Loading...
HomeMy WebLinkAboutNCC215883_NOT Closeout Documents_20231212 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094 (910)433-3300 County: Anson Project: Selwyn Solar Electric Power Plant River basin: Yadkin-PeeDee Person financially responsible:Strata Clean Energy,LLC-Markus Wilhelm, Project#: ANSON-2021-006 Manager NCC215883 Address: 800 Taylor Street,Suit 200,Durham,NC 27701 1. Project Location: Standback Ferry Rd,Lilesville Pictures: No 2. Weather and soil conditions: dry,workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Jason Grice Title: Project Manager Inspection report: Sent Report Date given/sent: August 11,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Melissa Joyner Others present: Denise Bruce,Kelly Jonas,Evangelyn Lower-Jacobs Date of inspection: August 10,2023 Time arriving on site: 3:20 AM Time leaving site: 3:40 PM cc: