HomeMy WebLinkAbout2020-01779 NWP 39 Tearsheet - Phases 2-4.pdf U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2020-01779 County:Wake U.S.G.S. Quad:NC-Garner
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Sound Timber Management,LLC
Attn: H.Glen Bagwell,Jr
Address: 333 Sherwee Drive
Raleigh,NC 27603
Size(acres) —135 Nearest Town Garner
Nearest Waterway UT to Big Branch River Basin Neuse
USGS HUC 03020201 Coordinates 35.7175784,-78.5753504
Location description: The proiect area is located on the west side of Auburn Church Road,approximately 1.25 mile south of its
intersection with Jones Sausage Road,at 4100 Auburn Church Road,Garner,North Carolina.
Description of projects area and activity: This verification authorizes the permanent discharge of fill material into 0.009 acre(58
linear feet)of stream channel,22 linear feet 10.004 acrel of which are considered a permanent loss of waters,necessary to
construct access and infrastructure for Phases 2-4 of the Eagle Crest commercial/industrial park.
Applicable Law(s): ®Section 404(Clean Water Act,33 USC 1344)
❑Section 10(Rivers and Harbors Act,33 USC 403)
Authorization: NWP 39.Commercial and Institutional Developments
SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS
REMARKS: See also the NWP 18 verification,dated 7/30/2021,for the initial phase of the Eagle Crest commercial/
industrial park single and complete proiect.
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached
Conditions,your application dated 2/28/2023(received via email 11/1/2023),and the enclosed plans"Eagle Crest West
Industrial Park Wetland Impacts Exhibit"Sheet No.1,"Eagle Crest West Industrial Park Non-JD Wetland Impacts"Sheet
No.2,and"Eagle Crest West Industrial Park Subdivision Phasing Plan"Sheet No.C204.Any violation of the attached
conditions or deviation from your submitted plans may subject the permittee to a stop work order,a restoration order,a Class
I administrative penalty,and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit
authorization is modified,suspended or revoked. If,prior to the expiration date identified below,the nationwide and/or regional general
permit authorization is reissued and/or modified,this verification will remain valid until the expiration date identified below,provided
it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization
expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the
nationwide permit,activities which have commenced(i.e.,are under construction)or are under contract to commence in reliance upon
the nationwide and/or regional general permit,will remain authorized provided the activity is completed within twelve months of the
date of the nationwide and/or regional general permit's expiration,modification or revocation,unless discretionary authority has been
exercised on a case-by-case basis to modify,suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources(telephone 919-807-6300)to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act(CAMA),prior
to beginning work you must contact the N.C.Division of Coastal Management.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State
or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of
Engineers regulatory program,please contact David E.Bailey at 919 817-2436 or David.E.Bailey2(a,usace.army.mil.
Corps Regulatory Official: Date: 11/17/2023
Expiration Date of Verification: 3/14/2026
SAW-2020-01779
SPECIAL CONDITIONS
1. "Suitable habitat for tricolored bat(Perimyotis subflavus) may be present at the site. On September
14, 2022, the USFWS published a proposal in the Federal Register to list the tricolored bat as
endangered under the Endangered Species Act (ESA). The permittee understands and agrees that
all work associated with the clearing and removal of trees and removal or modification of culverts
must be completed prior to the effective date of the final listing in the Federal Register. Work
associated with the aforementioned activities not completed by that time must cease and the
permittee must contact the Corps' (David E. Bailey at (919) 817-2436 or
David.E.Bailey2(&usace.army.mil) to determine if additional coordination with the United States
Fish and Wildlife Service is required under Section 7 of the Endangered Species Act prior to
continuing work."
2. Please note that this project is considered cumulative with all current and future phases of the Eagle
Crest commercial/industrial park development with respect to compensatory mitigation and
Nationwide Permit thresholds. As such, impacts permitted for this project (SAW-2020-01779) are
considered cumulative with impacts proposed for any future phases (conceptual plan shown on the
attached Exhibit C, entitled "Conceptual Master Plan — Wetland Impacts"). Current cumulative
impacts to potential waters of the US for the Eagle Crest commercial/industrial park single and
complete project include 0.018 acre of wetlands and 0.004 acre (22 linear feet) of stream channel,or
a total loss of 0.022 acre of potential waters of the US.
Corps Regulatory Official: Date: 11/17/2023
Expiration Date of Verification: 3/14/2026
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,
please complete the Customer Satisfaction Survey located at https://re ug lator.ops.usace.army.mil/customer-service-survey/.
E-copies furnished:
Jeff Harbour,Terracon,jef£harbourgterracon.com
Zachary Thomas,NCDEQ-NCDWR,zachM.thomasAdeq.nc.gov
O
Lo
AGL CR ST W ST IN USTRIAL PARK
"`+ U
Z
PERMITTINGSTREAM /
O
(o U
IH =CU ZONING _
� U
CITY OF RALEIGH SUB =0074=2022 Q 3
w
/ 0 400 800 1200 O _jPROJECT MANAGER _ O Y
DEVELOPMENT AND CONSTRUCTION INSIGHT, LLC n
SITE DATA TABLE / / 2054 KILDAIRE FARM ROAD, #167
CARY, NORTH CAROLINA 27518
PROJECT NAME: EAGLE CREST WEST INDUSTRIAL PARK DAVID PARKER
/ David@DClnight.com
PROJECT ADDRESS: 4100, 4150, 4200, 4250, 4300 AND 4320 AUBURN CHURCH ROAD 919-868-3099
PIN: 1721-68-5073, 1721-67-7688, 1721-67-9063, 1721-66-8487, _� PH1 PERMITTED
1721-56-5995 AND 1721-45-8914 IMPACT 0.020 AC ENGINEER
PROPERTY OWNER: SOUND TIMBER MANAGEMENT LLC pt�11 WETLANDS CAPITAL CIVIL ENGINEERING, PLLC
DWR# 20210137 209 N SALEM ST, STE 220
333 SHERWEE DRIVE APEX, NC 27502
RALEIGH, NC 27603 ACOE SAW-2020-01779 PH: 919 249-8587
i MICHAEL J. KANE, PE
`=�'•.a mkane@capitalcivil.com
ZONING: IH-CU
919-249-8587
OVERLAY DISTRICT: N/A
-- 7G
GROSS SITE AREA: 175.09 ACRES (NOT INCLUDING EXISTING R/W) _� - 0 Q
NET SITE AREA: 170.48 ACRES NOT INCLUDING R W r Q z
WATERSHED: N/A - -- 0 0 0 0 J
zG J H
Q
RIVER BASIN: NEUSE � U00
JURISDICTION: PH1 LOT3 S N
CITY OF RALEIGH �/� I PH5 LOT9 7O U) O
CURRENT LAND USE. VACANT / WAREHOUSE NON-404 = z W
PROPOSED USE: WAREHOUSE / STREAM WETLANDS \ U)
CROSSING IMPACT 0.90 AC Z w U
NUMBER OF PROPOSED LOTS: 9 c ��., , Q
Q PROPOSED Q
._ WET IMPACTS U) a
P POND uj o
HATCH INDICATES y
FINAL GRADE �� � PHASE 2 - 31.92 AC
T � y z
PROJECT OCEAN SCOPE OF CURRENT � U Q
PROJECT uj cc j
_ BUFFER IMPACT
DWR# 20221796 APPROVED
f EXISTING GRADE PH3 LOT8 JUNE 30 2023 U z W
r � �J
��JM M �FILL \\ SUBSURFACE DRAIN
W �
�=� TO BE PROVIDED, i E J m
WASHED STONE WRAPPED P7 �1
IN FILTER FABRIC �� @ SEE DETAIL THIS SHEET �\ _
MIRAFI 18ON OR EQUAuj
L EXTEND STONE 12 OVER PIPE i �``'$
6" DIAMETER EXTEND STONE 6" UNDER PIPE i \�
CORRUGATED _ \
PERFORATED PIPE
FOLLOW EXISTING SLOPE
SUBSURFACE DRAIN DETAIL
OVERVIEW
SCALE: 1" = 400'
275 275
0
ID �
I I I 1 1 CD r- o
(r� III�� \\\ , i 1 I I 1 I !' r I� fill r N �
;I 270 270 z0CD
N � �
\ 1 I111 � �, r X "' w
\ \\ " N Q
36 LINEAR FT II I� � oSTREAM IMPACT _j1 265 265
(RIP—RAP) � Ld
_
_j
// ZONE IMPACT � � � � �� � � ' 00 Q
601 S l
U' o 1 I lI Il�� l '� �/ ZONE 2 IMPACT A ti�� [� I �
o coo ( / 1 / / � /// //\� / \ �\ 426 SF 5 oE�1 1 T �\ _j Z J N
` o J � °' N
1 T�2�,6/`W265 I I \ I I „ r<( \
\ 1 II ( r �\ 6�� \ \ 260 260 Q
\ \ I ( � � / 8 ZONE I PA ,'
>> �)\� ' l - - 242 SF`\ \ z = o
LL CD � z 55 c�N
I v `� v 255 255
PROPOSED \ 01 � \ SEAL �111111///
-
XISTING 60.78 -79.21' OF 48'�?� 1 �O \ - EXIS G DRIVE 22 LIN FT _ ao EXISTI DRIVE `-
\ 1 / �OF 36" CMP TO /� iRCP ® 6�pp6% �I ROgL) W POD ��j / II�ACT STREAM Kn) IMPACT -- C A RO
I '4 • FE /� • ��
E REMOVED, - 26g EWER W SNOl / `� IMPACT / 26e Off, •S S •�,/�\
Taza ����270 ��fT \ I --�-- -- 250 250 = SEAE
03119
EX 36 CMP E
-- - Z I I \ 1 �� 0 11\I 1 \� \ \ E� . �•
CULVERT
\ \ \ 6�g� I III III �� Q�i �� \\I \� 1 1 \ \ �1 \� ZONE 2 IMPACT ( / I I I I\\
l ( r 1 �6 I ) I I I I \ \\ �►I I\\ \\ \ .�1 2ss OUTLET HAD /// 9 26 2023
soy SF
ERODED BANK
BELOW)
DATE
- 245 245
TW262 �\ �� ZONE 1 IMPACT
796 SF ZONE 2 IMPACT SEPTEMBER 26, 2023
PROPOSED 48" ISSUED FOR
STREAM LINEAR IMPACT = 58 FT — ZONE 1 IMPACT RCP CULVERT PERMITTING
934 SF
STREAM AREA IMPACT = 447 SF '-� '-� 240 _ 240 SHEET No.
ZONE 1 BUFFER IMPACT = 2,861 SF _ BQ
_ \� - RIP-RAP d50=15,'ZONE 2 BUFFER IMPACT 2,112 SF - _
EMBEDDED 34" DEEP
WETLAND IMPACT = 0 SF 235 0+00 0+30 0+60 0+90 1+20 1+5035
STREAM CROSSING PLAN VIEW STREAM CROSSING IMPACTS STREAM CROSSING PROFILE
SCALE: 1" = 50' SCALE: 1" = 50' SCALE: 1" = 30' HORIZ, 1" = 5' VERT
0
O
0 50 100 150
PHI LOT3 BULDING PAD
LO
� Z
CONCRETE DOCK AREA \
\ }
\ U E
\ / O
0 Q
I o
I og 3
ASPHALT LOADING AREA I `` 3
I
I J�. O J_
I
JJ
0
( I IZ, J Qcn
CD
Li
Q
cf)
LUQ w
LLJ
PH2�LOT4 Ij I W
\ \ \ I B ILDI G P4D
LU
�1 I p\ (5' FILL) \ \ \ 1— 270 \
\ \ vomg
\ t
00
0
Ln l In 0 J
\\ \ 2 N i D
76 L� -- � zoo
_ w
LLJ
x CD
( U
7' FIL ) N� N I / J o `` w
\ \ l
\ P OPOS A E CREWAY = = 1 \ 1 N
J
r � I,-
00
_ -- - -
� -_ J J N U
Q C4
04
o f 7 s \ �\ L
\ f P�2 15\ I
\\ SEALSEAL
C — 03119
9/26/2023
DATE
NON-JD WETLAND AREA
SEPTEMBER 26, 2023
SCALE: 1 " = 50'
ISSUED FOR
PERMITTING
NON-404 WETLAND IMPACT = 0.90 AC SHEET No.
2
0
PHASE 1 \ `
12.9 ACRES
LOT A FROM SUB-0011-2021 \\
/ P O E1 J Z
/ S OT0011 R 2021CD
/ 10 ` w V
Q Z
ao
C)
0 U
Z o I
O
HASE 1 cn I Z Z
W
�LOT 2
64 ACRES O O
PREVIOUS N
LOT B FRO =
21N\' SUB-0011 ~ U
W
m m
a U
Q
W
,� TR LEGEND J
69' ♦♦^^
< I FLOODWAY Q
3 O D 1% ANNUAL FLOOD W
2
FUTURE CONDITIONS 1% ANNUAL
i P WETLANDS
LO 7 PHASE 1 �� 1% ANNUAL FLOOD LIMITS
.2 AC S LOT 3 100YR
L R 12.42 ACRES
- 1 PREVIOUS FLOODWAY FW
LOT C FROM
SUB-0011-2021
z
w
0
O
0o U
PHASE 1 IMPROVEMENTS o
Of
w
x1w
a PHASE 2 IMPROVEMENTS o_
ji
M
PHASE 3 IMPROVEMENTS z N
a z O
o C'4
PHASE 4 IMPROVEMENTS w
� N
AS 2
O
IJ O O
1 � I
ryry N
4� z CD J
u
v PHASING PLAN NOTES1
o z
�1 + 1. PHASE 1 TIMING - PHASE 1 DEVELOPMENT OF
INFRASTRUCTURE AND TWO BUILDINGS WAS APPROVED IN
GL C 9 H E i _ 2022 AND CONSTRUCTION WILL BE COMPLETE IN 2023. x w
2. PHASE 2 TIMING - PHASE 2 INFRASTRUCTURE CONSTRUCTION
1 L p E SHALL BEGIN IN 2023. THIS PHASE WILL PROVIDE ALL _
REQUIRED ROADWAY, WATER AND SANITARY SEWER FOR ALL w r C)
OA S REMAINING PHASES OF DEVELOPMENT. THIS PHASE WILL 00 a
PROVIDE THE REQUIRED SCI FOR THE NEW RIGHT-OF-WAY. _ ao I,--
3. PHASE 3 TIMING - PHASE 3 PRIVATE DEVELOPMENT w Q
CONSTRUCTION WILL BEGIN IN 2023. J a C C)
' 4. PHASE 4 TIMING - PHASE 4 PRIVATE DEVELOPMENT N
Mill will 1 11CONSTRUCTION TIMING IS NOT KNOWN AT THIS TIME. _ o
II w I 5. PHASE 3 AND 4 DEVELOPMENTS WILL PROVIDE INDIVIDUAL � Z o_ _
SCI TO MEET REGULATORY REQUIREMENTS. O
6. AMENDMENTS TO THIS PHASING PLAN MAY BE MADE IN oN o
CONJUNCTION WITH THE REVIEW OF CONSTRUCTION PLANS, o
BUT AN UPDATED COPY OF THE NEW PHASING PLAN MUST
�� BE SUBMITTED AND PLACED IN THE CASE FILE MAINTAINED BY
I I Mill Mill Mill Mill Mill Mill Mill I � THE DEVELOPMENT SERVICES DIRECTOR. SEAL ��I I 111//
� C A R O
^ �r\\��' • • • 'C 2
9
A Mill
�/15/2023
Mill
DATE
FEBRUARY 15, 2023
ISSUED FOR
821N/ z
SUBDIVISION REVIEW
Z �\� SHEET NO.
0 200 400 600
C204
. .
ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL CITY OF RALEIGH, NCDOT, AND NCDEQ STANDARDS AND SPECIFICATIONS.
1 2 3 4 5 6 7
COMPANY,INC. ENI
1 /
PIN 17
D.B.14011,011,PG.PG.836
LOT 7
BOM 2010,PG,541 ^� / N� / ■ ■
THRALEIGH SUITES-QOZB,LLC 4'x4'ECM
NV5 ENGINEERS AND CONSULTANTS,INC.
R�W Mon. / / PIN: 1721483707
Lxh t C
HSU[ 2042 I I i 3300 REGENCY PARKWAY,STE 100
��, oN k f CARY,NC 27518
LOT I
P:919.851.1912 www.NV5.com
CRERR� / BOM 2008,PG,1624 I I " ' /
SOUND TIMBER MANAGEMENT LLC
D.B.1495,PG223117730RACT 4) y
LEGEND NC License#F-1333
I I I I y BOM:TRACPG'1253 former) CALYX Engineers+Consultants
R/W Mon.
SO�+YRALEIGHSUITES-QOZB,LLC //� J
PIN: 1721481534 I I as\ r°
D.B.17964,PG.2042 J
LOTz II II o _ 1.,��j/ 00 + + + EXISTING WETLANDS
/ BOM 2LO PG.1624 19• O
_ ' ' I I �,°� �����mws° + + +
SiBEIP ,�� �_ _
ff
v BKINVESTMENTS,LLC WETLAND IMPACTS A PIN: nz, PROPOSED WETLAND IMPACTS
Go1 I 1 LOT3P 1 I I \� V /�O
\ D.B.16536.PG. 36 )/ 1 (/ I ( I/R
IF I II BON 20 PG.1624 I I // a s V 0 0 1— ) IF
\ III I I II II PEPSI BOTTLING VENTURES,LLC _ � ���;, \\\
\ I I I S I DB 83711,,PG.10056.74'PP
— BOM 2007,PG.409
If I PIN: 1721587576
VI I0242.54Out: 0
\ I I
I
-
10 AP RALa I GH,LLC
D
✓�`� PIN: 1721476786 _ `
LOT S
BOM: 2014,PG.1822
e
AP
D.B.
n
Cn
154,535 SF \\ 9 v o
MP-7 ��
69,725 SF ��� �� �� A\ (� A\ ��)
GARNER ECONOMIC DEVELOPMENT CORP. ° -�� OfIMBER MA °
D.B.140121460
12,PG.2740
PIN: 21 PG,204
7 }} 1 J V �j �f �*
BOM: 2018.PG.1450 \ �l'� WID PARVC�N U..95 �< ��/ '( ` \\� 61068
OJR111CK`�COo � N^pI P WETLAND IMPACTS Bs
� o RES O O 10 �\ a I' o v �O o p °� ��z (4, 750 SF POTENTIAL
�vv� ��\ a � �� O � � � _V
� � D \ NON - 404 WETLANDS)
a\ o\
43011 �/
77
��\ / � \�\�n' 'I \ �� � -�� rJ` ✓� l � ( � � � ~ 1�'�� 1 �� 1, �� \° °�lU�o D \ O 1 PG. 3 ..�LS, �.1/`�����)o o`\ � O 1 W
RL 03
200 0 100 200 400 C� x
Np (890 x 250)
, },� oo � G
\\\ A I�r) }�1 ( w \ \ O° °Q , A5 222,500 SF
, . BMP6 �\ O qr c � 'fir � J \
127,922 SF \ ° TRUCK f �( ° A °° ° �� OR ° \ V AI�� \� �� ✓� ° \�O Z
1 1 n
"� � ���� GRAPHIC SCALE
1 inch - 200 ft.
PARKING AISLE (193 SPC) l � Iv
5 z17 sD \ ATQHL7N
/ � � °° vJ ( - � �c � W
U
TRUCK ACCESS AND PARKING (1400'x 185') O� \�� 3 a� °° �` �_�� �\ ( �I f, �I \� �
RL 04
! 625'x25o�) POTENTIAL FUTURE WETLAND IMPACTS ' C '
Fn z
156,250 SF
O �� ( - 1 , 400 SF — ESTIMATED) Conceptual only, not authorized as part
BMP 5 �/
Parc r r
M �1
108,690 SF Y � � ° � �O�\ �, �y �� �a,� � � y � �° ° � N W P 1 verified i f e n 7 2 21 r
� o N o� of 8 e ed o /30/ 0 , o
\`� \ �I� �✓�f� � )�'� NOTE: EXISTING ROAD
Nn� �� \�� _ °� D �f \\� 1 (1,400 x500) ��/���� °� \ I _� � o �� �� ��O s - z v 1 P 14 verified on 11/17/2023.
TRUCK ACCESS AND PARKING
\� 700,000SF \ � Off / ��� A _; Q) �� (� v - ° (565'X200') 0 1 \ CROSSING TO BE UTILIZED W
'�
vP � �y o a PROPOSED CROSSING TO
l \� \ l � °�� °\ \\v® �1 1/ 1 �/�� MP-a \p O \ ���1�11 MINIMIZE NEW STREAM IMPACTS .
b w kb \ V\ �� °o P \�. \� 88,774 SIF ��\ / ' ' RL 05
C 1 p \ � \ a ° d ° \ �\ �LI )"B� �f \ /\ � a A f �� \ (665 x 250)o � /I o \ � 166,250SF
�\ \ \ \ �)4 )\ I`-o °\ � \\ `1\I l,1 - \/ (//// N/� /I)1 V/"/// // /1 1 N) � Il(\ `I \/\) � � Sly � o �� � N � D.B.14 P T 3) / � �•
TRUCK ACCESS`ND PARKING (1400' \
°
PARKING AISLE (180 SPC) \�, ` I I
�\7 L s �EIP(�.43
'c Sou6outlwj° C/ \ \
� BMP-11 i o\C 1 I C
>s 105,345 SF
MARTINMARIETTAMATERIALS,INC. �O 9 �, \ N
MARTINMARIETTAMATERIAL INC S, D.B.14625,PG,2126 C` 111G1O,
D.B.5 864 PIN: 1721446485 1721 24
PIN: 240 (20NED R-20) / I Z O TI
(ZONEDED R-R-20) lJ l�Ps o S l
z �T �
BMP 3
174,931 SF
L
��f I D�a \� 1 R TAP
1 f
/
LoR 1v90
i
1 69'PUBLIC RIGHT-OF-WAY O \ \\ \ \\\ ���\ \ D I I w
(TYP) \ 9�A
\ ` TRUCK ACCESS AND PARKING (1550'x 185')
�/ � O 'V
C��OO \ems
\�� � \' O� \ \ \ o �G ° �f� %r—i'J= \�J ���—O �s
1 > ( o
rf � � 1 � 1 /, �i� ri ,r-/' /i �O� O-O��--- z�0 ,z. \ '�J O`----' ✓� ,O f �,0� S < �� � r-� '�` ��o l \\ , $;
ff w
3 sm
� � if � ¢ a? 0 ) O o 0 0 �� / lam CD 01 � � °O\ ° o s \\� �0 '� \� G`���1� \ � ��� ���✓0� � �� ��� \O�o ( `y � o
f j / S (1,550 x 600)
ILI) \ Y °C O�/ 929,992 SF =�� 0� \ PARKING AISLE(344 SPC)
0
° O� O Q1���ri / //� O 2 ✓O / O��\ \\ \ \ ��\ ° o �� \ ! ti 8 1 �r/ l S N C� ID Ls 0�
--L �, ,-,' -�— o ,J �,-- �I //31
�-^ \ \ t\ \� � Off` �� � �G� - �(L/ -
IJ
�' � t �� /�� °\ �OJ j 0 �� � �� P a 2020173.00
r � � i PROJECT NO:
s0 / `O° f �� �� / � \ BMP-2 ~�
/i , ° ° 229,740 SF �-
q TRUCK ACCESS AND PARKING (1550'x 185) / �0 o O - —\ `� 0\�\ \� < O �1
1
��f��� �� ��� A\� O ✓�' \� �\ ��� �' ww�C q DRAWN BY: FM
DWG. CHECKED BY: .JAA
BASE 0�00/O /� \\\ ° �� O ��� \NL s SCALE: SEE PLAN
�O"EI 4'EIP ° '�- P �� G ° / ° Arm O' 4 0 0 ��� \ \ O\ �� .a ♦`♦..
nn o \ / /J
DATE:
0712-
2021
V f�—� 1
J\_ 1
I 1
� / O 1 �
w / CONCEPTUAL-
MASTER
,J
5X
AN WETLAND
,
IMPACTS
/1 Z YYY
0 r
G
—- n
o
V 5
.aaa.a
...... .....
OT.— a..aa.aaa.
..............................................
/r , ...................................
i z
Action ID Number: SAW-2020-01779 County: Wake
Permittee: Sound Timber Management, LLC (Attn: H. Glen Bagwell, Jr)
Project Name: Eagle Crest industrial park phases 2-4 /4100 Auburn Church Road/Garner
Date Verification Issued: 11/17/2023
Project Manager: David E. Bailey
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: David E. Bailey
Raleigh Regulatory Office
U.S Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
or
David.E.Bailey2@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee Date
SAW-2020-01779
A. Determination of Jurisdiction:
1. ❑ There are waters,including wetlands on the above-described project area that may be subject to Section 404 of the Clean Water
Act(CWA)(33 USC§ 1344)and/or Section 10 of the Rivers and Harbors Act(RHA)(33 USC§403).This preliminary
determination is not an appealable action under the Regulatory Program Administrative Appeal Process(Reference 33 CFR Part
331). However,you may request an approved JD,which is an appealable action,by contacting the Corps district for further
instruction. Please note,if work is authorized by either a general or nationwide permit,and you wish to request an appeal of an
approved JD,the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work
in waters of the United States and prior to any work that could alter the hydrology of waters of the United States.
2. ❑ There are Navigable Waters of the United States within the above-described project area subject to the permit requirements of
Section 10 of the Rivers and Harbors Act(RHA)(33 USC §403)and Section 404 of the Clean Water Act(CWA)(33 USC §
1344). This determination may be relied upon for a period not to exceed five years from the date of this notification,provided
there is no change in law or our published regulations or new information that warrants revision of this determination.
3. ❑ There are waters,including wetlands within the above-described project area that are subject to the permit requirements of
Section 404 of the Clean Water Act(CWA)(33 USC § 1344). This determination may be relied upon for a period not to exceed
five years from the date of this notification,provided there is no change in law or our published regulations or new information
that warrants revision of this determination.
4. A jurisdiction determination was not completed with this request. Therefore,this is not an appealable action. However,you may
request an approved JD,which is an appealable action,by contacting the Corps for further instruction.
5. ® The jurisdictional areas within the project area have been identified under previous actions.Please reference the
preliminary jurisdictional determination issued 7/28/2021,and approved jurisdictional determination issued 11/1/2023.
Action ID: SAW-2020-01779.
Corps Regulatory Official:
David E.Bailey