HomeMy WebLinkAboutSW3221202_Email_20230404 Peck, Kaitlin From:Farkas, Jim J Sent:Tuesday, April 4, 2023 2:35 PM To:kayle.schmidt@eagleonline.net Cc:'Jeremy Roberts'; 'Matt Kirchner'; 'Lauren Thomas'; Eagle PC's; 'Steven Prophet' Subject:RE: Automatic reply: \[External\] SW3221202 - 7162 - Piper Meadows - State Stormwater Follow Up Depending on the nature of the comments, yes, the re-review can take up to 90 calendar days (The quick review queue is for projects with minor/administrative comments that don’t require a full re-review of the design, but it hasn’t been all that much quicker recently). With the new reviewer starting tomorrow, the review times should come down quite a bit (about 2 years ago when we were fully staffed, a typical “standard” review would take about 30 calendar days and a quick review would take about a week so that is what we are shooting for). Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: kayle.schmidt@eagleonline.net <kayle.schmidt@eagleonline.net> Sent: Tuesday, April 4, 2023 2:26 PM To: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Cc: 'Jeremy Roberts' <jroberts@eagleonline.net>; 'Matt Kirchner' <MKirchner@eagleonline.net>; 'Lauren Thomas' <lauren.thomas@eagleonline.net>; Eagle PC's <pc@eagleonline.net>; 'Steven Prophet' <steven.prophet@eagleonline.net> Subject: RE: Automatic reply: \[External\] SW3221202 - 7162 - Piper Meadows - State Stormwater Follow Up CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Jim, Quick question, is it still a 90 day review cycle for a resubmittal of a project? Thank you, Kayle Schmidt Eagle Engineering, Inc. 1 Civil Project Coordinator | Civil Division (704) 288-5695 - Direct (704) 882-4222 - Office kayle.schmidt@eagleonline.net 2013 Van Buren Avenue, Suite A Indian Trail, NC 28079 www.eagleonline.net Any attached files are for information use only. Eagle Engineering, Inc. (EEI) assumes no responsibility for the accuracy or the validity of any electronic data. All construction should follow signed and sealed construction documents. The content of this email is the confidential property of EEI and should not be copied, modified, retransmitted, or used for any purpose except with EEI's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately. From: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Sent: Friday, March 31, 2023 9:07 AM To: kayle.schmidt@eagleonline.net Subject: Automatic reply: \[External\] SW3221202 - 7162 - Piper Meadows - State Stormwater Follow Up \[This is an auto-generated reply and is not in reference to your specific email. If this auto-generated message is not applicable to you, please ignore it and I will try to respond to your email in a timely manner (if needed). If you are expecting a response from me and I haven't responded to your email within one week, please email me again as I may have forgot to respond to your email.\] NOTE: Questions can now also be directed to Mike Laywer, the new supervisor of the stormwater group. At this time, we are not processing new Standard Applications. Until further notice, we will acknowledge the receipt of any Standard Applications and hold onto them until we resume processing them or until 90 days after having received the application has elapsed, whichever comes first. Fast-Track Applications are still being processed and any Standard Application not processed within 90 days of us receiving it will be deemed approved (in accordance with 15A NCAC 02H .1042(3)(c)). The typical review time is approximatley 90 calendar days for a project at the end of the Standard Review Queue, approximatley 15-30 calendar days for a project at the end of the Fast-Track Review Queue, and whenever my schedule allows (but not to exceed the typical review time) for a project at the end of the Quick Review Queue. These are currently the project review queues and should give you a rough estimate of when your project will be reviewed (occasionally, a project that is lower in the review queue will get reviewed prior to a project that is higher in the review queue, this is because different projects require different amounts of review time and I am trying to maximize the number of projects that I review in my working hours). Dates indicate review/resubmission deadlines: Standard Project Review Queue:  SW6221203 - Briarwood Park  SW6230101 - Kingsbury Ridge (4/10/23)  SW3220803 - Cresswind - Phase 4 (4/10/23)  SW6230104 - Dunn, NC - Petco (4/13/23)  SW6230102 - Tranquil Meadows - Phase 1 (4/17/23)  SW3221003 - Rockwell ABC (4/19/23)  SW3220804 - Midland Crossing (4/23/23)  SW6230103 - Carter Farms Subdivision - Phase 1 (4/24/23)  SW3220805 - Village at Granite Quarry, Phase III (4/25/23)  SW4230101 - E M Holt Elementary (4/27/23)  SW6221007 - Spout Springs Self Storage & Warehouse (4/30/23)  SW6110103 - JSOC Microgrid (4/30/23)  SW3220702 - Preserve at Forest Creek - Phase 2 (5/1/23)  SW5221001 - Umstead State Park Campground Improvements (5/2/23) 2  SW3221007 - Dollar General - Store #24556 (5/7/23)  SW3221005 - Boulder Run (5/11/23)  SW3221008 - The Estates of Marvin Branch (5/11/23)  SW6221006 - Distribution Facility Expansion for CCBCC (5/16/23)  SW3221001 - Brighton Park Subdivision (5/17/23)  SW3220306 - Preserve at Forest Creek - Phase 1 (5/18/23)  SW1221002 - Asheville Airport Terminal Mod. & Expansion (5/22/23)  SW3230302 - Davis Village (5/30/23)  SW4210601 - Wynnfall (6/6/23)  SW3230301 - Kerns Ridge (6/6/23)  SW1221003 - Mills River Townhomes (6/14/23)  SW3221202 - Piper Meadows (6/15/23)  SW3220701 - Old Town Village (6/21/23) Fast-Track Project Review Queue:  SWA000192 - Woodbridge South (4/13/23)  SWA000193 - Griffin Real Estate LLC Outdoor Storage Project (4/13/23)  SWA000194 - Gretchen Pines Subdivision Phase 4 (4/13/23)  SWA000195 - Legacy at Mills River - Phase 1 (4/19/23) Quick Review Queue:  SW1220801 - Sparks Drive  SW6220802 - Champs  SW6140302 - West Hampton Phase II Subdivision (Renewal)  SW6221102 - Ashley Heights  SW3221004 - Mount Pleasant H.S. Synthetic Turf Field Project  SW6200404 - SOF GSB TEMF - PN79453  SW1210503 - Hot Springs Microgrid (Transfer)  SW4221001 - Fieldcrest Subdivision  SW6220202 - Messer Parcel  SW6221001 - Macridge and Chicken Road Improvements  SW3190702 - Weddington Point Projects I’m waiting on info for:  SW3210301 - Cresswind - Phases 2 and 3 (Minor Modification)  SW3220801 - Stonebow  SW3221006 - Cottages at Wingate - Phases 1 & 2  SW3221101 - Parkwood Electrical Substation  SW4220503 - Cane Creek - Phase 8  SW4221202 - Dollar General - Lexington  SW5220801 - Dollar General - Chapel Hill  SW5221102 - Bryson's Ridge Subdivision - Phase 2  SW6201005 - Woodlake II - Phase I Subdivision (Minor Modification)  SW6210905 - Champion Court  SW6220505 - Shahbain Reserve  SW6220902 - Wood Lake II - Phase II  SW6221003 - Carolina Wildlife Conservation Parking Lot  SW6221101 - Ft. Bragg, North Carolina Technical Support Annex  SW6221201 - Ample Storage - Erwin  SW6221202 - HIES - Eastover 3  SWA000183 - Raeford Commons Phase II  SWA000187 - Circle K HSD Steadman  SWA000190 - Fairview Fire and Rescue -Jim 4