Loading...
HomeMy WebLinkAbout20190157 Ver 1_Perry Hill_100093_MY3_2023_20231208 MONITORING YEAR 3 ANNUAL REPORT FINAL December 2023 PERRY HILL MITIGATION SITE Orange County, NC Neuse River Basin HUC 03020201 DMS Project No. 100093 DMS Contract No. 7744 DMS RFP No. 16-007576 USACE Action ID No. 2019-00125 DWR Project No. 2019-0157 v1 Data Collection Period: January - October 2023 PREPARED FOR: NC Department of Environmental Quality Division of Mitigation Services 1652 Mail Service Center Raleigh, NC 27699-1652 PREPARED BY: 312 West Millbrook Road, Suite 225 Raleigh, NC 27609 Jason Lorch jlorch@wildlandseng.com Phone: 919.851.9986 Perry Hill Mitigation Site Monitoring Year 3 Annual Report - FINAL i PERRY HILL MITIGATION SITE Monitoring Year 3 Annual Report TABLE OF CONTENTS Section 1: PROJECT OVERVIEW .......................................................................................................1-1 1.1 Project Quantities and Credits ................................................................................................... 1-1 1.2 Project Goals and Objectives ..................................................................................................... 1-2 1.3 Project Attributes ....................................................................................................................... 1-4 Section 2: MONITORING YEAR 3 DATA ASSESSMENT .......................................................................2-1 2.1 Vegetative Assessment .............................................................................................................. 2-1 2.2 Vegetation Areas of Concern and Management ....................................................................... 2-1 2.3 Stream Assessment .................................................................................................................... 2-2 2.4 Stream Areas of Concern and Management.............................................................................. 2-2 2.5 Hydrology Assessment ............................................................................................................... 2-2 2.6 Monitoring Year 3 Summary ...................................................................................................... 2-2 Section 3: REFERENCES ...................................................................................................................3-1 TABLES Table 1: Project Quantities and Credits ..................................................................................................... 1-1 Table 2: Goals, Performance Criteria, and Functional Improvements ...................................................... 1-3 Table 3: Project Attributes ......................................................................................................................... 1-5 Figures Figures 1-1b Current Condition Plan View APPENDICES Appendix A Visual Assessment Data Table 4 Visual Stream Morphology Stability Assessment Table Table 5 Vegetation Condition Assessment Table Stream Photographs Culvert Crossing Photographs Vegetation Plot Photographs Appendix B Vegetation Plot Data Table 6 Vegetation Plot Data Table 7 Vegetation Performance Standards Summary Table Appendix C Stream Geomorphology Data Cross-Section Plots Table 8 Baseline Stream Data Summary Table 9 Cross-Section Morphology Monitoring Summary Appendix D Hydrology Data Table 10 Bankfull Events Table 11 Rainfall Summary Recorded Bankfull Events Plots Perry Hill Mitigation Site Monitoring Year 3 Annual Report - FINAL ii Table 12 Recorded In-Stream Flow Events Summary Recorded In-Stream Flow Events Plots Appendix E Project Timeline and Contact Info Table 13 Project Activity and Reporting History Table 14 Project Contact Table Perry Hill Mitigation Site Monitoring Year 3 Annual Report - FINAL 1-1 Section 1: PROJECT OVERVIEW The Perry Hill Mitigation Site (Site) is located in Orange County, approximately three miles northwest of Hillsborough, NC. The Site drains to Corporation Lake on the Eno River, which then flows to Falls Lake. Corporation Lake is a water supply reservoir on the Eno River, which is classified as Water Supply Waters (WS-II) and Nutrient Sensitive Waters (NSW). Falls Lake is classified as Water Supply Waters (WS-IV), as well as Nutrient Sensitive Waters (NSW). Table 3 presents information related to the project attributes. 1.1 Project Quantities and Credits The Site is located on one parcel and a conservation easement was recorded on 26.88 acres. Mitigation work within the Site included restoration and enhancement I and II of perennial and intermittent stream channels (Figures 1-1b). Approximately 20 feet (or a total of 0.19 acres) was added alongside both internal crossings as a maintenance area in Monitoring Year 2. No credit is claimed in the maintenance area and project credits were reduced accordingly. The credits associated with the stretch of inadequate stream flow on UT1 Reach 1 have been put “at-risk” and are listed in red, for more information refer to Sections 2.4 and 2.5. Table 1 below shows updated stream credits by reach and the total amount of stream credits expected at closeout. Table 1: Project Quantities and Credits PROJECT MITIGATION QUANTITIES Project Segment Mitigation Plan Footage As-Built Footage Mitigation Category Restoration Level Mitigation Ratio (X:1) Credits Comments Stream Perry Branch Reach 1 321 323 Warm R 1.0 321.000 Full Channel Restoration, Planted Buffer, Livestock Exclusion Perry Branch Reach 2 344 342 Warm EII 3.5 98.286 Grade Control Structures, Invasive Control, Planted Buffer, Livestock Exclusion 20 20 N/A N/A 0.0 N/A Maintenance Area 60 60 N/A N/A 0.0 N/A Culvert Crossing Perry Branch Reach 3 691 694 Warm R 1.0 691.000 Full Channel Restoration, Planted Buffer, Livestock Exclusion Perry Branch Reach 4 634 642 Warm R 1.0 634.000 Full Channel Restoration, Planted Buffer, Livestock Exclusion 20 20 N/A N/A 0.0 N/A Maintenance Area 60 60 N/A N/A 0.0 N/A Culvert Crossing 1,284 1,297 Warm R 1.0 1,284.000 Full Channel Restoration, Planted Buffer, Livestock Exclusion Perry Hill Mitigation Site Monitoring Year 3 Annual Report - FINAL 1-2 PROJECT MITIGATION QUANTITIES Project Segment Mitigation Plan Footage As-Built Footage Mitigation Category Restoration Level Mitigation Ratio (X:1) Credits Comments Stream UT1 Reach 1 222 222 Warm R 1.5 148.000 Full Channel Restoration, Planted Buffer, Livestock Exclusion 63 63 Warm R 1.5 42.000 Full Channel Restoration, Planted Buffer, Livestock Exclusion UT1 Reach 2 291 293 Warm R 1.5 194.000 Full Channel Restoration, Planted Buffer, Livestock Exclusion UT2 Reach 1 221 223 Warm EII 2.5 88.400 Bank Stabilization, Planted Buffer, Livestock Exclusion UT2 Reach 2 947 941 Warm EI 2.5 378.800 Grade Control Structures, Bank Stabilization, Planted Buffer, Livestock Exclusion UT3 343 319 Warm EII 2.5 137.200 Grade Control Structures, Bank Stabilization, Planted Buffer, Livestock Exclusion Total: 4,016.686 *Credits updated in Monitoring Year 2 to reflect the addition of the maintenance areas and resulting reduction in credits. Twenty LF of stream fall within each of the maintenance areas, reducing credits on Perry Branch Reach 2 by 5.714 credits and Perry Branch Reach 4 by 20 credits. Blue = Restoration Restoration Credits at Risk Yellow = Enhancement I Orange = Enhancement II 1.2 Project Goals and Objectives The project is intended to provide numerous ecological benefits. Table 2 below describes the project goals and objectives along with the expected outcomes to water quality and ecological processes. Additionally, performance criteria for project objectives and a summary of the related monitoring data results for Monitoring Year 3 (MY3) are included. Restoration Level Stream Warm Cool Cold Restoration 3,166.000 Restoration at Risk 148.000 Enhancement I 378.800 Enhancement II 323.886 Preservation -- Totals 4,016.686 Total Stream Credit 4,016.686 Perry Hill Mitigation Site Monitoring Year 3 Annual Report - FINAL 1-3 Table 2: Goals, Performance Criteria, and Functional Improvements Goal Objective/ Treatment Likely Functional Uplift Performance Criteria Measurement Cumulative Monitoring Results Exclude livestock (i.e. cattle) from project streams and adjacent riparian areas. Exclude livestock from streams and riparian areas by installing fencing around project area and/or removing livestock from the Site. Reduce and control sediment inputs; reduce and manage nutrient inputs; contribute to protection of or improvement to a Water Supply Waterbody. Exclusion fencing is installed and maintained. Livestock remain excluded from the project area. Visually inspect the perimeter, as well as interior, of the Site to ensure there are no signs of livestock entering the Site. Cattle are excluded from project streams. Improve the stability of stream channels. Construct and enhance stream channels that will maintain a stable pattern and profile considering the hydrologic and sediment inputs to the system, the landscape setting, and the watershed conditions. Reduce sediment inputs; contribute to protection of or improvement to a Water Supply Waterbody. Entrenchment ratio over 2.2 and bank height ratios below 1.2 with visual assessments showing stability. Cross-section monitoring will be assessed during MY1, MY2, MY3, MY5, and MY7 and visual inspections will be assessed annually. Cross-sections show streams are stable and functioning as designed. ERs are over 2.2 and BHRs are below 1.2. Improve instream habitat. Install habitat features such as constructed riffles, cover logs, and brush toes on restored/enhanced streams. Add woody materials to channel beds. Construct pools of varying depth. Improve aquatic communities in project streams. There is no performance standard for this metric. N/A N/A Reconnect channels with floodplains. Reconstruct stream channels with appropriate bankfull dimensions and depth relative to the existing floodplain. Reduce and control sediment inputs; reduce and manage nutrient inputs; contribute to protection of or improvement to a Water Supply Waterbody. Four bankfull events in separate years within monitoring period. 30-days of continuous surface water flow will be documented annually along intermittent restoration or enhancement I reaches. Pressure transducers recording flow elevations. No bankfull events were documented on project streams in MY3. Greater than 30 days of consecutive flow was recorded on UT2 and on UT1 Reach 2 but not UT1 Reach 1. Perry Hill Mitigation Site Monitoring Year 3 Annual Report - FINAL 1-4 Goal Objective/ Treatment Likely Functional Uplift Performance Criteria Measurement Cumulative Monitoring Results Restore and enhance native floodplain vegetation. Convert active livestock pasture to forested riparian buffers along all Site streams. Protect and enhance existing forested riparian buffers. Treat invasive species during monitoring period to permit establishment of native plantings. Reduce sediment inputs; provide a canopy to shade streams and reduce thermal loadings; contribute to protection of or improvement to a Water Supply Waterbody. Survival rate of 320 stems per acre at MY3, 260 planted stems per acre at MY5, and 210 stems per acre at MY7. Vegetation plots will average 7-ft in height in MY5 and 10-ft in height in MY7. One hundred square meter vegetation plots are placed on 2% of the planted area of the Site and monitored annually. Thirteen of the fourteen vegetation plots have a planted stem density greater than 320 stems per acre. Permanently protect the Site from harmful uses. Establish a conservation easement on the Site. Ensure that development and agricultural uses that would damage the Site or reduce the benefits of the project are prevented. Prevent easement encroachment. Visually inspect the perimeter of the Site to ensure no easement encroachment is occurring. No easement encroachments have been observed in MY3. 1.3 Project Attributes The project includes one parcel that has been managed as pasture and/or crop production, as indicated by aerial photographs from 1938 to 2017. Portions of the upper watershed historically have been forested. The stream crossings which existed prior to construction on Perry Branch were installed before 1938. Forested areas within the headwaters of UT2 and UT3 were cleared between 1938 and 1950. The high-voltage utility transmission line that crosses the downstream extent of Perry Branch was constructed between 1938 and 1950. Between 1950 and 1955, two ponds were constructed on the project parcel, including one within the headwaters of Perry Branch Reach 1 and the other an offline pond adjacent to Perry Branch Reach 4 within the lower portion of the watershed. Table 3 below and Table 8 in Appendix C present additional information on pre-restoration conditions. Project Activity and Reporting History, as well as the Project Contact Table are included in Appendix E. Perry Hill Mitigation Site Monitoring Year 3 Annual Report - FINAL 1-5 Table 3: Project Attributes PROJECT INFORMATION Project Name Perry Hill Mitigation Site County Orange County Project Area (acres) 26.88 Project Coordinates 36° 06’ 25.81” N, 79° 07’46.66” W PROJECT WATERSHED SUMMARY INFORMATION Physiographic Province Carolina Slate Belt of the Piedmont River Basin Neuse River USGS HUC 8-digit 03020201 USGS HUC 14-digit 03020201030020 DWR Sub-basin 03-04-01 Land Use Classification 68% managed herbaceous cover/pasture; 22% forested; 5% shrub; 3% grassland/herbaceous; 2% residential area; <1% impervious Project Drainage Area (acres) 174 Percentage of Impervious Area <1% RESTORATION TRIBUTARY SUMMARY INFORMATION Parameters Perry Branch UT1 UT2 UT3 Reach 1 Reach 2 Reach 3 Reach 4 Reach 1 Reach 2 Reach 1 Reach 2 Pre-project length (feet) 326 417 732 2,061 388 213 266 974 357 Post-project length (feet)* 323 422 694 2,166 285 293 223 941 319 Valley confinement (Confined, moderately confined, unconfined) Unconfined Moderately Confined Confined to Moderately Confined Moderately Confined Confined Moderately Confined Unconfined Drainage area (acres) 58 66 117 175 9 10 15 23 20 Perennial, Intermittent, Ephemeral Perennial Intermittent DWR Water Quality Classification WS-II/HQW/NSW Dominant Stream Classification (existing) G4c C4 G4c F4 E6b F4b C6 E4 C4 *Includes No Credit Project Stream lengths in internal crossings, the maintenance area, and the downstream end of Perry Branch Reach 4. Perry Hill Mitigation Site Monitoring Year 3 Annual Report - FINAL 1-6 RESTORATION TRIBUTARY SUMMARY INFORMATION Parameters Perry Branch UT1 UT2 UT3 Reach 1 Reach 2 Reach 3 Reach 4 Reach 1 Reach 2 Reach 1 Reach 2 Dominant Stream Classification (proposed) C4 C4 C4 C4 B4 C4b C6 C4 C4 Dominant Evolutionary class (Simon) if applicable III V IV III/IV III/IV III/IV V III/IV III/IV REGULATORY CONSIDERATIONS Parameters Applicable? Resolved? Supporting Documentation Water of the United States - Section 404 Yes Yes USACE Nationwide Permit No. 27 and DWQ 401 Water Quality Certification No. 4134. Water of the United States - Section 401 Yes Yes Endangered Species Act Yes Yes Categorical Exclusion in Mitigation Plan (Wildlands, 2020) Historic Preservation Act Yes Yes Coastal Zone Management Act (CZMA or CAMA) N/A N/A N/A Essential Fisheries Habitat N/A N/A N/A Perry Hill Mitigation Site Monitoring Year 3 Annual Report - FINAL 2-1 Section 2: MONITORING YEAR 3 DATA ASSESSMENT Annual monitoring and site visits were conducted during MY3 to assess the condition of the project. The vegetation and stream success criteria for the Site follow the approved performance standards presented in the Mitigation Plan (Wildlands Engineering, 2020). Performance criteria for vegetation, stream, and hydrologic assessment are located above in Section 1.2 Table 3: Goals, Performance Criteria, and Functional Improvements. Methodology for annual monitoring is described in the MY0 As- Built Baseline Report (Wildlands, 2021). 2.1 Vegetative Assessment The MY3 vegetative survey was completed in September 2023. Vegetation monitoring resulted in an average density of 526 stems per acre of project planting list species across all vegetation plots, which is well above the interim success criteria of 320 stems per acre required at MY3. Thirteen of the fourteen vegetation plots individually met the success criteria and planting list stem densities for each plot range from 202 to 769 stems per acre. While vegetation plot 10 does not meet the stem density success criteria, it is not representative of the area surrounding it. There are healthy planted trees around the plot that seem to be on par with density and growth across the rest of the site. We do not believe it is currently a concern. Herbaceous vegetation is growing well and other desirable tree species such as common hackberry (Celtis occidentalis) and hickory (Carya spp.) species are establishing themselves. Refer to Appendix A for Vegetation Plot Photographs and the Vegetation Condition Assessment Table and Appendix B for Vegetation Plot Data and Vegetation Performance Standards Summary Table. 2.2 Vegetation Areas of Concern and Management Wildlands does not believe the area around vegetation plot 10 has low stem density or needs replanting at this point. As mentioned above, there are healthy planted stems with density and growth that resemble the rest of the site around the vegetation plot boundary. However, Wildlands will continue to observe the area to confirm that tree health and density stays at an appropriate level. As in the previous year, planted trees are growing well but pasture grasses are still dense in areas. To ensure planted trees remain competitive, herbicide ring sprays were applied around the base of trees where necessary in April 2023. Areas where patches of blackberry (Rubus spp.) were competing with trees along UT2 were treated via mechanical removal or a foliar spray application of triclopyr. Wildlands plans to continue to treat aggressive blackberry growth as needed in spring of 2024. Additionally, follow up treatments were done on a few stems of Chinese privet (Ligustrum sinense) along the west side of UT2 using a cut stump application of triclopyr in May 2023. In 2024, Wildlands plans to target scattered resprouts of Chinese privet in the wooded area along Perry Branch Reaches 1 and 2 that was previously treated in 2020. Wildlands will continue to monitor for invasive species and treatments will be applied as necessary. While the vegetation across the maintenance areas is no longer a concern, Wildlands is still working to mark the area appropriately. At the beginning of November, the surveyor was finally able to move the corners of the Perry Hill II bank conservation easement that shares a boundary with the DMS easement, and in doing so, marked the edge of the maintenance area as well. Wildlands would like to order appropriate signs to differentiate the maintenance area from the rest of the conservation easement and will install them in MY4. Perry Hill Mitigation Site Monitoring Year 3 Annual Report - FINAL 2-2 2.3 Stream Assessment Morphological surveys for MY3 were conducted in April 2023. All streams within the Site are stable and functioning as designed. Cross-sections show minimal change in max depth and bankfull cross-sectional area. Bank height ratios are less than 1.2 and entrenchment ratios are over 2.2. Specific entrenchment ratio numbers are not included in this report template but are available upon request. Cross-sections show slight deviations from as-built due to sediment deposition and establishment of vegetation. Some sediment deposition in pools is natural and expected. Pebble count data is no longer required per the September 29, 2021 Technical Work Group Meeting and is not included in this report. The IRT reserves the right to request pebble count data/particle distributions if deemed necessary during the monitoring period. Refer to Appendix A for the Visual Stream Morphology Stability Assessment Table, Current Condition Plan View maps, Stream Photographs, and Culvert Crossing Photographs. Refer to Appendix C for the morphological data and cross-section plots. 2.4 Stream Areas of Concern and Management Wildlands continued to observe flow in the upper part of UT1 Reach 1 after the rock sill repair in September 2022. Repairs did not have the desired effect and stream flow is similar to previous years. The credits associated with the stretch of inadequate stream flow have been put “at-risk”, as seen in Table 1 and Figure 1b. Wildlands will continue to monitor flow on UT1 Reach 1 through flow gauges and visual observation and reevaluate the “at-risk” credits in MY4. 2.5 Hydrology Assessment By the end of MY7, four bankfull events must have occurred in separate years within the restoration and enhancement I reaches. While there were significant flow events, flow does not seem to have crested top of bank. No bankfull events were recorded on Site during MY3. In addition, the presence of baseflow must be documented on restored or enhanced intermittent reaches (UT1 Reach 1 and UT2 Reach 2) for a minimum of 30 consecutive days during a normal precipitation year. UT2 Reach 2 exceeded baseflow criterion with 154 consecutive and 176 total days of baseflow. UT1 Reach 1 did not meet baseflow criteria. The original UT1 Reach 1 flow gauge recorded one consecutive and six cumulative days of flow. UT1 Reach 1 flow gauge B shows four consecutive and 16 total days of flow. However, the crest gauge on UT1 Reach 2 is installed in such a way that it can also record flow. It shows 54 days of consecutive and 72 total days of flow. Refer to Appendix D for Hydrology Summary Data. 2.6 Monitoring Year 3 Summary Vegetation across the Site has exceeded the MY3 interim requirement of 320 planted stems per acre. Monitoring Year 3 data shows an average density of 526 stems per acre of project planting list species across all plots. Aggressive vegetation and resprouts of invasive vegetation were treated in MY3 and additional follow up treatments will be scheduled as necessary. Wildlands is working to mark the maintenance area with appropriate signage. Project streams are stable and functioning. Cross-sections show limited deviations from as-built due to sediment deposition and vegetation establishment. No bankfull events were documented in MY3. UT2 and UT1 Reach 2 achieved more than 30 consecutive days of baseflow, and while UT1 Reach 1. Rock sill repairs in September 2022 do not seem to have had the desired effect and stream credits have been put “at-risk” accordingly. Wildlands will continue to observe this stretch of channel and “at-risk” credits will be reevaluated in MY4. No easement encroachment or stream crossing issues have been identified in MY3. Perry Hill Mitigation Site Monitoring Year 3 Annual Report - FINAL 2-3 Summary information and data related to the performance of various project and monitoring elements can be found in the tables and figures in the report appendices. All raw data supporting the tables and figures in the appendices are available from DMS upon request. Perry Hill Mitigation Site Monitoring Year 3 Annual Report - FINAL 3-1 Section 3: REFERENCES Breeding, R. 2010. Neuse River Basin Restoration Priorities. North Carolina Ecosystem Enhancement Program. Accessed at: https://files.nc.gov/ncdeq/Mitigation%20Services/Watershed_Planning/Neuse_River_Basin/FINAL% 20RBRP%20Neuse%202010_%2020111207%20CORRECTED.pdf Doll, B.A., Grabow, G.L., Hall, K.A., Halley, J., Harman, W.A., Jennings, G.D., and Wise, D.E. 2003. Stream Restoration A Natural Channel Design Handbook. Harrelson, C.C; Rawlins, C.L.; Potyondy, John P. 1994. Stream Channel Reference Sites: An Illustrated Guide to Field Technique. Gen. Tech. Rep. RM-245. Fort Collins, CO: U.S. Department of Agriculture, Forest Service, Rocky Mountain Forest and Range Experiment Station. Accessed at: https://www.fs.fed.us/biology/nsaec/fishxing/fplibrary/Harrelson_1994_Stream_Channel_Reference _Sites_An_Illustrated.pdf Lee, M.T., Peet, R.K., Roberts, S.D., & Wentworth, T.R. 2008. CVS-EEP Protocol for Recording Vegetation Version 4.2. Accessed at: http://cvs.bio.unc.edu/protocol/cvs-eep-protocol-v4.2-lev1-2.pdf NOAA. 2022. National Integrated Drought Information System. Drought Conditions for Orange County. Accessed at: https://www.drought.gov/states/north-carolina/county/orange Rosgen, D.L. 1994. A classification of natural rivers. Catena 22:169-199. Rosgen, D.L. 1996. Applied River Morphology. Pagosa Springs, CO: Wildland Hydrology Books. United States Army Corps of Engineers. 2003. Stream Mitigation Guidelines. USACE, NCDENR-DWQ, USEPA, NCWRC. United States Geological Survey. 1998. North Carolina Geology. Accessed at: http://www.geology.enr.state.nc.us/usgs/carolina.htm Wildlands Engineering, Inc. 2020. Perry Hill Mitigation Plan. DMS, Raleigh, NC. Wildlands Engineering, Inc. 2021. Perry Hill Baseline Monitoring Document and As-Built Baseline Report. DMS, Raleigh, NC. APPENDIX A. Visual Assessment Data Table 4. Visual Stream Morphology Stability Assessment Table Perry Hill Mitigation Site DMS Project No. 100093 Monitoring Year 3 - 2023 Perry Branch Reach 1 323 646 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 2 2 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 4 4 100% Visual assessment was completed October 18, 2023. Perry Branch Reach 3 and Reach 4 2,653 5,306 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 18 18 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 17 17 100% Visual assessment was completed October 18, 2023. Structure Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-Built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Bank Totals: % Stable, Performing as Intended Assessed Stream Length Assessed Bank Length Bank Totals: Structure % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-Built Amount of Unstable Footage Table 4. Visual Stream Morphology Stability Assessment Table Perry Hill Mitigation Site DMS Project No. 100093 Monitoring Year 3 - 2023 UT1 Reach 1 and Reach 2 578 1,156 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 18 18 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 7 7 100% Visual assessment was completed October 18, 2023. UT2 Reach 2 941 1,882 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 8 8 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 2 2 100% Visual assessment was completed October 18, 2023. Structure Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-Built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Bank Totals: % Stable, Performing as Intended Assessed Stream Length Assessed Bank Length Bank Totals: Structure % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-Built Amount of Unstable Footage Perry Hill Mitigation Site DMS Project No. 100093 Monitoring Year 3 - 2023 Planted Acreage 20.53 Vegetation Category Definitions Mapping Threshold (ac) Combined Acreage % of Planted Acreage Bare Areas Very limited cover of both woody and herbaceous material.0.10 0 0% Low Stem Density Areas Woody stem densities clearly below target levels based on current MY stem count criteria.0.10 0 0% 0 0% Areas of Poor Growth Rates Planted areas where average height is not meeting current MY Performance Standard.0.10 0 0% 0.0 0% Visual assessment was completed October 18, 2023. Easement Acreage 26.88 Vegetation Category Definitions Mapping Threshold (ac) Combined Acreage % of Easement Acreage Invasive Areas of Concern Invasives may occur outside of planted areas and within the easement and will therefore be calculated against the total easement acreage. Include species with the potential to directly outcompete native, young, woody stems in the short-term or community structure for existing communities. Invasive species included in summation above should be identified in report summary. 0.10 0 0% Easement Encroachment Areas Encroachment may be point, line, or polygon.Encroachment to be mapped consists of any violation of restrictions specified in the conservation easement.Common encroachments are mowing,cattle access,vehicular access.Encroachment has no threshold value as will need to be addressed regardless of impact area. none Visual assessment was completed October 18, 2023. Table 5. Vegetation Condition Assessment Table Total Cumulative Total 0 Encroachments Noted / 0 ac STREAM PHOTOGRAPHS Perry Hill Mitigation Site Appendix A: Visual Assessment Data – Stream Photographs PHOTO POINT 1 Perry Branch R1 – upstream (03/14/2023) PHOTO POINT 1 Perry Branch R1 – downstream (03/14/2023) PHOTO POINT 2 Perry Branch R2 – upstream (03/14/2023) PHOTO POINT 2 Perry Branch R2 – downstream (03/14/2023) PHOTO POINT 3 Perry Branch R3 – upstream (03/14/2023) PHOTO POINT 3 Perry Branch R3 – downstream (03/14/2023) Perry Hill Mitigation Site Appendix A: Visual Assessment Data – Stream Photographs PHOTO POINT 4 Perry Branch R3 – upstream (03/14/2023) PHOTO POINT 4 Perry Branch R3 – downstream (03/14/2023) PHOTO POINT 5 Perry Branch R3 – upstream (03/14/2023) PHOTO POINT 5 Perry Branch R3 – downstream (03/14/2023) PHOTO POINT 6 Perry Branch R4 – upstream (03/14/2023) PHOTO POINT 6 Perry Branch R4 – downstream (03/14/2023) Perry Hill Mitigation Site Appendix A: Visual Assessment Data – Stream Photographs PHOTO POINT 7 Perry Branch R4 – upstream (03/14/2023) PHOTO POINT 7 Perry Branch R4 – downstream (03/14/2023) PHOTO POINT 8 Perry Branch R4 – upstream (03/14/2023) PHOTO POINT 8 Perry Branch R4 – downstream (03/14/2023) PHOTO POINT 9 Perry Branch R4 – upstream (03/14/2023) PHOTO POINT 9 Perry Branch R4 – downstream (03/14/2023) Perry Hill Mitigation Site Appendix A: Visual Assessment Data – Stream Photographs PHOTO POINT 10 Perry Branch R4 – upstream (03/14/2023) PHOTO POINT 10 Perry Branch R4 – downstream (03/14/2023) PHOTO POINT 11 Perry Branch R4 – upstream (03/14/2023) PHOTO POINT 11 Perry Branch R4 – downstream (03/14/2023) PHOTO POINT 12 UT1 R1 – upstream (03/14/2023) PHOTO POINT 12 UT1 R1 – downstream (03/14/2023) Perry Hill Mitigation Site Appendix A: Visual Assessment Data – Stream Photographs PHOTO POINT 13 UT1 R2 – upstream (03/14/2023) PHOTO POINT 13 UT1 R2 – downstream (03/14/2023) PHOTO POINT 14 UT2 R1 – upstream (03/14/2023) PHOTO POINT 14 UT2 R1 – downstream (03/14/2023) PHOTO POINT 15 UT2 R2 – upstream (03/14/2023) PHOTO POINT 15 UT2 R2 – downstream (03/14/2023) Perry Hill Mitigation Site Appendix A: Visual Assessment Data – Stream Photographs PHOTO POINT 16 UT2 R2 – upstream (03/14/2023) PHOTO POINT 16 UT2 R2 – downstream (03/14/2023) PHOTO POINT 17 UT2 R2 – upstream (03/14/2023) PHOTO POINT 17 UT2 R2 – downstream (03/14/2023) PHOTO POINT 18 UT3 – upstream (03/14/2023) PHOTO POINT 18 UT3 – downstream (03/14/2023) Perry Hill Mitigation Site Appendix A: Visual Assessment Data – Stream Photographs PHOTO POINT 19 UT3 – upstream (03/14/2023) PHOTO POINT 19 UT3 – downstream (03/14/2023) CULVERT CROSSING PHOTOGRAPHS Perry Hill Mitigation Site Appendix A: Visual Assessment Data – Culvert Crossing Photographs Perry Branch R2 – Looking Upstream (03/14/2023) Perry Branch R2 – Looking Downstream (03/14/2023) Perry Branch R4 – Looking Upstream (03/14/2023) Perry Branch R4 – Looking Downstream (03/14/2023) VEGETATION PLOT PHOTOGRAPHS Perry Hill Mitigation Site Appendix A: Visual Assessment Data – Vegetation Plot Photographs FIXED VEG PLOT 1 (09/07/2023) FIXED VEG PLOT 2 (09/07/2023) FIXED VEG PLOT 3 (09/07/2023) FIXED VEG PLOT 4 (09/07/2023) FIXED VEG PLOT 5 (09/07/2023) FIXED VEG PLOT 6 (09/07/2023) Perry Hill Mitigation Site Appendix A: Visual Assessment Data – Vegetation Plot Photographs FIXED VEG PLOT 7 (09/07/2023) FIXED VEG PLOT 8 (09/07/2023) FIXED VEG PLOT 9 (09/07/2023) FIXED VEG PLOT 10 (09/07/2023) FIXED VEG PLOT 11 (09/07/2023) FIXED VEG PLOT 12 (09/07/2023) Perry Hill Mitigation Site Appendix A: Visual Assessment Data – Vegetation Plot Photographs RANDOM VEG PLOT 13 (09/07/2023) RANDOM VEG PLOT 14 (09/07/2023) APPENDIX B. Vegetation Plot Data Table 6. Vegetation Plot Data Perry Hill Mitigation Site DMS Project No. 100093 Monitoring Year 3 - 2023 20.53 2021-04-04 2023-09-07 0.0247 Planted Total Planted Total Planted Total Planted Total Planted Total Acer negundo1 boxelder Tree FAC 1 1 1 1 1 1 Asimina triloba1 pawpaw Tree FAC Betula nigra river birch Tree FACW 3 3 2 2 1 1 4 4 2 2 Cornus amomum1 silky dogwood Shrub FACW 1 1 Diospyros virginiana common persimmon Tree FAC 2 3 1 1 Nyssa sylvatica blackgum Tree FAC Platanus occidentalis American sycamore Tree FACW 2 2 4 4 1 1 2 2 2 2 Populus deltoides eastern cottonwood Tree FAC 2 2 1 1 1 1 Quercus alba white oak Tree FACU Quercus falcata southern red oak Tree FACU Quercus lyrata overcup oak Tree OBL 2 2 2 2 Quercus pagoda cherrybark oak Tree FACW 1 1 1 1 1 1 2 2 Quercus phellos willow oak Tree FAC 1 1 Quercus rubra northern red oak Tree FACU 2 2 Ulmus alata winged elm Tree FACU Ulmus americana American elm Tree FACW 2 2 1 1 1 1 Viburnum prunifolium1 blackhaw Tree FACU 1 1 Sum 10 10 11 11 9 10 10 10 11 11 Carya glabra pignut hickory Tree FACU Carya tomentosa mockernut hickory Tree 1 Celtis occidentalis common hackberry Tree FACU 1 Fraxinus caroliniana Carolina ash Tree OBL Fraxinus pennsylvanica green ash Tree FACW 4 Juglans nigra black walnut Tree FACU Liquidambar styraciflua sweetgum Tree FAC 2 1 Ulmus sp.1 Sum 10 14 11 14 9 10 10 10 11 11 10 11 10 10 11 405 445 405 405 445 6 5 7 5 8 30 36 25 40 17 5 8 4 6 6 0 0 0 0 0 14 14 10 10 11 567 567 405 405 445 7 8 7 5 8 30 36 25 40 17 7 7 4 6 6 0 0 0 0 0 1Species not subject to monitoring height requirement due to species growth habit. 2Subcanopy tree species not subject to the height requirement have been removed from average height calculations. Dominant Species Composition (%) 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Proposed Standard Performance Standard Post Mitigation Plan Species Mitigation Plan Performance Standard Post Mitigation Plan Performance Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.)2 Average Plot Height (ft.)2 % Invasives % Invasives Current Year Stem Count Stems/Acre Species Count Veg Plot 5 FIndicator Status Veg Plot 1 F Veg Plot 2 F Veg Plot 3 F Veg Plot 4 FScientific Name Common Name Tree/ Shrub Species Included in Approved Mitigation Plan Planted Acreage Date of Initial Plant Date of Current Survey Plot size (ACRES) Table 6. Vegetation Plot Data Perry Hill Mitigation Site DMS Project No. 100093 Monitoring Year 3 - 2023 20.53 2021-04-04 2023-09-07 0.0247 Planted Total Planted Total Planted Total Planted Total Planted Total Acer negundo1 boxelder Tree FAC 1 1 1 1 1 1 3 3 Asimina triloba1 pawpaw Tree FAC Betula nigra river birch Tree FACW 3 3 1 1 3 3 2 2 Cornus amomum1 silky dogwood Shrub FACW Diospyros virginiana common persimmon Tree FAC 1 1 3 3 1 1 1 1 Nyssa sylvatica blackgum Tree FAC Platanus occidentalis American sycamore Tree FACW 6 6 2 3 2 2 3 4 2 2 Populus deltoides eastern cottonwood Tree FAC 1 1 2 2 1 2 1 1 Quercus alba white oak Tree FACU Quercus falcata southern red oak Tree FACU Quercus lyrata overcup oak Tree OBL 2 2 Quercus pagoda cherrybark oak Tree FACW 1 1 1 1 2 2 1 1 1 1 Quercus phellos willow oak Tree FAC 1 1 Quercus rubra northern red oak Tree FACU 2 2 Ulmus alata winged elm Tree FACU 2 Ulmus americana American elm Tree FACW 2 2 4 4 1 1 Viburnum prunifolium1 blackhaw Tree FACU 1 1 1 1 Sum 15 15 11 12 17 19 13 15 5 5 Carya glabra pignut hickory Tree FACU 1 Carya tomentosa mockernut hickory Tree Celtis occidentalis common hackberry Tree FACU Fraxinus caroliniana Carolina ash Tree OBL Fraxinus pennsylvanica green ash Tree FACW Juglans nigra black walnut Tree FACU Liquidambar styraciflua sweetgum Tree FAC 1 Ulmus sp.2 Sum 15 15 11 14 17 20 13 15 5 5 15 12 19 15 5 607 486 769 607 202 6 9 8 8 4 40 25 20 27 40 11 5 7 7 9 0 0 0 0 0 15 14 20 15 5 607 567 810 607 202 6 10 9 8 4 40 25 20 27 40 11 4 7 7 9 0 0 0 0 0 1Species not subject to monitoring height requirement due to species growth habit. 2Subcanopy tree species not subject to the height requirement have been removed from average height calculations. 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Common Name Tree/ Shrub Species Included in Approved Mitigation Plan Planted Acreage Date of Initial Plant Date of Current Survey Plot size (ACRES) Stems/Acre Species Count Veg Plot 10 FVeg Plot 8 F Veg Plot 9 FVeg Plot 6 F Veg Plot 7 FIndicator StatusScientific Name Dominant Species Composition (%) Proposed Standard Performance Standard Post Mitigation Plan Species Mitigation Plan Performance Standard Post Mitigation Plan Performance Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.)2 Average Plot Height (ft.)2 % Invasives % Invasives Current Year Stem Count Table 6. Vegetation Plot Data Perry Hill Mitigation Site DMS Project No. 100093 Monitoring Year 3 - 2023 20.53 2021-04-04 2023-09-07 0.0247 Veg Plot 13 R Veg Plot 14 R Planted Total Planted Total Total Total Acer negundo1 boxelder Tree FAC 1 1 Asimina triloba1 pawpaw Tree FAC 1 1 Betula nigra river birch Tree FACW 2 2 2 2 3 1 Cornus amomum1 silky dogwood Shrub FACW Diospyros virginiana common persimmon Tree FAC 3 4 2 4 1 5 Nyssa sylvatica blackgum Tree FAC 1 1 Platanus occidentalis American sycamore Tree FACW 4 4 4 4 1 3 Populus deltoides eastern cottonwood Tree FAC 1 1 2 2 Quercus alba white oak Tree FACU 1 1 Quercus falcata southern red oak Tree FACU 3 Quercus lyrata overcup oak Tree OBL Quercus pagoda cherrybark oak Tree FACW 1 1 4 Quercus phellos willow oak Tree FAC Quercus rubra northern red oak Tree FACU 1 1 1 1 2 Ulmus alata winged elm Tree FACU 1 1 6 2 Ulmus americana American elm Tree FACW Viburnum prunifolium1 blackhaw Tree FACU Sum 13 14 13 15 18 17 Carya glabra pignut hickory Tree FACU 1 Carya tomentosa mockernut hickory Tree 2 Celtis occidentalis common hackberry Tree FACU 3 Fraxinus caroliniana Carolina ash Tree OBL 1 Fraxinus pennsylvanica green ash Tree FACW Juglans nigra black walnut Tree FACU 1 Liquidambar styraciflua sweetgum Tree FAC 2 Ulmus sp. Sum 13 20 13 15 18 18 14 15 18 17 567 607 729 688 7 8 7 6 27 24 33 29 5 7 4 6 0 0 0 0 20 15 18 18 810 607 729 729 10 8 7 7 27 24 33 29 4 7 4 6 0 0 0 0 1Species not subject to monitoring height requirement due to species growth habit. 2Subcanopy tree species not subject to the height requirement have been removed from average height calculations. 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Performance Standard Post Mitigation Plan Species Mitigation Plan Performance Standard Post Mitigation Plan Performance Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.)2 Average Plot Height (ft.)2 % Invasives % Invasives Current Year Stem Count Veg Plot 11 F Veg Plot 12 F Planted Acreage Date of Initial Plant Date of Current Survey Plot size (ACRES) Common Name Tree/ Shrub Species Included in Approved Mitigation Plan Stems/Acre Species Count Indicator StatusScientific Name Dominant Species Composition (%) Proposed Standard Table 7. Vegetation Performance Standards Summary Table Perry Hill Mitigation Site DMS Project No. 100093 Monitoring Year 3 - 2023 Stems/Ac.Av. Ht. (ft)1 # Species % Invasives Stems/Ac.Av. Ht. (ft)1 # Species % Invasives Stems/Ac.Av. Ht. (ft)1 # Species % Invasives 405 5 6 0 445 8 5 0 405 4 7 0 364 5 6 0 445 6 5 0 364 4 7 0 607 2 6 0 486 3 6 0 405 3 7 0 607 2 6 0 486 2 6 0 486 2 8 0 Stems/Ac.Av. Ht. (ft)1 # Species % Invasives Stems/Ac.Av. Ht. (ft)1 # Species % Invasives Stems/Ac.Av. Ht. (ft)1 # Species % Invasives 405 6 5 0 445 5 8 0 607 11 6 0 364 4 4 0 445 4 8 0 648 6 6 0 567 2 6 0 445 3 8 0 648 4 6 0 607 2 6 0 486 2 9 0 688 2 6 0 Stems/Ac.Av. Ht. (ft)1 # Species % Invasives Stems/Ac.Av. Ht. (ft)1 # Species % Invasives Stems/Ac.Av. Ht. (ft)1 # Species % Invasives 486 5 9 0 769 7 8 0 607 7 8 0 486 3 9 0 769 5 9 0 526 4 8 0 486 2 9 0 729 3 8 0 526 3 8 0 486 2 9 0 729 2 8 0 526 2 8 0 Stems/Ac.Av. Ht. (ft)1 # Species % Invasives Stems/Ac.Av. Ht. (ft)1 # Species % Invasives Stems/Ac.Av. Ht. (ft)1 # Species % Invasives 202 9 4 0 567 5 7 0 607 7 8 0 324 4 6 0 567 4 7 0 607 5 8 0 567 2 8 0 567 3 7 0 607 3 8 0 648 2 8 0 607 2 7 0 607 2 8 0 Stems/Ac.Av. Ht. (ft)1 # Species % Invasives Stems/Ac.Av. Ht. (ft)1 # Species % Invasives 729 4 7 0 688 6 6 0 405 4 6 0 567 7 6 0 364 3 4 0 445 3 6 0 567 2 7 0 445 2 8 0 *Each monitoring year represents a different plot for the random vegetation plot "groups". Random plots are denoted with an R, and fixed plots with an F. 1Subcanopy tree species not subject to the height requirement have been removed from average height calculations. Monitoring Year 1 Monitoring Year 0 Veg Plot 1 F Veg Plot 2 F Veg Plot 3 F Veg Plot 4 F Veg Plot 5 F Veg Plot 6 F Veg Plot 7 F Veg Plot 8 F Veg Plot 9 F Veg Plot 10 F Veg Plot 11 F Veg Plot 12 F Veg Plot Group 13 R Veg Plot Group 14 R Monitoring Year 0 Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 2 Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 Monitoring Year 1 Monitoring Year 0 Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 0 Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 APPENDIX C. Stream Geomorphology Data Cross-Section Plots Perry Hill Mitigation Site Appendix C: Stream Geomorphology Data – Cross-Section Plots Downstream (04/04/2023) MY0 MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area 650.73 650.88 650.81 650.84 Bank Height Ratio - Based on AB-Bankfull Area 1.00 0.96 1.01 0.99 Thalweg Elevation 649.33 649.61 649.60 649.63 LTOB Elevation 650.73 650.83 650.83 650.83 LTOB Max Depth 1.44 1.22 1.23 1.20 LTOB Cross-Sectional Area 6.71 6.24 6.83 6.61 Perry Hill Mitigation Site Appendix C: Stream Geomorphology Data – Cross-Section Plots Downstream (04/04/2023) MY0 MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area 637.59 637.57 637.54 637.49 Bank Height Ratio - Based on AB-Bankfull Area 1.00 0.88 0.89 0.95 Thalweg Elevation 636.38 636.56 636.52 636.43 LTOB Elevation 637.59 637.45 637.43 637.44 LTOB Max Depth 1.21 0.89 0.91 1.01 LTOB Cross-Sectional Area 6.27 5.22 5.06 5.73 Perry Hill Mitigation Site Appendix C: Stream Geomorphology Data – Cross-Section Plots Downstream (04/04/2023) MY0 MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area N/A N/A N/A N/A Bank Height Ratio - Based on AB-Bankfull Area N/A N/A N/A N/A Thalweg Elevation 634.49 634.71 634.76 634.70 LTOB Elevation 637.17 637.32 637.40 637.40 LTOB Max Depth 2.68 2.61 2.64 2.70 LTOB Cross-Sectional Area 16.26 16.24 16.79 16.87 Perry Hill Mitigation Site Appendix C: Stream Geomorphology Data – Cross-Section Plots Downstream (04/04/2023) MY0 MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area 634.12 634.27 634.26 634.26 Bank Height Ratio - Based on AB-Bankfull Area 1.00 0.96 0.97 1.00 Thalweg Elevation 632.30 632.49 632.56 632.50 LTOB Elevation 634.12 634.20 634.21 634.27 LTOB Max Depth 1.81 1.71 1.65 1.77 LTOB Cross-Sectional Area 12.85 11.91 12.18 12.96 Perry Hill Mitigation Site Appendix C: Stream Geomorphology Data – Cross-Section Plots Downstream (04/04/2023) MY0 MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area N/A N/A N/A N/A Bank Height Ratio - Based on AB-Bankfull Area N/A N/A N/A N/A Thalweg Elevation 630.33 630.62 630.61 630.60 LTOB Elevation 633.73 633.76 633.77 633.76 LTOB Max Depth 3.40 3.14 3.16 3.16 LTOB Cross-Sectional Area 28.55 26.42 25.56 25.26 Perry Hill Mitigation Site Appendix C: Stream Geomorphology Data – Cross-Section Plots Downstream (04/04/2023) MY0 MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area N/A N/A N/A N/A Bank Height Ratio - Based on AB-Bankfull Area N/A N/A N/A N/A Thalweg Elevation 618.34 618.60 618.51 618.85 LTOB Elevation 621.17 621.28 621.32 621.37 LTOB Max Depth 2.83 2.68 2.81 2.52 LTOB Cross-Sectional Area 26.08 22.86 23.88 22.83 Perry Hill Mitigation Site Appendix C: Stream Geomorphology Data – Cross-Section Plots Downstream (04/04/2023) MY0 MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area 620.89 621.15 621.17 621.14 Bank Height Ratio - Based on AB-Bankfull Area 1.00 0.87 0.91 0.91 Thalweg Elevation 618.98 619.35 619.33 619.33 LTOB Elevation 620.89 620.92 621.01 620.98 LTOB Max Depth 1.91 1.57 1.68 1.65 LTOB Cross-Sectional Area 14.13 11.34 12.15 12.17 Perry Hill Mitigation Site Appendix C: Stream Geomorphology Data – Cross-Section Plots Downstream (04/04/2023) MY0 MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area 626.30 626.45 626.46 626.47 Bank Height Ratio - Based on AB-Bankfull Area 1.00 0.82 0.79 0.78 Thalweg Elevation 625.54 625.77 625.80 625.84 LTOB Elevation 626.30 626.33 626.32 626.33 LTOB Max Depth 0.77 0.56 0.52 0.49 LTOB Cross-Sectional Area 2.52 1.86 1.72 1.72 Perry Hill Mitigation Site Appendix C: Stream Geomorphology Data – Cross-Section Plots Downstream (04/04/2023) MY0 MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area 618.63 618.74 618.76 618.74 Bank Height Ratio - Based on AB-Bankfull Area 1.00 1.02 1.05 1.07 Thalweg Elevation 617.81 617.99 618.01 617.97 LTOB Elevation 618.63 618.76 618.80 618.80 LTOB Max Depth 0.82 0.77 0.79 0.83 LTOB Cross-Sectional Area 3.23 3.32 3.49 3.60 Perry Hill Mitigation Site Appendix C: Stream Geomorphology Data – Cross-Section Plots Downstream (04/04/2023) MY0 MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area 641.54 641.78 641.80 641.74 Bank Height Ratio - Based on AB-Bankfull Area 1.00 0.82 0.73 0.83 Thalweg Elevation 640.35 640.63 640.62 640.62 LTOB Elevation 641.54 641.58 641.48 641.55 LTOB Max Depth 1.18 0.95 0.86 0.93 LTOB Cross-Sectional Area 5.39 3.93 3.42 4.08 Perry Hill Mitigation Site Appendix C: Stream Geomorphology Data – Cross-Section Plots Downstream (04/04/2023) MY0 MY1 MY2 MY3 MY5 MY7 Bankfull Elevation - Based on AB-Bankfull Area N/A N/A N/A N/A Bank Height Ratio - Based on AB-Bankfull Area N/A N/A N/A N/A Thalweg Elevation 637.54 637.81 637.83 638.03 LTOB Elevation 640.51 640.30 640.24 640.22 LTOB Max Depth 2.97 2.49 2.41 2.19 LTOB Cross-Sectional Area 14.86 12.04 12.15 11.50 Table 8. Baseline Stream Data Summary Perry Hill Mitigation Site DMS Project No. 100093 Monitoring Year 3 - 2023 Parameter Riffle Only Min Mean Med Max n Min Max Max Min n Bankfull Width (ft)2.7 2.9 2.9 3.1 2 1 Floodprone Width (ft)4 4 4 4 2 1 Bankfull Mean Depth (ft)0.4 0.5 0.5 0.6 2 1 Bankfull Max Depth (ft)0.6 0.7 0.7 0.8 2 1 Bankfull Cross Sectional Area (ft2)1.1 1.6 1.6 2.0 2 1 Width/Depth Ratio 5.2 6.0 6.0 6.8 2 1 Entrenchment Ratio 1.3 1.4 1.4 1.4 2 1 Bank Height Ratio 2.1 2.4 2.4 2.7 2 1.0 1.1 1 Max particle size (mm) mobilized at bankfull Rosgen Classification Bankfull Discharge (cfs)2.8 4.4 4.4 5.9 2 1 Sinuosity Water Surface Slope (ft/ft) Other Parameter Riffle Only Min Mean Med Max n Min Max Min Max n Bankfull Width (ft)5.3 5.7 5.7 6.1 2 1 Floodprone Width (ft)11.0 12.5 12.5 14.0 2 1 Bankfull Mean Depth (ft)0.6 0.7 0.7 0.7 2 1 Bankfull Max Depth (ft)0.7 0.8 0.8 0.8 2 1 Bankfull Cross Sectional Area (ft2)3.4 3.5 3.5 3.6 2 1 Width/Depth Ratio 8.7 8.8 8.8 8.8 2 1 Entrenchment Ratio 2.1 2.2 2.2 2.2 2 1 Bank Height Ratio 1.9 2.1 2.1 2.3 2 1.0 1.1 1 Max particle size (mm) mobilized at bankfull Rosgen Classification Bankfull Discharge (cfs)9.1 9.7 9.7 10.2 2 1 Sinuosity Water Surface Slope (ft/ft) Other Parameter Riffle Only Min Mean Med Max n Min Max Min Max n Bankfull Width (ft)5.7 6.7 6.0 9.3 4 13.0 13.1 2 Floodprone Width (ft)9 12 12 17 4 125 175 2 Bankfull Mean Depth (ft)0.6 0.8 0.8 1.0 4 1.0 1.1 2 Bankfull Max Depth (ft)0.9 1.2 1.2 1.4 4 1.8 1.9 2 Bankfull Cross Sectional Area (ft2)4.0 5.1 5.2 5.9 4 12.8 14.1 2 Width/Depth Ratio 6.3 9.2 7.9 14.6 4 12.1 13.1 2 Entrenchment Ratio 1.4 1.9 1.8 2.7 4 9.6 13.5 1 Bank Height Ratio 1.2 2.2 2.3 3.0 4 1.0 1.1 2 Max particle size (mm) mobilized at bankfull Rosgen Classification Bankfull Discharge (cfs)10.8 15.1 14.4 20.7 4 48.3 56.4 2 Sinuosity Water Surface Slope (ft/ft) Other 8.7 1.0 9.2 80 0.7 1.4 6.8 12.6 1.10 8.0 29 0.6 1.0 5.0 36 C4 14.9 Perry Branch Reach 1 0.0128 --- PRE-EXISTING CONDITIONS DESIGN 1.16 39 C4 1.13 MONITORING BASELINE (MY0) --- G4c 9.6 22.0 0.0129 61 12.8 7.6 --- 0.0127 156 0.8 1.2 7.2 12.8 16.3 35 46 0.0135 0.0130 32 G4c C4 C4 25.1 17.9 --------- 1.15 1.12 1.12 0.0155 9.1 1.0 11.0 100 0.6 1.2 6.3 19.2 11.4 123 0.9 1.4 10.1 12.9 0.0111 0.0110 10.8 1.0 33 46 48 F4 C4 C4 Perry Branch Reach 3 Perry Branch Reach 4 --------- 35.5 1.11 1.14 1.15 0.0109 Table 8. Baseline Stream Data Summary Perry Hill Mitigation Site DMS Project No. 100093 Monitoring Year 3 - 2023 Parameter Riffle Only Min Mean Med Max n Min Max Min Max n Bankfull Width (ft)1.7 1.7 1 1 Floodprone Width (ft)6.0 6.0 1 1 Bankfull Mean Depth (ft)0.8 0.8 1 1 Bankfull Max Depth (ft)1.1 1.1 1 1 Bankfull Cross Sectional Area (ft2)1.4 1.4 1 1 Width/Depth Ratio 2.1 2.1 1 1 Entrenchment Ratio 3.3 3.3 1 1 Bank Height Ratio 1.9 1.9 1 1.0 1.1 1 Max particle size (mm) mobilized at bankfull Rosgen Classification Bankfull Discharge (cfs)7.5 7.5 1 1 Sinuosity Water Surface Slope (ft/ft) Other Parameter Riffle Only Min Mean Med Max n Min Max Max Min n Bankfull Width (ft)3.7 4.6 4.6 5.4 2 1 Floodprone Width (ft)7 8 8 9 2 1 Bankfull Mean Depth (ft)0.3 0.4 0.4 0.4 2 1 Bankfull Max Depth (ft)0.6 0.7 0.7 0.7 2 1 Bankfull Cross Sectional Area (ft2)1.4 1.5 1.5 1.6 2 1 Width/Depth Ratio 9.3 14.0 14.0 18.7 2 1 Entrenchment Ratio 1.6 1.8 1.8 2.0 2 1 Bank Height Ratio 2.6 2.8 2.8 3.0 2 1.0 1.1 1 Max particle size (mm) mobilized at bankfull Rosgen Classification Bankfull Discharge (cfs)3.2 3.5 3.5 3.7 2 Sinuosity Water Surface Slope (ft/ft) Other Parameter Riffle Only Min Mean Med Max n Min Max Min Max n Bankfull Width (ft)3.2 3.8 4.0 4.0 3 1 Floodprone Width (ft)20 44 42 69 3 1 Bankfull Mean Depth (ft)0.6 0.7 0.7 0.8 3 1 Bankfull Max Depth (ft)1.0 1.1 1.0 1.2 3 1 Bankfull Cross Sectional Area (ft2)2.0 2.7 2.7 3.0 3 1 Width/Depth Ratio 5.0 5.4 5.2 5.9 3 1 Entrenchment Ratio 6.2 11.3 10.3 17.3 3 1 Bank Height Ratio 1.2 1.4 1.3 1.6 3 1.0 1.1 1 Max particle size (mm) mobilized at bankfull Rosgen Classification Bankfull Discharge (cfs)6.2 8.7 9.0 10.9 3 1 Sinuosity Water Surface Slope (ft/ft) Other 0.8 0.4 1.9 7.5 22 E6b 3.3 1.4 PRE-EXISTING CONDITIONS DESIGN 0.6 2.5 14.32.1 1.7 1.1 6.0 11 --------- 9.4 1.04 11.7 1.06 0.0473 0.0522 1.04 0.0508 13.2 8.7 1.0 111 94 B4 MONITORING BASELINE (MY0) B4 1.8 5.8 50 0.4 0.8 2.5 UT1 Reach 1 6 6.0 6.4 113 175 0.5 0.5 0.8 0.8 2.9 3.2 12.5 13.0 18.8 27.2 1.0 22 51 48 F4b C4b C4b 7.6 11.0 1.14 1.15 1.14 0.0204 0.0221 0.0233 --------- 6.0 7.7 44 100 0.5 0.7 0.7 1.2 2.7 5.4 13.2 10.8 7.3 13.0 1.0 52 37 51 C4 8.2 20.7 1.13 1.11 1.11 UT1 Reach 2 UT2 Reach 2 0.0187 0.0177 0.0179 --------- E4 C4 DMS Project No. 100093 Monitoring Year 3 - 2023 MY0 MY1 MY2 MY3 MY5 MY7 MY0 MY1 MY2 MY3 MY5 MY7 MY0 MY1 MY2 MY3 MY5 MY7 Bankfull Elevation (ft) - Based on AB-Bankfull1 Area 650.73 650.88 650.81 650.84 637.59 637.57 637.54 637.49 N/A N/A N/A N/A Bank Height Ratio - Based on AB Bankfull1 Area 1.00 0.96 1.01 0.99 1.00 0.88 0.89 0.95 N/A N/A N/A N/A Thalweg Elevation 649.33 649.61 649.60 649.63 636.38 636.56 636.52 636.43 634.49 634.71 634.76 634.70 LTOB2 Elevation 650.73 650.83 650.83 650.83 637.59 637.45 637.43 637.44 637.17 637.32 637.40 637.40 LTOB2 Max Depth (ft)1.44 1.22 1.23 1.20 1.21 0.89 0.91 1.01 2.68 2.61 2.64 2.70 LTOB2 Cross-Sectional Area (ft2)6.71 6.24 6.83 6.61 6.27 5.22 5.06 5.73 16.26 16.24 16.79 16.87 MY0 MY1 MY2 MY3 MY5 MY7 MY0 MY1 MY2 MY3 MY5 MY7 MY0 MY1 MY2 MY3 MY5 MY7 MY0 MY1 MY2 MY3 MY5 MY7 Bankfull Elevation (ft) - Based on AB-Bankfull1 Area 634.12 634.27 634.26 634.26 N/A N/A N/A N/A N/A N/A N/A N/A 620.89 621.15 621.17 621.14 Bank Height Ratio - Based on AB Bankfull1 Area 1.00 0.96 0.97 1.00 N/A N/A N/A N/A N/A N/A N/A N/A 1.00 0.87 0.91 0.91 Thalweg Elevation 632.30 632.49 632.56 632.50 630.33 630.62 630.61 630.60 618.34 618.60 618.51 618.85 618.98 619.35 619.33 619.33 LTOB2 Elevation 634.12 634.20 634.21 634.27 633.73 633.76 633.77 633.76 621.17 621.28 621.32 621.37 620.89 620.92 621.01 620.98 LTOB2 Max Depth (ft)1.81 1.71 1.65 1.77 3.40 3.14 3.16 3.16 2.83 2.68 2.81 2.52 1.91 1.57 1.68 1.65 LTOB2 Cross-Sectional Area (ft2)12.85 11.91 12.18 12.96 28.55 26.42 25.56 25.26 26.08 22.86 23.88 22.83 14.13 11.34 12.15 12.17 MY0 MY1 MY2 MY3 MY5 MY7 MY0 MY1 MY2 MY3 MY5 MY7 MY0 MY1 MY2 MY3 MY5 MY7 MY0 MY1 MY2 MY3 MY5 MY7 Bankfull Elevation (ft) - Based on AB-Bankfull1 Area 626.30 626.45 626.46 626.47 618.63 618.74 618.76 618.74 641.54 641.78 641.80 641.74 N/A N/A N/A N/A Bank Height Ratio - Based on AB Bankfull1 Area 1.00 0.82 0.79 0.78 1.00 1.02 1.05 1.07 1.00 0.82 0.73 0.83 N/A N/A N/A N/A Thalweg Elevation 625.54 625.77 625.80 625.84 617.81 617.99 618.01 617.97 640.35 640.63 640.62 640.62 637.54 637.81 637.83 638.03 LTOB2 Elevation 626.30 626.33 626.32 626.33 618.63 618.76 618.80 618.80 641.54 641.58 641.48 641.55 640.51 640.30 640.24 640.22 LTOB2 Max Depth (ft)0.77 0.56 0.52 0.49 0.82 0.77 0.79 0.83 1.18 0.95 0.86 0.93 2.97 2.49 2.41 2.19 LTOB2 Cross-Sectional Area (ft2)2.52 1.86 1.72 1.72 3.23 3.32 3.49 3.60 5.39 3.93 3.42 4.08 14.86 12.04 12.15 11.50 Perry Branch Reach 1 Perry Branch Reach 3 Cross-Section 7 (Riffle) Cross-Section 8 (Riffle)Cross-Section 9 (Riffle) Perry Branch Reach 4 Cross-Section 4 (Riffle)Cross-Section 5 (Pool)Cross-Section 6 (Pool) 1Bank Height Ratio (BHR) takes the As-Built bankfull area as the basis for adjusting each subsequent years bankfull elevation. 2LTOB Cross-Sectional Area and Max depth are based on the LTOB elevation for each years survey (The same elevation used for the LTOB in the BHR calculation). Area below the LTOB elevation will be used and tracked for each year as above. The difference between the LTOB elevation and the thalweg elevation (same as in the BHR calculation) will be recorded and tracked above as LTOB max depth. *Entrenchment Ratios for each cross-section available upon request. Cross-Section 10 (Riffle)Cross-Section 11 (Pool) UT1 Reach 1 UT1 Reach 2 UT2 Reach 2 Table 9. Cross-Section Morphology Monitoring Summary Perry Hill Mitigation Site Cross-Section 1 (Riffle)Cross-Section 2 (Riffle)Cross-Section 3 (Pool) APPENDIX D. Hydrology Data Reach MY1 (2021)1 MY2 (2022)MY3 (2023)2 MY4 (2024)MY5 (2025)MY6 (2026)MY7 (2027) Perry Branch Reach 1 N/A N/A N/A Perry Branch Reach 4 N/A N/A N/A Perry Branch Reach 4 (Gauge B) Installed January 2022 5/24/2022 N/A UT1 Reach 2 7/19/2021 5/23/2022 N/A 3/9/2022 5/23-24/2022 MY1 (2021)MY2 (2022)MY3 (2023)MY4 (2024)MY5 (2025)MY6 (2026)MY7 (2027) Annual Precipitation Total 40.10 in^48.4 in 39.26* 30 Year Average Precip WETS 30th Percentile 43.75 in 43.52 in 44.06 in 30 Year Average Precip WETS 70th Percentile 51.13 in 51.01 in 51.44 in Annual Precipitation Compared to Normal Low Normal * 30 Year Average Precipitation Source: Chapel Hill 2 W Station, Orange County, NC, AgACIS (Approximately 16 miles from Site) ^MY1 Report calculation erroneously included December 2020 daily rainfall data. *Annual precipitation total includes data from 1/1/2023 to 10/18/2023. Data from the remainder of MY3 will be updated in MY4. Annual Precipitation Source: Durham 11 W Station, Orange County, NC, State Climate Office (Approximately 9.5 miles from Site) Perry Hill Mitigation Site DMS Project No. 100093 Monitoring Year 3 - 2023 Table 10. Bankfull Events Perry Hill Mitigation Site DMS Project No. 100093 Monitoring Year 3 - 2023 Table 11. Rainfall Summary 1Gauges were installed mid-March 2021. 2Data was collected 1/1/2023 to 10/18/2023. Data from the remainder of MY3 will be updated in MY4. UT2 Reach 2 7/19/2021 N/A Recorded Bankfull Events Plot Monitoring Year 3 - 2023 Perry Hill Mitigation Site DMS Project No. 100093 160 days of consecutive stream flow Jan Feb Mar Apr May Jun Jul Aug Sep Oct 0 1 2 3 4 5 6 7 8 9 648 649 650 651 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Perry Hill: Perry Branch Reach 1 - Crest Gauge Recorded Bankfull Events Plot Monitoring Year 3 - 2023 Perry Hill Mitigation Site DMS Project No. 100093 235 days of consecutive stream flow Jan Feb Mar Apr May Jun Jul Aug Sep Oct 0 1 2 3 4 5 6 7 8 9 632 633 634 635 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Perry Hill: Perry Branch Reach 4 - Crest Gauge Recorded Bankfull Events Plot Monitoring Year 3 - 2023 Perry Hill Mitigation Site DMS Project No. 100093 128 days of consecutive stream flow Jan Feb Mar Apr May Jun Jul Aug Sep Oct 0 1 2 3 4 5 6 7 8 9 618 619 620 621 622 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Perry Hill: Perry Branch Reach 4 - Crest Gauge B Recorded Bankfull Events Plot Monitoring Year 3 - 2023 Perry Hill Mitigation Site DMS Project No. 100093 54 days of consecutive stream flow Jan Feb Mar Apr May Jun Jul Aug Sep Oct 0 1 2 3 4 5 6 7 8 9 617 618 619 620 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Perry Hill: UT1 Reach 2 - Crest and Flow Gauge Recorded Bankfull Events Plot Monitoring Year 3 - 2023 Perry Hill Mitigation Site DMS Project No. 100093 129 days of consecutive stream flow Jan Feb Mar Apr May Jun Jul Aug Sep Oct 0 1 2 3 4 5 6 7 8 9 639 640 641 642 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Perry Hill: UT2 Reach 2 - Crest Gauge Table 12. Recorded In-Stream Flow Events Summary Perry Hill Mitigation Site DMS Project No. 100093 Monitoring Year 3 - 2023 MY1 (2021)1 MY2 (2022)MY3 (2023)2 MY4 (2024)MY5 (2025)MY6 (2026)MY7 (2027) 1 Day/ 1 Day 1 Day/ 10 Days 1 Day/ 6 Days Not Installed until December 2021 20 Days/ 123 Days 4 Days/ 16 Days 98 Days/ 154 Days 164 Days/ 212 Days 154 Days/ 176 Days *Success criterion is presence of baseflow for a minimum of 30 consecutive days. 1Gauges were installed mid-March 2021. 2Data was collected 1/1/2023 to 10/18/2023. Data from the remainder of MY3 will be updated in MY4. Reach Max Consecutive Days/Total Days of Baseflow* UT1 Reach 1 UT2 Reach 2 UT1 Reach 1 (Gauge B) Recorded In-stream Flow Events Plot Monitoring Year 3 - 2023 Perry Hill Mitigation Site DMS Project No. 100093 1 days of consecutive stream flow Jan Feb Mar Apr May Jun Jul Aug Sep Oct 0 2 4 6 8 10 12 623 624 625 626 627 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Perry Hill: UT1 Reach 1 - In-Stream Flow Gauge Recorded In-stream Flow Events Plot Monitoring Year 3 - 2023 Perry Hill Mitigation Site DMS Project No. 100093 4 days of consecutive stream flow Jan Feb Mar Apr May Jun Jul Aug Sep Oct 0 2 4 6 8 10 12 630 631 632 633 634 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Perry Hill: UT1 Reach 1 - In-Stream Flow Gauge B Recorded In-stream Flow Events Plot Monitoring Year 3 - 2023 Perry Hill Mitigation Site DMS Project No. 100093 154 days of consecutive stream flow Jan Feb Mar Apr May Jun Jul Aug Sep Oct 0 2 4 6 8 10 12 646 647 648 649 650 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Perry Hill: UT2 Reach 2 - In-Stream Flow Gauge APPENDIX E. Project Timeline and Contact Info DMS Project No. 100093 Invasive Vegetation Treatment Easement Encroachment Competitive Vegetation Treatment1 Invasive Vegetation Treatment In-Stream Vegetation Treatment UT1 Channel Repair DMS Project No. 100093 Baseline Monitoring Document (Year 0)Stream Survey March 2021 September 2022 August 2022 October 2021 Stream Survey March and August 2022 October 2021 May 2021April 2021 April 2022 Year 1 Monitoring Year 2 Monitoring 2024 Stream Survey December 2024 Stream Survey Vegetation Survey December 2022April 2022 April 2023 September 2022 Competitive Vegetation Treatment1 Invasive Vegetation Treatment April 2023 May 2023 September 2023 Main Stream Earthwork, Inc. Table 14. Project Contact Table 2027Stream Survey Vegetation Survey December 2027 Wildlands Engineering, Inc. Construction Contractor Reidsville, NC 27320 631 Camp Dan Valley Rd 843.277.6221 Designer Geoff Smith, PE 1Herbicide ring sprays around the base of planted stems. 497 Bramson Ct, Suite 104 Mt. Pleasant, SC 29464 Monitoring Year 3 - 2023 Year 6 Monitoring 2025 December 2026 Perry Hill Mitigation Site 2027Year 7 Monitoring 2025 December 2025Year 5 Monitoring July 2020Mitigation Plan Approved July 2020 919.851.9986 Jason Lorch Monitoring Performers Wildlands Engineering, Inc. Monitoring, POC Vegetation Survey December 2021October 2021 Stream Survey December 2023 Vegetation Survey 2026 Year 4 Monitoring Table 13. Project Activity and Reporting History Activity or Report Data Collection Complete Completion or Scheduled Delivery Project Instituted NA December 2018 Perry Hill Mitigation Site Monitoring Year 3 - 2023 November 2020Invasive Vegetation Treatment Vegetation Survey Vegetation Survey As-Built Survey Completed Competitive Vegetation Treatment1 April 2021 April 2021 April 2021 October 2021 March 2021Construction (Grading) Completed NA Year 3 Monitoring