HomeMy WebLinkAboutNCG060112_Emails RE Outfall Descriptions_20231214 Georgoulias, Bethany
From: Georgoulias, Bethany
Sent: Thursday, December 14, 2023 1:16 PM
To: Alexandrea Hill
Cc: Williams,Tina,US-Eden; Cherjuana Crawford; Cook, Brittany
Subject: RE: [External] RE: NCG060112 Outfall Location Update
Good afternoon, Alex,
I have made the updates to these outfalls. You should see them reflected in our reports and the eDMR system after 24-
48 hours.
Permit: NCGO60112 Version: 8.0 I Status: ktive
Outfall Number description Latitude Longitude E
001 Basin 3 Discharge +36.31.02 -79.42.33
002 Basin 1 Discharge +36.31.15 -79.42.39
003 Basin 2 Discharge +36.31.19 -79.42.41
004 Stormwater Ditch North of Plant +36.31.21 -79.43.04
Best regards,
Bethany Georgoulias(she/her)
Environmental Engineer,Stormwater Program
DEMLR Laserfiche Administrator
Division of Energy, Mineral,and Land Resources
N.C. Department of Environmental Quality
919 707 3641 office
bethany.georgoulias@deq.nc.gov
512 N.Salisbury Street,Raleigh, NC 27604 (location)
1612 Mail Service Center,Raleigh, NC 27699-1612 (mailing)
Website: http//deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
From:Alexandrea Hill <AHill@woodardcurran.com>
Sent:Wednesday, December 13, 2023 10:16 AM
To: Georgoulias, Bethany<bethany.georgoulias@deq.nc.gov>
Cc:Williams,Tina,US-Eden <Tina.Williams@purina.nestle.com>; Cherjuana Crawford
<CCrawford@woodardcurran.com>; Cook, Brittany<Brittany.Cook@deq.nc.gov>
Subject: [External] RE: NCG060112 Outfall Location Update
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Good Morning Bethany,
i
Thank you for making the outfall coordinate changes. In reviewing the dashboard presented in the email below
it seems as though the descriptions associated with the outfalls should be updated. The below descriptions are
more representative of the updated outfall coordinates:
- 001: Basin 3 Discharge
- 002: Basin 1 Discharge
- 003: Basin 2 Discharge
- 004: Stormwater Ditch North of Plant
If any additional information is needed to support this update, please let me know.
Best!
Alex
Alexandrea Hill, CPESC, EIT
Environmental Engineer
Woodard&Curran
C9 770.285.9007 ® 626.646.6410 @ woodardcurran.com
F-;i ahillCd)woodardcurran.com
Q 2055 Sugarloaf Circle,Suite 175 Duluth,GA 30097
m ® m n
From: Georgoulias, Bethany<bethany.georgoulias@deg.nc.gov>
Sent: Monday, November 27, 2023 8:30 AM
To:Alexandrea Hill <AHill@woodardcurran.com>
Cc:Williams,Tina,US-Eden <Tina.Williams@purina.nestle.com>; Cherjuana Crawford
<CCrawford@woodardcurran.com>; Cook, Brittany<Brittany.Cook@deg.nc.gov>
Subject: RE: NCG060112 Outfall Location Update
Good morning,
We have updated the outfall location coordinates as you specified. Please let us know if you have any other questions.
2