Loading...
HomeMy WebLinkAboutNC0003719_Compliance Schedule for 1,4-dioxane_20231213��a December 11, 2023 Dr. Sergei Chernikov Environmental Engineer III Industrial NPDES Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 Subject: NPDES Permit No. NC0003719 Compliance Schedule for 1,4-dioxane Dear Dr. Chernikov: I k @ P polyester NCDEQ/DWR/NPDES As part of renewing the NPDES permit for Alpek Polyester USA, LLC's Cedar Creek Site in Fayetteville, Cumberland County, North Carolina, NCDEQ is implementing a 1,4-dioxane limit of 2,112.1 µg/L in the permit. Alpek does not currently have the capability to meet the new limit. This limit will require a major capital investment. Alpek has developed a Rough Order of Magnitude (ROM) capital cost estimate of approximately $10 million. Bench scale treatability studies and pilot plant work need to be performed to evaluate the technologies. Two approaches are being considered: (1) ultra filtration, UV, and hydrogen peroxide or (2) ultra filtration, ozone, and hydrogen peroxide. Initial discussions with vendors for treatment of 1,4-dioxane raise concern about the ability to reduce the average level from 4,612.7 µg/L to the new permit limit of 2,112.1 µg/L for a wastewater treatment plant of this size. In addition, the engineering involved in this effort is extremely complex, very long lead times are required for equipment deliveries, and there is a limited number of companies that can provide this equipment. Alnek has developed the followine compliance schedule for inclusion in the permit. Description Months to Complete from the effective date of the permit Scheduled Completion Date Based on an assumed effective date of the permit of March 1, 2024 1. Treatability study and pilot plant work 18 September 1, 2025 2 Preliminary design engineering 18 March 1, 2027 3. NCDEQ review and environmental Permitting 12 March 1, 2028 4. Capital project approval full funding) 12 March 1, 2029 5. Detailed engineering 12 March 1, 2030 6. Equipment bidding/procurement 18 September 1 2031 7. Construction 24 September 1 2033 8. Start-up and optimization 6 March 1, 2034 If you have questions or need additional information, please contact Elizabeth Wike at (910) 512-4883 or ewike@alpekpolyester.com. Sincerely, Matthew P. Hendrickson Director, Cedar Creek Site Alpek Polyester USA, LLC • Cedar Creek Site 3216 Cedar Creek Rd. • Fayetteville, NC 28312 910-433-8200 . www.alpekpolyester.com