HomeMy WebLinkAboutSW4230801_Stormwater Narrative_20231208 ACC PUBLIC SAFETY TRAINING CENTER
STORMWATER IMPACT ANALYSIS STATEMENT
• � 'i ter'. � I + ,''��" • ll' .�- -�..•. �`r
r
1
x.
F ,11*77
DECEMBER 8, 2023
PREPARED BY: = z a SEA y s
Garrett Frank, PE, PLA = 5 80
5410 Trinity Road, Suite 102
�• s
Raleigh, North Carolina 27607
919.866.4503 phone
919.859.5663 fax
Garrett.Fran k(aD-timmons.com .••S`sue
www.timmons.com
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
ACC Public Safety Training Center
Burlington, NC
Project Number:49685
Table of Contents
Section 1: Site Analysis and Narrative
Existing and Proposed Conditions
Pertinent Onsite and Offsite Drainage Conditions
Anticipated Stormwater Impacts & Design Criteria
Soils Series and Flood Hazard Areas
Proposed Stormwater Management Practices
Calculation Method
Summary of Results
Pre/Post Summary Tables
Section 2: Environmental Maps
Soil Map
FEMA Map
USGS Quad Map
Section 3: Stormwater Calculations
Wet Pond Sizing Calculations
Pre/Post Drainage Area Calculations
HGL Calculations
Rip Rap Outlet Protection Design
Section 4: Stormwater Compliance Maps
Pre/Post Stormwater Maps
ACC Public Safety Training Center
Burlington, NC
Project Number: 49685
Section 1 : Site Analysis and Narrative
Existing and Proposed Conditions
The existing site is undeveloped and previously used for mining. The proposed development will include an
administration/classroom building, 400'x400' asphalt driving pad, pavilion, and training tower. The site work will
include asphalt paving, concrete paving, grading, erosion control, and utility work. The overall site is
approximately 57.49 acres. The total lease agreement is for 90.43 acres. The proposed increase in impervious
area for the project site is 8.00 acres.
Pertinent Onsite and Offsite Drainage Conditions
The site is undeveloped with vegetation and trees. The site and surrounding areas drain to Boyd's Creek to the
west of the site.
Anticipated Stormwater Impacts & Design Criteria
The additional impervious will require a stormwater control measure to peak flow control caused by the
increase in impervious area. This project will provide a wet pond SCM located west of the driving pad. The wet
pond is sized to treat the proposed additional impervious area as well as the indoor shooting range alternate.
Soils Series and Flood Hazard Areas
The site is located in the Cape Fear River Basin. Soils on the site are mostly Udorthents and Vance Sandy
Loam. hydrologic soil group C, based upon the Alamance County Soils Survey. A review of Flood Hazard
Areas based on the published maps and the NC Flood plain Mapping Information System indicate that there
are no flood zones on site.
Proposed Stormwater Management Practices
There will be a proposed wet pond which will accept flow from the proposed administrative/classroom building,
asphalt driving pad, the future indoor shooting range, and parking lots.
Calculation Method
The Discrete NRCS Curve Number Method was used to calculate pre and post development flows and perform
routing. The rainfall frequency data was collected from NOAA Atlas 14. The Rational Method was used to
calculate the hydraulic grade lines in the storm network to confirm the pipes can meet capacity.
Summary of Results
Site Nitrogen and Phosphorus Loading Requirements:
The site lies within the Boyds Creek watershed which is located within the Jordan Reservoir Watershed. The
nitrogen and phosphorus must be calculated per the state procedures and approved by the stormwater
reviewer. This export will be calculated in pounds per acre per year (lb/ac/yr). Any activity in the Jordan
delivery zone 030050 shall not exceed 1.43 Ib/ac/yr for nitrogen and phosphorus. After stormwater treatment
on site, the total nitrogen load is 3.42 Ib/ac/yr and the total phosphorus load is 0.57 Ib/ac/yr. There is no
nutrient buydown required to meet the nitrogen and phosphorus loading requirements. The total loading was
calculated for the current project area and the future ACC project area (total leased area) of 90.43 acres.
.Gee
www.timmons.com
TIMMONS GROUP
Yl U_.I I]I VA N A_I I IL'I L V 1-1-U---
ACC Public Safety Training Center
Burlington, NC
Project Number: 49685
Pre/Post:
The wet pond will capture and treat approximately 21.24 acres, of which approximately 8.29 acres is
impervious. The wet pond will reduce flow downstream which would otherwise be increased from the added
impervious. There are three analysis points located on-site where the proposed storm network daylights into
the existing ditches and Boyd's Creek. Drainage area 1 contains the wet pond and will reduce runoff to below
pre-development levels for the 1, 2, and 10 year storm events by treating upstream runoff from the proposed
development. Drainage areas 2 and 3 will reduce runoff to below the pre-development levels for the 1, 2, and
10- year storm events by directing flow to drainage area 1. See the table below for pre-development and post-
development conditions for analysis point 1, 2 and 3.
www.timmons.com
TIMMONS GROUP
ACC Public Safety Training Center
Burlington, NC
Project Number:49685
Section 1 : Site Analysis and Narrative
Pre/Post Summary Tables
Site Anal is Point 1
Site Condition 1 Year cfs 2 Year cfs 10 Year cfs
Pre-Development 10.96 17.02 34.63
Post-Development 8.23 12.87 23.20
Site Anal is Point 2
Site Condition 1 Year cfs 2 Year cfs 10 Year cfs
Pre-Development 3.520 5.278 10.36
Post-Development 1.732 2.628 5.193
Site Anal is Point 3
Site Condition 1 Year cfs 2 Year cfs 10 Year cfs
Pre-Development 15.66 24.17 48.79
Post-Development 14.62 22.18 43.86
www.timmons.com
TIMMONS GROUP
YOUR VISION AC-LVfD TIROUGN OURS.
ACC Public Safety Training Center
Burlington, NC
Project Number:49685
Section 2: Environmental Maps
Soil Map
www.timmons.com
TIMMONS GROUP
YOUR VISION AC-LVfD TIROUGN OURS.