HomeMy WebLinkAboutNCC233624_ESC Approval Submitted_20231214 a
��memo-
ROY COOPER ', 4 apt A
Governor '� I,WI ���i' �;
ELIZABETH S.BISER ', . .
Secretaryvt =
BRIAN WRENN NORTH CAROLINA
Director Environmental Quality
October 27,2022
LETTER OF APPROVAL WITH MODIFICATIONS
Fort Bragg Directorate of Public Works
Attn: Aaron Brown, Deputy Director
2175 Reilly Road Stop A
Fort Bragg,NC 28310
RE: Project Name: FB - SOF Supply Support Activity PN87447
Acres Approved: 6.31
Project ID: CUMBE-2023-045
County: Cumberland, City: Fort Bragg, Address: Tora Bora Boulevard
River Basin: Cape Fear
Stream Classification: Other
Submitted By: Cape Fear Engineering
Date Received by LQS: September 27,2022
Plan Type: New
Dear Mr. Brown:
This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter
of Approval with Modifications. A list of the modifications and reservations is attached. This plan approval
shall expire three(3)years following the date of approval,if no land-disturbing activity has been undertaken,
as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will
be required(G.S. 113A-54.1)(b).
As of April 1,2019, all new construction activities are required to complete and submit an electronic
Notice of Intent(eNOI) form requesting a Certificate of Coverage(COC)under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete,you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed,you will receive
the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this
project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI
form to Annette Lucas at danny.smith@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov.After you
submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A
$100 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to the
DEMLR Stormwater Central Office staff in Raleigh. If the owner/operator of this project changes in the
future,the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
�D_E , North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
v Fayetteville Regional Office 1225 Green Street,Suite 714 I Fayetteville,North Carolina 28301
NORTH CAROLINA
Daparhnent of Environmental lluallty 910.433.3300
Letter of Approval with Modifications
Fort Bragg Directorate of Public Works
October 27,2022
Page 2 of 3
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure
compliance with the approved plan.
Title 15A NCAC 4B .0118(a)requires that a copy of the approved erosion control plan be on file at the job
site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws,regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form,which you provided.You are requested to file an amended form if there is any change
in the information included on the form. This permit allows for a land-disturbance, as called for on the
application plan,not to exceed the approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee.In addition,it would be helpful if you notify
this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
614 36C.i.
Jodi Pace,EI
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCGO1 Fact Sheet
cc: Mason Manhertz, Cape Fear Engineering(electronic copy)
Lee Ward,Water Management Section(electronic copy)
DEMLR-Fayetteville Regional Office File
Letter of Approval with Modifications
Fort Bragg Directorate of Public Works
October 27,2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: FB- SOF SUPPLY SUPPORT ACTIVITY PN87447
Project Number: CUMBE-2023-045
County: CUMBERLAND
Provide two full size copies of each revised plan sheet showing all the Modifications required for
approval,prior to beginning any land-disturbing activity.
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities