HomeMy WebLinkAbout20231664 Ver 1_Site Plan_20231207Full Pond/
Normal, Water Level
Shoreline
La fie
(At Full Pond/ Normal Water Level)
D' kt)ow .x tgco`
l ' cLbove X 18Lo `
i0` 118U, I-cfl'q-h
.r..�rvim
No -�,ees v em dv ed
Please approximately sketch the following information on this plan, ienrLh of shoreline
(provide dimensions for each item, such as 10 ft x 100 ft)*;
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining wails, docks, etc.
S. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
6. Location of construction access corridors
FORM: SSGP 10-2013 Page 3 of 3