Loading...
HomeMy WebLinkAboutNCC204146_NOT Closeout Documents_20231205 �`y OF�,� PROJECT Thornton Reserve Lots 42-47 �l do PERMIT# LDG 026391-2021 CERTIFICATE OF COMPLETION PLAN# Mass 0047-2021 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCGO1 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1 �`y OF�,� PROJECT Thornton Reserve Lots 4851 �l do PERMIT# LDG 032009-2021 CERTIFICATE OF COMPLETION PLAN# Mass 0057-2021 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCGO1 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1 �`y OF�,� PROJECT Thornton Reserve Lots 61-64 �l do PERMIT# LDG 025875-2022 CERTIFICATE OF COMPLETION PLAN# Mass 0059-2022 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCG01 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1 �`y OF�,� PROJECT Thornton Reserve Lots 65-69 �l do PERMIT# LDG 018484-2022 CERTIFICATE OF COMPLETION PLAN# Mass 0043-2022 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCG01 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1 �`y OF�,� PROJECT Thornton Reserve Lots 19-23 �l do PERMIT# LDG 052775-2021 CERTIFICATE OF COMPLETION PLAN# Mass 0096-2021 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCG01 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1 �`y OF�,� PROJECT Thornton Reserve Lots 52-56 �l do PERMIT# LDG 039001-2021 CERTIFICATE OF COMPLETION PLAN# Mass 0067-2021 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCGO1 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1 �`y OF�,� PROJECT Thornton Reserve Lots 70-73 �l do PERMIT# LDG 013846-2022 CERTIFICATE OF COMPLETION PLAN# Mass 0032-2022 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCG01 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1 �`y OF�,� PROJECT Thornton Reserve Lots 74-78 �l do PERMIT# LDG 009996-2022 CERTIFICATE OF COMPLETION PLAN# Mass 0022-2022 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCGO1 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1 �`y OF�,� PROJECT Thornton Reserve Lots 79-82 �l do X` cR••% T. • PERMIT# LDG 056756-2021 CERTIFICATE OF COMPLETION PLAN# Mass 0110-2021 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCG01 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1 �`y OF�,� PROJECT Thornton Reserve Lots 83-87 �l do PERMIT# LDG 047627-2021 CERTIFICATE OF COMPLETION PLAN# Mass 0083-2021 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCG01 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1 �`y OF�,� PROJECT Thornton Reserve Lots 88-92 �l do PERMIT# LDG 059162-2021 CERTIFICATE OF COMPLETION PLAN# Mass 0114-2021 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCGO1 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1 �`y OF�,� PROJECT Thornton Reserve Lots 93-98 �l do PERMIT# LDG 004739-2022 CERTIFICATE OF COMPLETION PLAN# Mass 0009-2022 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCG01 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1 �`y OF�,� PROJECT Thornton Reserve Lots 7-12,36-41 �l do PERMIT# LDG 012021-2021 CERTIFICATE OF COMPLETION PLAN# Mass 0018-2021 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCG01 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1 �`y OF�,� PROJECT Thornton Reserve Lots 57-60 �l do PERMIT# LDG 044988-2021 CERTIFICATE OF COMPLETION PLAN# Mass 0079-2021 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCG01 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1 �`y OF�,� PROJECT Thornton Reserve Lots 1-6,24-29 �l do PERMIT# LDG 035345-2020 CERTIFICATE OF COMPLETION PLAN# Mass 0071-2020 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCG01 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1 °`y OF Ft.4,95. PROJECT Thornton Reserve Lots 13-18 �l do .,." PERMIT# LDG 049884-2021 CERTIFICATE OF COMPLETION PLAN# Mass 0091-2021 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCG01 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1 �`y OF�,� PROJECT Thornton Reserve Lots 30-35 �l do PERMIT# LDG 042109-2021 CERTIFICATE OF COMPLETION PLAN# Mass 0072-2021 City of Raleigh Stormwater Management Division (919)996-3940 Stephen Leischner DATE 11/21/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. VI City Permit(s) Closed The referenced permit(s) have been closed. • Coverage Under NCG010000 Proceed to deq.nc.gov/NCGO1 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCG01 compliance will no longer be required. • All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. • All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.3/2022 Page 1 of 1