068207-S-102 0 FOR INFORMATION 00 PROFILE VIEW SCALE: 1"=20' 60 70 80 90 100 110 120 130 140 150 160 170 180 60 70 80 90 100 110 120 130 140 150 160 170 180 1006+001005+001004+00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 2' - 0 " ST E M 3' - 0 " 5' - 0 " 5'-0"5'-0"5'-0"2'-53 4" C/L OF PZ-22 STEEL PILE C/L OF 14" CONC. PILE (BATTER 2.5V:1H U.N.O.) 1' - 6 " 1' - 6 " 2' - 6 " 4' - 6 " 10 ' - 0 " BA S E S L A B C/L OF 14" CONC. PILE (BATTER 2.5V:1H U.N.O.) I - WALL 1 2'-53 4" MONOLITH WALL 2 1 4" = C/L OF EXPANSION JOINT 19'-1112" A S-301 1/2" EXPANSION JOINT FACES OF FLOOD WALL EDGE OF BASE SLAB FLOOD SIDE PROTECTED SIDE T - WALL BASE SLAB VERTICAL TRANSITIONS NOT SHOWN NOTE: 1 4" = C/L OF EXPANSION JOINT 4' - 2 " MONOLITH 1 PLAN VIEW SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 1 PLAN VIEW -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-103 0 FOR INFORMATION 00 FLOOD SIDE 14" = C/L EXPANSION JOINT 2'-53 4"5'-0"5'-0"5'-0"2'-53 4" 19'-1112"MONOLITH WALL 3MONOLITH WALL 1 1 4" = C/L EXPANSION JOINT 1/2" EXPANSION JOINT 2' - 0 " ST E M 3' - 0 " 5' - 0 " PROTECTED SIDENOTE: T - WALL BASE SLAB VERTICAL TRANSITIONS NOT SHOWN A S-302 EDGE OF BASE SLAB FACES OF FLOOD WALL C/L OF 14" CONC. PILE (BATTER 2.5V:1H U.N.O.) 4' - 4 " 2' - 8 " 1' - 6 " C/L OF PZ-22 STEEL PILE C/L OF 14" CONC. PILE (BATTER 2.5V:1H U.N.O.) 1' - 6 " 10 ' - 0 " BA S E S L A B 1/2" EXPANSION JOINT MONOLITH 2 PLAN VIEW SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 2 PLAN VIEW -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-104 0 FOR INFORMATION 00 18'- 8 3 4" MONOLITH WALL 4 NOTE: T - WALL BASE SLAB VERTICAL TRANSITIONS NOT SHOWN 2'-5 3 4" 5'-0 " 5'-0 " 5'-0 " 1'-3 " 6'-312"5'-0"5'-0"2'-53 4" 18'-914" 14" = C/L EXPANSION JOINT MON O L I T H W A L L 2 1 4" = C / L E X P A N S I O N J O I N T 1/2" E X P A N S I O N J O I N T 1/2" EXPANSION JOINT 2' - 0 " ST E M 3' - 0 " 5' - 0 " C/L O F 1 4 " C O N C . P I L E (BA T T E R 2 . 5 V : 1 H U . N . O . ) 4'- 4 " 2'- 8 " 1'- 6 " C/L O F P Z - 2 2 STE E L P I L E C/L O F 1 4 " C O N C . P I L E (VE R T I C A L ) 1'- 6 " 10 ' - 0 " B A S E S L A B C/L OF 14" CONC. PILE (BATTER 2.5V:1H U.N.O.) C/L OF 14" CONC. PILE (BATTER 2.5V:1H U.N.O.) C/L OF PZ-22 STEEL PILE 10 ' - 0 " BA S E S L A B 14'- 3 3 4" 14'-4" 132°19 ' 2 4 " A S-303 FACES OF FLOOD WALL EDGE OF BASE SLAB FLOOD SIDE PROTECTED SIDE SEE S-XXX FOR CONNECTION DETAILS MONOLITH 3 PLAN VIEW SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 3 PLAN VIEW -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-105 0 FOR INFORMATION 00 1' - 6 " 3' - 0 " 3' - 0 " 2' - 8 " 1' - 6 " C/L OF 14" CONC. PILE (BATTER 3V:1H U.N.O.) C/L OF PZ-22 STEEL PILE 16 ' - 0 " BA S E S L A B C/L OF 14" CONC. PILE (BATTER 3V:1H U.N.O.) C/L OF 14" CONC. PILE (BATTER 3V:1H U.N.O.) 4' - 4 " 11 ' - 0 " 2' - 0 " ST E M 3' - 0 " 5'-0"5'-0"5'-0"5'-0"2'-53 4"2'-53 4" 24'-1112" 1 4" = C/L EXPANSION JOINT 14" = C/L EXPANSION JOINT EDGE OF BASE SLAB FACES OF FLOOD WALL 1/2" EXPANSION JOINT 1/2" EXPANSION JOINT NOTE: T - WALL BASE SLAB VERTICAL TRANSITIONS NOT SHOWN FLOOD SIDE PROTECTED SIDE SEE S-XXX FOR CONNECTION DETAILS A S-304 113 4" MONOLITH WALL 3 MONOLITH WALL 5 PROPOSED SLUICE GATE (SEE S-524 FOR DETAILS) 6'-53 4" DRAINAGE MONOLITH 4 PLAN VIEW SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 4 PLAN VIEW -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-106 0 FOR INFORMATION 00 FACES OF FLOOD WALL FLOOD SIDE PROTECTED SIDE NOTE: T - WALL BASE SLAB VERTICAL TRANSITIONS NOT SHOWN C/L OF 14" CONC. PILE (BATTER 3V:1H U.N.O.) 1' - 6 " 3' - 0 " 3' - 0 " 1' - 6 " 7' - 0 " 16 ' - 0 " BA S E S L A B C/L OF PZ-22 STEEL PILE C/L OF 14" CONC. PILE (BATTER 3V:1H U.N.O.) C/L OF 14" CONC. PILE (BATTER 3V:1H U.N.O.) 1/2" EXPANSION JOINT 3' - 0 " 2' - 0 " ST E M 11 ' - 0 " 1/2" EXPANSION JOINT 5'-0"1'-53 4" 52'-1112"MONOLITH WALL 4 5'-0"5'-0"5'-0"5'-0"5'-0"5'-0"5'-0"5'-0"5'-0"1'-53 4"1 4" = C/L EXPANSION JOINT14" = C/L EXPANSION JOINT MONOLITH WALL 6 EDGE OF BASE SLAB 6'-53 4"5'-0"30'-0" GATE OPENING 5'-0"6'-53 4" A S-305 MONOLITH 5 (GATE) PLAN VIEW SCALE: 3/8"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 3/8 inch = 1 ft. ( IN FEET ) WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 5 PLAN VIEW -------- --/--/----/--/----/--/-- --/--/-- 3/8"= 1' S0 100068207-S-107 0 FOR INFORMATION 00 0 1 2 4 8 EDGE OF BASE SLAB 11" 1' - 6 " 3' - 0 " 3' - 0 " 2' - 8 " 1' - 6 " C/L OF 14" CONC. PILE (BATTER 3V:1H U.N.O.) C/L OF PZ-22 STEEL PILE 16 ' - 0 " BA S E S L A B C/L OF 14" CONC. PILE (BATTER 3V:1H U.N.O.) C/L OF 14" CONC. PILE (BATTER 3V:1H U.N.O.) 4' - 4 " 1/2" EXPANSION JOINT 11 ' - 0 " 2' - 0 " ST E M 3' - 0 " 1/2" EXPANSION JOINT 5'-0"5'-0"5'-0"5'-0"2'-53 4"2'-53 4" 24'-1112" 1 4" = C/L EXPANSION JOINT 14" = C/L EXPANSION JOINT A S-306 MONOLITH WALL 5 MONOLITH WALL 7 SEE S-XXX FOR CONNECTION DETAILS FACES OF FLOOD WALL FLOOD SIDE PROTECTED SIDET - WALL BASE SLAB VERTICAL TRANSITIONS NOT SHOWN NOTE: PROPOSED SLUICE GATE (SEE S-524 FOR DETAILS) 6'-53 4" DRAINAGE MONOLITH 6 PLAN VIEW SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 6 PLAN VIEW -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-108 0 FOR INFORMATION 00 1' - 6 " 2' - 8 " 4' - 4 " 1' - 6 " 10 ' - 0 " BA S E S L A B C/L OF 14" CONC. PILE (BATTER 2.5V:1H U.N.O.) C/L OF PZ-22 STEEL PILE C/L OF 14" CONC. PILE (BATTER 2.5V:1H U.N.O.) 1/2" EXPANSION JOINT 1 4" = C/L EXPANSION JOINT 1 4" = C/L EXPANSION JOINT5'-0"5'-0"5'-0"5'-0"2'-53 4"2'-53 4"5'-0"5'-0" 34'-1112"MONOLITH WALL 6 MONOLITH WALL 8 5' - 0 " 2' - 0 " ST E M 3' - 0 " 1/2" EXPANSION JOINT FACES OF FLOOD WALL EDGE OF BASE SLAB FLOOD SIDE PROTECTED SIDE A S-307 T - WALL BASE SLAB VERTICAL TRANSITIONS NOT SHOWN NOTE: MONOLITH 7 PLAN VIEW SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 7 PLAN VIEW -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-109 0 FOR INFORMATION 00 1' - 6 " 2' - 8 " 4' - 4 " 1' - 6 " 10 ' - 0 " BA S E S L A B C/L OF 14" CONC. PILE (BATTER 2.5V:1H U.N.O.) C/L OF PZ-22 STEEL PILE C/L OF 14" CONC. PILE (BATTER 2.5V:1H U.N.O.) 1/2" EXPANSION JOINT 2'-53 4"5'-0"5'-0"5'-0"5'-0"2'-61 4" 25'-0" 1' - 1 1 1 2" 5' - 0 " 2' - 5 3 4" 9' - 5 1 4" 14" = C/L EXPANSION JOINT MONOLITH WALL 7 1 4" = C / L E X P A N S I O N J O I N T M O N O L I T H W A L L 9 2'-0" STE M 3'-0" 5'-0" 10'-0 " BAS E S L A B FLOOD SIDE PROTECTED SIDE A S-308 EDGE OF BASE SLAB FACES OF FLOOD WALL 20'-712" 5' - 1 " 132° 4 6 ' 4 3 " 1/ 2 " E X P A N S I O N J O I N T V V T - WALL BASE SLAB VERTICAL TRANSITIONS NOT SHOWN NOTE: MONOLITH 8 PLAN VIEW SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 8 PLAN VIEW -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-110 0 FOR INFORMATION 00 FLOOD SIDE 14" = C/L EXPANSION JOINT 2'-53 4"5'-0"5'-0"5'-0"2'-53 4" 19'-1112"MONOLITH WALL 10MONOLITH WALL 8 14" = C/L EXPANSION JOINT 1/2" EXPANSION JOINT A S-309 EDGE OF BASE SLAB1/2" EXPANSION JOINT 2' - 0 " ST E M 3' - 0 " 5' - 0 " C/L OF 14" CONC. PILE (BATTER 2.5V:1H U.N.O.) 4' - 4 " 2' - 8 " 1' - 6 " C/L OF PZ-22 STEEL PILE C/L OF 14" CONC. PILE (BATTER 2.5V:1H U.N.O.) 1' - 6 " 10 ' - 0 " BA S E S L A B PROTECTED SIDE FACES OF FLOOD WALL T - WALL BASE SLAB VERTICAL TRANSITIONS NOT SHOWN NOTE: MONOLITH 9 PLAN VIEW SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 9 PLAN VIEW -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-111 0 FOR INFORMATION 00 FLOOD SIDE 14" = C/L EXPANSION JOINT 2'-53 4"5'-0"5'-0"5'-0"2'-53 4" 19'-1112"I - WALL 2MONOLITH WALL 9 14" = C/L EXPANSION JOINT 1/2" EXPANSION JOINT A S-310 EDGE OF BASE SLAB1/2" EXPANSION JOINT 2' - 0 " ST E M 3' - 0 " 5' - 0 " C/L OF 14" CONC. PILE (BATTER 2.5V:1H U.N.O.) 4' - 4 " 2' - 8 " 1' - 6 " C/L OF PZ-22 STEEL PILE C/L OF 14" CONC. PILE (BATTER 2.5V:1H U.N.O.) 1' - 6 " 10 ' - 0 " BA S E S L A B PROTECTED SIDE FACES OF FLOOD WALL T - WALL BASE SLAB VERTICAL TRANSITIONS NOT SHOWN NOTE: 1' - 0 " 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 10 PLAN VIEW -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-112 0 FOR INFORMATION 00 MONOLITH 10 PLAN VIEW SCALE: 1/2"=1' C/L OF PZ-22 STEEL PILE FLOOD SIDE PROTECTED SIDE A S-307 20'-0" 2' - 0 " ST E M 1/2" EXPANSION JOINT FACES OF FLOOD WALL I-WALL 1 PLAN VIEW SCALE: 3/4"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 3/4 inch = 1 ft. ( IN FEET ) WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES I-WALL 1 PLAN VIEW -------- --/--/----/--/----/--/-- --/--/-- 3/4"= 1' S0 100068207-S-113 0 FOR INFORMATION 00 0 1 2 4 25'-0" 2' - 0 " ST E M FACES OF FLOOD WALL FLOOD SIDE PROTECTED SIDE A S-308 1/2" EXPANSION JOINT C/L OF PZ-22 STEEL PILE I-WALL 2 PLAN VIEW SCALE: 3/4"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 3/4 inch = 1 ft. ( IN FEET ) WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES I-WALL 2 PLAN VIEW -------- --/--/----/--/----/--/-- --/--/-- 3/4"= 1' S0 100068207-S-114 0 FOR INFORMATION 00 0 1 2 4 FLOOD SIDE PROTECTED SIDE 6'-6"5'-0"30'-0" OPENING 5'-0"6'-6" 11'-612"1'-8"3'-7"1'-8"11'-1012" 16 ' - 0 " 11 ' - 0 " 2' - 0 " 3' - 0 " 2' - 6 " 5' - 0 " MONOLITH WALL 5 (GATE) = 53'-0"MONOLITH WALL 4 MONOLITH WALL 6 1/2" EXPANSION JOINT 1/2" EXPANSION JOINT RR GATE SILL FLOOD WALL SILL FLOOD WALL SILL A S-303 2' - 0 " 5'-0"2'-6" 2' - 6 " SCALE: 3/8"=1' RAILROAD PLAN VIEW 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend 3/8 inch = 1 ft. ( IN FEET ) WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES RAIL ROAD PLAN VIEW -------- --/--/----/--/----/--/-- --/--/-- 3/8"= 1' S0 100068207-S-115 0 FOR INFORMATION 00 0 1 2 4 8 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 2'-0" WALL 10'-0" 4' - 0 " 3'-0"5'-0" STEEL SHEET PILE 14" SQUARE PRE-STRESSED CONCRETE PILES REINF. CONC. FOOTING TOP OF FOOTING EL. +121.45' FLOOD SIDE PROTECTED SIDE 3 1 3 1 BOTTOM OF FOOTING EL. +117.45' 4" STABILIZATION SLAB (SEE CONCRETE NOTE 2 IN GENERAL NOTES) 4" 4'-6"1'-6"2'-6"1'-6" 2' - 4 " 9" 4" 3" C L R . 4" C L R . 3" C L R . C.J. 4" CLR. 1/4"/ FT 3/4" CHAMFER (TYP. AT EXPOSED EDGES) 3" 12 ' - 6 " TOP OF WALL EL. +134.20' 2" C L R . MONOLITH 1 SECTION SCALE: 3/4"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 1 SECTION -------- --/--/----/--/----/--/-- --/--/-- 3/4"= 1' S0 100068207-S-301 0 FOR INFORMATION 00 3/4 inch = 1 ft. ( IN FEET ) 0 1 2 4 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 10'-0" 4' - 0 " 3'-0"5'-0" STEEL SHEET PILE 14" SQUARE PRE-STRESSED CONCRETE PILES REINF. CONC. FOOTING TOP OF FOOTING EL. +119.95' FLOOD SIDE PROTECTED SIDE 3 1 3 1 BOTTOM OF FOOTING EL. +115.95' 4" STABILIZATION SLAB (SEE CONCRETE NOTE 2 IN GENERAL NOTES) 4" 4'-6"1'-6"2'-6"1'-6" 2' - 4 " 9" 4" 3" C L R . 4" C L R . 3" C L R . C.J. 1/4"/ FT 3/4" CHAMFER (TYP. AT EXPOSED EDGES) 3" 14 ' - 0 " 4" CLR. 2'-0" WALL TOP OF WALL EL. +134.20' 2" C L R . MONOLITH 2 SECTION SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 2 SECTION -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-302 0 FOR INFORMATION 00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 10'-0" 4' - 0 " 3'-0"5'-0" STEEL SHEET PILE 14" SQUARE PRE-STRESSED CONCRETE PILES REINF. CONC. FOOTING TOP OF FOOTING EL. +119.95' FLOOD SIDE PROTECTED SIDE 3 1 3 1 BOTTOM OF FOOTING EL. +115.95' 4" STABILIZATION SLAB (SEE CONCRETE NOTE 2 IN GENERAL NOTES) 4" 4'-6"1'-6"2'-6"1'-6" 2' - 4 " 9" 4" 3" C L R . 4" C L R . 3" C L R . C.J. 1/4"/ FT 3/4" CHAMFER (TYP. AT EXPOSED EDGES) 3" 14 ' - 0 " 4" CLR. 2'-0" WALL TOP OF WALL EL. +134.20' 2" C L R . MONOLITH 3 SECTION SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 3 SECTION -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-303 0 FOR INFORMATION 00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 2'-0" WALL 16'-0" 4' - 0 " 3'-0"11'-0" STEEL SHEET PILE 14" SQUARE PRE-STRESSED CONCRETE PILES REINF. CONC. FOOTING SLUICE GATE TOP OF FOOTING EL. +115.70' FLOOD SIDE PROTECTED SIDE 3 1 3 3 1 1 BOTTOM OF FOOTING EL. +111.70' 3'-0"3'-0"7'-0"1'-6"1'-6" 4" STABILIZATION SLAB (SEE CONCRETE NOTE 2 IN GENERAL NOTES) 4" 3" C L R . 4" 3/4" CHAMFER (TYP. AT EXPOSED EDGES) C.J. 3" 2' - 4 " 4" C L R . 4" CLR. 1/4"/FT 3" C L R . 9" 18 ' - 3 " TOP OF WALL EL. +134.20' 2" C L R . MONOLITH 4 (DRAINAGE) SECTION SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 4 SECTION -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-304 0 FOR INFORMATION 00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 2'-0" WALL 16'-0" 4' - 0 " 3'-0"11'-0" STEEL SHEET PILE 14" SQUARE PRE-STRESSED CONCRETE PILES REINF. CONC. FOOTING 3 1 3 1 3 1 FLOOD SIDE PROTECTED SIDE GATE SILL SWING GATE TOP OF RAIL EL. +122.20' TOP OF FOOTING EL. +118.95' BOTTOM OF FOOTING EL. +114.95' 1'-6"3'-0"3'-0"7'-0"1'-6" 4" STABILIZATION SLAB (SEE CONCRETE NOTE 2 IN GENERAL NOTES) 4"2' - 4 " 9" C.J.3" 3" C L R . 3" C L R . 15 ' - 0 " TOP OF WALL EL. +134.20' 2" C L R . MONOLITH 5 (GATE) SECTION SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 5 SECTION -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-305 0 FOR INFORMATION 00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 2'-0" WALL 16'-0" 4' - 0 " 3'-0"11'-0" STEEL SHEET PILE 14" SQUARE PRE-STRESSED CONCRETE PILES REINF. CONC. FOOTING SLUICE GATE TOP OF FOOTING EL. +115.70' FLOOD SIDE PROTECTED SIDE 3 1 3 3 1 1 BOTTOM OF FOOTING EL. +111.70' 3'-0"3'-0"7'-0"1'-6"1'-6" 4" STABILIZATION SLAB (SEE CONCRETE NOTE 2 IN GENERAL NOTES) 4" 3" C L R . 4" 3/4" CHAMFER (TYP. AT EXPOSED EDGES) C.J. 3" 2' - 4 " 4" C L R . 4" CLR. 1/4"/FT 3" C L R . 9" 18 ' - 3 " TOP OF WALL EL. +134.20' 2" C L R . MONOLITH 6 (DRAINAGE) SECTION SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 6 SECTION -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-306 0 FOR INFORMATION 00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 10'-0" 4' - 0 " 3'-0"5'-0" STEEL SHEET PILE 14" SQUARE PRE-STRESSED CONCRETE PILES REINF. CONC. FOOTING TOP OF FOOTING EL. +119.95' FLOOD SIDE PROTECTED SIDE 3 1 3 1 BOTTOM OF FOOTING EL. +115.95' 4" STABILIZATION SLAB (SEE CONCRETE NOTE 2 IN GENERAL NOTES) 4" 4'-6"1'-6"2'-6"1'-6" 2' - 4 " 9" 4" 3" C L R . 4" C L R . 3" C L R . C.J. 1/4"/ FT 3/4" CHAMFER (TYP. AT EXPOSED EDGES) 3" 14 ' - 0 " 4" CLR. 2'-0" WALL TOP OF WALL EL. +134.20' 2" C L R . MONOLITH 7 SECTION SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 7 SECTION -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-307 0 FOR INFORMATION 00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 10'-0" 4' - 0 " 3'-0"5'-0" STEEL SHEET PILE 14" SQUARE PRE-STRESSED CONCRETE PILES REINF. CONC. FOOTING TOP OF FOOTING EL. +119.95' FLOOD SIDE PROTECTED SIDE 3 1 3 1 BOTTOM OF FOOTING EL. +115.95' 4" STABILIZATION SLAB (SEE CONCRETE NOTE 2 IN GENERAL NOTES) 4" 4'-6"1'-6"2'-6"1'-6" 2' - 4 " 9" 4" 3" C L R . 4" C L R . 3" C L R . C.J. 1/4"/ FT 3/4" CHAMFER (TYP. AT EXPOSED EDGES) 3" 14 ' - 0 " 4" CLR. 2'-0" WALL TOP OF WALL EL. +134.20' 2" C L R . MONOLITH 8 SECTION SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 8 SECTION -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-308 0 FOR INFORMATION 00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 10'-0" 4' - 0 " 3'-0"5'-0" STEEL SHEET PILE 14" SQUARE PRE-STRESSED CONCRETE PILES REINF. CONC. FOOTING TOP OF FOOTING EL. +119.95' FLOOD SIDE PROTECTED SIDE 3 1 3 1 BOTTOM OF FOOTING EL. +115.95' 4" STABILIZATION SLAB (SEE CONCRETE NOTE 2 IN GENERAL NOTES) 4" 4'-6"1'-6"2'-6"1'-6" 2' - 4 " 9" 4" 3" C L R . 4" C L R . 3" C L R . C.J. 1/4"/ FT 3/4" CHAMFER (TYP. AT EXPOSED EDGES) 3" 14 ' - 0 " 4" CLR. 2'-0" WALL TOP OF WALL EL. +134.20' 2" C L R . MONOLITH 9 SECTION SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 9 SECTION -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-309 0 FOR INFORMATION 00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 2'-0" WALL 10'-0" 4' - 0 " 3'-0"5'-0" STEEL SHEET PILE 14" SQUARE PRE-STRESSED CONCRETE PILES REINF. CONC. FOOTING TOP OF FOOTING EL. +124.70' FLOOD SIDE PROTECTED SIDE 3 1 3 1 BOTTOM OF FOOTING EL. +120.70' 4" STABILIZATION SLAB (SEE CONCRETE NOTE 2 IN GENERAL NOTES) 4" 4'-6"1'-6"2'-6"1'-6" 2' - 4 " 9" 4" 3" C L R . 4" C L R . 3" C L R . C.J. 4" CLR. 1/4"/FT 3/4" CHAMFER (TYP. AT EXPOSED EDGES) 3" 9' - 3 " TOP OF WALL EL. +134.20' 2" C L R . MONOLITH 10 SECTION SCALE: 1/2"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES MONOLITH 10 SECTION -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-310 0 FOR INFORMATION 00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 STEEL SHEET PILING (PZ 22) TIP EL. 102.50 C/L I-WALL & SHEETING 6" CONCRETE SLOPE PAVEMENT W/ 6X6-W2.9XW2.9 @ MID DEPTH EL 134.20 FLOOD SIDE PROTECTED SIDE EL 122.50 2'-0"4'-0" C/L I-WALL 4'-0" C/L OF LEVEE SEE S-504 FOR I-WALL REINFORCEMENT 1 3 EXPANSION. JOINT MATERIAL W/ ELASTOMERIC SEALER TOP OF SHEET PILE EL 126.00 1 4" / FT.1 4" / FT. 1 3 I WALL 1 SECTION SCALE: 3/4"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES I-WALL 1 SECTION -------- --/--/----/--/----/--/-- --/--/-- 3/4"= 1' S0 100068207-S-311 0 FOR INFORMATION 00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 3/4 inch = 1 ft. ( IN FEET ) 0 1 2 4 STEEL SHEET PILING (PZ 22) TIP EL. 105.75 C/L I-WALL & SHEETING 6" CONCRETE SLOPE PAVEMENT W/ 6X6-W2.9XW2.9 @ MID DEPTH EL 134.20 FLOOD SIDE PROTECTED SIDE EL 122.50 2'-0"4'-0" C/L I-WALL 4'-0" C/L OF LEVEE SEE S-504 FOR I-WALL REINFORCEMENT 1 3 EXPANSION. JOINT MATERIAL W/ ELASTOMERIC SEALER TOP OF SHEET PILE EL 126.00 1 4" / FT.1 4" / FT. 1 3 I WALL 2 SECTION SCALE: 3/4"=1' 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES I-WALL 2 SECTION -------- --/--/----/--/----/--/-- --/--/-- 3/4"= 1' S0 100068207-S-312 0 FOR INFORMATION 00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 3/4 inch = 1 ft. ( IN FEET ) 0 1 2 4 EL. 122.20TOP OF SILL EL. 122.97 EL. 134.20 L TOP HINGE EL. 133.62 C EL. 134.95 5'-0"30'-0" GATE OPENING 5'-0" 1'-8"1'-0" 4" 1'-7 1/2"14 EQ. SPACES @ 2'-0" = 28'-0"1'-7 1/2"1'-0 3/4" L HINGESC 3'-5 1/4" 13'-9 3/4"± TOP HINGE SEE DETAILS ON DWG. 52 LOWER HINGE SEE DETAILS ON DWG. 52 L BOT HINGEC FA C E O F CO L U M N FA C E O F CO L U M N 3 5 / 1 6 " 3' - 0 " EL. 134.20 EL. 134.95 TOP OF GATE EL. 134.20 SEE DETAIL SEE DETAIL SEE DETAILOPP. HAND 6" SEE DETAIL LADDER SEE DETAILS ON DWG. S-515 ALL BEAMS (TYP.) 1"Ø DRAIN HOLES IN FLOOD SIDE PROTECTED SIDE C/L HINGE 1' - 3 1 1 / 1 6 " C/L HINGESKIN PLATE LADDER SEE DETAILS ON DWG. 56A 1'-6 3/4" 312" SEE DETAIL 312" 1 S-501 S-503 6 S-501 S-503 2 S-501 S-503 2 S-501 S-502 1 S-501 S-502 8 S-501 S-503 PROTECTED SIDE FLOOD SIDE EL. 122.20 TOP OF SILL EL. 122.97 L GIRDERC EL. 133.62 L GIRDERC SEE DETAIL GATE ELEVATION SCALE: 1/2" = 1'-0" WT5/ 8 " ST I F F N E R PL 5/ 8 " ST I F F N E R PL 5/ 8 " ST I F F N E R PL 5/ 8 " ST I F F N E R PL 5/ 8 " ST I F F N E R PL 5/ 8 " ST I F F N E R PL 5/ 8 " ST I F F N E R PL 5/ 8 " ST I F F N E R PL SEE DETAIL3 S-501 S-503 SEE DETAIL4 S-501 S-503 A TYP. A TYP. TYP. SCALE: 1/2"= 1'-0" SECTION B TYP. TYP. SCALE: 1/2"= 1'-0" SECTION B TYP. HINGE PEDESTAL 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES GATE ELEVATION -------- --/--/----/--/----/--/-- --/--/-- 1/2"= 1' S0 100068207-S-501 0 FOR INFORMATION 00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/2 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 FLOOD SIDE ELEVATION SCALE: 1/4" = 1'-0" C LATCH EL. 123.22 EL. 133.77 C LATCH C LATCH C L A D D E R L L L LC HINGES C BOT. HINGE EL. 122.97L EL. 133.62 C TOP HINGEL L EL. 134.20 TOP OF WALL EL. 134.95 1'-6 3/4" EL. 134.20 TOP OF WALL C LATCH EL. 133.77L EL. 123.12C LATCHL EL. 134.95C LATCHL 32'-11 3/4" SCREW JACK SEE DETAIL LATCH (TYP.) 53'-0"25'-0" 30'-0" OPENING 1'-5" C/L OF MONOLITH JOINTC/L OF MONOLITH JOINT EL. 119.20 TOP OF FTG. AT WALL SEE DETAIL SEE DETAIL C SCREW JACK AND LATCHESL W/L C SCREW JACKL 16 ' - 0 " 6'-6"5'-0"5'-0"6'-6" 53'-0" GATE MONOLITH25'-0" T-WALL MONOLITH C HINGESL C LATCHLGATE MONOLITHT-WALL MONOLITH C/L OF MONOLITH JOINT C/L OF MONOLITH JOINT 30'-0" OPENING 1'-5" 1'-6 3/4" 32'-11 3/4" PROTECTED SIDE FLOOD SIDE GATE MONOLITH 5 PLAN (GATE IN OPEN POSITION) SCALE: 1/4" = 1'-0" EL. 122.20 TOP OF RAIL EL. 114.95 BOT. OF FTG. EL. 115.70 TOP OF SHEET PILE EL. 118.95 TOP OF FTG. AT EDGE 2 S-512 S-514 3 S-512 S-514 1 S-512 S-514 RAIL AND COMPONENTS SEE DETAILS ON S-526 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES SWING GATE LATCHING DETAIL -------- --/--/----/--/----/--/-- --/--/-- 1/4"= 1' S0 100068207-S-512 0 FOR INFORMATION 00 1/4 inch = 1 ft. ( IN FEET ) 0 2 4 8 12 FACE OF WALL 1/4 1/4 1'' Ø STEEL BAR BAR 3 X 1/2 ANGLE 3/4'' Ø EXPANSION ANCHOR (GALV) 1'' Ø STEEL BAR BAR 3 X 1/2 8X4X1/2" - 4" LONG 1'-3"2 1/2" 1'-6" TYP. 7" 4" 2 1/2" 1/4" A TYP. TYP. SCALE: 3"= 1'-0" SECTION 1 TYP. TYP. SCALE: 3"= 1'-0" DETAIL EL. 134.92 EL. 134.92 CL L A D D E R C C NOTE: FIELD ADJUST THE LOCATION OF THE L LADDERS TO MATCH L OF T-WALL MONOLITH. NOTE: ALL LADDERS SHALL BE HOT-DIPPED GALVANIZED AFTER FABRICATION. BAR 3 X 1/2 1'' Ø RUNGS (TYP) 6' ' 6' ' BAR 3 X 1/2 3' ' 9" 5' - 2 1 / 2 " ± L8X4X1/2 - 3" LONG (TYP.) TOP OF FTG. EL. 122.25 5'-0" 3' - 6 " 7" 2'-0" 12 " 6" 1'-6" 3' - 6 " SEE DETAIL FLOOD SIDE PROTECTED SIDE 5' - 2 1 / 2 " ± 7" 1' - 6 " 12" MAX C-C RUNGS RUNG SP. EQUALLY LADDER DETAILS SCALE: 3/4" = 1'-0" PROTECTED SIDE ELEVATION SECTION A TYP. 1 TYP. 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES LADDER DETAIL (1 OF 3) -------- --/--/----/--/----/--/-- --/--/-- SEE DWG. S0 100068207-S-515 0 FOR INFORMATION 00 3 inch = 1 ft. ( IN INCHES ) 0 3 6 12 3/4 inch = 1 ft. ( IN FEET ) 0 1/2 1 2 4 2'-11" 2'-7" 1' - 0 " ( M A X . ) ( T Y P . ) 1'-6" 7" (MIN.) 4' - 0 " HO O P B A R S @ 4 ' - 0 " O . C . ( M A X . ) 9' - 0 " ± 4' - 0 " 9' - 0 " EL. 134.92EL. 134.92 TOP OF GATE COLUMN TOP OF FOOTING EL. 122.25 EL. 122.25 HOOP BAR (3"x1/4") HO O P B A R @ 4 ' - 0 " O . C . ( M A X . ) 4' - 0 " 4' - 0 " VERT. BAR (2"x1/4")(TYP.) VERT. BAR (2"x1/4")(TYP.) RUNG (1"Ø) (TYP.) SIDE RAIL BAR (3"x1/2") SIDE RAIL BAR (3"x1/2") RUNG (1"Ø) (TYP.) HOOP BAR (3"x1/4") (TYP.) 9' - 2 1 / 8 " HOOP BAR (3"x1/4") EL. 122.25 TOP OF FOOTING SEE DETAIL (TYP.) HOOP BAR (2"x1/4")(TYP.) SUPPORT (TYP.) SEE DETAIL HOOP BAR (2"x1/4")(TYP.) 6' - 0 " L A D D E R S E C U R I T Y DO O R ( S E E S H E E T 5 6 ) BOTTOM/LADDER 2' - 6 " SECURITY DOOR SECURITY DOOR TOP/LADDER 6" EL. 134.92 TYPICAL LADDER ELEVATIONS SCALE: 3/4" = 1'-0" A S-517 B S-517 C S-517 2 S-517 1 S-517 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES LADDER DETAIL (2 OF 3) -------- --/--/----/--/----/--/-- --/--/-- 3/4" = 1'-0" S0 100068207-S-516 0 FOR INFORMATION 00 3/4 inch = 1 ft. ( IN FEET ) 0 1/2 1 2 4 1/4" 1"Ø BAR RUNG @ 1'-0" O.C. UNLESS OTHERWISE NOTEDSIDE BAR (3"x1/2") 1/4 2 S-516 S-517 SCALE: 3"= 1'-0" DETAIL 9" 1 1 / 4 " FACE OF CONC. FLOODWALL C/L OF LADDER 3/4"Ø C.R.S. BOLTS W/ C.R.S. WASHERS AND NUTS (TYP.)3/4"Ø C.R.S. EXP. ANCHORS (5" MIN. EMBED.) 9" 1 1 / 4 " 7" ( M I N . ) (T Y P . ) 1 1/4"1 1/4" L 8"x4"x1/2"L 8"x4"x1/2" 3/4"Ø C.R.S. EXP. ANCHORS (5" MIN. EMBED.) PL3"x1/2" (TYP.) D TYP. A S-516 S-517 SCALE: 2"= 1'-0" SECTION C/ L O F L A D D E R R=1 ' - 5 1 / 2 " 40°(T Y P . ) 7" 1'-1 1/2"3" 9" 9" 3/ 4 " 7 3 / 4 " 3/ 4 " 7 3 / 4 " BAR RUNG (1"Ø) SIDE RAIL BAR (3"x1/2")(TYP.) VERT. BAR (2"x1/4")(TYP.) BENT BAR (3"x1/4")(TYP.) C/L OF RUNG HOOP BAR (3"x1/4")(TYP.) BAR RUNG (1"Ø) 7" 1'-1 1/2" R=1 ' - 1 1 / 2 " VERT. BAR (2"x1/4")(TYP.) SIDE RAIL BAR (3"x1/2")(TYP.) HOOP BAR (2"x1/4")(TYP.) C/ L O F L A D D E R 9"3/ 4 " 3" 3 3 / 4 " BENT BAR (3"x1/4")(TYP.) 9" 3/ 4 " 3 3 / 4 " C/L OF RUNG 40°(T Y P . ) B S-516 S-517 SCALE: 1"= 1'-0" SECTION C S-516 S-517 SCALE: 1"= 1'-0" SECTION CONC. FLOODWALL FOOTING 1 1/4"1 1 / 4 " 2 1 / 4 " L 8"x4"x1/2" PL 3"x1/2" 3/4"Ø C.R.S. EXP. ANCHORS (5" MIN. EMBED.) 3/4"Ø C.R.S. BOLTS W/ C.R.S. WASHERS AND NUTS (TYP.) 1 1 / 4 " D TYP. TYP. SCALE: 2"= 1'-0" SECTION 1 1 / 4 " 1 1 / 4 " 5" 1/4 12" 3/4"Ø C.R.S. EXP. ANCHORS (5" MIN. EMBED.)L 8"x4"x1/2" CONC. GATE COLUMN SIDE BAR RAIL (3"x1/2") 1 S-516 S-517 SCALE: 2"= 1'-0" DETAIL NOTE: CONTRACTOR TO PROVIDE A SECURITY DOOR FOR ALL LADDERS ON THE PROTECTED SIDE OF THE WALL ONLY HINGE HINGE TYP. EL. 134.92 CL LATCH EXPANDED METAL SECURITY DOOR (GALV) FRAME PL 3/16 X 2 12 " 1'-10" 12 " 2' - 6 " 4' - 6 " TOP OF FTG. EL. 122.25 6" 12 " 6' - 0 " PROTECTED SIDE ELEVATION SCALE: 3/4" = 1'-0" FACE OF WALL EXPANDED METAL, WELD TO FRAME OF DOOR. 1/4 3/8 WITH HOLE TO ACCEPT LOCK (ATTACHED TO LADDER) 1/4 1/4 WITH HOLE TO ACCEPT LOCK (ATTACHED TO SECURITY DOOR) HINGES (180° SWING) BAR 1/2 X 1 1/2 X 0'-4'' PL 1/4 X 1 X 0'-1 1/2'' PL 1/4 X 1 X 0'-1 1/4'' FRAME PL 3/16 X 2 (TYP) 1 1/2" 1 1 / 4 " 1 1/2" 1" PLAN SCALE: 3/8" = 1" 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend LADDER SECURITY DOOR DETAILS PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES LADDER DETAIL (3 OF 3) -------- --/--/----/--/----/--/-- --/--/-- SEE DWG. S0 100068207-S-517 0 FOR INFORMATION 00 3 inch = 1 ft. ( IN INCHES ) 0 3 6 12 3/4 inch = 1 ft. ( IN FEET ) 0 1/2 1 2 4 0 1/2 1 2 3 1 inch = 1 ft. ( IN FEET ) 3/8 inch = 1 ft. ( IN FEET ) 0 1 2 4 8 0 1/4 1/2 1 1 1/2 2 inch = 1 ft. ( IN FEET ) SIDE SEAL ANGLE SIZE VARIES L 5 X 5 X 1/2 C/L HINGE C/L HINGE SIDE SEAL HINGE END 1/2'' Ø X 6" ANCHORS, @ 12'' O.C., STAGGERED 1/2''Ø X 6" ANCHORS, @ 12'' O.C., STAGGERED L 4 X 4 X 3/8 BAR 1 3/8 X 1 3/8 CONT. GATE OPENING VARIES W 1'-3 11/16" C/L HINGE SEE DETAIL SEE DETAIL FLOOD SIDE PROTECTED SIDE W FREE END TYPICAL SECTION THRU SWING GATE SCALE: 3" = 1'-0" 2 TYP 1 TYP SIDE SEAL SKIN PL R=5/16'' FLANGE W FACE OF COLUMN L 4 X 4 X 3/8 END PL SEAL RETAINING BAR 2 X 5/16, C.R.S., SEE DETAIL 1/2''Ø X 6" ANCHORS, @ 12'' O.C., STAGGERED 9/16'' X 1 1/2'' VERTICAL SLOTTED HOLES IN BEAM FLANGES AND SKIN PL 1/2''Ø BOLTS W/WASHERS, @ 12'' O.C., C.R.S. 2.75 0.75 1.50 0.5625 5.7500 1" Ø 1 3/4" Ø THIS SHT. 1 TYP. TYP. SCALE: 6"= 1'-0" DETAIL SIDE SEAL L 8 X 4 X 1/2 FACE OF COLUMN FLANGE W R=5/16" END PL BAR 1 3/8 X 1 3/8 CONT. 5/16 SKIN PL SEAL RETAINING BAR 2 X 5/16, C.R.S., SEE DETAIL 9/16'' X 1 1/2'' VERTICAL SLOTTED HOLES IN BEAM FLANGES AND SKIN PL 1/2''Ø BOLTS W/WASHERS, @ 12'' O.C., C.R.S. 1/2''Ø X 6'' ANCHORS, @ 12'' O.C., STAGGERED 5.0000 0.5000 1.5000 1.5000 6.7500 2.7500 0.5625 1"Ø 1 3/4"Ø 2 TYP. TYP. SCALE: 6"= 1'-0" DETAIL C.R.S. R=5/16" 9/16"Ø HOLES, FOR 1/2''Ø BOLTS 2.00 1.00 1.00 0.3125 SEAL RETAINING BAR SCALE: 12" = 1'-0" AP P R O X . APPR O X . OPTIONAL SPLICE CORNER DETAIL, TYPICAL BOTH SIDES FACTORY VULCANIZED SPLICE BACK OF VERTICAL SEAL FACTORY VULCANIZED MITER SPLICE JOINT FULL MOLDED VERTICAL OUTSIDE BULB CORNER 5" 14 " 1" TYPICAL GATE SEAL SCALE: N.T.S. NOTES: 1. FOR GENERAL NOTES, SEE G-001. 2. ALL SPLICES WILL BE FACTORY MADE IN HEAVY STEEL PRESS RUBBER. TO ASSEMBLY. TYPE MOLDS UNDER PRESSURE AND HEAT. 4. SEAL CLAMP ANGLES SHALL BE PAINTED ON ALL SIDES PRIOR 5. AFTER ASSEMBLY AND SEAL ADJUSTMENTS ARE MADE, ALL 50% OF THE MINIMUM TENSILE STRENGTH REQUIRED OF THE 3. ALL SPLICE JOINTS MUST DEVELOP STRENGTH OF AT LEAST A SILICONE RUBBER SEALANT TO PROVIDE WATERTIGHT JOINTS. GAPS IN SEALS AND SEAL SUPPORTS SHALL BE SEALED WITH 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES SWING GATE SEAL DETAIL (1 OF 2) -------- --/--/----/--/----/--/-- --/--/-- SEE DWG. S0 100068207-S-520 0 FOR INFORMATION 00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 6 inch = 1 ft. ( IN INCHES ) 0 1 2 4 12 inch = 1 ft. ( IN INCHES ) 0 1/2 1 2 3 inch = 1 ft. ( IN INCHES ) 0 3 6 12 BOTTOM SEAL 1/2" L 5 X 5 X 1/2 W SEAL RETAINING BAR 2 X 5/16, C.R.S. SEAL RETAINING BAR 2 X 5/16, C.R.S. SIDE SEAL SKIN PL END PL SKIN PL BAR 1 3/8 X 1 3/8 CONT. (@ FREE END ONLY) COPE END OF ANGLE SEE DETAIL THIS SHT. 1/2"Ø BOLTS W/WASHERS, @ 12'' O.C., C.R.S. 1/2"Ø BOLTS W/WASHERS, @ 12'' O.C., C.R.S. 1/2"Ø X 2 1/4" BOLTS 1" 1 1/2" 2" 1 3 / 4 " @ 12'' O.C., C.R.S. END ELEVATION - PROTECTED SIDE SCALE: 3" = 1'-0" B TYP. A TYP. SEAL RETAINING BAR 2 X 5/16, C.R.S. W BOTTOM SEAL SKIN PL L 5 X 5 X 1/2 (@ FREE END ONLY) 1/2"Ø X 2 1/4" BOLTS @ 12'' O.C., C.R.S. 1/2"Ø BOLTS W/WASHERS @ 12" O.C., C.R.S. FLOOD SIDE PROTECTED SIDE 1" BACK OF VERTICAL SEAL L 5 X 5 X 1/2 BAR 1 3/8 X 1 3/8 CONT. A TYP. TYP. SCALE: 3"= 1'-0" SECTION 1.7500 1.5000 3.25003.2500 5.0000 7 1 3 / 1 6 " - A L L G A T E S 3. 1 2 5 0 PROTECTED SIDEFLOOD SIDE SLOTTED HOLES L 5 X 5 X 1/2 9/16" X 1 1/2'' 12'' O.C., C.R.S. 1/2''Ø BOLTS W/WASHERS, SKIN PL NOTE: SEAL SET FOR 1/4'' DEFLECTION. BOTTOM 1/2''Ø X 2 1/4" BOLTS, @ 12'' O.C., C.R.S. 1/8 0.5625 R=5/16" 2 X 5/16, C.R.S., SEAL RETAINING BAR SEE DETAIL ON S-XX 1"Ø 1 3/4"Ø SEAL B TYP. TYP. SCALE: 6"= 1'-0" SECTION 1/8 1/4 PL 1/2 X 2 X 0'-5'' 9/16''Ø HOLE 9/16'' X 1 1/2'' SLOTTED HOLE 1" 3 1/8" 2"4" 1 1/2" 3 1/4" L 5 X 5 X 1/2 L 5 X 5 X 1/2 PLAN ELEVATION (PROTECTED SIDE) END OF L 5 X 5 X 1/2 SCALE: 3" = 1'-0" NOTES: 1. FOR GENERAL NOTES, SEE G-001. 2. ALL SPLICES WILL BE FACTORY MADE IN HEAVY STEEL PRESS RUBBER. TO ASSEMBLY. TYPE MOLDS UNDER PRESSURE AND HEAT. 4. SEAL CLAMP ANGLES SHALL BE PAINTED ON ALL SIDES PRIOR 5. AFTER ASSEMBLY AND SEAL ADJUSTMENTS ARE MADE, ALL 50% OF THE MINIMUM TENSILE STRENGTH REQUIRED OF THE 3. ALL SPLICE JOINTS MUST DEVELOP STRENGTH OF AT LEAST A SILICONE RUBBER SEALANT TO PROVIDE WATERTIGHT JOINTS. GAPS IN SEALS AND SEAL SUPPORTS SHALL BE SEALED WITH 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES SWING GATE SEAL DETAIL (2 OF 2) -------- --/--/----/--/----/--/-- --/--/-- SEE DWG. S0 100068207-S-521 0 FOR INFORMATION 00 PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 6 inch = 1 ft. ( IN INCHES ) 0 1 2 4 3 inch = 1 ft. ( IN INCHES ) 0 3 6 12 SLOPE PAVEMENT ELEVATION- SOUTH SIDE SCALE: 1/4" = 1'-0" SEE TYPICAL CONCRETE KEY DETAIL 12" EXPANSION JOINT BOTTOM OF T-WALL EL. 115.95 TOP OF FOOTING EL. 119.95 PZ-22 SHEET PILE WALL TIP EL. 101.00 BOTTOM OF T-WALL EL. 115.95 TOP OF FOOTING EL. 119.95 BOTTOM OF T-WALL EL. 117.45 TOP OF FOOTING EL. 121.45 PZ-22 SHEET PILE WALL TIP EL. 102.50 BOTTOM OF I-WALL EL. 122.45 SHEET PILE CUT-OFF EL. 126.00 TOP OF EMBANKMENT EL. 134.00 SEE TYPICAL CONCRETE KEY DETAIL PZ-22 SHEET PILE WALL TIP EL. 102.50 12" EXPANSION JOINT 12" EXPANSION JOINT 20'-0" I-WALL 1 20'-0" MONOLITH 1 M1 20'-0" MONOLITH 2 M2 32'-3" MONOLITH 3 M3 TOP OF I-WALL EL. 134.20 TOP OF I-WALL EL. 134.20 TOP OF I-WALL EL. 134.20 TOP OF I-WALL EL. 134.20 SEE CIVIL 1 10'-0" CONCRETE SLOPE PAVEMENT EARTHEN EMBANKMENT SPACING 2' O.C., 1" FROM EDGE1' - 6 " 9" 6'' 6' ' 1 4"18" R EXPANSION TUBE ELASTOMERIC SEALER 12" SMOOTH DOWEL#6 BAR SURFACE OF PAVEMENT GREASE THIS END OF THE DOWEL PREMOLDED JOINT FILLER 2" CHAMFER 18" EMBANKMENT NATURAL GRADE LEVE E S L O P E 1V ON 3 H O R 4 H TYPICAL CONCRETE KEYS FOR SCOUR PROTECTION DETAIL SCALE: N.T.S. EXPANSION JOINT DETAIL SCALE: N.T.S. 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 1/4 inch = 1 ft. ( IN FEET ) 0 2 4 8 12 WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES SCOUR PROTECTION DETAIL (1 OF 2) -------- --/--/----/--/----/--/-- --/--/-- 1/4"= 1' S0 100068207-S-522 0 FOR INFORMATION 00 SLOPE PAVEMENT ELEVATION- NORTH SIDE SCALE: 3/16" = 1'-0" 29'-3" MONOLITH 8 M8 20'-0" MONOLITH 9 M9 20'-0" MONOLITH 10 M10 38'-0" CONCRETE SLOPE PAVEMENT25'-0" I-WALL 2 EARTHEN EMBANKMENT SEE CIVIL 1 TOP OF T-WALL EL. 134.20 TOP OF T-WALL EL. 134.20 TOP OF T-WALL EL. 134.20 TOP OF T-WALL EL. 134.20 TOP OF PAVEMENT EL. 134.00 TOP OF EMBANKMENT EL. 134.00 SEE TYPICAL CONCRETE KEY DETAIL SHEET PILE CUT-OFF EL. 126.00 PZ-22 SHEET PILE WALL TIP EL. 105.75 EXIST. GRADE 12" EXPANSION JOINT12" EXPANSION JOINT 12" EXPANSION JOINTSEE TYPICAL CONCRETE KEY DETAIL BOTTOM OF T-WALL EL. 115.95 PZ-22 SHEET PILE WALL TIP EL. 101.00 BOTTOM OF T-WALL EL. 115.95 PZ-22 SHEET PILE WALL TIP EL. 105.75 BOTTOM OF T-WALL EL. 120.70 BOTTOM OF I-WALL EL. 122.45TOP OF FOOTING EL. 119.95 TOP OF FOOTING EL. 119.95 TOP OF FOOTING EL. 124.70 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 3/16 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES SCOUR PROTECTION DETAIL (2 OF 2) -------- --/--/----/--/----/--/-- --/--/-- 3/16"= 1' S0 100068207-S-523 0 FOR INFORMATION 00 4 3 4'' 7 8'' 1 1 4''9 32'' R 9 32'' R 12'' R 3' ' 7 8 '' 1'' 1 7 32''3 4'' 9 16 '' BUCKHORN RUBBER PRODUCTS, INC.MOLD NO. 6404,SPECIFICATION: NATURAL-177OR EQUAL 5 16 '' FACE PLATE 12'' 13 4'' 13 4'' 12'' 12'' 1 4'' G A P 1 1 FLOOD SIDE 1' ' 6' ' 4' ' 1' ' E X I S T I N G P I P E HALF OF PIPE O.D. 1'' 12'' NEOPRENE 13 4'' 512'' FLOOD SIDE ELEVATION FLOOD SIDE 9 16'' Ø HOLE, 12'' O.C. FOR 12'' Ø BOLTS 9 16'' Ø HOLES, FOR 12'' Ø BOLTS DE T A I L S Y M . A B O U T C / L P I P E FLOOD SIDE PROTECTED SIDE 6" FACE OF SHEETPILE MIN. NOTES: 1. THIS DETAIL IS BASED ON THE NEW WALL FACEBEING PERPENDICULAR TO THE PIPE. 2. ALL FLANGE MATERIAL ATTACHED TO THESHEETPILE SHALL BE STEEL. 3. ALL MATERIAL FOR FRONTING PROTECTIONSHALL BE ALUMINUM, UNLESS OTHERWISE NOTED. 4. ALL STRUCTURAL ALUMINUM PLATES SHALL BEASTM B 209, TYPE 6061-T6. 5. ALL CORROSION-RESISTANT STEEL (C.R.S.)SHALL BE TYPE 316. 6. WELDS SHOWN ARE TYPICAL FOR SIMILAR JOINTSAND ALL WELDS ON WALL SIDE OF FACE PLATESHALL BE FLUSH WITH BASE METAL. 7. AFTER THE TWO FRAMES ARE LOOSELY CLAMPEDON THE PIPE, THE TOTAL ASSEMBLY SHALL BEPUSHED AGAINST THE WALL, SETTING THE SEALS,THEN TIGHTEN CLAMP PLATES TO CLOSE THE 1 4" GAP. 8. UPON COMPLETION OF THE ASSEMBLY, APPLY A ANAEROBIC ADHESIVE (LOCTITE THREADLOCKER 290 OR EQUAL) TO ALL NUT AND BOLT JUNCTURES 9. INCLUDE THE COST OF THE WORK ON THIS SHEET IN THE LUMP SUMP PRICE FOR "DRAINAGE CANAL CROSSINGS AND END TREAMENT" NOTE: SET SEAL FOR A MINIMUM OF A 14" INITIAL DEFLECTION NOTE: SET SEAL FOR A MINIMUM OF A 14" INITIAL DEFLECTION 6" 6" 12" 3" 3" 3"3" 5"5" (TYP) 12'' 1" 5" PIPE O.D. 18'' 1 4'' G A P PI P E O . D . 31 2'' (T Y P ) 51 2'' (M A X . S P A C I N G ) (T Y P ) 12''512'' (MAX. SPACING)(TYP) 6 12"6"6 12"6"9"9" (TYP) (TYP) (TYP)(TYP) (TYP) (TYP) 3 16 C UTILITY PIPE 12" STIFFENER PL. SEAL SETTING BAR 1x1 (C.R.S) 1 4" BACKING PL. (C.R.S) "L" TYPE WATERSTOP SEAL RETAINING BAR (C.R.S.) 12"Øx23 4" BOLTS W/ WASHERS AND LOCK WASHERS, C.R.S. (TYP) 12" Ø 2 12" BOLTS W/LOCK WASHERS AND TWO WASHERS, C.R.S.. AFTER BOLTS ARE TIGHTENED, SCAR THREADS OR UPSET BOLT TO PREVENT VANDALISM. (TYP) 12" PIPE SLEEVE 12" FACE PL. FLANGE PL.12"x4 3/16 1/4 C.R.S. PL. CLAMP PL. 12" STIFFENER PL. 3/16TYP.3/16 5/16 TYP.5/16 SEAL SETTING BAR 1x1 (C.R.S.) SEAL SETTING BAR 1x1 (C.R.S.) NEOPRENE PAD 116x4x0'-18" SEAL SETTING BAR 1x1 (C.R.S.) SEAL PL. 12x312 C.R.S. BACKING PL. 1 4"x1112" 812" BACKING PLATE STIFFENERS EQUALLY SPACED RADIALLY AROUND PIPE SLEEVE 12" PIPE SLEEVE 12" STIFFENER PL. CLAMP PL. 12"x4"x0'-12" NEOPRENE PAD 116x4x0'-18" SEAL RETAINING BAR "L" TYPE WATERSTOP FRONTING PROTECTION SEALANT FILL 12" NEOPRENE CONTACT SURFACE WELDED TO SHEETPILE DETAIL OF PROTECTED SIDE FRONTING PROTECTION SAME AS FLOOD SIDE ASSEMBLY PIPE SLEEVE STEEL SHEET PILING 12" NEOPRENE 12" FACE PL. 5 16" R ALL PLATE 12" UNLESS OTHERWISE NOTED SEE SHEET C-201FOR LOCATION OFTHESE PENETRATIONS 18'' L 5/16 TYP.5/16 I-WALL PIPE PENETRATION DETAIL SCALE: N.T.S. "L" TYPE WATERSTOP SCALE: 6" = 1'-0" SEAL RETAINING BAR SCALE: 6" = 1'-0" SECTION THRU SHEETPILE WALL SCALE: N.T.S. A TYP. TYP. SCALE: 3"= 1'-0" SECTION B TYP. TYP. SCALE: 3"= 1'-0" SECTION A TYP. B TYP. 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. 3 inch = 1 ft. ( IN INCHES ) WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES DRAINAGE AND UTILITY DETAILS -------- --/--/----/--/----/--/-- --/--/-- SEE DWG. S0 100068207-S-524 0 FOR INFORMATION 00 0 3 6 12 6 inch = 1 ft. ( IN INCHES ) 0 1 2 4 10"10" 4"4" C/L 7 8" Ø x 6" WELDED ANCHORS C/L RAIL 4" 4" 1' - 3 " 1' - 3 " 2' - 6 " S I L L C/L 7 8"Ø x6" WELDED ANCHORS RETAINER PLATE 3 8" 1" Ø INSPECTION HOLE 3 4" IN BENT PLATE RETAINER PLATE 3 8" RUBBER RAILROAD FILLER BLOCKS NOT SHOWN FOR CLARITY FIELD SIDE GAGE SIDE PROTECTED SIDE FLOOD SIDE PLAN SCALE: 1" = 1'-0" C TYP. B TYP. A TYP. 812" 21 2" C/L 1"Ø HOLES FOR 3 4" Ø BOLTS 10"10" 6"6" 3"3 8" C/L RAIL FIELD SIDE GAGE SIDE 2" RUBBER GUARDRAIL FILLER BLOCKS (TO BE PROVIDED BY THE CONTRACTOR) TOP OF SILL AND RAIL GAGE SIDE BLOCKS WERE CUT TO ALLOW PASSAGE OF RAIL WHEELS SO THAT BLOCKS COULD BE BOLTED IN PLACE PERMANENTLY. CUT STRIPS RETAINED IN GATE FOR CLOSURE. 3 4" FABRICATED PLATE TOP OF BASE SLAB A TYP. TYP. SCALE: 1"= 1'-0" SECTION PROTECTED SIDEFLOOD SIDE 2'-6" SILL L3x3 TYP. 3 8" RETAINER PLATE 5"x5"x3 4" TYP. (GALV.) 3 8" RETAINER PLATE TOP OF RAIL BALLAST PRECAST CONCRETE SILL TOP OF BASE SLAB C TYP. TYP. SCALE: 1"= 1'-0" SECTION- RAIL ASSEMBLY 3' - 0 " 81 2" 1' - 6 12" 212" 10"10" 6"6" C/L RAIL FIELD SIDE GAGE SIDE TOP OF SILL AND RAIL RETAINER PLATE 3 8" SEE DETAIL, THIS SHEET TOP OF FOOTING B TYP. TYP. SCALE: 1"= 1'-0" SECTION 4" (TYP) 1'-8" 3 4" 6"7 8"Ø X 6" WELDED ANCHORS (TYP.) 1 TYP. TYP. SCALE: 1 1/2"= 1'-0" DETAIL 1' - 6 12" 73 4" 73 4" 3" 1" 11 2" 13 8" 11 4" 25 8" 1" 112" C/L RAIL 618" 13 8" 11 4" 25 8" 73 8"21 2"418" 6"6" 53 4"618" 33 4"33 4" 3"10"3"3"10"3" 1'-4"1'-4"C/L 7 8"Ø HOLES FOR 3 4"Ø EXP. ANCHORS (GALV) C/L 7 8"Ø HOLES FOR 3 4"Ø BOLTS, C.R.S. 21 2" RETAINER PLATE DETAIL SCALE: 1 1/2" = 1'-0" 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES RAIL AND COMPONENT PART DETAIL (1 OF 2) -------- --/--/----/--/----/--/-- --/--/-- SEE DWG. S0 100068207-S-526 0 FOR INFORMATION 00 1 1/2 inch = 1 ft. ( IN FEET ) 0 1/2 1 2 3 0 1/4 1/2 1 2 1 inch = 1 ft. ( IN FEET ) PROTECTED SIDEFLOOD SIDE 2'-6" SILL L3x3 TYP.TOP OF L3x3 & RAIL L8x6x12 x 2'-8" W/ 1 2 x 10 x 3'-4", TIRE ASSEMBLY SHALL HOT-DIP GALVANIZED FABRICATION EACH ANGLE LEG BALLAST PRECAST CONCRETE SILL 212"5"212" C/L 7 8" DIA. X 6" SQ. HEAD SCREW SPIKES TOP OF BASE SLAB A TYP. TYP. SCALE: 1"= 1'-0" SECTION CROSS TIE 1'-4"1'-4"4"4" 2"3'-0"2" 3'-4" C/L TRACKC/L RAIL C/L RAIL CROSS TIE 2' - 6 " S I L L DEFLECTOR ANGLE AND PLATE PROTECTED SIDE FLOOD SIDE PLAN - DEFLECTOR ANGLE AND PLATE DETAIL SCALE: 3/4" = 1'-0" *DEFLECTOR ANGLE AND PLATE TO BE PLACED ON FIRST TIE EACH SIDE OF SILL. A TYP. 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES RAIL AND COMPONENT PART DETAIL (2 OF 2) -------- --/--/----/--/----/--/-- --/--/-- SEE DWG. S0 100068207-S-527 0 FOR INFORMATION 00 3/4 inch = 1 ft. ( IN FEET ) 0 1/2 1 2 3 1 inch = 1 ft. ( IN FEET ) 0 1/2 1 2 4 SP I R A L , W I R E S I Z E W 4 12 ' - 0 " 1' - 3 " DR I V I N G H E A D 14" X 14" PRESTRESSED PRECAST CONCRETE PILE NTS 14 " 14" 4 1/2" (TYP) 2 1/2" (TYP) SPIRAL 3/4" CHAMFER (TYP) 6, 1/2" Ø, 7 WIRE, LOW RELAXATION STRAND, GR270 4, #8 HOOK ON REINFORCING FOR ALL PILES. STANDARD 180° TO ALLOW FOR PROPER PLACEMENT OF CONCRETE, HOOKS SHOULD BE PLACED SO THAT BEND OF HOOK IS APPROXIMATELY PARALLEL TO ADJACENT FACE OF PILE AS SHOWN PL (P A Y M E N T L E N G T H ) 2" C L 1" 5 T U R N S A T 1 " = 5 " 16 T U R N S A T 3 " = 4 ' - 0 " 6" P I T C H 16 T U R N S A T 3 " = 4 ' - 0 " 5 T U R N S A T 1 " = 5 " 1" 3/ 4 " C H A M F E R 8, 1 / 2 " Ø , 7 W I R E , L O W RE L A X A T I O N S T R A N D S , G R 2 7 0 4, # 8 DRIVING HEAD CONCRETE, STRANDS AND SPIRAL TIES TO BE REMOVED AFTER DRIVING TO EXPOSE HOOKS (NO PAYMENT) NOTE: GRIND PRESTRESSED STRANDS FLUSH WITH PILE HEAD AND PILE TIP. 0.21 L 0.58 L 0.21 L L 2 POINT PICKUP (L ≤ 83') 14" X 14" PILE NOTE: PICKUP POINTS TO BE PLAINLY MARKED ON PILES 14" SQ. PPC PILE TYP. HOOKED BARS FROM PILE TYP. 4" T Y P . TENSION CONNECTOR DETAIL NTS 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES TYPICAL PILE DETAIL -------- --/--/----/--/----/--/-- --/--/-- NTS S0 100068207-S-528 0 FOR INFORMATION 00 TRACK WINDOWS WILL BE REQUIRED FOR ALL PHASES OF WORK WHERE TRACK(S) WILL BE BLOCKED OR OUT OF SERVICE, TRACK WINDOWS TO BE COORDINATED WITH CSX. PHASE 1 CONSTRUCTION SEQUENCING: 1. CONTRACTOR COORDINATES FINAL CONSTRUCTION SEQUENCE WITH THE RAILROAD COMPANY AND EXECUTES A TEMPORARY CONSTRUCTION CROSSING AGREEMENT WITH CSX RAILROAD. 2. THE CONTRACTOR SHALL COORDINATE WITH THE RAILROAD COMPANY TO SCHEDULE TRACK WINDOWS TO INSTALL SECTIONS OF SHORING SHEET PILING. THE RAILROAD COMPANY WILL REMOVE 34-FOOT SECTIONS OF RAIL FROM EACH TRACK. CONTRACTOR TO INSTALL SECTIONS OF SHORING (TRS) SHEET PILING. FINAL ELEVATION OF SHORING SHEET PILING SHALL BE AS SHOWN IN THE PLANS. SHORING SHEET PILING SHALL REMAIN IN-PLACE AT THE COMPLETION OF THE PROJECT AND WILL BE CUT-OFF A MINIMUM OF 2-FT BELOW THE TOP-OF-TIE. 25 ' - 0 " ±67'-0" 25'-0" PROTECTED SIDEFLOOD SIDE EXIST. GROUND EL. +121.6' (SHORING) TRS PZ-27 SHEET PILE 8"X10"X8'-6" CROSS TIE 3' - 0 " 3' - 0 " A TYP. TOP OF RAIL (CSX RAILROAD) C/L ABUTMENTS (14" DIA. PIPE PILES) C/L ABUTMENTS (14" DIA. PIPE PILES) 34 ' - 1 " W/L 1 TYP. TYP. SCALE: 1/4" = 1'-0" PHASE 1 PLAN VIEW A TYP. TYP. SCALE: 1/4" = 1'-0" SECTION 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES RAILROAD TRS (1 OF 6) -------- --/--/----/--/----/--/-- --/--/-- 1/4"=1'-0" S0 100068207-CS-100 0 FOR INFORMATION 00 1/4 inch = 1 ft. ( IN FEET ) 0 2 4 8 12 EXIST. GROUND TOP OF CUT-OFF SHEETPILE DRIVEN TO EL. +X.XX BACKFILL W/ COMPACTED FILL PHASE 2 CONSTRUCTION SEQUENCING: 1. CONTRACTOR AND RAILROAD COMPANY WILL COORDINATE AND SCHEDULE STOPPAGE OF TRAIN OPERATIONS (TRACK WINDOW) ON ALL TRACKS TO INSTALL PERMANENT CUT OFF SHEET PILING. 2. RAILROAD COMPANY WILL REMOVE 34-FT TRACK SECTIONS & TWO TIMBER CROSSTIES FROM EACH TRACK. CONTRACTOR TO DRIVE CUT-OFF SHEET PILING AFTER RAILS AND CROSS TIES ARE REMOVED. 3. CONTRACTOR TO INSTALL PERMANENT CUT-OFF SHEET PILING BEGINNING AT OWNER'S NORTH PROPERTY LINE AND PROGRESSING SOUTHWARD TO A POINT TEN FEET NORTH OF TRACK. PHASE 3 CONSTRUCTION SEQUENCING: 1. CONTRACTOR DRIVES PERMANENT CUT-OFF SHEET PILING FROM A POINT TEN FEET NORTH OF THE TRACK TO INTERSECT WITH THE PZ-27 SHEET PILING, CUT-OFF SHEET PILING SHALL BE "CHASED DOWN" BELOW THE ELEVATION OF THE BOTTOM CHORD OF THE PROPOSED JUMP SPAN BRIDGE. PHASE 4 CONSTRUCTION SEQUENCING: 1. RAILROAD COMPANY WILL REINSTALL TWO TIMBER CROSS TIES AND TWO 34-FOOT SECTIONS OF RAIL ON EACH TRACK, USING STAGGERED JOINTS AND NO WELDS. ±67'-0" ±67'-0" ±67'-0" 10'-0" MIN. C/L CUT-OFF SHEETING A TYP. C/L CUT-OFF SHEETING C/L CUT-OFF SHEETING 25 ' - 0 " 34 ' - 1 " 20 ' - 7 " 13 ' - 6 " 1 TYP. TYP. SCALE: 1/8" = 1'-0" PHASE 2 PLAN VIEW A TYP. TYP. SCALE: 1/8" = 1'-0" SECTION 2 TYP. TYP. SCALE: 1/8" = 1'-0" PHASE 3 PLAN VIEW 3 TYP. TYP. SCALE: 1/8" = 1'-0" PHASE 4 PLAN VIEW 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES RAILROAD TRS (2 OF 6) -------- --/--/----/--/----/--/-- --/--/-- 1/8"=1'-0" S0 100068207-CS-101 0 FOR INFORMATION 00 1/8 inch = 1 ft. ( IN FEET ) 0 4 8 16 24 PHASE 5 CONSTRUCTION SEQUENCING: 1. CONTRACTOR AND RAILROAD COMPANY WILL COORDINATE AND SCHEDULE TRACK WINDOWS FOR PILING INSTALLATION (14" DIA. PIPE, AND CONCRETE PILES). THE RAILROAD COMPANY WILL REMOVE TIMBER CROSSTIES AT EACH PILE INSTALLATION LOCATION AS SHOWN IN THE PLANS. PIPE PILES SHALL BE "CHASED-DOWN" (DRIVEN WITH FOLLOWERS) TWELVE INCHES BELOW TOP-OF-TIE (TOP OF RAILROAD TIMBER CROSSTIE). CONCRETE PILES SHALL BE DRIVEN TO FINAL GRADE. 25 ' - 0 " ±67'-0" 25'-0" PROTECTED SIDEFLOOD SIDE EXIST. GROUND W/L 14" DIA. PIPE PILE PZ-27 SHEET PILE (SHORING) TRS PZ-27 SHEET PILE 8"X10"X8'-6" CROSS TIE 8"X10"X8"-6" CROSS TIES TO BE REMOVED TO DRIVE 14" DIA. PIPE PILES AND STEEL H-PILES EL. +121.6' C/L CUT-OFF SHEETING TOP OF RAIL (CSX RAILROAD) A TYP. 19 ' - 0 " 1 TYP. TYP. SCALE: 1/4" = 1'-0" PHASE 5 PLAN VIEW A TYP. TYP. SCALE: 1/4" = 1'-0" SECTION 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES RAILROAD TRS (3 OF 6) -------- --/--/----/--/----/--/-- --/--/-- 1/4"=1'-0" S0 100068207-CS-102 0 FOR INFORMATION 00 1/4 inch = 1 ft. ( IN FEET ) 0 2 4 8 12 25'-0" PROTECTED SIDEFLOOD SIDE EXIST. GROUND 50'-0" W/L C/L OF STRUT EL. +119.35' TOP OF BASE SLAB EL. +118.35' CONTRACTOR TO CUT PIPE PILE TO REQUIRED ELEVATION EL. +121.6' WXXxXX 25'-0" PROTECTED SIDEFLOOD SIDE EXIST. GROUND 50'-0" W/L 14" DIA. PIPE PILE PZ-27 SHEET PILE (SHORING) TRS PZ-27 SHEET PILE 8"X10"X8'-6" CROSS TIE WXXxXX WXXxXXTOP OF RAIL (CSX RAILROAD) 8"X10"X8'-6" CROSS TIE TOP OF RAIL (CSX RAILROAD) DEPTH OF EXCAVATION EL. +114.35' 14" DIA. PIPE PILE PZ-27 SHEET PILE (SHORING) TRS PZ-27 SHEET PILE STRUT C/L OF STRUT EL. +119.35' TOP OF BASE SLAB EL. +118.35' EL. +121.6' DEPTH OF EXCAVATION EL. +114.35' PHASE 6 CONSTRUCTION SEQUENCING: 1. CONTRACTOR AND RAILROAD COMPANY WILL COORDINATE AND SCHEDULE ONE 12-HR TRACK WINDOW TO INSTALL THE JUMP SPAN BRIDGE. 2. RAILROAD COMPANY WILL REMOVE ONE 50-FT. SECTION OF TRACK. 3. CONTRACTOR TO EXCAVATE MATERIAL, CUT-OFF PILES, INSTALL WALES & STRUTS, INSTALL PILE CAPS, AND INSTALL THE JUMP SPAN BRIDGE. 4. RAILROAD COMPANY WILL INSTALL ONE 50-FT. PRE-ASSEMBLED TRACK PANEL, AND WELD JOINTS ON EACH TRACK. NOTES: 1. HATCHED AREA DENOTES APPROXIMATE LIMITS OF EXCAVATION 25 ' - 0 " ±67'-0" A & B TYP. C/L CUT-OFF SHEETING 2 TYP. TYP. SCALE: 1/4" = 1'-0" PHASE 6 PLAN VIEW A TYP. TYP. SCALE: 3/16" = 1'-0" SECTION B TYP. TYP. SCALE: 3/16" = 1'-0" SECTION 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES RAILROAD TRS (4 OF 6) -------- --/--/----/--/----/--/-- --/--/-- SEE DWG. S0 100068207-CS-103 0 FOR INFORMATION 00 1/4 inch = 1 ft. ( IN FEET ) 0 2 4 8 12 3/16 inch = 1 ft. ( IN FEET ) 0 1 2 4 6 PHASE 7 CONSTRUCTION SEQUENCING: 1. CONTRACTOR WORKS UNDER THE JUMP SPAN BRIDGE TO EXCAVATE, CUT OFF PERMANENT SHEET PILING, AND INSTALL REINFORCED CONCRETE BASE SLAB, WALL STEM, AND PILASTERS. 25 ' - 0 " ±67'-0" 4" STAB. SLAB 25'-0" PROTECTED SIDEFLOOD SIDE EXIST. GROUND 14" DIA. PIPE PILE PZ-27 SHEET PILE PZ-27 SHEET PILE 8"X10"X8'-6" CROSS TIE CONTRACTOR TO CUT PERMANENT SHEET PILE TO FINAL ELEVATION 4" STAB. SLAB WXXxXX WXXxXX 3-FT PILASTERS 3' - 0 " TOP OF RAIL (CSX RAILROAD) C/L OF STRUT EL. +119.35' TOP OF BASE SLAB EL. +118.35' DEPTH OF EXCAVATION EL. +114.35' EL. +121.6' W/L C/L CUT-OFF SHEETING STRUT A TYP. 1 TYP. TYP. SCALE: 1/4" = 1'-0" PHASE 7 PLAN VIEW A TYP. TYP. SCALE: 1/4" = 1'-0" SECTION 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES RAILROAD TRS (5 OF 6) -------- --/--/----/--/----/--/-- --/--/-- 1/4"=1'-0" S0 100068207-CS-104 0 FOR INFORMATION 00 1/4 inch = 1 ft. ( IN FEET ) 0 2 4 8 12 PHASE 8 CONSTRUCTION SEQUENCING: 1. CONTRACTOR AND RAILROAD COMPANY WILL COORDINATE AND SCHEDULE TRACK WINDOWS TO REMOVE JUMP SPAN BRIDGE AND COMPLETE THE INSTALLATION OF THE SILL WALL. 2. RAILROAD COMPANY WILL CUT RAILS ON SECTIONS OF TRACK OVER JUMP SPAN BRIDGE. 3. CONTRACTOR REMOVES JUMP SPAN BRIDGE, INCLUDING THE CUT TRACK SECTIONS. 4. CONTRACTOR INSTALLS CAST-IN-PLACE SILL, CUT OFF SHORING AND JUMP SPAN BRIDGE PILES, AND INSTALLS SUBGRADE TO AN ELEVATION 21 INCHES BELOW TOP-OF-TIE. PHASE 9 CONSTRUCTION SEQUENCING: 1. RAILROAD COMPANY WILL PLACE TWELVE INCHES OF BALLAST ROCK, INSTALL PRE-FABRICATED TRACK PANELS ON ALL TRACKS, AND SURFACE THE TRACKS. 2. RAILROAD COMPANY WILL SCHEDULE TRACK WINDOWS TO WELD JOINTS ON TRACK PANELS ON ALL TRACKS. PHASE 10 CONSTRUCTION SEQUENCING: 1. THE CONTRACTOR AND RAILROAD COMPANY TO SCHEDULE TRACK WINDOWS TO PLACE STEEL SWING GATE DURING PLACEMENT OF THE GATE, THE CONTRACTOR SHALL MAINTAIN A MINIMUM CLEARANCE OF 15'-0" FROM THE CENTERLINE OF TRACKS. IF CLEARANCE REQUIRED IS LESS THAN 15'-0", A FLAGMAN AND RAILROAD INSPECTOR SHALL BE PRESENT. 25 ' - 0 " ±67'-0" C/L CUT-OFF SHEETING 4" STAB. SLAB 25'-0" PROTECTED SIDEFLOOD SIDE EXIST. GROUND 14" DIA. PIPE PILE PZ-XX SHEET PILE PZ-XX SHEET PILE CONTRACTOR TO CUT PERMANENT SHEET PILE TO FINAL ELEVATION 4" STAB. SLAB WXXxXX3' - 0 " C/L OF STRUT EL. +119.35' TOP OF BASE SLAB EL. +118.35' DEPTH OF EXCAVATION EL. +114.35' EL. +121.6' 8"X10"X8'-6" CROSS TIE WXXxXX 3-FT PILASTERS TOP OF RAIL (CSX RAILROAD) W/L A TYP. STRUT 1 TYP. TYP. SCALE: 1/4" = 1'-0" PHASE 10 PLAN VIEW A TYP. TYP. SCALE: 1/4" = 1'-0" SECTION 22x34 Date DesignedScale Drawing Title Project Title Drawing Status DO NOT SCALE Date Date Date Drawn Checked Authorized Client Copyright C Atkins Limited (2020) 1616 East Millbrook Road Suite 160 Raleigh, NC 27519 www.atkinsglobal.com Original Size Suitability Tel:Fax: Drawing Number +1 (919) 876-6888 +1 (919) 876-6848 Revision In c h e s 4 0 1 12 Rev. Date Description By Chk'd App'd 13608 18th Street Suite 200 Metairie, LA 70002 www.lhjunius.com Tel: Fax: +1 (504) 833-5300 +1 (504) 833-5350 LINFIELD , HUNTER & JUNIUS, INC. 5400 Trinity Road Suite 107 Raleigh, NC 27607 mcgillassociates.com +1 (919) 378-9111Tel:NC Firm License # C-0459 Seal Seal Drawing Legend PRELIMINARY NOT TO BE USED FOR BIDDING, CONSTRUCTION, RECORDATION, CONVEYANCE OR SALES PREPARED UNDER THE SUPERVISION OF DANIEL A. FLORES GUEVARA NORTH CAROLINA P.E.LIC. NO. 051021 LINFIELD, HUNTER & JUNIUS, INC. WEST LUMBERTON FLOOD G AT VFW ROAD AND RAILROAD UNDERP ENGINEERING SERVICES RAILROAD TRS (6 OF 6) -------- --/--/----/--/----/--/-- --/--/-- 1/4"=1'-0" S0 100068207-CS-105 0 FOR INFORMATION 00 1/4 inch = 1 ft. ( IN FEET ) 0 2 4 8 12 FEMA FIRMette NEPAssist FEMA FIRMs PFIRMs NFIP Community Status Book Hydrologic and Hydraulic Analysis National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or DepthZone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mileZone X Future Conditions 1% Annual Chance Flood HazardZone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood HazardZone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 11/28/2023 at 1:00 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 79°2'46"W 34°37'57"N 79°2'9"W 34°37'27"N Basemap Imagery Source: USGS National Map 2023 Laclaire R d SESE H i l t o n S t CoxRd Heste r D r W 5 t h S t Hec t o r M ac l ean Hwy H ector Ma c l ea n Hw y VF W R d H a c k e t t S t Civita n R d Laclaire R d Cr y s t a l R d He c t or M ac l ea n Hwy SE VFW R d Nation al A v e Reservoir S t B u r ke S t Co x Rd Hack ett S t Se als St Crys tal Rd W 5t h S t W 5th St He ctor M a clean H wy West Lumberton Flood Gate - FEMA FIRM NC CGIA, Maxar, Esri Community Maps Contributors, State of North Carolina DOT, © OpenStreetMap, Microsoft, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, EPA, NPS, US Census Bureau, USDA Flood Hazard Zones 1% Annual Chance Flood Hazard Regulatory Floodway Special Floodway Area of Undetermined Flood Hazard 0.2% Annual Chance Flood Hazard Future Conditions 1% Annual Chance Flood Hazard Area with Reduced Risk Due to Levee Area with Risk Due to Levee 2400 Cox Rd #938179684407 2306 W 5th St #938189201500 2460 Cox Rd #938179143700 550 VFW Rd #938189443052 VFW & Hackett #938280300700 November 29, 2023 0 0.06 0.120.03 mi 0 0.1 0.20.05 km 1:4,514 Laclaire R d SESE H i l t o n S t CoxRd Heste r D r W 5 t h S t Hect or M a c l ean H w y Hector Mac l ean Hw y VF W R d H a c k e t t S t C ivi t a n R d Laclaire R d Cr y s t a l R d He ct or M a c lea n H w y SE VFW R d No rr i s S t Nation al A v e Re s e rv oir S t B u r ke S t Co x Rd Hacke t t S t Se alsSt Cryst a l R d W 5 t h S t W 5th St He ctor M a c l e a n H wy West Lumberton Flood Gate - FEMA FIRM with Action Area NC CGIA, Maxar, Esri Community Maps Contributors, State of North Carolina DOT, © OpenStreetMap, Microsoft, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, EPA, NPS, US Census Bureau, USDA, EPA OEI Flood Hazard Zones 1% Annual Chance Flood Hazard Regulatory Floodway Special Floodway Area of Undetermined Flood Hazard 0.2% Annual Chance Flood Hazard Future Conditions 1% Annual Chance Flood Hazard Area with Reduced Risk Due to Levee Area with Risk Due to Levee WLFG Project Action Area 550 VFW Rd #938189443052 2306 W 5th St #938189201500 2400 Cox Rd #938179684407 2460 Cox Rd #938179143700 VFW & Hackett #938280300700 Railroads December 1, 2023 0 0.06 0.120.03 mi 0 0.1 0.20.05 km 1:4,514 Community Status Book Report NORTH CAROLINA Communities Participating in the National Flood Program CID Community Name County Init FIRM Identified Curr Eff Map Date Reg-Emer Date Init FHBM Identified Tribal % Disc SFHA % Disc Non SFHA CRS Entry Date Curr Class Curr Eff Date 370323#LOWELL, CITY OF GASTON COUNTY 11/04/09 03/05/9003/05/9008/15/75 No 370537#LUCAMA, TOWN OF WILSON COUNTY 04/16/13 11/03/0411/03/04 No 370203K LUMBERTON, CITY OF ROBESON COUNTY 12/06/19 11/05/8011/05/8006/28/74 No 370090K MACCLESFIELD, TOWN OF EDGECOMBE COUNTY 06/02/15 03/25/8003/18/8012/28/73 No 370150#MACON COUNTY *MACON COUNTY 04/19/10 06/01/0106/01/0106/30/78 No 370152#MADISON COUNTY *MADISON COUNTY 01/06/10 09/02/8209/02/8207/22/77 No 370207#MADISON, TOWN OF ROCKINGHAM COUNTY 01/02/09 11/16/7711/16/7711/22/74 No 370389#MAGGIE VALLEY, TOWN OF HAYWOOD COUNTY 04/03/12 04/17/8404/17/8407/08/77 No 370669#MAGNOLIA, TOWN OF DUPLIN COUNTY 02/16/07 07/23/1002/16/06 No 370056#MAIDEN, TOWNSHIP OF LINCOLN COUNTY/CATAWBA COUNTY 07/07/09 09/03/8009/03/8009/20/74 No 375355K MANTEO, TOWN OF DARE COUNTY 06/19/20 01/05/7301/12/7301/12/73 No 5 10%10/01/21 25%10/01/91 370266#MARION, CITY OF MCDOWELL COUNTY 01/06/10 05/01/8707/15/8809/10/82 No 370385#MARS HILL, TOWN OF MADISON COUNTY 01/06/10 08/19/8708/19/8707/02/76 No 370154#MARSHALL, TOWN OF MADISON COUNTY 01/06/10 05/15/7805/15/7806/14/74 No 370474#MARSHVILLE, TOWN OF UNION COUNTY 03/02/09 12/15/0907/05/94 No 370155K MARTIN COUNTY *MARTIN COUNTY 06/19/20 07/16/9107/16/9111/29/74 No 370514#MARVIN, VILLAGE OF UNION COUNTY 02/19/14 12/28/9801/17/97 No 370310#MATTHEWS, TOWN OF MECKLENBURG COUNTY 02/19/14 02/04/0402/04/04 No 370587F MAXTON, TOWN OF SCOTLAND COUNTY/ROBESON COUNTY 12/06/19 05/26/2001/19/05 No 370208#MAYODAN, TOWN OF ROCKINGHAM COUNTY 01/02/09 07/18/7707/18/77 No 370330#MAYSVILLE, TOWN OF JONES COUNTY 02/16/06 08/19/8607/02/04 No 370101#MCADENVILLE,TOWN OF GASTON COUNTY 11/04/09 06/01/8706/01/8706/21/74 No 370148#MCDOWELL COUNTY*MCDOWELL COUNTY 01/06/10 07/15/8807/15/8812/20/74 No 370390J MEBANE, CITY OF ORANGE COUNTY/ALAMANCE COUNTY 11/17/17 11/05/8011/05/80 No 370158F MECKLENBURG COUNTY *MECKLENBURG COUNTY 11/16/18 06/01/8106/01/8110/22/76 No 5 10%04/01/21 25%10/01/91 370426L MESIC, TOWN OF PAMLICO COUNTY 06/19/20 09/04/8507/02/04 No 8 05%04/01/21 10%05/01/19 370500J MICRO, TOWN OF JOHNSTON COUNTY 06/20/18 11/08/1610/20/00 No 370445#MIDDLESEX, TOWN OF NASH COUNTY 07/07/14 03/19/9901/20/82 No 370182L MIDLAND, TOWN OF CABARRUS COUNTY 11/16/18 06/01/0905/05/8112/27/74 No 370393#MIDWAY, TOWN OF DAVIDSON COUNTY 06/16/09 02/05/1903/16/09 No 370529#MINERAL SPRINGS, TOWN OF UNION COUNTY 03/02/09 05/17/0007/18/83 No 370418K MINNESOTT BEACH, TOWN OF PAMLICO COUNTY 06/19/20 09/23/8508/05/8503/02/79 No 8 05%10/01/21 10%10/01/92 370539E MINT HILL, TOWN OF MECKLENBURG COUNTY 11/16/18 12/21/0702/04/04 No 370026#MISENHEIMER, VILLAGE OF STANLY COUNTY 06/16/09 02/17/1009/03/08 No 370161#MITCHELL COUNTY *MITCHELL COUNTY 06/02/09 09/04/8609/04/8606/30/78 No 370309#MOCKSVILLE, TOWN OF DAVIE COUNTY 06/16/09 09/17/0806/27/0007/11/75 No 370657#MOMEYER, TOWN OF NASH COUNTY (NSFHA)12/29/0511/03/04 No 370236#MONROE, CITY OF UNION COUNTY 03/02/09 01/19/8301/19/8309/20/74 No 370336#MONTGOMERY COUNTY*MONTGOMERY COUNTY 06/16/09 02/20/9706/01/8110/13/78 No 370476#MONTREAT, TOWN OF BUNCOMBE COUNTY 01/06/10 09/19/0505/06/96 No 370164H MOORE COUNTY *MOORE COUNTY 11/17/17 12/15/8912/15/8910/13/78 No 370314#MOORESVILLE, TOWN OF IREDELL COUNTY 06/16/09 05/01/8005/01/8004/25/75 No 370048#MOREHEAD CITY, TOWN OF CARTERET COUNTY 11/03/05 02/16/7702/16/7702/22/74 No 6 10%05/01/20 20%10/01/92 370035#MORGANTON,CITY OF BURKE COUNTY 07/07/09 02/19/8702/19/8703/22/74 No 370242K MORRISVILLE, TOWN OF WAKE COUNTY 07/19/22 11/01/7811/01/7810/29/76 No 370226B MOUNT AIRY,CITY OF SURRY COUNTY 11/18/16 12/01/8112/01/8106/28/74 No 370102L MOUNT HOLLY, CITY OF GASTON COUNTY 09/02/15 09/28/7909/28/7901/09/74 No 370369K MOUNT OLIVE, TOWN OF DUPLIN COUNTY/WAYNE COUNTY 06/20/18 02/17/8202/17/8206/17/77 No 370470J MOUNT PLEASANT, TOWN OF CABARRUS COUNTY 11/16/18 02/24/1211/02/94 No 370419#MURFREESBORO,TOWN OF HERTFORD COUNTY 08/03/09 06/01/8706/01/8711/10/78 No 370061#MURPHY, TOWN OF CHEROKEE COUNTY 04/19/10(M)07/03/8607/03/8603/08/74 No 375356K NAGS HEAD, TOWN OF DARE COUNTY 06/19/20 11/10/7211/10/72 No 5 10%04/01/22 25%10/01/91 Page 7 of 13 09/11/2023 West Lumberton Flood Gate Closure Structure at the VFW Road and CSX Railroad Interstate 95 Underpass Hydrologic and Hydraulic Analysis City of Lumberton 9 January 2023 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page ii Document history Revision Purpose description Originated Checked Reviewed Authorized Date Rev 0.0 Floodgate Closure Structure Design KH EB DS AS 3/19/2020 Rev 1.0 Floodgate Closure Structure Design KH EB DS AS 10/19/2020 Rev 2.0 Floodgate Closure Structure Design KH EB DS AS 1/09/2023 Client signoff Client City of Lumberton Project West Lumberton Flood Gate Closure Structure at the VFW Road and CSX Railroad Interstate 95 Underpass Job number 100068207 Client signature / date Notice This document and its contents have been prepared and are intended solely as information for City of Lumberton and use in relation to the design of the flood gate closure structure at the VFW Road and CSX Railroad Interstate 95 Underpass. SNC-Lavalin assumes no responsibility for the use of the information presented in this report for purposes other than for the design of the flood gate closure structure. This document has 174 pages including the cover. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page iii Contents Chapter Page Acronyms and Abbreviations vi Executive Summary 1 1. Introduction 2 1.1. Authorization and Study Purpose 2 1.2. Assumptions and Limitations 3 2. Hydrological Setting 4 2.1. Watershed Location and Size(s) 4 2.2. Climate 4 2.3. Historical Floods 5 3. Data Collection 8 3.1. Terrain and Watershed Data 8 3.2. Precipitation Data 9 3.3. Streamflow Data 11 3.4. Soils Data 12 3.5. Land Use Data 13 3.6. Field Survey and Data Collection 14 4. Design Flood Selection 19 4.1. Review of FEMA Levee Accreditation Guidelines 19 4.2. Flood Frequency Analysis 19 4.3. Recommended Design Flood Frequency 24 5. Hydrologic Model Development 25 5.1. General Methodology 25 5.2. HEC-HMS Model Parameters 25 5.3. Sub-basin Delineation 26 5.4. Initial Parameter Estimation 28 5.5. Model Calibration to Historic Events 31 5.6. Model Validation to Historic Events 34 5.7. Design Flood Simulations 35 6. Hydraulic Model Development 39 6.1. Model Development 39 6.2. Boundary Conditions 42 6.3. Model Execution 43 6.4. Model Calibration and Verification 43 6.5. Design Flood Simulations and Results 46 7. Freeboard Estimation 51 7.1. Estimate average wind speed over an appropriate fetch 51 7.2. Estimate Wave Height and Wave Period 53 7.3. Estimate wind setup and wave runup 54 7.4. Sensitivity Analysis 55 7.5. Results 55 8. Recommendations 56 9. References 57 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page iv Appendices 59 Field Data 60 Hydrologic Analysis 61 Hydraulic Analysis 62 Wind Wave Analysis 63 Electronic Attachments 64 Tables Table 3-1. Precipitation gage availability and utilization in models. 10 Table 4-1. Calculated discharge per return period at the Lumberton gage (USGS 02134170). 20 Table 4-2. Calculated discharge per return period based on the extended Lumberton gage records (USGS 02134170). 21 Table 4-3. Calculated discharge per return period based on the extended Lumberton gage records (USGS 02134170) and altered Hurricane Matthew. 22 Table 4-4. Regional regression weighted peak flow rate estimates for Methods 2 approaches. 23 Table 5-1. HEC-HMS modeling methods and required parameters. 26 Table 5-2. Sub-basin composite curve numbers. 29 Table 5-3. Calculated sub-basin initial losses. 29 Table 5-4. Muskingum-Cunge routing parameters used for hydrologic modeling. 31 Table 5-5. Peak streamflow reported at USGS gages in Lumberton and Maxton for each study event. 31 Table 5-6. Peak flow comparison between observed and simulated calibrated events. 32 Table 5-7. Time of peak comparison between observed and simulated calibrated events. 33 Table 5-8. Volume comparison between observed (USGS 02134170 at Lumberton) and simulated calibrated events. 33 Table 5-9. Average calibrated HEC-HMS parameters. 33 Table 5-10. Peak flow comparison between observed and simulated for a verification event. 34 Table 5-11. Time of peak flow comparison between observed and simulated for a verification event. 34 Table 5-12. Volume comparison between observed and simulated for a verification event. 34 Table 5-13. Initial and optimized parameters for the HEC-METVue model. 36 Table 5-14. Average PMP depths from optimized HMR 52 storm parameters. 37 Table 5-15. Design Rainfall Depths. 38 Table 5-16. Peak flow comparison between simulated HEC-HMS, FEMA reports, and gage statistics. 38 Table 5-17. Comparison of Peakflows from SCS and Partial Duration Rainfall Distributions. 38 Table 6-1. Manning's n coefficient ranges per land cover type. 39 Table 6-2. Lumber River historical storms used for calibration and verification. 44 Table 7-1. Deep water wave characteristics. 54 Table 7-2. Summary of sensitivity analysis. 55 Table 8-1. Recommended Range of Gate Heights 56 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page v Figures Figure 1-1. Lumberton site location map. 3 Figure 2-1. Lumber River basin location within southeastern North Carolina. 4 Figure 2-2. Flooding along I-95 and inside the Lumberton Levee from Hurricane Matthew; area to right of road is the levee protected side of Lumberton (Source: City of Lumberton). 6 Figure 2-3. Flooding under I-95 at VFW Road and CSX railroad in Lumberton, NC from Hurricane Florence (Source: City of Lumberton). 7 Figure 3-1. Lumber River basin terrain. 8 Figure 3-2. CRONOS rainfall gages in and near the Lumber River basin. 10 Figure 3-3. Example of Thiessen polygons used to calculate weighted rainfall; shown is the 2004 event Thiessen polygons. 11 Figure 3-4. USGS gage (02134170 Lumber River at Lumberton, NC) within the Lumber River basin. 12 Figure 3-5. Lumber River basin soil type distribution. 13 Figure 3-6. Lumber River basin 2016 land cover type. 14 Figure 3-7. Collected field data for structures, high water marks, and survey points. 15 Figure 3-8. Location of field and USGS high water marks. 17 Figure 3-9. Example of HWM from Lumberton field visit near the VFW Road and railroad intersection by the flood gate location. 18 Figure 4-1. Discharge-Frequency curve for Lumberton gage with reported Hurricane Matthew peak flow rate. 20 Figure 4-2. Discharge-Frequency curve for Lumberton gage with adjusted Hurricane Matthew peak flow rate.21 Figure 4-3. Discharge-Frequency curve for Lumberton gage with extended record. 22 Figure 4-4. Discharge-Frequency curve for Lumberton gage (USGS 02134 170) with extended record and altered Hurricane Matthew. 23 Figure 5-1. Lumber River sub-basin delineation. 27 Figure 5-2. HEC-HMS sub-basins, reaches, and junctions. 28 Figure 5-3. Centroid, channel length (L), and channel length to centroid (Lc) of each sub-basin for Snyder hydrograph development. 30 Figure 5-4. Comparison of observed gage flow (black) and simulated flow (solid blue) for the September 2018 (Hurricane Florence) calibrated event. 32 Figure 5-5. Comparison of observed gage flow (black) and simulated flow (solid blue) for the October 2016 (Hurricane Matthew) verification event. 35 Figure 5-6. HMR 52 storm position with HEC-HMS (optimized) parameters. 37 Figure 6-1. Lumber River 2D external model domain. 40 Figure 6-2. Bridge example. 41 Figure 6-3. I-95 Meadow Branch culvert 2D connection example. 42 Figure 6-4. Boundary condition locations. 43 Figure 6-5. High water marks comparison for Hurricane Florence. 44 Figure 6-6. High water marks comparison for Hurricane Matthew. 46 Figure 6-7. Inundation boundaries without floodgate 49 Figure 6-8. WSE (ft) without flood gate compared to with flood gate and I-95 raised for 100YR storm. 50 Figure 6-9. WSE (ft) without flood gate compared to with flood gate and I-95 raised for 500YR storm. 50 Figure 7-1. Definition sketch for wave runup and wind setup (USACE, 1997). 51 Figure 7-2. Fetch line (red) superimposed on 500-year depth raster and satellite imagery. 52 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page vi Acronyms and Abbreviations 1D one-dimensional 2D two-dimensional C conversion factor cfs cubic foot per second CFR Code of Federal Regulations CN curve number Cp peaking coefficient Ct basin coefficient D average depth of water along fetch line DEMLR Division of Energy, Mineral and Land Resources (NCDEQ) ECONet North Carolina Environment and Climate Observing Network FEMA Federal Emergency Management Agency Fs maximum fetch distance Ft feet FWL ratio of winds over water to winds over land g gravity GIS Geographic Information System GPS Global Positioning System H wave height at the toe of the structure HEC-HMS Hydrologic Engineering Center’s Hydrologic Modeling System HEC-MetVue Hydrologic Engineering Center’s Meteorological Visualization Utility Engine HEC-RAS Hydrologic Engineering Center’s River Analysis System H&H hydrologic and hydraulic HMR Hydrometeorological Reports hr hour HWM high water mark Ia initial loss in inch in/hr inch per hour KFAY Fayetteville Airport CRONOS rainfall gage KMEB Laurinburg-Maxton Airport CRONOS rainfall gage KSOP Moore County Airport CRONOS rainfall gage L length of main channel Ld deep water wavelength Lc length of main channel to the centroid LiDAR Light Detection and Ranging LILE NC Electric Cooperative Anson Peaking Plant CRONOS rainfall gage mi mile MOVE Maintenance of variance estimator PMF Probable Maximum Flood PMP Probable Maximum Precipitation mph miles per hour NAVD North American Vertical Datum NC North Carolina 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page vii NC CRONOS North Carolina Climate Retrieval and Observations Network of the Southeast Database NCDOT North Carolina Department of Transportation NCDEQ North Carolina Department of Environmental Quality NCFMP North Carolina Floodplain Mapping Program NCSCO North Carolina State Climate Office NLCD National Land Cover Database NLUM Lumberton CRONOS rainfall gage NOAA National Oceanic and Atmospheric Administration NRCK Rockingham CRONOS rainfall gage NRCS Natural Resources Conservation Service NUWH Uwharrie-Troy CRONOS rainfall gage NWS National Weather Service R wave runup s seconds SCS Soil Conservation Service Se set-up sq mi square mile SSURGO Soil Survey Geographic Database t time Td deep water wave period Tp hydrograph lag U average wind velocity U1hr one hour averaged wind speed U33 wind speed at height of 33 feet USACE United States Army Corps of Engineers USDA United States Department of Agriculture USGS United States Geological Survey Ut fastest wind speed at a specified duration Uw overwater wind speed Uz wind speed at a distance of z above surface WHIT Border Belt Tobacco Res Station CRONOS rainfall gage WSE water surface elevation yr year z elevation 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 1 Executive Summary The western part of the City of Lumberton is protected from flooding from the Lumber River by a levee system that consists of three segments: the levee that was designed and constructed by the Natural Resources Conservation Service (NRCS) (formerly the Soil Conservation Service), a portion of I-95 highway embankment, and a portion of Alamac Road. An opening exists within the I-95 highway embankment portion of the levee system to allow a CSX rail corridor and VFW Road to traverse under the highway. During extreme storms, the Lumber River overflows its banks and floods the western part of the city through this opening. Flow also overtops low segments of the I-95 portion of the levee protection system. Floodwaters from recent extreme weather events, like Hurricane Matthew (2016) and Hurricane Florence (2018) flooded the city through the opening in the I-95 embankment, causing major damages to residences and businesses. The City of Lumberton plans to improve its flood resiliency by installing a flood gate closure structure along the opening within the I-95 highway embankment to prevent future flooding. The North Carolina Department of Transportation (NCDOT) also plans to widen and raise the I-95 portion of the flood protection system to increase capacity and to prevent the I-95 highway embankment from overtopping. This report documents the detailed hydrologic and hydraulic (H&H) study of the Lumber River that was performed to establish the height of the proposed flood gate closure structure. It is the desire of the City of Lumberton to be protected from flooding events with magnitudes like that of the flood of record (Hurricane Florence) and to pursue FEMA accreditation of the levee protection system. For the levee system to be accredited, its minimum top elevation must be equal to the 100-year elevation plus 4.5 feet of freeboard (128.5 feet, North American Vertical Datum [NAVD]88). The North Carolina Department of Environmental Quality’s Division of Energy, Mineral and Land Resources (DEMLR) determined in October 2021 that the proposed floodgate is subject to the jurisdiction of the Dam Safety Law of 1967 and will have a Class C high hazard and large size classification. This classification implies that the proposed floodgate should be designed to withstand the ¾ Probable Maximum Flood (PMF). In determining the design elevation of the gate, a statistical analysis was performed and the recurrence interval of the flood of record was estimated to be about 200-years. Hydraulic simulations were performed without the gate and with the gate and the proposed I-95 configuration in place, to estimate the resulting peak elevations of the 100-year through the Probable Maximum Flood (PMF) return period events, and the flood of record. Based on the results of the analysis, the recommended range of top of gate elevations and gate heights that meets the objectives of the City of Lumberton and regulatory requirements are shown in tabular form below: Design Storm Recommended Top of Gate Elevation and Gate Height Max. Stillwater Elevation (feet, NAVD88) Freeboard (feet) Top of Gate Elevation (feet, NAVD88) Gate Height (feet) 100 YR 124.0 5.4 129.4 9.4 ¼ PMF 126.0 6.6 132.6 12.6 500 YR 127.6 6.6 134.2 14.2 Reference Elevations: 1. Minimum elevation for levee accreditation = 128.5 feet (ft), NAVD88 2. Flood of record elevation at gate location assuming gate is in place and I-95 raised = 125.6 ft, NAVD88 3. Elevation of ¾ PMF at gate location assuming gate is in place and I-95 raised = 128.8 ft, NAVD88 4. Elevation of PMF at gate location assuming gate is in place and I-95 raised = 129.2 ft, NAVD88 5. Average ground elevation at gate location is 120.0 ft 6. ¼ PMF is the largest storm that does not overtop the levee and proposed I-95 7. Levee is overtopped during the 500-year storm. The recommended range of top of flood gate elevations of 129.4 to 134.2 feet, NAVD88 ensures that the gate is not overtopped up to the PMF if freeboard is not accounted and meets all the regulatory requirements. The ¼ PMF is the largest event that does not overtop the levees. Minor overtopping of the levee occurs during the 500-year event. Selection of the design gate height from this range should be based on cost, floodplain impacts, and minimum desired level of service. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 2 1. Introduction 1.1. Authorization and Study Purpose Atkins was authorized to conduct this study through its contract with City of Lumberton dated October 18, 2019. The contract is to provide engineering services for the design of a flood gate closure structure at the VFW Road and CSX Railroad Interstate 95 (I-95) Underpass in the City of Lumberton. The City of Lumberton is susceptible to flooding from the Lumber River. A levee system provides flood prevention to the City of Lumberton. The levee system consists of three segments: the levee that was designed and constructed by the Natural Resources Conservation Service (NRCS) (formerly the Soil Conservation Service), a portion of I-95 highway embankment, and a portion of Alamac Road (Figure 1-1). The levee begins at the tie in with I-95, approximately 1,100 feet north-east of VFW Road and extends south-east to the tie-in with Alamac Road, running parallel to the Lumber River. An opening exists within the I-95 highway embankment to allow a CSX rail corridor and VFW Road to traverse under the highway. During extreme storms, the Lumber River overflows its banks and through the opening in I-95 flooding portions of the City of Lumberton. Floodwaters from recent extreme weather events, like Hurricane Matthew (2016) and Hurricane Florence (2018) flooded the city through the opening in the I-95 embankment, causing major damages to residences and businesses. During Hurricane Matthew, no attempts were made to close the opening, resulting in significant flows into the protected area. In preparation for Hurricane Florence, sandbags and temporary barriers were placed across the opening. Although these measures provided temporary protection they eventually failed. And, therefore, the City of Lumberton wants to install permanent protection such as flood gates within the opening under I-95. The gate would have to be closed over the CSX railroad corridor and local road to protect the southern part of the city from flooding.. The purpose of this project is to design and install the flood gate at this most vulnerable location to improve the flood resilience of the City of Lumberton. To establish the height of the flood gate closure structure, a detailed hydrologic and hydraulic (H&H) study of the Lumber River is required. The H&H study includes a hydrologic analysis of the Lumber River from the headwaters located near Eagle Springs, North Carolina (NC) to the confluence of the Lumber River and Jacob Swamp located about 4 miles downstream of Lumberton. A hydraulic model was developed along the Lumber River and of its tributaries near the city of Lumberton to establish flood elevations for use in the flood gate closure design. It is worth noting that there is a second opening in the levee protection system along Alamac Road. This opening is a bridge that allows Jacob Swamp to connect with the Lumber River. Although flow in the Lumber River backs up through this opening under extreme flooding conditions, it does not result in extensive flooding compared to flow through the I-95 opening. The opening within Alamac road is not a focus of this study. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 3 Figure 1-1. Lumberton site location map. 1.2. Assumptions and Limitations The assumptions and limitations of the analysis and report are as follows: a. The analysis and results presented in this report are for the sole purpose of designing the flood gate. b. Top elevations of the Lumberton levee system including the existing I-95 highway are based on terrain data described in Section 3.1. The top of levee elevations from the terrain match elevations from a survey performed by others as described in this report. Atkins does not guarantee the accuracy of this data. c. The geometry of the proposed I-95 embankment and hydraulic structures that traverse the highway embankment are based on 25-percent design plans from NCDOT and is subject to change. Atkins does not guarantee the accuracy of this data. d. Atkins relied on hydraulic structure data included in the effective Federal Emergency Management Agency (FEMA) models. Atkins spot checked the information gathered on these structures by comparing them to field observations but does not guarantee the accuracy of all the data. e. Atkins relied on the high-water mark, streamflow, and stage data collected by the United States Geological Survey (USGS) for model calibration. Atkins does not guarantee the accuracy of this data. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 4 2. Hydrological Setting 2.1. Watershed Location and Size(s) The Lumber River basin is in southeastern North Carolina, approximately 30 miles (mi) south of Fayetteville, NC, and has a total drainage area of 748 mi2 at the confluence of the Lumber River and Jacob Swamp (Figure 2-1). The drainage area to the USGS gage along Lumber River in Lumberton is 708 mi2. The location of the USGS gage is approximately 1.7 miles downstream from the proposed flood gate closure location. The Lumber River basin at the gage location is entirely within the state of North Carolina and encompasses portions of six different counties: Robeson, Hoke, Scotland, Moore, Richmond, and Montgomery. Figure 2-1. Lumber River basin location within southeastern North Carolina. 2.2. Climate The National Oceanic and Atmospheric Administration (NOAA) provides precipitation and temperature data for the entire United States. The state of North Carolina is divided into eight climate regions (NOAA, 2020). The Lumber River basin is in two of the regions: Southern Piedmont for the northern quarter and Southern Coastal Plains for much of the basin. The mean annual temperature for these regions is 59.7°F and 61.5°F, respectively. This is above the national average of 52.02°F. The mean annual precipitations for the NOAA- defined NC climate regions of Southern Piedmont and Southern Coastal Plain are 46.59-in and 49.23-in, respectively, which are well above the national average of 29.94-in (NOAA, 2020). 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 5 Due to its proximity to the Atlantic seaboard, eastern NC is highly susceptible to coastal events including tropical events that mainly occur during the official hurricane season (June 1st to November 30th) as well as extratropical events such as nor’easters and storms that trail along stalled frontal boundaries. Hist orical data shows that the North Carolina coast is most likely to have a hurricane in September and October based on the prevailing wind patterns (NOAA, 2019a). In 2015, 2016, and 2018, annual precipitation depths were about 14 - in, 11-in, and 22-in, respectively, above the annual North Carolina mean (1901-2019) (NOAA, 2020), primarily due to tropical storms and hurricanes. 2.3. Historical Floods 2.3.1. Storms Prior to 2000 Records of major flooding caused by tropical storms dates to the 1600s. However, no flow measurements were available until after the installation of the USGS Gage 02134170 (on Lumber River at Lumberton, NC) circa the year 2000. Notable storms that occurred prior to 2000 include: o The flood of October 1954 was the result of Hurricane Hazel which made landfall on October 14, 1954, as a category 4 storm near Calabash, NC, approximately 70 miles southeast from Lumberton, NC. Total rainfall was reported to be over 7 inches in parts of NC, including near the upstream portion of the Lumber River basin, with totals between 5 to 6 inches closer to Lumberton, NC (North Carolina State Climate Office (NCSCO), 2015). While tropical events occurred prior to 1954, Hurricane Hazel was noted as one of the most catastrophic in the twentieth century (Barnes, 1998), thus selected as the earliest record of interest. o The flood of September 1996 was the result of Hurricane Fran which made landfall on September 5, 1996, as a category 3 storm near where the Cape Fear River reaches the Atlantic Ocean (NCSCO, 2015). This is approximately 75 miles southeast of Lumberton, NC. A total of 5 to 10 inches of rainfall across parts of eastern and central NC was reported (USGS, 2016). o The flood of September 1999 was the result of Hurricane Floyd, which made landfall on September 16, 1999, as a category 2 storm near Cape Fear, NC, approximately 75 miles southeast of Lumberton, NC . Rainfall records across the state ranged from 12 to 20 inches. The rainfall total at the Lumberton Airport was 8.48 inches (NOAA, 2019b) and 7.62 inches in Lumberton (USGS, 2016). 2.3.2. Storm and Flood of September 2004 Significant rainfall fell across the entire state of North Carolina in September 2004 as a result of Hurricane Frances. Hurricane Frances impacted North Carolina from September 7-8 and mainly hit the western part of the state but did result in significant rainfall in the eastern half (National Weather Service [NWS], 2004). Rainfall gages near the Lumber River basin reported total rainfall depths from the storm from 4.31 to 11.87 inches (NCSCO,2020). The USGS gage on Lumber River at Lumberton (USGS 02134170) reported a peak streamflow of 7,420 cubic feet per second (cfs) in the early hours of September 11, 2004 (USGS, 2020). 2.3.3. Storm and Flood of October 2016 The flood of October 2016 was the result of Hurricane Matthew which made landfall on October 8, 2016, as a Category 1 storm southeast of McClellanville, South Carolina, approximately 110 miles southwest of Lumberton, NC. A front moved inland, pushing the storm north and east towards North Carolina. The storm moved back into the Atlantic Ocean on October 9. While the storm was only over land for two days the sharp turn of the path slowed down the forward speed, resulting in heavy precipitation for 2 days over the eastern portions of both North Carolina and South Carolina (NOAA, 2019c). The total recorded precipitation depth in Lumberton, NC from this storm was 12.53 inches, which is the highest recorded until 2018 (previously 7.62 inches in 1999) (Weaver et al., 2016). Recorded peak flows at the USGS gages in Lumberton (02134170) and Boardman, NC (02134500) were 14,600 cfs and 38,200 cfs, respectively (USGS, 2020). The recorded peak of 38,200 cfs at the USGS gage in Boardman, NC is the highest ever recorded flow to date and it resulted in a peak stage of 14.43 ft (USGS, 2016). The Boardman gage is approximately 15 miles downstream of the USGS Lumberton gage. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 6 Based on high water marks (HWM) provided by the USGS, flood depths in and around Lumberton ranged from 0.65 to 6.89 ft. The levee did not overtop or fa il during Hurricane Matthew. Flooding in the area was caused by overtopping of I-95, flow through the I-95 opening at VFW Road/CSX Railroad underpass, and inadequate capacity of the internal drainage system (Figure 2-2). Figure 2-2. Flooding along I-95 and inside the Lumberton Levee from Hurricane Matthew; area to right of road is the levee protected side of Lumberton (Source: City of Lumberton). 2.3.4. Storm and Flood of September 2018 The flood of September 2018 was the result of Hurricane Florence. Hurricane Florence made landfall on September 14, 2018, as a Category 1 storm at Wrightsville Beach, NC, approximately 75 miles southeast of Lumberton, NC. After making landfall, the storm turned southwest into South Carolina, where it moved inland and then turned north before becoming a tropical depression. While the winds were lower as a result of being a Category 1 storm, the system moved slowly at about 2 to 3 miles per hour over North and South Carolina, resulting in large rainfall amounts. Rainfall continued over a four-day period across the southeastern portion of North Carolina (NOAA, 2019c). Total rainfall values reported by NOAA at stations 2.3 miles northeast of Lumberton and 2.6 east-southeast of Lumberton are 22.8 inches and 21.4 inches, respectively. Hurricane Florence resulted in the highest ever recorded peak flow at the USGS gage in Lumberton (02134170 Lumber River at Lumberton) of 17,100 cfs with a peak stage of 22.21 ft. Hurricane Florence caused major flooding within the City of Lumberton as floodwaters passed through the opening under I-95 at the VFW Road and CSX railroad intersection into the city (Figure 2-3). USGS estimates about 12-percent of the total recorded peak flow passed through the opening under I-95. Levee Protected Side 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 7 Figure 2-3. Flooding under I-95 at VFW Road and CSX railroad in Lumberton, NC from Hurricane Florence (Source: City of Lumberton). 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 8 3. Data Collection Data used for modeling included field data along with available hydrologic, terrain, and land data. Field data, including high water marks and survey, is provided in Appendix A. Hydrologic data, including rainfall, streamflow, and parameter calculations, is provided in Appendix B. Hydraulic data, including levee data, is provided in Appendix C. 3.1. Terrain and Watershed Data Terrain tiles were QL2 Light Detection and Ranging (LiDAR) obtained from the North Carolina Floodplain Mapping Program (NCFMP). QL2 data has a standard of 2 points per square meter, allowing for higher resolution than previous LiDAR. The projection of the data source was in NAD_1983_StatePlane_North_Carolina_FIPS_3200 _Feet. The vertical datum is NAVD 88. The terrain was for the entirety of Robeson County and portions of Hoke, Scotland, Moore, Richmond, and Montgomery counties and all are 10 ft resolution. The tiles within the project area were mosaiced using ArcG IS. The elevation within the Lumber River basin ranges from 102 to 734 ft NAVD 88 (Figure 3-1). Figure 3-1. Lumber River basin terrain. The LiDAR terrain source did not account for bathymetry. Bathymetric data for Lumber River were obtained from the Preliminary Lumber River one-dimensional (1D) Hydrologic Engineering Center’s River Analysis System (HEC-RAS) model obtained from NCFMP as part of this project. Channel banks were edited to ensure that the channel thalweg and top width were captured. The bank-to-bank elevations at each cross-section were 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 9 exported as the bathymetry using RASMapper. This same procedure was followed for Jacob Swamp and Little Jacob Swamp. For Fivemile Branch, Meadow Branch, Gum Branch, Cotton Mill Branch and Collection Canal , cross section data was obtained in the field for at least two points along the channel. This procedure is explained in further detail in Section 3.6.2. A slope was interpolated from the two surveyed cross sections, and the slope was used to drop the channel inverts along each reach. This procedure was completed using 1D HEC -RAS models and the bathymetry generated using the approach described for Lumber River and Jacob Swamp. The separate bathymetric terrains were then mosaiced with the original terrain, giving bathymetry the priority in ArcGIS. At confluences, tributary elevations were altered to match that of the main re ach to ensure the terrain merged smoothly. 3.2. Precipitation Data Hourly precipitation in the area was obtained from the North Carolina Climate Retrieval and Observations Network of the Southeast Database (NC CRONOS)/ North Carolina Environment and Climate Observing Network (ECONet) Database, which was developed by the State Climate Office of North Carolina (2019). There are eleven precipitation gages within or nearby the drainage basin, eight of which had precipitation data for selected calibration and verification storms (Figure 3-2). Gages with available data varied across storms (Table 3-1). For each event, Thiessen polygons were created based on the rainfall gages with available data to estimate the rainfall contribution from each gage for each sub-basin (Figure 3-3). Thiessen polygons were created for each event based on gages with available data to determine which gages to use for precipitation data for each sub- basin. Depending on the outcome of the Thiessen polygon divisions, some gages with available data were not used, as highlighted for the 2004 event in Figure 3-3. Sub-basin delineation is discussed in Section 5.3. Additional details on the Thiessen polygon procedure are included in Appendix B1. The area proportions determined from the Thiessen polygons were applied as weights to the precipitation data from the contributing gages. The storm hyetograph applie d to a sub-basin is the weighted average from all contributing rainfall gages. A summary of gage availability, weighted rainfall data sets, and the applied range of rainfall per event is provided in Table 3-1. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 10 Figure 3-2. CRONOS rainfall gages in and near the Lumber River basin. Table 3-1. Precipitation gage availability and utilization in models. Event Gages Available Gages Used Sept 2004 5 (KFAY, HAML, KMEB, NRCK, WHIT) KFAY, KMEB, NRCK, WHIT Oct 2015 4 (LILE, NLUM, NUWH, WHIT) LILE, NLUM, NUWH Oct 2016 5 (KSOP, LILE, NLUM, NUWH, WHIT) KSOP, LILE, NLUM, NUWH Sept 2018 4 (LILE, NLUM, NRCK, WHIT) NLUM, NRCK 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 11 Figure 3-3. Example of Thiessen polygons used to calculate weighted rainf all; shown is the 2004 event Thiessen polygons. 3.3. Streamflow Data There is a USGS stream gage approximately 1.7 miles downstream of the Lumberton flood gate location, USGS 02134170 Lumber River at Lumberton, NC (Figure 3-4). Fifteen (15) minute river discharge (cfs) and gage height (ft) were obtained for the full period of record (July 2, 2000 to present) (USGS, 2020) (Appendix E2.1). Additionally, there is a gage upstream on Lumber River in Maxton, NC (USGS 02133624) with a drainage area of 365 sq mi and a gage downstream of our modeled basin on Lumber River in Boardman, NC (USGS 02134500) with a drainage area of 1,228 sq mi (Figure 3-4). 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 12 Figure 3-4. USGS gage (02134170 Lumber River at Lumberton, NC) within the Lumber River basin. 3.4. Soils Data Hydrologic soil group data was obtained from the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) GeoSpatial Data Gateway (USDA, 2020). Gridded soil survey from the Soil Survey Geographic (gSSURGO) database was downloaded for all required counties. Most of the basin consists of B and C soils, with some D soils and minimal A soils (Figure 3-5). 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 13 Figure 3-5. Lumber River basin soil type distribution. 3.5. Land Use Data Land use data was obtained from the 2016 National Land Cover Database (NLCD) (Figure 3-6) (USDA, 2020). The northern portion of the watershed is primarily evergreen forest, while the southern half is cultivated crops and the developed area of Lumberton, NC. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 14 Figure 3-6. Lumber River basin 2016 land cover type. 3.6. Field Survey and Data Collection A field survey was conducted to validate structure dimensions from effective models/inspection reports and collect dimensions for structures without pre-existing data. A field survey was also conducted to gather cross section information for reaches within the levee protected area that did not have an effective model with bathymetry. Figure 3-7 below shows the locations of these structures and the cross-section locations. The location map and field measurements are provided in Appendix A1 and photographs for each structure are shown in Appendix E1. The team also gathered high water mark information from Hurricanes Florence and Matthew. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 15 Figure 3-7. Collected field data for structures, high water marks, and survey points. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 16 Additional structure surveys were conducted by McGill Associates for selected structures along the main reaches, Lumber River, and Fivemile Branch. McGill surveyed one structure on Lumber River/I-95 in the vicinity of the proposed flood gate and four structures on Fivemile Branch. 3.6.1. Structure Data An inventory of hydraulic structures within the project area was derived before the field survey. The initial list of structures came from the effective FEMA models for Lumber River, Jacob Swamp, Little Jacob Swamp, Fivemile Branch, Collection Canal, Cotton Mill Branch, and Raft Swamp. These were all obtained from the North Carolina Flood Risk Information System website (NCFMP, 2019). The second source of known structures was the NCDOT Bridges Map (NCDOT, 2019). Inspection reports were obtained from NCDOT for the structures found on the NCDOT Bridges Map,. Other structures were found using aerial imagery or data. Levee data was obtained from AECOM Project No. 60548447, Lumberton Flood Mitigation Report Levee Plans, provided in Appendix C2. The team collected general structure dimensions, material, skew, bed material and condition, normal depth, channel width, structure condition, scour, sedimentation, obstructions, and guardrail height. More specifically, data for bridges included: number of spans, width of spans, pier dimensions, cap dimensions, girder thickness, seat dimensions, depth from low chord to channel invert, length of bridge, and width of bridge. Data collection for culverts included: culvert type, number of barrels, rise, span/diameter, bed to crown, abutment type, scour, and length of culvert. The above data was obtained using Global Positioning System (GPS), measuring tapes, measuring wheels and rods. The team also looked for any additional structures not found in aerial imagery or ongoing construction. 3.6.2. Cross Sections Collection Canal, Gum Branch, and Cotton Mill Branch were surveyed at a minimum of two locations along the reach. This allowed for a slope to be interpolated along the channel bed. The cross sections were taken at the upstream side of a structure. To collect the cross-section data, the survey team used a laser level, GPS, and rod. A benchmark was determined using GPS coordinates (at top of bank). The elevation of the benchmark was estimated using LiDAR data. The team then took a back sight reading and found the height of instrument. Foresight readings were taken throughout the channel. Points were taken approximately every 5 feet across the channel to capture top of bank, edge of water and channel inverts. calculations were performed to determine the channel elevations from the collected measurements. Cross-section data and plots are provided in Appendix A3. 3.6.3. High Water Marks Eleven high water mark (HWM) locations and depths were obtained from a field visit with City of Lumberton waterworks department personnel (Figure 3-8). The City of Lumberton personnel provided the history of each water mark during the field visit. At each mark, the location, height of water from the ground, and event were noted, along with photos for each. An example of a recorded HWM photo is shown in Figure 3-9. Measured HWM depths were converted to elevations based on the terrain data described in Section 3.1. Additionally, HWM for Hurricanes Matthew and Florence were obtained from the USGS Flood Event Viewer application ((United States Geological Survey, 2019) (Figure 3-8). The high-water mark located just upstream of the proposed gate location was surveyed by McGill Associates. This HWM can be seen in Figure 3-8 below. Additional details are included in Appendix A2. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 17 Figure 3-8. Location of field and USGS high water marks. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 18 Figure 3-9. Example of HWM from Lumberton field visit near the VFW Road and railroad intersection by the flood gate location. HWM from Hurricane Florence 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 19 4. Design Flood Selection 4.1. Review of FEMA Levee Accreditation Guidelines FEMA provides guidelines and requirements that must be met for levee systems to be accredited (FEMA, 1986). The FEMA requirements, as specified in 44 Code of Federal Regulations (CFR) 65.10 (FEMA, 2006), related to levee height are as follows: • Levees mush have a minimum freeboard of 3 feet above the 100-year flood elevation (base flood elevation), with • an additional 1 foot of freeboard at locations within 100 feet of structures (such as bridges) or wherever the flow is restricted, and • an additional 0.5 foot of freeboard at the upstream end of a levee. The minimum elevation of the flood gate will therefore have to be above the 100-year water surface elevation plus 4.5 feet to meet FEMA accreditation requirements. The levee is currently not FEMA accredited. 4.2. Flood Frequency Analysis It is the desire of the City of Lumberton to have a flood gate that can, at a minimum, prevent flooding from events like that of Hurricanes Matthew and Florence, which are the highest recorded flooding events in Lumberton. Flood frequency analysis was performed to estimate the recurrence intervals of historic floods (Hurricane Matthew and Hurricane Florence) near the site. For reference, the recorded peak flow rate from Hurricane Matthew at the Lumberton and Boardman gages were 14,600 cfs and 38,200 cfs, respectively, and the recorded peak flows for Hurricane Florence at the Lumberton and Boardman gages were 17,100 cfs and 35,400 cfs, respectively. Flow measurements at the Lumberton gage during Hurricane Matthew did not account for flow that was diverted through the I-95 opening at the VFW Road and the CSX railroad track. The actual peak flow at Lumberton from Hurricane Matthew is therefore larger than the reported peak flow of 14,600 cfs. USGS records indicate that diverted flow through the I-95 opening during Hurricane Florence was about 2,000 cfs, approximately 12% of the total flow (USGS Correspondence, Appendix B6). Based on the recorded water surface elevations at the USGS gage in Lumberton (119.7 feet for Hurricane Florence versus 119.4 feet for Hurricane Matthew) for the two events, a similar amount of flow can be assumed to have been diverted through the I-95 opening during Hurricane Matthew. This implies that the actual peak flow at Lumberton from Hurricane Matthew is about 16,600 cfs. This estimate is consistent with the simulated peak flow from the Hydrologic Engineering Center’s Hydrologic Modeling System (HEC-HMS) model as described in Section 5.6 and Table 5-8. Additional analysis was performed with the adjusted peak flow for Hurricane Matthew to assess the sensitivity of the estimated return periods to the change in the peak flowrate for that event. PeakFQ (version 7.3) (USGS, 2019a) was utilized for the analysis. This version of the software was released in 2019 and uses Bulletin #17C methodology (USGS, 2019b) for the flood frequency computation. Log Pearson Type III distribution was used for the analysis. Peak streamflow data was downloaded for two USGS gages: 1. USGS 02134170 – Lumber River at Lumberton, NC o Near proposed Lumberton flood gate site 2. USGS 02134500 – Lumber River at Boardman, NC o Approximately 15 miles downstream of the Lumberton gage The flood frequency analysis was conducted for the gage at Lumberton (Gage 1). This gage had a record from 2001-2018 and the downstream gage (Gage 2) had a record from 1901-2018. Two different methods were used in estimating the return periods to assess the impact gage record length and method for gage adjustment based on nearby gage(s) with longer records: • Method 1 uses Gage 1 observed data only. • Method 2 extends the record at Gage 1 based on Gage 2 using the MOVE method. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 20 4.2.1. Method 1 The results of the analysis based only on the Gage 1 records with the reported and adjusted peak flow rates of 14,600 cfs, and 16,600 cfs for Hurricane Matthew are shown in Table 4-1 and Figures 4-1 and 4-2. Based on this data, the return periods for Hurricane Matthew and Florence are between 30 to 50 years. The Log Pearson Type III analysis for this is included in Appendix E4.2. The upper (95%) and lower (5%) confidence limits of the peak flow estimates are also reported to show the potential range of peak flows that could occur for each return period. Table 4-1. Calculated discharge per return period at the Lumberton gage (USGS 02134170). Return Period (years) With Reported Matthew Peak Flow Rate With Adjusted Matthew Peak Flow Rate Peak Flow (cfs) Peak Flow 5% Lower Bound Peak Flow 95% Upper Bound Peak Flow (cfs) Peak Flow 5% Lower Bound Peak Flow 95% Upper Bound 1.25 1,654 1,122 2,269 1,645 1,109 2,267 2 3,130 2,283 4,375 3,145 2,282 4,427 5 6,139 4,389 9,687 6,254 4,440 9,979 10 8,856 6,103 15,830 9,099 6,218 16,510 25 13,240 8,603 28,460 13,740 8,836 30,140 50 17,270 10,680 43,080 18,050 11,030 46,170 100 22,020 12,920 64,080 23,170 13,410 69,470 200 27,600 15,330 94,040 29,230 15,990 130,100 500 36,460 18,760 153,600 38,940 19,700 171,000 Figure 4-1. Discharge-Frequency curve for Lumberton gage with reported Hurricane Matthew peak flow rate. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 21 Figure 4-2. Discharge-Frequency curve for Lumberton gage with adjusted Hurricane Matthew peak flow rate. 4.2.2. Method 2 The maintenance of variance estimator (MOVE) method described in Bulletin #17C (USGS, 2019 b) wa s used to extend Gage 1 records. This method extends a shorter record series using a supplemental series while maintaining the variance of the extended series. The procedure of the MOVE adds observations (ne) to the original records (y). The values of the new observations have the information to transfer the mean and variance of the original records. The statistical analysis following this procedure resulted in a total of 38 records (n1+ne), compared to 18 in the original records (n1). A linear regression m odel was developed to estimate an additional 20 observations (ne). The 38 records were used as inputs for PeakFQ analysis (Appendix E4.2). Table 4-2 and Figure 4-3 below show the frequency analysis results. Table 4-2. Calculated discharge per return period based on the extended Lumberton gage records (USGS 02134170). Return Period (years) Peak Flow (cfs) Peak Flow 5% Lower Bound Peak Flow 95% Upper Bound 1.25 2,080 1,736 2,442 2 3,305 2,821 3,898 5 5,419 4,547 6,734 10 7,109 5,826 9,393 25 9,588 7,561 14,000 50 11,700 8,923 18,580 100 14,040 10,330 24,370 200 16,640 11,800 31,680 500 20,530 13,820 44,300 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 22 Figure 4-3. Discharge-Frequency curve for Lumberton gage with extended record. The estimated return periods for Hurricane Matthew and Florence are approximately 120 and 235 years, respectively. The extended record calculations and the Log Pearson Type III analysis for this is included in Appendix E4.1. When using the updated peak flow value of 16,600 cfs for Hurricane Matthew in the analysis, the return period for hurricane Matthew and Florence are approximately 170 and 190 years, respectively. The extended record calculations and the Log Pearson Type III analysis is included in Appendix E4.1. Table 4-3 and Figure 4-4 below show the results of the analysis using the adjusted flow for Hurricane Matthew. Table 4-3. Calculated discharge per return period based on the extended Lumberton gage records (USGS 02134170) and altered Hurricane Matthew. Return Period (years) Peak Flow (cfs) Peak Flow 5% Lower Bound Peak Flow 95% Upper Bound 1.25 2,080 1,742 2,436 2 3,325 2,844 3,916 5 5,500 4,626 6,837 10 7,255 5,964 9,609 25 9,852 7,795 14,460 50 12,080 9,242 19,320 100 14,560 10,750 25,500 200 17,340 12,320 33,340 500 21,520 14,500 46,990 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 23 Figure 4-4. Discharge-Frequency curve for Lumberton gage (USGS 02134170) with extended record and altered Hurricane Matthew. 4.2.3. Gage Weighted Regression Estimates Regional regression flow rate for each return period was calculated using USGS -developed regional regression equations for North Carolina (USGS, 2009). StreamStats was used to determine the basin percentage in each hydrologic region (1-5). A total of 45-percent of Lumber River basin is in Region 3 and 55-percent is in Region 4 (USGS, 2016). Based on the PeakFQ estimated gage peak flow at the Lumberton gage (USGS 02134170), regression estimated peak flow, and variance of prediction for each value, the gage weighted peak flow was estimated for the 2 – 500-year return periods (Table 4-4). The resulting return periods for Hurricanes Matthew and Florence remain the same as using only the gage estimates. The gage weighted regression calculation is included in Appendix E4.3. Table 4-4. Regional regression weighted peak flow rate estimates for Methods 2 approaches. Return Period (yrs) Regression Peak Flow Rate (cfs) Weighted Peak Flow Rate (cfs) Method 2 – unaltered Matthew Method 2 – altered Matthew 2 4,006 3,410 3,429 5 6,740 5,546 5,616 10 8,797 7,320 7,449 25 11,440 9,903 10,125 50 13,620 12,090 12,400 100 15,799 14,463 14,864 200 18,043 17,029 17,539 500 20,993 20,678 21,347 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 24 4.3. Recommended Design Flood Frequency The results of the analysis indicate that there is a high amount of uncertainty regarding the return periods for floods produced by Hurricanes Matthew and Florence at Lumberton, NC. This is due to the limited gage records at that location. Updating the limited gage data at the USGS gage at Lumberton based on the longer record at the USGS gage in Boardman provides more realistic estimates of the return periods. Based on this approach, the return periods for the flood produced by both Hurricanes Matthew and Florence are about 170 and 190 years, respectively. The minimum top of gate elevation must be the higher of the peak water surface elevation from Hurricane Florence at the gate location or the 100-year elevation at the gate plus 4.5 feet of freeboard. The return period of such a flood will be about 200-years or greater. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 25 5. Hydrologic Model Development 5.1. General Methodology The Hydrologic Engineering Center Hydrologic Modeling System (HEC-HMS) version 4.2.1 software was used to model the Lumber River basin and develop outflow hydrographs for each sub-basin. HEC-HMS is a rainfall- runoff model developed by the U.S. Army Corps of Engineers (USACE, 2017) and is widely used for detailed rainfall-runoff modeling across the United States. HEC-HMS has three main components: watershed physical description (basin model), meteorology description (meteorological model), and hydrologic simulation. For each basin and/or sub -basin a method can be selected for canopy, surface, loss, transform, and baseflow. The meteorological model represents the precipitation input needed by sub-basin elements in the basin model. Hydrologic simulation encompasses control specifications, which detail the simulation times (dates, times, time interval). The watershed physical description process involved the addition of sub-basins, junctions at the end of each sub-basin, and reaches connecting the junctions. This allowed all sub-basins to be connected and set up how water will move through the model from upstream to downstream. 5.2. HEC-HMS Model Parameters The modeling methods were selected from methods available in HEC -HMS Version 4.2.1. The hydrologic modeling methods selected were chosen based on the availability of data and ability to define modeling method parameters with this data. Predictive ability of the modeling method based on experience was also a factor. Based on these factors, the Snyder Unit Hydrograph method was selected and used to characterize the rainfall - runoff relationship of the sub-basins within the watershed. The Snyder Unit Hydrograph method allows for parameters to be compared across events and sub-basins so that the method can be transformed to ungagged sub-basins. The method is relatively simple yet detailed enough to provide an adequate unit runoff response for predicting large floods based on calibrated parameters. For all the sub-basins, the loss method was set to ‘Initial and Constant’ and a transform method of ‘Snyder Unit Hydrograph’. Table 5-1 summarizes the watershed physical parameters required for the selected mod eling methods. A summary of the equations and required parameters for each method are included in the HEC -HMS Technical Reference Manual (USACE, 2000). The initial loss was calculated using the Soil Conservation Service (SCS) runoff curve number method (USDA, 1986). Imperviousness was set to zero (0%) for all sub - basins as this was incorporated into the curve number and thus initial loss value. The remaining loss parameter is constant loss. The two parameters required for the transform method are the standard lag and peaking coefficient. The constant loss, lag time, and peaking coefficient are variables based on basin characteristics and thus were calibrated. Initial losses were also adjusted during calibration based on known a ntecedent soil conditions for each calibration and verification storm. The hydrologic simulation control specifications were individually set for each simulation event based on the corresponding dates and times. Rainfall and streamflow data were added as time series data. A precipitation gage was added for each basin for each simulated event. The number of precipitation gages added per event was based on the number of rainfall gages with available data and the associated weighted rainfall developed. The pr ecipitation gages included values covering the full time period of the control specification with a one -hour interval. Discharge gages were added for each event at the calibration points within the model (USGS Gage 02133624 at Maxton and USGS Gage 02134170 at Lumberton). The discharge gages contained the discharge data for each storm as recorded at those gage locations. Discharge was added at a fifteen-minute interval. Cross-section data was also added for each reach for use in flow routing. Initial parameter approximations were estimated using Geographic Information System (GIS) data and applicable parameter ranges. Model parameters were refined through calibration and validated by comparing model results to historic flow measurements. The calibrated and verified model was then used to simulate design flood hydrographs that were routed in a hydraulic model. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 26 Table 5-1. HEC-HMS modeling methods and required parameters. Modeling Method Parameter Description Acceptable Values Initial and Constant- Rate Loss Method Initial Loss (in) Initial loss parameter that accounts for the moisture condition in the watershed at the beginning of the simulation – loss from canopy interception, surface storage, and infiltration. Based on curve number (CN) Constant Loss (in/hr) Infiltration rate during saturated soil conditions. 0+ Impervious Area (%) Impervious area directly connected to the channel network (no losses are computed). 0% (for this study) Snyder Synthetic Unit Hydrograph Standard Lag (hr) The time from the center of mass of excess rainfall to the hydrograph peak. Based on Ct, which ranges from 0.4 to 8, and sub-basin lengths Peaking Coefficient (Cp) Dimensionless parameter affecting hydrograph shape. 0.4 to 0.8 5.3. Sub-basin Delineation Sub-basins were based on delineation of smaller channels/ tributaries within the Lumber River basin (Figure 5- 1) using StreamStats, which uses coarser terrain (30 ft x 30 ft) (USGS, 2016). Delineation was done where each channel joins into Lumber River. Additionally, a sub-basin was delineated at the USGS gage in Maxton, NC to allow for hydrograph calibration at the location. The streamstats delineated sub-basins were verified using the QL2 LiDAR, which has a finer tile size of 10 ft x 10 ft and edits were made to the sub-basin boundaries as necessary. Fourteen (14) sub-basins were delineated. There are twelve (12) sub-basins for tributaries to the Lumber River and an additiona l two (2) sub-basins within the HEC-HMS model to account for the drainage area right along the channel, which was not accounted for in the other basins. The sub -basins are called: Back Swamp, Bear Swamp, Fivemile downstream, Fivemile upstream, Lumberton Ca nals, Ivey Branch, Jacks Branch, Jacob Branch, Jacob Swamp, Lumber downstream, Lumber upstream, Meadow Branch, Raft Swamp, and White Oak (Figure 5-1 and Figure 5-2). StreamStats for each basin are provided in Appendix E2.2. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 27 Figure 5-1. Lumber River sub-basin delineation. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 28 Figure 5-2. HEC-HMS sub-basins, reaches, and junctions. 5.4. Initial Parameter Estimation Initial parameters were set constant across all sub-basins using: constant loss of 0.4 in/hr, basin coefficient (Ct) of 2.2, and peaking coefficient (Cp) of 0.4. The values were selected as they were the lower end for each parameter range. The starting initial loss estimates for the basins were estimated based on the sub-basin curve number, CN. The standard lag was calculated using the Ct and the previously calculated length of main channel (L, mi) and length of channel to centroid (Lc, mi). The initial loss, constant loss, Ct, and Cp were changed during the calibration process. 5.4.1. Curve Number and Initial Losses 5.4.1.1. Curve Number The curve number for each sub-basin is a useful basin characteristic and is needed to calculate other parameters, such as the initial loss rate. To calculate a sub-basin curve number, the soil type and land cover is required. A composite curve number was calculated for each sub-basin because each sub-basin had multiple soil types and land use classifications. Good condition curve numbers (USDA, 1986) were paired with the associated 2016 NLCD land cover classifications. ArcGIS was used to calculate the area of each land use classification associated with each soil type. The area of each land use per soil type was used to create a curve number for each soil type, and then those were used to calculate a composite curve number for each sub-basin (Table 5- 2). Curve number calculation are provided in Appendix B4. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 29 Table 5-2. Sub-basin composite curve numbers. Sub-basin Curve Number Back Swamp 85.7 Bear Swamp 83.1 Fivemile DS 82.8 Fivemile US 81.7 Lumberton Canals 83.2 Ivey Branch 79.4 Jacks Branch 82.2 Jacob Branch 85.2 Jacob Swamp 79.9 Lumber DS 84.3 Lumber Mid 82.9 Lumber US 62.1 Meadow Branch 78.0 Raft Swamp 78.9 White Oak 79.6 5.4.1.2. Initial Losses Based on the curve number, the initial loss was calculated using the SCS runoff method (USACE, 1986). The good condition curve number was used to calculate S (Equation 5-1), a value related to soil and cover conditions, which was then used to calculate the initial loss (I a) (Equation 5-2) (Table 5-3). The initial loss for each sub-basin was input into the HEC-HMS model and was not altered during calibration. 𝑅=1000 𝐶𝑁−10 (5-1) 𝐼𝑎=0.2𝑅 (5-2) Table 5-3. Calculated sub-basin initial losses. Sub-basin S Ia (in) Back Swamp 1.67 0.33 Bear Swamp 2.03 0.41 Fivemile DS 2.08 0.42 Fivemile US 2.24 0.45 Lumberton Canals 2.02 0.40 Ivey Branch 2.59 0.52 Jacks Branch 2.17 0.43 Jacob Branch 1.74 0.35 Jacob Swamp 2.52 0.50 Lumber DS 1.86 0.37 Lumber Mid 2.06 0.41 Lumber US 6.10 1.22 Meadow Branch 2.82 0.56 Raft Swamp 2.67 0.53 White Oak 2.56 0.51 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 30 5.4.2. Snyder Unit Hydrograph Parameters As previously stated, Snyder unit hydrograph was selected for the transform method. The equation for lag is (Equation 5-3): 𝑡𝑝=𝐶𝐶𝑡(𝐿𝐿𝑐)0.3 (5-3) Where tp is the hydrograph lag (hr), C is a conversion factor (1 for foot-pound system), Ct is a basin coefficient, L is the length of the main channel (mi), and Lc is the length of the channel from the outlet to the nearest watershed centroid (mi). GIS was used to calculate L and Lc. The flow path was drawn from the outlet of the sub-basin along the channel to the most remote point in the watershed. A centroid for each sub-basin was calculated in GIS (Figure 5-3). Based on the centroid, the length of channel to this point was measured. Values for L and Lc are available in Appendix B3. The basin coefficient, Ct, is a dimensionless parameter that can range from 0.4 in the mountains to 8.0 along the coast. Since this is not a physically-based parameter it was determined via calibration. Figure 5-3. Centroid, channel length (L), and channel length to centroid (Lc) of each sub-basin for Snyder hydrograph development. 5.4.3. Reach Routing Parameters Routing of sub-basin hydrographs within a watershed is necessary to capture the attenuation of flow while moving downstream through the channel and floodplain. In the hydrologic model this is performed using routing 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 31 reaches. The Muskingum-Cunge hydrologic routing method was used for the main river reaches throughout the Lumber River watershed. This method was chosen based on the need for a routing method capable of properly calculating discharge through a routing reach for a wide range of flow conditions. A representative 8-point cross-section was derived for each reach from representative 1-D HEC-RAS cross- sections from the FEMA effective model or LiDAR data and used to characterize the reach channel and floodplain. A location was selected that was reasonably characteristic of the reach of interest. This primarily relates to the typical channel and floodplain width under high flow conditions. The 8 -point cross-sections are included in Appendix B5. The adopted routing parameters used for this study are listed in Table 5-4. Table 5-4. Muskingum-Cunge routing parameters used for hydrologic modeling. Reach HMS Junctions Length (ft) Slope (ft/ft) Channel N-Value Left N- Value Right N- Value Cross- section 1 0 to 1 11284 0.0002 0.045 0.1 0.1 8-point 2 1 to 2 10922 0.0006 0.045 0.13 0.1 8-point 3 2 to 3 14490 0.0002 0.045 0.15 0.09 8-point 4 3 to 4 7220 0.0003 0.045 0.13 0.11 8-point 5 4 to 5 39679 0.0002 0.045 0.125 0.125 8-point 6 5 to 6 7849 0.0003 0.045 0.125 0.125 8-point 7 7 to 6 24525 0.0008 0.065 0.035 0.16 8-point 8 8 to 4 6644 0.0002 0.045 0.12 0.12 8-point 9 11 to 1 183005 0.0003 0.08 0.16 0.16 8-point 5.5. Model Calibration to Historic Events Four events were selected based on peak discharge: September 2004, October 2015, October 2016 (Hurricane Matthew), and September 2018 (Hurricane Florence) (Table 5-5). A complete hydrograph (rising limb, peak, and falling limb) was needed for analysis to allow for calibration to the storm peak and full storm volume. Of these, three calibration events were selected: September 2004, October 2015, and September 2018. The 2004 and 2015 events were peak water-year gage events, with peaks of 7,420 and 2,390 respectively. The 2018 event corresponds to Hurricane Florence, which is one of the largest rainfall events to hit the state of North Carolina. The peak flow at the USGS Lumberton gage set a peak record at 17,100 cfs. Hydrographs of the selected events for both gages are provided in Appendix B2. Table 5-5. Peak streamflow reported at USGS gages in Lumberton and Maxton for each study event. Event USGS Gage 02134170 at Lumberton, NC USGS Gage 02133624 at Maxton, NC Peak Streamflow (cfs) Time of Peak Peak Streamflow (cfs) Time of Peak Sept 2004 7,420 9/11/2004 2:00 2,280 9/11/2004 8:00 Oct 2015 2,390 10/9/2015 15:45 2,460 10/6/2015 12:15 Oct 2016 14,600 10/10/2016 7:00 6,790 10/11/2016 6:45 Sept 2018 17,100 9/17/2018 11:00 12,300 9/19/2018 4:00 The points of comparing simulated and observed peak flow rate, volume, and time of peak are at a junction along Lumber River where the USGS gage in Lumberton is located and at the location of the USGS gage in Maxton. During calibration trials the peak simulated flow rate, hydrograph shape, and time of peak flowrate were compared to what was observed at the USGS gages from the respective storm event. Calibration of the model to the observed values at the USGS gage in Lumberton was prioritized over the observed values at the USGS gage in Maxton due to the proximities of the two gage locations to the location of the proposed gate. Hurricane Florence was the first event to be calibrated due to its magnitude. The calibration parameters were changed for each of the sub-basins, relative to basin characteristics, until the peak flow rate, volume, and time to peak were as close to that of the observed as the model could achieve (Figure 5-4). The first set of 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 32 calibrated constant loss, Ct, and Cp values were applied to the other two calibration events for an initial baseline and adjusted iteratively until the simulated hydrographs matched reasonably well with the observed hydrographs for those storms. Results for each calibration are shown in Tables 5-6, 5-7, and 5-8. The calibrated parameters were able to accurately model the peak flow rate and time of peak for all the storms. Except for the October 2015 storm, the calibrated parameters were also able to accurately model the hydrograph shapes and volumes for the storms. The October 2015 storm is the smallest of the three storms , with a return period of less than 2 years. Since the design storms are more like the other two storms in terms of magnitude, additional iterations of the calibration parameters to get a better match for the volume for that storm was not necessary. Figure 5-4. Comparison of observed gage flow (black) and simulated flow (solid blue) for the September 2018 (Hurricane Florence) calibrated event. Table 5-6. Peak flow comparison between observed and simulated calibrated events. Storm Peak Flow rate (cfs) Observed Simulated % Difference At Lumberton Gage (USGS 02134170) Sept 2004 7,420 7,097 -4% Oct 2015 2,390 2,421 1% Sept 2018 17,100 17,257 1% At Maxton Gage (USGS 02133624) Sept 2004 2,280 3,439 51% Oct 2015 2,460 2,330 -5% Sept 2018 12,300 8,281 -33% 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 33 Table 5-7. Time of peak comparison between observed and simulated calibrated events. Storm Time Date and Time Observed Simulated Difference (hrs) At Lumberton Gage (USGS 02134170) Sept 2004 9/11/2004 0:30 9/11/2004 12:00 10 Oct 2015 10/9/2015 15:45 10/9/2015 12:00 -3.75 Sept 2018 9/17/2018 11:00 9/17/2018 11:00 0 At Maxton Gage (USGS 02133624) Sept 2004 9/11/2004 8:00 9/11/2004 6:00 -2 Oct 2015 10/6/2015 14:00 10/6/2015 11:00 -3 Sept 2018 9/19/2018 4:00 9/19/2018 11:00 7 Table 5-8. Volume comparison between observed (USGS 02134170 at Lumberton) and simulated calibrated events. Storm Volume (ac-ft) Observed Simulated % Difference At Lumberton Gage (USGS 02134170) Sept 2004 152,897 149,569 -2% Oct 2015 38,912 27,568 -29% Sept 2018 230,179 229,185 -0.4% At Maxton Gage (USGS 02133624) Sept 2004 59,436 39,728 -33% Oct 2015 29,054 21,498 -26% Sept 2018 79,108 59,424 -25% The calibrated parameters for each of the three calibration storms were averaged to obtain the calibrated parameters for the sub-basins. The calibrated parameters are shown in Table 5-9. Table 5-9. Average calibrated HEC-HMS parameters. Sub-basin Constant Loss (in/hr) Initial Loss (in) Ct Lag Time based on Ct (hr) Cp Back Swamp 0.14 0.36 7 31.3 0.40 Bear Swamp 0.14 0.41 7 31.8 0.40 Fivemile DS 0.05 0.44 7 9.1 0.40 Fivemile US 0.05 0.42 7 23.7 0.40 Lumberton Canals 0.05 0.43 7 13.9 0.40 Ivey Branch 0.05 0.58 7 12.6 0.40 Jacks Branch 0.05 0.39 7 21.1 0.40 Jacob Branch 0.05 0.34 7 22.4 0.40 Jacob Swamp 0.05 0.52 7 18.2 0.40 Lumber DS 0.05 0.37 7 33.0 0.40 Lumber Mid 0.14 0.43 8 62.7 0.40 Lumber US 0.14 5 7 76.0 0.73 Meadow Branch 0.05 0.68 7 15.2 0.40 Raft Swamp 0.19 0.46 8 56.2 0.40 White Oak 0.05 0.5 7 12.3 0.40 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 34 It is noted that the calibrated initial loss for the Lumber US sub-basin is higher than normal. This will likely lead to underestimation of more frequent storm events. The calibrated parameters noted in Table 5 -9 are appropriate for storms with recurrence intervals similar to that of the design storm for the flood gate project (100yr or greater). A spreadsheet with the simulated results and calibrated parameters is provided in Appendix E2.3. 5.6. Model Validation to Historic Events Following calibration, the average parameters were applied to a verification event. Hurricane Matthew, October 2016, was selected as the verification event. As previously discussed, Matthew was another large hurricane to hit North Carolina, setting many rainfall and streamflow records prior to Florence. Verification using the average parameters overpredicted the peak flow rate but matched the time of peak (Tables 5-10, 5-11, and 5-12). Graphical inspection of the observed and simulated hydrographs also indicates a good match of the rising and falling limbs (Figure 5-5). As discussed in Section 4.2, the recorded peak flow at the USGS gage of 14,600 cfs during Hurricane Matthew did not account for the diverted flow through the I-95 opening. Thus, this verification, while higher, is an accurate representation of the peak flows in the area. Table 5-10. Peak flow comparison between observed and simulated for a verification event. Storm Peak Flow rate (cfs) Observed Simulated % Difference At Lumberton Gage (USGS 02134170) Oct 2016 14,600 16,550 13% At Maxton Gage (USGS 02133624) Oct 2016 6,750 3,277 -51% Table 5-11. Time of peak flow comparison between observed and simulated for a verification event. Storm Time Date and Time Observed Simulated Difference (hrs) At Lumberton Gage (USGS 02134170) Oct 2016 10/10/2016 7:00 10/10/2016 10:00 3 At Maxton Gage (USGS 02133624) Oct 2016 10/11/2016 8:00 10/11/2016 14:00 6 Table 5-12. Volume comparison between observed and simulated for a verification event. Storm Volume (acre-ft) Observed Simulated % Difference At Lumberton Gage (USGS 02134170) Oct 2016 223,956 197,598 -12% At Maxton Gage (USGS 02133624) Oct 2016 82,111 27,026 -67% 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 35 Figure 5-5. Comparison of observed gage flow (black) and simulated flow (solid blue) for the October 2016 (Hurricane Matthew) verification event. 5.7. Design Flood Simulations Using the calibrated and verified parameters, floods from a 100-year through the Probable Maximum Flood (PMF) were simulated in HEC-HMS. The 100-year through 1,000-year flows were generated using the procedure described in Section 5.7.1. The Probable Maximum Precipitation (PMP) and resulting PMF values were estimated using the procedure described in Section 5.7.2 5.7.1. 100-Year through 1,000-Year Flows Analysis of the durations of previous rainfall events within the Lumber Basin ranged from 24 to 72 hours, with most of the major events having a duration of 48-hours. Thus, a 48-hour rainfall event was selected as the design flood duration for the 100-year to 1000-year return period events. Based on the location, an SCS Type II rainfall distribution (NRCS, 2019) was used. A spreadsheet with the distribution was downloaded from the NRCS website (NRCS, 2019). The spreadsheet provides the distribution for the peak 24-hour period which is assumed to occur during the first 24-hour period for any duration storm. Based on our sensitivity analysis, this assumption provided more conservative peak flow estimates compared to other placements of the peak 24 - hour period. For the 48-hour duration storm, the difference between the total 24-hour and 48-hour total rainfall depths is distributed evenly on the second day. For the 72-hour storm, the difference between the total 24-hour and 72-hour total rainfall depths is distributed evenly on the second and third days. Electronic files of the sensitivity analysis are included in Appendix E2.7. NOAA Atlas 14 was used to find the rainfall totals associated with 100-year to 1000-year return periods, assuming a 48-hour event. 5.7.2. PMP and PMF Estimation The PMP values for the Lumberton flood gate dam were estimated using the Hydrologic Engineering Center’s HEC-MetVue (version 3.0) and HEC-HMS (version 4.8) software packages (Appendix E5). The HEC-MetVue software has HMR52 plugin extension that allows the modeler to use NOAA’s Hydrometeorological Reports HMR 51 and 52 (HMR 51/52) to estimate the storm characteristics and generate PMP hyetographs. The initial storm parameters obtained from the HEC-MetVue model were optimized to maximize peak flow at the watershed outlet. The parameters were optimized using the HMR 52 precipitation method in the HEC-HMS meteorologic model. The calibrated HEC-HMS model described in the above sections was used for the 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 36 optimization run. This calibrated model required an upgrade from version 4.2.1 to version 4.8 to perform the optimization run. The initial and optimized storm parameters are summarized below in Table 5-13 and the positions of the storms based on the initial and optimized parameters are shown in Figure 5-6 and Figure 5-7, respectively. The optimized storm parameters were used in the HEC-MetVue model (Appendix E5) to generate the average PMP depths and hyetographs. The resulting 72-hour PMP depths and volumes for the sub-basins are summarized below in Table 5-14. The hyetographs from HEC-MetVue were then saved to a DSS file and linked to the calibrated HEC-HMS (version 4.2.1) model to estimate the Probable Maximum Flood (PMF). Discharge ratio factors of 0.25, 0.5, 0.67, and 0.75 were applied to the subbasins in the HEC-HMS simulation run to generate the ¼ PMF. 1/3 PMF, ½ PMF, 2/3 PMF, and ¾ PMF, respectively (Appendix E5). Table 5-13. Initial and optimized parameters for the HEC-METVue model. HMR 52 Storm Characteristics HEC-MetVue (Initial Parameters) HEC-HMS (Optimized Parameters) X Coordinate -79.33 -79.413 Y Coordinate 34.93 34.995 Orientation (deg.) 145.63 141.51 Peak Intensity Hours 36 to 42 Hours 36 to 42 Area (sq. mi.) 984.04 982.84 Figure 5-6. HMR 52 storm position with HEC-MetVue (initial) parameters 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 37 Figure 5-7. HMR 52 storm position with HEC-HMS (optimized) parameters. Table 5-14. Average PMP depths from optimized HMR 52 storm parameters. Name Average Depth (in) Volume (ac-ft) Back Swamp 24.38 45340 Bear Swamp 28.27 42664 Fivemile DS 23.17 2092 Fivemile US 25.33 29744 Ivey Branch 20.97 4214 Jacks Branch 25.55 4100 Jacob Branch 20.91 17178 Jacob Swamp 18.68 9531 Lumber DS 21.79 11787 Lumber Mid 29.81 118036 Lumber US 32.89 639092 Lumberton Canals 22.3 4616 Meadow Branch 20.73 5483 Raft Swamp 30.63 272525 White Oak 21.8 4322 Watershed 30.4 1210726 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 38 5.7.3. Results The total rainfall depths ranged from 10.2 inches (100-yr) to 14.9 inches (1,000-yr) (Table 5-15). The total rainfall for watershed for the full PMP storm event is 30.4 inches. The design flood hydrographs are provided in Appendix E2.2. Rainfall distributions are provided in Appendix E2.4. Table 5-15. Design Rainfall Depths. Recurrence Interval (Yrs) Rainfall Duration 24 Hours 48 Hours 72 Hours 100 8.99 10.20 10.60 500 11.90 13.30 13.70 1,000 13.30 14.90 15.20 Full PMP (Watershed Average) 30.4 The developed rainfall distribution was added to the HEC-HMS model as a cumulative precipitation gage for each event (Appendix E2.4). The simulated peak flow rates, FEMA peak flow rates (FEMA, 2014) and gage statistics (Section 4.2), at the location of the USGS gage in Lumberton are shown in Table 5-16. Simulated peak flow rates were lower than both those from FEMA and the gage statistics. The FEMA peak flow estimates are based on regression equations which are regionally based and not specific to the Lumber River Basin. The simulated results are from a calibrated and verified model for the basin and hence provide a more reliable estimate of both the peak flow and streamflow hydrograph for the basin . Table 5-16. Peak flow comparison between simulated HEC-HMS, FEMA reports, and gage statistics. Recurrence Interval (Yrs) Simulated Peak Flow (cfs) FEMA Peak Flow (cfs) Gage Statistics Flow (cfs) % Difference FEMA % Difference Gage 100 13,140 14,900 14,000 -13% -11% 500 22,110 20,200 20,530 9% 3% 1,000 26,990 - - - - 1/4 PMF 17,370 - - - - 1/3 PMF 23,590 - - - - 1/2 PMF 36,210 - - - - 2/3 PMF 48,990 - - - - 3/4 PMF 55,450 - - - - Full PMF 74,960 - - - - Additionally, partial duration rainfall distributions were created based on the NOAA Atlas 14 precipitation - frequency data for each return period and simulated in HEC-HMS. The partial duration rainfall distribution is an updated distribution compared to the SCS distribution (NRCS, 2019). The spreadsheet to develop the rainfall temporal distribution was also downloaded from the NRCS website (NRCS, 2019). However, this distribution produced lower stream flows than that of the SCS method and thus were not utilized for the hydraulic analysis. A comparison of the 48-hour duration peak flows from the SCS and partial duration distribution methods are shown in Table 5-17. Partial distributions are provided in Appendix E2.4. The HEC-HMS model is included the electronic Appendix E2.1. Table 5-17. Comparison of Peakflows from SCS and Partial Duration Rainfall Distributions. Recurrence Interval (Yrs) SCS Type II Peak Flow (cfs) Partial Duration Peak Flow (cfs) 100 13,140 10,670 500 22,110 19,330 1,000 26,990 23,980 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 39 6. Hydraulic Model Development A detailed two-dimensional model of the City of Lumberton, Lumber River, and its tributaries in the vicinity of the city was developed to help determine design flood elevations for the proposed gate. The model was developed using version 6.0 of the USACE HEC-RAS model (USACE, 2021). This section summarizes data used, assumptions and results of the hydraulic modeling effort. 6.1. Model Development The two-dimensional (2D) domain was selected to include all areas of flood concern within the extents of Lumber River. The domain extends along each river that confluences with Lumber River: Raft Swamp, Back Swamp, Bear Swamp, White Oak Branch, Meadow Branch, Jacob Swamp, Ivey Branch, Jack’s Branch and Fivemile Branch. It also extends in the Northeast region to include North Lumberton so that project impacts related to flooding levels can be assessed at those locations. Except for inflow and outflow boundary locations, the model boundary was placed at relatively high ground so that flooding is fully contained within the computational mesh. The locations of the boundary conditions were placed far enough from the location of the proposed gate so that boundary condition impacts would be negligible. The location and geometry of the flood gate within the model is based on the proposed layout of the flood gate. The model domain is shown in Figure 6-1 (see Section 6.1.2). 6.1.1. Manning’s N Coefficients Base model Manning’s n coefficients were based on land use classes selected from Table 6-1. Values were based on the “normal” column. A GIS shapefile of Lumber River and Fivemile Branch was used to override the land use of Lumber River and Fivemile Branch. The channel segment was assigned a base Manning’s n coefficient of 0.045. The initial roughness coefficients were modified during the model calibration phase. The calibrated roughness values and the procedure followed are documented in Section 6.2.5. Table 6-1. Manning's n coefficient ranges per land cover type. NLCD Classification Manning’s Roughness Source Minimum Normal Maximum 11 Open Water 0.025 0.03 0.033 Chow, 1959 21 Developed, Open Space 0.01 0.013 0.016 Calenda et al., 2005 22 Developed, Low Intensity 0.038 0.05 0.063 Calenda et al., 2005 23 Developed, Medium Intensity 0.056 0.075 0.094 Calenda et al., 2005 24 Developed, High Intensity 0.075 0.1 0.125 Calenda et al., 2005 31 Barren Land 0.025 0.03 0.035 Chow, 1959 41 Deciduous Forest 0.1 0.12 0.16 Chow, 1959 42 Evergreen Forest 0.1 0.12 0.16 Chow, 1959 43 Mixed Forest 0.1 0.12 0.16 Chow, 1959 52 Scrub/Shrub 0.035 0.05 0.07 Chow, 1959 71 Grassland Herbaceous 0.025 0.03 0.035 Chow, 1959 81 Pasture/Hay 0.03 0.04 0.05 Chow, 1959 82 Cultivated Crops 0.025 0.035 0.045 Chow, 1959 90 Woody Wetlands 0.08 0.1 0.15 Chow, 1959 95 Emergent Herbaceous Wetland 0.075 0.1 0.15 Chow, 1959 Channel 0.035 0.045 0.05 Chow, 1959 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 40 6.1.2. Mesh Development The 2D model domain for the hydraulic analysis is shown in Figure 6-1. The mesh utilized refinement regions, 2D connections, and breaklines to accurately capture focal points and variations within the terrain. Figure 6-1- A(1) shows the extent of the 2D domain with breaklines and 2D Connections. Figure 6-1-A(2) is an example of one of the refinement regions utilized in the mesh. This one is located at the gate. Figure 6-1-A(3) is a zoomed in example of how breaklines were applied and enforced. This breakline is representing the centerline of Lumber River. Figure 6-1. Lumber River 2D external model domain. A mesh resolution of 250-feet was applied to the 2D flow area. Refinement regions were used to represent areas of higher urbanization, Lumber River, and the flood gate location. A resolution of 100-ft was applied for urban areas and Lumber River, while a resolution of 50 -feet was used for the flood gate location. A breakline was enforced with 100-foot spacing along the Lumber River stream centerline to capture the lowest points in the terrain and account for total storage capacity. Breaklines were drawn and enforced with 50-foot spacing along all additional channels within the domain. Breaklines wer e then drawn along points of higher elevation representing roads, railroads, or berms. These were enforced with a spacing that varied between 50 and 100-feet. Within the flood gate opening, breaklines were also drawn with a spacing of 25-feet to properly align the grid representing the railroad. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 41 6.1.3. Lumberton Levee System The Lumberton levee was included as a 2D connection with top of levee elevations taken from AECOM Project No. 60548447, Lumberton Flood Mitigation Report. Provided surveyed top of levee elevations were within a few inches of the top of levee elevations in the terrain. See Appendix C2 for detailed comparison. For levee segments that were not surveyed, LiDAR elevations were utilized. Levee grid size was enforced as 20x20-feet to define the top width. Gravity drains were not modeled. Gravity drains are pipes within the levee embankments that drain rainfall trapped on the landward side of the levee system through the levee embankment. The gravity drains have gates on the pipe outlet to restrict river backwater from backing up in the pipe during periods of high river flows. The gravity drains therefore do not serve any hydraulic purpose when modelling flows in the Lumber River. 6.1.4. Hydraulic Structures HEC-RAS v6.0 provides the capability to model bridges within a 2D model. This version was utilized to model all the hydraulic structures within the modeled domain as either culverts or bridges. The normal 2D equation was selected as the overflow computation method as it is computationally more stable compared to the weir equation option. A full list of structures within the hydraulic model and their areas are included in Appendices C1 and E3.3. Bridges along Lumber River were modeled using bridge geometry data from the effective model. Figure 6-2 below shows an example of a bridge that was modeled. Figure 6-2. Bridge example. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 42 Large culverts on Fivemile Branch were modeled as 2D connections with a rectangular notch when possible. However, for the culverts on I-95, the structure length was too long to be considered for a notch, so they were modeled as culverts. For these structures, roadway and deck elevations were taken from LiDAR. See Figure 6- 3 for an example of a long culvert on I-95. Figure 6-3. I-95 Meadow Branch culvert 2D connection example. 6.2. Boundary Conditions There are nine inflow locations representing flow from Lumber River, Raft Swamp, Jacob Swamp, Jacks Branch, Fivemile Branch, Meadow Branch, Ivey Branch, and White Oak Branch. Flows from Back Swamp were included in the flows for Lumber River. There are no significant inflows within the project area that would cause direct impact. A normal depth boundary condition was applied at the downstream end of the model and upstream along Back Swamp to prevent flows reaching that boundary from piling up. The normal depth was set to a friction slope of 0.001 after averaging the slope of several locations along the boundary. The boundary condition locations are shown in Figure 6-4. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 43 Figure 6-4. Boundary condition locations. 6.3. Model Execution The completed models were executed using a fixed timestep of 5 seconds. The selected timestep provided stable results without unduly prolonging the simulation time. The Shallow Water Equations with a Eulerian- Lagrangian approach to solving for advection (SWE-ELM equation set) was used for all simulations. Stage and flow hydrograph data at hydraulic structure locations were reviewed and verified to be appropriate. In certain cases, minor instabilities were noted in the flow data going through the structures, however, this did not impact the stages and hence do not impact the accuracy of the results. 6.4. Model Calibration and Verification The 2D HEC-RAS model was calibrated and verified by comparing the simulated peak stages and flows to observed peak stages and flows, and high-water marks. Observed data used for calibration and verification included USGS streamflow gage data at the USGS gage in Lumberton (USGS Gage 02134170), high water marks obtained during field data collection, a surveyed high- water mark, and high-water marks from the USGS National Water Information System Database (USGS, 2019). Available peak flows and stages at the USGS gage in Lumberton were reviewed to identify significant flooding events for use in calibration and verification. Two flooding events were identified and selected for use in 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 44 calibration and verification (Table 6-2). Hurricane Florence in September 2018 was used for calibration and Hurricane Matthew from October 2016, was used for verification. Table 6-2. Lumber River historical storms used for calibration and verification. Storm Peak Flow (cfs) Peak Stage (ft, NAVD88) Purpose Sept 2018 (Hurricane Florence) 17,100 119.69 Calibration Oct 2016 (Hurricane Matthew) 16,6001 119.36 Verification 1 Flow adjusted to account for bypass flow through I-95 opening. Recorded flow at gate without bypass flow was 14,600 cfs. The inflows for these storms were derived from the HEC-HMS model generated in the hydrology phase of this project. Manning’s n-coefficients were adjusted iteratively until the simulated values matched the observed values at both the USGS gage location and at the high-water mark locations. The comparison between the calibrated model results and observed data for the two storms are provided in Table 6-3. Figure 6-5 shows the differences between the simulated water surface elevations and the observed high-water marks for Hurricane Florence (September 2018). Matching HWMs in the vicinity of the proposed gate was prioritized over matching water surface elevations at the USGS gage location during the calibration process. Table 6-3. Observed versus simulated results at the USGS Gage in Lumberton. Gage vs. Simulated Results Storm Peak Flowrate (cfs) Peak Stage (ft, NAVD88) Observed Simulated % Difference Observed Simulated Difference (ft) Calibration Sept 2018 (Hurricane Florence) 17,100 15,877 -7.2 119.69 120.63 0.94 Figure 6-5. High water marks comparison for Hurricane Florence. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 45 The difference between the simulated peak water surface elevation and the USGS high -water marks ranges from -1.6 feet to 1.2 feet. Near the gate, the model results are within 0.5 feet of the USGS HWM elevations. The simulated peak water surface elevation is about 1.2 feet higher than the observed elevation at the location of the surveyed high-water mark near the proposed gate location. Along Lumber River, the results indicate that the simulated results are within 1 foot of the HWM elevations, although mostly lower than the HWM elevations. The model results at the USGS gage location were 0.9 feet higher than the recorded gage elevation. The analysis shows that for USGS high-water marks around the gate location, the model tends to underpredict values. Whereas for field collected high-water marks around the gate location, the model overpredicts values. This trend may reflect inherent errors associated with the collection of the high-water mark data. Achieving calibration results that fall in-between the two data sets was the desired goal. Note that the resulting flows in HEC-RAS at the USGS gage location are slightly different from those applied as boundary conditions due to attenuation of the peak flows within the HEC -RAS model and 2-dimensional distribution of the flows. The final calibrated roughness coefficients that were assigned to the various land use classifications are provided in Table 6-4. Results of the various calibration iterations are included in Appendix C3. During the calibration process, the Manning’s n values were generally increased to achieve a better match between simulated and observed water levels. Changes to the Manning’s n values for all land use classes are within the published Manning’s n value ranges (Table 6-1). Additionally, Manning’s n refinement regions were created for portions of the Lumber River and the area in the immediate vicinity of the proposed gate location. This was done to better capture the variations in land uses in those areas and were necessary in achieving good calibration results. The land use classes and assigned Manning’s n values for the refinement regions are included in Table 6-4. The calibrated Manning’s n coefficient was used to simulate Hurricane Matthew for verification. The results are shown in Table 6-5. Table 6-4. Calibrated Manning's n coefficients. NLCD Code NLCD Classification Base N Final Calibrated N 11 Open Water 0.03 0.033 21 Developed, Open Space 0.013 0.016 22 Developed, Low Intensity 0.05 0.063 23 Developed, Medium Intensity 0.075 0.094 24 Developed, High Intensity 0.1 0.125 31 Barren Land 0.03 0.03 41 Deciduous Forest 0.12 0.12 42 Evergreen Forest 0.12 0.12 43 Mixed Forest 0.12 0.12 52 Scrub/Shrub 0.05 0.05 71 Grassland Herbaceous 0.03 0.03 81 Pasture/Hay 0.04 0.04 82 Cultivated Crops 0.035 0.045 90 Woody Wetlands 0.1 0.15 95 Emergent Herbaceous Wetland 0.1 0.1 Channel 0.045 0.065 Area Upstream of Gate 0.05 0.05 Black's Tire and Auto Service 0.1 0.1 I-95 0.013 0.013 Ponds 0.03 0.033 Railroad Area 0.02 0.02 Wetland Upstream of I-95 0.1 0.1 Wooded Area 0.12 0.12 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 46 Table 6-5. Lumber River verification historical storms data versus simulated results. Gage vs. Simulated Results Storm Peak Flowrate (cfs) Peak Stage (ft, NAVD88) Observed Simulated % Difference Observed Simulated Difference (ft) Verification Oct 2016 (Hurricane Matthew) 16,600 14,924 -10.1 119.36 120.42 1.06 Like Hurricane Florence, final water surface elevations produced from the Hurricane Matthew simulation were compared to the USGS high-water mark elevations. The results of this comparison can be seen in Figure 6-6. The trend noted in calibration was consistent throughout the verification process. The results of calibration trial runs are included in Appendix C3. The calibration of HEC-RAS model is included in the electronic Appendix E3.1. The calibration model consists of 2 geometries, 2 unsteady flow files and 3 plans. Each unsteady flow file is a different storm event, and each geometry is a different trial, utilizing different roughness coefficients. Ultimately, there was a base Manning’s n coefficient plan, and three trials were run for the calibration storm. The verification storm (Hurricane Matthew) was only run once with the final geometry. Figure 6-6. High water marks comparison for Hurricane Matthew. 6.5. Design Flood Simulations and Results 6.5.1. Design Flood Simulations The 100-year, 500-year, 1,000-year, ¼ PMF, 1/3 PMF, ½ PMF, 2/3 PMF, ¾ PMF and PMF peak stages at the proposed gate location were simulated using the calibrated HEC-RAS model. The hydrographs developed in 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 47 Section 5.7 were used as the inflow boundary conditions for the simulations. As stated in Section 5.7, the duration of all the design storms was 48 hours. Geometry files were created for the existing conditions (without the proposed gate), and for the proposed conditions (with the proposed floodgate in place and I-95 embankment raised). Both geometry files use the calibrated and verified Manning’s n-coefficients. Nineteen different runs were performed using two different geometry files. The ten plans are: 1. 100yr Without Gate – Unsteady flow: 100YR, Geometry: Lumber River without Gate 2. 100yr with Gate and Proposed I-95 – Unsteady flow: 100YR, Geometry: Lumber River with Proposed I-95 and Gate 3. 500yr Without Gate – Unsteady flow: 500YR, Geometry: Lumber River without Gate 4. 500yr With Gate and Proposed I-95 – Unsteady flow: 500YR, Geometry: Lumber River with Proposed I-95 and Gate 5. 1,000yr Without Gate – Unsteady flow: 1,000YR, Geometry: Lumber River without Gate 6. 1,000yr With Gate and Proposed I-95 – Unsteady flow: 1,000YR, Geometry: Lumber River with Proposed I-95 and Gate 7. Florence Design – Unsteady flow: Hurricane Florence, Geometry: Lumber River with Proposed I-95 and Gate 8. 0.25PMF Without Gate – Unsteady flow: 0.25PMP, Geometry: Lumber River without Gate 9. 0.25 PMF With Gate and Proposed I-95 – Unsteady flow: 0.25PMP, Geometry: Lumber River with Proposed I-95 and Gate 10. 0.33 PMF Without Gate – Unsteady flow: 0.33PMP, Geometry: Lumber River without Gate 11. 0.33 PMF With Gate and Proposed I-95 – Unsteady flow: 0.33PMP, Geometry: Lumber River with Proposed I-95 and Gate 12. 0.5 PMF Without Gate – Unsteady flow: 0.5PMP, Geometry: Lumber River without Gate 13. 0.5 PMF With Gate and Proposed I-95 – Unsteady flow: 0.5PMP, Geometry: Lumber River with Proposed I-95 and Gate 14. 0.67 PMF Without Gate – Unsteady flow: 0.67PMP, Geometry: Lumber River without Gate 15. 0.67 PMF With Gate and Proposed I-95 – Unsteady flow: 0.67PMP, Geometry: Lumber River with Proposed I-95 and Gate 16. 0.75 PMF Without Gate – Unsteady flow: 0.75PMP, Geometry: Lumber River without Gate 17. 0.75 PMF With Gate and Proposed I-95 – Unsteady flow: 0.67PMP, Geometry: Lumber River with Proposed I-95 and Gate 18. FullPMP Without Gate – Unsteady flow: FullPMP, Geometry: Lumber River without Gate 19. PMF With Gate and Proposed I-95 – Unsteady flow: FullPMP, Geometry: Lumber River with Proposed I-95 and Gate Plans using the geometry “Lumber River without Gate” represent existing conditions; without the gate in place and without a raised I-95. Plans with the geometry “Lumber River with Proposed I-95 and Gate” represent proposed conditions with the flood gate and proposed I-95 raised embankment configuration in place. Simulations with and without the gate provide insights into possible impacts from the installation of the flood gate and raising of I-95. Hurricane Florence was also simulated with the proposed conditions geometry to determine the resulting peak water surface elevation at the proposed gate location for the flood of record. The models are included in the electronic Appendix E3.2. 6.5.2. Hydraulic Results 6.5.2.1. Water Surface Elevations The maximum water surface elevations from the ten simulations are summarized in Table 6-6. The maximum water surface elevations were extracted from a profile line along the upstream end of the proposed gate location in RasMapper. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 48 Table 6-6. Maximum Water Surface Elevation (WSE) from simulations at the flood gate location . Under the 100-year flood conditions, Lumber River overtops its banks and flows through the I-95 opening at the VFW Road (proposed gate location). The peak water surface elevation upstream of the gate is 123.7 feet, NAVD88. No segments of the levee system are overtopped. Installing the floodgate and raising I-95 results in an increase in the peak water surface elevation of 0.3 feet (Table 6-6) upstream of the gate. Inundation maps for these simulations are included in Appendix C4. Under the ¼ PMF flood conditions, Lumber River overtops its banks and flows through the I-95 opening at the VFW Road (proposed gate location). The peak water surface elevation upstream of the gate is 124.8 feet, NAVD88. No segments of the levee system are overtopped. Installing the floodgate and raising I-95 results in an increase in the peak water surface elevation by 1.2 feet (Table 6-6) upstream of the gate. Inundation maps for these simulations are included in Appendix C4. Under the 500-year flood conditions, Lumber River overtops its banks and flows through the I-95 opening at the VFW Road (proposed gate location). About 2,500 cfs of flow goes through the I-95 opening. In addition to flow through the I-95 opening, flow overtops the low segments of I-95 east and west of the proposed gate location. The overtopping flowrate at the low segments of I-95 is about 2,800 cfs on the west side and about 2,500 cfs on the east side. No overtopping occurs with the gate in place and I-95 raised. However, minor overtopping of the levee occurs at the intersection of the levee and NC72 where the levee is relatively low. Peak water surface elevation upstream of the gate under this scenario is 127.6 feet, NAVD88. Installing the floodgate and raising I-95 results in an increase in the peak water surface elevation 2.1 feet (Table 6-6) upstream of the gate. Inundation maps for these simulations are included in Appendix C4. Under the 1/3 PMF flood conditions, Lumber River overtops its banks and flows through the I-95 opening at the VFW Road (proposed gate location). In addition to flow through the I -95 opening, flow overtops at multiple locations along I-95 and causes widespread inundation in the city. Overtopping occurs on the west side of I-95 farther away from the gate location when the gate is in place and I-95 raised. The levee is also overtopped at multiple locations. Peak water surface elevation upstream of the gate under this scenario is 127.7 feet, NAVD88. Installing the floodgate and raising I-95 results in an increase in the peak water surface elevation 2.1 feet (Table 6-6) upstream of the gate. Inundation maps for these simulations are included in Appendix C4. Under the 1,000-year flood conditions, Lumber River overtops its banks and flows through the I-95 opening at the VFW Road (proposed gate location). In addition to flow through the I-95 opening, flow overtops at multiple locations along I-95 and the levee and causes widespread inundation in the city. Overtopping occurs on the west side of I-95 farther away from the gate location when the gate is in place and I-95 raised. Peak water surface elevation upstream of the gate under this scenario is 12 8.1 feet, NAVD88. Installing the floodgate and raising I-95 will result in an increase in the peak water surface elevation of 2.3 feet (Table 6-6) upstream of the gate. Inundation maps for these simulations are included in Appendix C4. Storm Event Maximum WSE (feet, NAVD88) Existing Conditions Proposed Conditions 100 YR 123.7 124.0 Hurricane Florence 124.8 125.6 ¼ PMF 124.8 126.0 500 YR 125.5 127.6 1/3 PMF 125.6 127.7 1,000 YR 125.8 128.1 ½ PMF 126.1 128.4 2/3 PMF 126.4 128.7 ¾ PMF 126.5 128.8 PMF 126.8 129.2 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 49 Under the ½ PMF, 2/3 PMF, ¾ PMF and full PMF flood conditions, Lumber River overtops its banks and flows through the I-95 opening at the VFW Road (proposed gate location). Flow also overtops at multiple locations along I-95 and the levee and causes widespread inundation in the city. The peak water surface elevations upstream of the gate without the gate and with the gate installed and I -95 raised for the different PMF runs are listed in Table 6-6. For the ¾ PMF flood condition, the peak water surface elevation upstream of the gate is 128.8 feet when the gate is in place and I-94 raised. Installing the floodgate and raising I-95 results in an increase in the peak water surface elevation by 2.3 feet (Table 6-6) upstream of the gate for the ¾ PMF flood condition. Peak water surface elevations upstream of the gate for the flood of record (Hurricane Florence) under existing conditions is 124.8 feet, NAVD88. Installing the gate and raising I-95 to prevent overtopping increases the peak water surface elevation to 125.6 feet, NAVD88. When comparing the simulated 100-year existing conditions (without gate) inundation boundary to the effective floodplain, the internal flooding estimated by the model is less extensive (Figure 6-7). This difference is due to the fact that the effective floodplain includes mapping for Jacob Swamp and Little Jacob Swamp, whereas the model does not include either stream as an inflow. However, in the northeast and northwest corners of the domain, the simulated boundary is predicted to spread further. Jack’s Branch, to the west of Raft Swamp, is not included in the effective floodplain, but shows substantial flow within the model. The same scenario occurs with Ivey Branch, north of Meadow Branch. Figure 6-7. Inundation boundaries without floodgate 6.5.2.2. Impacts of Flood Gate Installation The impacts of the flood gate installation in terms of increases in water surface elevations were assessed by comparing flood depths and inundation areas from model simulations with and without the flood gate for the 100-year, and 500-year floods. Figures 6-8 and 6-9 show the difference in water surface elevations and extents of impact of the proposed projects (floodgate and raising of I-95) for the 100-year and 500-year storms. The results show that proposed projects will result in peak water surface elevation increases of up to about 0.4 feet are expected during the 100-year flood (Figure 6-8) and up to about 3 feet during the 500-year flood (Figure 6-9). 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 50 Figure 6-8. WSE (ft) without flood gate compared to with flood gate and I -95 raised for 100YR storm. Figure 6-9. WSE (ft) without flood gate compared to with flood gate and I-95 raised for 500YR storm. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 51 7. Freeboard Estimation The proposed flood gate will impound water leading to temporary pond-like situation at the northern side of the gate. This situation is expected to last for about 5 days during the design flood. During this temporary pond-like situation, wind setup caused by the horizontal stress exerted on the water surface by the winds and runup associated with wind generated waves (Figure 7-1) may develop. The height of the flood gate should include freeboard allowance that considers these wind effects on the surface of water. This section outlines the procedure used to calculate the wind setup and wave run-up based on simplified wave models. Figure 7-1. Definition sketch for wave runup and wind setup (USACE, 1997). In general, the different steps involved in calculating wave run-up are as follows: • Estimate average wind speed over an appropriate fetch • Estimate wave height and wave period • Estimate wind setup and wave-runup Above steps are described in more detail in the following sections. 7.1. Estimate average wind speed over an appropriate fetch 7.1.1. Fetch Fetch is defined as the unobstructed distance along which wind blows over the surface of water to creat e wind generated waves. The inundation extents computed from H&H modeling for the 500-year storm with gate and I-95 raised was superimposed on satellite imagery to determine the longest unobstructed distance (measured along a straight line) that is exposed to wind effects wh en water pools behind the Lumberton Flood Gate during the flood. The longest fetch was estimated to be around 2 miles to the northwest of the flood gate (red line in Figure 7-2). 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 52 Figure 7-2. Fetch line (red) superimposed on 500-year depth raster and satellite imagery. 7.1.2. Wind Speed Annual extreme fastest mile wind speed measured at 30 feet for 138 stations around United States was used to draw maps for the 2-year, 50-year and 100-year mean recurrence intervals (Thorn, 1968, shown in Appendix D). The 2-yr return period wind speed from that dataset was used as the input to compute the design wind speed. The estimated 2-year fastest mile wind speed over the state of North Carolina is 50 miles per hour. The following assumptions (USACE, 1989) are made about the wind speed used as input for wave growth models: • Wind fields are well organized and can be adequately described using an average wind speed and direction over the entire fetch • Wind speed should be corrected to the 33-foot (10 meter) level. • Wind speed should be representative of the average wind speed measured over the fetch • When the fetch length is 10 miles (16 kilometers) or less, the wind has not fully adjusted to the frictional characteristics of the waves. • When the fetch length is greater than 10 miles (16 kilometers), thermal stability effects must be included in the wind speed transformation. To satisfy these assumptions, the following adjustments are made to the wind speed. 7.1.2.1. Height Adjustment Since the wind speed was measured at 30 f eet, an adjustment was applied to get the equivalent wind speed at a height of 33 feet using the 1/7 power law (USACE, 1989) (Equation 7-1): 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 53 𝑈33 =(33 𝑧) 1 7 ∗𝑈𝑧 (7-1) Where U33 is the wind speed at the 33-foot level (miles per hour [mph]), z is the elevation above the surface (ft), and Uz is the wind speed at a distance of z above the surface (mph). When z is 30 feet and U30 is 50 mph, U33 is equal to 50.68 mph. 7.1.2.2. Overland Wind Adjustment The fastest mile data is based on measurements at land-based stations. Under comparable meteorological conditions, wind velocities over water are higher than over lan d surfaces because of smoother and more uniform surface conditions. Factors to adjust land-based wind speed measurements to account for these effects are presented on page 15-2 of USACE, 1997 (see Appendix D). For a wind fetch of 2 miles (see section 7.1.1), the ratio of winds over water to the winds over land (FWL) was estimated to be 1.21. The overwater wind speed, 𝑈𝑤 was calculated using Equation 7-2. 𝑈𝑤=𝐹𝑊𝐿∗𝑈33 (7-2) 𝑈𝑤=1.21 ∗50.68 =61.32 𝑚𝑝ℎ Where FLW is the ratio of winds over water to winds over land, and U33 is the previously calculated wind speed at the 33-foot level (mph). With an FWL of 1.21 and the U33 of 50.68 mph, the Uw is 61.32 mph. 7.1.2.3. Computing Adjusted Wind Speeds based on Averaging Time There are two approaches (fetch-limited and duration-limited) for determining the characteristics of wind generated waves. Fetch-limited conditions assume that the wind blows with a constant speed and direction over a certain fetch for sufficient time for the waves to travel the entire fetch length (Ozeren et al., 2009). Within this time steady state conditions are achieved within the fetch. If the wind duration is less than the required time for the waves to travel the fetch, then the wave conditions will be time dependent, and such wave conditions are described as duration‐limited. In the present work, since the wind generated waves are limited by the extent of the ponded areas adjacent to the flood gate, the assumption of fetch-limited conditions is appropriate. Therefore, a minimum duration (t) must be selected to meet the assumptions of the fetch-limited conditions discussed above. An averaging interval (larger than the minimum duration, t) over which wind speeds are rela tively constant should also be selected and the corresponding averaged wind speed must be computed. The equations for computing wind speeds over different averaging intervals are based on Figure 5-26 in USACE, 1989 (also shown in Appendix D). First, the duration corresponding to a fastest mile wind speed of 50 mph was determined from the relationship t=3600/U (from Figure 5-35 in USACE, 1989), where Ut is the fastest mile wind speed. Thus, t = 72 s. The 72s fastest mile winds to which overland adjustment has been applied is converted to 1 hour averaged wind speed using equation below (Equation 7-3): 𝑇𝑟 𝑇1ℎ𝑟 =1.277 +0.296 tanh (0.9 log (49 𝑡)) (7-3) 𝑇72 𝑇1ℎ𝑟 =1.277 +0.296 tanh (0.9 log (49 72)) 𝑈1ℎ𝑟 = 50.13 mph 7.2. Estimate Wave Height and Wave Period Deepwater wave characteristics based on the fetch and adjusted wind speeds computed in Section 7.1 are determined using hindcasting charts for deep water waves (Figure 5-34, USACE, 1989, shown in Appendix D). The computed wave heights, periods and minimum duration are shown in Table 7-1 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 54 Table 7-1. Deep water wave characteristics. Adjusted Wind Speed (mph) Fetch (miles) Duration (min) Deep water Wave Height (ft) Deep water Wave Period (s) 50.13 2 45 3 3 The minimum duration computed from the chart is around 45 minutes, therefore the assumption of fetch-limited conditions is valid if we assume a duration of 1 hour. Therefore, the design deep water wave height and period is selected to be equal to 3 ft and 3 seconds (s) respectively. Next, we compute the deep-water wavelength (Equation 7-4) using the dispersion relationship to verify the assumption of deep-water conditions. 𝐿𝑐=𝑔𝑇𝑑2 2𝜋 (7-4) Where Ld is the deep-water wavelength (ft), g is gravity (ft/s2), and Td is the deep-water wave period (s). When Td is 3 s, the deep-water wavelength (Ld) is 46.12 ft. 𝐿𝑐=32.2∗32 2𝜋 = 46.12 feet For deep water wave growth to be unimpeded by the bottom, the ratio of water depth to wavelength must be equal to or greater than 0.5 (USACE, 1989). Design flood depth at the gate is about 8 feet so the ratio of the water depth to wavelength is 0.17 which is significantly less than half the wavelength. Therefore, the assumption of deep-water wave growth is not applicable. The wave height and period should therefore be based on shallow water curves. The hindcasting charts for computing shallow water wave cha racteristics at a depth of ten feet is shown in Appendix D, Figure D-5 (or Figure 5-36 USACE, 1989). For a wind speed of 50.13 mph and fetch of 2 miles, the shallow water wave height and wave period are 2.5 feet and 2.75 s respectively. 7.3. Estimate wind setup and wave runup 7.3.1 Wind Setup Set-up (Se) is the piling up of water at the leeward end, and a lowering of water level at the windward end in a reservoir caused by wind (Figure 7-1). Wind set-up can be estimated for the reservoir, based on the following equation (USACE, 1989) (Equation 7-5): 𝑅𝑐=𝑇2 ∗𝐹𝑟 1400𝐶 (7-5) Where Se is set-up in feet above the still water level (ft), U is the average wind velocity (mph) over the maximum fetch distance (Fs) (mi) that influences the wind, and D is the average depth of water along the fetch line (ft). When D is 13 ft and Fs is 2 ft the Se is 0.3 ft. 𝑅𝑐=50.132∗2 1400∗13 = 0.3 ft 7.3.2 Wave Runup Wave runup is defined as the height above still water level to which a wave will rise on a structure or beach (Figure 7-1). The upper limit for relative runup on smooth vertical walls (derived from laboratory experiments), is presented in the U.S Army Corps of Engineers miscellaneous paper CERC-90-4 (USACE, 1990) and is equal to (Equation 7-6): 𝑅 𝐻=2.5 (7-6) Where R is the wave runup (ft) and H is the wave height at the toe of the structure (ft). For a wave height of 2.5 ft, the runup is 6.25 ft. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 55 𝑅 =2.5 ∗2.5 =6.25 𝑓𝑡 7.4. Sensitivity Analysis A sensitivity analysis was performed to understand the variability of the computed wave runup and was setup with changes in the fetch and wind speed for the 100-year, 500-year and the ¼ PMF return period events. As stated in Section 3, the top elevation of the flood gate should be at a minimum higher than the elevation from the flood of record, which has a return period of about of 200 years. The sensitivity analysis provides a range of values for freeboard for the 100-year and 500-year floods to provide lower and upper freeboard threshold estimates. The direction of the prevailing winds determines the fetch length. The black dashed lines in Figure 7-2 indicate the different fetch lines that may be applicable depending on the wind direction over the study area. Thus, the fetch length can vary between a maximum of 2 feet to a minimum of 0.6 feet. Also plotted were the modeled depths along the fetch to confirm that the average depth along the fetch length (around 12 feet) is large enough to overtop the vegetation in that area and thereby provide an unobstructed path for the winds. The wind setup and wave runup computed for the different fetch-wind speed combinations are summarized in Table 7-2. These quantities were found to be sensitive to changes in the fetch. Table 7-2. Summary of sensitivity analysis. Design Storm Fetch (mi) Wind Speed (mph) Wave Runup (ft) Wind Setup (ft) Total Wind and Wave Component (ft) 100-Year 2 50 5 0.4 5.4 0.6 50 3.8 0.1 3.9 500-Year 2 50 6.3 0.3 6.6 0.6 50 3.8 0.1 3.9 ¼ PMF 2 50 6.3 0.3 6.6 0.6 50 3.8 0.1 3.9 7.5. Results The estimated range of freeboard to account for wind-wave action is 3.9 feet to 5.4 feet for the 100-year flood and 3.9 feet to 6.6 feet for the 500-year and ¼ PMF return period events. The lower bound estimate of 3.9 feet results from the use of a fetch of 0.6 miles during either the 100-year or 500-year or ¼ PMF event. The upper bound estimates of 5.4 and 6.6 feet corresponds to a fetch of 2 miles during the 100-year and 500-year or ¼ PMF events, respectively. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 56 8. Recommendations The recommended range of top of gate elevations and gate heights are shown in Table 8.1. Table 8-1. Recommended Range of Gate Heights Design Storm Recommended Top of Gate Elevation and Gate Height Max. Stillwater Elevation (feet, NAVD88) Freeboard (feet) Top of Gate Elevation (feet, NAVD88) Gate Height (feet) 100 YR 124.0 5.4 129.4 9.4 ¼ PMF 126.0 6.6 132.6 12.6 500 YR 127.6 6.6 134.2 14.2 Reference Elevations: 1. Minimum elevation for levee accreditation = 128.5 feet (ft), NAVD88 2. Flood of record elevation at gate location assuming gate is in place and I-95 raised = 125.6 ft, NAVD88 3. Elevation of ¾ PMF at gate location assuming gate is in place and I-95 raised = 128.8 ft, NAVD88 4. Elevation of PMF at gate location assuming gate is in place and I-95 raised = 129.2 ft, NAVD88 5. Average ground elevation at gate location is 120.0 ft 6. ¼ PMF is the largest storm that does not overtop the levee and proposed I -95 7. Levee is overtopped during the 500-year storm. The resulting peak elevation upstream of the gate f or the flood of record, the minimum elevation required for levee accreditation, and the ¾ PMF and PMF peak water surface elevations are also shown in the table for reference. The range of recommended top of flood gate elevation of 129.4 feet, NAVD88 to 134.2 feet, NAVD88 all meet the minimum requirements for levee certification. The recommended top of gate elevation also ensures that the gate is not overtopped even during the PMF, if freeboard is not considered. Selection of the gate height from the range provided should consider the following factors: • Cost; • Floodplain Impacts; and • Minimum desired level of service 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 57 9. References 1. Barnes, J., 1998. North Carolina’s Hurricane History, Revised and updated version. University of North Carolina Press. 2. Calenda et al., 2005. Distribution of the extreme peak floods of the Tiber River from the XV century. Advances in water resources, 28(6), 615-625. 3. Chow, 1959. Open Channel Hydraulics. McGraw-Hill, New York. 4. Federal Emergency Management Agency, 2008. Meeting the Criteria for Accrediting Levee Systems on NFIP Flood Maps. Federal Emergency Management Agency (FEMA), 2008, Meeting the Criteria for Accrediting Levee Systems on NFIP Flood Maps, www.fema.gov/media-library-data/20130726-1600- 20490-4180/lv_accredit_checklist_nov08.pdf. 5. Federal Emergency Management Agency, 2006. Mapping of areas protected by levee systems. Code of Federal Regulations Title 44 Section 65.10. Federal Emergency Management Agency, Aug. 25, 1986 6. Federal Emergency Management Agency, 2014. A Report of Flood Hazards in Robeson County, North Carolina and Incorporated Areas, Flood Insurance Study Number 37155CV000, Federal Emergency Management, Atlanta, GA. 7. National Institute of Standards and Technology, 2015. Maps of Non-hurricane Non-tornadic Wind Speeds with Specified Mean Recurrence Intervals for the Contiguous United States Using a Two- dimensional Poisson Process Extreme Value Model and Local Regression, National Institute of Standards and Technology Special Publication 500-301, 102 pages 8. National Oceanic and Atmospheric Administration, 2019a. Tropical Cyclone Climatology. National Oceanic and Atmospheric Administration National Hurricane Center and Central Pacific Hurricane Center. Available at: nhc.noaa.gov/climo 9. National Weather Service, 2019a. Hurricane Floyd: September 16, 1999. National Oceanic and Atmospheric Administration National Weather Service. Available at: http://weather.gov/ilm/Floyd 10. National Weather Service, 2019b. Hurricane Florence: September 14, 2018. National Oceanic and Atmospheric Administration National Weather Service. Available at: http://weather.gov/ilm/HurricaneFlorence 11. National Oceanic and Atmospheric Administration, 202 0. Climate at a Glance-Statewide Time Series. National Oceanic and Atmospheric Administration National Centers for Environmental Information. Available at: ncdc.noaa.gov/cag/statewide/time-series 12. National Weather Service, 2017. Hurricane Matthew in the Carolinas: October 8, 2016. National Oceanic and Atmospheric Administration National Weather Service. Available at: http://weather.gov/ilm/Matthew 13. North Carolina Department of Transportation, 2019. North Carolina Department of Transportation Bridges Map, ncdot.maps.arcgis.com/home/webmap/viewer.html?webmap=db3b56c3228743b3811e36761393d661. Date accessed: 9 Dec. 2019 14. North Carolina Flood Risk Information System, North Carolina Floodplain Mapping Program, fris.nc.gov/fris/Index.aspx?user=General Public&amp;ST=NC&amp;FIPS=161. 15. Natural Resources Conservation Service, 2019. National Engineering Handbook, Part 630 Hydrology ., United States Department of Agriculture, Natural Resources Conservation Service, August 2019. Rainfall Distribution spreadsheet available at https://www.nrcs.usda.gov/wps/portal/nrcs/detailfull/national/water/?&cid=stelprdb1044959 16. Ozeren, Yavuz & Wren, D., 2009. Technical Note: Predicting Wind-Driven Waves in Small Reservoirs. Transactions of the American Society of Agricultural and Biological Engineers, Vol. 52(4), pages 1213 – 1221. 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 58 17. Rucker, Gregory C. Hurricane Matthew: Sources of Flooding and Mitigation Strategies in Lumberton, NC. AECOM, 2017, pp. Appendix C, Hurricane Matthew: Sources of Flooding and Mitigation Strategies in Lumberton, NC. 18. State Climate Office of North Carolina, 2015. NC Extremes: Damaging hurricanes from slopes to shores. NC State University. Available at: http://climate.ncsu.edu/climateblog?id=157 19. State Climate Office of North Carolina, NC State University. CRONOS [internet database] available at http://climate.ncsu.edu/cronos/. Accessed December 20, 2019. 20. Thorn, H.C.S, 1968. New Distributions of Extreme Winds in the United States. Journal of the Structural Division, 1968, Vol. 94, Issue 7, Pg. 1787-1802 21. United States Army Corps of Engineers, 1984. Shore protection manual. Vicksburg, Miss: Dept. of the Army, Waterways Experiment Station, Corps of Engineers, Coastal Engineering Research Center. 22. United States Army Corps of Engineers, 1989. "Water Levels and Wave Heights for Coastal Engineering Design," US Army Corps of Engineers EM 1110-2-1414, July 5, 1989. 23. United States Army Corps of Engineers, 1990. “Maximum Periodic Wave Runup on smooth slopes”, US Army Corps of Engineers Miscellaneous Paper CERC-90-4. 24. United States Army Corps of Engineers, 1997. "Hydrologic Engineering Requirements 1. for Reservoirs," US Army Corps of Engineers EM 1110-2-1420. 25. United States Army Corps of Engineers, 2000. Hydrologic Modeling System HEC-HMS Technical Reference Manual. Report CPD-74B. United States Army Corps of Engineers, Davis, CA. 26. United States Army Corps of Engineers, 2017. Hydrologic Modeling System Version 4.2.1, United States Army Corps of Engineers, March 2017, Davis, CA. 27. United States Army Corp of Engineers (USACE). 2021. Hydrologic Engineering Center's River Analysis System (HEC-RAS), Version 6.0. February 2021. 28. United States Department of Agriculture Natural Resources Conservation Service. Geospatial Data Gateway [internet database] available at: http://datagateway.nrcs.usda.gov. Accessed October 30, 2019. 29. United States Geological Survey, 2009. Magnitude and Frequency of Rural floods in the Southeastern United States, through 2006: Volume 2, North Carolina. U.S department of Interior, U.S Geological Survey. 30. United States Geological Survey, 2016. The StreamStats program. Available at: http://streamstats.usgs.gov. Accessed on: November 1, 2019. 31. United States Geological Survey, 2019 a. PeakFQ Version 7.3. November 21, 2019. 32. United States Geological Survey, 2019 b. U.S. Guidelines for Determining Flood Frequency. Bulletin 17C.Techniques and Methods 4-B5 version 1.1., Department of Interior, U.S. Geological Survey, May 2019. 33. United States Geological Survey, 2020. USGS Current Conditions for North Carolina. Available at: https://waterdata.usgs.gov/nc/nwis/uv?. Accessed on January 4,2020. 34. USGS Flood Event Viewer, 2019. United States Geological Survey National Water Information System Database, stn.wim.usgs.gov/fev/. 35. Weaver, J.C., Feaster, T.D., and Robbins, J.C., 2016. Preliminary peak stage and streamflow data at selected streamgaging stations in North Carolina and South Carolina for flooding following Hurricane Matthew, October 2016: US Geological Survey Open-File Report 2016-1205, 38: https://doilorg/10.3133/ofr20161205 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report Page 59 Appendices 1 | 1.0 | 16 March 2020 Atkins | West Lumberton Flood Gate H&H Report Field Data Page A1.0 Page A1-1 Label Name Channel Street Name Field Accesible?Status Latitude Longitude Structure Type Material Inlet Rise Span Diameter # Piers Culvert Length Obstruction/ Buried E1 Fivemile Branch Dawn Dr (next to I-95)Will be surveyed 34.650605 -79.012221 2RCBC Concrete 8 10 E2 Meadow Branch Dawn Dr (next to I-95)Will be surveyed 34.649444 -79.012578 2RCBC Concrete 8 10 E3 Fivemile Branch N Roberts Ave (SR 211)Will be surveyed 34.649424 -79.016424 3RCBC Concrete 9 14 E4 Fivemile Branch W Carthage Rd (SR 1536)Will be surveyed 34.635177 -79.030266 3RCBC Concrete 11 14 E5 Lumber River Kenric Rd (SR 1539)Effective 34.624071 -79.057228 Bridge 194.9 2 E6 Lumber River S Caton Rd Effective 34.624567 -79.054882 Bridge 354.9 4 E7 Lumber River CSX Railroad Not accessible Effective 34.630821 -79.04933 Bridge 350 14 E8 Lumber River I-95 Effective 34.632279 -79.029675 2 Bridges 7 E9 Lumber River 5th Street Effective 34.620186 -79.010729 Bridge 236.6 5 E10 Lumber River W 2nd St Effective 34.617969 -79.011103 Bridge 282.9 5 E11 Lumber River CSX Railroad Effective 34.617576 -79.011324 Bridge 14 E12 Lumber River Alamac Rd (SR 2289)Effective 34.610595 -79.009171 Bridge 330.5 6 E13 Lumber River S Chippewa St/ Hestertown Rd Will be surveyed 34.607211 -79.000088 Bridge 198 4 E14 Lumber River NC HWY 72 Effective 34.591539 -78.982678 Bridge 360.9 7 E15 Small Trib NC Hwy 72 Missing 34.584553 -79.986302 Arch Culvert Aluminum 6.4 26 LJ1 Little Jacob Swamp Diversion Contempora Dr (SR 2513)Effective 34.607631 -79.076069 Circular Culverts (2)CMP Headwall 4.5 60 Look at field sketch; Left = 3.1', Right = 1.8' LJ2 Little Jacob Swamp Contempora Dr (SR 2513)Effective 34.597965 -79.070544 Circular Culvert Concrete Square edge entrance with headwall 5 40 LJ3 Little Jacob Swamp KB Rd (SR 2413)Effective 34.596479 -79.067027 Circular Culverts (2)CMP L @ Mitered to conform to slope; R @ Headwall 60 LJ4 Little Jacob Swamp MLK Dr (NC 41)Effective 34.589393 -79.043117 Arch (2) Corrugated Metal 90 degree headwall 7.1 15 60 LJ5 Little Jacob Swamp Lovette Rd (SR 2204)Effective 34.587254 -79.022739 Arch Corrugated Metal 90 degree headwall 8 20 40 JS1 Jacob Swamp Culvert in Field Missing 34.605287 -79.057754 JS2 Jacob Swamp Culvert in Field Missing 34.604426 -79.056623 JS3 Jacob Swamp KB Rd (SR 2413)Effective 34.603918 -79.055988 CMP Corrugated Metal Thin wall projecting 6 50 JS4 Jacob Swamp Culvert in Field Not accessible Missing 34.601447 -79.047198 Culvert JS5 Jacob Swamp MLK Dr (NC 41)Effective 34.595612 -79.038041 Box Culverts (2) Concrete Wingwall flared 30 to 75 deg 4.5 6 40 JS6 Jacob Swamp Lovette Rd (SR 2204)Effective 34.59306 -79.020421 Bridge 7.4 to LC 24 0 40 JS7 Jacob Swamp Alamac Rd (SR 2289)Not accessible Effective 34.587111 -79.006068 Bridge JS8 Jacob Swamp SR 2305 Effective 34.580668 -78.99918 Bridge 11 to LC 90 1 JS9 Jacob Swamp Wilmington Hwy (NC 72)Effective 34.565913 -78.976465 Bridge 14 to LC 90 2 GB1 Gum Branch Kenny Biggs Rd (SR 2413)Missing 34.609149 -79.040569 Elliptical CMP (2) CMP 90-deg HW 5 8 GB2 Gum Branch Railroad Not accessible Missing 34.608131 -79.036988 Culvert GB3 Gum Branch Crandlemire Rd Missing 34.608943 -79.032704 2 CMP CMP Stone HW 6 GB4 Gum Branch MLK Dr (NC 41)Missing 34.60779 -79.023378 Arched Bridge 7.3 23.5 GB4.5 Gum Branch CMP CMP 5.5 39 GB5 Gum Branch Lovette Rd (SR 2204)Missing 34.609855 -79.016345 2 Arched CMP CMP 6 12 CM1 Cotton Mill Branch School St Missing 34.621688 -79.035749 Culvert Plastic 4 CM2 Cotton Mill Branch Railroad Not accessible Missing 34.624044 -79.033085 Culvert CM3 Cotton Mill Branch Railroad Not accessible Missing 34.622187 -79.033458 Culvert CM4 Cotton Mill Branch Railroad Not accessible Missing 34.621246 -79.033609 Culvert CM5 Cotton Mill Branch Culvert in Field Not accessible Missing 34.620526 -79.030114 Culvert CM6 Cotton Mill Branch Culvert in Field Not accessible Missing 34.619697 -79.024166 Culvert CM7 Cotton Mill Branch MLK Dr (NC 41)Effective 34.614704 -79.01783 2RCBC Concrete Flared WW, Beveled 8 9 CC1 Collection Canal Crystal Rd Missing 34.629362 -79.03478 Pipe Culvert Concrete Proj. 2 52 CC2 Collection Canal Crystal Rd Missing 34.630156 -79.033034 Pipe Culvert Concrete, Open Bottom 3:1 Tapered Inlet, Proj. 3 1 54 CC3 Collection Canal Crystal Rd Obstructed Missing 34.630653 -79.03194 Culvert Completely obstructed CC4 Collection Canal The Riverwalk (Levee)Missing 34.630864 -79.028611 Bridge Aluminum 37.4 0 3 CC5 Collection Canal The Riverwalk (Levee)Missing 34.628388 -79.024622 Arched Bridge Aluminum 9' to LC 59 0 8.9 CC6 Collection Canal Lowery St Not accessible Missing 34.62794 -79.025577 Culvert Outlet Submersed, no inlet found CC6.5 Collection Canal Pipe Culvert Concrete 1.5 Couldn't located inlet CC7 Collection Canal The Riverwalk (Levee)Missing 34.62674 -79.023144 Bridge Wood 51 2 5.7 CC8 Collection Canal The Riverwalk (Levee)Missing 34.622822 -79.016516 2 Pipes CMP 4 CC9.5 Collection Canal Bridge 41 2 7 CC9 Collection Canal W 5th Street Missing 34.62021 -79.01208 RCP Concrete 90 degree headwall 6 CC10 Collection Canal MLK Dr (NC 41)Missing 34.618242 -79.012282 Pipe Culvert CMP 90 degree headwall 7 CC11 Collection Canal Railroad Not accessible Missing 34.61793 -79.012451 Pipe Culvert CMP 7 Completely blocked with Sediment CC12 Collection Canal Bullard St/ The Riverwalk Missing 34.617154 -79.012644 2 CMP CMP Proj. 4 29.5 CC12.5 Collection Canal Missing RCP Concrete 3 76 CC13 Collection Canal Fig St/ The Riverwalk Missing 34.615763 -79.013626 Culvert (long)RCP Proj. 5/7 CC14 Collection Canal Chicken Foot Rd Missing 34.609231 -79.014287 Arch Culvert CMP HW 9 22 Complete Structure List from Field Data Collection Page A1-2 E9 E8 E7 E6E5 E4 E3 E2 E1 CC9 CC8 CC7 CC6CC5 CC4CC3CC2CC1 CM7 CM6CM5CM4CM3 CM2 CM1 GB5 GB4 GB3GB2 GB1 JS8 JS7 JS6 JS5 JS4 JS3JS2JS1 LJ5 LJ4 LJ3 LJ2 LJ1 E14 E13 E12 E11E10 CC14 CC13 CC12 CC11 CC10 Lumberton Flood Gate Lumber R i v e r Ivey Branch Meadow Bran c h Jacob S w a m p Raft Swamp Fivemi l e B r a n c h Jac k s B r a n c h Bear Swamp Mill Branch Re e d y B r a n c h Ke r s e y B r a n c h Po w e l l B r a n c h Bac k S w a m p Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community 0 1 20.5 Miles Legend Field Structures Channel Collection Channel Cotton Mill Branch Fivemile Gum Branch Jack Swamp Little Jack Swamp Lumber Page A1-3 Page A1-4 Page A1-5 Number Street Name Business/Address Height Latitude Longitude Storm Notes 1 1451 Lowery St Lumberton Water Plant 39" from floor 34.626688 -79.024735 Matthew 2 1451 Lowery St Lumberton Water Plant Maintenance Building 41" from floor 34.626243 -79.024175 Matthew 3 Well Site #2 ( Park)42-43" from ground 34.630742 -79.031307 Matthew 4 VFW Crest by future Flood Gate 36" from crest 34.627654 -79.039719 Florence 5 2460 Cox Rd Lift Station #23 85" 34.627352 -79.04139 Florence Top of barbed wire 6 Steel building by CSX Railroad (by gate location)36" 34.628221 -79.041324 Florence 7 Raw Water Intake 120" 34.633669 -79.037256 Matthew; Florence 8 415 County Club Dr Lift Station #21 34.626366 -79.058788 Florence 68" from mound to bottom of generator; 40" from ground to mound base 9 2385 Lackey St Lift Station #25 77" 34.64292 -79.025638 Florence 10 3621 Dawn Drive Lift Station #27 66" 34.65168 -79.012432 Florence 11 Ramada Inn - Lift Station #31 45" from floor 34.647553 -79.010911 Matthew? Page A1-6 Page A1-7 D D D D D D CM7 CC3 CM1 GB5GB3CC14 Lumber R i v e r Cotto n M i l l B r a n c h Gum Branch Canal ± 0 0.1 0.2 0.3 0.40.05 Miles Legend D Survey Backsight Levee Lumber River Page A1-8 Cross Section Data Analysis Table 1. CC3 Survey Data Station BS HI FS Elev BM 4.36 119.2087 114.8487 0 4.36 114.8487 5 5.99 113.2187 15.5 9.15 110.0587 19 11.8 107.4087 22.5 11.3 107.9087 25.7 8 111.2087 30 5.82 113.3887 33 5.44 113.7687 Figure 1. CC3 cross section 106 107 108 109 110 111 112 113 114 115 116 0 5 10 15 20 25 30 35 El e va t i o n ( f t ) Station CC3 Survey vs. LiDAR Survey XS Lidar Page A1-9 Table 2. CC14 Survey Data Station BS HI FS Elev BM 3.39 115.75 112.36 0 3.39 112.36 5 3.79 111.96 13 6.92 108.83 21 13.14 102.61 34 14.35 101.4 48 14.37 101.38 56 10.16 105.59 64 5.71 110.04 75 3.93 111.82 Figure 2. CC14 cross section 100 102 104 106 108 110 112 114 0 10 20 30 40 50 60 70 80 El e va t i o n ( f t ) Station CC14 Survey vs. LiDAR Survey XS LiDAR Page A1-10 Table 3. CM7 Survey Data Station BS HI FS Elev BM 3.35 119.37 116.02 0 4.97 114.4 8 6.03 113.34 13 11.78 107.59 16 12.84 106.53 20 13.4 105.97 22 12.46 106.7 26 12.67 106.9 27.5 12.47 111.07 33 8.3 113.85 37 5.52 114.31 43 5.06 119.37 Figure 3. CM7 cross section 106 108 110 112 114 116 118 120 122 0 10 20 30 40 50 60 El e va t i o n ( f t ) Station CM7 Survey vs. LiDAR Survey XS LiDAR Page A1-11 Table 4. GB3 Survey Data Station BS HI FS Elev BM 4.52 121.16 116.64 0 5.88 115.28 17 5.64 115.52 25 8.04 113.12 30 11.43 109.73 34.5 12.45 108.71 44 11.69 110.53 48.5 10.63 114.26 53 6.9 114.94 60 6.22 121.16 Figure 4. GB3 cross section 106 108 110 112 114 116 118 120 122 0 10 20 30 40 50 60 70 El e va t i o n ( f t ) Station GB3 Survey vs. LiDAR Survey XS LiDAR Page A1-12 Table 5. GB5 Survey Data Station BS HI FS Elev BM 4.48 117.3 112.82 0 6.39 110.91 6 6.76 110.54 11 10.23 107.07 21 12.46 104.84 35 10.4 106.9 42.5 4.32 117.3 not reliable Figure 5. GB5 cross section 104 106 108 110 112 114 116 118 0 10 20 30 40 50 60 El e va t i o n ( f t ) Station GB5 Survey vs. LiDAR Survey XS LidAR Page A1-13 Table 6. CM1 Survey Data Station BS HI FS Elev BM 5.42 122.15 116.73 0 6.21 115.94 9 5.89 116.26 13 8.78 113.37 17 10.59 111.56 21 11.67 110.48 27 10.6 111.55 30.5 8.72 113.43 36 5.22 116.93 Figure 6. CM1 cross section 106 108 110 112 114 116 118 0 5 10 15 20 25 30 35 40 El e va t i o n ( f t ) Station CM1 Survey vs. LiDAR Survey XS Lidar Page A1-14 1 | 1.0 | 16 March 2020 Atkins | West Lumberton Flood Gate H&H Report Hydrologic Analysis Page B1.0 B1 Rainfall Data and Analysis Page B1-1 Thiessen Polygon Procedure 1. Determine precipitation gage data availability for specific event (see table below) 2. Use a point shapefile with only the available gages to create a set of Thiessen polygons in GIS 3. Determine which polygons overlay the sub-basins 4. If a basin is within two or more polygons, calculate the area in each polygon and its proportion in relation to the sub-basin’s total area. This proportion will become the weight 5. For sub-basins that have area-based weights collect the raw data from all rainfall gages being used (polygons falling within). The incremental rainfall for each gage will be multiplied by the appropriate area-based weight. The weighted rainfall from each of the gages utilized will be added across each time interval to get the new weighted rainfall. 6. Any sub-basin that completely falls within one thiessen polygon will use the rainfall gage data from that one gage with no weighting applied Gage Sep-04 Oct-15 Oct-16 Sep-18 Fayetteville Airport Hamlet Jackson Springs Laurinburg Lilesvile Lumberton Mackall Airfield Moore Airport Rockingham Troy Whiteville Event Gage Rainfall Range (in) Sept 2004 4.31 – 11.87 Oct 2015 5.74 – 7.40 Oct 2016 8.12 – 12.59 Sept 2018 12.95 – 17.53 Page B1-2 Thiessen Weights September 2004 Sub-basin KFAY KMEB NRCK WHIT Back Swamp 0 1 0 0 Bear Swamp 0 1 0 0 Fivemile DS 0 0.13 0 0.87 Fivemile US 0.08 0.86 0 0.06 Internal Canals 0 0.03 0 0.97 Ivey Branch 0 0 0 1 Jacks Branch 0 1 0 0 Jacob Branch 0 0.14 0 0.86 Jacob Swamp 0 0 0 1 Lumber DS 0 0.32 0 0.68 Lumber Mid 0 1 0 0 Lumber US 0 0.24 0.76 0 Meadow Branch 0 0 0 1 Raft Swamp 0 1 0 0 White Oak 0.05 0 0 0.95 Page B1-3 October 2015 Sub-basin LILE NLUM NUWH Back Swamp 0 1 0 Bear Swamp 0 1 0 Fivemile DS 0 1 0 Fivemile US 0 1 0 Internal Canals 0 1 0 Ivey Branch 0 1 0 Jacks Branch 0 1 0 Jacob Branch 0 1 0 Jacob Swamp 0 1 0 Lumber DS 0 1 0 Lumber Mid 0 1 0 Lumber US 0.5 0.14 0.36 Meadow Branch 0 1 0 Raft Swamp 0 1 0 White Oak 0 1 0 Page B1-4 October 2016 Sub-basin KSOP LILE NLUM NUWH Back Swamp 0 0 0 0 Bear Swamp 0 0 0 0 Fivemile DS 0 0 0 0 Fivemile US 0 0 0 0 Internal Canals 0 0 0 0 Ivey Branch 0 0 0 0 Jacks Branch 0 0 0 0 Jacob Branch 0 0 0 0 Jacob Swamp 0 0 0 0 Lumber DS 0 0 0 0 Lumber Mid 0.02 0 0.98 0 Lumber US 0.82 0.02 0.06 0.1 Meadow Branch 0 0 0 0 Raft Swamp 0.22 0 0.78 0 White Oak 0 0 0 0 Page B1-5 September 2018 Sub-basin NLUM NRCK Back Swamp 1 0 Bear Swamp 1 0 Fivemile DS 1 0 Fivemile US 1 0 Internal Canals 1 0 Ivey Branch 1 0 Jacks Branch 1 0 Jacob Branch 1 0 Jacob Swamp 1 0 Lumber DS 1 0 Lumber Mid 0.95 0.05 Lumber US 0.03 0.97 Meadow Branch 1 0 Raft Swamp 0.81 0.19 White Oak 1 0 Page B1-6 B2 Streamflow Data Page B2-1 USGS 02133624 Lumber River at Maxton, NC September 2004 0 500 1000 1500 2000 2500 8/1/2004 0:00 8/11/2004 0:00 8/21/2004 0:00 8/31/2004 0:00 9/10/2004 0:00 9/20/2004 0:00 9/30/2004 0:00 10/10/2004 0:00 10/20/2004 0:00 Fl ow R a t e ( c f s ) Date Page B2-2 October 2015 0 500 1000 1500 2000 2500 3000 9/13/2015 0:00 9/18/2015 0:00 9/23/2015 0:00 9/28/2015 0:00 10/3/2015 0:00 10/8/2015 0:00 10/13/2015 0:0010/18/2015 0:0010/23/2015 0:00 Fl o w Ra t e ( c f s ) Date Page B2-3 October 2016 0 1000 2000 3000 4000 5000 6000 7000 8000 9/27/2016 0:00 10/7/2016 0:00 10/17/2016 0:00 10/27/2016 0:00 11/6/2016 0:00 11/16/2016 0:00 11/26/2016 0:00 Fl ow R a t e ( c f s ) Date Page B2-4 September 2018 0 2000 4000 6000 8000 10000 12000 14000 9/7/2018 0:00 9/12/2018 0:00 9/17/2018 0:00 9/22/2018 0:00 9/27/2018 0:00 10/2/2018 0:00 10/7/2018 0:00 10/12/2018 0:00 Fl o w R a t e ( c f s ) Date Page B2-5 USGS 02134170 Lumber River at Lumberton, NC September 2004 0 1000 2000 3000 4000 5000 6000 7000 8000 8/1/2004 0:00 8/11/2004 0:00 8/21/2004 0:00 8/31/2004 0:00 9/10/2004 0:00 9/20/2004 0:00 9/30/2004 0:00 10/10/2004 0:00 10/20/2004 0:00 Fl ow R a t e ( c f s ) Date Page B2-6 October 2015 0 500 1000 1500 2000 2500 9/3/2015 0:00 9/13/2015 0:00 9/23/2015 0:00 10/3/2015 0:00 10/13/2015 0:00 10/23/2015 0:00 11/2/2015 0:00 11/12/2015 0:00 Fl ow R a t e ( c f s ) Date Page B2-7 October 2016 0 2000 4000 6000 8000 10000 12000 14000 16000 9/27/2016 0:00 10/2/2016 0:00 10/7/2016 0:0010/12/2016 0:0010/17/2016 0:0010/22/2016 0:0010/27/2016 0:0011/1/2016 0:00 11/6/2016 0:0011/11/2016 0:00 Fl ow R a t e ( c f s ) Date Page B2-8 September 2018 0 2000 4000 6000 8000 10000 12000 14000 16000 18000 8/28/2018 0:00 9/7/2018 0:00 9/17/2018 0:00 9/27/2018 0:00 10/7/2018 0:00 10/17/2018 0:00 10/27/2018 0:00 Fl ow R a t e ( c f s ) Date Page B2-9 Verification Results B3 HEC-HMS Model Calibration and Page B3-1 HEC-HMS Calibration Junction 5 Observed volume Computed Volume Volume Differential Observed Simulated % Difference Observed Simulated Difference (hrs) Sep 2004 7420 7097.2 -4% 9/11/2004 2:00 9/11/2004 12:00 10 152897 149569 -2% Oct 2015 2390 2421.1 1% 10/9/2015 15:45 10/9/2015 12:00 -3.75 10/9/2015 18:00 38912 27568 -29% Sept 2018 17100 17257 1% 9/17/2018 11:00 9/17/2018 11:00 0 Hurricane Florence 230179 229185 -0.4% Junction 11 Observed Simulated % Difference Observed Simulated Difference (hrs) Sep 2004 2280 3438.8 51% 9/11/2004 8:00 9/11/2004 6:00 -2 Oct 2015 2460 2329.6 -5% 10/6/2015 14:00 10/6/2015 11:00 -3 10/9/2015 18:00 Sept 2018 12300 8281 -33% 9/19/2018 4:00 9/19/2018 11:00 7 Hurricane Florence Reach 9 Routing 0.0003 0.08 Reach 9 Routing 0.0003 0.08 Reach 9 Routing 0.001 0.03 Sep-04 Initial Loss Constant Loss Ct Cp Initial Loss Constant Loss Ct Cp Initial Loss Constant Loss Ct Cp Constant Loss Ct Cp Back Swamp 0.15 7 0.4 0.15 7 0.4 0.12 7 0.4 0.14 7 0.40 Bear Swamp 0.15 7 0.4 0.15 7 0.4 0.12 7 0.4 0.14 7 0.40 Fivemile DS 0.05 6 0.4 0.05 7 0.4 0.05 7 0.4 0.05 7 0.40 Fivemile US 0.05 6 0.4 0.05 7 0.4 0.05 7 0.4 0.05 7 0.40 Internal Canals 0.05 6 0.4 0.05 7 0.4 0.05 7 0.4 0.05 7 0.40 Ivey Branch 0.05 6 0.4 0.05 7 0.4 0.05 7 0.4 0.05 7 0.40 Jacks Branch 0.05 6 0.4 0.05 7 0.4 0.05 7 0.4 0.05 7 0.40 Jacob Branch 0.05 6 0.4 0.05 7 0.4 0.05 7 0.4 0.05 7 0.40 Jacob Swamp 0.05 6 0.4 0.05 7 0.4 0.05 7 0.4 0.05 7 0.40 Lumber DS 0.05 6 0.4 0.05 7 0.4 0.05 7 0.4 0.05 7 0.40 Lumber Upper 5 0.14 6 0.8 3.3 0.14 8 0.8 4 0.14 8 0.6 0.14 7 0.73 Lumber Mid 0.15 8 0.4 0.15 8 0.4 0.12 8 0.4 0.14 8 0.40 Meadow Branch 0.05 6 0.4 0.05 7 0.4 0.05 7 0.4 0.05 7 0.40 Raft Swamp 0.18 8 0.4 0.18 8 0.4 0.2 8 0.4 0.19 8 0.40 White Oak 0.05 6 0.4 0.05 7 0.4 0.05 7 0.4 0.05 7 0.40 AVERAGE Storm Approx. Return Period (Yrs) Peak Flowrate (cfs)Time Date and Time Notes Sep-18 Oct-15 Storm Approx. Return Period (Yrs) Peak Flowrate (cfs)Time Date and Time Notes Page B3-2 HEC-HMS Design Storm Comparison SCS-24HR SCS-48HR SCS-72HR Recurrence Interval (Yrs) Simulated Peak Flow (cfs)FEMA Peakflows(cfs) Gage Statistics (cfs) % Diff_FEMA % Diff_Gage % Diff_FEMA % Diff_Gage % Diff_FEMA % Diff_Gage 10 5,334 5,506 5,520 8,150 7,255 -53%-36%-48% -32% -48% -31% 25 6,991 7,191 7,204 10,700 9,852 -53%-41%-49% -37% -49% -37% 50 8,451 9,683 10,569 12,800 12,080 -51%-43%-32% -25% -21% -14% 100 10,103 13,141 13,993 14,900 14,560 -47%-44%-13% -11% -6% -4% 500 18,720 22,105 23,025 20,200 21,520 -8%-15%9% 3% 12% 7% 1000 22,920 26,991 27,634 NOAA Partial - 48HR Recurrence Interval (Yrs) Simulated Peak Flow (cfs) FEMA Peakflows(cfs) Gage Statistics (cfs) % Diff_FEMA % Diff_Gage 10 5,661 8,150 7,255 -44%-28% 25 7,030 10,700 9,852 -52%-40% 50 8,487 12,800 12,080 -51%-42% 100 10,665 14,900 14,560 -40%-37% 500 19,333 20,200 21,520 -4%-11% 1000 23,977 SCS 24HR SCS-48HR SCS-72HR Page B3-3 HEC-HMS Verification Observed Simulated % Difference Observed Simulated Difference (hrs) Observed volume Computed Volume Volume Differential Oct 2016 14600 16551.3 13% 10/10/16 7:00 10/10/16 10:00 3 Hurricane Matthew 223956 197598 -12% Storm Approx. Return Period (Yrs) Peak Flowrate (cfs)Time Date and Time Notes Page B3-4 Subbasin L (mi) Lc (mi) Back Swamp 17.61 8.39 Bear Swamp 17.94 8.66 Fivemile DS 2.48 0.98 Fivemile US 12.49 4.67 Internal Canals 5.31 1.85 Ivey Branch 4.17 1.69 Jacks Branch 8.21 4.85 Jacob Branch 10.5 4.59 Jacob Swamp 7.32 3.33 Lumber DS 18.84 9.34 Lumber US 101.36 68.64 Meadow Branch 5.21 2.57 Raft Swamp 35.77 18.55 White Oak 3.87 1.69 Sub-basin Snyder Characteristics Page B3-5 B4 Curve Number Calculations Page B4-1 Sub-basin Curve Number Sub-basin Basin Area (sq. mi) Good Conditions Composite CN Back Swamp 35.09 85.7 Bear Swamp 28.39 83.1 Fivemile DS 1.71 82.8 Fivemile US 22.14 81.7 Lumberton Canals 3.88 83.2 Ivey Branch 3.76 79.4 Jacks Branch 3 82.2 Jacob Branch 15.28 85.2 Jacob Swamp 9.61 79.9 Lumber DS 10.15 84.3 Lumber Mid 73.54 82.9 Lumber US 365.27 62.1 Meadow Branch 4.94 78 Raft Swamp 167.02 78.9 White Oak 3.73 79.6 Page B4-2 Back Swamp Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN 11 Open Water 58.5 2.5 100 16.3 0.9 100 89.0 1.7 100 284.7 2.2 100 21 Developed, Open Space 269.1 11.4 49 167.6 9.4 69 441.5 8.2 79 742.4 5.7 84 22 Developed, Low Intensity 133.1 5.6 54 103.0 5.8 70 242.6 4.5 80 376.9 2.9 85 23 Developed, Medium Intensity 38.9 1.6 61 31.2 1.7 75 71.1 1.3 83 90.5 0.7 87 24 Developed, High Intensity 3.4 0.1 77 0.2 0.0 85 7.2 0.1 90 12.0 0.1 92 31 Barren Land 1.7 0.1 77 1.0 0.1 86 1.1 0.0 91 1.3 0.0 94 41 Deciduous Forest 60.3 2.5 36 11.5 0.6 60 205.3 3.8 73 334.7 2.6 79 42 Evergreen Forest 150.5 6.4 36 99.7 5.6 60 766.1 14.3 73 1589.9 12.3 79 43 Mixed Forest 13.4 0.6 36 3.9 0.2 60 39.3 0.7 73 98.7 0.8 79 52 Shrub/Scrub 54.9 2.3 35 19.4 1.1 56 194.5 3.6 70 331.9 2.6 77 71 Grassland/Herbaceous 5.5 0.2 30 7.0 0.4 58 19.3 0.4 71 40.4 0.3 78 81 Pasture/Hay 4.2 0.2 39 0.0 0.0 61 4.7 0.1 74 3.1 0.0 80 82 Cultivated Crops 1230.2 52.0 67 1193.8 66.7 78 2323.4 43.3 85 4176.3 32.3 89 90 Woody Wetlands 341.3 14.4 100 132.4 7.4 100 946.4 17.6 100 4789.2 37.0 100 95 Emergent Herbaceous Wetlands 1.1 0.0 100 2.6 0.1 100 16.0 0.3 100 63.9 0.5 100 2365.9 100.0 65.9 1789.6 100.0 77.0 5367.6 100.0 84.3 12936.0 100.0 91.0 85.7Weighted Average CN = Existing Landuse Conditions CN for Soil Type DLUCODE Land Use Descriptions Total CN for Soil Type A CN for Soil Type B CN for Soil Type C Page B4-3 Bear Swamp Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN 11 Open Water 7.9 0.2 100 0.0 0.0 100 0.0 0.0 100 55.1 0.5 100 21 Developed, Open Space 364.5 8.4 49 288.3 10.4 69 7.5 9.1 79 822.1 7.5 84 22 Developed, Low Intensity 130.1 3.0 54 135.8 4.9 70 2.6 3.2 80 348.8 3.2 85 23 Developed, Medium Intensity 34.1 0.8 61 31.5 1.1 75 0.2 0.3 83 145.5 1.3 87 24 Developed, High Intensity 8.0 0.2 77 18.9 0.7 85 0.0 0.0 90 33.8 0.3 92 31 Barren Land 0.0 0.0 77 0.0 0.0 86 0.0 0.0 91 0.0 0.0 94 41 Deciduous Forest 29.0 0.7 36 8.5 0.3 60 1.4 1.7 73 62.0 0.6 79 42 Evergreen Forest 151.9 3.5 36 183.8 6.6 60 5.1 6.2 73 881.4 8.1 79 43 Mixed Forest 6.1 0.1 36 8.3 0.3 60 1.0 1.2 73 28.9 0.3 79 52 Shrub/Scrub 36.1 0.8 35 45.4 1.6 56 2.4 2.9 70 146.3 1.3 77 71 Grassland/Herbaceous 5.2 0.1 30 6.8 0.2 58 0.0 0.0 71 23.8 0.2 78 81 Pasture/Hay 0.0 0.0 39 0.0 0.0 61 0.0 0.0 74 0.2 0.0 80 82 Cultivated Crops 3052.5 70.1 67 1846.5 66.5 78 53.7 65.5 85 4830.1 44.2 89 90 Woody Wetlands 525.6 12.1 100 200.7 7.2 100 7.2 8.7 100 3528.8 32.3 100 95 Emergent Herbaceous Wetlands 3.4 0.1 100 0.2 0.0 100 0.9 1.1 100 29.4 0.3 100 4354.4 100.0 67.5 2774.8 100.0 76.6 82.0 100.0 84.2 10936.2 100.0 91.0 83.1Weighted Average CN = Existing Landuse Conditions CN for Soil Type DLUCODE Land Use Descriptions Total CN for Soil Type A CN for Soil Type B CN for Soil Type C Page B4-4 Lumberton Canals Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN 11 Open Water 2.1 1.2 100 1.0 1.3 100 15.1 1.4 100 85.0 7.3 100 21 Developed, Open Space 27.1 16.1 49 13.3 17.0 69 220.3 20.6 79 233.6 20.0 84 22 Developed, Low Intensity 32.4 19.2 54 12.6 16.2 70 258.0 24.2 80 151.2 13.0 85 23 Developed, Medium Intensity 19.1 11.4 61 14.7 18.8 75 174.4 16.3 83 57.3 4.9 87 24 Developed, High Intensity 7.3 4.4 77 8.0 10.3 85 81.7 7.7 90 13.5 1.2 92 31 Barren Land 0.0 0.0 77 0.0 0.0 86 0.0 0.0 91 0.0 0.0 94 41 Deciduous Forest 1.1 0.7 36 0.0 0.0 60 1.7 0.2 73 8.4 0.7 79 42 Evergreen Forest 30.7 18.2 36 0.1 0.1 60 86.6 8.1 73 123.9 10.6 79 43 Mixed Forest 0.0 0.0 36 0.0 0.0 60 0.0 0.0 73 0.7 0.1 79 52 Shrub/Scrub 15.2 9.0 35 0.0 0.0 56 8.5 0.8 70 24.5 2.1 77 71 Grassland/Herbaceous 0.0 0.0 30 0.0 0.0 58 0.5 0.0 71 7.6 0.6 78 81 Pasture/Hay 4.4 2.6 39 0.0 0.0 61 0.0 0.0 74 0.5 0.0 80 82 Cultivated Crops 19.1 11.4 67 28.2 36.0 78 197.3 18.5 85 234.9 20.1 89 90 Woody Wetlands 9.9 5.9 100 0.3 0.3 100 23.4 2.2 100 224.8 19.3 100 95 Emergent Herbaceous Wetlands 0.0 0.0 100 0.0 0.0 100 0.1 0.0 100 1.0 0.1 100 168.5 100.0 54.2 78.2 100.0 75.7 1067.6 100.0 82.0 1166.9 100.0 88.9 83.2Weighted Average CN = Existing Landuse Conditions CN for Soil Type DLUCODE Land Use Descriptions Total CN for Soil Type A CN for Soil Type B CN for Soil Type C Page B4-5 Fivemile DS Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN 11 Open Water 0.7 0.2 100 0.0 0.0 100 0.0 0.0 100 18.1 3.0 100 21 Developed, Open Space 36.1 9.8 49 11.1 16.9 69 6.2 10.2 79 47.0 7.9 84 22 Developed, Low Intensity 23.0 6.2 54 5.0 7.6 70 4.9 8.0 80 23.7 4.0 85 23 Developed, Medium Intensity 11.6 3.1 61 9.7 14.8 75 24.6 40.3 83 23.2 3.9 87 24 Developed, High Intensity 3.5 0.9 77 3.4 5.1 85 8.0 13.1 90 6.7 1.1 92 31 Barren Land 0.0 0.0 77 0.0 0.0 86 0.0 0.0 91 0.0 0.0 94 41 Deciduous Forest 0.0 0.0 36 1.1 1.7 60 0.0 0.0 73 3.9 0.7 79 42 Evergreen Forest 19.9 5.4 36 9.7 14.8 60 6.8 11.2 73 33.2 5.6 79 43 Mixed Forest 0.1 0.0 36 0.0 0.0 60 0.3 0.5 73 5.9 1.0 79 52 Shrub/Scrub 3.8 1.0 35 0.1 0.1 56 0.7 1.1 70 9.8 1.6 77 71 Grassland/Herbaceous 0.0 0.0 30 0.0 0.0 58 0.0 0.0 71 0.0 0.0 78 81 Pasture/Hay 0.0 0.0 39 0.0 0.0 61 0.0 0.0 74 0.0 0.0 80 82 Cultivated Crops 227.8 61.8 67 12.7 19.3 78 5.6 9.2 85 109.0 18.2 89 90 Woody Wetlands 41.1 11.1 100 12.9 19.7 100 3.9 6.4 100 311.7 52.1 100 95 Emergent Herbaceous Wetlands 1.3 0.4 100 0.0 0.0 100 0.0 0.0 100 5.6 0.9 100 368.9 100.0 66.2 65.7 100.0 77.1 61.0 100.0 83.2 597.8 100.0 93.7 82.8Weighted Average CN = Existing Landuse Conditions CN for Soil Type DLUCODE Land Use Descriptions Total CN for Soil Type A CN for Soil Type B CN for Soil Type C Page B4-6 Fivemile US Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN 11 Open Water 8.4 0.2 100 0.0 0.0 100 0.0 0.0 100 32.4 0.4 100 21 Developed, Open Space 446.2 11.3 49 116.7 6.1 69 30.3 16.5 79 362.0 4.5 84 22 Developed, Low Intensity 215.3 5.4 54 46.0 2.4 70 20.0 10.9 80 147.3 1.8 85 23 Developed, Medium Intensity 64.0 1.6 61 16.6 0.9 75 18.7 10.2 83 52.4 0.6 87 24 Developed, High Intensity 21.7 0.5 77 6.2 0.3 85 1.0 0.5 90 6.2 0.1 92 31 Barren Land 0.4 0.0 77 0.0 0.0 86 0.0 0.0 91 0.0 0.0 94 41 Deciduous Forest 26.7 0.7 36 17.2 0.9 60 1.3 0.7 73 92.8 1.1 79 42 Evergreen Forest 279.7 7.1 36 300.8 15.8 60 12.3 6.7 73 1223.9 15.1 79 43 Mixed Forest 4.2 0.1 36 4.3 0.2 60 0.0 0.0 73 24.9 0.3 79 52 Shrub/Scrub 68.9 1.7 35 27.2 1.4 56 4.0 2.2 70 162.9 2.0 77 71 Grassland/Herbaceous 11.8 0.3 30 39.7 2.1 58 2.6 1.4 71 30.0 0.4 78 81 Pasture/Hay 8.4 0.2 39 0.0 0.0 61 0.0 0.0 74 6.7 0.1 80 82 Cultivated Crops 2393.1 60.5 67 1091.3 57.4 78 57.6 31.4 85 2662.2 32.9 89 90 Woody Wetlands 403.8 10.2 100 227.6 12.0 100 35.0 19.0 100 3230.7 39.9 100 95 Emergent Herbaceous Wetlands 3.7 0.1 100 7.2 0.4 100 1.0 0.6 100 64.5 0.8 100 3956.3 100.0 64.5 1900.8 100.0 76.2 183.9 100.0 84.8 8098.9 100.0 91.3 81.7Weighted Average CN = Existing Landuse Conditions CN for Soil Type DLUCODE Land Use Descriptions Total CN for Soil Type A CN for Soil Type B CN for Soil Type C Page B4-7 Ivey Branch Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN 11 Open Water 0.0 0.0 100 0.0 0.0 100 0.0 0.0 100 5.7 0.4 100 21 Developed, Open Space 52.2 11.8 49 56.4 11.8 69 27.7 26.5 79 176.6 12.7 84 22 Developed, Low Intensity 76.3 17.3 54 36.9 7.8 70 32.4 31.0 80 131.8 9.5 85 23 Developed, Medium Intensity 56.5 12.8 61 14.3 3.0 75 13.5 12.9 83 75.9 5.5 87 24 Developed, High Intensity 16.8 3.8 77 5.8 1.2 85 2.9 2.8 90 20.7 1.5 92 31 Barren Land 0.0 0.0 77 0.0 0.0 86 0.0 0.0 91 0.0 0.0 94 41 Deciduous Forest 2.6 0.6 36 2.8 0.6 60 0.0 0.0 73 22.7 1.6 79 42 Evergreen Forest 29.2 6.6 36 46.9 9.9 60 1.4 1.4 73 235.1 17.0 79 43 Mixed Forest 0.0 0.0 36 0.7 0.1 60 0.0 0.0 73 1.9 0.1 79 52 Shrub/Scrub 1.1 0.2 35 8.3 1.7 56 0.9 0.9 70 18.4 1.3 77 71 Grassland/Herbaceous 0.0 0.0 30 0.1 0.0 58 0.0 0.0 71 0.1 0.0 78 81 Pasture/Hay 0.0 0.0 39 0.0 0.0 61 0.0 0.0 74 0.0 0.0 80 82 Cultivated Crops 199.3 45.2 67 289.6 60.8 78 25.4 24.3 85 582.7 42.0 89 90 Woody Wetlands 7.4 1.7 100 14.0 2.9 100 0.3 0.3 100 114.6 8.3 100 95 Emergent Herbaceous Wetlands 0.0 0.0 100 0.0 0.0 100 0.0 0.0 100 0.0 0.0 100 441.2 100.0 60.5 476.0 100.0 74.7 104.6 100.0 81.5 1386.2 100.0 86.8 79.4Weighted Average CN = Existing Landuse Conditions CN for Soil Type DLUCODE Land Use Descriptions Total CN for Soil Type A CN for Soil Type B CN for Soil Type C Page B4-8 Jacks Branch Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN 11 Open Water 0.0 0.0 100 0.0 0.0 100 0.0 0.0 100 3.4 0.3 100 21 Developed, Open Space 52.7 18.5 49 40.0 6.8 69 1.2 3.5 79 46.3 4.6 84 22 Developed, Low Intensity 13.6 4.8 54 13.3 2.2 70 1.4 4.2 80 11.7 1.2 85 23 Developed, Medium Intensity 6.1 2.1 61 3.2 0.5 75 0.7 2.0 83 1.4 0.1 87 24 Developed, High Intensity 1.3 0.5 77 4.2 0.7 85 0.1 0.3 90 0.0 0.0 92 31 Barren Land 0.0 0.0 77 0.0 0.0 86 0.0 0.0 91 0.0 0.0 94 41 Deciduous Forest 0.0 0.0 36 0.3 0.0 60 0.0 0.0 73 4.9 0.5 79 42 Evergreen Forest 19.2 6.7 36 111.2 18.8 60 10.6 31.2 73 227.1 22.5 79 43 Mixed Forest 0.1 0.0 36 0.4 0.1 60 0.0 0.0 73 6.7 0.7 79 52 Shrub/Scrub 0.2 0.1 35 17.9 3.0 56 0.0 0.0 70 29.6 2.9 77 71 Grassland/Herbaceous 0.6 0.2 30 8.3 1.4 58 0.0 0.0 71 2.8 0.3 78 81 Pasture/Hay 0.0 0.0 39 0.0 0.0 61 0.0 0.0 74 0.0 0.0 80 82 Cultivated Crops 154.9 54.3 67 279.0 47.2 78 15.5 45.6 85 307.2 30.4 89 90 Woody Wetlands 35.0 12.3 100 111.2 18.8 100 4.4 12.8 100 369.0 36.5 100 95 Emergent Herbaceous Wetlands 1.3 0.5 100 2.1 0.3 100 0.1 0.4 100 0.9 0.1 100 285.0 100.0 65.0 590.9 100.0 77.1 34.1 100.0 82.8 1011.1 100.0 90.0 82.2Weighted Average CN = Existing Landuse Conditions CN for Soil Type DLUCODE Land Use Descriptions Total CN for Soil Type A CN for Soil Type B CN for Soil Type C Page B4-9 Jacob Branch Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN 11 Open Water 41.0 2.3 100 18.1 2.8 100 101.1 5.1 100 273.4 5.1 100 21 Developed, Open Space 167.3 9.3 49 45.0 7.0 69 188.9 9.5 79 381.1 7.1 84 22 Developed, Low Intensity 111.5 6.2 54 29.8 4.7 70 150.7 7.6 80 160.9 3.0 85 23 Developed, Medium Intensity 54.1 3.0 61 21.6 3.4 75 81.2 4.1 83 60.5 1.1 87 24 Developed, High Intensity 11.1 0.6 77 2.3 0.4 85 20.3 1.0 90 16.4 0.3 92 31 Barren Land 0.5 0.0 77 0.0 0.0 86 0.0 0.0 91 1.0 0.0 94 41 Deciduous Forest 3.2 0.2 36 6.2 1.0 60 41.5 2.1 73 46.3 0.9 79 42 Evergreen Forest 97.9 5.4 36 71.5 11.2 60 271.3 13.6 73 526.0 9.9 79 43 Mixed Forest 3.8 0.2 36 1.7 0.3 60 6.7 0.3 73 9.1 0.2 79 52 Shrub/Scrub 33.0 1.8 35 6.6 1.0 56 42.3 2.1 70 108.3 2.0 77 71 Grassland/Herbaceous 43.3 2.4 30 9.5 1.5 58 21.4 1.1 71 47.1 0.9 78 81 Pasture/Hay 0.4 0.0 39 0.1 0.0 61 2.9 0.1 74 3.1 0.1 80 82 Cultivated Crops 984.2 54.5 67 315.3 49.3 78 795.7 39.9 85 1308.4 24.5 89 90 Woody Wetlands 195.9 10.8 100 111.2 17.4 100 211.8 10.6 100 2177.3 40.8 100 95 Emergent Herbaceous Wetlands 58.1 3.2 100 0.4 0.1 100 60.6 3.0 100 220.3 4.1 100 1805.2 100.0 66.5 639.4 100.0 78.6 1996.4 100.0 84.4 5339.2 100.0 92.6 85.2Weighted Average CN = Existing Landuse Conditions CN for Soil Type DLUCODE Land Use Descriptions Total CN for Soil Type A CN for Soil Type B CN for Soil Type C Page B4-10 Jacob Swamp Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN 11 Open Water 0.8 0.0 100 3.5 0.4 100 0.0 0.1 100 65.0 2.1 100 21 Developed, Open Space 219.1 10.5 49 58.0 7.2 69 0.3 0.5 79 159.2 5.0 84 22 Developed, Low Intensity 99.3 4.7 54 35.9 4.5 70 0.2 0.3 80 61.2 1.9 85 23 Developed, Medium Intensity 11.1 0.5 61 6.1 0.8 75 0.0 0.0 83 12.5 0.4 87 24 Developed, High Intensity 2.5 0.1 77 0.7 0.1 85 0.0 0.0 90 4.1 0.1 92 31 Barren Land 0.0 0.0 77 0.0 0.0 86 0.0 0.0 91 0.2 0.01 94 41 Deciduous Forest 13.8 0.7 36 4.9 0.6 60 0.4 0.8 73 31.3 1.0 79 42 Evergreen Forest 158.7 7.6 36 113.5 14.1 60 22.6 44.6 73 506.9 16.0 79 43 Mixed Forest 5.0 0.2 36 1.2 0.1 60 0.6 1.2 73 14.3 0.5 79 52 Shrub/Scrub 33.0 1.6 35 15.2 1.9 56 0.3 0.6 70 58.0 1.8 77 71 Grassland/Herbaceous 1.8 0.1 30 0.4 0.0 58 0.03 0.1 71 2.4 0.1 78 81 Pasture/Hay 0.0 0.0 39 0.0 0.0 61 0.0 0.0 74 0.0 0.0 80 82 Cultivated Crops 1380.1 65.9 67 464.5 57.6 78 20.6 40.7 85 1014.0 32.0 89 90 Woody Wetlands 168.8 8.1 100 102.1 12.7 100 5.7 11.3 100 1224.9 38.7 100 95 Emergent Herbaceous Wetlands 0.8 0.0 100 0.2 0.03 100 0.0 0.0 100 13.7 0.4 100 2094.6 100.0 64.0 806.1 100.0 76.8 50.7 100.0 81.0 3167.7 100.0 91.2 79.9Weighted Average CN = Existing Landuse Conditions CN for Soil Type DLUCODE Land Use Descriptions Total CN for Soil Type A CN for Soil Type B CN for Soil Type C Page B4-11 Lumber DS Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN 11 Open Water 24.5 1.4 100 5.4 1.1 100 66.8 10.8 100 703.0 19.2 100 21 Developed, Open Space 329.7 18.5 49 118.4 24.3 69 73.3 11.8 79 309.5 8.5 84 22 Developed, Low Intensity 374.3 21.0 54 156.1 32.0 70 57.7 9.3 80 249.6 6.8 85 23 Developed, Medium Intensity 178.2 10.0 61 56.5 11.6 75 76.5 12.4 83 98.8 2.7 87 24 Developed, High Intensity 83.7 4.7 77 12.0 2.5 85 21.5 3.5 90 28.4 0.8 92 31 Barren Land 3.1 0.2 77 0.0 0.0 86 1.4 0.2 91 3.8 0.1 94 41 Deciduous Forest 9.4 0.5 36 0.7 0.1 60 11.7 1.9 73 16.1 0.4 79 42 Evergreen Forest 113.9 6.4 36 20.1 4.1 60 50.3 8.1 73 166.6 4.5 79 43 Mixed Forest 2.7 0.2 36 0.4 0.1 60 1.3 0.2 73 5.1 0.1 79 52 Shrub/Scrub 27.4 1.5 35 7.2 1.5 56 8.0 1.3 70 31.4 0.9 77 71 Grassland/Herbaceous 2.6 0.1 30 0.3 0.1 58 1.7 0.3 71 11.3 0.3 78 81 Pasture/Hay 0.2 0.0 39 0.0 0.0 61 0.0 0.0 74 0.2 0.01 80 82 Cultivated Crops 369.6 20.8 67 76.5 15.7 78 98.6 15.9 85 191.5 5.2 89 90 Woody Wetlands 249.1 14.0 100 33.2 6.8 100 121.4 19.6 100 1774.6 48.5 100 95 Emergent Herbaceous Wetlands 10.1 0.6 100 0.8 0.2 100 28.5 4.6 100 71.3 1.9 100 1778.5 100.0 63.3 487.7 100.0 73.7 618.6 100.0 87.6 3661.3 100.0 95.3 84.3Weighted Average CN = Existing Landuse Conditions CN for Soil Type DLUCODE Land Use Descriptions Total CN for Soil Type A CN for Soil Type B CN for Soil Type C Page B4-12 Lumber Mid Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN 11 Open Water 54.9 0.4 100 64.5 1.5 100 12.8 0.5 100 679.5 2.7 100 21 Developed, Open Space 1041.5 7.2 49 391.0 9.3 69 681.4 24.1 79 1195.1 4.7 84 22 Developed, Low Intensity 382.7 2.6 54 175.0 4.2 70 215.9 7.6 80 518.6 2.0 85 23 Developed, Medium Intensity 63.9 0.4 61 65.0 1.5 75 118.4 4.2 83 163.6 0.6 87 24 Developed, High Intensity 23.7 0.2 77 20.1 0.5 85 34.7 1.2 90 48.6 0.2 92 31 Barren Land 0.2 0.002 77 0.4 0.01 86 0.0 0.0 91 0.1 0.0003 94 41 Deciduous Forest 176.4 1.2 36 41.4 1.0 60 15.4 0.5 73 222.6 0.9 79 42 Evergreen Forest 867.0 6.0 36 225.6 5.4 60 136.9 4.8 73 1486.8 5.8 79 43 Mixed Forest 39.1 0.3 36 13.4 0.3 60 10.1 0.4 73 82.6 0.3 79 52 Shrub/Scrub 314.5 2.2 35 70.4 1.7 56 47.2 1.7 70 274.5 1.1 77 71 Grassland/Herbaceous 123.5 0.9 30 26.2 0.6 58 12.5 0.4 71 77.0 0.3 78 81 Pasture/Hay 23.8 0.2 39 7.6 0.2 61 5.0 0.2 74 11.4 0.04 80 82 Cultivated Crops 9680.8 66.6 67 2698.8 64.3 78 1306.5 46.2 85 8541.3 33.5 89 90 Woody Wetlands 1705.8 11.7 100 395.2 9.4 100 224.0 7.9 100 11896.2 46.6 100 95 Emergent Herbaceous Wetlands 27.3 0.2 100 5.5 0.1 100 6.3 0.2 100 314.3 1.2 100 14525.1 100.0 66.1 4200.0 100.0 77.5 2826.9 100.0 83.4 25512.2 100.0 93.4 82.9Weighted Average CN = Existing Landuse Conditions CN for Soil Type DLUCODE Land Use Descriptions Total CN for Soil Type A CN for Soil Type B CN for Soil Type C Page B4-13 Lumber US Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN 11 Open Water 96.2 0.1 100 3603.7 7.3 100 275.7 0.7 100 304.3 0.8 100 21 Developed, Open Space 12212.7 11.2 49 3287.0 6.7 69 3659.3 9.5 79 863.2 2.3 84 22 Developed, Low Intensity 3886.1 3.6 54 823.6 1.7 70 809.9 2.1 80 130.6 0.4 85 23 Developed, Medium Intensity 1077.9 1.0 61 285.2 0.6 75 256.0 0.7 83 31.7 0.1 87 24 Developed, High Intensity 243.3 0.2 77 36.3 0.1 85 49.8 0.1 90 3.5 0.01 92 31 Barren Land 692.7 0.6 77 379.2 0.8 86 76.4 0.2 91 13.3 0.04 94 41 Deciduous Forest 3299.2 3.0 36 2152.4 4.4 60 1789.9 4.7 73 374.7 1.0 79 42 Evergreen Forest 44799.7 41.2 36 20704.5 42.0 60 17445.5 45.3 73 4677.0 12.5 79 43 Mixed Forest 2070.3 1.9 36 5405.0 11.0 60 2229.7 5.8 73 894.8 2.4 79 52 Shrub/Scrub 6893.8 6.3 35 2137.8 4.3 56 1887.5 4.9 70 338.2 0.9 77 71 Grassland/Herbaceous 14772.7 13.6 30 4267.2 8.7 58 2355.9 6.1 71 457.6 1.2 78 81 Pasture/Hay 3576.2 3.3 39 1142.3 2.3 61 631.1 1.6 74 60.3 0.2 80 82 Cultivated Crops 12211.6 11.2 67 2687.9 5.5 78 1673.7 4.3 85 2381.4 6.4 89 90 Woody Wetlands 2763.4 2.5 100 2311.1 4.7 100 5214.6 13.5 100 26340.0 70.6 100 95 Emergent Herbaceous Wetlands 99.5 0.1 100 57.2 0.1 100 130.5 0.3 100 419.6 1.1 100 108695.4 100.0 43.2 49280.3 100.0 66.6 38485.6 100.0 78.1 37290.2 100.0 95.0 62.1Weighted Average CN = Existing Landuse Conditions CN for Soil Type DLUCODE Land Use Descriptions Total CN for Soil Type A CN for Soil Type B CN for Soil Type C Page B4-14 Meadow Branch Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN 11 Open Water 0.5 0.1 100 0.2 0.0 100 0.0 0.0 100 0.7 0.0 100 21 Developed, Open Space 115.2 15.1 49 108.0 18.3 69 20.1 15.0 79 275.7 16.6 84 22 Developed, Low Intensity 161.0 21.1 54 152.2 25.8 70 27.1 20.2 80 265.1 16.0 85 23 Developed, Medium Intensity 73.4 9.6 61 61.7 10.5 75 35.8 26.7 83 162.9 9.8 87 24 Developed, High Intensity 36.9 4.8 77 17.2 2.9 85 49.5 37.0 90 50.3 3.0 92 31 Barren Land 0.0 0.0 77 0.0 0.0 86 0.0 0.0 91 0.0 0.0 94 41 Deciduous Forest 3.0 0.4 36 3.0 0.5 60 0.0 0.0 73 10.7 0.6 79 42 Evergreen Forest 40.9 5.3 36 34.1 5.8 60 1.4 1.1 73 180.0 10.8 79 43 Mixed Forest 0.5 0.1 36 0.0 0.0 60 0.0 0.0 73 3.3 0.2 79 52 Shrub/Scrub 5.7 0.7 35 6.9 1.2 56 0.0 0.0 70 21.5 1.3 77 71 Grassland/Herbaceous 0.4 0.1 30 0.4 0.1 58 0.0 0.0 71 1.2 0.1 78 81 Pasture/Hay 0.0 0.0 39 0.0 0.0 61 0.0 0.0 74 0.0 0.0 80 82 Cultivated Crops 307.3 40.2 67 185.9 31.5 78 0.0 0.0 85 505.0 30.4 89 90 Woody Wetlands 19.9 2.6 100 20.1 3.4 100 0.0 0.0 100 184.0 11.1 100 95 Emergent Herbaceous Wetlands 0.0 0.0 100 0.0 0.0 100 0.0 0.0 100 0.0 0.0 100 764.6 100.0 60.3 589.8 100.0 73.5 134.0 100.0 84.3 1660.3 100.0 87.3 78.0Weighted Average CN = Existing Landuse Conditions CN for Soil Type DLUCODE Land Use Descriptions Total CN for Soil Type A CN for Soil Type B CN for Soil Type C Page B4-15 Raft Swamp Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN 11 Open Water 110.5 0.2 100 6.3 0.1 100 44.5 1.5 100 896.3 1.9 100 21 Developed, Open Space 3527.5 7.5 49 672.0 7.3 69 135.8 4.7 79 1501.3 3.1 84 22 Developed, Low Intensity 1386.9 2.9 54 351.2 3.8 70 57.4 2.0 80 723.6 1.5 85 23 Developed, Medium Intensity 213.0 0.5 61 112.8 1.2 75 19.9 0.7 83 131.8 0.3 87 24 Developed, High Intensity 68.3 0.1 77 45.3 0.5 85 12.8 0.4 90 41.9 0.1 92 31 Barren Land 10.4 0.02 77 0.2 0.002 86 0.6 0.02 91 0.6 0.001 94 41 Deciduous Forest 746.3 1.6 36 151.4 1.6 60 60.7 2.1 73 426.1 0.9 79 42 Evergreen Forest 4666.1 9.9 36 1335.4 14.5 60 482.7 16.8 73 4057.3 8.5 79 43 Mixed Forest 274.7 0.6 36 94.8 1.0 60 27.9 1.0 73 235.7 0.5 79 52 Shrub/Scrub 1594.4 3.4 35 357.5 3.9 56 89.2 3.1 70 723.4 1.5 77 71 Grassland/Herbaceous 788.1 1.7 30 114.9 1.2 58 60.1 2.1 71 225.9 0.5 78 81 Pasture/Hay 103.6 0.2 39 12.7 0.1 61 1.6 0.1 74 11.3 0.02 80 82 Cultivated Crops 27567.2 58.6 67 5091.3 55.3 78 954.5 33.2 85 12306.4 25.8 89 90 Woody Wetlands 5916.2 12.6 100 834.4 9.1 100 916.1 31.8 100 26044.2 54.5 100 95 Emergent Herbaceous Wetlands 66.6 0.1 100 20.8 0.2 100 15.5 0.5 100 448.5 0.9 100 47039.8 100.0 64.0 9200.9 100.0 74.9 2879.4 100.0 86.6 47774.3 100.0 93.9 78.9Weighted Average CN = Existing Landuse Conditions CN for Soil Type DLUCODE Land Use Descriptions Total CN for Soil Type A CN for Soil Type B CN for Soil Type C Page B4-16 White Oak Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN Area (ac) Area (%) CN 11 Open Water 1.2 0.7 100 0.3 0.05 100 0.0 0.0 100 11.3 0.7 100 21 Developed, Open Space 32.5 18.6 49 81.9 14.7 69 3.3 20.3 79 253.8 15.5 84 22 Developed, Low Intensity 39.5 22.7 54 59.0 10.6 70 5.3 32.3 80 145.9 8.9 85 23 Developed, Medium Intensity 37.1 21.3 61 25.8 4.6 75 4.0 24.4 83 64.9 4.0 87 24 Developed, High Intensity 21.3 12.2 77 11.3 2.0 85 0.5 2.7 90 24.9 1.5 92 31 Barren Land 0.0 0.0 77 0.0 0.0 86 0.0 0.0 91 0.0 0.0 94 41 Deciduous Forest 2.3 1.3 36 4.6 0.8 60 0.0 0.0 73 13.8 0.8 79 42 Evergreen Forest 16.0 9.2 36 232.2 41.8 60 1.8 10.8 73 619.7 37.7 79 43 Mixed Forest 0.0 0.0 36 5.5 1.0 60 0.0 0.0 73 5.4 0.3 79 52 Shrub/Scrub 1.5 0.9 35 16.3 2.9 56 0.0 0.0 70 68.8 4.2 77 71 Grassland/Herbaceous 0.0 0.0 30 0.1 0.03 58 0.0 0.0 71 3.6 0.2 78 81 Pasture/Hay 0.0 0.0 39 0.0 0.0 61 0.0 0.0 74 0.0 0.0 80 82 Cultivated Crops 12.7 7.3 67 88.0 15.8 78 0.0 0.0 85 128.8 7.8 89 90 Woody Wetlands 10.2 5.8 100 31.0 5.6 100 1.6 9.5 100 297.8 18.1 100 95 Emergent Herbaceous Wetlands 0.0 0.0 100 0.1 0.02 100 0.0 0.0 100 3.7 0.2 100 174.3 100.0 59.3 556.1 100.0 68.6 16.4 100.0 81.9 1642.4 100.0 85.5 79.6Weighted Average CN = Existing Landuse Conditions CN for Soil Type DLUCODE Land Use Descriptions Total CN for Soil Type A CN for Soil Type B CN for Soil Type C Page B4-17 B5 Reach Routing Parameters Page B5-1 Muskingum-Cunge Routing Parameters Notes: • Cross-section data from terrain with bathymetry for all reaches Reach HMS Junctions Length (ft) Slope (ft/ft) Channel N-Value Left N-Value Right N-Value 8pt XS # 1 0 to 1 11284 0.0002 0.045 0.1 0.1 XS1 2 1 to 2 10922 0.0006 0.045 0.13 0.1 XS2 3 2 to 3 14490 0.0002 0.045 0.15 0.09 XS3 4 3 to 4 7220 0.0003 0.045 0.13 0.11 XS4 5 4 to 5 39679 0.0002 0.045 0.125 0.125 XS5 6 5 to 6 7849 0.0003 0.045 0.125 0.125 XS6 7 7 to 6 24525 0.0008 0.065 0.035 0.16 XS7 8 8 to 4 6644 0.0002 0.045 0.12 0.12 XS8 9 11 to 1 183005 0.0003 0.08 0.16 0.16 XS9 Page B5-2 Cross-Section 1 Station (ft) Elevation (ft) 0 126 64 121.4 216 121.9 275.78 112.82 281 112.79 330.5 122 884 121.09 1669 123.5 100 105 110 115 120 125 130 0 200 400 600 800 1000 1200 1400 1600 1800 El e va t i o n ( f t ) Distance (ft) Page B5-3 Cross-Section 2 Station (ft) Elevation (ft) 0 124 458 117.6 787 118.47 828.42 110.36 849.05 110.17 870.1 118.67 1362.6 118.05 2180 123.3 100 105 110 115 120 125 130 0 500 1000 1500 2000 2500 El e va t i o n ( f t ) Distance (ft) Page B5-4 Cross-Section 3 Station (ft) Elevation (ft) 0 117 112 113.35 1237 113.44 1293.34 104.66 1327 107.21 1356.5 113 2022.5 112.7 2759 117 100 102 104 106 108 110 112 114 116 118 0 500 1000 1500 2000 2500 3000 El e va t i o n ( f t ) Distance (ft) Page B5-5 Cross-Section 4 Station (ft) Elevation (ft) 0 125 180 115 275 115.65 327 104.56 410 102 431 113 570 112.19 630 117 95 100 105 110 115 120 125 130 0 100 200 300 400 500 600 700 El e va t i o n ( f t ) Distance (ft) Page B5-6 Cross-Section 5 Station (ft) Elevation (ft) 0 114.3 64 109.1 510.9 108.55 560.6 96 603.4 105.71 632 109.83 982.5 108.1 1650 110.27 80 85 90 95 100 105 110 115 120 0 200 400 600 800 1000 1200 1400 1600 1800 El e va t i o n ( f t ) Distance (ft) Page B5-7 Cross-Section 6 Station (ft) Elevation (ft) 0 110.9 54 104.4 485.1 105.25 550 92.43 560.5 93.48 614.4 105.26 3178.25 103.48 3256 109.56 90 95 100 105 110 115 0 500 1000 1500 2000 2500 3000 3500 El e va t i o n ( f t ) Distance (ft) Page B5-8 Cross-Section 7 Station (ft) Elevation (ft) 0 117.22 500 111.83 1070 113.62 1090 100.88 1100 100.88 1131.25 112.36 1500 111.69 2461 114.9 80 85 90 95 100 105 110 115 120 0 500 1000 1500 2000 2500 3000 El e va t i o n ( f t ) Distance (ft) Page B5-9 Cross-Section 8 Station (ft) Elevation (ft) 0 125.12 452.65 113.68 727.02 114.48 750.33 107.29 762.12 107.19 784 114.06 989 111.47 1956 123.89 106 108 110 112 114 116 118 120 122 124 126 128 0 200 400 600 800 1000 1200 1400 1600 1800 2000 El e va t i o n ( f t ) Distance (ft) Page B5-10 Cross-Section 9 Station (ft) Elevation (ft) 0 165 410 163 1130 162.7 1310 146.1 2840 145 3039.7 152.4 4079.7 149.7 4400 157 140 145 150 155 160 165 170 0 500 1000 1500 2000 2500 3000 3500 4000 4500 El e va t i o n ( f t ) Distance (ft) Page B5-11 B6 USGS Correspondence Page B6-1 From: McClenney, Bryce J <bjmcclen@usgs.gov> Sent: Monday, February 3, 2020 12:38 PM To: Sachan, Amit Cc: Walters, Douglas A; Weaver, John C; Hunu, Kenneth; Beadenkopf, Edward G Subject: Re: Lumber River flows discussion Per your request after our conversation today, I looked into the Hurricane Matthew peak discharges. We did make a slight change to the rating based on the measurement made during Florence. The peak recorded gage height for the Matthew event was 21.87 ft. Rating 4.0 was in use at the time a gives a value of 14,600 cfs for this peak. Rating 5.0 was developed following the Florence measurement in 2018 and activated in September 2018. It computes a discharge of 15,700 cfs for the 21.87 peak gage height for Matthew. This is around 7% different. We would not have issues a revision based on this as the uncertainty of the measurements are higher than the percent difference of the computed discharges. There were three measurements made during Matthew as follows: 142- GH=19.85 Q=9900 143- GH=19.05 Q=8000 144-GH=19.02 Q=7380 It was noted during all three measurements that large pumps were setup behind the levee that were pumping water back into the channel downstream of the gage from behind the levee. This flow was not able to be measured. There was no note of any secondary channel being measured such as with Florence, however, the gage height was roughly 2.5 ft lower than the Florence measurement at 22.20 ft so there likely would not have been as much flow through the breach at that time. Hope this helps. Page B6-2 Bryce McClenney Hydrologic Technician USGS South Atlantic Water Science Center Raleigh, NC (919)417-7021 From: Sachan, Amit <Amit.Sachan@atkinsglobal.com> Sent: Friday, January 31, 2020 9:28 AM To: McClenney, Bryce J <bjmcclen@usgs.gov> Cc: Walters, Douglas A <dwalters@usgs.gov>; Weaver, John C <jcweaver@usgs.gov>; Hunu, Kenneth <Kenneth.Hunu@atkinsglobal.com>; Beadenkopf, Edward G <Edward.Beadenkopf@atkinsglobal.com> Subject: [EXTERNAL] RE: Lumber River flows discussion Thanks Bryce. We will call you on Monday (2/3) at 11 AM. Amit Sachan, PE, CFM Project Director, Public & Private Business Unit Tel: +1 919 431 5253 Cell: +1 919 985 1095 Atkins, member of the SNC-Lavalin Group 1616 East Millbrook Road, Suite 160, Raleigh, NC 27519 From: McClenney, Bryce J <bjmcclen@usgs.gov> Sent: Friday, January 31, 2020 7:44 AM To: Sachan, Amit <Amit.Sachan@atkinsglobal.com> Cc: Walters, Douglas A <dwalters@usgs.gov>; Weaver, John C <jcweaver@usgs.gov>; Hunu, Kenneth <Kenneth.Hunu@atkinsglobal.com>; Beadenkopf, Edward G <Edward.Beadenkopf@atkinsglobal.com> Subject: Re: Lumber River flows discussion That should work for me. I could do Monday or Tuesday mornings. Bryce McClenney Hydrologic Technician USGS South Atlantic Water Science Center Raleigh, NC (919)417-7021 From: Sachan, Amit <Amit.Sachan@atkinsglobal.com> Sent: Thursday, January 30, 2020 1:57 PM To: McClenney, Bryce J <bjmcclen@usgs.gov> Cc: Walters, Douglas A <dwalters@usgs.gov>; Weaver, John C <jcweaver@usgs.gov>; Hunu, Kenneth Page B6-3 <Kenneth.Hunu@atkinsglobal.com>; Beadenkopf, Edward G <Edward.Beadenkopf@atkinsglobal.com> Subject: [EXTERNAL] RE: Lumber River flows discussion Hi Bryce, Hope that you are doing well. We would like to learn about your experience during hurricanes Florence and Matthew. Would you be available for a brief call sometime in next few days? Let me know and we will plan accordingly. Thanks Amit Sachan, PE, CFM Project Director, Public & Private Business Unit Tel: +1 919 431 5253 Cell: +1 919 985 1095 Atkins, member of the SNC-Lavalin Group 1616 East Millbrook Road, Suite 160, Raleigh, NC 27519 From: Walters, Douglas A <dwalters@usgs.gov> Sent: Friday, January 24, 2020 7:36 AM To: Hunu, Kenneth <Kenneth.Hunu@atkinsglobal.com>; Sachan, Amit <Amit.Sachan@atkinsglobal.com>; Beadenkopf, Edward G <Edward.Beadenkopf@atkinsglobal.com> Cc: Weaver, John C <jcweaver@usgs.gov>; McClenney, Bryce J <bjmcclen@usgs.gov> Subject: Re: Lumber River flows discussion Amit, Ken and Ed, I spoke with the technician, Bryce McClenney, who measured Lumberton flows during Florence. As you can see below, they did measure the main channel at the gage (15,100 cfs) as well as the the overflow (1,977 cfs) under I-95 (railroad opening). The overflow was significant, comprising almost 12% of the total flow. The overflow was measured by wading the flows (split into 2 sections) overtopping 5th street, downstream of the I-95 opening. I hope this information is helpful. If you have further questions about the measurement or the conditions at the time, you can contact Bryce directly (cc'd in this email or at 919-417-7021). Bryce also has pictures and video of the conditions which he can share with you, if you like. Page B6-4 Page B6-5 Doug, Can you swing by for a few minutes before you leave for the day? JCWeaver J. Curtis Weaver, Hydrologist, PE Email: jcweaver@usgs.gov USGS South Atlantic Water Science Center Online: https://www.usgs.gov/centers/sa-water North Carolina - South Carolina - Georgia 3916 Sunset Ridge Road Raleigh, NC 27607 Phone: (919) 571-4043 // Fax: (919) 571-4041 From: Sachan, Amit <Amit.Sachan@atkinsglobal.com> Sent: Wednesday, January 22, 2020 2:33 PM To: Weaver, John C <jcweaver@usgs.gov> Cc: Hunu, Kenneth <Kenneth.Hunu@atkinsglobal.com>; Beadenkopf, Edward G <Edward.Beadenkopf@atkinsglobal.com> Subject: [EXTERNAL] RE: Lumber River flows discussion Hi Curtis, Here are few questions for our discussion. I’ll send out a meeting invite for everyone’s calendars. Thanks · Does the USGS have any official estimate of the frequency of Matthew and Florence at Lumberton? · Can the USGS comment to how Atkins has done the frequency analyses and offer any suggestions for what we have not done? · Can we discuss the rating curve at Lumberton? Is the backup available? Is the USGS comfortable with the observed hydrographs and peaks for the two major Hurricanes? · Significant flow left the Lumber River at I-95 during these events and we were told for Florence that was overtopped and/or out of service for a time. How was the rating curve developed and how reliable are the flow estimated and hydrographs for Florence and Matthew? From: Sachan, Amit Sent: Tuesday, January 21, 2020 11:43 AM To: Weaver, John C <jcweaver@usgs.gov> Cc: Hunu, Kenneth <Kenneth.Hunu@atkinsglobal.com>; Beadenkopf, Edward G <Edward.Beadenkopf@atkinsglobal.com> Subject: RE: Lumber River flows discussion Curtis, Thanks for your prompt response. Our discussion will be focused on a flood gate design project for the City of Lumberton on opening under I-95. Our questions will be based on flood frequency Page B6-6 analysis and rating curves on Lumber River stream gages. We will send few specific questions this afternoon. Let me know if we can meet on Thursday (1/23) afternoon (say 3 PM). Thanks Amit Sachan, PE, CFM Project Director, Public & Private Business Unit Tel: +1 919 431 5253 Cell: +1 919 985 1095 Atkins, member of the SNC-Lavalin Group 1616 East Millbrook Road, Suite 160, Raleigh, NC 27519 From: Weaver, John C <jcweaver@usgs.gov> Sent: Tuesday, January 21, 2020 11:14 AM To: Sachan, Amit <Amit.Sachan@atkinsglobal.com> Cc: Weaver, John C <jcweaver@usgs.gov> Subject: Re: Lumber River flows discussion Amit, Aside from an appointment on Thursday morning, I am generally available the coming several days. In the interest of transparency, I just completed a review for NCDOT a few weeks ago of several FF analyses for the streamgage on the Lumber River at Lumberton that were completed as part of their planning for future I-95 work near Lumberton. Please let me know if you're interest in the Lumber River issues is related to this NCDOT planning. Also, it would be helpful to get a heads up on the specific questions you have on the Lumber River so I could plan accordingly in advance of a conversation. Thank you. JCWeaver J. Curtis Weaver, Hydrologist, PE Email: jcweaver@usgs.gov USGS South Atlantic Water Science Center Online: https://www.usgs.gov/centers/sa-water North Carolina - South Carolina - Georgia 3916 Sunset Ridge Road Raleigh, NC 27607 Phone: (919) 571-4043 // Fax: (919) 571-4041 From: Sachan, Amit <Amit.Sachan@atkinsglobal.com> Sent: Monday, January 20, 2020 3:30 PM Page B6-7 To: Weaver, John C <jcweaver@usgs.gov> Subject: [EXTERNAL] Lumber River flows discussion Hi Curtis, Hope that you are doing well. We have talked briefly at the NCAFPM conferences. I would like to request a quick meeting to discuss a project that we are working on. It is flood control project for the City of Lumberton and we want to get your input on Lumber River gages and flows. Let me know a convenient time in next few days and we’ll plan accordingly. Regards Amit Sachan PE, CFM Project Director, Mid-Atlantic Private & Public Business Unit +1(919) 431 5253 +1(919) 985 1095 1616 E. Millbrook Road, Suite 160, Raleigh, NC 27609 Company This email and any attached files are confidential and copyright protected. If you are not the addressee, any dissemination of this communication is strictly prohibited. Unless otherwise expressly agreed in writing, nothing stated in this communication shall be legally binding. The ultimate parent company of the Atkins Group is SNC-Lavalin Group Inc. Registered in Québec, Canada No. 059041-0. Registered Office 455 boul. René-Lévesque Ouest, Montréal, Québec, Canada, H2Z 1Z3. A list of Atkins Group companies registered in the United Kingdom and locations around the world can be found at http://www.atkinsglobal.com/site-services/group-company-registration- details Consider the environment. Please don't print this e-mail unless you really need to. Page B6-8 1 | 1.0 | 16 March 2020 Atkins | West Lumberton Flood Gate H&H Report Hydraulic Analysis Page C1.0 C1 Hydraulic Structures Data Page C1-1 Label Name Channel Street Name Effective Model XS Data Origin Structure Type Rise Span or Diameter # Piers E1 Fivemile Branch Dawn Dr (next to I-95)NA McGill Survey 2RCBC 7.67 10 E2 Meadow Branch Dawn Dr (next to I-95)NA McGill Survey 2RCBC 8 10 E3 Fivemile Branch N Roberts Ave (SR 211)NA McGill Survey 3RCBC 10 14 E4 Fivemile Branch W Carthage Rd (SR 1536)NA McGill Survey 3RCBC 11 13 E5 Lumber River Kenric Rd (SR 1539)376455 Effective Model Bridge 194.9 2 E6 Lumber River S Caton Rd 375387 Effective Model Bridge 354.9 4 E8 Lumber River I-95 360856 Effective Model Bridge 214.7 7 E9 Lumber River 5th Street 350697 Effective Model Bridge 236.6 5 E10 Lumber River W 2nd St 349864 Effective Model Bridge 282.9 5 E12 Lumber River S Chestnut St [Alamac Rd (SR 2289) in model]345664 Effective Model Bridge 330.5 6 E13 Lumber River S Chippewa St/ Hestertown Rd NA McGill Survey Bridge 197.7 2 E14 Lumber River Structure 44 on NC HWY 72 323321.5 Effective Model Bridge 360.9 7 E15 Lumber River I-95 Proposed Bridge 360856 Preliminary Model Bridge 428.8 4 E16 Lumber River CSX Railroad 370045 Effective Model Bridge 350 14 E17 Lumber River Railroad 349691 Effective Model Bridge 345 13 LJ4 Little Jacob Swamp MLK Dr (NC 41)NA Field Data Arch (2)7.1 15 JS5 Jacob Swamp MLK Dr (NC 41)25316.41 Effective Model Box Culverts (2) 4.5 6 CC9 Collection Canal W 5th Street NA Field Data RCP 6 CC10 Collection Canal MLK Dr (NC 41)NA Field Data Pipe Culvert 7 Summary of Final Structures in External Hydraulic Model Page C1-2 C2 Lumber Levee and I-95 Data Page C2-1 119 120 121 122 123 124 125 126 127 0 2000 4000 6000 8000 10000 12000 14000 E LEV A T I O N ( F T ) STATION ALONG LEVEE L I DAR VS. SURVEY ELEVATIONS L iDAR Survey Page C2-2 Image courtesy of USGS © 2017 Microsoft Corporation © 2017 HERE © AND © 2017 HERE © AND © 2017 Microsoft Corporation G-101 CITY OF LUMBERTON DRAWING INDEX DWG. No. ADMINSTRATIONAPPROVED BY: EXECUTIVE DIRECTOR PLANS PREPARED AECOM AND APPROVED BY: DATE DATE LUMBERTON FLOOD MITIGATION ROBESON COUNTY GENERAL DRAWINGS G-101 COVER SHEET G-102 GENERAL NOTES CIVIL DRAWINGS C-100 GENERAL SITE PLAN XXXX, 2017 CO V E R S H E E T AECOM PROJECT NO. 60548447 STATE PROJECT NO. XXXX FUNDED IN PART BY XXXX PROPOSED PROJECT LOCATION PROJECT LOCATION MAP SCALE: 1" = 2000' XX % SUBMITTAL SO L I C I T A T I O N N O . : DW N B Y : C K D B Y : DE S I G N E D B Y : 1 D 2 3 C 4 5 A B DA T E : FI L E N U M B E R : SI Z E : SU B M I T T E D B Y : PL O T S C A L E : P L O T D A T E : MA R K DE S C R I P T I O N CO N T R A C T N O . : SHEET IDENTIFICATION DA T E A P P R . 15 1 5 P O Y D R A S S T S T E 2 7 0 0 NE W O R L E A N S , L A 7 0 1 1 2 SHEET IDENTIFICATION AN S I D CI T Y O F L U M B E R T O N NO R T H C A R O L I N A NO T E D NA NA NA AE C O M P R O J E C T No . x x x x x x FI L E N A M E : NO T F O R C O N S T R U C T I O N PR E L I M I N A R Y S U B M I T T A L LU M B E R T O N F L O O D M I T I G A T I O N 21 5 S C E D A R S T R E E T LU M B E R T O N , N C 2 8 3 5 8 AU G U S T 2 0 1 7 PROPOSED PROJECT LOCATION VICINITY MAP SCALE: 1" = 10,000' Page C2-3 Image courtesy of USGS © 2017 Microsoft Corporation © 2017 HERE © AND Image courtesy of USGS © 2017 Microsoft Corporation © 2017 HERE © AND 0 + 0 0 5 + 0 0 1 0 + 0 0 1 5 + 0 0 2 0 + 0 0 2 5 + 0 0 3 0 + 0 0 3 5 + 0 0 4 0 + 0 0 4 5 + 0 0 5 0 + 0 0 5 5 + 0 0 6 0 + 0 0 65 + 0 0 70 + 0 0 75 + 0 0 80+ 0 0 85+00 90+00 95 + 0 0 10 0 + 0 0 10 5 + 0 0 110+00 115+00 120+ 0 0 12 5 + 0 0 130 + 0 0 135 + 0 0 140+00 145+00 150+ 0 0 155 + 0 0 160 + 0 0 165+00 170+00 175+00 180 + 0 0 185 + 0 0 190 + 0 0 19 3 + 8 8 EXISTING LEVEE ALIGNMENT Elevations Table Number 1 2 3 4 5 6 7 8 9 10 Minimum Elevation 105.00 110.01 113.01 114.01 115.01 116.01 117.01 118.01 120.01 122.01 Maximum Elevation 110.00 113.00 114.00 115.00 116.00 117.00 118.00 120.00 122.00 158.84 Color G-101 PR O J E C T O V E R V I E W SO L I C I T A T I O N N O . : DW N B Y : C K D B Y : DE S I G N E D B Y : 1 D 2 3 C 4 5 A B DA T E : FI L E N U M B E R : SI Z E : SU B M I T T E D B Y : PL O T S C A L E : P L O T D A T E : MA R K DE S C R I P T I O N CO N T R A C T N O . : SHEET IDENTIFICATION DA T E A P P R . 15 1 5 P O Y D R A S S T S T E 2 7 0 0 NE W O R L E A N S , L A 7 0 1 1 2 SHEET IDENTIFICATION AN S I D CI T Y O F L U M B E R T O N NO R T H C A R O L I N A NO T E D NA NA NA AE C O M P R O J E C T No . x x x x x x FI L E N A M E : NO T F O R C O N S T R U C T I O N PR E L I M I N A R Y S U B M I T T A L LU M B E R T O N F L O O D M I T I G A T I O N 21 5 S C E D A R S T R E E T LU M B E R T O N , N C 2 8 3 5 8 AU G U S T 2 0 1 7 NOTES: 1. CONTOURS SHOWN ARE TAKEN FROM XXX. Page C2-4 0+ 0 0 2+ 5 0 5+ 0 0 7+ 5 0 10 + 0 0 12 + 5 0 1 5 + 0 0 1 7 + 5 0 2 0 + 0 0 2 2 + 5 0 2 5 + 0 0 Profile View of Lumberton Levee Alignment 100 105 110 115 120 125 130 135 140 145 150 100 105 110 115 120 125 130 135 140 145 150 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 BFE+3 BFE LIDAR SURVEY 124.29 124.29 124.28 124.27 124.26 124.24 124.22 124.21 124.19 124.17 124.15 124.13 124.08 124.03 123.99 123.96 123.94 123.92 123.89 123.87 123.84 123.82 123.79 123.76 123.72 123.71 127.29 127.29 127.28 127.27 127.26 127.24 127.22 127.21 127.19 127.17 127.15 127.13 127.08 127.03 126.99 126.96 126.94 126.92 126.89 126.87 126.84 126.82 126.79 126.76 126.72 126.71 -1.57 -1.66 -1.46 -1.64 -2.21 -2.64 -2.95 -2.80 -1.19 0.94 3.27 5.59 9.36 14.04 16.83 17.56 12.52 8.28 4.92 1.91 -0.60 -1.86 -1.73 -1.79 -1.85 -1.78 LIDAR SURVEY IS ABOVE BFE+3 NO GROUND SURVEY PROVIDED LIDAR SURVEY IS BELOW BFE+3 NO GROUND SURVEY PROVIDED BFE BFE+3 LIDAR Δ SURVEY Δ NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA LIDAR SURVEY IS BELOW BFE+3 NO GROUND SURVEY PROVIDED NOTES: 1. GROUND SURVEY SHOTS WERE COLLECTED IN NOVEMBER 2009. 2. BASE FLOOD ELEVATION (BFE) TAKEN FROM THE NORTH CAROLINA FLOOD RISK INFORMATION SYSTEM (NC FRIS) WEBSITE. LEGEND: BASE FLOOD ELEVATION (BFE) BASE FLOOD ELEVATION +3' (BFE+3) LIDAR SURVEY GROUND SURVEY C-100 PL A N A N D P R O F I L E SO L I C I T A T I O N N O . : DW N B Y : C K D B Y : DE S I G N E D B Y : 1 D 2 3 C 4 5 A B DA T E : FI L E N U M B E R : SI Z E : SU B M I T T E D B Y : PL O T S C A L E : P L O T D A T E : MA R K DE S C R I P T I O N CO N T R A C T N O . : SHEET IDENTIFICATION DA T E A P P R . 15 1 5 P O Y D R A S S T S T E 2 7 0 0 NE W O R L E A N S , L A 7 0 1 1 2 SHEET IDENTIFICATION AN S I D CI T Y O F L U M B E R T O N NO R T H C A R O L I N A NO T E D NA 60 5 4 8 4 7 7 NA AE C O M P R O J E C T No . 6 0 5 4 8 4 4 7 FI L E N A M E : NO T F O R C O N S T R U C T I O N PR E L I M I N A R Y S U B M I T T A L LU M B E R T O N F L O O D M I T I G A T I O N 21 5 S C E D A R S T R E E T LU M B E R T O N , N C 2 8 3 5 8 AU G U S T 2 0 1 7 PLAN SCALE: 1" = 100' PROFILE SCALE: 1" = 100' MA T C H L I N E S T A 2 5 + 0 0 SH E E T C - 1 0 1 200'100'050'100' 1"= 100' Page C2-5 Imag e c o u r t e s y o f U S G S © 2 0 1 7 M i c r o s o f t C o r p o r a t i o n Imag e c o u r t e s y o f U S G S © 2 0 1 7 M i c r o s o f t C o r p o r a t i o n 25 + 0 0 27 + 5 0 30 + 0 0 32 + 5 0 35 + 0 0 37 + 5 0 40 + 0 0 42 + 5 0 45 + 0 0 47 + 5 0 50 + 0 0 COX ROAD COX ROAD I-95 I-95 HESTER DRIVE HESTER DRIVE W 5TH STREET W 5TH STREET W 5TH STREET US 72 US 72 US 2 5 2 2 HES T E R D R I V E FLOOD SIDE PROTECTED SIDE Profile View of Lumberton Levee Alignment 100 105 110 115 120 125 130 135 140 145 150 100 105 110 115 120 125 130 135 140 145 150 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 BFE+3 BFE LIDAR SURVEY 123.71 123.70 123.69 123.68 123.67 123.66 123.65 123.63 123.62 123.61 123.60 123.60 123.60 123.60 123.59 123.59 123.59 123.58 123.58 123.58 123.57 123.57 123.57 123.56 123.56 123.56 126.71 126.70 126.69 126.68 126.67 126.66 126.65 126.63 126.62 126.61 126.60 126.60 126.60 126.60 126.59 126.59 126.59 126.58 126.58 126.58 126.57 126.57 126.57 126.56 126.56 126.56 -1.78 -1.59 -1.65 -1.72 -1.88 -1.86 -1.95 -2.19 -2.25 -2.42 -2.55 -2.82 -2.98 -2.91 -2.91 -2.36 -1.91 -0.71 0.54 2.07 4.03 6.49 8.93 11.30 13.43 15.75 LIDAR SURVEY IS ABOVE BFE+3 NO GROUND SURVEY PROVIDED LIDAR SURVEY IS BELOW BFE+3 NO GROUND SURVEY PROVIDED BFE BFE+3 LIDAR Δ SURVEY Δ NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA LEGEND: BASE FLOOD ELEVATION (BFE) BASE FLOOD ELEVATION +3' (BFE+3) LIDAR SURVEY GROUND SURVEY C-101 PL A N A N D P R O F I L E SO L I C I T A T I O N N O . : DW N B Y : C K D B Y : DE S I G N E D B Y : 1 D 2 3 C 4 5 A B DA T E : FI L E N U M B E R : SI Z E : SU B M I T T E D B Y : PL O T S C A L E : P L O T D A T E : MA R K DE S C R I P T I O N CO N T R A C T N O . : SHEET IDENTIFICATION DA T E A P P R . 15 1 5 P O Y D R A S S T S T E 2 7 0 0 NE W O R L E A N S , L A 7 0 1 1 2 SHEET IDENTIFICATION AN S I D CI T Y O F L U M B E R T O N NO R T H C A R O L I N A NO T E D NA 60 5 4 8 4 7 7 NA AE C O M P R O J E C T No . 6 0 5 4 8 4 4 7 FI L E N A M E : NO T F O R C O N S T R U C T I O N PR E L I M I N A R Y S U B M I T T A L LU M B E R T O N F L O O D M I T I G A T I O N 21 5 S C E D A R S T R E E T LU M B E R T O N , N C 2 8 3 5 8 AU G U S T 2 0 1 7 PLAN SCALE: 1" = 100' PROFILE SCALE: 1" = 100' MA T C H L I N E S T A 2 5 + 0 0 SH E E T C - 1 0 0 MA T C H L I N E S T A 5 0 + 0 0 SH E E T C - 1 0 2 200'100'050'100' 1"= 100' Page C2-6 Imag e c o u r t e s y o f U S G S © 2 0 1 7 M i c r o s o f t C o r p o r a t i o n Imag e c o u r t e s y o f U S G S © 2 0 1 7 M i c r o s o f t C o r p o r a t i o n 50 + 0 0 52 + 5 0 55 + 0 0 57 + 5 0 60 + 0 0 62 + 5 0 65 + 0 0 67 + 5 0 70 + 0 0 72 + 5 0 75 + 0 0 C O X R O A D COX R O A D I-95 I-95 CRYSTAL ROAD V F W R O A D VFW R O A D HACKETT STREET HACKETT STREET CRYSTAL ROAD C S X R R SEE SHEET C-200 FOR WALL DETAILS FLOOD SIDE PROTECTED SIDE PROTECTED SIDE Profile View of Lumberton Levee Alignment 100 105 110 115 120 125 130 135 140 145 150 100 105 110 115 120 125 130 135 140 145 150 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 BFE+3 BFE 123.56 123.55 123.55 123.55 123.55 123.48 123.36 123.27 123.25 123.24 123.23 123.21 123.20 123.19 123.18 123.17 123.16 123.14 123.13 123.12 123.11 123.10 123.09 123.08 123.07 123.05 126.56 126.55 126.55 126.55 126.55 126.48 126.36 126.27 126.25 126.24 126.23 126.21 126.20 126.19 126.18 126.17 126.16 126.14 126.13 126.12 126.11 126.10 126.09 126.08 126.07 126.05 15.75 17.97 19.45 20.63 4.72 -4.02 21.38 20.31 18.76 16.72 14.34 11.83 9.59 7.06 4.90 2.41 0.25 -1.57 -1.76 -1.54 -1.19 -1.31 -1.47 -1.55 -1.18 -1.02 SEE C-200 FOR DETAILS I-95 BRIDGE CSX RR VFW RD LIDAR SURVEY IS BELOW BFE+3 NO GROUND SURVEY PROVIDED BFE BFE+3 LIDAR Δ SURVEY Δ NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA LIDAR SURVEY IS ABOVE BFE+3 NO GROUND SURVEY PROVIDED LIDAR SURVEY LEGEND: BASE FLOOD ELEVATION (BFE) BASE FLOOD ELEVATION +3' (BFE+3) LIDAR SURVEY GROUND SURVEY C-102 PL A N A N D P R O F I L E SO L I C I T A T I O N N O . : DW N B Y : C K D B Y : DE S I G N E D B Y : 1 D 2 3 C 4 5 A B DA T E : FI L E N U M B E R : SI Z E : SU B M I T T E D B Y : PL O T S C A L E : P L O T D A T E : MA R K DE S C R I P T I O N CO N T R A C T N O . : SHEET IDENTIFICATION DA T E A P P R . 15 1 5 P O Y D R A S S T S T E 2 7 0 0 NE W O R L E A N S , L A 7 0 1 1 2 SHEET IDENTIFICATION AN S I D CI T Y O F L U M B E R T O N NO R T H C A R O L I N A NO T E D NA 60 5 4 8 4 7 7 NA AE C O M P R O J E C T No . 6 0 5 4 8 4 4 7 FI L E N A M E : NO T F O R C O N S T R U C T I O N PR E L I M I N A R Y S U B M I T T A L LU M B E R T O N F L O O D M I T I G A T I O N 21 5 S C E D A R S T R E E T LU M B E R T O N , N C 2 8 3 5 8 AU G U S T 2 0 1 7 PLAN SCALE: 1" = 100' PROFILE SCALE: 1" = 100' MA T C H L I N E S T A 5 0 + 0 0 SH E E T C - 1 0 1 200'100'050'100' 1"= 100' PHOTO NO. 178 MA T C H L I N E S T A 7 5 + 0 0 SH E E T C - 1 0 3 Page C2-7 7 5 + 0 0 7 7 + 5 0 8 0 + 0 0 8 2 + 5 0 85 + 0 0 87 + 5 0 90 + 0 0 92 + 5 0 95 + 0 0 97 + 5 0 100 + 0 0 C/L LEVEE 125.46 C/L LEVEE125.95 C/L LEVEE 126.05 C/L LEVEE125.66 C/L LEVEE125.56 C/L LEVEE 121.56 C/L LEVEE 119.67 C/L LEVEE 117.53 C/L LEVEE 117.28 C/L LEVEE 116.36 I-95 THE RIVER W A L K 100 105 110 115 120 125 130 135 140 145 150 100 105 110 115 120 125 130 135 140 145 150 75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00 91+00 92+00 93+00 94+00 95+00 96+00 97+00 98+00 99+00 100+00 BFE+3 BFE SURVEY POINTS LOWER THAN BFE+3 SURVEY POINTS HIGHER THAN BFE+3 LIDAR SUVEY INDICATES LOW SPOTS BE G I N G R O U N D SU R V E Y D A T A 123.05 123.02 122.99 122.97 122.95 122.93 122.91 122.89 122.87 122.86 122.84 122.81 122.80 122.77 122.75 122.73 122.71 122.68 122.66 122.63 122.60 122.57 122.54 122.51 122.48 122.45 126.05 126.02 125.99 125.97 125.95 125.93 125.91 125.89 125.87 125.86 125.84 125.81 125.80 125.77 125.75 125.73 125.71 125.68 125.66 125.63 125.60 125.57 125.54 125.51 125.48 125.45 -0.14 -0.02 0.10 0.23 0.25 0.01 -0.22 -0.09 0.04 0.17 0.30 0.42 0.49 0.56 0.63 BFE BFE+3 LIDAR Δ SURVEY Δ GROUND SURVEY LIDAR SURVEY -1.02 -1.26 -0.92 -0.98 -1.05 -1.05 -0.64 -0.31 -0.21 -0.49 -0.32 -0.57 -0.04 -0.17 0.01 0.09 -0.19 -0.37 -0.16 -0.26 0.15 0.22 0.20 0.38 0.59 0.80 NA NA NA NA NA NA NA NA NA NA NA SURVEY POINTS LOWER THAN BFE+3 SURVEY POINTS HIGHER THAN BFE+3 LIDAR SURVEY IS BELOW BFE+3 NO GROUND SURVEY PROVIDED LEGEND: BASE FLOOD ELEVATION (BFE) BASE FLOOD ELEVATION +3' (BFE+3) LIDAR SURVEY GROUND SURVEY C-103 PL A N A N D P R O F I L E SO L I C I T A T I O N N O . : DW N B Y : C K D B Y : DE S I G N E D B Y : 1 D 2 3 C 4 5 A B DA T E : FI L E N U M B E R : SI Z E : SU B M I T T E D B Y : PL O T S C A L E : P L O T D A T E : MA R K DE S C R I P T I O N CO N T R A C T N O . : SHEET IDENTIFICATION DA T E A P P R . 15 1 5 P O Y D R A S S T S T E 2 7 0 0 NE W O R L E A N S , L A 7 0 1 1 2 SHEET IDENTIFICATION AN S I D CI T Y O F L U M B E R T O N NO R T H C A R O L I N A NO T E D NA 60 5 4 8 4 7 7 NA AE C O M P R O J E C T No . 6 0 5 4 8 4 4 7 FI L E N A M E : NO T F O R C O N S T R U C T I O N PR E L I M I N A R Y S U B M I T T A L LU M B E R T O N F L O O D M I T I G A T I O N 21 5 S C E D A R S T R E E T LU M B E R T O N , N C 2 8 3 5 8 AU G U S T 2 0 1 7 PLAN SCALE: 1" = 100' PROFILE SCALE: 1" = 100' MA T C H L I N E S T A 7 5 + 0 0 SH E E T C - 1 0 2 MA T C H L I N E S T A 1 0 0 + 0 0 SH E E T C - 1 0 4 200'100'050'100' 1"= 100' PROTECTED SIDE FLOOD SIDE Page C2-8 court e s y o f U S G S © 2 0 1 7 M i c r o s o f t C o r p o r a t i o n 1 0 0 + 0 0 10 2 + 5 0 105 + 0 0 107 + 5 0 110 + 0 0 112 + 5 0 11 5 + 0 0 1 1 7 + 5 0 1 2 0 + 0 0 1 2 2 + 5 0 1 2 5 + 0 0 C/L LEVEE125.46 C/L LEVEE 125.92 C/L LEVEE124.60 C/L LEVEE 125.90 C/L LEVEE 125.66 C/L LEVEE 126.11 LUM B E R R I V E R T H E R I V E R W A L K L U M B E R R I V E R LOWERY STRE E T L O C K L E A R S T . LOWERY STRE E T Profile View of Lumberton Levee Alignment 100 105 110 115 120 125 130 135 140 145 150 100 105 110 115 120 125 130 135 140 145 150 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00 BFE+3 BFE SURVEY POINTS HIGHER THAN BFE+3 122.45 122.41 122.38 122.34 122.31 122.28 122.25 122.23 122.21 122.19 122.17 122.16 122.14 122.11 122.09 122.06 122.02 121.98 121.95 121.91 121.87 121.83 121.79 121.75 121.71 121.67 125.45 125.41 125.38 125.34 125.31 125.28 125.25 125.23 125.21 125.19 125.17 125.16 125.14 125.11 125.09 125.06 125.02 124.98 124.95 124.91 124.87 124.83 124.79 124.75 124.71 124.67 0.80 0.28 0.20 0.50 0.37 0.30 0.88 0.73 0.51 0.87 0.81 0.23 0.43 0.68 0.92 0.35 0.47 -0.02 -0.49 0.26 0.31 0.12 -0.11 0.10 0.16 -0.30 0.63 0.67 0.59 0.51 0.43 0.41 0.54 0.66 0.48 0.27 0.06 -0.14 -0.35 -0.45 0.00 0.45 0.90 0.81 0.72 0.63 0.57 0.54 0.52 0.49 0.47 0.44 GROUND SURVEY LIDAR SURVEY BFE BFE+3 LIDAR Δ SURVEY Δ SURVEY POINTS LOWER THAN BFE+3 SURVEY POINTS HIGHER THAN BFE+3 LIDAR SUVEY INDICATES LOW SPOTS LEGEND: BASE FLOOD ELEVATION (BFE) BASE FLOOD ELEVATION +3' (BFE+3) LIDAR SURVEY GROUND SURVEY C-104 PL A N A N D P R O F I L E SO L I C I T A T I O N N O . : DW N B Y : C K D B Y : DE S I G N E D B Y : 1 D 2 3 C 4 5 A B DA T E : FI L E N U M B E R : SI Z E : SU B M I T T E D B Y : PL O T S C A L E : P L O T D A T E : MA R K DE S C R I P T I O N CO N T R A C T N O . : SHEET IDENTIFICATION DA T E A P P R . 15 1 5 P O Y D R A S S T S T E 2 7 0 0 NE W O R L E A N S , L A 7 0 1 1 2 SHEET IDENTIFICATION AN S I D CI T Y O F L U M B E R T O N NO R T H C A R O L I N A NO T E D NA 60 5 4 8 4 7 7 NA AE C O M P R O J E C T No . 6 0 5 4 8 4 4 7 FI L E N A M E : NO T F O R C O N S T R U C T I O N PR E L I M I N A R Y S U B M I T T A L LU M B E R T O N F L O O D M I T I G A T I O N 21 5 S C E D A R S T R E E T LU M B E R T O N , N C 2 8 3 5 8 AU G U S T 2 0 1 7 PLAN SCALE: 1" = 100' PROFILE SCALE: 1" = 100' MA T C H L I N E S T A 1 0 0 + 0 0 SH E E T C - 1 0 3 MA T C H L I N E S T A 1 2 5 + 0 0 SH E E T C - 1 0 5 200'100'050'100' 1"= 100' PROTECTED SIDE FLOOD SIDE Page C2-9 cou r t e s y o f U S G S © 2 0 1 7 M i c r o s o f t C o r p o r a t i o n Ima g e c o u r t e s y o f U S G S © 2 0 1 7 M i c r o s o f t C o r p o r a t i o n 1 2 5 + 0 0 1 2 7 + 5 0 1 3 0 + 0 0 13 2 + 5 0 13 5 + 0 0 13 7 + 5 0 14 0 + 0 0 1 4 2 + 5 0 145 + 0 0 1 4 7 + 5 0 1 5 0 + 0 0 C/L LEVEE124.61 C/L LEVEE 124.67 C/L LEVEE 124.80 C/L LEVEE 125.05C/L LEVEE124.91 C/L LEVEE 124.91 C/L LEVEE 125.19 C/L LEVEE 125.14 C/L LEVEE125.39 C/L LEVEE125.09 THE R I V E R W A L K LU M B E R R I V E R LOWER Y S T R E E T A Y E R S C T . KI N G S T R E E T 100 105 110 115 120 125 130 135 140 145 150 100 105 110 115 120 125 130 135 140 145 150 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00 140+00 141+00 142+00 143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 BFE+3 BFE SURVEY POINTS HIGHER THAN BFE+3 LIDAR SUVEY INDICATES LOW SPOTS 121.67 121.64 121.61 121.59 121.58 121.56 121.54 121.50 121.45 121.41 121.40 121.38 121.37 121.36 121.35 121.33 121.32 121.31 121.29 121.28 121.27 121.26 121.25 121.24 121.22 121.20 124.67 124.64 124.61 124.59 124.58 124.56 124.54 124.50 124.45 124.41 124.40 124.38 124.37 124.36 124.35 124.33 124.32 124.31 124.29 124.28 124.27 124.26 124.25 124.24 124.22 124.20 -0.30 0.36 0.53 0.28 0.28 0.40 0.26 0.40 0.28 0.60 0.35 0.40 0.49 0.44 0.20 -0.16 -0.20 0.18 0.11 0.94 1.05 0.36 0.36 0.09 -0.12 -0.31 0.44 0.50 0.61 0.70 0.79 0.75 0.66 0.65 0.71 0.76 0.79 0.77 0.72 0.67 0.62 0.58 0.59 0.60 0.64 0.72 0.71 0.52 0.42 0.39 0.38 0.38 BFE BFE+3 LIDAR Δ SURVEY Δ GROUND SURVEY LIDAR SURVEY LEGEND: BASE FLOOD ELEVATION (BFE) BASE FLOOD ELEVATION +3' (BFE+3) LIDAR SURVEY GROUND SURVEY C-105 PL A N A N D P R O F I L E SO L I C I T A T I O N N O . : DW N B Y : C K D B Y : DE S I G N E D B Y : 1 D 2 3 C 4 5 A B DA T E : FI L E N U M B E R : SI Z E : SU B M I T T E D B Y : PL O T S C A L E : P L O T D A T E : MA R K DE S C R I P T I O N CO N T R A C T N O . : SHEET IDENTIFICATION DA T E A P P R . 15 1 5 P O Y D R A S S T S T E 2 7 0 0 NE W O R L E A N S , L A 7 0 1 1 2 SHEET IDENTIFICATION AN S I D CI T Y O F L U M B E R T O N NO R T H C A R O L I N A NO T E D NA 60 5 4 8 4 7 7 NA AE C O M P R O J E C T No . 6 0 5 4 8 4 4 7 FI L E N A M E : NO T F O R C O N S T R U C T I O N PR E L I M I N A R Y S U B M I T T A L LU M B E R T O N F L O O D M I T I G A T I O N 21 5 S C E D A R S T R E E T LU M B E R T O N , N C 2 8 3 5 8 AU G U S T 2 0 1 7 PLAN SCALE: 1" = 100' PROFILE SCALE: 1" = 100' MA T C H L I N E S T A 1 2 5 + 0 0 SH E E T C - 1 0 4 MA T C H L I N E S T A 1 5 2 + 0 0 SH E E T C - 1 0 6 200'100'050'100' 1"= 100' PROTECTED SIDE FLOOD SIDE Page C2-10 Im a g e c o u r t e s y o f U S G S © 2 0 1 7 M i c r o s o f t C o r p o r a t i o n Im a g e c o u r t e s y o f U S G S © 2 0 1 7 M i c r o s o f t C o r p o r a t i o n 1 5 0 + 0 0 1 5 2 + 5 0 1 5 5 + 0 0 1 5 7 + 5 0 16 0 + 0 0 16 2 + 5 0 165 + 0 0 167 + 5 0 170 + 0 0 172+ 5 0 175 + 0 0 C/L LEVEE121.89 C/L LEVEE 121.83 C/L LEVEE 122.66 C/L LEVEE 123.02 C/L LEVEE123.11 C/L LEVEE 123.28 C/L LEVEE 122.82 C/L LEVEE123.62 C/L LEVEE124.41C/L LEVEE 124.57 C/L LEVEE 124.45 C/L LEVEE121.72 C/L LEVEE120.56 C/L LEVEE120.51 C/L LEVEE121.27 C/L LEVEE 123.23 C/L LEVEE124.28C/L LEVEE 124.35 C/L LEVEE 124.44 C/L LEVEE 124.56 C/L LEVEE 124.61 TH E R I V E R W A L K W 2N D S T . THE R I V E R W A L K W 5 T H S T . W 5T H S T . W 2ND S T . A P P L E S T . LINCOLN S T . Profile View of Lumberton Levee Alignment 100 105 110 115 120 125 130 135 140 145 150 100 105 110 115 120 125 130 135 140 145 150 150+00 151+00 152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00 160+00 161+00 162+00 163+00 164+00 165+00 166+00 167+00 168+00 169+00 170+00 171+00 172+00 173+00 174+00 175+00 BFE+3 BFE SURVEY POINTS HIGHER THAN BFE+3 LIDAR SUVEY INDICATES LOW SPOTS 121.20 121.13 121.06 121.00 120.94 120.87 120.82 120.76 120.70 120.61 120.49 120.38 120.27 120.16 120.05 119.94 119.81 119.69 119.56 119.53 119.50 119.47 119.24 118.69 118.49 118.35 124.20 124.13 124.06 124.00 123.94 123.87 123.82 123.76 123.70 123.61 123.49 123.38 123.27 123.16 123.05 122.94 122.81 122.69 122.56 122.53 122.50 122.47 122.24 121.69 121.49 121.35 -0.31 -0.01 -0.07 0.01 0.18 -0.07 0.52 0.55 0.19 0.49 0.23 0.41 0.48 -0.04 -2.55 -0.29 1.31 1.45 1.61 1.55 1.36 1.26 1.09 1.78 0.12 0.64 0.38 0.43 0.47 0.50 0.53 0.56 0.59 0.62 0.64 0.71 0.80 0.66 0.34 -0.33 -2.52 -0.92 1.10 1.80 1.97 1.96 1.84 1.17 0.97 1.10 0.43 0.87 BFE BFE+3 LIDAR Δ SURVEY Δ GROUND SURVEY LIDAR SURVEY W. 5 T H S T SURVEY POINTS LOWER THAN BFE+3 SURVEY POINTS HIGHER THAN BFE+3 LIDAR SUVEY INDICATES LOW SPOTS LEGEND: BASE FLOOD ELEVATION (BFE) BASE FLOOD ELEVATION +3' (BFE+3) LIDAR SURVEY GROUND SURVEY C-106 PL A N A N D P R O F I L E SO L I C I T A T I O N N O . : DW N B Y : C K D B Y : DE S I G N E D B Y : 1 D 2 3 C 4 5 A B DA T E : FI L E N U M B E R : SI Z E : SU B M I T T E D B Y : PL O T S C A L E : P L O T D A T E : MA R K DE S C R I P T I O N CO N T R A C T N O . : SHEET IDENTIFICATION DA T E A P P R . 15 1 5 P O Y D R A S S T S T E 2 7 0 0 NE W O R L E A N S , L A 7 0 1 1 2 SHEET IDENTIFICATION AN S I D CI T Y O F L U M B E R T O N NO R T H C A R O L I N A NO T E D NA 60 5 4 8 4 7 7 NA AE C O M P R O J E C T No . 6 0 5 4 8 4 4 7 FI L E N A M E : NO T F O R C O N S T R U C T I O N PR E L I M I N A R Y S U B M I T T A L LU M B E R T O N F L O O D M I T I G A T I O N 21 5 S C E D A R S T R E E T LU M B E R T O N , N C 2 8 3 5 8 AU G U S T 2 0 1 7 PLAN SCALE: 1" = 100' PROFILE SCALE: 1" = 100' MA T C H L I N E S T A 1 5 0 + 0 0 SH E E T C - 1 0 5 MA T C H L I N E S T A 1 7 5 + 0 0 SH E E T C - 1 0 7 200'100'050'100' 1"= 100' PROTECTED SIDE FLOOD SIDE Page C2-11 I m a g e c o u r t e s y o f U S G S © 2 0 1 7 M i c r o s o f t C o r p o r a t i o n o f U S G S © 2 0 1 7 M i c r o s o f t C o r p o r a t i o n 1 7 5 + 0 0 17 7 + 5 0 18 0 + 0 0 18 2 + 5 0 18 5 + 0 0 18 7 + 5 0 1 9 0 + 0 0 1 9 2 + 5 0 1 9 5 + 0 0 1 9 7 + 5 0 2 0 0 + 0 0 C/L LEVEE122.44 C/L LEVEE 122.25 C/L LEVEE 122.43 C/L LEVEE122.75 C/L LEVEE122.32 C/L LEVEE122.15 C/L LEVEE 121.66 C/L LEVEE 121.36 C/L LEVEE121.33 121.13 C/L LEVEE 122.39 C/L LEVEE 122.13 C/L LEVEE 122.26 C/L LEVEE122.22 C/L LEVEE 121.97 C/L LEVEE 121.86 C/L LEVEE 121.89 C/L LEVEE 121.69 C/L LEVEE 122.47 C/L LEVEE122.36 C/L LEVEE 122.15 C/L LEVEE122.29 C/L LEVEE122.25 C/L LEVEE LU M B E R R I V E R HO P P E R S T . BULL A R D S T . CA M P B E L L S T . KIN L A W S T . LUMBER R I V E R LUM B E R R I V E R Profile View of Lumberton Levee Alignment 100 105 110 115 120 125 130 135 140 145 150 100 105 110 115 120 125 130 135 140 145 150 175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00 184+00 185+00 186+00 187+00 188+00 189+00 190+00 191+00 192+00 193+00 194+00 195+00 196+00 197+00 198+00 199+00 200+00 BFE+3 BFE SURVEY POINTS HIGHER THAN BFE+3 LIDAR SUVEY HIGHER THAN BFE+3 118.35 118.20 118.09 117.98 117.88 117.78 117.68 117.57 117.46 117.34 117.21 117.08 116.95 116.83 116.74 116.69 116.63 116.58 116.53 116.48 116.43 116.37 116.32 116.27 116.22 116.15 121.35 121.20 121.09 120.98 120.88 120.78 120.68 120.57 120.46 120.34 120.21 120.08 119.95 119.83 119.74 119.69 119.63 119.58 119.53 119.48 119.43 119.37 119.32 119.27 119.22 119.15 0.64 0.67 0.76 0.74 1.21 1.56 1.40 1.15 1.08 1.32 1.60 1.91 2.29 2.34 2.73 2.22 2.46 2.87 3.02 2.73 2.57 2.51 2.26 2.14 2.19 2.13 0.87 1.08 1.10 1.31 1.52 1.67 1.46 1.13 1.37 1.54 1.69 2.00 2.30 2.34 2.64 2.65 2.72 3.03 3.10 2.93 2.84 2.81 2.67 2.48 2.28 2.19 BFE BFE+3 LIDAR Δ SURVEY Δ GROUND SURVEY LIDAR SURVEY LEGEND: BASE FLOOD ELEVATION (BFE) BASE FLOOD ELEVATION +3' (BFE+3) LIDAR SURVEY GROUND SURVEY C-107 PL A N A N D P R O F I L E SO L I C I T A T I O N N O . : DW N B Y : C K D B Y : DE S I G N E D B Y : 1 D 2 3 C 4 5 A B DA T E : FI L E N U M B E R : SI Z E : SU B M I T T E D B Y : PL O T S C A L E : P L O T D A T E : MA R K DE S C R I P T I O N CO N T R A C T N O . : SHEET IDENTIFICATION DA T E A P P R . 15 1 5 P O Y D R A S S T S T E 2 7 0 0 NE W O R L E A N S , L A 7 0 1 1 2 SHEET IDENTIFICATION AN S I D CI T Y O F L U M B E R T O N NO R T H C A R O L I N A NO T E D NA 60 5 4 8 4 7 7 NA AE C O M P R O J E C T No . 6 0 5 4 8 4 4 7 FI L E N A M E : NO T F O R C O N S T R U C T I O N PR E L I M I N A R Y S U B M I T T A L LU M B E R T O N F L O O D M I T I G A T I O N 21 5 S C E D A R S T R E E T LU M B E R T O N , N C 2 8 3 5 8 AU G U S T 2 0 1 7 PLAN SCALE: 1" = 100' PROFILE SCALE: 1" = 100' MA T C H L I N E S T A 1 7 5 + 0 0 SH E E T C - 1 0 6 200'100'050'100' 1"= 100' FLOOD SIDE PROTECTED SIDE MA T C H L I N E S T A 2 0 0 + 0 0 SH E E T C - 1 0 8 Page C2-12 of U S G S © 2 0 1 7 M i c r o s o f t C o r p o r a t i o n Im a g e c o u r t e s y o f U S G S © 2 0 1 7 M i c r o s o f t C o r p o r a t i o n 20 0 + 0 0 2 0 2 + 5 0 2 0 5 + 0 0 2 0 7 + 5 0 2 1 0 + 0 0 2 1 2 + 5 0 2 1 5 + 0 0 217 + 5 0 220 + 0 0 222 + 5 0 225 + 0 0 C/L LEVEE C/L LEVEE 121.36 C/L LEVEE 121.33 C/L LEVEE 121.13 C/L LEVEE 121.07 C/L LEVEE 121.53 C/L LEVEE 121.56 C/L LEVEE 121.43 C/L LEVEE121.64 C/L LEVEE 121.73 C/L LEVEE121.71 C/L LEVEE121.60 C/L LEVEE121.18 C/L LEVEE 119.73 CHICKEN FOOT RD. U S 2 2 8 9 LUMBER RIVER LU M B E R R I V E R 100 105 110 115 120 125 130 135 140 145 150 100 105 110 115 120 125 130 135 140 145 150 200+00 201+00 202+00 203+00 204+00 205+00 206+00 207+00 208+00 209+00 210+00 211+00 212+00 213+00 214+00 215+00 216+00 217+00 218+00 219+00 220+00 221+00 222+00 223+00 224+00 225+00 BFE+3 BFE EN D G R O U N D SU R V E Y D A T A 116.15 116.06 115.97 115.93 115.88 115.83 115.78 115.74 115.69 115.64 115.60 115.55 115.51 115.46 115.41 115.31 115.25 115.25 115.25 115.24 115.23 115.23 115.22 115.20 115.18 115.15 119.15 119.06 118.97 118.93 118.88 118.83 118.78 118.74 118.69 118.64 118.60 118.55 118.51 118.46 118.41 118.31 118.25 118.25 118.25 118.24 118.23 118.23 118.22 118.20 118.18 118.15 2.13 1.74 1.78 1.86 2.04 2.23 2.25 2.34 2.49 2.79 2.56 2.89 3.07 2.94 3.10 1.85 1.31 0.61 0.13 -0.31 -0.35 -0.40 -0.57 -0.44 -0.62 -0.76 2.19 2.06 2.12 2.26 2.41 2.54 2.69 2.80 2.86 2.89 2.86 2.95 3.13 3.26 3.19 2.01 BFE BFE+3 LIDAR Δ SURVEY Δ LIDAR SURVEY NA NA NA NA NA NA NA NA NA NA GROUND SURVEY SURVEY POINTS HIGHER THAN BFE+3 LIDAR SUVEY HIGHER THAN BFE+3 LIDAR SURVEY LOWER THAN BFE+3 LIDAR SUVEY HIGHER THAN BFE+3 LEGEND: BASE FLOOD ELEVATION (BFE) BASE FLOOD ELEVATION +3' (BFE+3) LIDAR SURVEY GROUND SURVEY C-108 PL A N A N D P R O F I L E SO L I C I T A T I O N N O . : DW N B Y : C K D B Y : DE S I G N E D B Y : 1 D 2 3 C 4 5 A B DA T E : FI L E N U M B E R : SI Z E : SU B M I T T E D B Y : PL O T S C A L E : P L O T D A T E : MA R K DE S C R I P T I O N CO N T R A C T N O . : SHEET IDENTIFICATION DA T E A P P R . 15 1 5 P O Y D R A S S T S T E 2 7 0 0 NE W O R L E A N S , L A 7 0 1 1 2 SHEET IDENTIFICATION AN S I D CI T Y O F L U M B E R T O N NO R T H C A R O L I N A NO T E D NA 60 5 4 8 4 7 7 NA AE C O M P R O J E C T No . 6 0 5 4 8 4 4 7 FI L E N A M E : NO T F O R C O N S T R U C T I O N PR E L I M I N A R Y S U B M I T T A L LU M B E R T O N F L O O D M I T I G A T I O N 21 5 S C E D A R S T R E E T LU M B E R T O N , N C 2 8 3 5 8 AU G U S T 2 0 1 7 PLAN SCALE: 1" = 100' PROFILE SCALE: 1" = 100' MA T C H L I N E S T A 2 0 0 + 0 0 SH E E T C - 1 0 7 200'100'050'100' 1"= 100' FLOOD SIDE PROTECTED SIDE MA T C H L I N E S T A 2 2 5 + 0 0 SH E E T C - 1 0 9 Page C2-13 US G S © 2 0 1 7 M i c r o s o f t C o r p o r a t i o n 22 5 + 0 0 22 7 + 5 0 23 0 + 0 0 23 2 + 5 0 23 5 + 0 0 23 7 + 5 0 24 0 + 0 0 24 2 + 5 0 24 5 + 0 0 24 7 + 5 0 25 0 + 0 0 CHIC K E N F O O T R D . ALAMAC DR. HE N D R E N S P O N D D R . FL O O D L N . WA Y N E ' S R D . ALAMAC DR. 100 105 110 115 120 125 130 135 140 145 100 105 110 115 120 125 130 135 140 145 225+00 226+00 227+00 228+00 229+00 230+00 231+00 232+00 233+00 234+00 235+00 236+00 237+00 238+00 239+00 240+00 241+00 242+00 243+00 244+00 245+00 246+00 247+00 248+00 249+00 250+00 BFE+3 BFE 115.15 115.12 115.09 115.06 115.03 114.98 114.93 114.89 114.84 114.82 114.79 114.76 114.73 114.50 114.27 114.25 114.23 114.21 114.18 114.15 114.11 114.07 114.05 114.02 113.98 113.95 118.15 118.12 118.09 118.06 118.03 117.98 117.93 117.89 117.84 117.82 117.79 117.76 117.73 117.50 117.27 117.25 117.23 117.21 117.18 117.15 117.11 117.07 117.05 117.02 116.98 116.95 -0.76 -0.84 -0.88 -0.73 -0.64 -0.43 -0.37 -0.39 -0.32 -0.24 -0.40 -0.45 -0.45 -0.32 -0.18 -0.16 -0.14 0.06 0.12 0.08 0.08 0.00 0.01 0.02 -0.04 -0.09 LIDAR SURVEY BFE BFE+3 LIDAR Δ SURVEY Δ NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA LIDAR SURVEY LOWER THAN BFE+3 LEGEND: BASE FLOOD ELEVATION (BFE) BASE FLOOD ELEVATION +3' (BFE+3) LIDAR SURVEY GROUND SURVEY C-109 PL A N A N D P R O F I L E SO L I C I T A T I O N N O . : DW N B Y : C K D B Y : DE S I G N E D B Y : 1 D 2 3 C 4 5 A B DA T E : FI L E N U M B E R : SI Z E : SU B M I T T E D B Y : PL O T S C A L E : P L O T D A T E : MA R K DE S C R I P T I O N CO N T R A C T N O . : SHEET IDENTIFICATION DA T E A P P R . 15 1 5 P O Y D R A S S T S T E 2 7 0 0 NE W O R L E A N S , L A 7 0 1 1 2 SHEET IDENTIFICATION AN S I D CI T Y O F L U M B E R T O N NO R T H C A R O L I N A NO T E D NA 60 5 4 8 4 7 7 NA AE C O M P R O J E C T No . 6 0 5 4 8 4 4 7 FI L E N A M E : NO T F O R C O N S T R U C T I O N PR E L I M I N A R Y S U B M I T T A L LU M B E R T O N F L O O D M I T I G A T I O N 21 5 S C E D A R S T R E E T LU M B E R T O N , N C 2 8 3 5 8 AU G U S T 2 0 1 7 PLAN SCALE: 1" = 100' PROFILE SCALE: 1" = 100' MA T C H L I N E S T A 2 2 5 + 0 0 SH E E T C - 1 0 8 200'100'050'100' 1"= 100' FLOOD SIDE PROTECTED SIDE MA T C H L I N E S T A 2 5 0 + 0 0 SH E E T C - 1 1 0 Page C2-14 sy o f U S G S © 2 0 1 7 M i c r o s o f t C o r p o r a t i o n 25 0 + 0 0 25 2 + 5 0 25 5 + 0 0 25 7 + 5 0 26 0 + 0 0 26 2 + 5 0 26 5 + 0 0 26 7 + 5 0 27 0 + 0 0 27 2 + 5 0 27 5 + 0 0 MA C O N S T . BRO A D W A Y D R . ALAMAC DR.US 2289 US 2289 BRO A D W A Y D R . ALAMAC DR. 100 105 110 115 120 125 130 135 140 145 150 100 105 110 115 120 125 130 135 140 145 150 250+00 251+00 252+00 253+00 254+00 255+00 256+00 257+00 258+00 259+00 260+00 261+00 262+00 263+00 264+00 265+00 266+00 267+00 268+00 269+00 270+00 271+00 272+00 273+00 274+00 275+00 BFE BFE+3 LIDAR Δ SURVEY Δ NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA BFE+3 BFE LIDAR SURVEY 113.95 113.92 113.89 113.84 113.81 113.78 113.76 113.71 113.66 113.59 113.53 113.47 113.40 113.30 113.22 113.14 113.08 113.06 113.04 113.01 113.00 112.98 112.97 112.95 112.93 112.90 116.95 116.92 116.89 116.84 116.81 116.78 116.76 116.71 116.66 116.59 116.53 116.47 116.40 116.30 116.22 116.14 116.08 116.06 116.04 116.01 116.00 115.98 115.97 115.95 115.93 115.90 -0.09 -0.24 -0.13 -0.19 -0.33 -0.31 -0.29 -0.29 -0.27 -0.29 -0.22 -0.09 -0.20 -0.06 0.11 0.13 0.16 0.23 0.13 0.06 0.11 -0.01 0.13 0.07 -0.01 -0.05 LEGEND: BASE FLOOD ELEVATION (BFE) BASE FLOOD ELEVATION +3' (BFE+3) LIDAR SURVEY GROUND SURVEY C-110 PL A N A N D P R O F I L E SO L I C I T A T I O N N O . : DW N B Y : C K D B Y : DE S I G N E D B Y : 1 D 2 3 C 4 5 A B DA T E : FI L E N U M B E R : SI Z E : SU B M I T T E D B Y : PL O T S C A L E : P L O T D A T E : MA R K DE S C R I P T I O N CO N T R A C T N O . : SHEET IDENTIFICATION DA T E A P P R . 15 1 5 P O Y D R A S S T S T E 2 7 0 0 NE W O R L E A N S , L A 7 0 1 1 2 SHEET IDENTIFICATION AN S I D CI T Y O F L U M B E R T O N NO R T H C A R O L I N A NO T E D NA 60 5 4 8 4 7 7 NA AE C O M P R O J E C T No . 6 0 5 4 8 4 4 7 FI L E N A M E : NO T F O R C O N S T R U C T I O N PR E L I M I N A R Y S U B M I T T A L LU M B E R T O N F L O O D M I T I G A T I O N 21 5 S C E D A R S T R E E T LU M B E R T O N , N C 2 8 3 5 8 AU G U S T 2 0 1 7 PLAN SCALE: 1" = 100' PROFILE SCALE: 1" = 100' MA T C H L I N E S T A 2 5 0 + 0 0 SH E E T C - 1 0 9 200'100'050'100' 1"= 100' FLOOD SIDE PROTECTED SIDE MA T C H L I N E S T A 2 7 5 + 0 0 SH E E T C - 1 1 1 Page C2-15 e c o u r t e s y o f U S G S © 2 0 1 7 M i c r o s o f t C o r p o r a t i o n 28 2 + 5 0 28 5 + 0 0 28 7 + 5 0 29 0 + 0 0 29 2 + 5 0 29 5 + 0 0 29 5 + 3 6 JACO B B R A N C H JA C O B B R A N C H US 2289ALAMAC DR. 100 105 110 115 120 125 130 135 140 145 150 280+00 281+00 282+00 283+00 284+00 285+00 286+00 287+00 288+00 289+00 290+00 291+00 292+00 293+00 294+00 295+00 296+00 297+00 298+00 299+00 300+00 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA BFE+3 BFE LIDAR SURVEY 112.88 112.88 112.87 112.87 112.87 112.86 112.86 112.86 112.85 112.85 112.85 112.84 112.84 112.83 112.83 112.83 115.88 115.88 115.87 115.87 115.87 115.86 115.86 115.86 115.85 115.85 115.85 115.84 115.84 115.83 115.83 115.83 -0.33 -0.18 -0.22 -0.24 -0.15 -0.17 -0.06 -0.14 -0.39 -0.32 -0.26 -0.28 -0.34 -0.43 -10.84 -1.83 LEGEND: BASE FLOOD ELEVATION (BFE) BASE FLOOD ELEVATION +3' (BFE+3) LIDAR SURVEY GROUND SURVEY C-111 PL A N A N D P R O F I L E SO L I C I T A T I O N N O . : DW N B Y : C K D B Y : DE S I G N E D B Y : 1 D 2 3 C 4 5 A B DA T E : FI L E N U M B E R : SI Z E : SU B M I T T E D B Y : PL O T S C A L E : P L O T D A T E : MA R K DE S C R I P T I O N CO N T R A C T N O . : SHEET IDENTIFICATION DA T E A P P R . 15 1 5 P O Y D R A S S T S T E 2 7 0 0 NE W O R L E A N S , L A 7 0 1 1 2 SHEET IDENTIFICATION AN S I D CI T Y O F L U M B E R T O N NO R T H C A R O L I N A NO T E D NA 60 5 4 8 4 7 7 NA AE C O M P R O J E C T No . 6 0 5 4 8 4 4 7 FI L E N A M E : NO T F O R C O N S T R U C T I O N PR E L I M I N A R Y S U B M I T T A L LU M B E R T O N F L O O D M I T I G A T I O N 21 5 S C E D A R S T R E E T LU M B E R T O N , N C 2 8 3 5 8 AU G U S T 2 0 1 7 PLAN SCALE: 1" = 100' PROFILE SCALE: 1" = 100' MA T C H L I N E S T A 1 7 5 + 0 0 SH E E T C - 1 0 6 200'100'050'100' 1"= 100' FLOOD SIDE PROTECTED SIDE Page C2-16 C3 Calibration Results Page C3-1 Table 1. Roughness coefficients used for calibration trial runs NLCD Classification Base N Min. Value Max. Value Final Calibrated N 11 Open Water 0.03 0.025 0.033 0.033 21 Developed, Open Space 0.013 0.01 0.016 0.016 22 Developed, Low Intensity 0.05 0.038 0.063 0.063 23 Developed, Medium Intensity 0.075 0.056 0.094 0.094 24 Developed, High Intensity 0.1 0.075 0.125 0.125 31 Barren Land 0.03 0.025 0.035 41 Deciduous Forest 0.12 0.1 0.16 42 Evergreen Forest 0.12 0.1 0.16 43 Mixed Forest 0.12 0.1 0.16 52 Scrub/Shrub 0.05 0.035 0.07 71 Grassland Herbaceous 0.03 0.025 0.035 81 Pasture/Hay 0.04 0.03 0.05 82 Cultivated Crops 0.035 0.025 0.045 0.045 90 Woody Wetlands 0.1 0.08 0.15 0.15 95 Emergent Herbaceous Wetland 0.1 0.075 0.15 Channel 0.045 0.035 0.05 Override Region 0.065 Area Upstream of Gate 0.05 Black's Tire and Auto Service 0.1 I-95 0.013 Ponds 0.03 0.033 Railroad Area 0.02 Wetland Upstream of I-95 0.1 Wooded Area 0.12 Page C3-2 Hurricane Florence Calibration Results at USGS Gage Location Table 2. Hurricane Florence water surface elevations for calibration trial runs. Water Surface Elevation (ft) Gage Peak Base n Final 119.69 120.02 120.63 Table 3. Hurricane Florence peak discharges for calibration trial runs. Peak Flow Rate (cfs) Gage Peak Base n Final 17,100 16,092 15,877 Figure 1- Hurricane Florence hydrographs for calibration trial runs. 0 2000 4000 6000 8000 10000 12000 14000 16000 18000 9/ 1 3 /2 0 1 8 0 : 0 0 9/ 1 5 /2 0 1 8 0 : 0 0 9/ 1 7 /2 0 1 8 0 : 0 0 9/ 1 9 /2 0 1 8 0 : 0 0 9/ 2 1 /2 0 1 8 0 : 0 0 9/ 2 3 /2 0 1 8 0 : 0 0 Fl o w Ra t e ( c f s ) Time Observed Base n Final Page C3-3 Hurricane Matthew Verification Results at USGS Gage Location Table 4. Hurricane Matthew water surface elevations for verification. Water Surface Elevation (ft) Gage Peak Verification 119.36 120.42 Table 5. Hurricane Matthew peak discharges for verification Peak Flow Rate (cfs) Gage Peak Verification 14,600 14,924 Figure 2. Hurricane Matthew hydrographs for verification run. 0 2000 4000 6000 8000 10000 12000 14000 16000 9/30/2016 0:00 10/5/2016 0:00 10/10/2016 0:00 10/15/2016 0:00 10/20/2016 0:00 Fl ow R a t e ( c f s ) Time Observed Verification Page C3-4 C4. Inundation Maps Page C4-1 Figure C4-1 – Water depths (ft) for the 100YR flood event during the Scenario - Without Gate. Page C4-2 Figure C4-2 – Water depths (ft) for the 100YR flood event during the Scenario – With Gate and I-95 raised Page C4-3 Figure C4-3 – Water depths (ft) for the 500YR flood event during the Scenario - Without Gate. Page C4-4 Figure C4-4 – Water depths (ft) for the 500YR flood event during the Scenario – With Gate and I-95 raised. Page C4-5 Figure C4-5 – Water depths (ft) for the 1000YR flood event during the Scenario - Without Gate. Page C4-6 Figure C4-6 – Water depths (ft) for the 1000YR flood event during the Scenario – With Gate and I-95 raised. Page C4-7 1 | 1.0 | 16 March 2020 Atkins | West Lumberton Flood Gate H&H Report Wind Wave Analysis Page D1.0 FIGURES FOR WIND SET-UP AND WAVE RUNUP CALCULATIONS Figure D-1. Isotachs showing wind speeds with a recurrence interval of 2 years over the United States (Thorn, 1968) Page D1-1 Figure D-2 Table for overland to over water conversion of wind speeds from USACE, 1997 Figure D-3 Chart for converting wind speeds between various averaging intervals from USACE, 1989 Page D1-2 Figure D-4 Hindcasting Charts for Deep water Wave Characteristics from USACE, 1989 Figure D-5 Hindcasting Charts for Shallow water Wave Characteristics from USACE, 1989 Page D1-3 Electronic Attachments Items submitted electronically are: 1. E1 – Field Data a. F1 – Photo Log 2. E2 – Hydrologic Analysis a. E2.1 – HEC-HMS Model b. E2.2 – Design Flood Hydrographs c. E2.3 – Calibration and Verification Spreadsheets d. E2.4 – Rainfall Hyetographs and Thiessen Polygon Weights e. E2.5 – StreamStats Reports f. E2.6 – USGS Gage Data g. E2.7 – Hydrograph Sensitivity 3. E3 – Hydraulic Analysis a. E3.1 – Final HEC-RAS Model b. E3.2 – Calibration Runs c. E3.3 – Hydraulic Structure Data 4. E4 – Flood Frequency Analysis a. E4.1 – Gage Data Record Extension b. E4.2 – PeakFQ Analysis c. E4.3 – Regional Regression Weighted Peak Flowrates Page E1-1 1 | 1.0 | 9 January 2023 Atkins | West Lumberton Flood Gate H&H Report © SNC-Lavalin except where stated otherwise Atkins North America 1616 East Millbrook RoadRaleigh, NC 27609 Ken Hunu, PE, DWRE, PMP, CFM Kenneth.hunu@atkinsglobal.com USFWS NWI Map Total Wetlands Area Map USACE Correspondence Laclaire R d SESE H i l t o n S t CoxRd Heste r D r W 5 t h St Hec t o r M ac l ean Hwy Hecto r Ma c l ean Hw y VF W R d H a c k e t t S t C ivita n R d Laclaire R d Cr y s t a l R d He c t or M ac l ea n Hwy SE VFW R d No rr i s S t Nation al A v e Reservoir S t B u r ke S t Co x Rd Hacke tt S t Se als St Crys tal R d W 5t h S t W 5th St He ctor M a clean H wy West Lumberton Flood Gate - NWI Map U.S. Fish and Wildlife Service, National Standards and Support Team, wetlands_team@fws.gov, NC CGIA, Maxar, Esri Community Maps Contributors, State of North Carolina DOT, © OpenStreetMap, Microsoft, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, EPA, NPS, US Census Bureau, USDA, EPA OEI Wetlands Estuarine and Marine Deepwater Estuarine and Marine Wetland Freshwater Emergent Wetland Freshwater Forested/Shrub Wetland Freshwater Pond Lake Other Riverine WLFG Project Action Area 550 VFW Rd #938189443052 2306 W 5th St #938189201500 2400 Cox Rd #938179684407 2460 Cox Rd #938179143700 VFW & Hackett #938280300700 Railroads December 1, 2023 0 0.06 0.120.03 mi 0 0.1 0.20.05 km 1:4,514 West Lumberton Flood Gate – Total Wetlands Area Map 1 Gievers, Andrea From:Gievers, Andrea Sent:Monday, December 20, 2021 12:06 PM To:Beecher, Gary H CIV USARMY CESAW (USA) Cc:Hair, Sarah E CIV USARMY CESAW (USA); matt.cusack@atkinsglobal.com; Sachan, Amit Subject:FW: West Lumberton Flood Gate Project (Previous Correspondence) Attachments:I-95 Flood Gate Lidar.pdf; WLFG CONCEPTUAL Plan 11.3.21.pdf Hello:    Please see the email below from August 18, 2020 regarding the West Lumberton Flood Gate project.  Matt Cusack is the  contact along with Amit Sachan at Atkins, cc’d on this email.  The original design was located on the eastern side and the  current proposal is for the western side of I‐95.  I am attaching the conceptual plan as well.  As you can see in the emails  below, the proposed project is being conducted in concert with the I‐95 widening team.  Please let me know if you have  any questions.  Thank you.    Sincerely,    Andrea    Andrea Gievers, JD, MSEL, ERM  Environmental SME  Community Development  NC Office of Recovery and Resiliency  Andrea.L.Gievers@Rebuild.NC.Gov  (845) 682‐1700    From: Beecher, Gary H CIV USARMY CESAW (USA) <Gary.H.Beecher@usace.army.mil>   Sent: Tuesday, August 18, 2020 8:26 AM  To: Cusack, Matthew T <matt.cusack@atkinsglobal.com>  Cc: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil>; Mickey Sugg <Mickey.t.sugg@usace.army.mil>  Subject: RE: City of Lumberton floodgate project overlapped by I‐6064 DRAFT waters of the US Delineations    Mr. Cusack,    Based on the Lidar Image and Soils Map for the site it does appear that the proposed project area will not be in wetlands  or Waters of the US.     I can write a No Permit Required, however I must issue an Approved JD with it. I’ve attached a Jurisdictional  Determination Request Form for you to fill out. If you already have one filled out, please send it to me.    Respectfully,    Gary    From: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil>   Sent: Monday, August 17, 2020 2:33 PM  To: Beecher, Gary H CIV USARMY CESAW (USA) <Gary.H.Beecher@usace.army.mil>; Sugg, Mickey T CIV USARMY CESAW  2 (USA) <Mickey.T.Sugg@usace.army.mil>  Subject: RE: City of Lumberton floodgate project overlapped by I‐6064 DRAFT waters of the US Delineations    Gary/Mickey,    I issued a PJD for the NC DOT I‐6064 project (I‐95 widening). If the City of Lumberton is asking for a No permit required,  then I believe you would need to do an AJD for the project area. I believe the site is all uplands based on the PJD and  information provided by Matt Cusack.    Please let me know if you have any questions.    Liz    From: Cusack, Matthew T <matt.cusack@atkinsglobal.com>   Sent: Monday, August 17, 2020 2:22 PM  To: Beecher, Gary H CIV USARMY CESAW (USA) <Gary.H.Beecher@usace.army.mil>; Hair, Sarah E CIV CESAW CESAD (US)  <Sarah.E.Hair@usace.army.mil>  Cc: Boot, Robert A <Robert.Boot@atkinsglobal.com>; Price, Gregory W <gwprice2@ncdot.gov>; Huff, Christy  <chuff@ncdot.gov>; Sachan, Amit <Amit.Sachan@atkinsglobal.com>; rarmstrong@ci.lumberton.nc.us  Subject: [Non‐DoD Source] RE: City of Lumberton floodgate project overlapped by I‐6064 DRAFT waters of the US  Delineations    Greetings Mr. Beecher,    I am following up with regards to this email below. I also tried to reach your office voicemail, which instructed me to  correspond with you via email.    There are more project details below, but the essential question is whether you will agree to use the NCDOT data from I‐ 6064 to issue a “No Permit Required” form for the City of Lumberton’s floodgate project, or whether independent  project review is required. The NCDOT data is current, and has recently been reviewed by Ms. Hair.    Please let me know if you would like to setup a Webex to screenshare and discuss this request and the associated  information we have that is pertinent.    Thanks!    Best,  Matt    Matt Cusack PWS Senior Project Manager/Scientist, Technical Professional Organization North America Engineering, Design, and Project Management     919-431-5255     919-800-1234        1616 E. Millbrook Road, Suite 160, Raleigh, NC 27609 3    Company          From: Cusack, Matthew T   Sent: Friday, June 12, 2020 8:52 AM  To: gary.h.beecher@usace.army.mil; sarah.e.hair@usace.army.mil  Cc: Boot, Robert A <Robert.Boot@atkinsglobal.com>; Price, Gregory W <gwprice2@ncdot.gov>; Huff, Christy  <chuff@ncdot.gov>; Sachan, Amit <Amit.Sachan@atkinsglobal.com>; rarmstrong@ci.lumberton.nc.us  Subject: City of Lumberton floodgate project overlapped by I‐6064 DRAFT waters of the US Delineations    Greetings,    For the benefit of this email, please see a screen capture below for an overlap area between a proposed natural  resources Study Area related to the City of Lumberton’s flood gate project and the I‐6064 corridor that Liz Hair is  currently reviewing for NCDOT. The flood gate project is possibly new to USACE regulatory, but Civil Works has been  involved. The proposed floodgate is located where the CSX rail line and Cox Rd/VFW Road passes under I‐95 centered at  34.6227789,‐79.0329097.    We understand that Liz has been working with NCDOT to evaluate delineations performed by their consultants for I‐ 6064. Through coordination with NCDOT, Atkins and the City of Lumberton have determined that the entire natural  resources Study Area for flood gate project has already been evaluated for I‐6064. Further, the entirety of the City’s  Study Area did not have any waters of the U.S. features. Please see the Study Area for the flood gate project (red outline  below) appears to contain no waters of the US. Correspondence with NCDOT is also provided below.    To support everyone’s goal of avoiding overlapping work between these projects, the City of Lumberton would like to  rely upon NCDOT’s findings for the flood gate project once Liz has completed her review. This would include the PJD and  NRTR prepared by NCDOT (when available) as basis for the environmental documentation related to waters of the U.S.  for the proposed floodgate. All we need right now is agreement from Gary that he will consider those resources when  they are available, and will be willing to issue a “No Permit Required” determination for the City’s Study Area if the  documents approved by Liz for NCDOT end up demonstrating what is explained in this email.     Please let me know if that is an agreeable plan. If you have any questions, please let Amit Sachan and/or me know and  we can set up a teleconference to better describe this situation. I am available to coordinate as necessary.    Best,  Matt    Yellow is I‐6064 Study Limits with blue/white depicting waters of the US as identified by NV5. Red is the natural  resources study area for the City of Lumberton floodgate project  4   Matt Cusack PWS Senior Project Manager/Scientist, Technical Professional Organization North America Engineering, Design, and Project Management     919-431-5255     919-800-1234        1616 E. Millbrook Road, Suite 160, Raleigh, NC 27609     Company          From: Rerko, James J <jjrerko@ncdot.gov>   Sent: Tuesday, May 19, 2020 9:37 AM  To: Cusack, Matthew T <matt.cusack@atkinsglobal.com>; Huff, Christy <chuff@ncdot.gov>; Price, Gregory W  <gwprice2@ncdot.gov>  Cc: Boot, Robert A <Robert.Boot@atkinsglobal.com>; Heather Wallace <Heather.Wallace@nv5.com>; Nick Mountcastle  <Nick.Mountcastle@nv5.com>; Sachan, Amit <Amit.Sachan@atkinsglobal.com>; rarmstrong@ci.lumberton.nc.us  Subject: RE: [External] City of Lumberton floodgate project overlapped by I‐6064 DRAFT Wetland Delineations  5   Matt    I am fine with the plan. We are getting together with the Corps and DWR virtually to start the review today.       James J. Rerko, PWS  Project Development and Environmental Analysis Engineer  North Carolina Department of Transportation    910 364-0834 office  910 486 1959 fax  jjrerko@ncdot.gov Email    1000 Transportation Drive  Fayetteville, NC 28302    Email correspondence to and from this address is subject to the  North Carolina Public Records Law and may be disclosed to third parties.  _____________________________________________________________        From: Cusack, Matthew T <matt.cusack@atkinsglobal.com>   Sent: Monday, May 18, 2020 7:43 PM  To: Huff, Christy <chuff@ncdot.gov>; Rerko, James J <jjrerko@ncdot.gov>; Price, Gregory W <gwprice2@ncdot.gov>  Cc: Boot, Robert A <robert.boot@atkinsglobal.com>; Heather Wallace <Heather.Wallace@nv5.com>; Nick Mountcastle  <Nick.Mountcastle@nv5.com>; Sachan, Amit <amit.sachan@atkinsglobal.com>; rarmstrong@ci.lumberton.nc.us  Subject: [External] City of Lumberton floodgate project overlapped by I‐6064 DRAFT Wetland Delineations    CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to  report.spam@nc.gov      Greetings,    For the benefit of this email, please see a screen capture of the overlap area between the I‐6064 corridor and the  natural resources Study Area for the City of Lumberton’s flood gate project.    I understand that NCDOT and it’s consultants are waiting on a field concurrence meeting with the USACE to approve the  delineation for I‐6064. I am also curious if the other environmental work, specifically the protected species surveys,  identified anything that isn’t resolved at this location in Lumberton where the rail line and Cox Rd/VFW Road passes  under I‐95 centered at 34.6227789,‐79.0329097.    To support everyone’s goal of avoiding overlapping work between these projects, we would like to rely upon NCDOT’s  findings for our project. This would include the PJD and NRTR prepared for NCDOT (when available) as our basis for our  environmental documentation. Since my understanding is that the City’s Study Area (red outline below) appears to  6 contain no waters of the US or protected species (assumption), this seems to be the logical choice. Obviously, we don’t  need NCDOT’s documents at this time, but I wanted to confirm there isn’t an issue of the City proceeding in this manner.  If NCDOT is amenable to this approach, Atkins will reach out to the NCDOT and private Corps reps and confirm that our  project will be relying upon NCDOT’s findings and environmental documentation and that our project has no impacts.     Please let me know if that is an agreeable plan. If you have any questions, please let Amit Sachan and/or me know and  we can coordinate as necessary.    Best,  Matt    Yellow is I‐6064 Study Limits with blue/white depicting waters of the US as identified by NV5. Red is the natural  resources study area for the City of Lumberton project      Matt Cusack PWS Senior Project Manager/Scientist, Technical Professional Organization North America Engineering, Design, and Project Management       919-431-5255     919-800-1234          1616 E. Millbrook Road, Suite 160, Raleigh, NC 27609     7       Company          From: Brian Yamamoto <Brian.Yamamoto@nv5.com>   Sent: Monday, April 20, 2020 4:46 PM  To: Sachan, Amit <Amit.Sachan@atkinsglobal.com>  Cc: Huff, Christy <chuff@ncdot.gov>; Nick Mountcastle <Nick.Mountcastle@nv5.com>; Rerko, James J  <jjrerko@ncdot.gov>; Price, Gregory W <gwprice2@ncdot.gov>; Heather Wallace <Heather.Wallace@nv5.com>; Boot,  Robert A <Robert.Boot@atkinsglobal.com>; Cusack, Matthew T <matt.cusack@atkinsglobal.com>  Subject: RE: I‐6064 DRAFT Wetland Delineations    OK Amit.    Sounds like there is no way right now to put a schedule on that, but we will stay tuned to what is happening with COVID‐ 19 situation.    Brian Yamamoto, PE | Senior Project Development Engineer | NV5  6750 Tryon Road | Cary, NC 27518 | P: 919.858.1865 | C: 919.606.9716     Electronic Communications Disclaimer    From: Sachan, Amit <Amit.Sachan@atkinsglobal.com>   Sent: Monday, April 20, 2020 4:35 PM  To: Brian Yamamoto <Brian.Yamamoto@nv5.com>  Cc: Huff, Christy <chuff@ncdot.gov>; Nick Mountcastle <Nick.Mountcastle@nv5.com>; Rerko, James J  <jjrerko@ncdot.gov>; Price, Gregory W <gwprice2@ncdot.gov>; Heather Wallace <Heather.Wallace@nv5.com>; Boot,  Robert A <Robert.Boot@atkinsglobal.com>; Cusack, Matthew T <matt.cusack@atkinsglobal.com>  Subject: RE: I‐6064 DRAFT Wetland Delineations    Thanks for sending these over, Brian. Please let us know when these have been verified by the USACE. Regards      Amit Sachan, PE, CFM Project Director, Public & Private Business Unit Tel: +1 919 431 5253 Cell: +1 919 985 1095  Atkins, member of the SNC-Lavalin Group 1616 East Millbrook Road, Suite 160, Raleigh, NC 27519    From: Brian Yamamoto <Brian.Yamamoto@nv5.com>   Sent: Monday, April 20, 2020 2:11 PM  8 To: Sachan, Amit <Amit.Sachan@atkinsglobal.com>; Boot, Robert A <Robert.Boot@atkinsglobal.com>  Cc: Huff, Christy <chuff@ncdot.gov>; Nick Mountcastle <Nick.Mountcastle@nv5.com>; Rerko, James J  <jjrerko@ncdot.gov>; Price, Gregory W <gwprice2@ncdot.gov>; Heather Wallace <Heather.Wallace@nv5.com>  Subject: I‐6064 DRAFT Wetland Delineations    Hey guys,    See attached DRAFT delineations for the I‐6064 (I‐95 widening from Exit 13 to Exit 22 in Robeson County near  Lumberton). These probably cover your study area for the Lumberton Floodgate Project that you are currently working  on. Because of the COVID‐19 situation, the USACE is restricted from doing field work. As such, these delineations are  unverified at this stage. I don’t know if you all were planning to conduct delineations as part of your project, but this will  help USACE to avoid dual delineations in overlapping areas. We plan to have these delineations (conducted by NV5  biologists) verified as soon as restrictions are lifted on the USACE.    Let me know if you have any questions.    Brian Yamamoto, PE | Senior Project Development Engineer | NV5  6750 Tryon Road | Cary, NC 27518 | P: 919.858.1865 | C: 919.606.9716     Electronic Communications Disclaimer      This email and any attached files are confidential and copyright protected. If you are not the addressee, any dissemination of this communication is strictly prohibited. Unless otherwise expressly agreed in writing, nothing stated in this communication shall be legally binding. The ultimate parent company of the Atkins Group is SNC-Lavalin Group Inc. Registered in Québec, Canada No. 059041-0. Registered Office 455 boul. René-Lévesque Ouest, Montréal, Québec, Canada, H2Z 1Z3. A list of Atkins Group companies registered in the United Kingdom and locations around the world can be found at Blockedhttp://www.atkinsglobal.com/site-services/group-company-registration-details Consider the environment. Please don't print this e-mail unless you really need to.    Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.