Loading...
HomeMy WebLinkAboutSW1231201_Plansheet - SCM Detail_20231212 z 0 0 z w It 4' X 6' PRECAST CONCRETE STRUCTURE TOP ELEV = 2335.0 GALVANIZED TRASH RACK = 0 3" X 36" WEIR FACING THE WETLAND TOP OF COMPACTED EARTHEN = WEIR ELEV = 2334.25 EMBANKMENT BERM 3" ABOVE FELEV = 2337.0 U_ PERMANENT POOL 10' WIDE WEIR OPENING w ELEVATION 4" PVC TEE INVERT INTO IN EARTHEN EMBANKMENT ~ RISER AT ELEV. = 2333.0 P TOP OF TEE D C ELEV = 2336.0 Q SOLID INFLOW SO It TEMPORARY POOL = 2334.25 SIGN N N 3:1 MAX. j Uj \ -- / \, w RIPRAP BACKED WITH TEMPORARY 15" MAX 1' \ / z FILTER CLOTH PERMANENT POOL = 2333.0 i \ 1 r } _/�J\ FOREBAY EXIT POOL STABLE OUTFACE CLASS B / 3' DEEP 3' DEEP RIP-RAP AND FILTER AT OUTLET CLOTH � � o o.s' o.s' y c �\ ��� 23.88 LF 24" HDPE � 0"-9" BELOW PERMANENT 12" SOIL AMENDMENT OF \ \ \ U) POOL ELEVATION SHALLOW ORGANIC MATERIAL FOR f /1 \ -\ \ o WATER ZONE ENHANCED PLANTING MEDIA ( x\` - \ `\ / U) 1.5" ORIFICE _> I _ w IN BOTTOM KEYWAY SHALLOW WATER ZONE CAP OF TEE 1 I /' \ PROPOSED WP INLET \ ANTI-SEEP COLLAR * I I / -_ STA 23+73.31 / LU SEDIMENT STORAGE AT Alignment - (Storm D) \ LL RIM: 2331.83/ / / BOTTOM OF OUTLET INVERT ELEV. = 2330.0 I I I \ INV IN: 2329.65 � \\ 0 DEEP POOL 2 X 24" RCP OUTLET I I / �. \� \ f I \ PIPES / I MAli �NI v I z \ ` \ 1 \- � I � TYPICAL CROSS-SECTION !� I I FOREBAY o SURFACE AREA = 1182.86SF \ I\/ 4' X 6' PRECAST CONCRETE GALVANIZED TRASH RACK PROPOSED CI-D13 RISER TOP ELEV. = 2335.0 PER MANUFACTURER / STA 23+49.43 \ / //�• CONSTRUCTION NOTES Alignment - (Storm D) / \ � \ \ TEMPORARY INUNDATION ZONE \ RIM: 2335.61 4S1 `/\\//\\//\\//\\//\\//\\//\\//\\ 1. ALL PRE CAST STRUCTURES SHALL BE 4000 PSI CONCRETE INV IN: 2330.35 `\ - \� \ --- SURFACE AREA = 3822.86SF / // i \\\\\\\\\\\\\\\\\\\\\' 2. ENGINEER MUST APPROVE ALL PRE CAST STRUCTURES -- INV OUT: 2330.25 // // / \ 3. ALL PIPE IN STORM DRAINAGE STRUCTURE SHALL BE STRUCK �, \�j\\j \j\\/\ \j\ D /\/ EVEN WITH THE INSIDE WALL AND GROUTED AND BRUSHED SMOOTH 36 X 3"HIGH OPENING ELEV. = 2334.25 __ ./\/\/\/\/\/\/\/\/\/\ \\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\ TOP OF TEMPORARY POOL `_, 1 L �\ �� \\ / NON-FOREBAY DEEP POOL (OPEN ONE SIDE FACING WETLAND) I- /X /////j//j//j//j//j//j//j//j//j//j//j//j//j \� \ \ - \ \ / PERMANENT POOL ELEV. = w 2333.0 SURFACE AREA = 829 70SF \ /\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\ BOTTOM OF TEE = 2332.0 _ _ / //// / //// //// //// / //// //// /\ 36"06" CORRUGATED TEMPORARY INUNDATION ZONE ALUMINUM SURFACE AREA = 3822.86SF ANTI-SEEP COLLAR \ \ S 2 X 24 RCP OUTLET PIPES EMERGENCY SPILLWAY PROTECTED WITH CLASS B RIP-RAP / ///\\j ° INLET OUTLET r II // +\ w \,�\//\//\// D ° ° . D °D. °. \\//\//\//\//\//\// 1 i SHALLOW WATER ZONE SURFACE AREA = 4367.93SF (n /\\ \\ \ > D. D. . .D..D ° ; D .D \ KEYWAY CATCH BASIN AND CONCRETE ANTI-FLOTATION BLOCK CAST TOGETHER FOR PRE-CAST MONOLITHIC BASE Q SECTION B ANTI-FLOTATION BLOCK DIMENSIONS 8 x8 x2 x _ / PROPOSED WP Outlet Box OUTLET CONTROL STRUCTURE STA 10+00.00 / Alignment - (Wet Pond Outlet) / I / RIM: 2335.08 I / INV OUT. 2330.00 0 o NOTES: - -` 1. VOLUME REQUIRED IS THE TREATMENT VOLUME OF THE TEMPORARY POOL. TEMPORARY POOL SHALL I / N / 0 NOT EXCEED 15" IN DEPTH. DRAWDOWN TIME FOR THE TEMPORARY POOL SHALL BE 2 TO 5 DAYS. I / OUTLET CONTROL STRUCTURE I-% ,-----__ 2. SURFACE AREA REQUIRED IS BASED ON 15" DEPTH. FLOW PATH FROM INLET TO OUTLET SHALL BE I / ! cV ---- o MAXIMIZED IN LENGTH. I / /ICd / - 3. FOREBAY (DEEP POOL) SHALL BE CONSTRUCTED AT THE INLET.Uj - Uj 4. LOCATE A DEEP POOL AT THE OUTLET CONTROL STRUCTURE. U) 5. PLANTINGS SHALL BE CHOSEN FROM APPROVED NCDEQ PLANTING LISTS FOR STORMWATER WETLANDS, SHALLOW WATER PLANTINGS AND TEMPORARY INUNDATION ZONE PLANTINGS. 0 6. A SOIL ANALYSIS SHALL BE CONDUCTED TO DETERMINE PROPER SOIL AMENDMENTS TO BE ADDED TO THE FIRST 12" OF SOIL DEPTH FOR HEALTHY PLANT GROWTH. / PROPOSED WP Outlet HW N 7. SEE INSPECTION AND MAINTENANCE AGREEMENT FOR WETLAND MAINTENANCE PROCEDURES. -------- / i STA 10+86.27 8. THE WETLAND SHALL BE STABILIZED WITHIN 14 DAYS OF CONSTRUCTION. / 0 9. CATTAILS ARE NOT PERMITTED TO BE PLANTED IN OR NEAR THE WETLAND. Alignment - (Wet Pond Outlet) PROPOSED HEADWALL OUTLET ,' 10. THE WETLAND AREA SHALL BE FULLY CLEANED OUT OF ANY SEDIMENT PRIOR TO FINAL CONSTRUCTION AND PLANTING OF THE WETLAND. NIV.IN: 02330.00 _ ^ j /� �> 1 w 11. THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL OPERATION AND MAINTENANCE OF THE WETLAND --- /- \ / = STORMWATER CONTROL MEASURE (SCM). z 12. DURING MAINTENANCE OPERATIONS, THE WETLAND SHALL BE PUMPED AS NECESSARY FOR SEDIMENT REMOVAL. - --_ _----- _ _ - - I ( �- �� \ - �� 1 + z CONSTRUCTED WETLAND (SCM) SCHEDULE SURFACE SURFACE SURFACE SURFACE SURFACE WETLAND SURFACE DRAINAGE VOLUME AREA AREA AREA AREA AREA AREA DRAWDOWN - Uj SCM AREA PROVIDED PROVIDED FOREBAY DEEP POOLS SHALLOW WATER PERMANENT POOL TEMPORARY POOL PIPE DIA. 20 0 10 20 40 PLAN 0 (ACRE) (CU.FT.) (SQ.FT.) (SQ.FT.) (SQ.FT.) (SQ.FT.) (SQ.FT.) (SQ.FT.) (INCH) Q = 1 4.77 10365 10203 1183 830 4368 6381 10203 1.5 U) GRAPHIC SCALE DIVISION VALUE = 20 FEET U_ w Q U) of w N H W U) z BOBBY N. SETZER SHEET o �N CARD '%, o� oFEssio4 ; STATE FISH HATCHERY RENOVATION AS NOTED 3 R 55 Broad Street _��� 9�a� O� SCO PROJECT # 19-20324-02A WETLAND PLAN AND DETAILS z Asheville, NC 28801 _ 344SEAE '11 J��y OFFICE MANAGER DESIGNER N 828.252.0575 ' , ° C= 1 40 °�,NGINEE�° NC WILDLIFE RESOURCES COIIIIMISSION M. CATHEY N. CROOM NC Firm License # C-0459 -,,F,y °°°°°°°°�F, .` 0 T. CAS 23 1 12/5/23 NS STORMWATER REVISIONS PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# mcgillassociates.com �l a 12I NO. DATE BY DESCRIPTION TRANSYLVANIA COUNTY, NORTH CAROLINA K. SEAMAN B. CATHEY OCTOBER 2023 19.00124 SCO #19-20324-02A