HomeMy WebLinkAboutBZ2 Pipe RemovalCarpenter, Kristi
From: Pettus, Martin
Sent: Friday, November 17, 2023 12:45 PM
To: Hayes, Meredith D; Walkes, Larry K; Griffin, Christopher J
Cc: Parker, Jerry A; dmoore@rkk.com; Conchilla, Ryan; Young, Joshua M
Subject: BZ2 Pipe Removal
Nathan,
As discussed previously, the extension of the pipe into BZ2 goes beyond the permitted impacts of the project. Once the
pipe is removed, please stabilize the area with coir fiber matting and native seed. Please send us photos of the
completed work.
Thanks,
Martin Pettus Jr.
Field Operations Staff Engineer Div 7 & 8
NCDOT Roadside Environmental Unit
919 579 5256 office
336 340 7091 cell
mpettus ncdot.gov
P.O. Box 429
1530 South 7th Street
Sanford, NC 27330
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.