HomeMy WebLinkAbout20231658 Ver 1_Site Plan_20231207�j) vej wN4. H *FUN
i vra.- �- 4AAC15
FW11 Paid/
Norm
'Laim
AJ4 Ft9X
D � GkT. 40' X 71, x s' & ,�,�
"TbTA . 001-reu�n Az e-A - . b! A-c. fps
LI�CAv, ry S ) 78- AO,,CA - . Q [ &its
P"""'a pItI�P � y match th a foil owIn In form
�310 /$ Jr Yl0 f j , it �tiQn art tf� is plan (RMfde d4mwu;*ns1*r =1r
i, All prOPOSed valatl'an daar}ng
2' Locwdon Of r1p MP a f"I to be pieced above the Full parr 3, ' lamian of rip rap orf11Jto be placed beilow the Fall Pond/ Hormel y+y� L&W leveton
4G, LDc"Dn Ofeny► Pr'Wmad str utura such a: bulldln ratatnr ,ter � alevatian
S. taca 'On cf any a=vrW n or dredging�• "� walk dackx, atx.
6. L"I"fon of da s w#}re lull Pond/ Normal WaterU"J elevation
'ucNon etas Ccrrfdor,�
FokM: SSMp i)xnU
Peas 3 of 3
FA Aent4 /
Norrr
Lakm
OA%I P&WNwmW %vwL44 I
Se r zw
�* 4
Nb —M&;130 )7
MXNfP-AL t)drug
7 13U Awg_
(,kS1NA L*
QLChalit
W9
plaua ; szror, . IO � tfi t !�I !
at 1'rx.tWftj , rr9brmrti4 and pl:r, la+a* djn,.rarrar,�}ar.a,�r.
i. All Propoaltd V"an dl�
I. Ldan of MP rep or flit to be plscsd gbmm the FUI] Aare
3. iocatlon of r1v W ar flU tc bt p lid below tha N i I pond/ N�rmE1 War �! �le►rrtlan
Llo"JOn cf2RV Pr*Pmd rtru>:tww audh buiidln Lmml GlevaWn
S• motion of any �n ar d IM riMning rw�lk�, dodo. rtx,
rad#IM balm th. Fuld pvn/ NarmW Witter i.avgl aWntiOn
Ulaft" of Wnstruet on suss com&rs
FORM. sap io.=
h0i of 3
�j) vej wN4. H *FUN
i vra.- �- 4AAC15
FW11 Paid/
Norm
'Laim
AJ4 Ft9X
D � GkT. 40' X 71, x s' & ,�,�
"TbTA . 001-reu�n Az e-A - . b! A-c. fps
LI�CAv, ry S ) 78- AO,,CA - . Q [ &its
P"""'a pItI�P � y match th a foil owIn In form
�310 /$ Jr Yl0 f j , it �tiQn art tf� is plan (RMfde d4mwu;*ns1*r =1r
i, All prOPOSed valatl'an daar}ng
2' Locwdon Of r1p MP a f"I to be pieced above the Full parr 3, ' lamian of rip rap orf11Jto be placed beilow the Fall Pond/ Hormel y+y� L&W leveton
4G, LDc"Dn Ofeny► Pr'Wmad str utura such a: bulldln ratatnr ,ter � alevatian
S. taca 'On cf any a=vrW n or dredging�• "� walk dackx, atx.
6. L"I"fon of da s w#}re lull Pond/ Normal WaterU"J elevation
'ucNon etas Ccrrfdor,�
FokM: SSMp i)xnU
Peas 3 of 3
FA Aent4 /
Norrr
Lakm
OA%I P&WNwmW %vwL44 I
Se r zw
�* 4
Nb —M&;130 )7
MXNfP-AL t)drug
7 13U Awg_
(,kS1NA L*
QLChalit
W9
plaua ; szror, . IO � tfi t !�I !
at 1'rx.tWftj , rr9brmrti4 and pl:r, la+a* djn,.rarrar,�}ar.a,�r.
i. All Propoaltd V"an dl�
I. Ldan of MP rep or flit to be plscsd gbmm the FUI] Aare
3. iocatlon of r1v W ar flU tc bt p lid below tha N i I pond/ N�rmE1 War �! �le►rrtlan
Llo"JOn cf2RV Pr*Pmd rtru>:tww audh buiidln Lmml GlevaWn
S• motion of any �n ar d IM riMning rw�lk�, dodo. rtx,
rad#IM balm th. Fuld pvn/ NarmW Witter i.avgl aWntiOn
Ulaft" of Wnstruet on suss com&rs
FORM. sap io.=
h0i of 3
40
From: Tirnera Hww tamerahaye SMud mm if
Subject: Rusty shorvtne pcs
Date, November 18, 2023 at 2 04 PM �
To: TAMARA HAGER lw wOLskeparmn,Com
Tamara Hager
704-575-2227
The information contained in this message is confidential and is intended solely for the
recipient(s) identified above. If you are not the intended recipient or there are any problems,
please notify the sender immediately. The unauthorized use, disclosure, or copying of this
message is strictly forbidden and may subject you to legal action,
upwom ML"M3R Lew
5, Describe the eAsting land use or condition of the site at the time of this appiication (residential,
undeveloped, etc.):
6, Describe proposed work (include discussion as to how hardening of shoreline has been avolded, or
why it is necessary): _ O'
Y
7. Will work be conducted from land] ❑ From water?.f�l
8. Total Amount of impacts below the normal pool lake level / Normal Water Level
Permanent Impacts including all excavation, backfiil, rip rap, re�ning walls, etc,) In square feet:
Temporary impacts in square feet:
Ik
9. Total amount of impacts above the normal pool lake level J Normal Water Level and so feet 4nd-
ward
Permanent Impacts tincllu�ding back fill, excavation, rip rap, retaining wails, etc.( in square feet-
— D rYc1c�
Temporary Impacts (temporary cleari1(Ang, construction corridor} in square feet,
-
10. Please describe the vegetation above the normal pool lake ievel/ Normal Water level and 50 feet
landward to be impacted (number of trees, for instance):
N�
11. Signature
By signing below, I, as the project proponent, certify to the following:
+ The project proponent hereby certifies that all information contained herein is true, accurate,
and complete to the best of my knowledge and belief
• The project proponent hereby requests that the certifying authorlty review and take actron on
this CWA 401 certificati-on request within the applicable reasonable period of time
(r' iL4
LA k4 f
nor ent's Signature* ( Dow
l nes Si900ture is VOW only if an outhorir>ation Fetter from the owner is provided.
12. Please approximately sketch the following Information on this plan and provide dinwmlons for
each item:
a. All propoierd vegetation clearing
b. Location of rip rap or fill to be placed above the Fuli Pond/ Normal Water Level eleevation
c, Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
d. Location of any proposed structures such as buildings, retaining walls, docks, etc.
e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
�t2 %O t %04M w.d 1 1047 wt S.+Lx L'fa I bleuik %,xu t rLde+a ?%g4.1411
era.7W'4 '
AGENT AUTHORIZATION FORM
PROP'L M LEGAL DESAMUMON:
LOT Pod. LE PLAN NO, �� , PARCEL ID: i7f'i �P
srRFE7 ADDRe55: 4 30 dt
Please print
Praperty Owner: W
Pie.-Lv Ow*r:
The urider;i}r-wrl, registered property owners of the above noted property, do hereby authorize
LIA4 Ki�� 4)rejj1
Agent) {Ntame oyf ooresulting firm} c.•.�-
tll-a -0a-� half and take ail adi m necessary for the prooming, issuance and acacptanee of
this permit or mrtfficiftn and arty and &I standard and special conditions ached,
PrOPwty (>AmWs Address (if different tton property above):
Te"ane:Q_N
We beretry certify the above information submitted in this appiicaom is true and accurate to the
best of ar bmowkdge,
Date: 1
Date'.
PmJect NuWWdu. PQ �v� c T
�c,5jm
----,County. L! N C 4S Liv
l.tx: �tririon ,tdcii�
Hi�opt N r7 T
Dbpoaa! Are" req'3"d (N ft Rlldlor artvtge)
+� S v�3
rt""t r TeW�i� aadistd �u �. � arxrG ftt the It"t must adibwe to all ihih
e►nslnn anntro end "ateL 9URIttY, And live pertntlrsi+ott for � 4Qla and
i A"' o f lndividtW ajrd Company
to di3PM of their drama 1,nate6pj at tibe abo sts tied ioca:iatr ,
r
Aiona tvjTh farm, phase pmvidc
Aerial of EmrmVjot {(-ount}, OIS r
Ito 01' pmlvm ad SP61 mitt
idendQied Fxofx►wd rpoil aite
TO WMOM FT MAY CONCERN:
SAMUEL GOOMfi GIVES AUTHORIZATX)N TO SHANNON MILLER WiTH LAKE POORMM Q KEDGING $e
MARINE CONSTRC nON TO UsE PROPERTY LOCATED AT 67W KJOVIL1.E RD, 7ENVER AIC 28037
FOR
OAEDGE MATERIAL DISPOSAL Srrf
PARCEL NUMBER- # 3694021277
SAMUEL GOODSON
From: TAMARA HAGE
�ll4.A' R � ]r::•� zqA��bS IkTJ'`�{.-'I.�lx
Date; 08 at 5.51.38 PM
2�27 8t 5,52:46 PM
TO: TAMARA HAGE
Tamara Ham
04-5 5-2227
Lake it LLC
❑ESCRIPTION OF DREDGE
The scope of this dredging event is to remove sediment that has
accumulated around the shoreline area of Lake Norman. Work will be
performed from water using a long reach mechanical bucket dredge
that will excavate the spoils and place them directly into hopper barges.
Lake Norman ❑redging & Marine Construction will unload at 4561
Slanting Bridge Rd, Sherrills Ford, NC 28673 then all material is taken to
their Dredge Spoil Site located at 6790 Kidville Rd, Denver, NC 28037.
Disposal area acreage is approximately 75 acres.
Shown from Google Earth
Purdy personal dock will be dredged involving mechanical removal of
approximately 829.63 cubic yards of sediment.
Dredge of cut is 40 ft x 70 ft x 8 ft depth when measured at full pond,
Impacted area is .01 acres,
S _ ,vo
u o' X -70 u 6 "do"-
b
y r-4qc
x a' DepA-
�" -t-
two-.....
LIZ
1
If
1
- XAWRA PIPARIAtu BUFFER NOTIFICATION FORM
Project Ndame/address: T It.l"I-AJ
3 !� AS ��&aunty: I
Owner: nA4/0^ ■ r nt r rJ JNk f
Prinr
Gantt ter/vent: I
Signature
>=rinf V r LIi
Tr:� aPPro.�al is for *.he purpose and des.gn described 1 your application. Impacts not Indicated In the
application is a 4iviadon of the Buffer Rule. site specific work should be provided In the application. (ISA NCAC
0= 1 .0-S06 :,16A NCAC 02 B .0243(8)1
Trees are not allowed to be removed frorr; Zone 1 of the Buffer {w;ahin 3a ft of the full pond elevation), unless
a f-A:s .,ed. L-40t,on, those trees that are severely undermined along the immediate shoreline can be removed.
IvICtimaI s�.api,ig allu S,opIag along the immediate shoreline is allowed. I15A NCAC 028 .0243(6)}
genct ing, grading in the "ufr"er is not allowed. Ucessive disturbance of ground cover, 115A NCAC 02B .0243 (6)j
Le'c."ds, it : r�ia:as pat:Gs, impervious walkways. etc. are not allowed in the buffer unless specifically approved
.M -aee 0f44• ,. 1,* e are IF:T,itat+on on size for decks. 115A NCAC 02B .0243(4) and (6)]
�s:Urk co br ccnc,rcted rrurn land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corrfdor shall be restored. Staging, spoil, construction
crater+oi m�„ter .�„t:i ie f;ie ihdfer. �15A NCACO211 A502 and 1SA NCAC [)ZB ,0243 (4),(6), (8)1
5iarrrtwater cannot ,.e olped or channeled for direct discharge to the lake. All constricted stormwater
trye natural elevation and discharged prior to entering the bijffer directed as diffuse or
: ;haet 'hero ,_ r.,iw-era;;et- 0,e:ac�ties is -tie lake. (15A NCAC 02a .0243(5), (6)1
A cr, o -fcaz �-negr c. lvcrrft ravon
hereby state that i have been informed of the Catawba
1,,L iL� t -� :...�.....r �:ork cLncucted in the buffer, not specifically stated in the application and approved
LY. - f-,v:+'er Resources (DWR), Is a violation and subject to enforcement, Due diligence will be
i • :� : �..*=.:�.?o, will be built within substantial compllance and intent of the 401 Water
4uailty Certification and Surfer Rules, the approved plan(s) and specification(s), and other supporting
� tr
Date. 7L