HomeMy WebLinkAboutNCC232039_MODIFICATION Supporting Documents_20231208 r
m. j,- csl as l a-- -\w
I "A_
Ss. _. 613oi -rw
Pt
MAT WORK AREA TO EXTEND OVER STREAM CHANNEL
USE CRANE MATTING, EMTEK MATS(DESIGNED BY OTHERS UNDER SEPARATE
COVER)OR SIMILAR TO AVOID IMPACT TO STREAM CHANNEL
NO IN-STREAM WORK PERMITTED
MATS REQUIRED TO BE ANCHORED AT ALL TIMES IN ACCORDANCE WITH THE
MANUFACTURERS SPEC
REMOVE MATS FROM STREAM CROSSING IN ADVANCE OF STORM EVENTS
MONITOR FOR ANY DEBRIS CAUGHT ON MATS TO PREVENT UPSTREAM BACKUP
•.•• tl. _ i....:.:: �>:-:-:Y--• ----.dd:-.-•--: - 17o 23 .
Cs _ OW' __ 1Arm
SS :... • .....••::•:•::•:•:::• �:i�� 2058/11••••••••:•:•...- •. •••• - .... - ::::::... :...•:..
SS EXISTING FOUNDATION ON
8' EDGE OF STREAM TO REMAIN
y CSX Transportation
NASH COUNTY
—.� — ..—..— r..7 �1:��—^...s^_-ry;^p 4 in a T R i_ ;C"scm, F c _ —. ._. --
��"�' EDGECOMBE COUNTY
MAT STABILIZATION REQUIRED
FOR ACCESS IN HYDRIC SOILS
- --
5`-'
SS
AREAS ARE LOCATED IN THE FLOODPLAIN AND ARE SUBJECT TO FLOODING. FLOATING MATS MAY BE
REQUIRED FOR ACCESS. DESIGN AND ENGINEERING OF FLOATING MATS TO BE PROVIDED BY OTHERS
UNDER SEPARATE COVER.ALL MATS SHALL BE ANCHORED OR PROPERLY SECURED AT ALL TIMES.
TEMPORARY STOCKPILES AND SPOILS SHALL BE LOCATED OUTSIDE OF THE 100-YEAR FLOODPLAIN. NO
FILUMATERIAL SHALL BE PLACED OR STOCKPILED WITHIN THE FLOODPLAIN IN SUCH A MANNER AS TO
IMPEDE OR ACT AS A BARRIER TO FLOW. DEWATERING IF NEEDED SHALL UTILIZE AN APPROVED
DEWATERING DEVICE AND BE IN ACCORDANCE WITH THESE PLANS.
t 1 t 1 EROSION&SEDIMENT CONTROL PLAN
0 25 50 100 Feet rl, CUT SHEET INDEX
Scale 1s 1 IN•tOO FT siren pnnled at ...ir
\\\11111/////� on ale¢ede5ctt
\\��N CARO I�i, Line 2181 Hathaway-Rocky Mount Rebuild
< , Project Milestones
0. .-•E S/0•. .7,- City of Rocky Mount, North Carolina
_• = ESC Measures installed A I30/2-3 -1.-
:a SEAL
054381 — Final Grading
5/26/2023 . Rehabilitation Complete 'mi • BCE
. .9
•
V'
�'i� TT BLOS'��` Cut Sheets aid inENRONMENTAL
the implementation of the ESC Plan NC License No C-4572
///I i I I 1 1\\\ and are not a substitute for the ESC Plan See ESC
Plan for additional information
CUT SHEET 37 OF 41
r ,eausIM., ,eallr-wimagowymittellimilliafalneemes.--er
•
`fn� . ,1\VI c SS SS
0 'MctV5 --I`9�i, SS -5-
SS
SS CONSTRUCTION ROAD STABILIZATION
MATS OR TEMPORARY GRAVE , .)\
. ;,.tt�-fir
.•...y . . SS •• �•• eR,
-.2181/326: Iii"_••."4�11
.- ..-.- 2058/10� " ,� 1
:;_.. .::_ 81/326 t�.��i �, � 1
•
- - — — — — xx`. xx-xX- .
Q
7
CSX Transportation 1„.g111a3 —CM- .1 - 7/13J?3 J
NASH COUNTY a+ --R
EDGECOMBE COUNTY I CONFIGURE WORK AREA AND PLACEMENT OF
CONTROLS AS NEEDED FOR ADEQUATE
TURNAROUND WITHIN LIMITS OF DISTURBANCE
AREAS ARE LOCATED IN THE FLOODPLAIN AND ARE SUBJECT TO FLOODING.FLOATING MA I S MAY cst
REQUIRED FOR ACCESS. DESIGN AND ENGINEERING OF FLOATING MATS TO BE PROVIDED BY OTHERS
UNDER SEPARATE COVER.ALL MATS SHALL BE ANCHORED OR PROPERLY SECURED AT ALL TIMES.
TEMPORARY STOCKPILES AND SPOILS SHALL BE LOCATED OUTSIDE OF THE 100-YEAR FLOODPLAIN. NO
FILUMATERIAL SHALL BE PLACED OR STOCKPILED WITHIN THE FLOODPLAIN IN SUCH A MANNER AS TO
IMPEDE OR ACT AS A BARRIER TO FLOW.DEWATERING IF NEEDED SHALL UTILIZE AN APPROVED
DEWATERING DEVICE AND BE IN ACCORDANCE WITH THESE PLANS.
I—I—I—T-1 EROSION&SEDIMENT CONTROL PLAN
0 25 50 100 Feet 1,, CUT SHEET INDEX
Scale is t IN=t W FT wnen panted al lir
\\\1111I f//// engxulsae of 85r11
\�N .OAR0,//, Line 2181 Hathaway RockyMount Rebuild
o.d • Project Milestones y
a/j/0_•,i2 City of Rocky Mount, North Carolina
..0— AL • = ESC Measures installed 11lilt')
_ :a SEAL -: _
: 054381 = Final Grading
5/26/2023 . \� Rehabilitation Complete a�': BCE
C ' .GINS.•
///I B L 05`'�\`�\ Cut Sheets ad In the Implementation of the ESC Plan ENVIRONMENTAL
////1 1 1 11\\\ and are not a substitute for the ESC Plan.See ESC NC License No C.d572
Plan for addltlonal information
CUT SHEET 38 OF 41