HomeMy WebLinkAboutSW3230301_Supplement-EZ Form_20231207WET POND
s is me �u X! sizea to heat me wv rrom au sunaces ai ouua-oul
................................................................................................................................................................................................................................................................
res
4 Is the SCM located awa from contaminated soils?
Yes
5 What are the side slo es of the SCM H M
3:1
6 Does the SCM have retaining walls, gabion walls or other engineered
No
side slopes?
Are the inlets, outlets, and receiving stream protected from erosion
7
Yes
10- ear storm)?
8 Is there an overflow or bypass for inflow volume in excess of the
Yes
desi n volume?
9 What is the method for dewal2rinq the SCM for maintenance?
Pum re
10 If a Iicable, will the SCM be cleaned out after construction?
Yes
11 Does the maintenance access comply with General MDC (8)M
Yes
12 Does the draina„9e easement comply„with General MDC (9)?
Yes
13 If the SCM is on a single family lot, does (will?) the plat comply with
Yes
General MDC 10 M
14 Is there an O&M Agreement that complies with General MDC (11)?
Yes
15 Is there an O&M Plan that comPIies with General MDC (12)?
Yes
16 Does the SCM follow the device soec ific MDC?
Yes
19 Has a sta e/stora e table been rovided in the calculations?
Yes
.........................
20 Elevation of the excavated main pool depth (bottom of sediment
671.00
removal) fmsl
21 Elevation of the main ooI bottom to of sediment removal fmsl
671.50
22 Elevation of the bottom of the ve etated shelf fmsl
675.00
23 Elevation of the ermanent ooI fmsl
675.50
24 Elevation of the top of the ve etated shelf fmsl
676.00
25 Elevation of the tem ora ooI fmsl
677.00
26 Surface area of the main ermanent ool s uare feet
30896
27 Volume of the main ermanent ooI cubic feet
100396 cf
28 Avera e de th of the main ooI feet
3.25 ft
29 Avera e de the nation used
...............
E nation 2
30 If usin e nation 3 main ool erimeter feet
31 If usin e nation 3 width of submer ed ve .shelf feet
32 Volume of the foreba cubic feet
15062 cf
33 Is this 15-20% of the volume in the main oolM
Yes
34 Clean -out de th for foreba inches
36 in
35 Desi n volume of SCM cu ft
60202 cf
36 Is the outlet an orifice or a weir?
...........................................................................................................................................................................................................................................................................
Orifice
37 If orifice orifice diameter inches
3 in
38 If weir weir hei ht inches
..................
39 If weir, weir length inches
40 Drawdown time for the tem ora ool da s
4.17
............................................................................
41 Are the inlet(s) and outlet located in a manner that avoids short-
Yes
circuiting?
42 Are berms or baffles pE2yidecl to improve the flow athM
Yes
43 Depth 2!!oE2!?ay at entrance inches
48 in
44 Depth of foreba at exit inches
42 in
45 Does water flow out of the foreba in a non -erosive manner?
Yes
..................................................................................................Y...........................................................................................................................................................
46 Width of the veaetated shelf (feet)
6 ft
Wet Pond (2) 1 3:21 PM 12/7/2023