Loading...
HomeMy WebLinkAboutBZ2 Pipe RemovalCarpenter, Kristi From: Pettus, Martin Sent: Friday, November 17, 2023 12:45 PM To: Hayes, Meredith D; Walkes, Larry K; Griffin, Christopher J Cc: Parker, Jerry A; dmoore@rkk.com; Conchilla, Ryan; Young, Joshua M Subject: BZ2 Pipe Removal Nathan, As discussed previously, the extension of the pipe into BZ2 goes beyond the permitted impacts of the project. Once the pipe is removed, please stabilize the area with coir fiber matting and native seed. Please send us photos of the completed work. Thanks, Martin Pettus Jr. Field Operations Staff Engineer Div 7 & 8 NCDOT Roadside Environmental Unit 919 579 5256 office 336 340 7091 cell mpettus ncdot.gov P.O. Box 429 1530 South 7th Street Sanford, NC 27330 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.