HomeMy WebLinkAbout2020-01779 NWP 39 Tearsheet - Phases 2-4.pdf U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2020-01779 County:Wake U.S.G.S. Quad:NC-Garner GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Sound Timber Management,LLC Attn: H.Glen Bagwell,Jr Address: 333 Sherwee Drive Raleigh,NC 27603 Size(acres) —135 Nearest Town Garner Nearest Waterway UT to Big Branch River Basin Neuse USGS HUC 03020201 Coordinates 35.7175784,-78.5753504 Location description: The proiect area is located on the west side of Auburn Church Road,approximately 1.25 mile south of its intersection with Jones Sausage Road,at 4100 Auburn Church Road,Garner,North Carolina. Description of projects area and activity: This verification authorizes the permanent discharge of fill material into 0.009 acre(58 linear feet)of stream channel,22 linear feet 10.004 acrel of which are considered a permanent loss of waters,necessary to construct access and infrastructure for Phases 2-4 of the Eagle Crest commercial/industrial park. Applicable Law(s): ®Section 404(Clean Water Act,33 USC 1344) ❑Section 10(Rivers and Harbors Act,33 USC 403) Authorization: NWP 39.Commercial and Institutional Developments SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS REMARKS: See also the NWP 18 verification,dated 7/30/2021,for the initial phase of the Eagle Crest commercial/ industrial park single and complete proiect. Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions,your application dated 2/28/2023(received via email 11/1/2023),and the enclosed plans"Eagle Crest West Industrial Park Wetland Impacts Exhibit"Sheet No.1,"Eagle Crest West Industrial Park Non-JD Wetland Impacts"Sheet No.2,and"Eagle Crest West Industrial Park Subdivision Phasing Plan"Sheet No.C204.Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order,a restoration order,a Class I administrative penalty,and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified,suspended or revoked. If,prior to the expiration date identified below,the nationwide and/or regional general permit authorization is reissued and/or modified,this verification will remain valid until the expiration date identified below,provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit,activities which have commenced(i.e.,are under construction)or are under contract to commence in reliance upon the nationwide and/or regional general permit,will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration,modification or revocation,unless discretionary authority has been exercised on a case-by-case basis to modify,suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources(telephone 919-807-6300)to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act(CAMA),prior to beginning work you must contact the N.C.Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,please contact David E.Bailey at 919 817-2436 or David.E.Bailey2(a,usace.army.mil. Corps Regulatory Official: Date: 11/17/2023 Expiration Date of Verification: 3/14/2026 SAW-2020-01779 SPECIAL CONDITIONS 1. "Suitable habitat for tricolored bat(Perimyotis subflavus) may be present at the site. On September 14, 2022, the USFWS published a proposal in the Federal Register to list the tricolored bat as endangered under the Endangered Species Act (ESA). The permittee understands and agrees that all work associated with the clearing and removal of trees and removal or modification of culverts must be completed prior to the effective date of the final listing in the Federal Register. Work associated with the aforementioned activities not completed by that time must cease and the permittee must contact the Corps' (David E. Bailey at (919) 817-2436 or David.E.Bailey2(&usace.army.mil) to determine if additional coordination with the United States Fish and Wildlife Service is required under Section 7 of the Endangered Species Act prior to continuing work." 2. Please note that this project is considered cumulative with all current and future phases of the Eagle Crest commercial/industrial park development with respect to compensatory mitigation and Nationwide Permit thresholds. As such, impacts permitted for this project (SAW-2020-01779) are considered cumulative with impacts proposed for any future phases (conceptual plan shown on the attached Exhibit C, entitled "Conceptual Master Plan — Wetland Impacts"). Current cumulative impacts to potential waters of the US for the Eagle Crest commercial/industrial park single and complete project include 0.018 acre of wetlands and 0.004 acre (22 linear feet) of stream channel,or a total loss of 0.022 acre of potential waters of the US. Corps Regulatory Official: Date: 11/17/2023 Expiration Date of Verification: 3/14/2026 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at https://re ug lator.ops.usace.army.mil/customer-service-survey/. E-copies furnished: Jeff Harbour,Terracon,jef£harbourgterracon.com Zachary Thomas,NCDEQ-NCDWR,zachM.thomasAdeq.nc.gov O Lo AGL CR ST W ST IN USTRIAL PARK "`+ U Z PERMITTINGSTREAM / O (o U IH =CU ZONING _ � U CITY OF RALEIGH SUB =0074=2022 Q 3 w / 0 400 800 1200 O _jPROJECT MANAGER _ O Y DEVELOPMENT AND CONSTRUCTION INSIGHT, LLC n SITE DATA TABLE / / 2054 KILDAIRE FARM ROAD, #167 CARY, NORTH CAROLINA 27518 PROJECT NAME: EAGLE CREST WEST INDUSTRIAL PARK DAVID PARKER / David@DClnight.com PROJECT ADDRESS: 4100, 4150, 4200, 4250, 4300 AND 4320 AUBURN CHURCH ROAD 919-868-3099 PIN: 1721-68-5073, 1721-67-7688, 1721-67-9063, 1721-66-8487, _� PH1 PERMITTED 1721-56-5995 AND 1721-45-8914 IMPACT 0.020 AC ENGINEER PROPERTY OWNER: SOUND TIMBER MANAGEMENT LLC pt�11 WETLANDS CAPITAL CIVIL ENGINEERING, PLLC DWR# 20210137 209 N SALEM ST, STE 220 333 SHERWEE DRIVE APEX, NC 27502 RALEIGH, NC 27603 ACOE SAW-2020-01779 PH: 919 249-8587 i MICHAEL J. KANE, PE `=�'•.a mkane@capitalcivil.com ZONING: IH-CU 919-249-8587 OVERLAY DISTRICT: N/A -- 7G GROSS SITE AREA: 175.09 ACRES (NOT INCLUDING EXISTING R/W) _� - 0 Q NET SITE AREA: 170.48 ACRES NOT INCLUDING R W r Q z WATERSHED: N/A - -- 0 0 0 0 J zG J H Q RIVER BASIN: NEUSE � U00 JURISDICTION: PH1 LOT3 S N CITY OF RALEIGH �/� I PH5 LOT9 7O U) O CURRENT LAND USE. VACANT / WAREHOUSE NON-404 = z W PROPOSED USE: WAREHOUSE / STREAM WETLANDS \ U) CROSSING IMPACT 0.90 AC Z w U NUMBER OF PROPOSED LOTS: 9 c ��., , Q Q PROPOSED Q ._ WET IMPACTS U) a P POND uj o HATCH INDICATES y FINAL GRADE �� � PHASE 2 - 31.92 AC T � y z PROJECT OCEAN SCOPE OF CURRENT � U Q PROJECT uj cc j _ BUFFER IMPACT DWR# 20221796 APPROVED f EXISTING GRADE PH3 LOT8 JUNE 30 2023 U z W r � �J ��JM M �FILL \\ SUBSURFACE DRAIN W � �=� TO BE PROVIDED, i E J m WASHED STONE WRAPPED P7 �1 IN FILTER FABRIC �� @ SEE DETAIL THIS SHEET �\ _ MIRAFI 18ON OR EQUAuj L EXTEND STONE 12 OVER PIPE i �``'$ 6" DIAMETER EXTEND STONE 6" UNDER PIPE i \� CORRUGATED _ \ PERFORATED PIPE FOLLOW EXISTING SLOPE SUBSURFACE DRAIN DETAIL OVERVIEW SCALE: 1" = 400' 275 275 0 ID � I I I 1 1 CD r- o (r� III�� \\\ , i 1 I I 1 I !' r I� fill r N � ;I 270 270 z0CD N � � \ 1 I111 � �, r X "' w \ \\ " N Q 36 LINEAR FT II I� � oSTREAM IMPACT _j1 265 265 (RIP—RAP) � Ld _ _j // ZONE IMPACT � � � � �� � � ' 00 Q 601 S l U' o 1 I lI Il�� l '� �/ ZONE 2 IMPACT A ti�� [� I � o coo ( / 1 / / � /// //\� / \ �\ 426 SF 5 oE�1 1 T �\ _j Z J N ` o J � °' N 1 T�2�,6/`W265 I I \ I I „ r<( \ \ 1 II ( r �\ 6�� \ \ 260 260 Q \ \ I ( � � / 8 ZONE I PA ,' >> �)\� ' l - - 242 SF`\ \ z = o LL CD � z 55 c�N I v `� v 255 255 PROPOSED \ 01 � \ SEAL �111111/// - XISTING 60.78 -79.21' OF 48'�?� 1 �O \ - EXIS G DRIVE 22 LIN FT _ ao EXISTI DRIVE `- \ 1 / �OF 36" CMP TO /� iRCP ® 6�pp6% �I ROgL) W POD ��j / II�ACT STREAM Kn) IMPACT -- C A RO I '4 • FE /� • �� E REMOVED, - 26g EWER W SNOl / `� IMPACT / 26e Off, •S S •�,/�\ Taza ����270 ��fT \ I --�-- -- 250 250 = SEAE 03119 EX 36 CMP E -- - Z I I \ 1 �� 0 11\I 1 \� \ \ E� . �• CULVERT \ \ \ 6�g� I III III �� Q�i �� \\I \� 1 1 \ \ �1 \� ZONE 2 IMPACT ( / I I I I\\ l ( r 1 �6 I ) I I I I \ \\ �►I I\\ \\ \ .�1 2ss OUTLET HAD /// 9 26 2023 soy SF ERODED BANK BELOW) DATE - 245 245 TW262 �\ �� ZONE 1 IMPACT 796 SF ZONE 2 IMPACT SEPTEMBER 26, 2023 PROPOSED 48" ISSUED FOR STREAM LINEAR IMPACT = 58 FT — ZONE 1 IMPACT RCP CULVERT PERMITTING 934 SF STREAM AREA IMPACT = 447 SF '-� '-� 240 _ 240 SHEET No. ZONE 1 BUFFER IMPACT = 2,861 SF _ BQ _ \� - RIP-RAP d50=15,'ZONE 2 BUFFER IMPACT 2,112 SF - _ EMBEDDED 34" DEEP WETLAND IMPACT = 0 SF 235 0+00 0+30 0+60 0+90 1+20 1+5035 STREAM CROSSING PLAN VIEW STREAM CROSSING IMPACTS STREAM CROSSING PROFILE SCALE: 1" = 50' SCALE: 1" = 50' SCALE: 1" = 30' HORIZ, 1" = 5' VERT 0 O 0 50 100 150 PHI LOT3 BULDING PAD LO � Z CONCRETE DOCK AREA \ \ } \ U E \ / O 0 Q I o I og 3 ASPHALT LOADING AREA I `` 3 I I J�. O J_ I JJ 0 ( I IZ, J Qcn CD Li Q cf) LUQ w LLJ PH2�LOT4 Ij I W \ \ \ I B ILDI G P4D LU �1 I p\ (5' FILL) \ \ \ 1— 270 \ \ \ vomg \ t 00 0 Ln l In 0 J \\ \ 2 N i D 76 L� -- � zoo _ w LLJ x CD ( U 7' FIL ) N� N I / J o `` w \ \ l \ P OPOS A E CREWAY = = 1 \ 1 N J r � I,- 00 _ -- - - � -_ J J N U Q C4 04 o f 7 s \ �\ L \ f P�2 15\ I \\ SEALSEAL C — 03119 9/26/2023 DATE NON-JD WETLAND AREA SEPTEMBER 26, 2023 SCALE: 1 " = 50' ISSUED FOR PERMITTING NON-404 WETLAND IMPACT = 0.90 AC SHEET No. 2 0 PHASE 1 \ ` 12.9 ACRES LOT A FROM SUB-0011-2021 \\ / P O E1 J Z / S OT0011 R 2021CD / 10 ` w V Q Z ao C) 0 U Z o I O HASE 1 cn I Z Z W �LOT 2 64 ACRES O O PREVIOUS N LOT B FRO = 21N\' SUB-0011 ~ U W m m a U Q W ,� TR LEGEND J 69' ♦♦^^ < I FLOODWAY Q 3 O D 1% ANNUAL FLOOD W 2 FUTURE CONDITIONS 1% ANNUAL i P WETLANDS LO 7 PHASE 1 �� 1% ANNUAL FLOOD LIMITS .2 AC S LOT 3 100YR L R 12.42 ACRES - 1 PREVIOUS FLOODWAY FW LOT C FROM SUB-0011-2021 z w 0 O 0o U PHASE 1 IMPROVEMENTS o Of w x1w a PHASE 2 IMPROVEMENTS o_ ji M PHASE 3 IMPROVEMENTS z N a z O o C'4 PHASE 4 IMPROVEMENTS w � N AS 2 O IJ O O 1 � I ryry N 4� z CD J u v PHASING PLAN NOTES1 o z �1 + 1. PHASE 1 TIMING - PHASE 1 DEVELOPMENT OF INFRASTRUCTURE AND TWO BUILDINGS WAS APPROVED IN GL C 9 H E i _ 2022 AND CONSTRUCTION WILL BE COMPLETE IN 2023. x w 2. PHASE 2 TIMING - PHASE 2 INFRASTRUCTURE CONSTRUCTION 1 L p E SHALL BEGIN IN 2023. THIS PHASE WILL PROVIDE ALL _ REQUIRED ROADWAY, WATER AND SANITARY SEWER FOR ALL w r C) OA S REMAINING PHASES OF DEVELOPMENT. THIS PHASE WILL 00 a PROVIDE THE REQUIRED SCI FOR THE NEW RIGHT-OF-WAY. _ ao I,-- 3. PHASE 3 TIMING - PHASE 3 PRIVATE DEVELOPMENT w Q CONSTRUCTION WILL BEGIN IN 2023. J a C C) ' 4. PHASE 4 TIMING - PHASE 4 PRIVATE DEVELOPMENT N Mill will 1 11CONSTRUCTION TIMING IS NOT KNOWN AT THIS TIME. _ o II w I 5. PHASE 3 AND 4 DEVELOPMENTS WILL PROVIDE INDIVIDUAL � Z o_ _ SCI TO MEET REGULATORY REQUIREMENTS. O 6. AMENDMENTS TO THIS PHASING PLAN MAY BE MADE IN oN o CONJUNCTION WITH THE REVIEW OF CONSTRUCTION PLANS, o BUT AN UPDATED COPY OF THE NEW PHASING PLAN MUST �� BE SUBMITTED AND PLACED IN THE CASE FILE MAINTAINED BY I I Mill Mill Mill Mill Mill Mill Mill I � THE DEVELOPMENT SERVICES DIRECTOR. SEAL ��I I 111// � C A R O ^ �r\\��' • • • 'C 2 9 A Mill �/15/2023 Mill DATE FEBRUARY 15, 2023 ISSUED FOR 821N/ z SUBDIVISION REVIEW Z �\� SHEET NO. 0 200 400 600 C204 . . ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL CITY OF RALEIGH, NCDOT, AND NCDEQ STANDARDS AND SPECIFICATIONS. 1 2 3 4 5 6 7 COMPANY,INC. ENI 1 / PIN 17 D.B.14011,011,PG.PG.836 LOT 7 BOM 2010,PG,541 ^� / N� / ■ ■ THRALEIGH SUITES-QOZB,LLC 4'x4'ECM NV5 ENGINEERS AND CONSULTANTS,INC. R�W Mon. / / PIN: 1721483707 Lxh t C HSU[ 2042 I I i 3300 REGENCY PARKWAY,STE 100 ��, oN k f CARY,NC 27518 LOT I P:919.851.1912 www.NV5.com CRERR� / BOM 2008,PG,1624 I I " ' / SOUND TIMBER MANAGEMENT LLC D.B.1495,PG223117730RACT 4) y LEGEND NC License#F-1333 I I I I y BOM:TRACPG'1253 former) CALYX Engineers+Consultants R/W Mon. SO�+YRALEIGHSUITES-QOZB,LLC //� J PIN: 1721481534 I I as\ r° D.B.17964,PG.2042 J LOTz II II o _ 1.,��j/ 00 + + + EXISTING WETLANDS / BOM 2LO PG.1624 19• O _ ' ' I I �,°� �����mws° + + + SiBEIP ,�� �_ _ ff v BKINVESTMENTS,LLC WETLAND IMPACTS A PIN: nz, PROPOSED WETLAND IMPACTS Go1 I 1 LOT3P 1 I I \� V /�O \ D.B.16536.PG. 36 )/ 1 (/ I ( I/R IF I II BON 20 PG.1624 I I // a s V 0 0 1— ) IF \ III I I II II PEPSI BOTTLING VENTURES,LLC _ � ���;, \\\ \ I I I S I DB 83711,,PG.10056.74'PP — BOM 2007,PG.409 If I PIN: 1721587576 VI I0242.54Out: 0 \ I I I - 10 AP RALa I GH,LLC D ✓�`� PIN: 1721476786 _ ` LOT S BOM: 2014,PG.1822 e AP D.B. n Cn 154,535 SF \\ 9 v o MP-7 �� 69,725 SF ��� �� �� A\ (� A\ ��) GARNER ECONOMIC DEVELOPMENT CORP. ° -�� OfIMBER MA ° D.B.140121460 12,PG.2740 PIN: 21 PG,204 7 }} 1 J V �j �f �* BOM: 2018.PG.1450 \ �l'� WID PARVC�N U..95 �< ��/ '( ` \\� 61068 OJR111CK`�COo � N^pI P WETLAND IMPACTS Bs � o RES O O 10 �\ a I' o v �O o p °� ��z (4, 750 SF POTENTIAL �vv� ��\ a � �� O � � � _V � � D \ NON - 404 WETLANDS) a\ o\ 43011 �/ 77 ��\ / � \�\�n' 'I \ �� � -�� rJ` ✓� l � ( � � � ~ 1�'�� 1 �� 1, �� \° °�lU�o D \ O 1 PG. 3 ..�LS, �.1/`�����)o o`\ � O 1 W RL 03 200 0 100 200 400 C� x Np (890 x 250) , },� oo � G \\\ A I�r) }�1 ( w \ \ O° °Q , A5 222,500 SF , . BMP6 �\ O qr c � 'fir � J \ 127,922 SF \ ° TRUCK f �( ° A °° ° �� OR ° \ V AI�� \� �� ✓� ° \�O Z 1 1 n "� � ���� GRAPHIC SCALE 1 inch - 200 ft. PARKING AISLE (193 SPC) l � Iv 5 z17 sD \ ATQHL7N / � � °° vJ ( - � �c � W U TRUCK ACCESS AND PARKING (1400'x 185') O� \�� 3 a� °° �` �_�� �\ ( �I f, �I \� � RL 04 ! 625'x25o�) POTENTIAL FUTURE WETLAND IMPACTS ' C ' Fn z 156,250 SF O �� ( - 1 , 400 SF — ESTIMATED) Conceptual only, not authorized as part BMP 5 �/ Parc r r M �1 108,690 SF Y � � ° � �O�\ �, �y �� �a,� � � y � �° ° � N W P 1 verified i f e n 7 2 21 r � o N o� of 8 e ed o /30/ 0 , o \`� \ �I� �✓�f� � )�'� NOTE: EXISTING ROAD Nn� �� \�� _ °� D �f \\� 1 (1,400 x500) ��/���� °� \ I _� � o �� �� ��O s - z v 1 P 14 verified on 11/17/2023. TRUCK ACCESS AND PARKING \� 700,000SF \ � Off / ��� A _; Q) �� (� v - ° (565'X200') 0 1 \ CROSSING TO BE UTILIZED W '� vP � �y o a PROPOSED CROSSING TO l \� \ l � °�� °\ \\v® �1 1/ 1 �/�� MP-a \p O \ ���1�11 MINIMIZE NEW STREAM IMPACTS . b w kb \ V\ �� °o P \�. \� 88,774 SIF ��\ / ' ' RL 05 C 1 p \ � \ a ° d ° \ �\ �LI )"B� �f \ /\ � a A f �� \ (665 x 250)o � /I o \ � 166,250SF �\ \ \ \ �)4 )\ I`-o °\ � \\ `1\I l,1 - \/ (//// N/� /I)1 V/"/// // /1 1 N) � Il(\ `I \/\) � � Sly � o �� � N � D.B.14 P T 3) / � �• TRUCK ACCESS`ND PARKING (1400' \ ° PARKING AISLE (180 SPC) \�, ` I I �\7 L s �EIP(�.43 'c Sou6outlwj° C/ \ \ � BMP-11 i o\C 1 I C >s 105,345 SF MARTINMARIETTAMATERIALS,INC. �O 9 �, \ N MARTINMARIETTAMATERIAL INC S, D.B.14625,PG,2126 C` 111G1O, D.B.5 864 PIN: 1721446485 1721 24 PIN: 240 (20NED R-20) / I Z O TI (ZONEDED R-R-20) lJ l�Ps o S l z �T � BMP 3 174,931 SF L ��f I D�a \� 1 R TAP 1 f / LoR 1v90 i 1 69'PUBLIC RIGHT-OF-WAY O \ \\ \ \\\ ���\ \ D I I w (TYP) \ 9�A \ ` TRUCK ACCESS AND PARKING (1550'x 185') �/ � O 'V C��OO \ems \�� � \' O� \ \ \ o �G ° �f� %r—i'J= \�J ���—O �s 1 > ( o rf � � 1 � 1 /, �i� ri ,r-/' /i �O� O-O��--- z�0 ,z. \ '�J O`----' ✓� ,O f �,0� S < �� � r-� '�` ��o l \\ , $; ff w 3 sm � � if � ¢ a? 0 ) O o 0 0 �� / lam CD 01 � � °O\ ° o s \\� �0 '� \� G`���1� \ � ��� ���✓0� � �� ��� \O�o ( `y � o f j / S (1,550 x 600) ILI) \ Y °C O�/ 929,992 SF =�� 0� \ PARKING AISLE(344 SPC) 0 ° O� O Q1���ri / //� O 2 ✓O / O��\ \\ \ \ ��\ ° o �� \ ! ti 8 1 �r/ l S N C� ID Ls 0� --L �, ,-,' -�— o ,J �,-- �I //31 �-^ \ \ t\ \� � Off` �� � �G� - �(L/ - IJ �' � t �� /�� °\ �OJ j 0 �� � �� P a 2020173.00 r � � i PROJECT NO: s0 / `O° f �� �� / � \ BMP-2 ~� /i , ° ° 229,740 SF �- q TRUCK ACCESS AND PARKING (1550'x 185) / �0 o O - —\ `� 0\�\ \� < O �1 1 ��f��� �� ��� A\� O ✓�' \� �\ ��� �' ww�C q DRAWN BY: FM DWG. CHECKED BY: .JAA BASE 0�00/O /� \\\ ° �� O ��� \NL s SCALE: SEE PLAN �O"EI 4'EIP ° '�- P �� G ° / ° Arm O' 4 0 0 ��� \ \ O\ �� .a ♦`♦.. nn o \ / /J DATE: 0712- 2021 V f�—� 1 J\_ 1 I 1 � / O 1 � w / CONCEPTUAL- MASTER ,J 5X AN WETLAND , IMPACTS /1 Z YYY 0 r G —- n o V 5 .aaa.a ...... ..... OT.— a..aa.aaa. .............................................. /r , ................................... i z Action ID Number: SAW-2020-01779 County: Wake Permittee: Sound Timber Management, LLC (Attn: H. Glen Bagwell, Jr) Project Name: Eagle Crest industrial park phases 2-4 /4100 Auburn Church Road/Garner Date Verification Issued: 11/17/2023 Project Manager: David E. Bailey Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David E. Bailey Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or David.E.Bailey2@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date SAW-2020-01779 A. Determination of Jurisdiction: 1. ❑ There are waters,including wetlands on the above-described project area that may be subject to Section 404 of the Clean Water Act(CWA)(33 USC§ 1344)and/or Section 10 of the Rivers and Harbors Act(RHA)(33 USC§403).This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process(Reference 33 CFR Part 331). However,you may request an approved JD,which is an appealable action,by contacting the Corps district for further instruction. Please note,if work is authorized by either a general or nationwide permit,and you wish to request an appeal of an approved JD,the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. 2. ❑ There are Navigable Waters of the United States within the above-described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act(RHA)(33 USC §403)and Section 404 of the Clean Water Act(CWA)(33 USC § 1344). This determination may be relied upon for a period not to exceed five years from the date of this notification,provided there is no change in law or our published regulations or new information that warrants revision of this determination. 3. ❑ There are waters,including wetlands within the above-described project area that are subject to the permit requirements of Section 404 of the Clean Water Act(CWA)(33 USC § 1344). This determination may be relied upon for a period not to exceed five years from the date of this notification,provided there is no change in law or our published regulations or new information that warrants revision of this determination. 4. A jurisdiction determination was not completed with this request. Therefore,this is not an appealable action. However,you may request an approved JD,which is an appealable action,by contacting the Corps for further instruction. 5. ® The jurisdictional areas within the project area have been identified under previous actions.Please reference the preliminary jurisdictional determination issued 7/28/2021,and approved jurisdictional determination issued 11/1/2023. Action ID: SAW-2020-01779. Corps Regulatory Official: David E.Bailey