Loading...
HomeMy WebLinkAbout040010_Routine Inspection_20231128Date of Visit: _! �3 Arrival Time: Departure Time: County: Farm Name: �� %��(� o�C�.Gin Owner Email: Owner Name: ��� Phone: Mailing Address: Physical Address: Facility Contact: p(Gj,LLp Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: /j Region:-' A, d O Phone: Integrator: d; / Certification Number: `66ts_ Certification Number: Latitude: Longitude: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes e❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes E3'No ❑ NA ❑ NE ❑ Yes _[� No ❑ NA ❑ NE Page I of 3 511212020 Continued Facility Number: jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 2rNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes -E5 No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes &No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediatepublic health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? [—]Yes E'No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes _Q"No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes &No ❑ NA ❑ NE maintenance or improvement? Waste Apnlication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 1:�iNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. Q'Yes ❑ No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ,Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Wind/ow ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop TYpe(s) 13. Soil Type(s): _ ��] i� /%Zct 6� S 14. Do the receiving crops differ from those designated in the CAWMP? IV ❑ Yes — rNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes -Ef"No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes J:;JIQb ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes � No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �o ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Yes (4D No ❑ Yes [_�JAo ❑ Other: ❑NA ❑NE ❑NA ❑NE 21. Does record keeping need improvement? If yes, check the appropriate box below. [—]Yes 2j No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: - Date of inspection: a' 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [D No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes Ef �No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes -2No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes L2�No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [E�No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ETNo ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes E]"No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑fifo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes �io ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes L2'lVo ❑ NA ❑ NE Reviewer/Inspector Name: Reviewer/Inspector Signat Page 3 of 3 °7611 Z5 7I® "7 /" Phone: ljly Sic;—_ j'7f15_ Date: 511212020 FACILITY#: FARM NAME: ( Y7'Lr/� �LQ�( .#� LAGOON LEVEL PERMIT - DUE EVERY 5 YEARS - EXPERIATION DATE NUMBER OF ANIMALS CURRENT NUMBER OF ANIMAL - OIC CARD YES OR NO WASTE UTILIZATION PLAN (WUP) (#20) SOILTYPES CROP TYPES - ODOR CONTROL CHECKLIST YES OR NO - Irrigation Plan Maps YES OR NO WASTE REPORT (#21) -GOOD /FOR % 60/DAYS BEFORE OR AFTER // 1l e�-� NITROGEN LEVEL o2-6 SG c2- 1 � DATE / DATE ���/�.J NITROGEN LEVEL �� l 29 G fS DATE NITROGEN LEVELrL4 /, (0 G ` ?j- SOIL RE/PORT - EVERY 3 YEARS: DATE - P-I (NO MORETHEN 400) - PH (N�tei/4or1..) - Cu2N (NO MORE THEN N00) CU ZN OF PEANUTS NO MORE THEN 300) Not over PAN CROP TYPES FLOW RATES Not over PAN CROP TYPES FLOW RATES IRR2 (#Ti) NITROGEN (N) NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) �F7r� CALBRIATION (mq - EACH REEL SHOULD BE CALIBRATED EVERY OTHER YEAR DATE OF CALIBRATION FLOW RATES RAIN FALL(#2t) -INITIAL AFTER 1" RAIN EVENT -LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED POA NEEDED. UDGE (u21 a25) -DUE EVERY YEAR: DATE 63- a'/ Q`L/ G i l 0: U `S P: o?. ° ATIO OF SLUDGE aC °2 O: 7 t P:a, /� % RATIO OF SLUDGE 3 $ L U rt l 0: rr / P: 3, ( % RATIO OF SLUDGE 3 0: U P: 2, 91Y % RATIO OF SLUDGE 35 OTHER FORMS (422 AND 921) RAIN BREAKER FORM CROP YEILDS MORTALITY_ *If fields are grazed there will be no crop yields VISUAL CHECK FOUNDATION OR PIT LEAKS PIPE LEAKS_ LAGOON SEEPAGE LAGOON BARE AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES WINTERCROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT CROPS NO PONDING REELS FEED BINS LAGOON GARBAGE Bermuda grass: Opens March 1st- Ends September 30* Small Grain Over seed: Opens October s-t- Ends March 31 � Corn: Opens February 15* - Ends .dune 30t Cotton: Opens March 15N - Ends August 1°t Rye: Opens September I° -Ends March 31-t Oats: Opens September I°t- Ends April 15th Wheat Opens September 1st- Ends April 30t Soybeans: Opens April 1st -Ends September 15w - Fescue: Opens August i A- Ends July 31 Sorghum Hay: Opens March 15w - Ends August 31 st