HomeMy WebLinkAboutNCC201448_MODIFICATION Supporting Documents_20231207 ROY COOPER 1.
Governor
ELIZABETH S.BISER
M,cm/'
Secretary 4 qunm
WILLIAM E. TOBY VINSON,JR. NORTH CAROLINA
Interim Director environmental Quality
November 27, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
Duke Energy Carolinas, LLC
Attention: Mehdi Maibodi, General Manager
526 South Church Street
Charlotte,North Carolina 28202
RE: Project Name: Phase IV Rogers CCP Landfill Construction (Landfill Road Modifications)
Project ID: CLEVE-2020-016 -
Acres Approved: 53.8
County: Cleveland
City: Cliffside/Mooresboro
Location: McCraw Road
River Basin: Broad
Stream Classification: Other
Submitted By: WSP USA Environment & Infrastructure Inc
Date Received by LQS: November 13, 2023
Plan Type: Revised
Dear Mr. Maibodi:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire three I
(3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required
by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a link
with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the
COC via email. As the Financially Responsible Party shown on the FRO form submitted for this
project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this
project changes in the future, the new responsible party must obtain a new COC. •
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on
file at the job site:
North Carolina Department of Environmental Quality Division of Energy,Mineral,and Land Resources
Mooresville Regional Office 610 East Center Avenue,Suite 301 N,Iooresville,North Carolina 28115
704-663-1699
Letter of Approval with Modifications
Duke Energy Carolinas, LLC
November 27, 2023
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is•
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify this office of
the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Kathryn S. Peterson
Assistant Regional Engineer I
Land Quality Section
KSP •
Enclosure: Certificate of Approval
Modifications Required for Approval
NCGOI Fact Sheet
c: WSP USA Environment& Infrastructure Inc
Attention: Ken Daly, PE
2801 Yorkmont Road, Suite 100
Charlotte,North Carolina 28208
North Carolina Department of Environmental Quality Division of Energy,Mineral,and Land Resources
Mooresville Regional Office 610 East Center Avenue,Suite 301 Mooresville,North Carolina 28115
itamieufffts$ 704-663-1699
Letter of Approval with Modifications
Duke Energy Carolinas, LLC
November 27, 2023
Page 3 of 3
•
MODIFICATIONS REQUI i'E iU FOR APPROVAL
Project Name: Phase IV Rogers CCP Landfill Construction (Landfill Road Modifications)
Project ID: CLEVE-2020-016
County: Cleveland
Reviewed by: Kathryn S. Peterson
1. Ensure all erosion and sediment control measures are within the proposed Limits of Disturbance
(LOD).
2. On Sheet CLS C999.013.002 the revised total LOD is listed as 54.20 acres, but your Financial
Responsibility/Ownership (FRO) Form states the total modified acreage is 53.80 acres. Please ensure
that the total acreage on the plan reflects what is listed on the FRO Form.
3. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If
the approved erosion and sedimentation control measures prove insufficient, the applicant must take
those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
DE
North Carolina Department of Environmental Quality Division of Energy,ivUneral,and[.and Resources
Mooresville Regional Office 610 East Center Avenue,Suite 301 4looresville,North Carolina 28115
704-663-1699