Loading...
HomeMy WebLinkAboutNCC201448_MODIFICATION Supporting Documents_20231207 ROY COOPER 1. Governor ELIZABETH S.BISER M,cm/' Secretary 4 qunm WILLIAM E. TOBY VINSON,JR. NORTH CAROLINA Interim Director environmental Quality November 27, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Duke Energy Carolinas, LLC Attention: Mehdi Maibodi, General Manager 526 South Church Street Charlotte,North Carolina 28202 RE: Project Name: Phase IV Rogers CCP Landfill Construction (Landfill Road Modifications) Project ID: CLEVE-2020-016 - Acres Approved: 53.8 County: Cleveland City: Cliffside/Mooresboro Location: McCraw Road River Basin: Broad Stream Classification: Other Submitted By: WSP USA Environment & Infrastructure Inc Date Received by LQS: November 13, 2023 Plan Type: Revised Dear Mr. Maibodi: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three I (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. • Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality Division of Energy,Mineral,and Land Resources Mooresville Regional Office 610 East Center Avenue,Suite 301 N,Iooresville,North Carolina 28115 704-663-1699 Letter of Approval with Modifications Duke Energy Carolinas, LLC November 27, 2023 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is• determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Kathryn S. Peterson Assistant Regional Engineer I Land Quality Section KSP • Enclosure: Certificate of Approval Modifications Required for Approval NCGOI Fact Sheet c: WSP USA Environment& Infrastructure Inc Attention: Ken Daly, PE 2801 Yorkmont Road, Suite 100 Charlotte,North Carolina 28208 North Carolina Department of Environmental Quality Division of Energy,Mineral,and Land Resources Mooresville Regional Office 610 East Center Avenue,Suite 301 Mooresville,North Carolina 28115 itamieufffts$ 704-663-1699 Letter of Approval with Modifications Duke Energy Carolinas, LLC November 27, 2023 Page 3 of 3 • MODIFICATIONS REQUI i'E iU FOR APPROVAL Project Name: Phase IV Rogers CCP Landfill Construction (Landfill Road Modifications) Project ID: CLEVE-2020-016 County: Cleveland Reviewed by: Kathryn S. Peterson 1. Ensure all erosion and sediment control measures are within the proposed Limits of Disturbance (LOD). 2. On Sheet CLS C999.013.002 the revised total LOD is listed as 54.20 acres, but your Financial Responsibility/Ownership (FRO) Form states the total modified acreage is 53.80 acres. Please ensure that the total acreage on the plan reflects what is listed on the FRO Form. 3. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities DE North Carolina Department of Environmental Quality Division of Energy,ivUneral,and[.and Resources Mooresville Regional Office 610 East Center Avenue,Suite 301 4looresville,North Carolina 28115 704-663-1699