Loading...
HomeMy WebLinkAbout20231409 Ver 1_Approval Letter_20231211 (4)Baker, Caroline D From: Walter Cole <WCole@smeinc.com> Sent: Wednesday, October 18, 2023 8:39 AM To: Hopper, Christopher D CIV USARMY CESAW (USA); Thomas, Zachary T Cc: Martin, Matthew K CIV (USA) Subject: [External] Re: SAW-2023-01042 / Old Fairground Road Subdivision / Angier / Johnston County, NC - REQUEST FOR ADDITIONAL INFORMATION CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Got it, will get this information to you ASAP, thanks for the review. Get Outlook for iOS From: Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil> Sent: Wednesday, October 18, 2023 8:35:50 AM To: Walter Cole <WCole@smeinc.com>; Thomas, Zachary T <zachary.thomas@deq.nc.gov> Cc: Martin, Matthew K CIV (USA) <Matthew.K.Marti n@usace.army.mil> Subject: RE: SAW-2023-01042 / Old Fairground Road Subdivision / Angier / Johnston County, NC - REQUEST FOR ADDITIONAL INFORMATION Apologies Walter — Question 2 should read, "... document less than 0.1 acre of wetland ...". Christopher. D. Hopper TREC Team Lead / Wilmington District Liaison US Army Corps of Engineers Savannah District 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 588-9153 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web browser: https://re_ uq latory.ops.usace.army.mil/customer-service-surveY1. Thank you for taking the time to visit this site and complete the survey. 1 From: Hopper, Christopher D CIV USARMY CESAW (USA) Sent: Wednesday, October 18, 2023 8:24 AM To: Walter Cole <WCole@smeinc.com>; Thomas, Zachary T <zachary.thomas@deq.nc.gov> Cc: Martin, Matthew K CIV (USA)<Matthew.K.Martin@usace.army.mil> Subject: SAW-2023-01042 / Old Fairground Road Subdivision / Angier / Johnston County, NC - REQUEST FOR ADDITIONAL INFORMATION Good morning, Mr. Cole: This email is in reference to the Pre -construction notification (PCN) for the proposed Old Fairground Road Subdivision Project (SAW-2023-01042), received on October 13, 2023. The following information is required to complete our evaluation, confirm compliance with one or more General or Regional Conditions, and/or complete consultation with another federal/state agency to verify the use of the Nationwide Permit (NWP): The applicant for a permit verification would become the permittee, and be responsible for compliance with all regional, general, and special conditions throughout construction. Consultants are rarely, if ever, the applicant. Please confirm. 2. Road slopes appear to be close to 1:1, and permanent wetland impacts requested are one -thousandth of an acre from mitigation thresholds. Were steeper fill slopes, retaining walls, or other measures to minimize the unavoidable loss considered? Please provide additional justification for the area of loss required. Note that as -built surveys may be required to document less than 0.01 acre of wetland was lost. 3. The PCN states that county water would be provided to each of the proposed lots, but no water lines are shown on the attached plans. Please provide the proposed alignments for water infrastructure. 4. The PCN states that individual sewer systems would be utilized to serve each residence. Would any septic or repair area access across wetlands be required? No layouts for septic and service lines were provided. 5. The PCN states that two Stormwater BMPs would be constructed to treat stormwater resulting from the project, but none are shown on the attached plans. Please provide the location of each, as well as their proposed discharge points. 6. Please include a project layout that includes building and septic layouts. A Licensed Soil Surveyor report, if available, would be helpful in our review of potential future sewer related impacts. Note — this doesn't need to be construction level design, but rather to illustrate buildout is possible without additional impact. It is much simpler to cover these impacts now that to wait for individual landowners to request permit modifications. 7. The stream impact profile view appears to show a steep head cut about 20-feet upstream of the proposed culvert. Please provide additional detail about this feature, its likelihood of accelerated erosion once the new culvert is installed, and weather abatement measures are warranted. The stream channel below the proposed crossing appears to include significant meanders. What considerations for protecting these reaches of stream were made? Would shifting the road crossing either up- or down -stream reduce impacts while still enabling reasonable use of the land? 9. The PCN states that the entire tract was logged in 2021. We are unable to locate aerial photographs to document this for our USFWS consultation. Please provide photographs of the site's current condition to facilitate their review. Please provide the requested information within 30 days, or your application will be administratively withdrawn. To clarify, if the requested information is submitted after the 30-day timeframe, you will not be required to re -submit an entirely new PCN (unless otherwise specified). We will continue to review and/or process your permit application upon receipt of the requested information. Please contact me with any questions or concerns. Best Regards, Christopher. D. Hopper TREC Team Lead / Wilmington District Liaison US Army Corps of Engineers Savannah District 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 588-9153 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web browser: https:Hregulatory.ops.usace.army.mil/customer-service-survey[. Thank you for taking the time to visit this site and complete the survey.