Loading...
HomeMy WebLinkAbout20231512 Ver 1_USACE Correspondence_20231206From: Moose, David E CIV (USA) To: Snider, Hollev Subject: [External] FW: Royal Farms-Shallotte (SAW-2023-01044) - PCN/Supporting Documentation Date: Wednesday, December 6, 2023 9:17:38 AM Attachments: imaae001.)na CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. See below David Moose Regulatory Specialist US Army Corps of Engineers 69 Darlington Ave Wilmington, NC 28403 (910) 251-4810 David.e.moose (Dusace.army.mil E-PCN-Submittal httDs://edocs.dea.nc.Rov/Forms/Pre-Construction Notification Form PJDs, Wetland Delineation Concurrence & JD's. http://saw-reg.usace.arm)i.mil/JD/FINALSAW-JD-REQUEST-FORM-20170508.pdf Submittal You may submit requests via e-mail in PDF format to WilmingtonNCREG(@usace.army.mil Automated Data sheets for Atlantic & Gulf Coastal Plain Data Form Version 2.0 https://usace.contentdm.ocic.org/utils/getfile/collection/pl602lco119/id/2566 The Wilmington District is committed to providing the highest level of support to the public. From: Moose, David E CIV (USA) Sent: Thursday, November 16, 2023 12:27 PM To: Timothy P O'Halloran, PWS <TOHalloran@ecslimited.com> Cc: austin.tinsley@latpurser.com; Brandon Fulton, LSS, PSC, PWS <BFulton@ecslimited.com>; Snider, Holley <holley.snider@deq.nc.gov> Subject: RE: Royal Farms-Shallotte (SAW-2023-01044) - PCN/Supporting Documentation Good Morning This email is a follow to the conversation that we had this morning. A site visit is scheduled for December 5th at 9:00 AM. 1. This application is considered incomplete as it does not satisfy general condition 32 (4),(5) and regional condition(a) of the NWP 39. All the wetlands and all impacts are not shown and/or accounted for. There appears to be an impact for a stormwater pond in a wetland. 2. 1 have attached the NCDOT JD and the calls from DWR for the NCDOT project R-5857. These show that the feature on site is a stream and that there is another wetland located between the highway and the access rd. (This wetland [WM 0.1 Acres] has not been accounted for in the impacts for this site nor is it shown on the plans). I have concerns about this wetlands being cut off from downstream waters. 3. The impact to the stream has not been accounted for in the PCN and is shown as a ditch impact of 0.015 acres on the plans. The impact area differs from the topo elevations shown and acreage may need to be revisited. It appears that this impact could potentially exceed the threshold for mitigation and will have to be mitigated for. The mitigation ratio for this impact will depend on the determination of the quality of this stream during the site visit. 4. Currently there is a proposed 72" pipe coming into the stream that looks to be about 3 ft wide and is not aligned with channel downstream. This does not meet the not meet condition 9 of the NWP. I would like to see detailed drawing of this area where the pipe discharges and if there is going to be any riprap. Please provide me with cross sections and profile view of this area and detailed information how this is going to be stabilized. These impacts will need to be accounted for. 5. The wetland that is in the southeast corner of the project is not accounted for in the impacts. NWP 39 does not authorize the discharge in wetlands for stormwater management facilities. 6. There are also concerns on how this project lines up and conflicts with the NCDOT project and their proposed pipes. 7. There is a potential that an additional wetland may be found on the site visit. On 11/15/2023 1 walked on the site to look at the stream briefly and noticed an area that potential was missed under the original delineation. This will be determined on the upcoming schedule site visit. 8. With these additional impacts included the total number could result in more that 0.5 acres of impacts which would push this project into an Individual Permit. The time frame of which ranges from 4-6 months to complete. At this time, I advise that we withdraw this application till some of these concerns can be delt with and the JD be finalized. I you have any questions please let me know. Thank you. David Moose Regulatory Specialist US Army Corps of Engineers 69 Darlington Ave Wilmington, NC 28403 (910) 251-4810 David.e.moose(@usace.arm)t.miI E-PCN-Submittal https://edocs.deq.nc.gov/Forms/Pre-Construction_ Notification —Form PJDs, Wetland Delineation Concurrence & JD's. http://saw-reg.usace.army.mil/JD/FINALSAW-JD-REQUEST-FORM-20170508.pdf Submittal You may submit requests via e-mail in PDF format to WilmingtonNCREG(@usace.army.mil Automated Data sheets for Atlantic & Gulf Coastal Plain Data Form Version 2.0 https://usace.contentdm.ocic.org/utiIs/getfile/colIection/p16021col19/id/2566 The Wilmington District is committed to providing the highest level of support to the public. From: Timothy P O'Halloran, PWS <TOHalloran(@ecslimited.com> Sent: Tuesday, November 7, 2023 11:52 AM To: Moose, David E CIV (USA) <David.E.Moose(@usace.army.mil> Cc: austin.tinsley(@latpurser.com; Brandon Fulton, LSS, PSC, PWS <BFulton(@ecslimited.com> Subject: [Non-DoD Source] Royal Farms-Shallotte (SAW-2023-01044) - PCN/Supporting Documentation Hey David, Thanks for taking my call today. The linked folder below contains the following: 1. PCN submittal — includes details about the NCDOT work under Project Description. 2. Supporting documentation attachments (Revised PJD, original PJD from May 2023, NCWAM form, Wetland Data Forms, Impact Exhibits, letter to USFWS, letter to SHPO 3. SHPO concurrence letter (received yesterday after the PCN was submitted) 4. Digital Elevation Model Mapping— looks like that wetland shown on topo across Ocean Hwy W has been ditched significantly. 5. Impact Exhibits — showing the jurisdictional ditch being piped so that it doesn't potentially disconnect upstream aquatic resources. Also shows the proposed location of the DOT culvert from TIP Project R-5837. M Roval Farms Shallotte TIMOTHY P O'HALLORAN, PWS I Environmental Project Manager ECS SOUTHEAST, LLP T 704.525.5152 C 980.920.9615 1812 Center Park Drive, Suite D, Charlotte, NC 28217 TOHalloran(@ecslimited.com I www.ecslimited.com CELEBRATING 35 YEARS - Check out our video by clicking here. Instagram I Linkedln I Facebook I Twitter Confidential/proprietary message/attachments. Delete message/attachments if not intended recipient