Loading...
HomeMy WebLinkAbout010002_Compliance Evaluation Inspection_20231211 Division of Water Resources Facility Number 5` - O Division of Soil and Water Conservation O Other Agency Type of Visit: ®Compliance Inspection 0 Operation Review O Structure Evaluation p Technical Assistance Reason for Visit: ®Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access u Date of Visit: Arrival Time Departure Time: County: Region\ Farm Name:Recm (* L�rg G Owner Email: Owner Name: c 1' t' Phone: Mailing Address Physical Address: 11 ­V-) 4 (r±Xy_ ��,i V ax o►�ar+ n1t �1 �� Facility Contact: \ C(�x Title: Phone: '✓'3U-)_UO-4UL-A Onsite Representative: o'/ Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: .��e �b� 1 a Longitude: c61 w . Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer Dairy Cow Wean to Feeder r INon-Layer I Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder C7 Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes �No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes 0 No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes g No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes 'ice o ❑ NA ❑ NE of the State other than from a discharge? �� Page I of 3 511212020 Continued 11 KL ! Facility Number: - Date of inspection: \2 Waste Collection&Treatment 4.Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes No ❑ NA ❑ NE a.If yes,is waste level into the structural freeboard? ❑ Yes v❑�No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): Observed Freeboard(in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes j4No ❑ NA ❑ NE (i.e.,large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes JRTNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes �Io ❑ NA ❑ NE 8.Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ No jtgNA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9.Does any part of the waste management system other than the waste structures require ❑ Yes -g"No ❑ NA ❑ NE maintenance or improvement? Waste Application 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application?If yes,check the appropriate box below. [:] Yes ❑ No �NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ���� ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12.Crop Type(s): X)n 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No �NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes_'E�,No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes-KNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes XNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ;2j,'No ❑ NA ❑ NE Required Records&Documents 19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes $ZQNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes jKNo ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? Yes J; No ❑ NA ❑ NE ❑ ❑Weekly�reebea�- ❑VVasto Analysis ❑ of na ysis ❑ �� ❑W,-f- 2 -OZainfall Stocking ❑Grop-Yivt&- ❑120 klinnte4n9pootioas `Monthly and V Rainfall Inspections ❑Sludge-Saraeq- 22.Did the facility fail to install and maintain a rain gauge? ✓ ❑ Yes ONo ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [:] No 15;ZfNA ❑ NE Page 2 of 3 511212020 Continued Facility Number: Date of inspection: 2 5�i 71 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes ❑ No 5NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon _ List structure(s)and date of first survey indicating non-compliance: 26.Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ No jj�(NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes 15 'r o ❑ NA ❑ NE Other Issues 28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes VNo ❑ NA ❑ NE and report mortality rates that were higher than normal? �OXOd k\ 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes -No ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) /< 31.Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes ❑ No �NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 9 No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes 'allo ❑ NA ❑ NE 34.Does the facility require a follow-up visit by the same agency? ❑ Yes Q No ❑ NA ❑ NE Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments. U rawings of facility to better explain situations(use additional pages as necessary). Cc�\►bY��icr� cue aur4� Term►� Reviewer/Inspector Name: Phone: �,�""1�]U Reviewer/Inspector Signature: Date: Page 3 of 3 21412015