Loading...
HomeMy WebLinkAboutMonkeyWrench_Draft_Prospectus_DRAFT_reduced        PROSPECTUS  Draft      September 15, 2023  WILDLANDS FALLS LAKE NEUSE 01  UMBRELLA MITIGATION BANK  Site Name: Monkey Wrench Mitigation Site  Orange County, NC    Neuse River Basin  HUC 03020201    USACE Action ID No. TBD  DWR# TBD           DRAFT PROSPECTUS    Wildlands Falls Lake Neuse 01 Umbrella Mitigation Bank  Site Name: Monkey Wrench Mitigation Site  Orange County, NC    Neuse River Basin  HUC  03020201    USACE Action ID No. TBD  DWR# (To Be Determined)        PREPARED BY:        Wildlands Engineering, Inc.  312 West Millbrook Rd, Suite 225  Raleigh, NC 27609  Phone: (919) 851‐9986      September 15, 2023     Wildlands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site             Draft Prospectus   Page i    TABLE OF CONTENTS  Executive Summary ............................................................................................................................. 1  1.0 Mitigation Bank Introduction and Objectives ........................................................................ 1  1.1 Introduction ............................................................................................................................... 1  1.2 Bank Location ............................................................................................................................ 1  1.3 Goals and Objectives ................................................................................................................. 2  1.4 Qualifications of Bank Sponsor ................................................................................................. 2  2.0 Establishment and Operation of Mitigation Bank .................................................................. 3  2.1 Ownership Agreements ............................................................................................................. 3  2.2 Landowner Information ............................................................................................................ 3  2.3 Proposed Service Area............................................................................................................... 3  2.4 Need and Feasibility of Mitigation Bank ................................................................................... 3  3.0 Ecological Suitability of Site .................................................................................................. 5  3.1 Bank Site Characterization ........................................................................................................ 5  3.2 Cultural Resources and Significant Natural Heritage Areas ...................................................... 8  3.3 Threatened and Endangered Species ........................................................................................ 8  3.4 Floodplain Compliance .............................................................................................................. 9  3.5 Site Constraints and Access ....................................................................................................... 9  4.0 Mitigation Work Plan ......................................................................................................... 10  4.1 Stream Restoration ................................................................................................................. 10  4.2 Stream Enhancement I ............................................................................................................ 11  4.3 Stream Enhancement II ........................................................................................................... 11  4.4 Stream Preservation ................................................................................................................ 11  4.5 Wetlands ................................................................................................................................. 11  4.6 Vegetation Plan ....................................................................................................................... 12  5.0 Determination of Mitigation Credits ................................................................................... 12  5.2 Initial Allocation of Released Credits ....................................................................................... 15  5.3 Subsequent Credit Releases .................................................................................................... 15  6.0 Performance Standards and Monitoring Plan ..................................................................... 16  6.1 Stream Morphological Parameters and Channel Stability ...................................................... 16  6.2 Hydrology ................................................................................................................................ 17  6.3 Vegetation ............................................................................................................................... 17  6.4 Other Parameters .................................................................................................................... 17  7.0 Maintenance and Long‐Term Sustainability ........................................................................ 18  7.1 Maintenance ........................................................................................................................... 18  7.2 Adaptive Management ............................................................................................................ 19  7.3 Long Term Management Provisions ........................................................................................ 19  8.0 References ......................................................................................................................... 20        Wildlands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site             Draft Prospectus   Page ii    TABLES  Table 1. Mitigation Goals and Objectives ........................................................................................... 2  Table 2. Landowner Information ........................................................................................................ 3  Table 3. Project Soil Type and Description.......................................................................................... 8  Table 4. Federally Protected Species in Orange County, NC ................................................................ 8  Table 5. Proposed Easement Crossings............................................................................................... 9  Table 6. Proposed Stream Mitigation Credits ................................................................................... 13  Table 7. Proposed Wetland Mitigation Credits ................................................................................. 13  Table 8. Stream Credit Release Schedule .......................................................................................... 14  Table 9. Riparian Wetland Credit Release Schedule.......................................................................... 15  Table 10. Maintenance Plan ............................................................................................................... 18    FIGURES  Figure 1 Service Area Map   Figure 2 Vicinity Map  Figure 3 NCDOT Draft STIP FY 2020‐2029  Figure 4 USGS Topographic Map  Figure 5 Site Map  Figure 6 Watershed Map  Figure 7 Soils Map  Figure 8 Concept Map  Figure 8B Concept Map with Nutrient Offset Areas  Figure 9 LiDAR Map    APPENDICES  Appendix A  Historic Aerials  Appendix B  NCDWR Stream Classification Forms  Appendix C  Existing Geomorphic Data  Appendix D  EDR Radius Report Summary  Appendix E Landowner Authorizations            Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 1  Executive Summary  Wildlands Holdings XI, LLC (“Sponsor”) proposes a modification request to add the Monkey Wrench  Mitigation Site (“Site”) to a new Wildlands Falls Lake Neuse 01 UMBI (Bank). The Bank is currently in  development with the Camp Creek mitigation site in Durham County (SAW‐2023‐01616; NCDWR # TBD).  Wildlands Holdings XI, LLC is managed by Wildlands Engineering, Inc. (Wildlands) and developed for the  sole purpose of holding mitigation banks. This prospectus is for the second site to be developed under  the Wildlands Falls Lake Neuse 01 Umbrella Mitigation Bank, which will include restoration of streams  and wetlands along North Fork Little River and its unnamed tributaries (Figure 1). The purpose of the  Bank is to provide stream and wetland mitigation credits to compensate for impacts to Waters of the  United States and/or State Waters within the service area, Hydrologic Unit 03020201 (Neuse 01), as  depicted in Figure 2. The resulting conservation easement is estimated to be 41 acres.  1.0 Mitigation Bank Introduction and Objectives  1.1 Introduction  The Site being established under the proposed Bank is located on an active beef cattle farm that  includes bordering woodlands. In addition to North Fork Little River, the Site contains four unnamed  tributaries to North Fork Little River that, for the purpose of this project, are referred to as Rocky Creek,  Lathan Branch, Kitty Branch, and Spike Branch. The Site is located in the DWR Subbasin 03‐04‐01. All  project streams flow to North Fork Little River, which is classified as a Water Supply II Water (WS‐II), a  High Quality Water (HQW), and a Nutrient Sensitive Water (NSW).   A review of historic aerials from 1937 to 2020 shows the Site streams have existed in their approximate  existing locations over time. Before 1982, Rocky Creek was cleared just upstream of Lathan Branch.  Around 1990, and prior to 1993, the wet area around Rocky Creek and near Hester Road was converted  to pasture by the landowner’s father. Another forested area north of North Fork Little River was also  converted to pasture during this time. Last, Rocky Creek in the vicinity of Lathan Branch in the 1990s. A  pond was constructed on Lathan Branch at this time but the dam has since failed.   Within the project area, the streams are mostly eroding, incised, and some are severely impacted by  livestock access. Wetlands have been degraded due to historic channelization and channel incision. The  wetlands on the site have been hydrologically disconnected from the stream channels.   The Sponsor proposes to restore 6,128 linear feet (LF), enhance 972 LF, and preserve 444 LF of the site  streams. The Sponsor proposes to re‐establish 8.156 wetland acres. This stream and wetland mitigation  will include a conservation easement area that is estimated to total 41 acres.  1.2 Bank Location  The proposed Bank (36.221196° N, 79.081904° W) is in northern Orange County approximately eleven  miles north of Hillsborough, NC (Figure 1, Figure 2). The site is located within the Hydrologic Unit Code  (HUC) 03020201020010 and DWR Subbasin 03‐04‐01. The project site drains to Little River which drains  to Falls Lake.   To get to the Site from Raleigh, NC take I‐40 West to I‐885 North, NC‐147 North, and I‐85 South. From I‐ 85, take exit 170 for US‐70 West towards NC‐86 North. Just north of Hillsborough, take NC‐86 North for  four miles and go right on Walnut Grove Church Road. The site is 6 miles on Walnut Grove Church Road  on the left.       Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 2  1.3 Goals and Objectives  The proposed Bank described above will provide numerous ecological benefits within the Neuse River  Basin. Project benefits include site specific improvements and watershed scale benefits.   The project goals and related objectives are described in Table 1. Project goals are desired project  outcomes and objectives are activities that will result in the accomplishment of goals. The project will be  monitored after construction to demonstrate success. A detailed monitoring program will be described  in the forthcoming mitigation plan.   Table 1. Mitigation Goals and Objectives  Goal Objective Expected Outcomes  Improve stream  channel stability.  Construct stream channels that will  maintain stable cross‐sections, patterns,  and profiles over time. Repair eroding  stream banks with bioengineering.   Reduce shear stress on channel boundary.  Reduce sediment inputs from bank erosion.   Improve instream  habitat.  Install habitat features such as  constructed riffles, cover logs, and brush  toes in restored/enhanced streams. Add  woody materials to channel beds.  Construct pools of varying depth.   Increase and diversify available habitats for  macroinvertebrates, fish, and amphibians,  leading to colonization and an increase in  biodiversity over time. Add complexity  including large woody debris (LWD) to the  streams.  Exclude livestock  from streams and  wetlands.  Remove livestock from site or install  livestock exclusion fencing along the  conservation easement.  Reduce sediment, turbidity, nutrient, and  fecal coliform bacteria inputs.  Reconnect  channels with  floodplains.  Construct stream channels with  appropriate bankfull dimensions and  depth relative to the existing floodplain.  Allow more frequent flood flows to disperse  on the floodplain. Support geomorphology  and higher‐level functions. Improve wetland  hydrology.  Restore wetland  hydrology, soils,  and plant  communities.  Remove livestock to allow soil profiles to  stabilize. Restore riparian wetlands and  associated soil structure by raising stream  beds, plugging existing ditches, and  planting native wetland species.   Raise local groundwater elevations.  Periodically inundate floodplain wetlands and  vernal pools.  Restore and  enhance native  floodplain and  streambank  vegetation.  Plant native canopy species in riparian  zone and plant native shrub and  herbaceous species on streambanks. Treat  invasive species within the project area.  Reduce sediment inputs from bank erosion  and runoff. Increase nutrient cycling and  storage in floodplain. Provide riparian habitat.  Add a source of LWD and organic material to  streams. Support all stream functions.  Permanently  protect the project  from harmful uses.  Establish a conservation easement on the  Bank.   Protect Bank from encroachment on the  riparian corridor and direct impact to streams  and wetlands. Support all stream functions.  1.4 Qualifications of Bank Sponsor  The Sponsor, which is managed by Wildlands, was developed for the sole purpose of holding mitigation  banks. Wildlands is a multidisciplinary professional engineering firm that brings together the expertise  necessary to create outstanding ecological restoration projects in a timely and cost‐effective manner. To  execute stream and wetland mitigation projects, Wildlands assembles a team of project specific  subcontractors to perform surveying, construction services, and planting. Each of these subcontractors  has substantial experience in stream, wetland, and buffer restoration in North Carolina and a substantial      Wildlands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site             Draft Prospectus   Page i    TABLE OF CONTENTS  Executive Summary ............................................................................................................................. 1  1.0 Mitigation Bank Introduction and Objectives ........................................................................ 1  1.1 Introduction ............................................................................................................................... 1  1.2 Bank Location ............................................................................................................................ 1  1.3 Goals and Objectives ................................................................................................................. 2  1.4 Qualifications of Bank Sponsor ................................................................................................. 2  2.0 Establishment and Operation of Mitigation Bank .................................................................. 3  2.1 Ownership Agreements ............................................................................................................. 3  2.2 Landowner Information ............................................................................................................ 3  2.3 Proposed Service Area............................................................................................................... 3  2.4 Need and Feasibility of Mitigation Bank ................................................................................... 3  3.0 Ecological Suitability of Site .................................................................................................. 5  3.1 Bank Site Characterization ........................................................................................................ 5  3.2 Cultural Resources and Significant Natural Heritage Areas ...................................................... 8  3.3 Threatened and Endangered Species ........................................................................................ 8  3.4 Floodplain Compliance .............................................................................................................. 9  3.5 Site Constraints and Access ....................................................................................................... 9  4.0 Mitigation Work Plan ......................................................................................................... 10  4.1 Stream Restoration ................................................................................................................. 10  4.2 Stream Enhancement I ............................................................................................................ 11  4.3 Stream Enhancement II ........................................................................................................... 11  4.4 Stream Preservation ................................................................................................................ 11  4.5 Wetlands ................................................................................................................................. 11  4.6 Vegetation Plan ....................................................................................................................... 12  5.0 Determination of Mitigation Credits ................................................................................... 12  5.2 Initial Allocation of Released Credits ....................................................................................... 15  5.3 Subsequent Credit Releases .................................................................................................... 15  6.0 Performance Standards and Monitoring Plan ..................................................................... 16  6.1 Stream Morphological Parameters and Channel Stability ...................................................... 16  6.2 Hydrology ................................................................................................................................ 17  6.3 Vegetation ............................................................................................................................... 17  6.4 Other Parameters .................................................................................................................... 17  7.0 Maintenance and Long‐Term Sustainability ........................................................................ 18  7.1 Maintenance ........................................................................................................................... 18  7.2 Adaptive Management ............................................................................................................ 19  7.3 Long Term Management Provisions ........................................................................................ 19  8.0 References ......................................................................................................................... 20        Wildlands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site             Draft Prospectus   Page ii    TABLES  Table 1. Mitigation Goals and Objectives ........................................................................................... 2  Table 2. Landowner Information ........................................................................................................ 3  Table 3. Project Soil Type and Description.......................................................................................... 8  Table 4. Federally Protected Species in Orange County, NC ................................................................ 8  Table 5. Proposed Easement Crossings............................................................................................... 9  Table 6. Proposed Stream Mitigation Credits ................................................................................... 13  Table 7. Proposed Wetland Mitigation Credits ................................................................................. 13  Table 8. Stream Credit Release Schedule .......................................................................................... 14  Table 9. Riparian Wetland Credit Release Schedule.......................................................................... 15  Table 10. Maintenance Plan ............................................................................................................... 18    FIGURES  Figure 1 Service Area Map   Figure 2 Vicinity Map  Figure 3 NCDOT Draft STIP FY 2020‐2029  Figure 4 USGS Topographic Map  Figure 5 Site Map  Figure 6 Watershed Map  Figure 7 Soils Map  Figure 8 Concept Map  Figure 8B Concept Map with Nutrient Offset Areas  Figure 9 LiDAR Map    APPENDICES  Appendix A  Historic Aerials  Appendix B  NCDWR Stream Classification Forms  Appendix C  Existing Geomorphic Data  Appendix D  EDR Radius Report Summary  Appendix E Landowner Authorizations            Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 1  Executive Summary  Wildlands Holdings XI, LLC (“Sponsor”) proposes a modification request to add the Monkey Wrench  Mitigation Site (“Site”) to a new Wildlands Falls Lake Neuse 01 UMBI (Bank). The Bank is currently in  development with the Camp Creek mitigation site in Durham County (SAW‐2023‐01616; NCDWR # TBD).  Wildlands Holdings XI, LLC is managed by Wildlands Engineering, Inc. (Wildlands) and developed for the  sole purpose of holding mitigation banks. This prospectus is for the second site to be developed under  the Wildlands Falls Lake Neuse 01 Umbrella Mitigation Bank, which will include restoration of streams  and wetlands along North Fork Little River and its unnamed tributaries (Figure 1). The purpose of the  Bank is to provide stream and wetland mitigation credits to compensate for impacts to Waters of the  United States and/or State Waters within the service area, Hydrologic Unit 03020201 (Neuse 01), as  depicted in Figure 2. The resulting conservation easement is estimated to be 41 acres.  1.0 Mitigation Bank Introduction and Objectives  1.1 Introduction  The Site being established under the proposed Bank is located on an active beef cattle farm that  includes bordering woodlands. In addition to North Fork Little River, the Site contains four unnamed  tributaries to North Fork Little River that, for the purpose of this project, are referred to as Rocky Creek,  Lathan Branch, Kitty Branch, and Spike Branch. The Site is located in the DWR Subbasin 03‐04‐01. All  project streams flow to North Fork Little River, which is classified as a Water Supply II Water (WS‐II), a  High Quality Water (HQW), and a Nutrient Sensitive Water (NSW).   A review of historic aerials from 1937 to 2020 shows the Site streams have existed in their approximate  existing locations over time. Before 1982, Rocky Creek was cleared just upstream of Lathan Branch.  Around 1990, and prior to 1993, the wet area around Rocky Creek and near Hester Road was converted  to pasture by the landowner’s father. Another forested area north of North Fork Little River was also  converted to pasture during this time. Last, Rocky Creek in the vicinity of Lathan Branch in the 1990s. A  pond was constructed on Lathan Branch at this time but the dam has since failed.   Within the project area, the streams are mostly eroding, incised, and some are severely impacted by  livestock access. Wetlands have been degraded due to historic channelization and channel incision. The  wetlands on the site have been hydrologically disconnected from the stream channels.   The Sponsor proposes to restore 6,128 linear feet (LF), enhance 972 LF, and preserve 444 LF of the site  streams. The Sponsor proposes to re‐establish 8.156 wetland acres. This stream and wetland mitigation  will include a conservation easement area that is estimated to total 41 acres.  1.2 Bank Location  The proposed Bank (36.221196° N, 79.081904° W) is in northern Orange County approximately eleven  miles north of Hillsborough, NC (Figure 1, Figure 2). The site is located within the Hydrologic Unit Code  (HUC) 03020201020010 and DWR Subbasin 03‐04‐01. The project site drains to Little River which drains  to Falls Lake.   To get to the Site from Raleigh, NC take I‐40 West to I‐885 North, NC‐147 North, and I‐85 South. From I‐ 85, take exit 170 for US‐70 West towards NC‐86 North. Just north of Hillsborough, take NC‐86 North for  four miles and go right on Walnut Grove Church Road. The site is 6 miles on Walnut Grove Church Road  on the left.       Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 2  1.3 Goals and Objectives  The proposed Bank described above will provide numerous ecological benefits within the Neuse River  Basin. Project benefits include site specific improvements and watershed scale benefits.   The project goals and related objectives are described in Table 1. Project goals are desired project  outcomes and objectives are activities that will result in the accomplishment of goals. The project will be  monitored after construction to demonstrate success. A detailed monitoring program will be described  in the forthcoming mitigation plan.   Table 1. Mitigation Goals and Objectives  Goal Objective Expected Outcomes  Improve stream  channel stability.  Construct stream channels that will  maintain stable cross‐sections, patterns,  and profiles over time. Repair eroding  stream banks with bioengineering.   Reduce shear stress on channel boundary.  Reduce sediment inputs from bank erosion.   Improve instream  habitat.  Install habitat features such as  constructed riffles, cover logs, and brush  toes in restored/enhanced streams. Add  woody materials to channel beds.  Construct pools of varying depth.   Increase and diversify available habitats for  macroinvertebrates, fish, and amphibians,  leading to colonization and an increase in  biodiversity over time. Add complexity  including large woody debris (LWD) to the  streams.  Exclude livestock  from streams and  wetlands.  Remove livestock from site or install  livestock exclusion fencing along the  conservation easement.  Reduce sediment, turbidity, nutrient, and  fecal coliform bacteria inputs.  Reconnect  channels with  floodplains.  Construct stream channels with  appropriate bankfull dimensions and  depth relative to the existing floodplain.  Allow more frequent flood flows to disperse  on the floodplain. Support geomorphology  and higher‐level functions. Improve wetland  hydrology.  Restore wetland  hydrology, soils,  and plant  communities.  Remove livestock to allow soil profiles to  stabilize. Restore riparian wetlands and  associated soil structure by raising stream  beds, plugging existing ditches, and  planting native wetland species.   Raise local groundwater elevations.  Periodically inundate floodplain wetlands and  vernal pools.  Restore and  enhance native  floodplain and  streambank  vegetation.  Plant native canopy species in riparian  zone and plant native shrub and  herbaceous species on streambanks. Treat  invasive species within the project area.  Reduce sediment inputs from bank erosion  and runoff. Increase nutrient cycling and  storage in floodplain. Provide riparian habitat.  Add a source of LWD and organic material to  streams. Support all stream functions.  Permanently  protect the project  from harmful uses.  Establish a conservation easement on the  Bank.   Protect Bank from encroachment on the  riparian corridor and direct impact to streams  and wetlands. Support all stream functions.  1.4 Qualifications of Bank Sponsor  The Sponsor, which is managed by Wildlands, was developed for the sole purpose of holding mitigation  banks. Wildlands is a multidisciplinary professional engineering firm that brings together the expertise  necessary to create outstanding ecological restoration projects in a timely and cost‐effective manner. To  execute stream and wetland mitigation projects, Wildlands assembles a team of project specific  subcontractors to perform surveying, construction services, and planting. Each of these subcontractors  has substantial experience in stream, wetland, and buffer restoration in North Carolina and a substantial      Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 3  full‐time professional staff presence in North Carolina. For this project, Wildlands will serve as the  Authorized Agent.      Wildlands Engineering, Inc.       1430 South Mint Street, Suite 104      Charlotte, NC 28203         Phone: (704) 332‐7754     Fax: (704) 332‐3306      Attn: Shawn Wilkerson         Email: swilkerson@wildlandseng.com     2.0 Establishment and Operation of Mitigation Bank  2.1 Ownership Agreements   The Site is located on one parcel owned by two individuals, and an option agreement to record a  conservation easement for the Site has been signed by the landowner. Upon completion of the review  process for the bank prospectus, the Sponsor will submit a detailed mitigation plan and an umbrella  mitigation banking instrument (UMBI) for the site. The UMBI will provide detailed information regarding  bank operation and the long‐term management of the Bank. Once the final mitigation plan is approved  and the accompanying instrument executed by members of the Interagency Review Team (IRT), the  Sponsor will record a conservation easement on the Bank.   2.2 Landowner Information  Table 2 lists the landowner name, parcel identification numbers, deed reference, and address associated  with the parcel on the site.   Table 2. Landowner Information  Landowner Parcel ID Number Deed Reference Address  Lathan and Katherine  Hawkins 9879592873 Book 1960, Page 553 8400 Walnut Grove Church Rd,  Hillsborough, NC  Robert and Staci  Hengsterman 9979582378 Book 2342, Page 435 8328 Walnut Grove Church Rd,  Hillsborough, NC  2.3 Proposed Service Area  The Bank will be established to mitigate impacts to Waters of the United States and/or State Waters  within the service area depicted in Figure 1. This service area includes the Neuse (Hydrologic Unit  03020201) and the City of Raleigh, Falls Lake, Wake Forest, Hillsborough, Creedmoor, Rolesville, Garner,  Knightdale, Cary, Clayton, Smithfield, and portions of Durham, Morrisville, Holly Springs, and Fuquay‐ Varina.  2.4 Need and Feasibility of Mitigation Bank  2.4.1 Need  Basinwide  The Neuse 01 River Basin, as described in the North Carolina Division of Water Resources (NCDWR) 2009  Neuse River Basinwide Water Quality Plan (RBWQP), is undergoing rapid population growth. Wake  County is the most populous county in the state as of 2020, growing by 25.4% between 2010 and 2020  (ncdemography.org). Johnston County grew by 27.9%, and Durham by 21.4% in that same time period.  Wake, Johnston, and Durham Counties are expected to grow by 18.4%, 25.0%, and 13.9% respectively  (NC Office of State Budget and Management, 2020). This increase in population increases      Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 4  developmental pressures, change in land use, and the need for expanded infrastructure (roads, utilities,  etc.) all of which create the necessity for impacts to Waters of the United States to be mitigated for  appropriately and allow the economic growth of this region to continue while the environment and  water quality remain a priority.   The Sponsor expects Bank customers will include private enterprises and public entities with North  Carolina Division of Transportation (NCDOT) as the primary client. Figure 3 depicts the potential projects  set forth by NCDOT for fiscal years 2015‐2025 within the Neuse 01 watershed. This includes  transportation projects along several state, regional, and transition highways.  Sources:  Carolina Demography. “NC Population Growth 2010‐2020”. https://www.ncdemography.org/2021/08/12/first‐look‐at‐2020‐ census‐for‐north‐carolina/ Accessed: 7/27/23  Office of State Budget and Management “Projected Population Change in North Carolina Counties: 2020‐2030”.  https://files.nc.gov/ncosbm/demog/countygrowth_2030.html Accessed: 7/27/23  Local Subbasin  The proposed Bank is located in DWR subbasin 03‐04‐01 and HUC 03020201020010. The Site includes  North Fork Little River. The project site drains to Little River which drains to Falls Lake. This Site is four  miles southwest of an existing DMS full delivery project, Byrd’s Creek, that was initiated in 2011 and  closed out in 2020.   The 2009 Neuse River Basinwide Water Quality Plan lists major stressors in Subbasin 03‐04‐01 to be  total suspended solids (TSS), nutrients, and chlorophyll α. The 2010 (amended 201Neuse River Basin  Restoration Priorities (RBRP) highlights the importance of riparian buffers for stream restoration  projects. Riparian buffers retain and remove nutrients and suspended sediments. The RBRP states that  “priority [restoration] projects should increase or improve buffers.” Another goal of the RBRP for the  Neuse 01 HU is to support the Falls Lake watershed plan.  The Falls Lake water supply is downstream of  the Site and is classified as water supply waters (WS‐IV) and nutrient sensitive waters (NSW). The RBRP  also states that a goal for the Neuse 01 CU is to, “…promote nutrient and sediment reduction in  agricultural areas by restoring and preserving wetlands, streams, and riparian buffers.”    The Neuse River basin is also discussed in the 2005 North Carolina Wildlife Resource Commission’s  (NCWRC) Wildlife Action Plan (WAP). In the report, non‐point source pollution including nutrient loading  and erosion from stream channelization for agriculture attributed to degraded aquatic habitats in the  basin. Additionally, fertilizers and livestock contribute 60 percent of the nitrate and phosphate found in  the Neuse River basin according to the report. This report notes the importance of stream restoration  and land protection efforts in the watershed to address the observed stressors.  The Monkey Wrench Mitigation Site is beneficial because of its location within a Targeted Local  Watershed and its potential to address the goals of the Basinwide Water Quality Plan, the RBRP, and the  WAP through stream and buffer restoration, enhancement, and preservation. The proposed treatments  of streams on the Site will directly and indirectly address stressors identified in the planning documents  by creating stable stream banks, restoring meandering pattern, and restoring, enhancing, and preserving  forested riparian buffers. The project will slow surface runoff, increase retention times, provide shade to  streams, and reconnect the streams to their historic floodplains and riparian wetlands, which will reduce  sediment and nutrient loads which contribute to eutrophication of downstream waters. In addition,  restoration will provide and improve instream and terrestrial (riparian) habitats while improving stream  stability and overall hydrology.       Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 5  The watershed for North Fork Little River is comprised of agriculture/pasture, forestland, and developed  land (42%, 51%, and 7% respectively). The Rocky Creek drainage area consists of agriculture/pasture,  forestland, and developed land (61%, 25%, and 14% respectively).   2.4.2 Feasibility  A Radius Map Report was ordered for the Bank through Environmental Data Resources, Inc. (EDR) and  obtained on July 27, 2023. The target property was not listed in any of the Federal, State, or Tribal  environmental databases searched by EDR. A summary of the EDR report is included in the appendix.  The Bank is located in a rural watershed where the dominant land uses are agriculture, forest, and  residential. The site is located near Hillsborough which could develop in the future as Orange County  grows. Future changes in land use might alter the watershed but it is likely that low density residential  use would result in minimal site hydrology changes.   Based on the preliminary existing conditions assessments performed at the Bank in 2023, Wildlands is  confident that the site has substantial potential for the development of a viable mitigation bank. The  project will provide substantial uplift to the Falls Lake watershed and the Neuse River Basin.   3.0 Ecological Suitability of Site  3.1 Bank Site Characterization  The Bank Site is currently maintained for livestock pasture with sparsely wooded buffers along the  project streams. The Site is a livestock operation with 30 head of free‐range beef cattle on site  throughout the year. This does not include calves nor bulls so the average on the farm is probably closer  to 50 animals. Cattle have access to pastures and streams. It appears, however, that they don’t access  the upper part of N. Fork Little River because it is distant from pasture grass. Pastures are fertilized with  nitrogen once a year in the fall and livestock waste is left to break down in place on pastures. Most of  the streams and wetlands on site have been heavily impacted by livestock access. The existing  conditions of Bank streams are described in Section 3.1.1, existing wetlands are described in Section  3.1.2, and existing vegetation is described in Section 3.1.3. The appendix contains stream determination  forms and stream geomorphic data. Figure 4 is a topographic map of the site, Figure 5 illustrates the  existing Site conditions, and Figure 6 is a map of the project stream watersheds.   3.1.1 Existing Conditions ‐ Streams  North Fork Little River   North Fork Little River flows from west to east through the Site. Reach 1  begins at the upstream property line as a moderately incised channel  with a wide and mature riparian buffer. The lower streambanks are  frequently eroding in outside bends and the pools are typically  embedded with sand. Coarse riffles, however, are present and the  streambanks have mostly suitable herbaceous cover.   Approximately 450 feet downstream from the property line, North Fork  Little River Reach 2 begins as the channel becomes straighter and  increasingly incised below a riffle that is holding grade. Within 200 feet, as the bank height ratios  increase and the channel attempts to meander, streambank erosion worsens, marking the start of Reach  3. Here bank height ratios range from 1.3 to 1.4 but streambank erosion is pronounced and the channel  is disconnected from a wide floodplain. Bedform diversity is limited with sand embedding much of the  coarser bed material, making riffle and pool areas poorly defined. As above, the riparian buffer is mature  and wide. Additionally, approximately 700 feet from the start of Reach 3, cattle impacts become severe.  North Fork Little River       Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 6  A relic, broken fence marks an old crossing and cattle tend to not travel upstream from here, probably  due to the distance from pasture. Downstream from this point, however, cattle congregate in the  stream and have created many access ramps. Toward the downstream end of Reach 3, the buffer  narrows considerably, bedform is dominated by sand with minimal distinction between pools and riffles,  and bank erosion is prevalent.   Reach 4 begins at the confluence with Rocky Creek. The channel remains moderately incised at this  point but bank erosion is often severe. A livestock exclusion fence keeps cattle from the creek about 150  feet below the confluence. Bedform continues to be dominated by sand with little variation between  pools and riffles. The lowest 300 feet of the reach has been historically channelized and the buffer is  mature and wide on the right bank, but limited to about 50 feet on the left bank.   Rocky Creek  Rocky Creek enters the property at Hester Road as several intermittent  channels flow through a linear wetland. These pilot channels have  formed within the wetland and carry seasonal flow. The pilot channels  reach headcuts approximately 400 feet from the Hester Road culvert and  coalesce into a single thread, eroding stream channel. At this point,  Reach 2 continues as an intermittent stream.   The channel lacks riparian buffer for most of its length to the confluence  with Lathan Branch. The channel in this section is deeply incised (BHR =  2.8) and severely eroding. It has also been historically straightened for much of this length. The  substrate contains abundant cobble but the riffle‐pool sequencing is poorly defined. The riparian buffer  is absent except for 400 feet of the lower right bank, which has been livestock impacted but contains  trees for more than 200 feet from the channel.   Once below Lathan Branch, Rocky Creek Reach 3 becomes slightly more stable but still has impairments.  A head cut is located about 100 feet below the confluence followed by a long cobble riffle that stably  drops grade via a slightly incised channel. A farm road comes within 50 feet of the channel’s left bank  but otherwise the buffer is mature, wide, and livestock impacted.   A ford crossing marks a transition to the final section of Rocky Creek. This section has a flatter profile  and is in a wooded setting but the trees are relatively sparse. Reach 4 has a moderately incised channel  (BHR = 1.4) that is typically eroding only at the outside bends and at the streambank bottoms. Riffle‐ pool sequences are not well defined. The incision and erosion increase, however, as Rocky Creek Reach  5 approaches the North Fork Little River. The bank height ratio increases to 2.0 and the streambed  becomes less coarse and more dominated by sand. The streambanks are mostly covered by herbaceous  vegetation with trees spaced well apart.   Cattle have access to the entire length of Rocky Creek but their impacts are more pronounced in the  upper sections, which are closer to pasture.               Rocky Creek      Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 7  Lathan Branch  Lathan Branch enters the project property as an intermittent stream just  below a headcut and becomes more deeply incised and eroding as it extends  through the Site. The landowner’s father attempted to build a dam and  backwater the branch in approximately 1994. The pond dam has since failed  and, though stagnant water collects in the formed depression, the branch  directly flows to Rocky Creek. The bank height ratio is 1.7 and there are no  trees along the branch. A remnant pond dam with a corrugated plastic pipe  is present close to Rocky Creek.  Kitty Branch  Kitty Branch begins on site at an active headcut within a pasture. The branch descends to an incised  elevation and has eroding streambanks. A spring beyond the branch’s right bank adds flow  approximately 200 feet below the headcut. The channel remains incised with herbaceous vegetation  growing at the top of bank and sometimes within the channel. The bank height ratio is 2.6 and it  appears to be increasing. About 400 feet from the origin, Kitty Branch enters a wooded area that has  been impacted by cattle. The stream continues to be incised and eroding, with tree roots extending  above the channel bottom from one bank to the other. The bed material is predominantly sand.   Spike Branch  Spike Branch is a 150‐long intermittent channel that joins Kitty Branch after the latter reaches its  downstream, wooded section. A headcut is migrating up Spike Branch, leaving exposed tree roots and a  small, eroding channel.   3.1.2 Existing Wetlands  The project area includes approximately 1.1 acres of existing wetland in the floodplains of Rocky Creek  and Lathan Branch. Existing wetland areas with persistent wetland hydrology in the floodplain of Rocky  Creek and Lathan Branch, while influenced to an extent by groundwater, are also driven by overland  runoff from adjacent agricultural fields and hillslopes with moderate to steep grades. Existing wetland  areas have compacted soils from cattle trampling. Vegetation communities are dominated by a dense  herbaceous stratum with little to no woody species. Invasive species are not prevalent in existing  wetland areas. As a whole, soil compaction from cattle trampling and lack of woody vegetation are the  primary impairments to existing wetlands (Figure 5).   An additional 8.156 acres of the project area contains hydric soil or buried hydric soil, but lacks  contemporary wetland hydrology. Wetland hydrology of these areas has been removed by subsurface  drainage to channelized streams and placement of spoil material on hydric soils. The spoil originated  from channel modification along Lathan Branch and earthwork upslope of the valleys. Watershed  characteristics and limited floodplain access have resulted in excessive sedimentation and formation of  a natural upland levee along most of North Fork Little River and Rocky Creek. Buried floodplain soils  were observed in several locations within the project area, suggesting the presence of former wetlands.    3.1.3 Existing Vegetation  The condition of the riparian buffer along project streams varies throughout the site. Riparian buffers  are absent along Rocky Creek Reaches 1 and 2, Lathan Branch, and the upper portion of Kitty Branch.  Riparian buffers along these streams and reaches consist of open pasture dominated by pasture grasses  with little to no woody species. The riparian buffer along Rocky Creek Reaches 4 and 5, North Fork Little  River, Spike Branch, and the lower portion of Kitty Branch consist of headwater forest and bottomland  hardwood forest comprised mostly of native species including white oak (Quercus alba), sycamore  (Platanus occidentalis), ironwood (Carpinus caroliniana), green ash (Fraxinus pensylvannica), black  Lathan Branch pond breach      Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 8  walnut (Juglans nigra), and red maple (Acer rubrum) in the canopy and understory. Chinese privet was  noted in the understory along North Fork Little River and Rocky Creek, but was not dominant. The  herbaceous layer mainly consisted of species such as soft rush (Juncus effusus) and various sedges  (Carex spp.), but was dominated by Japanese stiltgrass (Microstegium vimineum).   3.1.4 Soils  The floodplain areas of the proposed project are mapped by the Orange County Soil Survey as primarily  Chewacla soils (Figure 7). This complex transitions from a loam to a silty clay loam and then a clay loam  at depth. An unconsolidated bedrock layer may be found at 80 inches or deeper. This series often  contains inclusions of Wehadkee, which were identified during soil mapping exercises. Wehadkee are  listed on the National Hydric Soil list.   Much of the soils along Rocky Creek Reaches 1 and 2 are mapped as Helena‐Sedgefield complex, but are  actually more similar to the Chewacla series.   Table 3. Project Soil Type and Description  Soil Name Description  Chewacla and  Wehadkee Soils  Generally found on floodplains. Somewhat poorly drained with bedrock layer more than  80 inches deep.  Helena Sandy Loam Moderately well drained soil generally found on hillslopes.  Helena‐Sedgefield  Complex Moderately well drained soil generally found on ridges and hillslopes.   Appling Sandy Loam Well drained, found on summits and interfluves.   Source: Soil Survey of Orange County, North Carolina, USDA‐NRCS,   https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx  3.2 Cultural Resources and Significant Natural Heritage Areas   No sites listed on the National Register with the State Historic Preservation Office are located  immediately adjacent to or within the project area. The archaeological site files at the North Carolina  Office of State Archaeology (OSA) have not been reviewed at this time. All appropriate cultural resource  agencies will be contacted for their review and comment prior to any land disturbing activity.   One registered Natural Heritage Area is located within one mile of the project site, Jimmy Ed Road  Hardpan Forest. No Managed Heritage Areas are located withing one mile of the project site.  3.3 Threatened and Endangered Species   Wildlands searched the USFWS and North Carolina Natural Heritage Program (NHP) databases to  identify federally listed threatened and endangered plant and animal species for Orange County, NC.  Table 4 details the current list of threatened and endangered species for Orange County. Wildlands will  conduct a full review for protected species in the mitigation planning phase and will coordinate with  USFWS and NCWRC as necessary based on that review.   Table 4. Federally Protected Species in Orange County, NC  Species Federal Status Habitat  Birds  Red‐cockaded woodpecker  (Picoides borealis) Endangered Mature pine forest. Longleaf pines are preferred but can  be found in other species of southern pines.  Mammals  Tricolored bat   (Perimyotis subflavus) Proposed Endangered Roost in trees during the summer and caves or mines in  the winter. Prefers to forage in forested riparian areas.       Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 9  Species Federal Status Habitat  Amphibians  Neuse River waterdog  (Necturus lewisi) Threatened  Inhabits perennial streams with clean, flowing water  with high concentrations of dissolved oxygen. Often  found under leaf packs or rocks.   Fish  Carolina madtom   (Noturus furiosus) Endangered Inhabits swiftly flowing, moderate gradient streams with  sand and gravel substrates  Cape Fear shiner   (Notropis mekistocholas) Endangered  Inhabits streams and rivers with gravel, cobble, and  boulder substrates and can be found in pools, riffles,  and runs.   Mussels  Atlantic pigtoe   (Fusconaia masoni) Endangered  Inhabits small creeks to larger rivers with excellent  water quality and flows sufficient to maintain clean, silt‐ free substrates.  Dwarf wedgemussel  (Alasmidonta heterodon) Endangered Requires milkweed species for breeding habitat and  flowering plants for foraging habitat.   Habitat information from the following website: https://ecos.fws.gov/ecp/report/species‐listings‐by‐current‐range‐ county?fips=37135  3.4 Floodplain Compliance  The Site is represented on the Orange County Flood Map 3710986800K and 3710996000L. North Fork  Little River and Site tributaries are mapped in a Zone AE Special Flood Hazard Area (SFHA) on Orange  County Flood Insurance Rate Map (FIRM) Panels 9868 and 9960. A limited detailed study has been  performed on North Fork Little River with base flood elevations defined and delineated floodplain. The  remaining tributaries do not have detailed hydraulic studies performed, but the downstream portions of  said reaches fall within the North Fork Little River SFHA. Effective hydraulic modeling for North Fork  Little River will be obtained from the NC Floodplain Mapping Program. A no‐rise condition will be  pursued if compatible with stream restoration and floodplain enhancement grading. If a no‐rise  condition is not attainable, then a CLOMR will be prepared. Wildlands’ engineers have successfully  navigated the CLOMR process for several similar mitigation project sites. The project will be designed to  avoid adverse floodplain impacts or hydrologic trespass on adjacent properties or local roads.  3.5 Site Constraints and Access   Five crossings are required on the Site property. However, only two of those crossings are within the  project and will allow livestock access. Crossings at Hester Road and above Lathan Branch are upstream  from the project. A third easement break is to allow access to a septic system in case maintenance is  needed. Two traditional crossings are on Rocky Creek and N. Fork Little River. Crossings are summarized  and numbered below in Table 5 and on Figure 8.   An area between Kitty Branch and Rocky Creek has an existing septic drainfield and repair area. This  area will be surveyed and left out of the conservation easement. A preliminary estimate of the area is  shown in Figure 8.  Table 5. Proposed Easement Crossings   No. Width (ft) Location Internal or  External Crossing Type Purpose  1 30 Rocky Creek –  upstream from Reach 1 Internal Ford Livestock passage over non‐ jurisdictional coneyance      Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 10  No. Width (ft) Location Internal or  External Crossing Type Purpose  2 40 Lathan Branch –  upstream from Reach 1 Internal Culvert Livestock passage over a  jurisdictional stream  3 60 N. Fork Little River –  Reach 3 Internal Ford Livestock passage over newly  constructed ford crossing  4 60 Rocky Creek – Reach 2 Internal  Ford Livestock passage via an existing,  stable ford crossing  5 10 Lathan Branch  Internal No crossing; break for  existing septic system.  Allow maintenance access to  existing septic drain line en route  to drain field.   The easement boundaries around streams proposed for mitigation credit provide the required 50‐foot  minimum riparian buffer for Piedmont streams. The entire easement area can be accessed for  construction, monitoring, and long‐term stewardship from Walnut Grove Church and Hester Roads. The  Whitfield Farms airport is located about four miles of the Site.  4.0 Mitigation Work Plan  Wildlands will begin the project by identifying the best design approach to meet the stated project  objectives and implement the appropriate degree of intervention. A combination of analog, empirical,  and analytical design approaches will potentially be used. All project resources will be designed to create  stable, functional stream channels and riparian wetlands.   4.1 Stream Restoration  All project reaches are proposed for restoration with the  exception of upper N. Fork Little River, Rocky Creek  Reaches 1 and 4, and Spike Branch. The restoration  reaches will be designed and built with appropriate  dimension, pattern, and profile to allow for frequent  overbank flooding, provide stable bank slopes, enable  biological lift, and reconnect streams with existing  floodplains. Reference streams will be identified and will  serve as one of the primary sources of information on  which restoration designs are based. Wildlands has  developed a general approach to be used as the basis for  stream restoration design. The design approach, which is tailored to each site, continues to develop as  additional projects are implemented.   All reaches proposed for restoration will be designed with a Priority 1 approach, raising channel beds to  reconnect them with existing floodplains. Priority 2 restoration will be required on the downstream end  of N. Fork Little River to stably connect with existing grades. The Priority 2 length will be minimized.   Stream structures will be installed to promote water quality, stabilize the bed and banks, provide  bedform diversity, and increase aquatic and terrestrial habitat. Wildlands plans to evaluate stream  substrate and determine appropriate gradations/bed features for the Site streams. At this stage,  Wildlands believes most of these channels will be built using a threshold channel approach with a  cobble‐gravel substrate. Wildlands believes based on other work in this area that appropriate substrate  will be able to be harvested on‐site.  Sandy Branch Mitigation Site  Designed and Constructed by Wildlands      Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 11  4.2 Stream Enhancement I  N. Fork Little RIver Reach 2 is slated for an Enhancement I approach. The channel incises further below a  stable cobble riffle. From this point, Wildlands will install constructed riffles to raise the stream bed  elevation in preparation for Priority 1 restoration in Reach 3.   Rocky Creek Reach 4 is also proposed for Enhancement I. Though it has less erosion than reaches slated  for restoration, its bank height ratio is 1.4, indicating it is moderately incised and not well connected  with the floodplain. An Enhancement I approach that focuses on raising the bed with constructed riffles  will increase floodplain interaction and increase bedform diversity in the form of riffle‐pool sequences.  The riparian buffer along Reach 4 is also sparse and supplemental planting and livestock exclusion will  be incorporated.   4.3 Stream Enhancement II  Rocky Creek Reach 1 and Spike Branch are slated for an Enhancement II approach. Rocky Creek Reach 1  is largely stable but is impacted by livestock trampling and does not have trees. The proposed approach  is to exclude livestock and plant a native riparian buffer.   Spike Branch is a short reach and stabilizing the headcut at the upstream end is the most critical need.  Given its small drainage area, raising the bed below this point could result in loss of jurisdictional status.  But streambank stabilization will be employed through bank grading and matting.   4.4 Stream Preservation   Upper N. Fork Little River is only slightly incised and has a very wide and mature riparian buffer  surrounding it. Though there is some erosion, preservation is proposed to protect it from degradation.   4.5 Wetlands  Proposed wetland mitigation includes approximately 8.156 acres of wetland re‐establishment. Two  activities will be used to improve wetland hydrology to justify wetland re‐establishment in the areas  identified in Figure 8. First, and likely most relevant, the restoration of incised streams using Priority 1  techniques will serve to effectively change the subsurface flow gradient and discharge characteristics of  the groundwater table to the receiving stream, rehydrating wetlands adjacent to the channel. Secondly,  cattle will be excluded from riparian areas, which will improve soil structure and allow native vegetation  to regenerate and proliferate. Areas lacking diversity of native riparian species will be scheduled for an  appropriate level of vegetation planting in addition to invasive species control. The credit ratio proposed  for wetland re‐establishment areas is 1:1.   Existing jurisdictional wetlands located adjacent to streams will benefit from planting of native riparian  vegetation and Priority 1 restoration techniques that will raise the groundwater table and re‐establish a  more traditional hydrology regime for headwater forests and bottomland hardwood forests. However,  these areas are targeted for nutrient offset mitigation and will not be proposed for wetland credit.          Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 12  4.6 Vegetation Plan  Native riparian buffers will be planted along restored and  enhanced stream reaches, in all proposed wetland  restoration zones, and in all riparian restoration areas. The  ecological uplift can be summarized as transforming an  agriculturally impacted area to a protected riparian  corridor. Buffer restoration will involve planting appropriate  native tree species along the riparian corridor. Herbaceous  riparian vegetation will also be planted, but additional  herbaceous plants are expected to re‐establish naturally  and through the placement of a native seed mix in  disturbed areas. Live stake shrub species will be planted  along restored streams. Vegetation management and herbicide applications will be needed over the first  few years of tree establishment in the riparian buffer restoration areas to prevent encroachment of  invasive species. Portions of the site that have been maintained as cleared agricultural fields will require  little site preparation other than select herbicide treatments or limited mechanical clearing to remove  undesirable underbrush prior to planting.   The planting plan will be based on an appropriate nearby reference community and past project  experience. The plan will be developed to restore appropriate strata (canopy, understory, shrub, and  herbaceous layers). Vegetation planted in restored wetland areas will be based on species identified  within appropriate reference locations and professional experience based on site conditions.   Areas with an existing wooded riparian corridor will be treated for invasive species. The Site will be  protected in perpetuity under a conservation easement and will be marked per IRT guidelines.  5.0 Determination of Mitigation Credits  The mitigation stream and wetland credit calculations were derived using the US Army Corps of  Engineers’ Stream Mitigation Guidance and was based on Wildlands’ conceptual design for maximum  ecological uplift. Given the existing conditions of the stream channels, wetlands, the disturbance factors,  and the constraints, management objectives for each reach have been established.   The Site will be a combination of stream restoration and enhancement level II activities. Stream  restoration is proposed at a ratio of 1:1, enhancement level I is proposed at 1.5:1, enhancement level II  is proposed at 2.5:1, and preservation is proposed at 10:1, as listed below. The management objective,  the mitigation type, and proposed amount of mitigation is presented in the below in Tables 6 and 7.     Planted riparian buffer      Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 13  Table 6. Proposed Stream Mitigation Credits  Stream Credits  Reach Management Objectives Type of Mitigation Length  (feet) Ratio Stream  Credits  RESTORATION  N. Fork Little River  Reaches 3 and 4  Restore appropriate dimension, pattern,  and profile with Priority 1 restoration.  Install habitat structures, allow bankfull  floodplain access. Establish native riparian  buffer, execute long term protection  instrument, mark easement.  Restoration  1,920 1 1,920  Rocky Creek   Reaches 2,  3, and 5 2,768 1 2,768  Lathan Branch 600 1 600  Kitty Branch    840 1 840  Restoration Subtotal: 6,128  6,128  ENHANCEMENT I  N. Fork Little River   Reach 2  Add constructed riffles to lower bank height  ratios and establish riffle‐pool sequences,  stabilize banks and add structures where  needed, establish native riparian buffer  where needed, execute long term  protection instrument, mark easement.  Enhancement I   210 1.5 140  Rocky Creek Reach 4 315 1.5 210  Enhancement I Subtotal: 525  350  ENHANCEMENT II  Rocky Creek Reach 1 Exclude livestock and plant forested riparian  buffer.   Enhancement II  297 3.5 85  Spike Branch  Stabilize headcut, treat invasive species,  stabilize banks where needed, plant  livestakes, execute long term protection  instrument, mark easement.  150 2.5 60  Enhancement II Subtotal: 447  145  PRESERVATION  N. Fork Little River   Reach 1  Treat invasive species, long term  protections instrument, mark easement. Preservation 444 10 44  Preservation Subtotal: 444  44  TOTAL 7,544  6,663    Table 7. Proposed Wetland Mitigation Credits  Wetland credits  Area Management Objectives Type of  Mitigation  Area  (Acres) Ratio Wetland  Credits  Wetland  Reestablishment    Reduce soil compaction, raise adjacent stream  beds and remove concentrated floodplain flow  paths (as needed) to restore hydrology, remove  overburden and excess sediment, establish native  hydrophytic vegetation  Wetland  Reestablishment 8.156 1:1 8.156      TOTAL: 8.156  8.156           Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 14  5.1.1 Credit Release Schedule  All credit releases will be based on the total credit generated as reported by the as‐built surveys of the  Bank. Under no circumstances shall the Bank be debited until the necessary Department of Army (DA)  authorization has been received for its construction or the District Engineer (DE) has otherwise provided  written approval for the project in the case where no DA authorization is required for construction of  the mitigation project. The DE, in consultation with the IRT, will determine if performance standards  have been satisfied sufficiently to meet the requirements of the release schedules below. In cases where  some performance standards have not been met, credits may still be released depending on the  specifics of the case. Monitoring may be required to restart or be extended, depending on the extent to  which the site fails to meet the specified performance standard. The release of project credits will follow  the Monitoring Requirements and Performance Standards for Compensatory Mitigation in North  Carolina, dated February 9, 2013. The proposed credit release schedule is shown in Tables 8 and 9.  Table 8. Stream Credit Release Schedule  Credit  Release  Milestone  Credit Release Activity Interim  Release  Total  Released  1 Bank Establishment  15% 15%  2 Completion of all initial physical and biological improvements made  pursuant to the Mitigation Plan 15% 30%  3 First year monitoring report demonstrates channels are stable and interim  performance standards have been met 10% 40%  4 Second year monitoring report demonstrates channels are stable and  interim performance standards have been met 10% 50%  5 Third year monitoring report demonstrates channels are stable and interim  performance standards have been met 10% 60%  6 Fourth year monitoring report demonstrates channels are stable and  interim performance standards have been met 5% 65%  (75%*)  7 Fifth year monitoring report demonstrates performance standards are  being met  10% 75%  (85%*)  8 Sixth year monitoring report demonstrates performance standards are  being met  5% 80%  (90%*)  9 Seventh year monitoring report demonstrates that channels are stable,  performance standards have been met.  10% 90%  (100%*)  *A 10% reserve of credits to be held back until the bankfull event performance standard has been met.         Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 15  Table 9. Riparian Wetland Credit Release Schedule  Credit  Release  Milestone  Credit Release Activity Interim  Release  Total  Released  1 Bank Establishment 15% 15%  2 Completion of all initial physical and biological improvements made  pursuant to the Mitigation Plan 15% 30%  3 First year monitoring report demonstrates interim performance standards  are being met 10% 40%  4 Second year monitoring report demonstrates interim performance  standards are being met 10% 50%   5 Third year monitoring report demonstrates interim performance standards  are being met 15% 65%   6 Fourth year monitoring report demonstrates interim performance  standards are being met 5% 70%   7  Fifth year monitoring report demonstrates performance standards are  being met; Provided that all performance standards are met, the IRT may  allow the Bank Sponsor to discontinue hydrologic monitoring after the fifth  year, but vegetation monitoring must continue for an additional two years  after the fifth year for a total of seven years  15% 85%   8 Sixth year monitoring report demonstrates performance standards are  being met 5% 90%   9 Seventh year monitoring report demonstrates performance standards are  being met, and project has received close‐out approval 10% 100%   5.2 Initial Allocation of Released Credits  The initial allocation of released credits is defined as Bank Establishment in the 2013 Wilmington District  credit release schedule guidance document. The initial allocation can be released without prior written  approval of the DE upon satisfactory completion of the following activities:  a. Execution of the UMBI by the Sponsor and the USACE.  b. Approval of the final mitigation plan.  c. Recordation of the conservation easement and delivery of a title opinion acceptable to the  USACE.   d. Delivery of the financial assurances described in the mitigation plan.  e. 404 permit verification for construction of the site, if required.  5.3  Subsequent Credit Releases  All subsequent credit releases must be approved by the DE, in consultation with the IRT, based on a  determination that required performance standards have been achieved. For stream projects, a reserve  of 10% of a site’s total stream credits shall be released after four bankfull events have occurred in  separate years, provided the channel is stable and all other performance standards are met. In the event  that less than four bankfull events occur during the monitoring period, release of these reserve credits  shall be at the discretion of the IRT. As the bank approaches milestones associated with the credit  release, Wildlands will submit a request for credit release to the DE along with documentation  substantiating achievement of criteria required for release to occur. This documentation will be included  with the annual monitoring report.       Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 16  6.0 Performance Standards and Monitoring Plan  The performance criteria for the Site will follow approved performance criteria presented in the October  2016 IRT Mitigation Monitoring Guidance. Annual monitoring and semi‐annual site visits will be  conducted to assess the condition of the completed project. Specific performance standard components  are proposed for stream morphology, hydrology, and vegetation. The stream restoration reaches of the  project will be assigned specific performance criteria components for hydrology, vegetation, and  geomorphology. The enhancement II reaches will be assigned specific performance criteria components  for vegetation only. Performance criteria will be evaluated throughout the (up to) seven years of post‐ construction monitoring. If all stream, vegetation, and hydrologic performance criteria have been  successfully met and at least four bankfull events have occurred during separate years, Wildlands may  propose to terminate stream and/or vegetation monitoring after five years with written approval from  the USACE and North Carolina Interagency Review Team (IRT). An outline of the performance criteria  components follows.   6.1 Stream Morphological Parameters and Channel Stability  Dimension   Riffle cross sections on the restoration reaches should be stable and should show little change in  bankfull area, bank height ratio, and width‐to‐depth ratio. Riffle cross sections should fall within the  parameters defined for channels of the appropriate stream type. If any changes do occur, these changes  will be evaluated to assess whether the stream channel is showing signs of instability. Changes in the  channel that indicate a movement toward stability or enhanced habitat include a decrease in the width‐ to‐depth ratio in meandering channels or an increase in pool depth. These sorts of bed changes do not  constitute a problem or indicate a need for remedial actions. If channel changes indicate a movement  toward stability, remedial action will not be taken.   In order to assess channel dimension performance, permanent  cross sections will be installed on restoration and reaches per  the IRT Mitigation Monitoring Guidelines (October 2016). Each  cross section will be permanently marked with pins to establish  its location. Cross section surveys will include points measured  at all breaks in slope, including top of bank, bankfull, edge of  water, and thalweg. Cross section and bank pin surveys (if  applicable) will be conducted in monitoring years one, two,  three, five, and seven.   Profile and Pattern   Longitudinal profile surveys will be conducted during the as‐built survey but will not be conducted  during the seven‐year monitoring period unless other indicators during the annual monitoring indicate a  trend toward vertical and lateral instability. If a longitudinal profile is deemed necessary, monitoring will  follow standards as described in the Stream Channel Reference Sites:  An Illustrated Guide to Field  Technique (Harrelson et. al., 1994) for the necessary reaches.   Substrate   Channel substrate materials will be sampled with the pebble count method along restoration, and  enhancement I reaches. These reaches should show maintenance of coarser materials in the riffle  features and smaller particles in the pool features. A reach‐wide pebble count will be performed in each  restoration reach each monitoring year for classification purposes. A pebble count will be performed at  each surveyed riffle cross‐section, only during the as‐built survey to characterize the pavement.   Example of a cross section survey      Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 17  6.2 Hydrology  Stream   Four bankfull flow events, occurring in separate years, must be documented on the restoration reaches  within the seven‐year monitoring period. Stream monitoring will continue until success criteria in the  form of four bankfull events in separate years have been documented. Bankfull events will be  documented using photographs and either a crest gage or a pressure transducer, as appropriate for Site  conditions. The selected measurement device will be installed in the stream within a surveyed riffle  cross section. Photographs will also be used to document the occurrence of debris lines and sediment  deposition.  Where restoration activities are proposed for intermittent streams, monitoring gages will be installed to  track the frequency and duration of stream flow events. Continuous surface water flow within the  tributaries must be documented to occur every year for at least 30 consecutive days during the seven‐ year monitoring period. This 30‐day period of flow can occur at any point during the year. Additional  monitoring may be required if surface water flow cannot be documented due to abnormally dry  conditions.  Wetland  Groundwater monitoring will be conducted for seven years after construction to evaluate the hydrologic  state of the restored wetland areas. Wetland groundwater gages will be installed in accordance with the  techniques and standards described in the USACE document entitled “Technical Standard for Water‐ Table Monitoring of Potential Wetland Sites” (ERDC TN‐WRAP‐05‐2, June 2005). Groundwater  monitoring gages will be established throughout the wetland area to adequately characterize the  different soils, vegetation communities, and surface topographic variations that are found across the  site. According to Table 1 in the USACE Mitigation Guidance update, Wehadkee soils have a wetland  saturation range of 12‐16% of the growing season. Based on this, the final criteria for wetland hydrology  will be groundwater levels within 12 inches of the soil surface for a minimum period of 12% of the  growing season.  6.3 Vegetation  The final vegetative success criteria will be the survival of 210 planted stems per acre in the riparian  corridors at the end of the required monitoring period (year seven). The interim measure of vegetative  success for the Site will be the survival of at least 320 native species stems per acre at the end of the  third monitoring year and at least 260 stems per acre at the end of the fifth year of monitoring. Also,  trees must average seven feet in height at the end of the fifth monitoring year, and ten feet in height at  the end of the seventh monitoring year. If this performance standard is met by year five and stem  density is trending towards success (i.e., vigor), and invasive species are not threatening ecological  success, monitoring of vegetation on the Site may be terminated with written approval by the USACE in  consultation with the IRT. The extent of invasive species coverage will also be monitored and controlled  as necessary throughout the required monitoring period.  Vegetation monitoring quadrants will be installed across the Site to measure the survival of the planted  trees. The number of monitoring quadrants required, and frequency of monitoring will be based on the  October 2016 IRT Mitigation Monitoring Guidance. Vegetation monitoring will occur in the summer and  will follow the CVS‐EEP Protocol for Recording Vegetation (2008).  6.4 Other Parameters  Photo Reference Stations  Photographs should illustrate the Site’s vegetation and morphological stability on an annual basis. Cross  section photos should demonstrate no excessive erosion or degradation of the banks. Longitudinal      Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 18  photos should indicate the absence of persistent mid‐channel bars within the channel or vertical  incision. Grade control structures should remain stable. Deposition of sediment on the bank side of vane  arms is preferable. Maintenance of scour pools on the channel side of vane arms is expected.   Photographs will be taken once a year to visually document stability for seven years following  construction. Permanent markers will be established and located with GPS equipment, so that the same  locations and view directions on the Site are photographed each year. Photos will be used to monitor  restoration and enhancement areas, as well as vegetation plots.   Longitudinal reference photos will be established at regular intervals along the channel by taking a  photo looking upstream and downstream. Cross sectional photos will be taken of each permanent cross  section looking upstream and downstream. Reference photos will also be taken for each of the  vegetation plots. Representative digital photos of each permanent photo point, cross section, and  vegetation plot will be taken when the stream and vegetation assessments are conducted. The  photographer will make every effort to consistently maintain the same area in each photo over time.   Visual Assessments  Visual assessments should support the specific performance standards for each metric as described  above. Visual assessments will be performed along stream reaches on a semi‐annual basis during the  seven‐year monitoring period. Problem areas such as channel instability (e.g. lateral and/or vertical  instability, instream structure failure/instability and/or piping, headcuts), vegetation health (e.g. low  stem density, vegetation mortality, invasive species, or encroachment), beaver activity, or livestock  access will be noted. Areas of concern will be mapped and photographed and will be accompanied by a  written description in the annual report. Problem areas will be re‐evaluated during each subsequent  visual assessment. Should remedial actions be required, a plan of action will be provided in the annual  monitoring report.  Benthic Macroinvertebrates  If required by DWR as part of the project’s permitting process, benthic macroinvertebrate sampling will  be performed on the restored site. Any required sampling will be performed using DWR Standard  Operating Procedures for Benthic Macroinvertebrates (October 2012).  7.0 Maintenance and Long‐Term Sustainability  7.1 Maintenance  The Bank shall be monitored on a regular basis and a physical inspection of the project shall be  conducted at a minimum of once per year throughout the post‐construction monitoring period until  performance standards are met. These site inspections may identify site components and features that  require routine maintenance. Routine maintenance will be conducted to rectify identified deficiencies  and may include the activities listed in Table 10.  Table 10.  Maintenance Plan  Component /  Feature Maintenance through project close‐out  Stream  Routine channel maintenance and repair activities may include chinking of in‐stream structures to  prevent piping, securing loose coir matting, and supplemental installations of live stakes and  other target vegetation along the channel. Areas where stormwater and floodplain flows  intercept the channel may also require maintenance to prevent bank failures and head‐cutting.  Beaver dams that inundate the streams channels shall be removed and the beaver shall be  trapped.       Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 19  Component /  Feature Maintenance through project close‐out  Vegetation  Vegetation shall be maintained to ensure the health and vigor of the targeted community.  Routine vegetation maintenance and repair activities may include supplemental planting,  pruning, mulching, and fertilizing. Exotic invasive plant species affecting the viability of the  mitigation shall be controlled by mechanical and/or chemical methods. Any vegetation control  requiring herbicide application will be performed in accordance with the NC Department of  Agriculture (NCDA) rules and regulations.   Site  Boundary  Site boundaries shall be identified in the field to ensure clear distinction between the bank site  and adjacent properties. Boundaries may be identified by fence, marker, bollard, post, tree‐ blazing, or other means as allowed by site conditions and/or conservation easement. Boundary  markers disturbed, damaged, or destroyed will be repaired and/or replaced on an as‐needed  basis.   7.2 Adaptive Management  Upon completion of site construction, the Sponsor will implement the post‐construction monitoring  protocols and minor remedial actions (routine maintenance) will be performed as needed for the  duration of the monitoring period. The Sponsor will notify the USACE immediately if monitoring results  or visual observations suggest a trend towards instability, major remedial actions are needed, or that  performance standards cannot be achieved. Should major remedial measures be required, the Sponsor  will submit a Corrective Action Plan and coordinate with the USACE until authorization is secured to  conduct the adaptive management activities. The Sponsor is responsible for funding and/or providing  the services necessary to secure any necessary permits to support the proposed major remedial  adaptive management actions, to implement the corrective action plan, and to deliver record drawings  that depict the extent and nature of the work performed. If the USACE determines that the Bank is not  meeting performance standards or the Sponsor is not complying with the terms of the instrument, the  USACE may take appropriate actions, including but not limited to: suspending credit sales, utilizing  financial assurances, and/or terminating the instrument.  7.3 Long Term Management Provisions  The Sponsor will institute a Long Term Management Plan responsible for assessing the condition of the  Bank and implementing maintenance provisions to maintain performance of the Bank. The proposed  conservation easement will help to ensure that only IRT‐allowable activities take place. This easement  will be transferred to an IRT‐approved non‐profit organization once monitoring success criteria have  been achieved.  The provider for long term management of the sites is anticipated to be Unique Places to Save  (UP2Save). UP2Save is a 501c3 nonprofit committed to land conservation through conservation planning  and management. The funding mechanism for long term management will be a stewardship  endowment funded by Wildlands. Contact information for UP2Save is listed below.  Unique Places to Save  206 Causeway Drive #206  Wrightsville Beach, NC 28480  Phone: (910) 707‐3622  Email: info@uniqueplacestosave.org   To monitor the project’s continued success, a Long Term Management Plan will be implemented  following the seven‐year monitoring period. All components of the bank will be inspected annually or  less frequently as needed to ensure that the Bank remains stable in perpetuity. Sources of instability or      Widllands Upper Neuse Umbrella Mitigation Bank  Monkey Wrench Mitigation Site   Draft Prospectus  Page 20  other deficiencies will be addressed. Invasive species will be managed annually or less frequently as  needed to ensure the long term survivability of the planned native vegetation community. All reporting  will be documented and kept on file for future reference.  8.0 References  Geologic Map of North Carolina 1:500,000 scale, 1985. Compiled by Philip M. Brown at el. Raleigh, NC,  North Carolina Geological Survey.  https://ncdenr.maps.arcgis.com/apps/MapSeries/index.html?appid=a8281cbd24b84239b29cd2ca7 98d4a10  Natural Resources Conservation Service (NRCS), 2011. Web Soil Survey.  http://websoilsurvey.nrcs.usda.gov/app/HomePage.htm  North Carolina Division of Water Resources (NCDWR) 2009 Neuse River Basinwide Water Quality Plan,  accessed at:  https://www.deq.nc.gov/about/divisions/water‐resources/water‐planning/basin‐planning/river‐ basin‐plans/neuse  North Carolina Division of Mitigation Services (NCDMS). 2018 Neuse River Basin Restoration Priorities  (RBRP), accessed at:   https://www.deq.nc.gov/about/divisions/mitigation‐services/dms‐planning/watershed‐planning‐ documents/neuse‐river‐basin‐documents  Soil Survey of Durham County, North Carolina, USDA‐NRCS, accessed at  https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx  Appendix A Historic Aerials The EDR Aerial Photo Decade Package Monkey Wrench Mitigation Site 8400 Walnut Grove Church Road Hurdle Mills, NC 27541 Inquiry Number: July 31, 2023 7402845.5 6 Armstrong Road, 4th floor Shelton, CT 06484 Toll Free: 800.352.0050 www.edrnet.com 2020 1"=500'Flight Year: 2020 USDA/NAIP 2016 1"=500'Flight Year: 2016 USDA/NAIP 2012 1"=500'Flight Year: 2012 USDA/NAIP 2009 1"=500'Flight Year: 2009 USDA/NAIP 2006 1"=500'Flight Year: 2006 USDA/NAIP 1999 1"=500'Acquisition Date: January 01, 1999 USGS/DOQQ 1993 1"=500'Acquisition Date: March 01, 1993 USGS/DOQQ 1982 1"=500'Flight Date: March 28, 1982 NHAP 1980 1"=500'Flight Date: January 19, 1980 USGS 1977 1"=500'Flight Date: March 25, 1977 USGS 1964 1"=500'Flight Date: March 12, 1964 USGS 1955 1"=500'Flight Date: March 30, 1955 USDA 1950 1"=500'Flight Date: November 18, 1950 USGS 1938 1"=500'Flight Date: April 28, 1938 USGS EDR Aerial Photo Decade Package 07/31/23 Monkey Wrench Mitigation Site Site Name:Client Name: Wildlands Eng, Inc. 8400 Walnut Grove Church Road 1430 South Mint Street Hurdle Mills, NC 27541 Charlotte, NC 28203 EDR Inquiry #7402845.5 Contact:Tasha King Environmental Data Resources, Inc. (EDR) Aerial Photo Decade Package is a screening tool designed to assist environmental professionals in evaluating potential liability on a target property resulting from past activities. EDR’s professional researchers provide digitally reproduced historical aerial photographs, and when available, provide one photo per decade. Search Results: Year Scale Details Source When delivered electronically by EDR, the aerial photo images included with this report are for ONE TIME USE ONLY. Further reproduction of these aerial photo images is prohibited without permission from EDR. For more information contact your EDR Account Executive. Disclaimer - Copyright and Trademark Notice Copyright 2023 by Environmental Data Resources, Inc. All rights reserved. Reproduction in any media or format, in whole or in part, of any report or map of Environmental Data Resources, Inc., or its affiliates, is prohibited without prior written permission. EDR and its logos (including Sanborn and Sanborn Map) are trademarks of Environmental Data Resources, LLC or its affiliates. All other trademarks used herein are the property of their respective owners. 7402845 5-page 2 This Report contains certain information obtained from a variety of public and other sources reasonably available to Environmental Data Resources, LLC. It cannot be concluded from this Report that coverage information for the target and surrounding properties does not exist from other sources. This Report is provided on an “AS IS”, “AS AVAILABLE” basis. NO WARRANTY EXPRESS OR IMPLIED IS MADE WHATSOEVER IN CONNECTION WITH THIS REPORT. ENVIRONMENTAL DATA RESOURCES, LLC AND ITS SUBSIDIARIES, AFFILIATES AND THIRD PARTY SUPPLIERS DISCLAIM ALL WARRANTIES, OF ANY KIND OR NATURE, EXPRESS OR IMPLIED, ARISING OUT OF OR RELATED TO THIS REPORT OR ANY OF THE DATA AND INFORMATION PROVIDED IN THIS REPORT, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES REGARDING ACCURACY, QUALITY, CORRECTNESS, COMPLETENESS, COMPREHENSIVENESS, SUITABILITY, MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, TITLE, NON-INFRINGEMENT, MISAPPROPRIATION, OR OTHERWISE. ALL RISK IS ASSUMED BY THE USER. IN NO EVENT SHALL ENVIRONMENTAL DATA RESOURCES, LLC OR ITS SUBSIDIARIES, AFFILIATES OR THIRD PARTY SUPPLIERS BE LIABLE TO ANYONE FOR ANY DIRECT, INCIDENTAL, INDIRECT, SPECIAL, CONSEQUENTIAL OR OTHER DAMAGES OF ANY TYPE OR KIND (INCLUDING BUT NOT LIMITED TO LOSS OF PROFITS, LOSS OF USE, OR LOSS OF DATA), ARISING OUT OF OR IN ANY WAY CONNECTED WITH THIS REPORT OR ANY OF THE DATA AND INFORMATION PROVIDED IN THIS REPORT. Any analyses, estimates, ratings, environmental risk levels, or risk codes provided in this Report are provided for illustrative purposes only, and are not intended to provide, nor should they be interpreted as providing any facts regarding, or prediction or forecast of, any environmental risk for any property. Only an assessment performed by a qualified environmental professional can provide findings, opinions or conclusions regarding the environmental risk or conditions in, on or at any property. 7402845.5 2020 = 500' 7402845.5 2016 = 500' 7402845.5 2012 = 500' 7402845.5 2009 = 500' 7402845.5 2006 = 500' 7402845.5 1999 = 500' 7402845.5 1993 = 500' 7402845.5 1982 = 500' 7402845.5 1980 = 500' 7402845.5 1977 = 500' 7402845.5 1964 = 500' 7402845.5 1955 = 500' 7402845.5 1950 = 500' 7402845.5 1938 = 500' Appendix B NCDWR Stream Classification Forms NC DWQ Stream Identification Form Version 4.11 Date: July 19, 2023 Project/Site: Monkey Wrench Latitude: 36.21907 Evaluator: S. Law Trib/Reach: E1 Longitude: -79.08289 Total Points: 16.75 Stream Determination: Ephemeral (<19) County: Orange A. Geomorphology (Subtotal = 10) Absent Weak Moderate Strong 1. Continuity of channel bed and bank ☐ 0 ☐ 1 ☐ 2 ☑ 3 2. Sinuosity of channel along thalweg ☐ 0 ☑ 1 ☐ 2 ☐ 3 3. In-channel structure ☐ 0 ☑ 1 ☐ 2 ☐ 3 4. Particle size of stream substrate ☐ 0 ☐ 1 ☑ 2 ☐ 3 5. Active/relict floodplain ☐ 0 ☑ 1 ☐ 2 ☐ 3 6. Depositional bars or benches ☑ 0 ☐ 1 ☐ 2 ☐ 3 7. Recent alluvial deposits ☑ 0 ☐ 1 ☐ 2 ☐ 3 8. Headcuts ☐ 0 ☑ 1 ☐ 2 ☐ 3 9. Grade control ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 10. Natural valley ☐ 0 ☐ 0.5 ☑ 1 ☐ 1.5 11. Second or greater order channel ☑ No = 0 ☐ Yes = 3 B. Hydrology (Subtotal = 1) 12. Presence of Baseflow ☑ 0 ☐ 1 ☐ 2 ☐ 3 13. Iron oxidizing bacteria ☑ 0 ☐ 1 ☐ 2 ☐ 3 14. Leaf litter ☐ 1.5 ☑ 1 ☐ 0.5 ☐ 0 15. Sediment on plants or debris ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 16. Organic debris lines or piles ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 17. Soil-based evidence of high water table? ☑ No = 0 ☐ Yes = 3 C. Biology (Subtotal = 5.75) 18. Fibrous roots in streambed ☐ 3 ☑ 2 ☐ 1 ☐ 0 19. Rooted upland plants in streambed ☑ 3 ☐ 2 ☐ 1 ☐ 0 20. Macrobenthos (note diversity and abundance) ☑ 0 ☐ 1 ☐ 2 ☐ 3 21. Aquatic Mollusks ☑ 0 ☐ 1 ☐ 2 ☐ 3 22. Fish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 23. Crayfish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 24. Amphibians ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 25. Algae ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 26. Wetland plants in streambed ☑ FACW = 0.75; ☐ OBL = 1.5; ☐ Other = 0 Notes: NC DWQ Stream Identification Form Version 4.11 Date: July 26, 2023 Project/Site: Monkey Wrench Latitude: 36.219102 Evaluator: S. Law Trib/Reach: Spike Branch Longitude: -79.082913 Total Points: 24.5 Stream Determination: Intermittent (19 to <30) County: Orange A. Geomorphology (Subtotal = 16.5) Absent Weak Moderate Strong 1. Continuity of channel bed and bank ☐ 0 ☐ 1 ☐ 2 ☑ 3 2. Sinuosity of channel along thalweg ☐ 0 ☐ 1 ☑ 2 ☐ 3 3. In-channel structure ☐ 0 ☐ 1 ☑ 2 ☐ 3 4. Particle size of stream substrate ☐ 0 ☐ 1 ☐ 2 ☑ 3 5. Active/relict floodplain ☐ 0 ☑ 1 ☐ 2 ☐ 3 6. Depositional bars or benches ☐ 0 ☑ 1 ☐ 2 ☐ 3 7. Recent alluvial deposits ☑ 0 ☐ 1 ☐ 2 ☐ 3 8. Headcuts ☐ 0 ☐ 1 ☐ 2 ☑ 3 9. Grade control ☐ 0 ☑ 0.5 ☐ 1 ☐ 1.5 10. Natural valley ☐ 0 ☐ 0.5 ☑ 1 ☐ 1.5 11. Second or greater order channel ☑ No = 0 ☐ Yes = 3 B. Hydrology (Subtotal = 2) 12. Presence of Baseflow ☑ 0 ☐ 1 ☐ 2 ☐ 3 13. Iron oxidizing bacteria ☑ 0 ☐ 1 ☐ 2 ☐ 3 14. Leaf litter ☐ 1.5 ☑ 1 ☐ 0.5 ☐ 0 15. Sediment on plants or debris ☐ 0 ☑ 0.5 ☐ 1 ☐ 1.5 16. Organic debris lines or piles ☐ 0 ☑ 0.5 ☐ 1 ☐ 1.5 17. Soil-based evidence of high water table? ☑ No = 0 ☐ Yes = 3 C. Biology (Subtotal = 6) 18. Fibrous roots in streambed ☑ 3 ☐ 2 ☐ 1 ☐ 0 19. Rooted upland plants in streambed ☑ 3 ☐ 2 ☐ 1 ☐ 0 20. Macrobenthos (note diversity and abundance) ☑ 0 ☐ 1 ☐ 2 ☐ 3 21. Aquatic Mollusks ☑ 0 ☐ 1 ☐ 2 ☐ 3 22. Fish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 23. Crayfish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 24. Amphibians ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 25. Algae ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 26. Wetland plants in streambed ☐ FACW = 0.75; ☐ OBL = 1.5; ☑ Other = 0 Notes: NC DWQ Stream Identification Form Version 4.11 Date: July 26, 2023 Project/Site: Monkey Wrench Latitude: 36.218078 Evaluator: S. Law Trib/Reach: Kitty Branch R1 Longitude: -79.083689 Total Points: 22.5 Stream Determination: Intermittent (19 to <30) County: Orange A. Geomorphology (Subtotal = 13.5) Absent Weak Moderate Strong 1. Continuity of channel bed and bank ☐ 0 ☐ 1 ☐ 2 ☑ 3 2. Sinuosity of channel along thalweg ☐ 0 ☐ 1 ☑ 2 ☐ 3 3. In-channel structure ☐ 0 ☐ 1 ☑ 2 ☐ 3 4. Particle size of stream substrate ☐ 0 ☐ 1 ☑ 2 ☐ 3 5. Active/relict floodplain ☑ 0 ☐ 1 ☐ 2 ☐ 3 6. Depositional bars or benches ☑ 0 ☐ 1 ☐ 2 ☐ 3 7. Recent alluvial deposits ☑ 0 ☐ 1 ☐ 2 ☐ 3 8. Headcuts ☐ 0 ☐ 1 ☐ 2 ☑ 3 9. Grade control ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 10. Natural valley ☐ 0 ☐ 0.5 ☐ 1 ☑ 1.5 11. Second or greater order channel ☑ No = 0 ☐ Yes = 3 B. Hydrology (Subtotal = 5.5) 12. Presence of Baseflow ☑ 0 ☐ 1 ☐ 2 ☐ 3 13. Iron oxidizing bacteria ☑ 0 ☐ 1 ☐ 2 ☐ 3 14. Leaf litter ☑ 1.5 ☐ 1 ☐ 0.5 ☐ 0 15. Sediment on plants or debris ☐ 0 ☐ 0.5 ☑ 1 ☐ 1.5 16. Organic debris lines or piles ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 17. Soil-based evidence of high water table? ☐ No = 0 ☑ Yes = 3 C. Biology (Subtotal = 3.5) 18. Fibrous roots in streambed ☐ 3 ☐ 2 ☑ 1 ☐ 0 19. Rooted upland plants in streambed ☐ 3 ☐ 2 ☑ 1 ☐ 0 20. Macrobenthos (note diversity and abundance) ☑ 0 ☐ 1 ☐ 2 ☐ 3 21. Aquatic Mollusks ☑ 0 ☐ 1 ☐ 2 ☐ 3 22. Fish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 23. Crayfish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 24. Amphibians ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 25. Algae ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 26. Wetland plants in streambed ☐ FACW = 0.75; ☑ OBL = 1.5; ☐ Other = 0 Notes: Persicaria spp., Juncus spp., & other FACW-OBL plants in streambed. Multiple red cedar and 1 maple growing in channel (~5% coverage). Taken right below headcut, starts at headcut. NC DWQ Stream Identification Form Version 4.11 Date: July 26, 2023 Project/Site: Monkey Wrench Latitude: 36.218381 Evaluator: S. Law Trib/Reach: Kitty Branch R2 Longitude: -79.08351 Total Points: 28 Stream Determination: Intermittent (19 to <30) County: Orange A. Geomorphology (Subtotal = 14.5) Absent Weak Moderate Strong 1. Continuity of channel bed and bank ☐ 0 ☐ 1 ☐ 2 ☑ 3 2. Sinuosity of channel along thalweg ☐ 0 ☐ 1 ☑ 2 ☐ 3 3. In-channel structure ☐ 0 ☐ 1 ☑ 2 ☐ 3 4. Particle size of stream substrate ☐ 0 ☐ 1 ☐ 2 ☑ 3 5. Active/relict floodplain ☑ 0 ☐ 1 ☐ 2 ☐ 3 6. Depositional bars or benches ☐ 0 ☑ 1 ☐ 2 ☐ 3 7. Recent alluvial deposits ☑ 0 ☐ 1 ☐ 2 ☐ 3 8. Headcuts ☐ 0 ☑ 1 ☐ 2 ☐ 3 9. Grade control ☐ 0 ☐ 0.5 ☑ 1 ☐ 1.5 10. Natural valley ☐ 0 ☐ 0.5 ☐ 1 ☑ 1.5 11. Second or greater order channel ☑ No = 0 ☐ Yes = 3 B. Hydrology (Subtotal = 7) 12. Presence of Baseflow ☐ 0 ☑ 1 ☐ 2 ☐ 3 13. Iron oxidizing bacteria ☑ 0 ☐ 1 ☐ 2 ☐ 3 14. Leaf litter ☑ 1.5 ☐ 1 ☐ 0.5 ☐ 0 15. Sediment on plants or debris ☐ 0 ☐ 0.5 ☑ 1 ☐ 1.5 16. Organic debris lines or piles ☐ 0 ☑ 0.5 ☐ 1 ☐ 1.5 17. Soil-based evidence of high water table? ☐ No = 0 ☑ Yes = 3 C. Biology (Subtotal = 6.5) 18. Fibrous roots in streambed ☐ 3 ☑ 2 ☐ 1 ☐ 0 19. Rooted upland plants in streambed ☑ 3 ☐ 2 ☐ 1 ☐ 0 20. Macrobenthos (note diversity and abundance) ☑ 0 ☐ 1 ☐ 2 ☐ 3 21. Aquatic Mollusks ☑ 0 ☐ 1 ☐ 2 ☐ 3 22. Fish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 23. Crayfish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 24. Amphibians ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 25. Algae ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 26. Wetland plants in streambed ☐ FACW = 0.75; ☑ OBL = 1.5; ☐ Other = 0 Notes: Persicaria dominating plants in streambed with Juncus throughout taken right above spring NC DWQ Stream Identification Form Version 4.11 Date: July 26, 2023 Project/Site: Monkey Wrench Latitude: 36.21949 Evaluator: S. Law Trib/Reach: Kitty Branch R3 Longitude: -79.083111 Total Points: 36 Stream Determination: Perennial (>=30) County: Orange A. Geomorphology (Subtotal = 22.5) Absent Weak Moderate Strong 1. Continuity of channel bed and bank ☐ 0 ☐ 1 ☐ 2 ☑ 3 2. Sinuosity of channel along thalweg ☐ 0 ☐ 1 ☐ 2 ☑ 3 3. In-channel structure ☐ 0 ☐ 1 ☐ 2 ☑ 3 4. Particle size of stream substrate ☐ 0 ☐ 1 ☐ 2 ☑ 3 5. Active/relict floodplain ☐ 0 ☐ 1 ☑ 2 ☐ 3 6. Depositional bars or benches ☐ 0 ☐ 1 ☑ 2 ☐ 3 7. Recent alluvial deposits ☐ 0 ☑ 1 ☐ 2 ☐ 3 8. Headcuts ☐ 0 ☐ 1 ☐ 2 ☑ 3 9. Grade control ☐ 0 ☐ 0.5 ☑ 1 ☐ 1.5 10. Natural valley ☐ 0 ☐ 0.5 ☐ 1 ☑ 1.5 11. Second or greater order channel ☑ No = 0 ☐ Yes = 3 B. Hydrology (Subtotal = 7.5) 12. Presence of Baseflow ☐ 0 ☑ 1 ☐ 2 ☐ 3 13. Iron oxidizing bacteria ☑ 0 ☐ 1 ☐ 2 ☐ 3 14. Leaf litter ☑ 1.5 ☐ 1 ☐ 0.5 ☐ 0 15. Sediment on plants or debris ☐ 0 ☐ 0.5 ☑ 1 ☐ 1.5 16. Organic debris lines or piles ☐ 0 ☐ 0.5 ☑ 1 ☐ 1.5 17. Soil-based evidence of high water table? ☐ No = 0 ☑ Yes = 3 C. Biology (Subtotal = 6) 18. Fibrous roots in streambed ☑ 3 ☐ 2 ☐ 1 ☐ 0 19. Rooted upland plants in streambed ☑ 3 ☐ 2 ☐ 1 ☐ 0 20. Macrobenthos (note diversity and abundance) ☑ 0 ☐ 1 ☐ 2 ☐ 3 21. Aquatic Mollusks ☑ 0 ☐ 1 ☐ 2 ☐ 3 22. Fish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 23. Crayfish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 24. Amphibians ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 25. Algae ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 26. Wetland plants in streambed ☐ FACW = 0.75; ☐ OBL = 1.5; ☑ Other = 0 Notes: Starts at confluence. Flow might be buried from sediment and cattle activity. NC DWQ Stream Identification Form Version 4.11 Date: July 26, 2023 Project/Site: Monkey Wrench Latitude: 36.217803 Evaluator: S. Law Trib/Reach: Lathan Branch Longitude: -79.085091 Total Points: 33.5 Stream Determination: Perennial (>=30) County: Orange A. Geomorphology (Subtotal = 17) Absent Weak Moderate Strong 1. Continuity of channel bed and bank ☐ 0 ☐ 1 ☐ 2 ☑ 3 2. Sinuosity of channel along thalweg ☐ 0 ☐ 1 ☑ 2 ☐ 3 3. In-channel structure ☐ 0 ☐ 1 ☑ 2 ☐ 3 4. Particle size of stream substrate ☐ 0 ☐ 1 ☐ 2 ☑ 3 5. Active/relict floodplain ☐ 0 ☑ 1 ☐ 2 ☐ 3 6. Depositional bars or benches ☐ 0 ☐ 1 ☑ 2 ☐ 3 7. Recent alluvial deposits ☑ 0 ☐ 1 ☐ 2 ☐ 3 8. Headcuts ☐ 0 ☐ 1 ☑ 2 ☐ 3 9. Grade control ☐ 0 ☑ 0.5 ☐ 1 ☐ 1.5 10. Natural valley ☐ 0 ☐ 0.5 ☐ 1 ☑ 1.5 11. Second or greater order channel ☑ No = 0 ☐ Yes = 3 B. Hydrology (Subtotal = 8) 12. Presence of Baseflow ☐ 0 ☑ 1 ☐ 2 ☐ 3 13. Iron oxidizing bacteria ☐ 0 ☑ 1 ☐ 2 ☐ 3 14. Leaf litter ☑ 1.5 ☐ 1 ☐ 0.5 ☐ 0 15. Sediment on plants or debris ☐ 0 ☐ 0.5 ☑ 1 ☐ 1.5 16. Organic debris lines or piles ☐ 0 ☑ 0.5 ☐ 1 ☐ 1.5 17. Soil-based evidence of high water table? ☐ No = 0 ☑ Yes = 3 C. Biology (Subtotal = 8.5) 18. Fibrous roots in streambed ☑ 3 ☐ 2 ☐ 1 ☐ 0 19. Rooted upland plants in streambed ☑ 3 ☐ 2 ☐ 1 ☐ 0 20. Macrobenthos (note diversity and abundance) ☑ 0 ☐ 1 ☐ 2 ☐ 3 21. Aquatic Mollusks ☑ 0 ☐ 1 ☐ 2 ☐ 3 22. Fish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 23. Crayfish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 24. Amphibians ☐ 0 ☑ 0.5 ☐ 1 ☐ 1.5 25. Algae ☐ 0 ☑ 0.5 ☐ 1 ☐ 1.5 26. Wetland plants in streambed ☐ FACW = 0.75; ☑ OBL = 1.5; ☐ Other = 0 Notes: Fe & algae limited to pools. E/I throughout reach. Impounded at bottom right above confluence. Relict headcut on boundary, actively moving up offsite. Water in pools only. Rock steps and riffles present. NC DWQ Stream Identification Form Version 4.11 Date: July 26, 2023 Project/Site: Monkey Wrench Latitude: 36.218378 Evaluator: S. Law Trib/Reach: Rocky Creek R1 Longitude: -79.088883 Total Points: 22 Stream Determination: Intermittent (19 to <30) County: Orange A. Geomorphology (Subtotal = 8.5) Absent Weak Moderate Strong 1. Continuity of channel bed and bank ☐ 0 ☐ 1 ☑ 2 ☐ 3 2. Sinuosity of channel along thalweg ☐ 0 ☐ 1 ☑ 2 ☐ 3 3. In-channel structure ☐ 0 ☑ 1 ☐ 2 ☐ 3 4. Particle size of stream substrate ☑ 0 ☐ 1 ☐ 2 ☐ 3 5. Active/relict floodplain ☐ 0 ☐ 1 ☑ 2 ☐ 3 6. Depositional bars or benches ☑ 0 ☐ 1 ☐ 2 ☐ 3 7. Recent alluvial deposits ☑ 0 ☐ 1 ☐ 2 ☐ 3 8. Headcuts ☑ 0 ☐ 1 ☐ 2 ☐ 3 9. Grade control ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 10. Natural valley ☐ 0 ☐ 0.5 ☐ 1 ☑ 1.5 11. Second or greater order channel ☑ No = 0 ☐ Yes = 3 B. Hydrology (Subtotal = 7) 12. Presence of Baseflow ☐ 0 ☑ 1 ☐ 2 ☐ 3 13. Iron oxidizing bacteria ☐ 0 ☑ 1 ☐ 2 ☐ 3 14. Leaf litter ☑ 1.5 ☐ 1 ☐ 0.5 ☐ 0 15. Sediment on plants or debris ☐ 0 ☑ 0.5 ☐ 1 ☐ 1.5 16. Organic debris lines or piles ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 17. Soil-based evidence of high water table? ☐ No = 0 ☑ Yes = 3 C. Biology (Subtotal = 6.5) 18. Fibrous roots in streambed ☐ 3 ☐ 2 ☑ 1 ☐ 0 19. Rooted upland plants in streambed ☑ 3 ☐ 2 ☐ 1 ☐ 0 20. Macrobenthos (note diversity and abundance) ☑ 0 ☐ 1 ☐ 2 ☐ 3 21. Aquatic Mollusks ☑ 0 ☐ 1 ☐ 2 ☐ 3 22. Fish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 23. Crayfish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 24. Amphibians ☐ 0 ☑ 0.5 ☐ 1 ☐ 1.5 25. Algae ☐ 0 ☑ 0.5 ☐ 1 ☐ 1.5 26. Wetland plants in streambed ☐ FACW = 0.75; ☑ OBL = 1.5; ☐ Other = 0 Notes: NC DWQ Stream Identification Form Version 4.11 Date: July 26, 2023 Project/Site: Monkey Wrench Latitude: 36.218964 Evaluator: S. Law Trib/Reach: Rocky Creek R2 Longitude: -79.087918 Total Points: 25.5 Stream Determination: Intermittent (19 to <30) County: Orange A. Geomorphology (Subtotal = 14.5) Absent Weak Moderate Strong 1. Continuity of channel bed and bank ☐ 0 ☐ 1 ☐ 2 ☑ 3 2. Sinuosity of channel along thalweg ☐ 0 ☐ 1 ☑ 2 ☐ 3 3. In-channel structure ☐ 0 ☐ 1 ☑ 2 ☐ 3 4. Particle size of stream substrate ☐ 0 ☐ 1 ☐ 2 ☑ 3 5. Active/relict floodplain ☑ 0 ☐ 1 ☐ 2 ☐ 3 6. Depositional bars or benches ☑ 0 ☐ 1 ☐ 2 ☐ 3 7. Recent alluvial deposits ☑ 0 ☐ 1 ☐ 2 ☐ 3 8. Headcuts ☐ 0 ☐ 1 ☐ 2 ☑ 3 9. Grade control ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 10. Natural valley ☐ 0 ☐ 0.5 ☐ 1 ☑ 1.5 11. Second or greater order channel ☑ No = 0 ☐ Yes = 3 B. Hydrology (Subtotal = 5) 12. Presence of Baseflow ☑ 0 ☐ 1 ☐ 2 ☐ 3 13. Iron oxidizing bacteria ☑ 0 ☐ 1 ☐ 2 ☐ 3 14. Leaf litter ☑ 1.5 ☐ 1 ☐ 0.5 ☐ 0 15. Sediment on plants or debris ☐ 0 ☑ 0.5 ☐ 1 ☐ 1.5 16. Organic debris lines or piles ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 17. Soil-based evidence of high water table? ☐ No = 0 ☑ Yes = 3 C. Biology (Subtotal = 6) 18. Fibrous roots in streambed ☑ 3 ☐ 2 ☐ 1 ☐ 0 19. Rooted upland plants in streambed ☑ 3 ☐ 2 ☐ 1 ☐ 0 20. Macrobenthos (note diversity and abundance) ☑ 0 ☐ 1 ☐ 2 ☐ 3 21. Aquatic Mollusks ☑ 0 ☐ 1 ☐ 2 ☐ 3 22. Fish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 23. Crayfish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 24. Amphibians ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 25. Algae ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 26. Wetland plants in streambed ☐ FACW = 0.75; ☐ OBL = 1.5; ☑ Other = 0 Notes: Soils are really compact - limits roots. Banks depleted near toe. Below multiple headcuts. NC DWQ Stream Identification Form Version 4.11 Date: July 26, 2023 Project/Site: Monkey Wrench Latitude: 36.218956 Evaluator: S. Law Trib/Reach: Rocky Creek R3 Longitude: -79.087818 Total Points: 43 Stream Determination: Perennial (>=30) County: Orange A. Geomorphology (Subtotal = 22.5) Absent Weak Moderate Strong 1. Continuity of channel bed and bank ☐ 0 ☐ 1 ☐ 2 ☑ 3 2. Sinuosity of channel along thalweg ☐ 0 ☐ 1 ☐ 2 ☑ 3 3. In-channel structure ☐ 0 ☐ 1 ☐ 2 ☑ 3 4. Particle size of stream substrate ☐ 0 ☐ 1 ☐ 2 ☑ 3 5. Active/relict floodplain ☐ 0 ☐ 1 ☑ 2 ☐ 3 6. Depositional bars or benches ☐ 0 ☐ 1 ☐ 2 ☑ 3 7. Recent alluvial deposits ☐ 0 ☑ 1 ☐ 2 ☐ 3 8. Headcuts ☐ 0 ☐ 1 ☑ 2 ☐ 3 9. Grade control ☐ 0 ☐ 0.5 ☑ 1 ☐ 1.5 10. Natural valley ☐ 0 ☐ 0.5 ☐ 1 ☑ 1.5 11. Second or greater order channel ☑ No = 0 ☐ Yes = 3 B. Hydrology (Subtotal = 10) 12. Presence of Baseflow ☐ 0 ☐ 1 ☑ 2 ☐ 3 13. Iron oxidizing bacteria ☐ 0 ☐ 1 ☑ 2 ☐ 3 14. Leaf litter ☐ 1.5 ☑ 1 ☐ 0.5 ☐ 0 15. Sediment on plants or debris ☐ 0 ☐ 0.5 ☑ 1 ☐ 1.5 16. Organic debris lines or piles ☐ 0 ☐ 0.5 ☑ 1 ☐ 1.5 17. Soil-based evidence of high water table? ☐ No = 0 ☑ Yes = 3 C. Biology (Subtotal = 10.5) 18. Fibrous roots in streambed ☑ 3 ☐ 2 ☐ 1 ☐ 0 19. Rooted upland plants in streambed ☑ 3 ☐ 2 ☐ 1 ☐ 0 20. Macrobenthos (note diversity and abundance) ☐ 0 ☑ 1 ☐ 2 ☐ 3 21. Aquatic Mollusks ☐ 0 ☑ 1 ☐ 2 ☐ 3 22. Fish ☐ 0 ☑ 0.5 ☐ 1 ☐ 1.5 23. Crayfish ☑ 0 ☐ 0.5 ☐ 1 ☐ 1.5 24. Amphibians ☐ 0 ☐ 0.5 ☑ 1 ☐ 1.5 25. Algae ☐ 0 ☐ 0.5 ☑ 1 ☐ 1.5 26. Wetland plants in streambed ☐ FACW = 0.75; ☐ OBL = 1.5; ☑ Other = 0 Notes: Left-sided snails, multiple frogs, caddisflies observed. Some areas have flow, mostly stagnant or slow-velocity water throughout. Some areas appear buried in sediment or by cattle activity. Appendix C Existing Geomorphic Data                      Appendix D EDR Radius Report Summary FORM-LBD-MGA ®kcehCoeG htiw tropeR ™paM suidaR RDE ehT 6 Armstrong Road, 4th floor Shelton, CT 06484 Toll Free: 800.352.0050 www.edrnet.com Monkey Wrench Mitigation Site 8400 Walnut Grove Church Road Hurdle Mills, NC 27541 Inquiry Number: 7402845.2s July 28, 2023 TABLE OF CONTENTS SECTION PAGE Executive Summary ES1 Overview Map 2 Detail Map 3 Map Findings Summary 4 Map Findings 8 Orphan Summary 9 Government Records Searched/Data Currency Tracking GR-1 GEOCHECK ADDENDUM Physical Setting Source Addendum A-1 Physical Setting Source Summary A-2 Physical Setting SSURGO Soil Map A-5 Physical Setting Source Map A-12 Physical Setting Source Map Findings A-14 Physical Setting Source Records Searched PSGR-1 Thank you for your business. Please contact EDR at 1-800-352-0050 with any questions or comments. Disclaimer - Copyright and Trademark Notice This Report contains certain information obtained from a variety of public and other sources reasonably available to Environmental Data Resources, LLC. It cannot be concluded from this Report that coverage information for the target and surrounding properties does not exist from other sources. This Report is provided on an "AS IS", "AS AVAILABLE" basis. NO WARRANTY EXPRESS OR IMPLIED IS MADE WHATSOEVER IN CONNECTION WITH THIS REPORT. ENVIRONMENTAL DATA RESOURCES, LLC AND ITS SUBSIDIARIES, AFFILIATES AND THIRD PARTY SUPPLIERS DISCLAIM ALL WARRANTIES, OF ANY KIND OR NATURE, EXPRESS OR IMPLIED, ARISING OUT OF OR RELATED TO THIS REPORT OR ANY OF THE DATA AND INFORMATION PROVIDED IN THIS REPORT, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES REGARDING ACCURACY, QUALITY, CORRECTNESS, COMPLETENESS, COMPREHENSIVENESS, SUITABILITY, MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, TITLE, NON-INFRINGEMENT, MISAPPROPRIATION, OR OTHERWISE. ALL RISK IS ASSUMED BY THE USER. IN NO EVENT SHALL ENVIRONMENTAL DATA RESOURCES, LLC OR ITS SUBSIDIARIES, AFFILIATES OR THIRD PARTY SUPPLIERS BE LIABLE TO ANYONE FOR ANY DIRECT, INCIDENTAL, INDIRECT, SPECIAL, CONSEQUENTIAL OR OTHER DAMAGES OF ANY TYPE OR KIND (INCLUDING BUT NOT LIMITED TO LOSS OF PROFITS, LOSS OF USE, OR LOSS OF DATA) INFORMATION PROVIDED IN THIS REPORT. Any analyses, estimates, ratings, environmental risk levels, or risk codes provided in this Report are provided for illustrative purposes only, and are not intended to provide, nor should they be interpreted as providing any facts regarding, or prediction or forecast of, any environmental risk for any property. Only an assessment performed by a qualified environmental professional can provide findings, opinions or conclusions regarding the environmental risk or conditions in, on or at any property. Copyright 2023 by Environmental Data Resources, LLC. All rights reserved. Reproduction in any media or format, in whole or in part, of any report or map of Environmental Data Resources, LLC, or its affiliates, is prohibited without prior written permission. EDR and its logos (including Sanborn and Sanborn Map) are trademarks of Environmental Data Resources, LLC or its affiliates. All other trademarks used herein are the property of their respective owners. TC7402845.2s Page 1 EXECUTIVE SUMMARY TC7402845.2s EXECUTIVE SUMMARY 1 A search of available environmental records was conducted by Environmental Data Resources, Inc (EDR). The report was designed to assist parties seeking to meet the search requirements of EPA’s Standards and Practices for All Appropriate Inquiries (40 CFR Part 312), the ASTM Standard Practice for Environmental Site Assessments (E1527 - 21), the ASTM Standard Practice for Environmental Site Assessments for Forestland or Rural Property (E2247 - 16), the ASTM Standard Practice for Limited Environmental Due Diligence: Transaction Screen Process (E1528 - 22) or custom requirements developed for the evaluation of environmental risk associated with a parcel of real estate. TARGET PROPERTY INFORMATION ADDRESS 8400 WALNUT GROVE CHURCH ROAD HURDLE MILLS, NC 27541 COORDINATES 36.2217970 - 36˚ 13’ 18.46’’Latitude (North): 79.0846130 - 79˚ 5’ 4.60’’Longitude (West): Zone 17Universal Tranverse Mercator: 672158.4UTM X (Meters): 4010049.2UTM Y (Meters): 646 ft. above sea levelElevation: USGS TOPOGRAPHIC MAP ASSOCIATED WITH TARGET PROPERTY 13839876 CALDWELL, NCTarget Property Map: 2019Version Date: AERIAL PHOTOGRAPHY IN THIS REPORT 20200711Portions of Photo from: USDASource: 7402845.2s Page 2 NO MAPPED SITES FOUND MAPPED SITES SUMMARY Target Property Address: 8400 WALNUT GROVE CHURCH ROAD HURDLE MILLS, NC 27541 Click on Map ID to see full detail. MAP RELATIVE DIST (ft. & mi.) ID DATABASE ACRONYMS ELEVATION DIRECTIONSITE NAME ADDRESS EXECUTIVE SUMMARY TC7402845.2s EXECUTIVE SUMMARY 3 TARGET PROPERTY SEARCH RESULTS The target property was not listed in any of the databases searched by EDR. DATABASES WITH NO MAPPED SITES No mapped sites were found in EDR’s search of available ("reasonably ascertainable ") government records either on the target property or within the search radius around the target property for the following databases: STANDARD ENVIRONMENTAL RECORDS Lists of Federal NPL (Superfund) sites NPL National Priority List Proposed NPL Proposed National Priority List Sites NPL LIENS Federal Superfund Liens Lists of Federal Delisted NPL sites Delisted NPL National Priority List Deletions Lists of Federal sites subject to CERCLA removals and CERCLA orders FEDERAL FACILITY Federal Facility Site Information listing SEMS Superfund Enterprise Management System Lists of Federal CERCLA sites with NFRAP SEMS-ARCHIVE Superfund Enterprise Management System Archive Lists of Federal RCRA facilities undergoing Corrective Action CORRACTS Corrective Action Report Lists of Federal RCRA TSD facilities RCRA-TSDF RCRA - Treatment, Storage and Disposal Lists of Federal RCRA generators RCRA-LQG RCRA - Large Quantity Generators RCRA-SQG RCRA - Small Quantity Generators RCRA-VSQG RCRA - Very Small Quantity Generators (Formerly Conditionally Exempt Small Quantity Generators) Federal institutional controls / engineering controls registries LUCIS Land Use Control Information System EXECUTIVE SUMMARY TC7402845.2s EXECUTIVE SUMMARY 4 US ENG CONTROLS Engineering Controls Sites List US INST CONTROLS Institutional Controls Sites List Federal ERNS list ERNS Emergency Response Notification System Lists of state- and tribal (Superfund) equivalent sites NC HSDS Hazardous Substance Disposal Site Lists of state- and tribal hazardous waste facilities SHWS Inactive Hazardous Sites Inventory Lists of state and tribal landfills and solid waste disposal facilities SWF/LF List of Solid Waste Facilities DEBRIS Solid Waste Active Disaster Debris Sites Listing OLI Old Landfill Inventory LCID Land-Clearing and Inert Debris (LCID) Landfill Notifications Lists of state and tribal leaking storage tanks LAST Leaking Aboveground Storage Tanks LUST Regional UST Database INDIAN LUST Leaking Underground Storage Tanks on Indian Land LUST TRUST State Trust Fund Database Lists of state and tribal registered storage tanks FEMA UST Underground Storage Tank Listing UST Petroleum Underground Storage Tank Database AST AST Database INDIAN UST Underground Storage Tanks on Indian Land State and tribal institutional control / engineering control registries INST CONTROL No Further Action Sites With Land Use Restrictions Monitoring Lists of state and tribal voluntary cleanup sites INDIAN VCP Voluntary Cleanup Priority Listing VCP Responsible Party Voluntary Action Sites Lists of state and tribal brownfield sites BROWNFIELDS Brownfields Projects Inventory ADDITIONAL ENVIRONMENTAL RECORDS Local Brownfield lists US BROWNFIELDS A Listing of Brownfields Sites EXECUTIVE SUMMARY TC7402845.2s EXECUTIVE SUMMARY 5 Local Lists of Landfill / Solid Waste Disposal Sites HIST LF Solid Waste Facility Listing SWRCY Recycling Center Listing INDIAN ODI Report on the Status of Open Dumps on Indian Lands DEBRIS REGION 9 Torres Martinez Reservation Illegal Dump Site Locations ODI Open Dump Inventory IHS OPEN DUMPS Open Dumps on Indian Land Local Lists of Hazardous waste / Contaminated Sites US HIST CDL Delisted National Clandestine Laboratory Register US CDL National Clandestine Laboratory Register Local Land Records LIENS 2 CERCLA Lien Information Records of Emergency Release Reports HMIRS Hazardous Materials Information Reporting System SPILLS Spills Incident Listing IMD Incident Management Database SPILLS 90 SPILLS 90 data from FirstSearch SPILLS 80 SPILLS 80 data from FirstSearch Other Ascertainable Records RCRA NonGen / NLR RCRA - Non Generators / No Longer Regulated FUDS Formerly Used Defense Sites DOD Department of Defense Sites SCRD DRYCLEANERS State Coalition for Remediation of Drycleaners Listing US FIN ASSUR Financial Assurance Information EPA WATCH LIST EPA WATCH LIST 2020 COR ACTION 2020 Corrective Action Program List TSCA Toxic Substances Control Act TRIS Toxic Chemical Release Inventory System SSTS Section 7 Tracking Systems ROD Records Of Decision RMP Risk Management Plans RAATS RCRA Administrative Action Tracking System PRP Potentially Responsible Parties PADS PCB Activity Database System ICIS Integrated Compliance Information System FTTS FIFRA/ TSCA Tracking System - FIFRA (Federal Insecticide, Fungicide, & Rodenticide Act)/TSCA (Toxic Substances Control Act) MLTS Material Licensing Tracking System COAL ASH DOE Steam-Electric Plant Operation Data COAL ASH EPA Coal Combustion Residues Surface Impoundments List PCB TRANSFORMER PCB Transformer Registration Database RADINFO Radiation Information Database HIST FTTS FIFRA/TSCA Tracking System Administrative Case Listing DOT OPS Incident and Accident Data CONSENT Superfund (CERCLA) Consent Decrees EXECUTIVE SUMMARY TC7402845.2s EXECUTIVE SUMMARY 6 INDIAN RESERV Indian Reservations FUSRAP Formerly Utilized Sites Remedial Action Program UMTRA Uranium Mill Tailings Sites LEAD SMELTERS Lead Smelter Sites US AIRS Aerometric Information Retrieval System Facility Subsystem US MINES Mines Master Index File ABANDONED MINES Abandoned Mines FINDS Facility Index System/Facility Registry System DOCKET HWC Hazardous Waste Compliance Docket Listing UXO Unexploded Ordnance Sites ECHO Enforcement & Compliance History Information FUELS PROGRAM EPA Fuels Program Registered Listing PFAS NPL Superfund Sites with PFAS Detections Information PFAS FEDERAL SITES Federal Sites PFAS Information PFAS TSCA PFAS Manufacture and Imports Information PFAS RCRA MANIFEST PFAS Transfers Identified In the RCRA Database Listing PFAS ATSDR PFAS Contamination Site Location Listing PFAS WQP Ambient Environmental Sampling for PFAS PFAS NPDES Clean Water Act Discharge Monitoring Information PFAS ECHO Facilities in Industries that May Be Handling PFAS Listing PFAS ECHO FIRE TRAINING Facilities in Industries that May Be Handling PFAS Listing PFAS PART 139 AIRPORT All Certified Part 139 Airports PFAS Information Listing AQUEOUS FOAM NRC Aqueous Foam Related Incidents Listing PFAS PFAS Contamination Site Listing AIRS Air Quality Permit Listing ASBESTOS ASBESTOS COAL ASH Coal Ash Disposal Sites DRYCLEANERS Drycleaning Sites Financial Assurance Financial Assurance Information Listing NPDES NPDES Facility Location Listing UIC Underground Injection Wells Listing AOP Animal Operation Permits Listing PFAS TRIS List of PFAS Added to the TRI MINES MRDS Mineral Resources Data System PCSRP Petroleum-Contaminated Soil Remediation Permits CCB Coal Ash Structural Fills (CCB) Listing SEPT HAULERS Permitted Septage Haulers Listing EDR HIGH RISK HISTORICAL RECORDS EDR Exclusive Records EDR MGP EDR Proprietary Manufactured Gas Plants EDR Hist Auto EDR Exclusive Historical Auto Stations EDR Hist Cleaner EDR Exclusive Historical Cleaners EDR RECOVERED GOVERNMENT ARCHIVES Exclusive Recovered Govt. Archives RGA HWS Recovered Government Archive State Hazardous Waste Facilities List RGA LF Recovered Government Archive Solid Waste Facilities List RGA LUST Recovered Government Archive Leaking Underground Storage Tank EXECUTIVE SUMMARY TC7402845.2s EXECUTIVE SUMMARY 7 SURROUNDING SITES: SEARCH RESULTS Surrounding sites were not identified. Unmappable (orphan) sites are not considered in the foregoing analysis. EXECUTIVE SUMMARY TC7402845.2s EXECUTIVE SUMMARY 8 There were no unmapped sites in this report. EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc. 6 80 680 680 760 7 20 7 2 0 640 680 720 6 80 6 80680 6 8 0 6 8 0 6 8 0 6 8 0 6 8 0 6 8 0 6 8 0 6 8 0 68 0 6 8 0 6 8 0 6 8 0 640 680 64 0 6 4 0 6 4 0 6 40 6 4 0 640 6 40 6 40 6 4 0 6406406 4 0640 6 4 0 6 4 0 640 6 4 0 640 6 4 0 6 4 0 6 40 6 4 0 6 4 0 6 4 0 EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc.EDR Inc. 680 640 640 640 6 4 0 640 64 0 64 0 MAP FINDINGS SUMMARY Search TargetDistance Total Database Property(Miles) < 1/8 1/8 - 1/4 1/4 - 1/2 1/2 - 1 > 1 Plotted STANDARD ENVIRONMENTAL RECORDS Lists of Federal NPL (Superfund) sites 0 NR 0 0 0 0 1.000NPL 0 NR 0 0 0 0 1.000Proposed NPL 0 NR 0 0 0 0 1.000NPL LIENS Lists of Federal Delisted NPL sites 0 NR 0 0 0 0 1.000Delisted NPL Lists of Federal sites subject to CERCLA removals and CERCLA orders 0 NR NR 0 0 0 0.500FEDERAL FACILITY 0 NR NR 0 0 0 0.500SEMS Lists of Federal CERCLA sites with NFRAP 0 NR NR 0 0 0 0.500SEMS-ARCHIVE Lists of Federal RCRA facilities undergoing Corrective Action 0 NR 0 0 0 0 1.000CORRACTS Lists of Federal RCRA TSD facilities 0 NR NR 0 0 0 0.500RCRA-TSDF Lists of Federal RCRA generators 0 NR NR NR 0 0 0.250RCRA-LQG 0 NR NR NR 0 0 0.250RCRA-SQG 0 NR NR NR 0 0 0.250RCRA-VSQG Federal institutional controls / engineering controls registries 0 NR NR 0 0 0 0.500LUCIS 0 NR NR 0 0 0 0.500US ENG CONTROLS 0 NR NR 0 0 0 0.500US INST CONTROLS Federal ERNS list 0 NR NR NR NR 0 0.001ERNS Lists of state- and tribal (Superfund) equivalent sites 0 NR 0 0 0 0 1.000NC HSDS Lists of state- and tribal hazardous waste facilities 0 NR 0 0 0 0 1.000SHWS Lists of state and tribal landfills and solid waste disposal facilities 0 NR NR 0 0 0 0.500SWF/LF TC7402845.2s Page 4 MAP FINDINGS SUMMARY Search TargetDistance Total Database Property(Miles) < 1/8 1/8 - 1/4 1/4 - 1/2 1/2 - 1 > 1 Plotted 0 NR NR 0 0 0 0.500DEBRIS 0 NR NR 0 0 0 0.500OLI 0 NR NR 0 0 0 0.500LCID Lists of state and tribal leaking storage tanks 0 NR NR 0 0 0 0.500LAST 0 NR NR 0 0 0 0.500LUST 0 NR NR 0 0 0 0.500INDIAN LUST 0 NR NR 0 0 0 0.500LUST TRUST Lists of state and tribal registered storage tanks 0 NR NR NR 0 0 0.250FEMA UST 0 NR NR NR 0 0 0.250UST 0 NR NR NR 0 0 0.250AST 0 NR NR NR 0 0 0.250INDIAN UST State and tribal institutional control / engineering control registries 0 NR NR 0 0 0 0.500INST CONTROL Lists of state and tribal voluntary cleanup sites 0 NR NR 0 0 0 0.500INDIAN VCP 0 NR NR 0 0 0 0.500VCP Lists of state and tribal brownfield sites 0 NR NR 0 0 0 0.500BROWNFIELDS ADDITIONAL ENVIRONMENTAL RECORDS Local Brownfield lists 0 NR NR 0 0 0 0.500US BROWNFIELDS Local Lists of Landfill / Solid Waste Disposal Sites 0 NR NR 0 0 0 0.500HIST LF 0 NR NR 0 0 0 0.500SWRCY 0 NR NR 0 0 0 0.500INDIAN ODI 0 NR NR 0 0 0 0.500DEBRIS REGION 9 0 NR NR 0 0 0 0.500ODI 0 NR NR 0 0 0 0.500IHS OPEN DUMPS Local Lists of Hazardous waste / Contaminated Sites 0 NR NR NR NR 0 0.001US HIST CDL 0 NR NR NR NR 0 0.001US CDL Local Land Records 0 NR NR NR NR 0 0.001LIENS 2 Records of Emergency Release Reports 0 NR NR NR NR 0 0.001HMIRS TC7402845.2s Page 5 MAP FINDINGS SUMMARY Search TargetDistance Total Database Property(Miles) < 1/8 1/8 - 1/4 1/4 - 1/2 1/2 - 1 > 1 Plotted 0 NR NR NR NR 0 0.001SPILLS 0 NR NR 0 0 0 0.500IMD 0 NR NR NR NR 0 0.001SPILLS 90 0 NR NR NR NR 0 0.001SPILLS 80 Other Ascertainable Records 0 NR NR NR 0 0 0.250RCRA NonGen / NLR 0 NR 0 0 0 0 1.000FUDS 0 NR 0 0 0 0 1.000DOD 0 NR NR 0 0 0 0.500SCRD DRYCLEANERS 0 NR NR NR NR 0 0.001US FIN ASSUR 0 NR NR NR NR 0 0.001EPA WATCH LIST 0 NR NR NR 0 0 0.2502020 COR ACTION 0 NR NR NR NR 0 0.001TSCA 0 NR NR NR NR 0 0.001TRIS 0 NR NR NR NR 0 0.001SSTS 0 NR 0 0 0 0 1.000ROD 0 NR NR NR NR 0 0.001RMP 0 NR NR NR NR 0 0.001RAATS 0 NR NR NR NR 0 0.001PRP 0 NR NR NR NR 0 0.001PADS 0 NR NR NR NR 0 0.001ICIS 0 NR NR NR NR 0 0.001FTTS 0 NR NR NR NR 0 0.001MLTS 0 NR NR NR NR 0 0.001COAL ASH DOE 0 NR NR 0 0 0 0.500COAL ASH EPA 0 NR NR NR NR 0 0.001PCB TRANSFORMER 0 NR NR NR NR 0 0.001RADINFO 0 NR NR NR NR 0 0.001HIST FTTS 0 NR NR NR NR 0 0.001DOT OPS 0 NR 0 0 0 0 1.000CONSENT 0 NR 0 0 0 0 1.000INDIAN RESERV 0 NR 0 0 0 0 1.000FUSRAP 0 NR NR 0 0 0 0.500UMTRA 0 NR NR NR NR 0 0.001LEAD SMELTERS 0 NR NR NR NR 0 0.001US AIRS 0 NR NR NR 0 0 0.250US MINES 0 NR NR NR 0 0 0.250ABANDONED MINES 0 NR NR NR NR 0 0.001FINDS 0 NR NR NR NR 0 0.001DOCKET HWC 0 NR 0 0 0 0 1.000UXO 0 NR NR NR NR 0 0.001ECHO 0 NR NR NR 0 0 0.250FUELS PROGRAM 0 NR NR NR 0 0 0.250PFAS NPL 0 NR NR NR 0 0 0.250PFAS FEDERAL SITES 0 NR NR NR 0 0 0.250PFAS TSCA 0 NR NR NR 0 0 0.250PFAS RCRA MANIFEST 0 NR NR NR 0 0 0.250PFAS ATSDR 0 NR NR NR 0 0 0.250PFAS WQP 0 NR NR NR 0 0 0.250PFAS NPDES 0 NR NR NR 0 0 0.250PFAS ECHO TC7402845.2s Page 6 MAP FINDINGS SUMMARY Search TargetDistance Total Database Property(Miles) < 1/8 1/8 - 1/4 1/4 - 1/2 1/2 - 1 > 1 Plotted 0 NR NR NR 0 0 0.250PFAS ECHO FIRE TRAINING 0 NR NR NR 0 0 0.250PFAS PART 139 AIRPORT 0 NR NR NR 0 0 0.250AQUEOUS FOAM NRC 0 NR NR NR NR NR TPPFAS 0 NR NR NR NR 0 0.001AIRS 0 NR NR NR NR 0 0.001ASBESTOS 0 NR NR 0 0 0 0.500COAL ASH 0 NR NR NR 0 0 0.250DRYCLEANERS 0 NR NR NR NR 0 0.001Financial Assurance 0 NR NR NR NR 0 0.001NPDES 0 NR NR NR NR 0 0.001UIC 0 NR NR NR NR 0 0.001AOP 0 NR NR NR 0 0 0.250PFAS TRIS 0 NR NR NR NR 0 0.001MINES MRDS 0 NR NR 0 0 0 0.500PCSRP 0 NR NR 0 0 0 0.500CCB 0 NR NR NR NR 0 0.001SEPT HAULERS EDR HIGH RISK HISTORICAL RECORDS EDR Exclusive Records 0 NR 0 0 0 0 1.000EDR MGP 0 NR NR NR NR 0 0.125EDR Hist Auto 0 NR NR NR NR 0 0.125EDR Hist Cleaner EDR RECOVERED GOVERNMENT ARCHIVES Exclusive Recovered Govt. Archives 0 NR NR NR NR 0 0.001RGA HWS 0 NR NR NR NR 0 0.001RGA LF 0 NR NR NR NR 0 0.001RGA LUST 0 0 0 0 0 0 0- Totals -- NOTES: TP = Target Property NR = Not Requested at this Search Distance Sites may be listed in more than one database TC7402845.2s Page 7 MAP FINDINGSMap ID Direction EDR ID NumberDistance EPA ID NumberDatabase(s)SiteElevation NO SITES FOUND TC7402845.2s Page 8 Appendix E Landowner Authorizations