Loading...
HomeMy WebLinkAboutSW3230301_Supplement-EZ Form_20231207WET POND s is me �u X! sizea to heat me wv rrom au sunaces ai ouua-oul ................................................................................................................................................................................................................................................................ res 4 Is the SCM located awa from contaminated soils? Yes 5 What are the side slo es of the SCM H M 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered No side slopes? Are the inlets, outlets, and receiving stream protected from erosion 7 Yes 10- ear storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes desi n volume? 9 What is the method for dewal2rinq the SCM for maintenance? Pum re 10 If a Iicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)M Yes 12 Does the draina„9e easement comply„with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with Yes General MDC 10 M 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that comPIies with General MDC (12)? Yes 16 Does the SCM follow the device soec ific MDC? Yes 19 Has a sta e/stora e table been rovided in the calculations? Yes ......................... 20 Elevation of the excavated main pool depth (bottom of sediment 671.00 removal) fmsl 21 Elevation of the main ooI bottom to of sediment removal fmsl 671.50 22 Elevation of the bottom of the ve etated shelf fmsl 675.00 23 Elevation of the ermanent ooI fmsl 675.50 24 Elevation of the top of the ve etated shelf fmsl 676.00 25 Elevation of the tem ora ooI fmsl 677.00 26 Surface area of the main ermanent ool s uare feet 30896 27 Volume of the main ermanent ooI cubic feet 100396 cf 28 Avera e de th of the main ooI feet 3.25 ft 29 Avera e de the nation used ............... E nation 2 30 If usin e nation 3 main ool erimeter feet 31 If usin e nation 3 width of submer ed ve .shelf feet 32 Volume of the foreba cubic feet 15062 cf 33 Is this 15-20% of the volume in the main oolM Yes 34 Clean -out de th for foreba inches 36 in 35 Desi n volume of SCM cu ft 60202 cf 36 Is the outlet an orifice or a weir? ........................................................................................................................................................................................................................................................................... Orifice 37 If orifice orifice diameter inches 3 in 38 If weir weir hei ht inches .................. 39 If weir, weir length inches 40 Drawdown time for the tem ora ool da s 4.17 ............................................................................ 41 Are the inlet(s) and outlet located in a manner that avoids short- Yes circuiting? 42 Are berms or baffles pE2yidecl to improve the flow athM Yes 43 Depth 2!!oE2!?ay at entrance inches 48 in 44 Depth of foreba at exit inches 42 in 45 Does water flow out of the foreba in a non -erosive manner? Yes ..................................................................................................Y........................................................................................................................................................... 46 Width of the veaetated shelf (feet) 6 ft Wet Pond (2) 1 3:21 PM 12/7/2023