Loading...
HomeMy WebLinkAboutSAW-2023-01991 Headwaters Trout Verification_20231206DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, WILMINGTON DISTRICT ASHEVILLE FIELD OFFICE 151 PATTON AVENUE ROOM 208 ASHEVILLE NORTH CAROLINA 28801 December 6, 2023 CESAW-RG-A Rhonda Ziegler Brown and Robert Cilley 10128 Parkway Road Balsam Grove, NC 28708 Via Email: rhonda@gaiaherbs.com Jonathan Bigelow Jaffe Retreat LLC 1422 South Barton Road Taylors, SC 29687 Via Email: wellspringmasonry@gmail.com Dear Ms. Brown, Mr. Cilley, and Mr. Bigelow: This letter is in response to the Pre-Construction Notification (PCN) you submitted to the Wilmington District, Asheville Field Office on October 11, 2023, for a Department of the Army Nationwide permit (NWP) verification. This project has been assigned the file number SAW-2023-01991 and is known as Headwaters Trout Farm Storm Fred EWP/StRAP Stream Stabilization. This file number should be referenced in all correspondence concerning this project. A review of the information provided indicates that the proposed work would include the stabilization of 1,595 linear feet of the North Fork French Broad River using a combination of stacked boulders, boulder/rock toe with vegetative geo-lifts, and plantings. The project area for this determination includes a 2.8 acre(s) area which is illustrated on the enclosed site plans/maps. The project/review area is located at 71 Headwaters Farm Road, at Latitude 35.24586 and Longitude -82.88329; in Balsam Grove, Transylvania County, North Carolina. We have determined that the proposed work is authorized by NWP 37 pursuant to authorities under Section 404 of the Clean Water Act (33 U.S.C. § 1344). The proposed work must be accomplished in strict accordance with the general permit conditions, any regional conditions, the special conditions listed in this letter, the application materials, and the enclosed plans. If the extent of the project area and/or nature of the authorized impacts to waters are modified, a revised PCN must be submitted to this office for written approval before work is initiated. Any violation of permit conditions or deviation from your submitted plans may subject the permittee to enforcement action. This verification is valid until March 14, 2026, unless prior to this date the subject NWP(s) is suspended, revoked, or is modified such that the activity no longer complies with the terms and conditions of this NWP. If you commence or are under contract to commence this activity before the date that the relevant NWP is modified or revoked, you will have 12 months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this NWP. Project Specific Special Conditions: 1. No in-water work shall occur between October 15 and April 15 of any year to minimize impacts to trout reproduction. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. This NWP verification does not preclude the necessity to obtain any other Federal, State, or local permits, licenses, and/or certifications, which may be required. If you have any questions related to this verification or have issues accessing documents referenced in this letter, please contact Shannon Healy, Regulatory Specialist of the Asheville Field Office at 828-271-7980 ext. 4233, by mail at the above address, or by email at shannon.healy@usace.army.mil. Please take a moment to complete our customer satisfaction survey located at https://regulatory.ops.usace.army.mil/customer-service-survey/. Sincerely, Shannon Healy Regulatory Specialist Enclosures Cc (w/enclosures) David Brown, Jennings Environmental, PLLC (via email) Jeff Parker, Transylvania County Soil & Water Conservation District (via email) Joey Winston, NCDWR (via email) Andrea Leslie, NCWRC (via email) General Conditions (33 CFR PART 320-330): 1. The time limit for completing the work authorized ends on March 14, 2026. 2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area. 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort of if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit you must obtain the signature of the new owner on the transfer form attached to this letter and forward a copy to this office to validate the transfer of this authorization. 5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the certification is attached if it contains such conditions. 6. You must allow a representative from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit. Commencement Notification Form Action ID Number: SAW-2023-01991 County: Transylvania Permittee: Rhonda Ziegler Brown, Robert Cilley, and Jonathan Bigelow Project Name: Headwaters Trout Farm Storm Fred EWP/StRAP Stream Stabilization Date Verification Issued: 12/6/2023 Project Manager: Shannon Healy Upon commencement of the activity authorized by this permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS Wilmington District Attn: Shannon Healy Asheville Field Office 151 Patton Avenue Room 208 Asheville, North Carolina 28801 or shannon.healy@usace.army.mil 828-271-7980 ext. 4233 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. Construction Start Date: ______________________ __________________________________ ______________________ Signature of Permittee Date Compliance Certification Form Action ID Number: SAW-2023-01991 County: Transylvania Permittee: Rhonda Ziegler Brown, Robert Cilley, and Jonathan Bigelow Project Name: Headwaters Trout Farm Storm Fred EWP/StRAP Stream Stabilization Date Verification Issued: 12/6/2023 Project Manager: Shannon Healy Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS Wilmington District Attn: Shannon Healy Asheville Field Office 151 Patton Avenue Room 208 Asheville, North Carolina 28801 or shannon.healy@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work, and mitigation (if applicable), authorized by the above referenced permit has been completed in accordance with the terms and conditions of the said permit including any general or specific conditions. Date Authorized Work Started: ___________ Completed: ___________ Describe any deviations from permit (attach drawing(s) depicting the deviations): ______________________________________________________________________ ______________________________________________________________________ *Note: The description of any deviations on this form does not constitute approval by the Corps. __________________________________ ______________________ Signature of Permittee Date P P P P P P P P P P P T O B TOB BB B B B B BB BB B B B B BB BB B B B B L O D L O D L O D L O D LO D LOD L O D LO D L O D L O D L O D L O D G: \ S H A R E D D R I V E S \ C A D \ 1 9 T R A N S Y L V A N I A C O U N T Y \ 1 9 0 5 N F O R K F B R H E A D W A T E R S T R O U T F A R M \ D W G \ 1 9 0 5 _ S H T - C O V E R . D W G | MI K E | S A V E D : Tu e s d a y , S e p t e m b e r 2 6 , 2 0 2 3 3 : 2 0 : 4 8 P M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Th u r s d a y , O c t o b e r 5 , 2 0 2 3 9 : 1 6 : 5 1 A M ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX MJ H MJ H PE R M I T D R A W I N G CO V E R S H E E T NO T F O R C O N S T R U C T I O N TR A N S Y L V A N I A C O U N T Y E W P NO R T H F O R K F R E N C H B R O A D R I V E R HE A D W A T E R S T R O U T F A R M TR A N S Y L V A N I A C O U N T Y , NO R T H C A R O L I N A 10/5/2023 1.1 SCALE (34"X22"): SCALE (17"X11"): 1" = 250' 1" = 500' SCALE IN FEET 0 500'250' TRANSYLVANIA COUNTY EWP SITE ID: 37-11-21-5042-402 - HEADWATERS TROUT FARM NORTH FORK FRENCH BROAD RIVER - HEADWATERS TROUT FARM TRANSYLVANIA COUNTY , NORTH CAROLINA LAT: 35.246125, LONG: -82.883498 PROJECT DIRECTORY PROJECT SPONSOR TRANSYLVANIA COUNTY SOIL AND WATER CONSERVATION DISTRICT JEFF PARKER SOIL & WATER DISTRICT DIRECTOR JEFF.PARKER@TRANSYLVANIACOUNTY.ORG DESIGN TEAM ENGINEER JENNINGS ENVIRONMENTAL PLLC GREG JENNINGS, PHD, PE PRESIDENT GREG@JENNINGSENV.COM SURVEYOR PILOT SURVEYING & ENGINEERING, PC CORY GEORGE, PE, PLS PRESIDENT CORY@PILOTSE.COM PROPERTY OWNER(S) PIN OWNER 8546-07-5032-000 RHONDA ZIEGLER BROWN & ROBERT CILLEY CO TRUSTEES 8546-05-8918-000 JAFFE RETREAT LLC PROJECT LOCATION NORTH F O R K FRENC H B R O A D R I V E R SHEET INDEX COVER SHEET 1.1 GENERAL PROJECT NOTES AND SPECIFICATIONS 1.2 STREAM RESTORATION PLAN 2.1 SECTIONS 3.1 DETAILS 4.1 - 4.3 EROSION & SEDIMENTATION CONTROL (ESC)5.1 - 5.3 RE-VEGETATION 6.1 - 6.2 PERMIT DRAWING NOT FOR CONSTRUCTION October 5, 2023 NRCS DESIGN CERTIFICATION: "TO THE BEST OF MY PROFESSIONAL KNOWLEDGE, JUDGEMENT, AND BELIEF, THESE PLANS MEET APPLICABLE NRCS STANDARDS AND PERMITTING REQUIREMENTS." GREG JENNINGS, PHD, PE PRESIDENT, JENNINGS ENVIRONMENTAL PLLC Know what'sbelow. before you digCall G: \ S H A R E D D R I V E S \ C A D \ 1 9 T R A N S Y L V A N I A C O U N T Y \ 1 9 0 5 N F O R K F B R H E A D W A T E R S T R O U T F A R M \ D W G \ 1 9 0 5 _ S H T - N O T E S . D W G | MI K E | S A V E D : Mo n d a y , S e p t e m b e r 2 5 , 2 0 2 3 3 : 0 0 : 2 6 P M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Th u r s d a y , O c t o b e r 5 , 2 0 2 3 9 : 1 6 : 5 4 A M ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX MJ H MJ H PE R M I T D R A W I N G GE N E R A L P R O J E C T N O T E S A N D S P E C I F I C A T I O N S NO T F O R C O N S T R U C T I O N TR A N S Y L V A N I A C O U N T Y E W P NO R T H F O R K F R E N C H B R O A D R I V E R HE A D W A T E R S T R O U T F A R M TR A N S Y L V A N I A C O U N T Y , NO R T H C A R O L I N A 10/5/2023 1.2 GENERAL PROJECT NOTES AND SPECIFICATIONS 1.DEFINITIONS: 1.1.CONSTRUCTION DOCUMENTS: THE CONTRACT AND APPLICABLE DRAWINGS, DETAILS, SPECIFICATIONS, PERMIT(S), AND/OR ANY OTHER DOCUMENTS (MEETING MINUTES, PUNCH LISTS, BID TABS, ETC.) FOR COMPLETE INFORMATION ABOUT THE REQUIRED WORK. ANY ONE OF THESE PARTS MAY NOT CONTAIN ALL OF THE INFORMATION REQUIRED TO COMPLETE THE PROJECT WORK. 1.2.ENGINEER: JENNINGS ENVIRONMENTAL PLLC 2.THE WORK ON THIS PROJECT SHALL ADHERE TO THE FOLLOWING SPECIFICATIONS, STANDARDS AND/OR REGULATIONS: 2.1.NC DEMLR'S "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" (2013) 2.2.NC DEMLR'S CONSTRUCTION GENERAL PERMIT NUMBER NCG01000 2.3.GENERAL, REGIONAL AND SPECIAL CONDITIONS OF USACE'S 404 NATIONWIDE PERMIT NUMBER 27 2.4.GENERAL AND SPECIAL CONDITIONS OF NCDWR'S 401 WATER QUALITY CERTIFICATION 4134 2.5.THE CONSTRUCTION DOCUMENTS 3.ALL EXISTING UTILITIES MAY NOT BE SHOWN. SOME LOCATIONS MAY BE APPROXIMATE. CONTRACTOR SHALL NOTIFY 'NC811' (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF 'NC811'. REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. ANY UTILITIES SHOWN ON THE CONSTRUCTION DOCUMENTS ARE FOR INFORMATIONAL PURPOSES ONLY AND IN NO WAY RELIEVES THE CONTRACTOR FROM COORDINATING, VERIFYING, AND PROTECTING EXISTING UTILITIES. 4.ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR IS RESPONSIBLE FOR COORDINATING CONSTRUCTION ACTIVITIES WITH THE APPROPRIATE UTILITY COMPANIES FOR ANY REQUIRED RELOCATIONS (I.E. POWER POLES, METERS, FITTINGS, ETC.). 5.THE CONTRACTOR IS RESPONSIBLE FOR THE PROJECT AREA UNTIL COMPLETION AND FINAL ACCEPTANCE BY THE ENGINEER AND PROJECT OWNER. THE CONTRACTOR SHALL CONFINE ALL ACTIVITIES, INCLUDING EQUIPMENT STORAGE, TO THE LIMITS OF DISTURBANCE, STAGING AREAS, AND DESIGNATED CONSTRUCTION ACCESS POINTS. 6.THE MANNER IN WHICH THE CONTRACTOR DEALS WITH PEOPLE AND THEIR PROPERTIES WHILE PERFORMING THIS WORK IS EXTREMELY IMPORTANT. THEREFORE, THE CONTRACTOR AND THE CONTRACTOR'S REPRESENTATIVES SHALL MANIFEST A SPIRIT OF FRIENDLINESS AND COOPERATION WHEN DEALING WITH PROPERTY OWNERS AND THE GENERAL PUBLIC WHILE PERFORMING WORK ON THE SITE. 7.EXTREME CARE AND DILIGENCE SHALL BE EXERCISED BY THE CONTRACTOR TO ASSURE THE SAFETY OF PERSONS, ANIMALS, AND PROPERTY. IF AT ANY TIME THE OWNER OR ENGINEER DETERMINES THAT THE CONTRACTOR'S METHODS OR EQUIPMENT ARE INADEQUATE FOR SECURING THE SAFETY OF THE CONTRACTOR'S EMPLOYEES OR THE PUBLIC, THE DESIGNATED REPRESENTATIVE MAY DIRECT THE CONTRACTOR TO TAKE SPECIFIC ACTIONS TO ENSURE SAFETY. THE CONTRACTOR SHALL IMPROVE METHODS AS DEEMED APPROPRIATE BY THE DESIGNATED REPRESENTATIVE WITHOUT ADDITIONAL COST TO THE PROJECT OWNER, SO AS TO ASSURE COMPLIANCE WITH SAFETY CONCERNS. FAILURE OF THE DESIGNATED REPRESENTATIVE TO MAKE THIS DEMAND SHALL NOT RELIEVE THE CONTRACTOR OF ANY OBLIGATION TO ENSURE THE SAFE CONDUCT OF ITS WORK. 8.THE CONTRACTOR SHALL MAINTAIN ALL LIGHTS, GUARDS, SIGNS, TEMPORARY PASSAGES, OR OTHER PRECAUTIONS NECESSARY FOR THE SAFETY OF ALL PERSONS. THE CONTRACTOR SHALL ABIDE BY ALL SAFETY RULES AND CONSTRUCTION CONDITIONS REQUIRED BY GOVERNMENTAL AUTHORITIES AND OTHER ENTITIES, INCLUDING RAILROADS, SO THE PUBLIC IS SAFEGUARDED FROM ACCIDENTS AND DELAYS. GUARDS AND FLAGS REQUIRED BY GOVERNMENTAL OR RAILROAD AUTHORITIES SHALL BE PROVIDED AT THE CONTRACTOR'S EXPENSE, UNLESS DIRECTED OTHERWISE BY THE DESIGNATED REPRESENTATIVE. CONTRACTOR SHALL AT NO TIME COMPROMISE EITHER SAFETY OR ENVIRONMENTAL REQUIREMENTS. 9.THE CONTRACTOR SHALL ONLY USE ACCESS PATHS AND STAGING AREAS SHOWN ON THE DRAWINGS. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY THE ENGINEER AND PROJECT OWNER PRIOR TO USE. 10.NO NON-PERMITTED FILL IN WETLANDS MAY OCCUR. ALL EXCESS SOILS FROM STABILIZATION AND GRADING WORK SHALL BE PLACED IN DESIGNATED AREAS ON THE SITE. TOPOGRAPHIC NOTES AND SPECIFICATIONS 11.HORIZONTAL DATUM IS NAD83(2011) & VERTICAL DATUM IS NAVD88. ALL COORDINATES ARE BASED ON NAD83(2011) AND ALL ELEVATIONS ARE BASED ON NAVD88. 12.THE DESIGN ELEVATIONS AND GRADES SHOWN IN THE DRAWINGS ARE BASED ON THE EXISTING GROUND SURFACE AS SURVEYED IN MAY 2023, FROM WHICH ALL COMPUTATIONS OF CUT AND FILL ARE BASED. DISCREPANCIES BETWEEN THE SURVEYED EXISTING GROUND SURFACE AND FIELD CONDITIONS AT THE TIME OF CONSTRUCTION CAN RESULT IN VARIATIONS OF TOTAL EXCAVATED QUANTITIES. THESE VARIATIONS SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. STREAM RESTORATION NOTES AND SPECIFICATIONS 13.FIELD CONDITIONS MAY REQUIRE ADAPTATION OF THE DESIGN AND/OR DETAILS PROVIDED IN THE DRAWINGS. MINOR VARIATION(S) OR ADAPTATION(S) OF THE PROPOSED WORK SHOWN IN THE DRAWINGS AND DETAILS ARE CONSIDERED INCIDENTAL TO THE WORK. THE ENGINEER WILL WORK WITH THE CONTRACTOR TO ADDRESS ANY FIELD CHANGES. 14.IN-STREAM ROCK STRUCTURES MAY BE SUBSTITUTED WITH WOOD STRUCTURES WITH WRITTEN APPROVAL FROM THE ENGINEER. 15.THE CONTRACTOR SHALL MARK THE LOCATIONS OF BANK STABILIZATION STRUCTURES USING SURVEY GRADE GPS EQUIPMENT FOR REVIEW BY THE ENGINEER BEFORE BEGINNING EXCAVATION AND GRADING. 16.CONTRACTOR SHALL MINIMIZE, TO THE MAXIMUM EXTENT POSSIBLE, IMPACTS TO ADJACENT SIGNIFICANT TREES. 17.CONTRACTOR SHALL USE AN EXCAVATOR WITH A HYDRAULIC THUMB TO INSTALL BANK STABILIZATION STRUCTURES. 18.DESIGN ELEVATIONS SHALL BE CONSTRUCTED WITHIN 0.1' (VERTICAL). WIDTHS AND DEPTHS MUST FALL WITHIN RANGES SHOWN IN THE DRAWINGS AND DETAILS. 19.IF THE EXISTING GROUND IS LESS THAN 0.2' HIGHER THAN THE PROPOSED BANKFULL ELEVATION, IT IS NOT NECESSARY TO EXCAVATE TO THE PROPOSED ELEVATIONS AND GRADES IN THE CONSTRUCTION DOCUMENTS. 20.BANK STABILIZATION STRUCTURES SHALL BE INSTALLED AS SHOWN IN THE DRAWINGS AND DETAILS. ALL STRUCTURES SHALL BE FINISHED TO A SMOOTH SURFACE IN ACCORDANCE WITH THE LINES, GRADES AND ELEVATIONS SHOWN IN THE DRAWINGS AND DETAILS. THE FINISHED STRUCTURE SLOPES AND GRADES SHALL BE WITHIN 0.1' OF DESIGN ELEVATIONS. 21.THE GRADED RIVER BANKS SHALL BE STABILIZED AS SOON AS POSSIBLE BY TEMPORARY AND PERMANENT SEEDING, ADDING STRAW MULCH TO BARE SOIL AND INSTALLING EROSION CONTROL MATTING AS SHOWN IN THE DRAWINGS AND DETAILS. PRIOR TO INSTALLING THE EROSION CONTROL MATTING, PREPARE THE SOIL SURFACE BY LOOSENING 3 - 6” OF SOIL OR APPLYING 3 - 6” OF TOPSOIL TO THE DESIGN ELEVATIONS AND APPLY TEMPORARY AND PERMANENT SEED AND THEN STRAW MULCH. SEED SHALL BE BROADCAST EVENLY OVER THE AREA USING A BROADCAST SPREADER PRIOR TO COVERING WITH THE EROSION CONTROL MATTING. THE MATTING SHALL BE ROLLED OUT IN THE DIRECTION OF ANTICIPATED RUNOFF. INSTALL MATTING IN ACCORDANCE WITH THE DETAIL INCLUDED IN THE DRAWINGS. MATTING USED FOR STREAMBANK STABILIZATION MUST BE CERTIFIED WEED-FREE STRAW OR OTHER NATURAL WEED-FREE / NON-PROPAGATING VEGETATIVE MATERIALS. REWORKING OF AREAS THAT DO NOT ESTABLISH VEGETATION OR BECOME UNSTABLE SHALL BE NECESSARY IN THE MATTING SEPARATES FROM THE SOIL. 22.TOPSOIL SHALL BE REMOVED FROM EXCAVATION AND FILL AREAS PRIOR TO EXCAVATION AND GRADING AND RE-APPLIED TO AREAS AFTER ROUGH GRADING IS COMPLETE. 2 - 4” OF TOPSOIL SHALL BE PLACED ON DISTURBED AREAS TO THE ELEVATIONS AND GRADES INCLUDED IN THE DRAWINGS. EROSION AND SEDIMENTATION CONTROL NOTES AND SPECIFICATIONS 23.ALL CONSTRUCTION ACTIVITIES SHALL ADHERE TO THE CONDITIONS AND REQUIREMENTS OF NCDEMLR'S NG01 CONSTRUCTION GENERAL PERMIT. 24.ALL TREES, UTILITIES AND OTHER SITE FEATURES SHALL BE PROTECTED UNLESS MARKED FOR REMOVAL OR RELOCATION. 25.ALL WETLANDS AND STREAMS LOCATED WITHIN 50 FEET OF THE CONSTRUCTION AREA ON THE PROJECT SITE SHALL BE CLEARLY MARKED (EXAMPLE- ORANGE FABRIC FENCING) PRIOR TO ANY LAND DISTURBING ACTIVITIES AND MUST BE MAINTAINED ON THE PROPERTY UNTIL THE PROJECT PHASE IS COMPLETED [15A NCAC 02H .0506 (B)(2)]. 26.THE CONTRACTOR SHALL USE A STANDARD CONSTRUCTION ENTRANCE AT ALL SITE ACCESS POINTS TO PREVENT SEDIMENT FROM BEING TRACKED ONTO PUBLIC ROADS. 27.THE CONTRACTOR SHALL USE TEMPORARY SILT FENCE ALONG THE DOWNSLOPE SIDE OF ALL STAGING AREAS AND TEMPORARY STOCK PILE AREAS. 28.THE TURBIDITY IN THE RECEIVING WATERS SHALL NOT EXCEED 50 NEPHELOMETRIC TURBIDITY UNITS (NTU) IN STREAMS NOT DESIGNATED AS TROUT WATERS AND 10 NTU IN STREAMS, LAKES, OR RESERVOIRS DESIGNATED AS TROUT WATERS, AS DESCRIBED IN 15A NCAC 02B .0200. APPROPRIATE SEDIMENT AND EROSION CONTROL PRACTICES MUST BE USED TO MEET THIS STANDARD. [15A NCAC 02B .0211 (21)]. 29.EQUIPMENT SHALL BE WELL-MAINTAINED, CLEANED PRIOR TO MOBILIZATION, AND CHECKED DAILY FOR LEAKS OF PETROLEUM PRODUCTS. FUELING, LUBRICATION AND GENERAL EQUIPMENT MAINTENANCE SHOULD NOT TAKE PLACE WITHIN 50 FEET OF A WATERBODY OR WETLANDS TO PREVENT CONTAMINATION BY FUEL AND OILS. [15A NCAC 02H .0506 (B)(3) AND 15A NCAC 02B.0211(12)]. 30.CONSTRUCTION SHALL BE TIMED TO OCCUR DURING TIMES OF LOW FLOW. 31.THE DESIGNER OR HIS DESIGNEE SHALL SUPERVISE THE INSTALLATION OF IN-STREAM STRUCTURES. [15A NCAC 02H .0506(B)(1) AND (2)]. 32.A TEMPORARY DIVERSION AND/OR PUMP AROUND SYSTEM SHALL BE USED TO DURING ALL STREAM RESTORATION AND STABILIZATION WORK AS SHOWN IN THE DETAILS. TEMPORARY PUMP AROUND SYSTEM SHALL BE USED AT PROJECT SITES WHERE THE WATERSHED SIZE IS LESS THAN 2 SQUARE MILES. 33.THE STREAM BANKS, IN-STREAM STRUCTURES, AND WORK AREA MUST BE STABILIZED AT THE END OF EACH DAY BEFORE THE TEMPORARY IN-STREAM DIVERSIONS AND/OR PUMP AROUND SYSTEM(S) ARE REMOVED AND FLOW IS RETURNED THE FULL CHANNEL. 34.EROSION CONTROL MATTING THAT INCORPORATES PLASTIC MESH AND/OR PLASTIC TWINE SHALL NOT BE USED ALONG STREAMBANKS OR WITHIN WETLANDS. DISTURBED AREAS SHOULD BE SEEDED, MULCHED, AND/OR MATTED AS SOON AS POSSIBLE, PREFERABLY AT THE END OF EACH WORKDAY. [15A NCAC 02B .0201] 35.IF BORROW OR WASTE MATERIAL IS REQUIRED OR GENERATED DURING GRADING OPERATIONS, AN APPROVED EROSION AND SEDIMENT CONTROL PERMIT MUST BE SECURED FOR THE BORROW OR WASTE MATERIAL SITE PRIOR TO INITIATION OF ANY LAND DISTURBING ACTIVITY. [15A NCAC 04B .0110]. QUANTITIES AND MATERIALS NOTES AND SPECIFICATIONS 36.THE CONTRACTOR SHALL FURNISH ALL MATERIALS NECESSARY TO COMPLETE THE PROPOSED WORK UNLESS OTHER PROVISIONS HAVE BEEN AGREED UPON PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL DELIVER ALL MATERIALS TO THE DESIGNATED ACCESS POINTS AND STAGING AREAS. MATERIAL QUANTITIES, DIMENSIONS AND SIZES SHALL CONFORM TO THE NOTES AND SPECIFICATIONS PROVIDED IN THE CONSTRUCTION DOCUMENTS. THE ENGINEER MAY INSPECT AND APPROVE ALL MATERIALS PRIOR TO CONSTRUCTION. IF MATERIALS DO NOT MEET THE MINIMUM REQUIREMENTS SPECIFIED IN THE CONSTRUCTION DOCUMENTS, THE ENGINEER SHALL REJECT THE MATERIALS. 37.COSTS INCURRED DUE TO PROJECT DELAYS RESULTING FROM FAILURE OF THE CONTRACTOR TO MEET THE REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS SHALL BE THE EXPENSE OF THE CONTRACTOR. QUANTITIES LISTED ARE ESTIMATES ONLY AND SHALL BE CONFIRMED BY THE CONTRACTOR. 38.THE EROSION CONTROL MEASURES DEPICTED ON THE DRAWINGS SHALL BE INSTALLED AS NEEDED TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. ADDITIONAL EROSION CONTROL MEASURES (ABOVE THOSE SHOWN ON THE DRAWINGS) MAY BE REQUIRED IN ORDER TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE PROJECT OWNER AND ENGINEER PRIOR TO INSTALLATION OF ADDITIONAL EROSION CONTROL MEASURES. 39.ANY ADDITIONAL GRADING OTHER THAN WHAT IS SHOWN ON THE PLANS SHALL REQUIRE PRIOR APPROVAL FROM THE PROJECT OWNER AND ENGINEER. 40.THE USE OF ANY BRAND NAMES/MANUFACTURERS OR MODELS IS INTENDED SOLELY TO DENOTE THE QUALITY STANDARD OF THE DESIRED PRODUCT. ANY USE OF BRAND NAMES IS NOT INTENDED TO RESTRICT BIDDERS TO A SPECIFIC BRAND, MAKE, MANUFACTURER, OR NAME. THE BRAND NAMES / MANUFACTURERS OF MODELS ARE INTENDED TO CONVEY THE GENERAL STYLE, TYPE, CHARACTER, AND QUALITY OF PRODUCT. EQUIVALENT PRODUCTS WILL BE ACCEPTABLE IF THE PROJECT OWNER OR ENGINEER HAS GIVEN APPROVAL OF THE SPECIFIC PRODUCT IN WRITING. 41.THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROVIDING STORAGE AREAS FOR CONSTRUCTION MATERIALS AND EQUIPMENT. THE MATERIAL AND EQUIPMENT STORAGE SHALL COMPLY WITH THE CONSTRUCTION DOCUMENTS AND ALL LOCAL, STATE AND FEDERAL REGULATIONS THROUGHOUT THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL RESTORE THE STORAGE AREA TO ITS ORIGINAL (OR BETTER) CONDITION UPON COMPLETION OF THE PROJECT OR UPON SUCH TIME AS DIRECTED BY THE PROJECT OWNER AND ENGINEER. SUCH RESTORATION SHALL BE AT NO ADDITIONAL COST TO THE PROJECT OWNER. NRCS PRACTICE CODES SCALE (34"X22"): SCALE (17"X11"): NTS NTS NOT TO SCALE CP CP CP CP CP CP CP C P C P CP C P CP CP CP CP CP CP CP CP CP P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P B B TOB T O B T O B T O B T O B TO B T O B T O B T O B T O B T O B T O B TO B TOB TOB T O B T O B TOB B B B B BB B B BB BB B B BB B B B B B B B B B B B B B B BB BB BB B B B B BB B B B B B B B B B B B B B B BB B B B B BB BB BB BB BB BB B B B B B B B B B B B B G: \ S H A R E D D R I V E S \ C A D \ 1 9 T R A N S Y L V A N I A C O U N T Y \ 1 9 0 5 N F O R K F B R H E A D W A T E R S T R O U T F A R M \ D W G \ 1 9 0 5 _ S H T _ P L A N . D W G | MI K E | S A V E D : Mo n d a y , S e p t e m b e r 2 5 , 2 0 2 3 2 : 5 9 : 3 2 P M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Th u r s d a y , O c t o b e r 5 , 2 0 2 3 9 : 1 7 : 0 7 A M ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX MJ H MJ H PE R M I T D R A W I N G RE S T O R A T I O N P L A N NO T F O R C O N S T R U C T I O N TR A N S Y L V A N I A C O U N T Y E W P NO R T H F O R K F R E N C H B R O A D R I V E R HE A D W A T E R S T R O U T F A R M TR A N S Y L V A N I A C O U N T Y , NO R T H C A R O L I N A 10/5/2023 2.1 SCALE (34"X22"): SCALE (17"X11"): 1" = 75' 1" = 150' SCALE IN FEET 0 75 150 580 - STREAMBANK STABILIZATION, 300 LF SEE DETAIL, SHEET 4.2 ARMOR BRIDGE ABUTMENTS (TYP.) 580 - STREAMBANK STABILIZATION, 250 LF SEE DETAIL, SHEET 4.1 NOTES: - STABILIZE RIGHT STREAM BANKS THROUGHOUT PROJECT REACH. - PLACE ADDITIONAL ROCK MATERIAL ON STREAMBANKS TO PROTECT BRIDGE ABUTMENTS FROM SCOUR. - PROVIDE STABLE OUTFALLS FOR ALL STORM SEWERS. -DEBRIS SHALL BE DISPOSED ON HIGH GROUND OUTSIDE OF THE FEMA 100-YR FLOODPLAIN. -ONSITE DEBRIS DISPOSAL SHALL BE LOCATED IN AN AREA OUTSIDE THE 100-YEAR FLOODPLAIN WITH LOCATION PROVIDED BY LANDOWNER AND APPROVED BY PROJECT ENGINEER. -RESTORE ACCESS PATHS AND STORAGE AREA(S) TO ORIGINAL CONDITION UPON COMPLETION OF THE PROJECT OR UPON SUCH TIME AS DIRECTED BY THE PROJECT OWNER AND ENGINEER. -DISTURBANCE OF TREES AND/OR WOODY VEGETATION SHALL BE KEPT TO THE MINIMUM EXTENT PRACTICABLE TO COMPLETE WORK. PLAN VIEW LEGEND 580 - STREAMBANK STABILIZATION SEE DETAIL, SHEETS 4.1 - 4.3 EXISTING STREAM CENTERLINE PROPERTY LINE EX. CONTOUR (1 FT) FLOW DIRECTION PROPOSED STREAM CENTERLINE 580 - STREAMBANK STABILIZATION, 1025 LF SEE DETAIL, SHEET 4.3 PROVIDE STABLE OUTLET FOR STORM SEWERS (TYP.) A A' 580 - STREAMBANK STABILIZATION, 120 LF SEE DETAIL, SHEET 4.2 MAX DEPTH AT CENTER OF RIFFLE CROSS-SECTION TIE TO EXISTING GROUND PER PLAN (MAX 2:1) DESIGN BANKFULL STAGE DESIGN GRADE DESIGN CENTERLINE ALIGNMENT 48.0' ±MIN. 3.0' 2:1 2:12: 1 2.3' ± BANKFULL BENCH GENERALLY MATCH EX. CHANNEL SECTION BELOW BANKFULL BENCHES MATCH EXISTING THALWEG INVERT TypSect - SCALE: HOR 1" =10'; VERT 1"= 5' 2890 2895 2900 2905 2910 2915 2890 2895 2900 2905 2910 2915 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 G: \ S H A R E D D R I V E S \ C A D \ 1 9 T R A N S Y L V A N I A C O U N T Y \ 1 9 0 5 N F O R K F B R H E A D W A T E R S T R O U T F A R M \ D W G \ 1 9 0 5 _ S H T _ X S . D W G | MI K E | S A V E D : Mo n d a y , S e p t e m b e r 2 5 , 2 0 2 3 4 : 0 8 : 4 7 P M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Th u r s d a y , O c t o b e r 5 , 2 0 2 3 9 : 1 7 : 2 0 A M ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX MJ H MJ H PE R M I T D R A W I N G TY P I C A L S E C T I O N NO T F O R C O N S T R U C T I O N TR A N S Y L V A N I A C O U N T Y E W P NO R T H F O R K F R E N C H B R O A D R I V E R HE A D W A T E R S T R O U T F A R M TR A N S Y L V A N I A C O U N T Y , NO R T H C A R O L I N A 10/5/2023 3.1 SCALE (34"X22"): SCALE (17"X11"): NTS NTS NOT TO SCALE TYPICAL DESIGN SECTION TYPICAL SECTION DESIGN CHANNEL SECTION SPECIFICATIONS MAINTAIN CHANNEL DIMENSION & CAPACITY STREAMBANK GRADING (TYP.) SEE DETAIL, SHEET 4.3 MAX 2:1 1.INSTALL STREAMBANK STABILIZARION PRACTICES AS SHOWN ON THE DRAWINGS AND DETAILS. CONTRACTOR SHALL NOT INCREASE CAPACITY OF THE CHANNEL BEYOND THE PRE-DISASTER CAPACITY AS DOCUMENTED. 2.FINISHED SURFACE OF STREAMBANKS AND STABILIZATION PRACTICES SHALL MATCH PRE-DISASTER CHANNEL DIMENSION AND CAPACITY. ELEVATIONS AND DEPTHS SHALL BE CONSTRUCTED TO WITHIN 0.1' (VERTICAL). CHANNEL WIDTHS AND OTHER HORIZONTAL (X,Y) DIMENSIONS SHALL BE WITHIN 0.2'. G: \ S H A R E D D R I V E S \ C A D \ 1 9 T R A N S Y L V A N I A C O U N T Y \ 1 9 0 5 N F O R K F B R H E A D W A T E R S T R O U T F A R M \ D W G \ 1 9 0 5 _ D E T L - B A N K S T A B I L I Z A T I O N . D W G | MI K E | S A V E D : We d n e s d a y , S e p t e m b e r 1 3 , 2 0 2 3 6 : 4 4 : 5 8 P M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Th u r s d a y , O c t o b e r 5 , 2 0 2 3 9 : 1 7 : 2 3 A M ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX MJ H MJ H PE R M I T D R A W I N G ST R E A M B A N K S T A B I L I Z A T I O N NO T F O R C O N S T R U C T I O N TR A N S Y L V A N I A C O U N T Y E W P NO R T H F O R K F R E N C H B R O A D R I V E R HE A D W A T E R S T R O U T F A R M TR A N S Y L V A N I A C O U N T Y , NO R T H C A R O L I N A 10/5/2023 4.1 NOT TO SCALE SCALE (34"X22"): SCALE (17"X11"): NTS NTS STREAMBANK STABILIZATION - STRUCTURAL NOTES AND SPECIFICATIONS 1.ALL STREAMBANK STABILIZATION - STRUCTURAL WORK SHALL TAKE PLACE DURING DRY WORKING CONDITIONS. THE CONTRACTOR SHALL MINIMIZE THE EXPORT OF SEDIMENT TO ADJACENT SURFACE WATERS TO THE MAXIMUM EXTENT PRACTICABLE BY USING ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES AS NEEDED OR AS DIRECTED BY THE ENGINEER ONSITE. 2.FOR IMPLEMENTATION, THE CONTRACTOR SHALL PREPARE THE EXISTING STREAMBANK AND INSTALL 8 OZ. NON-WOVEN FILTER FABRIC, AS NEEDED. STABILIZATION MATERIAL SHALL BE PLACED ON THE PREPARED SLOPE TO A MINIMUM DEPTH OF 2.0 FEET. LARGER MATERIAL IS TO BE PLACED IN A TOE TRENCH AT THE EXISTING TOE OF SLOPE. 3.ROCK MATERIAL USED FOR STRUCTURAL STREAMBANK STABILIZATION SHALL CONSIST OF 100% NCDOT CLASS 2 RIPRAP. ALL MATERIALS ARE TO BE APPROVED BY THE ENGINEER. RIPRAP SHALL BE INSTALLED IN LIFTS NOT TO EXCEED 2.0'. EACH LIFT SHALL BE COMPACTED WITH THE EXCAVATOR BUCKET TO FORM A DENSE LAYER OF COMPACTED ROCK MATERIAL TO LINES, ELEVATIONS AND GRADES IN THE DRAWINGS AND DETAILS. 4.KEY EROSION CONTROL MATTING IN AT INTERFACE WITH STRUCTURAL STREAMBANK STABILIZATION AND INSTALL MATTING ON ALL DISTURBED RIVER BANKS. 5.TRANSPLANTS AVAILABLE ONSITE MAY BE INSTALLED IN THE TOPSOIL AS DIRECTED BY THE ENGINEER ONSITE. 6.THE SURFACE OF THIS FEATURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS-SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. 7.STABILIZATION OF THE WORK AREA WITH TEMPORARY AND PERMANENT SEEDING AND MULCHING IS REQUIRED FOLLOWING GRADING OF THE STREAMBANK. INSTALL WOODY PLANTING AND VEGETATION AS SHOWN ON THE APPROVED RE-VEGETATION PLAN. FL O W MIN. 3.0' TIE TO EXISTING TOP OF BANK DETAILED SECTION A - A' NOT TO SCALE DETAILED PLAN NOT TO SCALE EX. TOP OF BANK MIN. 2.0 FT MIN. 2.0 FT VARIES (MAX. 2.0' ABOVE BANKFULL) COMPACTED BACKFILL NON-WOVEN GEOTEXTILE OR BEDDING MATERIAL, AS NEEDED TIE TO EXISTING GRADE EX. STREAMBED MATCH EX. GRADE MAX. 2:1 INSTALL EROSION CONTROL MATTING OR LIVE TRANSPLANTS AS DIRECTED BY THE ENGINEER ON ALL DISTURBED STREAMBANKS. STREAMBANK STABILIZATION - STRUCTURAL MATERIAL, SEE NOTE 3. ST R E A M B A N K S T A B I L I Z A T I O N LE N G T H V A R I E S P E R P L A N A A' VARIES (EXTEND TO TOP OF BANK) G: \ S H A R E D D R I V E S \ C A D \ 1 9 T R A N S Y L V A N I A C O U N T Y \ 1 9 0 5 N F O R K F B R H E A D W A T E R S T R O U T F A R M \ D W G \ 1 9 0 5 _ D E T L - B A N K S T A B I L I Z A T I O N . D W G | MI K E | S A V E D : We d n e s d a y , S e p t e m b e r 1 3 , 2 0 2 3 6 : 4 4 : 5 8 P M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Th u r s d a y , O c t o b e r 5 , 2 0 2 3 9 : 1 7 : 2 4 A M ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX MJ H MJ H PE R M I T D R A W I N G ST R E A M B A N K S T A B I L I Z A T I O N - BO U L D E R T O E P R O T E C T I O N NO T F O R C O N S T R U C T I O N TR A N S Y L V A N I A C O U N T Y E W P NO R T H F O R K F R E N C H B R O A D R I V E R HE A D W A T E R S T R O U T F A R M TR A N S Y L V A N I A C O U N T Y , NO R T H C A R O L I N A 10/5/2023 4.2 NOT TO SCALE SCALE (34"X22"): SCALE (17"X11"): NTS NTS 1.ALL BOULDERS SHALL BE STRUCTURAL STONE, CUBICAL OR RECTANGULAR IN SHAPE. BOULDERS AVAILABLE ONSITE MAY BE USED IF APPROVED BY THE ENGINEER. BOULDERS SHALL BE 3.0' X 5.0' X 3.0' (W X L X H) +/- 0.5'. THE MINIMUM ACCEPTABLE BOULDER THICKNESS (H) IS 2.5'. BOULDERS LONGER (L) THAN 5.5' WILL BE ACCEPTED. 2.A BEDDING COURSE CONSISTING OF NCDOT CLASS A RIPRAP SHALL BE INSTALLED BELOW THE FIRST ROW OF BOULDERS. IF BEDROCK IS ENCOUNTERED ONSITE, THE FIRST LIFT OF BOULDERS SHALL BE PLACED DIRECTLY ON THE BEDROCK. ALL BOULDERS SHALL FIT TIGHTLY TOGETHER. INSTALL EACH LIFT OF BOULDERS WITH A 1.5' SETBACK FROM THE FRONT EDGE OF THE PREVIOUS LIFT OF BOULDERS. 3.UNCONSOLIDATED GRAVEL AND TOPSOIL SHALL BE INSTALLED AS A LEVELING COURSE THE ABOVE BOULDERS BEFORE THE LIVE CUTTINGS AND SOIL LIFTS ARE INSTALLED. 4.PLACE LAYER OF LIVE CUTTINGS (MIN. 4' LENGTH) A 1.0' O.C. ON THE GRAVEL AND TOPSOIL SUCH THAT APPROXIMATELY 6 INCHES TO 1 FOOT OF EACH LIVE BRANCH WILL BE EXPOSED AND THE REMAINDER (2' TO 4') OF EACH LIVE BRANCH WILL BE COVERED BY THE SOIL LIFT. LIVE BRANCHES SHALL BE OF THE SPECIES SPECIFIED FOR LIVE STAKES OR APPROVED BY THE ENGINEER. 5.INSTALL SOIL LIFTS FROM THE FIRST ROW OF LIVE CUTTINGS UP TO THE EXISTING TOP OF BANK ELEVATION. LIFTS SHALL NOT EXCEED 1.0' THICKNESS. LIFTS SHALL INCLUDE ALL SOIL PREPARATION, TEMPORARY AND PERMANENT SEEDING AND MULCH. SOIL LIFTS SHALL USE 2 LAYERS OF MATTING: 24 OZ. / YD2 COIR MATTING (OUTER) AND 11 OZ./YD2 COCONUT FIBER BLANKET (INNER). EROSION CONTROL MATTING USED FOR SOIL LIFTS SHALL BE MADE OF 100% NATURAL FIBERS AND MATERIALS AND BE BIODEGRADABLE UNDER NORMAL CLIMATE CONDITIONS. EROSION CONTROL MATTING CONTAINING PLASTICS OR PLASTIC BASED MATERIALS SHALL NOT BE USED. 6.PLACE SOIL BACKFILL UP TO THE LIFT HEIGHT SPECIFIED OF NO GREATER THAN 1.0 FT BEING CAREFUL NOT TO PUSH/PULL OR TEAR THE FABRIC PREVIOUSLY PLACED. 7.REPEAT STEPS #4, #5 AND #6 AS NEEDED TO INSTALL SOIL LIFTS UP TO EXISTING TOP OF BANK. 8.THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS-SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED OR APPROVED BY THE ENGINEER. 9.RE-DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN-STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. LIVE CUTTINGS BETWEEN LIFTS SOIL LIFTS SHALL USE TWO LAYERS OF BIODEGRADABLE MATTING: 700 G/M2 COIR MATTING (OUTER) AND 320 G/M2 EROSION CONTROL BLANKET (INNER). LIVE STAKES AND BARE ROOT PLANTINGS FLO W BOULDER TOE PROTECTION BANKFULL LIVE CUTTINGS INSTALLED BETWEEN LIFTS 2.0' O.C. DETAILED PLAN NOT TO SCALE DETAILED SECTION A - A' NOT TO SCALE EXCAVATION LIMITS / EXISTING BANK WOOD STAKE (TYP.) 2" X 2" X 18" - 36" 1.0' MAX PLACE BOULDERS ON ROCK BEDDING AND LEVELING COURSE 9.0' MIN 8.0' MIN TOP OF BOULDERS EXISTING TOP OF BANK 2.0' MAX 1.0' MAX PLACE FIRST COURSE OF BOULDERS BELOW STREAMBED A A ' STREAMBANK STABILIZATION - BOULDER TOE PROTECTION NOTES AND SPECIFICATIONS SOIL GEOLIFTS TO EXISTING TOP OF BANK 1.5' UNCONSOLIDATED GRAVEL AND TOPSOIL FILTER FABRIC BOULDERS COMPACTED ONSITE BACKFILL NCDOT CLASS A ROCK BACKFILL AND BEDDING COURSE 1.ALL BANK GRADING WORK SHALL TAKE PLACE DURING DRY WORKING CONDITIONS. THE CONTRACTOR SHALL MINIMUZE THE EXPORT OF SEDIMENT TO ADJACENT SURFACE WATERS TO THE MAXIMUM EXTENT PRACTICABLE BY USING ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES AS NEEDED OR AS DIRECTED BY THE ENGINEER ONSITE. 2.FOR IMPLEMENTATION, THE CONTRACTOR SHALL GRADE THE RIVER BANK FROM THE EXISTING TOP OF SLOPE AT 3:1 DOWN TO A 3.0 FOOT FLAT BENCH TO ELEVATIONS OF SIMILAR FEATURE ON OPPOSITE BANK. ALL EXCAVATED MATERIAL SHALL BE HAULED AND PLACED IN DESIGNATED AREAS ONSITE. 3.IF STREAMBANK MATERIAL IS NOT SUITABLE FOR PLANTING AND RE-VEGETATION, INSTALL LIVE TRANSPLANTS AS DIRECTED BY THE ENGINEER ONSITE. 4.TRANSPLANTS AVAILABLE ONSITE MAY BE INSTALLED IN THE TOPSOIL AS DIRECTED BY THE ENGINEER ONSITE. 5.THE SURFACE OF THIS FEATURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS-SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. 6.STABILIZATION OF THE WORK AREA WITH TEMPORARY AND PERMANENT SEEDING AND MULCHING IS REQUIRED FOLLOWING GRADING OF THE STREAMBANK. INSTALL WOODY PLANTING AND VEGETATION AS SHOWN ON THE APPROVED RE-VEGETATION PLAN. FL O W EX. TOE OF SLOPE ST R E A M B A N K G R A D I N G LE N G T H V A R I E S P E R P L A N MIN. 3.0' LIVE STAKES AND BAREROOT PLANTINGS PER RE-VEGETATION PLAN, DETAILS, AND SCHEDULES INSTALL EROSION CONTROL MATTING ON ALL DISTURBED STREAM BANKS TIE TO EXISTING GRADE AT MAX. 3:1 3:1TIE TO EXISTING GRADE A A' EXISTING CHANNEL DETAILED SECTION A - A' NOT TO SCALE DETAILED PLAN NOT TO SCALE HOLD EX. TOP OF BANK GRADE DOWN TO PROP. BENCH AT MAX. 3:1 INSTALL EROSION CONTROL MATTING OR LIVE TRANSPLANTS AS DIRECTED BY THE ENGINEER ON ALL DISTURBED STREAMBANKS. MATCH BENCH/LOW BANK ELEVATION ON OPPOSITE BANK PREPARE THE SOIL SURFACE BY LOOSENING 2 - 4" OF SOIL. IF RIVER BANK MATERIAL IS NOT SUITABLE FOR RE-VEGETATION AND PLANTING, INSTALL LIVE TRANSPLANTS AS DIRECTED BY THE ENGINEER ONSITE. 3. 0 ' O . C . OFFSET ROWS OF LIVE STAKES AND BAREROOT PLANTINGS PER RE-VEGETATION PLAN AND DETAILS STREAMBANK STABILIZATION - BANK GRADING NOTES AND SPECIFICATIONS EX. TOP OF BANK MATCH EX. CHANNEL DIMENSIONS ROCK TOE PROTECTION (TYP.) FILL BEHIND ROCK TOE PROTECTION AS REQ'D ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX MJ H MJ H PE R M I T D R A W I N G ST R E A M B A N K S T A B I L I Z A T I O N - B A N K G R A D I N G NO T F O R C O N S T R U C T I O N TR A N S Y L V A N I A C O U N T Y E W P NO R T H F O R K F R E N C H B R O A D R I V E R HE A D W A T E R S T R O U T F A R M TR A N S Y L V A N I A C O U N T Y , NO R T H C A R O L I N A 10/5/2023 4.3 SCALE (34"X22"): SCALE (17"X11"): NTS NTS NOT TO SCALE C P C P C P C P C P CP CP CP C P CP CP CP CPCPCP CP CP CP CP CP CP CP CP C P CP CP CP CP CP P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P BB TO B TOB TOB TOB T O B TOB TOB TOBTOB TOB TO B TO B TOB TOBTOB TOB TOB TOB TOB TOB TOB TOB TO B TOB BB B B BB BB BB BB BB BB BB BB BB BB BB BB BB BB BB B B B B B B B B B B B B B B BB B B BB BB BB BB BBBB BB BB BB BB BB BB BB BB BB BB B B B B B B B B BB B B BBBB BB BB BB LOD LO D LOD LO D LOD LOD LOD L O D L O D LOD LOD LOD LO D LODLODLODLOD LOD LOD LOD LOD LOD LOD L O D LOD LOD LOD LOD LOD L O D L O D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D L O D L O D L O D LO D LOD LOD LOD LOD LOD L O D LO D LO D TD TD TD TD S F S F TD TD TD TD TD TD TD TD TD TD TD TD TD TD TD TD T D T D T D T D T D TD TD TD TD TD TD G: \ S H A R E D D R I V E S \ C A D \ 1 9 T R A N S Y L V A N I A C O U N T Y \ 1 9 0 5 N F O R K F B R H E A D W A T E R S T R O U T F A R M \ D W G \ 1 9 0 5 _ S H T _ E S C . D W G | MI K E | S A V E D : Th u r s d a y , O c t o b e r 5 , 2 0 2 3 9 : 1 6 : 1 7 A M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Th u r s d a y , O c t o b e r 5 , 2 0 2 3 9 : 1 7 : 3 8 A M ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX MJ H MJ H PE R M I T D R A W I N G ES C P L A N NO T F O R C O N S T R U C T I O N TR A N S Y L V A N I A C O U N T Y E W P NO R T H F O R K F R E N C H B R O A D R I V E R HE A D W A T E R S T R O U T F A R M TR A N S Y L V A N I A C O U N T Y , NO R T H C A R O L I N A 10/5/2023 5.1 SCALE (34"X22"): SCALE (17"X11"): 1" = 60' 1" = 120' SCALE IN FEET 0 60 120 TEMPORARY IN-STREAM DIVERSION (TYP.) LIMITS OF DISTURBANCE (LOD) = 2.80 AC. TEMPORARY SILT FENCE TEMPORARY STAGING AND STORAGE AREA STABILIZE STREAMBNAKS WITH EROSION CONTROL MATTING PROTECT EX. WATER INTAKE RACE/PIPES AT ALL TIMES TEMPORARY IN-STREAM DIVERSION (TYP.) UTILIZE EX. BRIDGE TO ACCESS SITE TEMP. ACCESS PATH ALONG TOP OF BANK (12' WIDE TYP.) EROSION AND SEDIMENTATION CONTROL LEGEND LOD LOD SF SF LIMITS OF DISTURBANCE SILT FENCE STAGING AND STORAGE AREA STABILIZED CONSTRUCTION ENTRANCE CONSTRUCTION ACCESS ROUTE TD TD TEMPORARY DIVERSION TEMPORARY IN-STREAM DIVERSION (TYP.)TEMPORARY CONSTRUCTION ENTRANCE EROSION CONTROL MATTING G: \ S H A R E D D R I V E S \ C A D \ 1 9 T R A N S Y L V A N I A C O U N T Y \ 1 9 0 5 N F O R K F B R H E A D W A T E R S T R O U T F A R M \ D W G \ 1 9 0 5 _ S H T _ E S C . D W G | MI K E | S A V E D : Th u r s d a y , O c t o b e r 5 , 2 0 2 3 9 : 1 6 : 1 7 A M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Th u r s d a y , O c t o b e r 5 , 2 0 2 3 9 : 1 7 : 3 9 A M ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX MJ H MJ H PE R M I T D R A W I N G ES C N O T E S , S P E C I F I C A T I O N S , & SE Q U E N C E O F C O N S T R U C T I O N NO T F O R C O N S T R U C T I O N TR A N S Y L V A N I A C O U N T Y E W P NO R T H F O R K F R E N C H B R O A D R I V E R HE A D W A T E R S T R O U T F A R M TR A N S Y L V A N I A C O U N T Y , NO R T H C A R O L I N A 10/5/2023 5.2 SCALE (34"X22"): SCALE (17"X11"): NTS NTS EROSION AND SEDIMENTATION CONTROL NOTES AND SPECIFICATIONS SEQUENCE OF CONSTRUCTION 1.ALL CONSTRUCTION ACTIVITIES SHALL ADHERE TO THE CONDITIONS AND REQUIREMENTS OF NC DEMLR'S NG01 CONSTRUCTION GENERAL PERMIT. 2.ALL TREES, UTILITIES AND OTHER SITE FEATURES SHALL BE PROTECTED UNLESS MARKED FOR REMOVAL OR RELOCATION. 3.EQUIPMENT SHALL BE WELL-MAINTAINED, CLEANED PRIOR TO MOBILIZATION, AND CHECKED DAILY FOR LEAKS OF PETROLEUM PRODUCTS. FUELING OPERATIONS SHALL BE PERFORMED IN A CONTAINED AREA AWAY FROM SURFACE WATER. 4.ALL WORK IN OR ADJACENT TO STREAMS AND RIVERS SHALL BE CONDUCTED SUCH THAT THE FLOWING WATER DOES NOT COME IN CONTACT WITH THE DISTURBED WORK AREA. 5.UTILIZE A TEMPORARY IN-STREAM DIVERSION AT ALL TIMES WHEN WORKING IN THE ACTIVE STREAM CHANNEL. SEE DETAIL, SHEET 5.3. 6.CONSTRUCTION SHALL BE TIMED TO OCCUR DURING TIMES OF LOW FLOW. 7.CONSTRUCTION SCHEDULING AND STAGING SHALL BE TIMED TO MINIMIZE THE AMOUNT OF TIME SPENT WORKING IN THE RIVER CHANNEL. 8.THE RIVERBANKS, IN-STREAM STRUCTURES AND WORK AREA MUST BE STABILIZED AT THE END OF EACH DAY BEFORE THE TEMPORARY IN-STREAM DIVERSIONS ARE REMOVED AND FLOW IS RETURNED THE FULL CHANNEL. 9.ALL WASTE SOIL SHALL STAY ONSITE AND WILL BE DISPOSED OF IN AREAS DESIGNATED ON THE PLANS. THE WASTE SOIL FOR THE FUTURE WALKING TRAIL SHALL BE ROUGH-GRADED AND STABILIZED WITH TEMPORARY AND PERMANENT SEEDING AND MULCH 1.OBTAIN AND REVIEW THE TRANSYLVANIA COUNTY EWP - NORTH FORK FRENCH BROAD RIVER HEADWATERS TROUT FARM PROJECT, EROSION AND SEDIMENTATION CONTROL PLAN AND ALL OTHER APPLICABLE PERMITS. 2.NOTIFY THE NCDEQ LQS INSPECTOR 48 HOURS BEFORE PROJECT STARTS. 3.FLAG THE WORK LIMITS AND STAKE OUT THE LIMITS OF DISTURBANCE (LOD) OF THE PROJECT. THE TOTAL PROJECT LOD IS 2.80 AC. 4.LOCATE ALL UNDERGROUND UTILITIES WITHIN THE WORK AREA. 5.INSTALL RAIN GAUGE AND PREPARE INSPECTION FORMS. 6.HOLD PRE-CONSTRUCTION MEETING WITH THE PERMITTEE, ENGINEER AND CONTRACTOR PRIOR TO STARTING ANY LAND DISTURBING ACTIVITIES. 7.NO MAJOR GRADING ACTIVITIES OR BASIN CONSTRUCTION ARE TO TAKE PLACE DURING WET WEATHER OR PERIODS OF PREDICTED WET WEATHER I.E. HURRICANES. SITE MUST BE "STORM READY" BEFORE ANY EXTENDED BREAKS IN CONSTRUCTION ACTIVITIES INCLUDING WEEKENDS. 8.INSTALL ALL EROSION AND SEDIMENTATION CONTROL BMPS AS SHOWN IN THE DRAWINGS AND DETAILS. 9.INSPECT EROSION PREVENTION AND SEDIMENT CONTROL BMPS DAILY AND AFTER SIGNIFICANT RAINFALL EVENTS. MAKE NEEDED REPAIRS IMMEDIATELY. KEEP ALL LOGS AND RECORDS UP-TO-DATE. 10.ACQUIRE AND STORE MATERIALS FOR SITE (E.G. ROCK, LOGS, EROSION CONTROL MATTING AND FILTER FABRICS) IN THE TEMPORARY STAGING AREAS. 11.CLEAR EXISTING VEGETATION REQUIRED TO COMPLETE THE WORK TAKING CARE NOT TO DISTURB DESIRABLE VEGETATION TO REMAIN INTACT. 12.GRADE THE RIVER BANKS AND INSTALL BANK STABILIZATION STRUCTURES ACCORDING TO THE PLANS AND DETAILS. WHEN POSSIBLE, PERFORM WORK FROM THE RIVER BANKS TO MINIMIZE TIME SPENT WORKING IN THE CHANNEL. 13.WHEN WORKING IN THE CHANNEL, UTILIZE A TEMPORARY IN-STREAM DIVERSION. 14.INSTALL TEMPORARY SEEDING, PERMANENT SEEDING, AND EROSION CONTROL MATTING ON ALL DISTURBED RIVER BANKS AND GRADED SLOPES AS SHOWN ON SHEET 5.3. 15.INSTALL TEMPORARY AND PERMANENT SEEDING AND MULCH TO ALL AREAS DISTURBED FOR CONSTRUCTION ACCESS AND STAGING AS SHOWN ON SHEET 5.1. 16.NOTIFY THE NCDEQ LQS INSPECTOR WHEN PROJECT IS READY FOR A CLOSE OUT INSPECTION. FILE FOR NPDES NCG010000 E-NOTICE OF TERMINATION WHEN FINAL CLOSE OUT INSPECTION REPORT IS RECEIVED FROM NCDEQ LQS. 17.ONCE THE WORK AREA IS STABILIZED AND CONSTRUCTION ACTIVITIES ARE COMPLETED, REMOVE AND DISPOSE OF ALL NON-BIODEGRADABLE EROSION AND SEDIMENTATION CONTROL BMPS. 18.NOTIFY THE PERMITEE AND THE ENGINEER FOR A FINAL INSPECTION AND WALK THROUGH TO VERIFY FINAL STABILIZATION OF THE SITE. 19.WHEN SEASONALLY APPROPRIATE, INSTALL PERMANENT PLANTINGS ON RIVER BANKS AND WITHIN THE RIPARIAN ZONES AS SHOWN ON SHEETS 6.1 THROUGH 6.2. NOT TO SCALE G: \ S H A R E D D R I V E S \ C A D \ 1 9 T R A N S Y L V A N I A C O U N T Y \ 1 9 0 5 N F O R K F B R H E A D W A T E R S T R O U T F A R M \ D W G \ 1 9 0 5 _ S H T _ E S C . D W G | MI K E | S A V E D : Th u r s d a y , O c t o b e r 5 , 2 0 2 3 9 : 1 6 : 1 7 A M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Th u r s d a y , O c t o b e r 5 , 2 0 2 3 9 : 1 7 : 3 9 A M ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX MJ H MJ H PE R M I T D R A W I N G ES C D E T A I L S NO T F O R C O N S T R U C T I O N TR A N S Y L V A N I A C O U N T Y E W P NO R T H F O R K F R E N C H B R O A D R I V E R HE A D W A T E R S T R O U T F A R M TR A N S Y L V A N I A C O U N T Y , NO R T H C A R O L I N A 10/5/2023 5.3 SCALE (34"X22"): SCALE (17"X11"): WORK AREA 1.ALL WORK IN OR ADJACENT TO THE RIVER SHALL BE CONDUCTED SUCH THAT FLOW DOES NOT COME IN CONTACT WITH THE DISTURBED WORK AREA. 2.CONSTRUCT A TEMPORARY IN-STREAM THAT DIRECTS FLOW AROUND THE WORK AREA SUCH THAT FLOW DOES NOT INTERACT WITH DISTURBED EARTH AND CONSTRUCTION MATERIALS. 3.IN-STREAM DIVERSION MAY BE CONSTRUCTED OF SANDBAGS, RIPRAP (NCDOT CLASS B, OR EQUIVALENT), AND/OR EXISTING BED AND BANK MATERIAL APPROVED BY THE ENGINEER. 4.CONSTRUCTION SHALL BE TIMED TO OCCUR DURING TIMES OF LOW FLOW. 5.CONSTRUCTION SCHEDULING AND STAGING SHALL BE TIMED TO MINIMIZE THE AMOUNT OF TIME SPENT WORKING IN THE RIVER CHANNEL. 6.THE RIVERBANKS, IN-STREAM STRUCTURES AND WORK AREA MUST BE STABILIZED AT THE END OF EACH DAY BEFORE THE TEMPORARY DIVERSION IS REMOVED AND FLOW IS RETURNED TO THE FULL CHANNEL. 7.AFTER THE WORK AREA IS STABILIZED, REMOVE THE MATERIAL USED TO CONSTRUCT THE TEMPORARY DIVERSION AND RETURN THE RIVERBED TO THE PRE-CONSTRUCTION CONDITION. 8.IN-STREAM DIVERSION SHALL BE INSPECTED WEEKLY OR AFTER EVERY RAIN EVENT. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY. (LENGTH NOT TO EXCEED THAT WHICH CAN BE COMPLETED IN ONE DAY) FLOW RIVER BA N K FLOW WORK AREA TEMPORARY GRAVEL/COBBLE BERM RIVER BANK DETAILED PLAN NOT TO SCALE TEMPORARY IN-STREAM DIVERSION NOTES AND SPECIFICATIONS 1.EROSION CONTROL MATTING IS USED TO PROTECT RECENTLY CONSTRUCTED STREAM BANKS FROM EROSION. THE MATTING WILL REMAIN INTACT WHILE THE BANK AND RIPARIAN VEGETATION MATURES, PROVIDING CRITICAL BANK PROTECTION. 2.STREAM BANK EROSION CONTROL MATTING MATERIAL SPECIFICATIONS: 2.1.MACHINE DIRECTION TENSILE STRENGTH: 77 LB/IN 2.2.CROSS MATCH DIRECTION TENSILE STRENGTH: 86 LB/IN 2.3.APPARENT OPENING SIZE: 0.59” x 0.67” 2.4.PERCENT OPENING: 49% 2.5.MASS: 700 G/M2 3.BEFORE INSTALLING EROSION CONTROL MATTING, RAKE SOIL LEVEL, ADD TEMPORARY AND PERMANENT SEED, SOIL PREPARATION AND MULCH. 4.EROSION CONTROL MATTING SHALL BE PLACED ALONG THE LENGTH OF THE NEW CHANNEL FROM THE TOE OF SLOPE AT THE INNER BERM TO THE BANKFULL STAGE. 5.SECURE MATTING IN PLACE BY STAKING AND OVERLAPPING AT THE SEEMS WITH A SHINGLE-TYPE METHOD SUCH THAT THE OVERLAPPING PIECE IS IN THE SAME DIRECTION AS THE STREAM FLOW AS SHOWN IN THE DETAIL. ADDITIONAL STAKING SHALL BE APPLIED BY THE CONTRACTOR AT NO ADDITIONAL COST IF THE MATTING SEPARATES FROM THE SOIL MORE THAN ONE INCH UNDER A REASONABLE PULL. 6.EROSION CONTROL MATTING USED ON ALL STREAM BANKS SHALL BE MADE OF 100% NATURAL FIBERS AND MATERIALS AND BE BIODEGRADABLE UNDER NORMAL CLIMATE CONDITIONS. EROSION CONTROL MATTING CONTAINING PLASTICS OR PLASTIC BASED MATERIALS SHALL NOT BE USED. EROSION CONTROL MATTING NOTES AND SPECIFICATIONS 2' EROSION CONTROL MATTING FROM TOE OF SLOPE TO 3.0' BEYOND BANKFULL STAGE BANKFULL EROSION CONTROL MATTING ECO-STAKE MIN. 12" LENGTH EDGE OVERLAP MIN. 4" WITH DOUBLE ECO-STAKES AT 2' O.C.EROSION CONTROL MATTING TOE OF SLOPE SECURE MATTING WITH 4" OVERLAP AND DOUBLED ECO-STAKES VERTICAL OVERLAP MIN. 12" WITH DOUBLE ECO-STAKES TURN DOWN MATTING MIN. 6" SINGLE 12" ECO-STAKES OFFSET ROWS AT 2'-3' O.C. BANKFULL STAGE A A' BANKFULL STAGE EXISTING GROUND DETAILED SECTION A - A' NOT TO SCALE DETAILED STAKING PLAN NOT TO SCALE TEMPORARY IN-STREAM DIVERSION EROSION CONTROL MATTING DETAILED PLAN NOT TO SCALE NTS NTS NOT TO SCALE C P C P C P C P C P CP CP C P C P CP CP CP CPCPCP CP CP CP CP CP CP CP CP C P CP CP CP CP CP P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P BB TO B TOB TOB TOB T O B TOB TOB TOBTOB TOB TO B TO B TOB TOBTOB TOB TOB TOB TOB TOB TOB TOB TO B TOB BB B B BB BB BB BB BB BB BB BB BB BB BB BB BB BB BB B B B B B B B B B B B B B B BB B B BB BB BB BB BBBB BB BB BB BB BB BB BB BB BB BB B B B B B B B B BB B B BBBB BB BB BB G: \ S H A R E D D R I V E S \ C A D \ 1 9 T R A N S Y L V A N I A C O U N T Y \ 1 9 0 5 N F O R K F B R H E A D W A T E R S T R O U T F A R M \ D W G \ 1 9 0 5 _ S H T _ V E G . D W G | MI K E | S A V E D : Th u r s d a y , S e p t e m b e r 2 1 , 2 0 2 3 4 : 3 4 : 5 2 P M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Th u r s d a y , O c t o b e r 5 , 2 0 2 3 9 : 1 7 : 5 9 A M ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX MJ H MJ H PE R M I T D R A W I N G RE - V E G E T A T I O N P L A N NO T F O R C O N S T R U C T I O N TR A N S Y L V A N I A C O U N T Y E W P NO R T H F O R K F R E N C H B R O A D R I V E R HE A D W A T E R S T R O U T F A R M TR A N S Y L V A N I A C O U N T Y , NO R T H C A R O L I N A 10/5/2023 6.1 SCALE (34"X22"): SCALE (17"X11"): 1" = 60' 1" = 120' SCALE IN FEET 0 60 120 SCALE IN FEET 0 60 120 RE-VEGETATION PLAN LEGEND ZONE 2 - RIPARIAN BUFFER ZONE 1 - STREAMBANKS ZONE 3 - SEED MIX ONLY ZONE 1: STREAMBANKS (TYP.) ZONE 2: RIPARIAN BUFFER ZONE 3: SEED MIX ONLY ZONE 2: RIPARIAN BUFFER ZONE 2: RIPARIAN BUFFER G: \ S H A R E D D R I V E S \ C A D \ 1 9 T R A N S Y L V A N I A C O U N T Y \ 1 9 0 5 N F O R K F B R H E A D W A T E R S T R O U T F A R M \ D W G \ 1 9 0 5 _ S H T _ V E G . D W G | MI K E | S A V E D : Th u r s d a y , S e p t e m b e r 2 1 , 2 0 2 3 4 : 3 4 : 5 2 P M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Th u r s d a y , O c t o b e r 5 , 2 0 2 3 9 : 1 8 : 0 0 A M ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX MJ H MJ H PE R M I T D R A W I N G RE - V E G E T A T I O N N O T E S & P L A N T I N G S C H E D U L E S NO T F O R C O N S T R U C T I O N TR A N S Y L V A N I A C O U N T Y E W P NO R T H F O R K F R E N C H B R O A D R I V E R HE A D W A T E R S T R O U T F A R M TR A N S Y L V A N I A C O U N T Y , NO R T H C A R O L I N A 10/5/2023 6.2 SCALE (34"X22"): SCALE (17"X11"): GENERAL RE-VEGETATION AND PLANTING NOTES 1. FINAL VEGETATION SPECIES SELECTION MAY CHANGE DUE TO REFINEMENT OR SPECIES AVAILABILITY AT THE TIME OF PLANTING. SPECIES SUBSTITUTIONS WILL BE COORDINATED BETWEEN THE BANK MANAGER, ENGINEER AND PLANTING CONTRACTOR PRIOR TO THE PROCUREMENT OF PLANT/SEED STOCK. 2. LARGER NATIVE TREE SPECIES TO BE PRESERVED WILL BE FLAGGED BY THE ENGINEER PRIOR TO CONSTRUCTION ACTIVITIES. ANY TREES HARVESTED FOR WOODY MATERIAL WILL BE UTILIZED TO PROVIDE BED AND BANK STABILIZATION AND COVER OR NESTING HABITAT ON THE FLOODPLAIN. ANY EXCESS WOODY MATERIALS MAY USED TO BACKFILL OLD CHANNELS. 3. ALL DISTURBED AREAS WILL BE STABILIZED USING TEMPRORY AND PERMERMANET SEEDING AS DEFINED IN THE SEEDING SCHEDULE AND THE APPROVED E&SC PLANS. 4. SUPPLEMENTAL PLANTING ACTIVITIES MAY BE REQUIRED WITHIN THE CONSERVATION EASEMENT. TEMPORARY SEEDING AND MULCHING NOTES 5. TEMPORARY SEEDING AND MULCHING SHALL BE APPLIED TO ALL AREAS AND ACCESS ROUTES DISTURBED DURING CONSTRUCTION. 6. ALL SEED AND SEED VARIETIES MUST BE FREE OF STATE AND FEDERALLY LISTED NOXIOUS WEED SEED AND INVASIVE SPECIES. 7. ALL DISTURBED AREAS WILL BE SEEDED WITH TEMPORARY SEED AND MULCHED WITH WHEAT STRAW. SEEDING WILL BE PERFORMED USING A BROADCAST SPREADER. OTHER METHODS MAY BE USED BUT MUST BE APPROVED BY ENGINEER IN ADVANCE OF INSTALLATION. 8. MAINTENANCE OF SEEDED AREAS SHALL CONSIST OF WATERING, WEED AND PEST CONTROL, FERTILIZATION, EROSION REPAIR, RESEEDING, AND INCIDENTAL OPERATIONS AS NECESSARY TO ESTABLISH A HEALTHY, VIGOROUS, WEED FREE AND DISEASE FEE UNIFORM STAND OF GRASS. ALL AREAS WHICH FAIL TO SHOW A UNIFORM STAND OF GRASS FOR ANY REASON SHALL BE TREATED REPEATEDLY UNTIL A UNIFORM STAND OF AT LEAST 90% COVERAGE IS ATTAINED WITH NO BARE AREA GREATER THAN FIVE (5) SQUARE FEET. PERMANENT SEEDING NOTES 9. PERMANENT SEEDING SHALL OCCUR IN CONJUNCTION WITH TEMPORARY SEEDING WHERE APPLICABLE. IDEALLY, PERMANENT SEEDING SHALL OCCUR DURING THE PLANTING SEASON FOR EACH SEED TYPE. AREAS FERTILIZED FOR TEMPORARY SEEDING SHALL BE SUFFICIENTLY FERTILIZED FOR PERMANENT SEEDING; ADDITIONAL FERTILIZER IS NOT REQUIRED FOR PERMANENT SEEDING. 10. ALL SEED AND SEED VARIETIES MUST BE FREE OF STATE AND FEDERALLY LISTED NOXIOUS WEED SEED AND INVASIVE SPECIES. 11. THE CONTRACTOR SHALL LOOSEN THE SOIL TO A MINIMUM DEPTH OF 4-INCHES AND GRADE TO A SMOOTH, EVEN SURFACE WITH A LOOSE, UNIFORMLY FINE TEXTURE. THE AREAS TO BE SEEDED ARE THEN TO BE ROLLED AND RAKED TO REMOVE RIDGES AND FILL DEPRESSIONS TO MEET FINISH GRADES. THE CONTRACTOR IS TO LIMIT SUB GRADE AND FINISH GRADE PREPARATION TO AREAS THAT WILL BE PLANTED IMMEDIATELY. PREPARED AREAS ARE TO BE RESTORED IF ERODED OR OTHERWISE DISTURBED AFTER FINE GRADING AND BEFORE PLANTING. 12. SEED SHALL BE SOWN WITH A SPREADER OR A SEEDING MACHINE. SEED IS NOT TO BE BROADCAST OR DROPPED WHEN WIND VELOCITY EXCEEDS 5 MPH. SEED SHALL BE EVENLY DISTRIBUTED BY SOWING IN TWO DIRECTIONS AT RIGHT ANGLES TO EACH OTHER. WET SEED OR SEED THAT IS MOLDY OR OTHERWISE DAMAGED IN TRANSIT OR STORAGE IS NOT TO BE USED. AFTER BEGIN SOWN, THE SEED SHALL BE RAKED INTO THE TOP 1/4 INCH OF THE TOPSOIL, LIGHTLY ROLLED, AND WATERED WITH FINE SPRAY. SEEDED AREAS ON STREAM BANKS SHALL BE PROTECTED WITH COIR FIBER MATTING. ZONE 1: STREAMBANK 13. LIVESTAKES AND HERBACEOUS PLUGS LISTED IN THE PLANTING SCHEDULE SHALL BE PLANTED IN OFFSET ROWS AT A DENSITY OF 4,840 STEMS PER ACRE (3.0' O.C.) FROM TOE OF THE RESTORED CHANNEL TO 2.0' OUTSIDE THE BANKFULL STAGE. HERBACEOUS PLUGS SHALL BE PLANTED ALONG THE TOE OF THE CHANNEL IN THE OUTSIDE OF THE POOL MEANDER BENDS. ZONE 2: RIPARIAN BUFFER WOODY SPECIES LISTED IN THE PLANTING SCHEDULE SHALL BE PLANTED IN OFFSET ROWS AT A DENSITY OF 440 STEMS PER ACRE (10.0' O.C.) FROM 2.0' OUTSIDE THE BANKFULL STAGE TO THE GRADING LIMITS. EXACT PLACEMENT OF THE SPECIES SHALL BE DETERMINED BY THE CONTRACTOR’S VEGETATION SPECIALIST PRIOR TO SITE PLANTING AND BASED ON THE WETNESS CONDITIONS OF PLANTING LOCATIONS. TEMPORARY SEEDING SCHEDULEPERMANENT SEEDING SCHEDULE NTS NTS NOT TO SCALE ZONE 1: STREAMBANKS ZONE 2: RIPARIAN BUFFER