Loading...
HomeMy WebLinkAboutSW6230803_Response To Comments_20231211 4MCKIM&CREED ENGINEERS SURVEYORS PLANNERS December 11, 2023 M&C (04739-0014) Mr.Jim Farkas State Stormwater Engineer DEMLR Post-Construction Stormwater Program 512 N. Salisbury Street, Office 640M Raleigh, NC 27604 RE: Request for Additional Information Stormwater Permit No.SW6230803 Dove Subdivision—North (Now Bloom Subdivision—North) Harnett County Below are our responses to the request stormwater review and request for information comments received on November 9th, 2023. The revised plans are included with this submittal for review. Please let us know if you have any questions. Comment Response Format Comment Response: 1. Please provide calculations showing the following: a. The stormwater outlets are stable in accordance with 15A NCAC 02H .1003(5). If the project does not require riprap outlet protection downstream of the stormwater outlets, please provide calculations showing that the outlets are stable as designed. Response: Riprap aprons have been added to discharge points. Calculations and details have been added to the plans. b. Design calculations for the proposed roadside ditches. Roadside ditches are vegetated conveyances and must be demonstrated to me requirements of 15A NCAC 02H .1003(c). Response: Additional ditches with calculations and details have been 1 730 Varsity Drive added. Please see sheet C12.2 for details,velocity calculations, and required stabilization. Suite 500 c. Please clarify the swale calculation. It is unclear what Manning's Raleigh, NC 27606 roughness coefficient was used to determine the velocities for the swales. In addition,the swale flow velocity during the design storm is not included in the calculations (it is noted that these velocities are included 919.233.8091 in the Supplement-EZ Form, but these velocities, as well as information on the swale geometry should be included in the calculations so that they Fax 919.233.8031 can be verified). w w w.me k i me reed.corn Response: Additional ditches have been added to the plans and calculations. The calculations now include the Manning's roughness coefficients and calculated velocities. 2. Please correct the following issue with the plan set: a. Please delineate the drainage area to the proposed swales/vegetated conveyances in the main set of plans. This item is required per 15A NCAC 02H .1042(2)(g)(iv) and Section VI, 80 of the Application. Please revise as needed. Response: Drainage area delineation lines for all permanent ditches have been added and called out on sheets C7.1—C7.2. 3. Please correct the following issues with the application: a. Section III, 1.b—Please provide the contact information (email address and phone number) for the applicant.This information is required per 15A NCAC 02H .1042(2)(a)(vii). Response: Additional contact information has been added. b. Section III, 2.b—Please provide the property owners (email address and phone number)for the applicant.This information is required per 15A NCAC 02H .1042(2)(a)(ix). Response: Additional contact information has been added. c. Section IV, 10— Please exclude the surface water area from the total and on-site drainage areas. For this project,these values will correspond to the value shown in Section IV, 7 of the Application. Please recalculate the percent impervious area. For this project, this value will correspond to the value in Section IV, 8 of the Application. Response: The surface water area has been subtracted from the total drainage area. The percent impervious has been recalculated. 4. Please correct the following issues with the Supplement-EZ Form: a. Cover Page: i. Line 2—Please exclude the surface water area from this item.This item should correspond to Section IV, 7 of the Application. Response: The surface water area has been subtracted from the total property area. b. Drainage Areas Page: i. Lines 5 & 6 — Please exclude the surface water area from these items. For this project, these items should correspond to Section IV, 7 of the Application. Response: The surface water area has been subtracted from the total drainage area. c. Low-Density Page: i. Please include the design information for the roadside ditches. Response: Design information for the roadside ditches has been added. 5. If you have not already done so, please reach out to Harnett County as this project is located within Harnett County's water supply watershed jurisdiction and requires their approval (in addition to being within the State's post-construction jurisdiction and requiring the State's approval). Response: Understood. v McKIM&CREED Please provide approval and/or additional comments. If you have any questions, please do not hesitate to contact me, at 919-233-8091 or at afreeman@mckimcreed.com. Sincerely, McKIM &CREED, INC dif\C-N41- Adam E. Freeman, PE Senior Project Engineer McKIM&CREED