Loading...
HomeMy WebLinkAbout20231705 Ver 1_Shoreline Stabilization_20231211c)o �)_5 CK ROY COOPER��'y Governor MICHAEL S. REGAN z �` Secretary S. DANIEL SMITH wauHvrr' Director NORTH CAROLINA Enviroamentat Quality State of North Carolina Department of Environment Quality Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 09-2020 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US postal Service Paul Wojoski If sending via delivery service (UPS, FedEx, etc.) Paul Wojoski DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 512 N. Salisbury Street Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of PreNling Date of Pre -filing Meeting Requ DWR ID # Request to this application. _/ (required) A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information (if applicable) Name: Jonathan & Meredith Lon Mailing Address: 8859 Cravenwood Drive Oak Ridge, NC 27310 Telephone Number: 336-708-3256 Fax Number: E-mail Address: (1)eremyersPgmail.com RECEIVED DEC DECQ WATER RESOURCES 401 & BUFFER PERMITTING QNo��rth Carolina Department of Environmental Quality I Division of Water Resources -D E512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 919.707.9000 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.ydf) i Name: N/A Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: B. Project Information [15A NCAC 02H .0502(a) & (b)l 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Montgomery Nearest Town: New London Lake/ river/ ocean adjacent to property: Badin Lake Property size (acres): 0.59 acres Subdivision name or site address (include phase/lot number): Lot 13, Pennington Ferry, Uwharrie Point Directions to site - please include road names and numbers, landmarks, etc.: NC Hwy 49 to Badin Lake Road, R on Uwharrie Point Parkway, see gate attendant for directions to the Property. Latitude (in decimal degrees) 35.28.4914 Longitude (decimal degrees) 80.05.4625 S. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Wooded, undeveloped lot in residential subdivision FORM: SSGP 09-2020 Page 2 of 6 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): To stabilize an eroding shoreline and protect it from further erosion. 7. Will work be conducted from land? ® From water? ❑ 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 410 sq. ft. Temporary impacts in square feet: None 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet j land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 720 sq. ft. Temporary impacts (temporary clearing, construction corridor) in square feet: 1025 sq. ft. 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 8 to 10 trees will be removed to complete the shoreline stabilization. 11. Signature By signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time Owner/Agent's Signature" F15A NCAC .0502 f Date `Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing FORM: SSGP 09-2020 Page 3 of 6 i { 'I '1 b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/ Normal Water Level) (Full Pond/ Normal Water i r M � Shoreline Plan View 0 1 Lake (At Full Pond/ Normal Water Level) Existing Dock 30 f[x7 ft aft x 150ft = low full pond/ NWL Full Pond/ Normal Water Level .-! a 7hore in; a ftx 150 ft Riprap Ab— foil pond! N WL t 3R+150ft. .iXXlr addlIf,"] Clearing I ' If ne<essery E ' i EX A M PI E Plan View FORM: SSGP 09-2020 Page 5 of 6 3 ft. below full and water level 4 ft. above full 2 ft• additional clearing p pond water level l 1 necessary •If 1 j Existing bank 10 ft. bank a height Q� QUO arm V fir♦ FORM: SSGP 09-2020 Page 6 of 6 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: Jonathan Long Lot 13, Pennington Ferry, Uwharrie Point STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 205 LF of proposed shoreline stabilization measures. Detail 2 indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 8 on NCDEQ Form SSGP 09-2020) Area of Impact = Shoreline Length x Depth* x Slope _ (205') x (1') x (2) = 410 sq. ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 — Impact Area Above the Normal Pool Level (Item 9 on NCDEQ Form SSGP 09-2020) Permanent Impact From Shoreline Stabilization Measures Height of Bank Above Normal Pool Varies Across the Shoreline Estimate 50 LF of Shoreline = 1 ft. Above Normal Pool Estimate 155 LF of Shoreline = 2 ft. Above Normal Pool Area of Impact = Length x Height x Slope = ( 50' x 1' x 2) + ( 155 x 2' x 2) = 100 + 620 = 720 sq. ft. Impact From Construction Above Shoreline Stabilization Assume 5 ft. Wide Zone Area of Impact = 205 x 5 ft. = 1025 sq. ft. Total Area of Impact Above Normal Pool Level = 1745 sq. ft. ry Wow -; - --t�Erg -- -- --- b L� �Q SITE MAP - JONATHAN LONG LOT 13, P E N N I N GTO N FERRY SCALE V= 40' Ir 4 VEGETATE DISTURBED AREA ABOVE SLOPE 1 2 EROSION CONTROL FABRIC - TYPICAL CONDITIONS 12" TO 36" ERODED CUT WAVE EXPOSURE EXISTING GRADE LAKE BOTTOM - i '1 `I FOR: JONATHAN LONG LOCATION: LOT 13, PENNINGTON FERRY, UWHARRIE POINT i RESERVOIR: BADIN LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: DETAE MINOR RIP RAP STABILIZATION 2 . &� , �y ,,� °�., ". ��� �,,M p�',�(� A 4`' �� �,� !.+ „qy �, �: .,yam ���n�"•�. Y.a'� °� �r�..���0.((�i : pf.� ` 4. 'v` �4`--�-•iR s�1� ;;�j�JM , j�'4�� �`';:Y .�� f�.'� l r-V 4 7A1. � k,+�s � F ��. � .e, �s ,� ri " 17. of f ( 1�1L_ 1i e". ~•FM ., ,� �. A�. � k...-Na. '!t l.qw+�.#, � y� r iNY f. f:l �0�,� �i4. •iiN.�� y��, y�""la. R i ` , _ � WL. i�*_ ar' ,,," + `r ?,. ,d' 'd+i► fit �'�" ..,.,,� .I4`s' �r,� "�- ,,$"._'�'�,"������'lr �� T�J i��� J,�..;- 1► F.,/. �+ �* 'w�yj{ ,;�, '• ° '!',�. A �;a"4K � � W 7. ,{ y, r�',,��'� :�� +'� J� . I �*.,•.yRx of '"� ,� '` ..'.fi:: ¢ '1. � I' 1`'° ,is,�•, ! ,^i :rS'I; � ; x ,��.' 'h`'` '`r �,$w_'G.:.... •..µ� `.. : �► -<it" l ♦ F `^ .. """' aAV" '.i'� rah ~ J• a f 7 a I 4 A, Q LIP bing maps 126 Moratock Pt, New London, NC 28127 Location: 35.4824067, -80.0998692 'Re-'o. t Cheors t F ;! : 'g ,, , ! . PS C ai. ; V.q a g R j - ; C; r, ' I 9 Old North Stale Ciub Marina 9 126 Moratock K New London, NC 28127 Old North State Club at Uwharrie Point Whi; C -i I '' Old North State Club qOld North State Real!y 1000 ft 500 M 02023TomTom, 00penStreetlVlap