Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0021717_Application (ATC)_20231206
F)I Authorization Application Construct This page intentionally left blank. FN Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application Contents Contents — IF ATC Application Form ATC-10-23 3 '_ Copy of Cover Letter Requesting ATC - Complete Copy of the Speculative NPDES Permit 3 L Finding of No Significant Impact (FONSI) Decision H Construction Sequence Plan 3 'T Engineering Calculations K Residuals Management Plan FN Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application Contents This page intentionally left blank. Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application A. ATC Application Form ATC-10-23 A. ATC Application Form ATC-10-23 FN Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application A. ATC Application Form ATC-10-23 This page intentionally left blank. State of North Carolina Department of Environmental Quality DWR Division of Water Resources Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 SECTION 1: INSTRUCTIONS AND INFORMATION A. The Division of Water Resources will accept this application package for review only if all of the items are provided and the application is complete. Failure to submit all of the required items will result in the application package being returned as incomplete per 15A NCAC 02T .0105(b). B. A check or money order must be submitted in the amount of $1000.00 dated within 90 days of application submittal and made payable to North Carolina Department of Environmental Quality (NCDEQ). C. Plans and specifications must be prepared in accordance with 15 NCAC 02H. 0100, 15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities. D. The plans and specifications submitted must represent a completed final design that is ready to advertise for bid. E. Any content changes made to this Form ATC 10-23 shall result in the application package being returned. F. The Applicant shall submit ONE ORIGINAL and ONE DIGITAL COPY (CD) of the application, all supporting documentation and attachments. All information must be submitted bound or in a 3-ring binder, with a Section tab for each Section, except the Engineering Plans. G. Check the boxes below to indicate that the information is provided and the requirements are met. H. If attachments are necessary for clarity or due to space limitations, such attachments are considered part of the application package and must be numbered to correspond to the item referenced. L For any project that requires review under the State Environmental Policy Act (SEPA), an Authorization to Construct cannot be issued prior to the completion of a State Clearinghouse advertisement period for a FONSI, EIS, etc. unless the project qualifies for a Determination of Minor Construction Activity. J. For more information, visit the Division of Water Resources web site at: http://portal.ncdenr.ora/web/wq/swM/ps/npdes. K. In addition to this Authorization to Construct, the Applicant should be aware that other permits may be required from other Sections of the Division of Water Resources (for example: reclaimed water facilities permits; Class A or B biosolids residuals permit). SECTION 2: APPLICANT INFORMATION AND PROJECT DESCRIPTION A APPLICANT Applicant's name Town of Wilkesboro Signature authority's name per 15A NCAC 02T .0106 b Kenneth Noland Signature authority's title Town Manager Complete mailing address P.O. Box 1056 203 West Main Street Wilkesboro NC 28697 Telephone number (336) 838-3951 Email address knoland@wilkesboronc.org B PROFESSIONAL ENGINEER Professional Engineer's name C. Wes Bramlett Professional Engineer's title Project Manager North Carolina Professional Engineer's License No. 037639 Firm name HDR Firm License number F0116 Complete mailing address 100 N Main Street Suite 1500, Winston-Salem, NC 27101 Telephone number 336-955-8258 Email address Wes.Bramlett hdrinc.com APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 1 DWR Division of Water Resources C NPDES PERMIT State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 NPDES Permit number NCO021717 Current Permitted flow (MGD) — include permit flow phases if applicable 4.9 D PROJECT DESCRIPTION Provide a brief description of the project: The project will generally include upgrades to the existing influent pump station and headworks; conversion of the existing aeration basin to an equalization basin; conversion of existing Clarifier No. 4 to an influent buffer tank to a new Aerobic Granular Sludge (AGS) process; installation of a new AGS influent pump station; installation of three (3) AGS sequencing batch reactors, a new UV disinfection system, and effluent flow measuring facilities; installation of a new digested sludge pump station; improvements to the existingsludge ludge dewatering facilities; a new operators building; and various yard piping and system improvements. These proposed improvements will allow for a new permitted flow of 8 MGD SECTION 3: APPLICATION ITEMS REQUIRED FOR SUBMITTAL FOR ALL PROJECTS A Cover Letter ® The letter must include a request for the Authorization to Construct; the facility NPDES Number; a brief project description that indicates whether the project is a new facility, facility modification, treatment process modification, or facility expansion; the construction timeline; and a list of all items and attachments included in the application package. ❑ If any of the requirements of 15 NCAC 02H. 0100, 15A NCAC 021, North Carolina General Statute 133-31 North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities are not met by the proposed design, the letter must include an itemized list of the requirements that are not met. B Application Fee (All New and Modification Application Packages): ® Submit a check or money order in the amount of $1,000.00, dated no more than 90 days prior to application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ) C NPDES Permit ® Submit Part I of the Final NPDES permit for this facility that includes Part A (Effluent Limitations and Monitoring Requirements) for the monthly average flow limit that corresponds to the work that is requested for this project. D Special Order by Consent ❑ If the facility is subject to any Special Orders by Consent (SOC), submit the applicable SOC. ® Not Applicable. E Finding of No Significant Impact or Record of Decision ® Submit a copy of the Finding of No Significant Impact or Record of Decision for this project. ❑ Provide a brief description of any of the mitigating factors or activities included in the approved Environmental Document that impact any aspect of design of this project, if not specified in the Finding of No Significant Impact or Record of Decision. APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 2 State of North Carolina Department of Environmental Quality DWR Division of Water Resources Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 ❑ Not Applicable. F Engineering Plans A Per 15A NCAC 02T .0504(c)(1), submit one set of detailed plans that have been signed, sealed and dated by a North Carolina Licensed Professional Engineer. ® Per 21 NCAC 56.1103(a)(6), the name, address and License number of the Licensee's firm shall be included on each sheet of the engineering drawings. ® Plans must be labeled as follows: FINAL DRAWING — FOR REVIEW PURPOSES ONLY — NOT RELEASED FOR CONSTRUCTION. ® 15A NCAC 02H .0124 requires multiple (dual at a minimum) components such as pumps, chemical feed systems, aeration equipment and disinfection equipment. Is this requirement met by the design? ® Yes or ❑ No. If no, provide an explanation: Plans shall include: ® Plans for all applicable disciplines needed for bidding and construction of the proposed project (check as appropriate): ® Civil ❑ Not Applicable ® Process Mechanical ❑ Not Applicable ® Structural ❑ Not Applicable ® Electrical ❑ Not Applicable ® Instrumentation/Controls ❑ Not Applicable ® Architectural ❑ Not Applicable ® Building Mechanical ❑ Not Applicable ® Building Plumbing ❑ Not Applicable ® Plan and profile views and associated details of all modified treatment units including piping, valves, and equipment (pumps, blowers, mixers, diffusers, etc.) ® Are any modifications proposed that impact the hydraulic profile of the treatment facility? ® Yes or ❑ No. If yes, provide a hydraulic profile drawing on one sheet that includes all impacted upstream and downstream units. The profile shall include the top of wall elevations of each impacted treatment unit and the water surface elevations within each impacted treatment unit for two flow conditions: (1) the NPDES permitted flow with all trains in service and (2) the peak hourly flow with one treatment train removed from service. ® Are any modifications proposed that impact the process flow diagram or process flow schematic of the treatment facility? ® Yes or ❑ No. If yes, provide the process flow diagram or process flow schematic showing all modified flow paths including aeration, recycle/return, wasting, and chemical feed, with the location of all monitoring and control instruments noted. G ® Engineering Specifications ® Per 15A NCAC 02T .0504(c)(2), submit one set of specifications that have been signed, sealed and dated by a North Carolina Licensed Professional Engineer. ® Specifications must be labeled as follows: FINAL SPECIFICATIONS — FOR REVIEW PURPOSES ONLY — NOT RELEASED FOR CONSTRUCTION. Specifications shall include: ® Specifications for all applicable disciplines needed for bidding and construction of the proposed project (check as appropriate): ® Civil ❑ Not Applicable Z Building Mechanical ❑ Not Applicable ® Process Mechanical ❑ Not Applicable E Building Plumbing ❑ Not Applicable ® Structural ❑ Not Applicable ® Electrical ❑ Not Applicable ® Instrumentation/Controls ❑ Not Applicable ® Architectural ❑ Not Applicable APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 3 State of North Carolina Department of Environmental Quality DWR Division of Water Resources Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 ® Detailed specifications for all treatment units and processes including piping, valves, equipment (pumps, blowers, mixers, diffusers, etc.), and instrumentation. ® Means of ensuring quality and integrity of the finished product including leakage testing requirements for structures and pipelines, and performance testing requirements for equipment. ❑ Bid Form for publicly bid projects. H Construction Sequence Plan ® Construction Sequence Plan such that construction activities will not result in overflows or bypasses to waters of the State. The Plan must not imply that the Contractor is responsible for operation of treatment facilities. List the location of the Construction Sequence Plan as in the Engineering Plans or in the Engineering Specifications or in both: Engineering Specifications _ I Engineering Calculations ® Per 15A NCAC 02T .0504(c)(3), submit one set of engineering calculations that have been signed, sealed and dated by a North Carolina Licensed Professional Engineer; the seal, signature and date shall be placed on the cover sheet of the calculations. For new or expanding facilities and for treatment process modifications that are included in Section 4.C, the calculations shall include at a minimum: ® Demonstration of how peak hour design flow was determined with a justification of the selected peaking factor. ® Influent pollutant loading demonstrating how the design influent characteristics in Section 4.B.2 of this form were determined. ® Pollutant loading for each treatment unit demonstrating how the design effluent concentrations in Section 4.13.2 of this form were determined. ® Hydraulic loading for each treatment unit. ® Sizing criteria for each treatment unit and associated equipment (blowers, mixers, pumps, etc.) ® Total dynamic head (TDH) calculations and system curve analysis for each pump specified that is included in Section 4.C.6. ® Buoyancy calculations for all below grade structures. ® Supporting documentation that the specified auxiliary power source is capable of powering all essential treatment units. APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 4 DWR Division of Water Resources J Permits State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 ® Provide the following information for each permit and/or certification required for this project: Permit/Certification Not Applicable Date Submitted Date Approved Permit/ Certification Number If Not Issued Provide Status and Expected Issuance Date Dam Safety X Soil Erosion and Sediment Control 10/26/23 11/17/23 WILKE- 2024-007 USCOE / Section 404 Permit X Water Quality Certification (401) X USCOE / Section 10 X Stormwater Management Plan X CAMA X NCDOT Encroachment Agreement X Railroad Encroachment Agreement X Other: Floodplain Development Permit; Town of Wilkesboro 11/14/23 Review in Progress K Residuals Management Plan ® For all new facilities, expanding facilities, or modifications that result in a change to sludge production and/or sludge processes, provide a Residuals Management Plan meeting the requirements of 15A NCAC 02T .0504(i) and .0508; the Plan must include: ® A detailed explanation as to how the generated residuals (including trash, sediment and grit) will be collected, handled, processed, stored, treated, and disposed. ® An evaluation of the treatment facility's residuals storage requirements based upon the maximum anticipated residuals production rate and ability to remove residuals. ® A permit for residuals utilization or a written commitment to the Applicant from a Permittee of a Department approved residuals disposal/utilization program that has adequate permitted capacity to accept the residuals or has submitted a residuals/utilization program application. ® If oil, grease, grit or screenings removal and collection is a designated unit process, a detailed explanation as to how the oil/grease will be collected, handled, processed, stored and disposed. ❑ Not Applicable. SECTION 4: PROJECT INFORMATION A WASTEWATER TREATMENT PLANT FLOW INFORMATION — COMPLETE FOR NEW OR EXPANDING FACILITIES APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 5 DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 1. Provide the following flow information: Plant Flows Existing Plant Design 4.9 MGD Current NPDES Permit Limit 4.9 MGD Current Annual Average (past 12 months) 3.97 MGD For Past 12 Months: Start Date: 04/2022 End Date: 04/2023 For Past 24 Months: Start Date: 04/2021 End Date: 04/2023 Maximum Month 4.49 MGD 4.49 MGD Maximum Day 6.51 MGD 6.83 MGD Peak Hour 8.98 MGD 10 MGD APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 6 DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 B WASTEWATER TREATMENT FACILITY DESIGN INFORMATION — COMPLETE FOR NEW OR EXPANDING FACILITIES AND FOR TREATMENT PROCESS MODIFICATIONS 1. Have all of the requirements of 15 NCAC 02H. 0100, 15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities been met by the proposed design and specifications? ❑ Yes or ❑ No. If no, provide justification as to why the requirements are not met, consistent with 15A NCAC 02T .0105(n): 2. Provide the design influent and effluent characteristics that are used as the basis for the project design, and the NPDES permit limits for the following parameters: Project Basis of Design Influent Design Influent Design Concentratio n - Current Concentration Influent Load Annual (Must be (Must be Average supported by supported by Design Effluent NPDES Permit (past 12 Engineering Engineering Concentration Limits (monthly months) if Calculations Calculations and/or Load average) Parameter Available [Section 3.11]) [Section 3.111 Ammonia Nitrogen 2 mg/L Summer 13.3 mg/L Summer (NH3-N) 17.6 mg/L 22 mg/L 14,4401b/day 2 mg/L Winter 13.3 mg/L Winter Biochemical Oxygen 10 mg/L Summer 24.4 mg/L Summer Demand (BODs) 424.2 mg/L 440 mg/L 28,910 lb/day 10 mg/L Winter 24.4 mg/L Winter Fecal Coliform 200 per 100 mL 200 per 100 mL Nitrate + Nitrite Nitrogen (NO3-N + 6.5 mg/L N/A mg/L NO2-N Total Kjeldahl Nitrogen 60 mg/L N/A mg/L N/A mg/L Total Nitrogen 205,476lb/year 205,476lb/year N/A mg/L N/A mg/L Total Phosphorus 64.4 mg/L 24.8 mg/L 1,630 lb/day 109,872lb/year 109,872lb/year Total Suspended Solids 138 mg/L 251 mg/L 16,470 lb/day 10 mg/L 30 mg/L (TSS) 3. Based on the "Project Basis of Design" parameters listed above, will the proposed design allow the treatment facility to meet the NPDES Permit Limits listed above? ® Yes or ❑ No. If no, describe how and why the Permit Limits will not be met: APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 7 DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 4. Per 15A NCAC 02T .0505(i), by-pass and overflow lines are prohibited. Is this condition met by the design? ❑ Yes or No If no, describe the treatment units bypassed, why this is necessary, and where the bypass discharges: This bypass condition only applies to the grit removal system. There is no redundant unit provided. Because of this lack of redundancy, this grit system might need to be bypassed during maintenance. 5. Per 15A NCAC 02T .0505(k), multiple pumps shall be provided wherever pumps are used. Is this condition met by the design? ® Yes or ❑ No. If no, provide an explanation: 6. Per 15A NCAC 02T .0505(1), power reliability shall be provided consisting of automatically activated standby power supply onsite capable of powering all essential treatment units under design conditions, or dual power supply shall be provided per 15A NCAC 02H. 0124(2)(a). Is this condition met by the design? ® Yes or ❑ No. If no, provide (as an attachment to this Application) written approval from the Director that the facility: ➢ Has a private water supply that automatically shuts off during power failures and does not contain elevated water storage tanks, and ➢ Has sufficient storage capacity that no potential for overflow exists, and ➢ Can tolerate septic wastewater due to prolonged detention. 7. Per 15A NCAC 02T .0505(0), a minimum of 30 days of residual storage shall be provided. Is this condition met by the design? ® Yes or ❑ No. If no, explain the alternative design criteria proposed for this project in accordance 15A NCAC 02T .105(n): 8. Per 15A NCAC 02T .0505(g), the public shall be prohibited from access to the wastewater treatment facilities. Explain how the design complies with this requirement: The entire WWTP facility is fenced in. Additionally, there is a gate at the entrance. The buildings outside of the fence are all locked and have passcodes to enter. 9. Is the treatment facility located within the 100-year flood plain? ® Yes or ❑ No. If yes, describe how the facility is protected from the 100-year flood: Approximately half of the WWTP's footprint is located within the Zone AE 100-fir floodplain from the Yadkin River. Much of the new equipment and treatment processes being added will be out of the floodplain. The only new infrastructure being added to the floodplain will be an electrical building on a platform, a new sludge pumping station platform, and the AGS influent pump station platform, all built above the 100-3r flood elevation of 962.50. Additionally, proposed manholes within the floodplain will be watertight. C WASTEWATER TREATMENT UNIT AND MECHANICAL EQUIPMENT INFORMATION — COMPLETE FOR NEW OR EXPANDING FACILITIES AND FOR MODIFIED TREATMENT UNITS PRELIMINARY AND PRIMARY TREATMENT (i.e., physical removal operations and flow equalization): Calculations No. of Plan Sheet Specification Treatment Unit Type Size per Unit Provided? (Yes Units Reference Reference or No) MGD Manual Bar N/A at peak hourly Screen flow 6 mm 7 MGD at Mechanical Bar Series 11 - 3 Perforated ed peakflow 46 21 53 Screen Headworks Yeso Plate 7.25 MGD at 1 Grit Removal I Stacked Tray peakflow Series 11 - N/A Grit Separator Headworks No o APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 8 DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 Series 13 — Flow Flow Equalization 1 -- 3.8 million Equalization and 01 23 00 and 46 Yesgallons Series 11 - 0170 Headworks ft Primary Clarifier N/A Circular diameter; ft side water depth square Primary Clarifier N/A Rectangular feet; ft side water depth Other: Screenings 1 Washer s 140 ft /hr Series 11 - 46 2173 & 46 No Treatment Compactor Headworks 2175 Other: Grit 1 Grit Classifier 250 gpm Series 11 - 46 23 63 No Treatment Headworks Other: Influent Buffer Tank and 1 600,000 Series 15 — Influent 4325 13 2 Yes AGS Pump gallons Buffer Tank - Station' Notes: 1. The existing Grit Removal unit is being refurbished and placed back into service in the headworks facility. 2. The existing aeration basin will be converted to a flow equalization basin. Flow will be diverted from the headworks to the aeration basin via a 20" pipe. Flow will drain via gravity to the influent pump station. An alternate design includes pumping the EQ basin effluent to the headworks influent channel. 3. An existing secondary clarifier will be converted to an influent buffer tank upstream of the biological treatment system. Additionally, the influent buffer tank will be a wet well for the AGS influent pump station. APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 9 State of North Carolina Department of Environmental Quality DWR Division of Water Resources Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 2. SECONDARY TREATMENT (BIOLOGICAL REACTORS AND CLARIFIERS) (i.e., biological and chemical processes to remove or anics and nutrients No. of Plan Sheet Specification Calculations Treatment Unit Units Type Size per Unit Reference Reference Provided. (Yes or No) Aerobic Zones/ N/A gallons Tanks Anoxic Zones/ N/A gallons Tanks Anaerobic N/A gallons Zones/Tanks Series 20 — Sequencing Batch 3 -- 1.29 million gallons Aerobic Granular 46 43 30 Yes Reactor (SBR) Sludge Basin No. 1-3 Membrane Bioreactor N/A -- gallons (MBR) Secondary N/A Circular ft diameter; Clarifier ft side water depth Secondary N/A Rectangular square feet; Clarifier ft side water depth Other N/A 3. TERTIARY TREATMENT No. of Plan Sheet Specification Calculations Treatment Unit Units Type Size per Unit Reference Reference Provided? (Yes or No) ft diameter; Tertiary Clarifier N/A Circular ft side water depth square feet; Tertiary Clarifier N/A Rectangular ft side water depth Tertiary Filter N/A square feet Tertiary Membrane N/A square feet Filtration Post -Treatment N/A -- gallons Flow Equalization Post -Aeration N/A gallons Other N/A 4. DISINFECTION Calculations No. of Plan Sheet Specification KreatmentUnit Type Size per Unit Provided? (Yes Units Reference Reference or No) APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 10 DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 3 Banks Per Parallel 9.1 million gal/day Channel (2 (Parallel per bank at peak Ultraviolet Light duty, 1 channels, hourly flow; 3 Series 40 — UV46 66 10 No standby). 2 banks in number of banks; Disinfection Channels series) 12 number of lampsibank (Gas; gallons of Chlorination N/A tablet; contact tank/unit liquid) (Gas; gallons of Dechlorination N/A tablet; contact tank/unit liquid) 5. RESIDUALS TREATMENT No. of Specification Calculations Treatment Unit Units Type Size per Unit Plan Sheet Reference Reference Provided? (Yes or No) square Gravity N/A feet; ft Thickening Tank side water depth Series 20 — Aerobic Intermediate 1 156,337 Granular Sludge Basin 46 43 30 Yes Tank gallons g No. 1-3 Sludge Buffer 1 - 490,000 01C150 Yard Piping p g N/A Yes Tank' gallons Mechanical Screw Press 667 dry Series 80 — Solids Thickening/ 2 Dewatering lb/hour Dewatering Facility 46 76 27 Yes Dewatering Aerobic Circular 601,658 Series 71 — Digester Digestion 3 aerobic gallons No. 1 and Series 72 — 40 61 96 No digesters Digester Nos. 2 & 3 Anaerobic N/A gallons Digestion Composting N/A dry lb/hour Drying N/A dry lb/hour Other N/A Notes: 1. The sludge buffer tank is an AGS system auxiliary tank. It is a converted secondary clarifier that will serve to thicken the wasted sludge from the AGS process. The influent and effluent piping will utilize existing infrastructure. 6. PUMP SYSTEMS (include influent, intermediate, effluent, major recycles, waste sludge, thickened waste sludge and plant drain pumps) APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page ll DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 No. of Capacity of each Plan Sheet Specification Location Pumps purpose Type pump Reference Reference GPM TDH Provide raw Influent 3 (2 duty, wastewater to the Submersible Series 08 - Influent Pump 1 municipal End -Suction 4,840 59.6 Pump Station 4325 13 Station standby) headworks facility Transfer AGS Tyson and Influent 3 (2 duty, municiapl Submersible Series 15 —Influent Pump 1 screened water End -Suction 6,330 83 Buffer Tank 4325 13 standby) from the influent Station buffer tank to the AGS Tanks Collect thickened WAS WAS 2 (1 duty, from the sludge Submersible Series 70 — WAS Pump 1 buffer tank and End -Suction 335 25 Pump Station 4325 13 Station standby) transfer to the aerobic digesters Transfer Digested 2 (1 duty, digested sludge Double Disc Series 74 —Digested Sludge 1 from Aerobic Pump Suction 90 126 Sludge Pump 43 23 54 Pump standby) Digester 3 to the Lift Station Station dewatering building Pumps decanted sludge from Series 71 — Digester Digester Aerobic Floating No. 1 and Series 72 Drawing Sheet Decant 2 Digesters 1 and 2 Decanter 210 gpm 8 — Digester Nos. 2 & 71D101 Pumps to the influent Pumps 3 pump station 7. MIXERS Power of No. of plan Sheet Specification Location Purpose Type each Mixer Mixers Reference Reference (Hp) Series 15 — To maintain solids Influent Buffer Tank 1 Floating Mixer 40 Influent 46 43 30 - 12 in suspension Buffer Tank APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 12 DWR Division of Water Resources 8. BLOWERS State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 Location No. of Purpose Pe Capacity of each Plan Sheet Specification Blowers Blower (CFM) Reference Reference AGS Tanks 6 To provide air Series 20 —Aerobic for the Hybrid Rotary Lobe 2,529 Granular Sludge 43 1133 biological Basin No. 1-3 process Provide air for Series 71 — Digester Aerobic 4 the aerobic Positive 1,804 No. 1 and Series 72 N/A Digesters' digestion Displacement — Digester Nos. 2 & process 3 Notes: 1. The aerobic digester blowers are not being modified and will remain in -place. 9. ODOR CONTROL Location No. of Units Purpose Type Plan Sheet Reference Specification Reference N/A D SETBACKS — COMPLETE FOR NEW WASTEWATER TREATMENT STRUCTURES 1. The minimum distance for each setback parameter to the wastewater treatment/storage units per 15A NCAC 02T .0506(b) are as follows: Minimum Distance Required Is Minimum Distance Requirement met Setback Parameter from Nearest Treatment/Storage by the Design? If "No", identify Setback Unit Waivers in Item D.2 Below Any habitable residence or place of assembly under separate ownership or not 100 ft ® Yes ❑ No to be maintained as part of the project site Any private or public water supply source 100 ft ® Yes ❑ No Surface waters (streams — intermittent and perennial, perennial waterbodies, and 50 ft ® Yes ❑ No wetlands) Any well with exception of monitoring 100 ft ® Yes ❑ No wells Any property line 50 ft ® Yes ❑ No 2. Have any setback waivers been obtained per 15A NCAC 02T .0506(d)? ❑ Yes or ® No. If yes, have these waivers been written, notarized and signed by all parties involved and recorded with the County Register of Deeds? ❑ Yes or ❑ No. If no, provide an explanation: APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 13 State of North Carolina Department of Environmental Quality NR Division of Water Resources Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 SECTION 5: APPLICATION CERTIFICATION BY PROFESSIONAL ENGINEER Professional Engineer's Certification per 15A NCAC 02T .0105: I, C. Wes Bramlett, attest that this application package for an Authorization to Construct (Typed Name of Professional Engineer) for the Wilkesboro Cub Creek WWTP Expansion and Upgrade Project (Facility and Project Name) was prepared under my direct supervisory control and to the best of my knowledge is accurate, complete and consistent with the information supplied in the engineering plans, specifications, calculations, and all other supporting documentation for this project. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with all applicable regulations and statutes, 15 NCAC 02H. 0100, 15A NCAC 021 North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities, and this Authorization to Construct Permit Application, except as provided for and explained in Section 4.13.1 of this Application. I understand that the Division of Water Resources' issuance of the Authorization to Construct Permit may be based solely upon this Certification and that the Division may waive the technical review of the plans, specifications, calculations and other supporting documentation provided in this application package. I further understand that the application package may be subject to a future audit by the Division. Although certain portions of this submittal package may have been prepared, signed and sealed by other professionals licensed in North Carolina, inclusion of these materials under my signature and seal signifies that I have reviewed the materials and have determined that the materials are consistent with the project design. I understand that in accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal with written signature placed over or adjacent to the seal and dated: CA R O FESS/,ft 1 Z, ? TN SEAL n i 037639 7S'� I� 8 1,2 -t -2023 APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 14 State of North Carolina DWR Department of Environmental Quality Division of Water Resources Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 SECTION 6: APPLICATION CERTIFICATION BY APPLICANT Applicant's Certification per 15A NCAC 02T .0106(b): I, Kenneth Noland, Town Manajzer, attest that this application package for an Authorization to Construct (Typed Name of Signature Authority and Title) for the Wilkesboro Cub Creek WWTP Expansion and Upgrade Project (Facility and Project Name) has been reviewed by me and is accurate and complete to the best of my knowledge. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. I further certify that in accordance with 15A NCAC 02T .0120(b), the Applicant or any affiliate has not been convicted of environmental crimes, has not abandoned a wastewater facility without proper closure, does not have an outstanding civil penalty where all appeals have been abandoned or exhausted, are compliant with any active compliance schedule, and does not have any overdue annual fees. I understand that the Division of Water Resources' issuance of the Authorization to Construct Permit may be based solely upon acceptance of the Licensed Professional Engineer's Certification contained in Section 5, and that the Division may waive the technical review of the plans, specifications, calculations and other supporting documentation provided in this application package. I fturther understand that the application package may be subject to a future audit. I understand that in accordance with General Statutes 143-215.6A and 143-215.613 any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $101000, as well as 'vil penalties up to $25,000 per violation. Signature: JDate: I Z ' THE COMPLETED APPLICATION AND SUPPORTING INFORMATION SHALL BE SUBMITTED TO: NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER RESOURCESINPDES By U.S. Postal Service By Courier/Special Delivery: 1617 MAIL SERVICE CENTER 512 N. SALISBURY STREET, 9TH FLOOR RALEIGH, NORTH CAROLINA 27699-1617 RALEIGH, NORTH CAROLINA 27604 TELEPHONE NUMBER: (919) 807-6396 APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 15 This page intentionally left blank. FN Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application B. Copy of Cover Letter Requesting ATC B. Copy of Cover Letter Requesting ATC FN Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application B. Copy of Cover Letter Requesting ATC This page intentionally left blank. hdrinc.com December 1, 2023 Mr. Ori Tuvia Division of Water Resources NPDES Permitting, 1617 Mail Service, Raleigh, NC 27699-1617 Subject: Town of Wilkesboro Wilkesboro Wastewater Treatment Plant Expansion and Upgrade NPDES Permit No. NCO021717 Request for Authorization to Construct Dear Mr. Tuvia, On behalf of the Town of Wilkesboro, HDR Engineering, Inc. of the Carolinas (HDR), is requesting an Authorization to Construct (ATC) for the Wilkesboro Cub Creek Wastewater Treatment Plant (WWTP) Expansion and Upgrade Project. We have submitted the Erosion Control permit package to the regional Winston-Salem office, as well as the floodplain development permitting package to the Town of Wilkesboro. The project will generally include upgrades to the existing influent pump station and headworks; conversion of the existing aeration basin to an equalization basin; conversion of existing Clarifier No. 4 to an influent buffer tank to a new Aerobic Granular Sludge (AGS) process; installation of a new AGS influent pump station; installation of three (3) AGS sequencing batch reactors, a new UV disinfection system, and effluent flow measuring facilities; installation of a new digested sludge pump station; improvements to the existing sludge dewatering facilities; a new operators building; and various yard piping and system improvements. These proposed improvements will allow for a new permitted flow of 8 MGD. Per ATC application approval, construction is scheduled to begin in March 2024 and final completion of the facility is anticipated by December 2026. The construction is planned to be executed in four stages. Stage 1 will construct the new treatment units, which will have limited impacts to the existing treatment operations. During Stage 2 of construction, upgrades will be made to components of the existing treatment process, which will require some bypass pumping. Stage 3 will include converting the existing Clarifier 4 to the influent buffer tank and making improvements to the dewatering building. Stage 4 will include start-up of the AGS biological treatment process and downstream equipment. And it will conclude with decommissioning the existing aeration basin. 100 North Main Street, Suite 1500, Winston-Salem, NC 27101-4015 336.955.8250 O. Tuvia December 1, 2023 Page 2 In accordance with the ATC application, the following documents are included within the submittal package: • Application for Authorization to Construct Permit (Form ATC-10-23) • One set of Engineering Plans and Specifications • Supporting Documentation • Speculative NPDES Permit NCO021717 • Engineering Calculations • One Digital Copy Uploaded to Microsoft Teams here and at the URL: https://tinVurl.com/3tkxm8bV The NPDES permit modification application was submitted to NC DEQ under a separate cover, dated September 27, 2022. The improvements will increase the overall WWTP flow capacity to 8 MGD and will change the biological treatment process from conventional activated sludge to aerobic granular sludge biological nutrient removal process. The disinfection process (ultraviolet — UV) will remain the same. We appreciate your assistance in coordinating the permitting process for this project. Please feel free to contact me at contact me at (336) 955-8258 should you have any questions or require additional information. Sincerely, HDR Engineering, Inc. of the Carolinas C. Wes Bramlett, PE Project Manager FN Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application C. Complete Copy of the Speculative NPDES Permit #NC0021717 C. Complete Copy of the Speculative NPDES Permit #NC0021717 Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application C. Complete Copy of the Speculative NPDES Permit #NC0021717 This page intentionally left blank. ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Ken Noland Town Manager Town of Wilkesboro 203 West Main Street, PO Box 1056 Wilkesboro, North Carolina 28697 Dear Mr. Noland: NORTH CAROLINA Environmental Quality October 28, 2020 Subject: Speculative Effluent Limits Cub Creek WWTP Permit No. NCO021717 Wilkes County Yadkin Pee -Dee River Basin This letter provides speculative effluent limits for expansion to 8.0 and 10.0 MGD at the Cub Creek WWTP. The Division received the speculative limits request in a letter dated June 30, 2020 from Ken Noland, Town Manager for Wilkesboro. Please recognize that speculative limits may change based on future water quality initiatives, and it is highly recommended that the applicant verify the speculative limits with the Division's NPDES Unit prior to any engineering design work. Receiving Stream. The Yadkin River has a stream classification of C and waters with this classification have a best usage for aquatic life propagation and maintenance of biological integrity, wildlife, secondary recreation, and agriculture. The Yadkin River has a summer 7Q 10 flow of 196 cfs, a winter 7Q 10 flow of 267 cfs, and an annual average flow of 682 cfs. The Yadkin River at this location is not listed on the 303(d) list of impaired waters. However, this section does comprise part of the headwaters of High Rock Lake which is impaired for chlorophyll a and turbidity. Permitted and speculative limits may change depending on the final nutrient strategy developed for the lake. Based upon a review of information available from the North Carolina Natural Heritage Program Online Map Viewer, there are not any Federally Listed threatened or endangered aquatic species identified within a 5-mile radius of the proposed discharge location. If there are any identified threatened/endangered species, it is recommended that the applicant discuss the proposed project with the US Fish and Wildlife Service to determine whether the proposed discharge location might impact such species. Speculative Effluent Limits. Based on Division review of receiving stream conditions and water quality modeling results, speculative limits for the proposed expansions to 8.0 and D E Qbi�� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 vOry rN Cx:40:.itiA � o .—Io E�.w�����a�:r� /� 919.707.9000 10.0 MGD are presented in Tables 1 and 2. A complete evaluation of these limits and monitoring requirements for metals and other toxicants, as well as potential instream monitoring requirements, will be addressed upon receipt of a formal NPDES permit application. Some features of the speculative limit development include the following: BOD/NH3 Limits. Biochemical oxygen demand (BOD) and ammonia -nitrogen limits were determined by holding the mass -loading for the expansions to currently permitted levels. Ammonia limits also account for toxicity limits. Nutrients: Total Nitrogen (TN) and Total Phosphorus (TP) mass -loading were held to current discharge levels based on the last three years annual average. These limits may change based on rulemaking, adoption of a High Rock Lake TMDL, or other nutrient strategy. TABLE 1. Speculative Limits for Cub Creek WWTP (8.0 MGD) Effluent Characteristic Effluent Limitations Monthly Average Weekly Average Daily Maximum Flow 8.0 MGD OD5 24.4 mg/L 36.6 mg/L H3 as N' 13.3 mg/L 35.0 mg/L TSS 30.0 mg/L 45.0 mg/L TRC (if used for disinfection) 28 µg/L TN2 205,476lbs/ ear TP3 109,872 lbs/year Fecal coliform (geometric mean) 200/100 mL 400/100 mL Chronic Toxicity', Pass/Fail (Quarterly test) 5.9% Notes: 1. Based on current permitted critical flows, flows will be updated through USGS upon receipt of permit modification application. Values are subject to change. 2. Equivalent to a concentration of 8.4 mg/L. 3. Equivalent to a concentration of 4.5 mg/L. TABLE 2. Speculative Limits for Cub Creek WWTP (10.0 MGD) Effluent Characteristic Effluent Limitations Monthly Average Weekly Average Daily Maximum Flow 10.0 MGD OD5 18.7 mg/L 28.0 mg/L H3 as N' 10.9 mg/L 32.7 mg/L TSS 30.0 mg/L 45.0 mg/L TRC (if used for disinfection) 28 µg/L Page 2 of 3 TN2 205,476 lbs/year TP3 109,872lbs/ ear Fecal coliform (geometric mean) 200/ 100 m L 400/ 100 mL Chronic Toxicity', Pass/Fail (Quarterly test) 7.3% Notes: 1. Based on current permitted critical flows, flows will be updated through USGS upon receipt of permit modification application. Values are subject to change. 2. Equivalent to a concentration of 6.7 mg/L. 3. Equivalent to a concentration of 3.6 mg/L. Engineering Alternatives AnalysisEAA). Please note that the Division cannot guarantee that an NPDES permit for a new or expanding discharge will be issued with these speculative limits. Final decisions can only be made after the Division receives and evaluates a formal permit application for the new/expanded discharge. In accordance with North Carolina Administrative Code 15A NCAC 2H.0105(c), the most environmentally sound alternative should be selected from all reasonably cost-effective options. Therefore, as a component of all NPDES permit applications for new or expanding flow, a detailed engineering alternatives analysis (EAA) must be prepared. The EAA must justify requested flows and provide an analysis of potential wastewater treatment alternatives. A copy of the Division guidance for preparing the EAA can be found at: https://deq.nc.gov/about/divisions/water-resources/water-quality-permitting/npdes- wastewater/npdes-permitting-process Should you have any questions about these speculative limits or NPDES permitting requirements, please feel free to contact David Hill at david.hillkncdenr.gov (919) 707-3612. Respectfully, DOCUSigned by: Hal 2E35935DF84D4AE... David Hill Environmental Specialist II NPDES Municipal Permitting Unit Hardcopy: NPDES Permit File Electronic Copy: NC Wildlife Resources Commission, Inland Fisheries, shannon.deaton@ncwildlife.org US Fish and Wildlife Service, Sarah_mcrae@fws.gov DWR/Water Quality Regional Operations/Winston-Salem DWRBasinwide Planning, Ian McMillan DWR/NPDES Server>Specs Page 3 of 3 This page intentionally left blank. Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application D. Finding of No Significant Impact (FONSI) Decision D. Finding of No Significant Impact (FONSI) Decision FN Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application D. Finding of No Significant Impact (FONSI) Decision This page intentionally left blank. F)l Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application D. Finding of No Significant Impact (FONSI) Decision A Note on the FONSI Decision NC DEQ has not yet issued a Finding of No Significant Impact (FONSI) for the Wilkesboro Cub Creek WWTP Expansion and Upgrade Project. The public meeting for the Engineering Report/Environmental Information Document (ER/EID) was held on November 6, 2023, from 5:00-7:00 pm. HDR presented during the regularly scheduled Wilkesboro Town Council meeting. After the EID is uploaded to the State Clearinghouse for 30-45 days, HDR will address any other comments received. The edited EID will then be sent back to NC DEQ. HDR is therefore planning to receive the FONSI decision in January 2024. FN Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application D. Finding of No Significant Impact (FONSI) Decision This page intentionally left blank. FN Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application E. Construction Sequence Plan E. Construction Sequence Plan FN Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application E. Construction Sequence Plan This page intentionally left blank. This page is intentionally left blank. Town of Wilkesboro I Construction Sequencing Plan ��� Construction Sequence Plan 1 Construction Sequence Plan The following construction sequence is preliminary, and the final sequence will be jointly determined by the Contractor, Owner, and Engineer prior to the start of construction. The contractor may suggest an alternate sequencing plan or changes to this sequence. 1. Stage I During this stage of construction, the installation of new treatment units will occur, which will have limited impacts to the existing treatment operations. The existing treatment operations will remain in service. a. Demolition of existing sludge drying beds and associated piping no longer in service. b. Site excavation for the new Aerobic Granular Sludge (AGS) system. c. Construction of new AGS process concrete tanks. d. Construction of new UV Disinfection system concrete structure. e. Construction of new Effluent Metering facility concrete structure. f. Installation of associated yard piping. g. Installation of Electrical Building Nos. 1 and 2. h. Installation of process equipment for the AGS system, UV Disinfection system, and Effluent Metering facility. Note: the schedules and sequence of equipment installation could be affected by equipment delivery times. 2. Stage 2 During this stage of construction, upgrades will be made to components of the existing treatment process, which will require some bypass pumping to maintain plant operations. a. Existing Headworks Structure: i. Construct bypass channel around the existing headworks grit removal chamber. ii. Installation of new headworks electrical panels. iii. Demolition of existing wastewater screens and screen channel slide gates. iv. Installation of new perforated plate wastewater screens and associated screen channel slide gates. Note: screens will be removed and replaced one channel at a time. V. Installation of the new screenings washer/compactor. vi. Installation of new grit pump and grit classifier. b. Existing Influent Pump Station: i. Installation of bypass pumping system to allow the influent pump station to be taken out of service. ii. Demolition of existing pumps, piping, valves, and electrical panels. iii. Installation of new pumps, piping, and valves. iv. Installation of new electrical panels and wet well level control system. V. Installation of a new influent flow meter. New Digested Sludge Pump Station/Digester Decant Pumps i. Construction of new elevated pump platform. ii. Installation of new digested sludge pumps. iii. Installation of electrical improvements for the new sludge pumps. Town of Wilkesboro I Construction Sequencing Plan ��� Construction Sequence Plan iv. Installation of new force mains to the existing dewatering building. V. Installation of new decant pumps in Digesters Nos. 1 and 2. d. Construction of the new Operations Building 3. Stage 3 a. Convert Existing Clarifier 4 to an Influent Buffer Tank i. Demolition of existing clarifier equipment. ii. Installation of an elevated platform for the new AGS influent pump station. iii. Installation of the AGS influent submersible pumps, piping, and valves. iv. Installation of a new tank mixer. V. Installation of electrical improvements required for the tank mixer and AGS influent pump station. b. Installation of associated yard piping to include the new force main piping from the Influent Buffer Tank to the AGS process. Dewatering building i. Demolition of the existing sludge dewatering unit and associated piping. ii. Construct improvements to the existing dewatering building. iii. Installation of the new dewatering unit and polymer blend systems. iv. Installation of piping, valves, and flow meters. V. Installation of the bulk polymer tank, day tank, and polymer transfer pump. vi. Installation of electrical improvements required for the sludge dewatering system. 4. Stage 4 a. AGS process start-up i. During the AGS System start-up, the existing biological process will remain in service. ii. Complete start-up and testing of the Influent Buffer Tank mixer, AGS influent pump station, AGS blowers, UV Disinfection System, and new Effluent Flow Meter. iii. Provide Operator training. iv. Once the functional integrity of the AGS system has been demonstrated, pretreated wastewater from Tyson Foods will be directed to the AGS system. V. Aerobic granular seed sludge may be provided by the AGS system manufacturer, if required. vi. Once the AGS System is fully operational, completely divert pretreated wastewater from Tyson Foods to the Influent Buffer tank. At this stage, treated wastewater will be discharged from both the existing ouffall and new outfall. b. Decommission Existing Aeration Basin i. Upon completion of the demonstration period for the AGS process, divert influent wastewater from the collection system to the Influent Buffer Tank. ii. Convert the existing RAS pump station to a WAS pump station. iii. Decommission the Existing Aeration Basin. Town of Wilkesboro I Construction Sequencing Plan ��� Construction Sequence Plan iv. Clean and convert the existing aeration basin to a wet weather flow equalization basin. V. Decommission the existing UV system and effluent flow measuring facilities. This page intentionally left blank. FN Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application F. Engineering Calculations F. Engineering Calculations FN Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application F. Engineering Calculations This page intentionally left blank. FN Engineering Calculations Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades Wilkesboro, North Carolina December 1, 2023 This page intentionally left blank. Town of Wilkesboro I Engineering Calculations ��� Contents Contents Section Number Discipline Description 1 Process Peaking Factor Determination 2 Process Basis of Design Report Design Max Month (8 MGD) 3 Hydraulic Profile Peak Hourly Flow (18.2 MGD) Current (Liquids) Proposed (Liquids) 4 Process Flow Diagram Current (Solids) Proposed (Solids) Influent Pump Station Pump Calculations AGS Influent Pump Station Pump Calculations 5 Pump Hydraulics WAS Pump Station Pump Calculations Digested Sludge Influent Pump Station Pump Calculations AGS Tanks & Intermediate Tank Parshall Flume Meter 12" WAS/WLC Line Parshall Flume Meter on 12" Plant Drain Line 6 Buoyancy Calculations AGS Influent Meter Vault UV Disinfection Structure Effluent Parshall Flume Plant Drain Meter Vault on 20" Drain Line 7 Electrical Standby Electrical Standby Power Calculations Town of Wilkesboro I Engineering Calculations Contents This page intentionally left blank. Town of Wilkesboro I Engineering Calculations Section 1 — Peaking Factor Determination Town of Wilkesboro I Engineering Calculations Section 1 — Peaking Factor Determination This page intentionally left blank. Town of Wilkesboro I Cub Creek WWTP Upgrade and Expansion Memo Memo Date: Friday, November 17, 2023 Project: Cub Creek WWTP Upgrade and Expansion To: Ori Tuvia and Mike Montebello (NC Division of Water Resources) From: Lara Grotz, Wes Bramlett (HDR) Subj, Evaluation of Flow Equalization Facilities and Peaking Factors Introduction The purpose of this technical memorandum (TM) is to document the basis of design for influent wastewater flows associated with the proposed Cub Creek Wastewater Treatment Plant (WWTP) upgrade and expansion project. The WWTP receives municipal influent from the Town of Wilkesboro's collection sewer system and pretreated wastewater from Tyson Foods. Tyson Foods is the single largest flow contributor to the WWTP. Design flows from the Town's collection system were developed based on population projections through 2042, and up to 0.5 million gallons per day (MGD) has been included for future flows from Tyson (above their current permitted capacity of 3.0 MGD). Municipal wet -weather flow from the Town's collection system will be equalized in a 3.8 million gallon wet -weather equalization basin. Tyson's peak industrial wastewater flows will be equalized within their existing pretreatment basins, which will have an available equalizing volume of 8.8 million gallons (MG). The combined equalized flows will then be pumped to the biological treatment system. The purpose of the flow equalization system is to limit peak flows such that the maximum flow through the WWTP during peak hour conditions is 18.2 MGD. Composite flows of Tyson Foods and Wilkesboro's collection system greater than 18.2 MGD will be equalized in the Town's wet - weather basin and Tyson's pretreatment basins before flowing to the influent buffer basin (which has an additional equalizing volume of 650,000 gallons). From the influent buffer basin, the combined wastewater streams are pumped to the new biological treatment system. This TM includes an evaluation of flow equalization storage and a peaking factor analysis for projected influent flows that confirm a peak hourly design flow of 18.2 MGD for the following plant processes: • AGS Influent Pump Station (with one pump out of service). • Biological treatment system (AquaNereda Tanks) (with one tank out of service). • UV Disinfection system (with one bank out of service in each UV channel). Town of Wilkesboro i Cub Creek WWTP Upgrade and Expansion ��� Peaking Factor Analysis Peaking Factor Analysis The Cub Creek WWTP treats a combination of municipal and industrial flows. Influent design criteria were established based on historical influent flows and loads data from the WWTP and from Tyson Foods. Tyson is the county's largest employer and is based in the Town of Wilkesboro. The annual average and maximum month influent characteristics between January 2018 through August 2021 are shown in Table 1. Table 1 Influent wastewater characteristics to the Cub Creek WWTP from 2018-2021 Town of Wilkesboro Tyson Foods Parameter Annual average Maximum month Annual average Maximum month BODs, mg/L 201 318 400 535 TSS, mg/L 215 393 150 201 NH3-N, mg/L 17 28 25 28 TKN, mg/L 26 43 60 67 TP. ma/L 4 7 42 47 BOD = biochemical oxygen demand TSS = total dissolved solids NH3-N = ammonia nitrogen TKN = total Kjeldahl nitrogen TP= total phosphorus During dry weather flow conditions between 2018- 2021, the Town's collection system contributed on average 1.0 MGD. Including Tyson's industrial contribution of 3.0 MGD from 2018-2021 and leachate and septage contributions, the WWTP in total treated on average 4.46 MGD over that five-year period (Table 2). Table 2. Current effluent flows for the Cub Creek WWTP. Year Average Max Peak Daily Month Day Effluent Effluent Effluent Flow Flow Flow (MGD) (MGD) (MGD) 2017 4.73 5.23 8.29 2018 4.13 4.53 7.64 2019 4.44 5.02 8.26 2020 4.77 5.05 8.50 2021 4.21 4.80 6.38 2022 4.19 4.6 6.23 According to wastewater treatment facility design guidelines, where "commercial, institutional, or industrial wastewaters are expected to make up ... 25% percent or more of all flows... peaking factors... should be estimated separately. [And] peaking factors for industrial wastewater should be estimated based on average water use." (Metcalf & Eddy, 2003). Tyson Foods contributes, on average, 62% of the total flow to the Cub Creek WWTP and the Town of Wilkesboro contributes, on average, 38% of the total flow to the plant. Because of this, the peaking factors for each flow stream were calculated separately. See Figure 1 for a process flow diagram of the flow equalization basins and the peaking factor applied. Town of Wilkesboro I Cub Creek WWTP Upgrade and Expansion ��� Peaking Factor Analysis 2.5 PF Equalization Tank (38 MG) Screening . Control Valve 2.5 PF From Municipal Influent Pump Station i Grit Removal 2.3 PF Noreda Biological System 2.3 PF +� Influent Buffer Tank Tyson Equalization Basin (S.S MG) Tyson Pretreatment Tank #1 8.8 MG Ovei ow oftFFrom Tyson Foods' Pump Station 1.8 PF Figure 1. Flow equalization process flow diagram. The peaking factor (based on maximum month flow) for the Town's collection system is 2.5, which meets North Carolina Department of Environmental Quality (NC DEQ's) minimum design requirement of 2.5. This yields a peak hourly flow from the Town's collection system of 9.9 MGD (Table 3). The peaking factor for Tyson Foods' (based on maximum month flow) is 1.8, which was determined using 3 years of industrial flow effluent data and acknowledging that normal plant operation is Monday through Friday (Table 4). There is a control valve between Tyson's Pretreatment Basins and the influent buffer tank. Once the plant is upgraded, the intention is for Tyson's flows to be equalized using available volume within their existing pretreatment basins. The municipal flow from the Town cannot be controlled but will be equalized in the 3.8-million- gallon equalization basin. The peaking factors for the individual streams are shown in the Table 3, Table 4, and Table 5 below: Table 3. Projected Collection System Flows (including leachate and septage) to the Cub Creek WWTP in 2042 Before Equalization. Town of Annual Average Maximum Max Hour Flow Max Hour: Max Wilkesboro + Flow (MGD) Month Flow (MGD) Month Peaking Leachate & (MGD) Factor Septage Wilkesboro 2.9 3.9 9.9 2.5 Collection System Town of Wilkesboro I Cub Creek WWTP Upgrade and Expansion ��� Peaking Factor Analysis Table 4. Projected Industrial Flows from Tyson Foods to the Cub Creek WWTP in 2042. Tyson Foods Annual Maximum Max Hour Flow Max Hour: Max Average Flow Month Flow (MGD) Month Peaking (MGD) (MGD) Factor 3.5 3.9 6.1 1.8 Table 5. Projected Total Flows to the Cub Creek WWTP Influent Buffer Tank in 2042 excluding return flows from the AASI Nereda® System. Total Influent Annual Average Maximum Max Hour Flow Max Hour: Max Flow Flow (MGD) Month Flow (MGD) Month (MGD) Weighted Peaking Factor 6.5 7.8 18.2 2.3 1. Excludes expected return flows of 2 MGD To summarize, the composite peaking factor of the municipal flow and industrial flow is 2.3, even though the individual municipal peaking factor is 2.5 and the industrial peaking factor is 1.8. The following unit processes at the Cub Creek WWTP downstream of the influent buffer tank are sized to treat wastewater at a peaking factor of 2.3 or 18.2 MGD (see Table 6): • Aerobic Granular Sludge (AGS) Influent Pump Station (with one pump out of service) • Biological treatment system (AquaNereda Tanks) (with one tank out of service) • UV Disinfection system (with one bank out of service) • Effluent flow metering system Table 6. System Design Flows separated by unit process, flow source, and peaking factor. Unit Process' Flow Source Design Design Hydraulic FIow2 Peaking Redundancy Factor Influent Pump Collection System 11.8 2.5 Largest Station pump out of service Headworks Collection System 11.83 2.5 1 screen out Screens of service AGS Influent Pump Collection System + Tyson 18.2 2.3 1 pump out Station Flows of service AGS System Collection System + Tyson 18.2 2.3 1 basin out Flows of service UV System Collection System + Tyson 18.2 2.3 1 bank out Flows of service Town of Wilkesboro I Cub Creek WWTP Upgrade and Expansion Evaluation of Flow Equalization Storage Effluent Flow Collection System + Tyson 18.2 2.3 N/A Metering System Flows 1. Solids peaking factors for the solids system not included in this technical memorandum 2. All flows include return flows 3. Screen sizing assumes 30% blinding Evaluation of Flow Equalization Storage The following equalization analysis demonstrates that any flows greater than 18.2 MGD can be equalized at the Wilkesboro Cub Creek WWTP facilities. To account for conservativism, a wet -weather stormwater model was generated at an influent flow of 20 MGD to the wastewater treatment plant. The basin that will equalize the municipal flow will be empty between storm events. As part of the WWTP upgrade and expansion, the operation of Tyson's pretreatment basins will be changed so that only one of the two basins is in operation. The second basin will be used for equalization in the event that the primary (i.e., first) basin reaches its maximum operating water level. This model illustrates that the volume of flow equalization storage available at the Cub Creek WWTP is sufficient to manage influent flows resulting from a large storm event to date at a peaking factor of 2.5. Date of Major Rain Event Hydrograph The simulated storm was a 10-year 24-hour duration storm. The hydrograph was taken from a rain gauge USGS Station Number: 02111391 at the W. Kerr Scott Reservoir Dam in Wilkesboro, NC. The probably of this storm occurring is 10% in any given year. The total rainfall was 5.33 inches over a 24-hour period. Results Figure 2 shows the water level of the two flow equalization basins. The 3.8 MG equalization basin equalizes the municipal flow from Wilkesboro and the 8.8 MG basin equalizes the flow from Tyson Foods. Each basin will have a means of controlling the rate of flow back into the overall treatment process. Town of Wilkesboro I Cub Creek WWTP Upgrade and Expansion ��� Conclusion Level of Water in 3.8 MG Tank Level of Water in 8.8 MG Tank 975 1025 Y 970....................................................................................... y 1020 4 ft freeboard 965 �6 ft freeboard 1015 Cy 960 Cwi w � 955 1010 m 950 ° 1005 w w 0.0 0,5 1.0 1.5 2.0 2,5 3,0 0.0 0,5 1,0 1.5 2.0 2.5 3,0 Time (Days) Time (Days) -WSEL in EQ Tank .••.••..• Top of Tank WSEL in EQ Tank ......... Top of Tank Figure 2. Water level in two equalization tanks simulated during a 24-hour 10-year storm with a combined flow of 20 MGD. 18.2 MGD is treated through the biological process and 4 MGD is diverted to flow equalization. These results indicated that the 3.8 MG basin will take 45 hours (- 2 days) to return to its starting elevation. Furthermore, the 8.8 MG basin will take 55 hours (-2.5 days) to return to its starting elevation. The rate of flow back into the overall treatment process will be controlled so that the WWTP effluent flow does not exceed the NPDES permitted capacity. The HydroCAD stormwater modeling simulations indicate that the combination of the two stormwater equalization basins have sufficient volume to hold 24 hours of diverted flow when the influent to the WWTP is 20 MGD. This model not only simulated 24-hour wet -weather flow but also overlaid storm events over the wet -weather equalization basins also. Conclusion The combined unit processes that are downstream of the influent buffer tank are designed to a "net" peaking factor of 2.3. This "net" peaking factor is less than NC DEQ's minimum guideline of 2.5 but this is sufficient for two reasons: 1. Availability of adequate flow equalization volume for 20 MGD as a composite flow from the Town's collection system in a 3.8 MG equalization basin and Tyson Foods' system in an 8.8 MG basin. This analysis has showed that the equalization volume available can reduce the flow down to 18.2 MGD downstream of the influent buffer basin. 2. The majority of flow contributing to the WWTP (62%) is from an industrial user, Tyson Foods, minimizing the peaking factor flow contribution from the Town's collection system due to 1/1. The weighted peaking factor of Tyson's and Wilkesboro's Collection System flows is 2.3. The HydroCAD exports are attached in Appendix A. The draft process diagram is in Appendix B and the site plan is in Appendix C. Town of Wilkesboro I Cub Creek WWTP Upgrade and Expansion Conclusion Appendix A — Wet Weather Flow Equalization HydroCAD Exports This page intentionally left blank. Town of Wilkesboro I Cub Creek WWTP Upgrade and Expansion Conclusion ` 9.9 CFS Scenario NC-INdkeshoro 24-hr S1 10-yr RainfaU=5.33" Prepared by HDR, Inc Printed 4f17f2023 HydroCAD®10.10-7c s/n 10126 ©2022 HydroCAD Software Solutions LLC Page 1 Summary for Pond 2P: 3.8 MG Tank Inflow Area = 40,910 sf,100.00% Impervious, Inflow Depth �139.65" for 10-yr event Inflow = 11.14 cfs @ 11.97 hrs, Volume= 476,086 cf, Incl. 5.30 cfs Base Flow Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routed to Pond 5P : 0.6 MG Tank Routing by Sim -Route method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Peak Elev= 962.44' @ 24.00 hrs Surf.Area= 0.939 ac Storage= 10.929 of Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 950.80' 14.086 of 202.25'W x 202.25'L x 15.00'H Prismatoid Device Routing Invert Outlet Devices #1 Primary 951.80' 14.0" Round Culvert L= 300.0' CMP, square edge headwall, Ke= 0.500 Inlet I Outlet Invert= 951.80'/ 947.93' S= 0.0129 T Cc= 0.900 n= 0.013, Flow Area= 1.07 sf #2 Device 1 951.80' 14.0" Delayed Weir/Valve C- 0.600 Trigger at 964.80' Open over 0.00 hrs Primary OutFlow Max=0.00 efs @ 0.00 hrs HW=950.80' TW=947.93' (Dynamic Tailwater) t1=Culvert ( Controls 0.00 cfs) t2=Delayed WeirNalve ( Controls 0.00 cfs) Town of Wilkesboro I Cub Creek WWTP Upgrade and Expansion ��� Conclusion 9.9 CFS Scenario NC-Wilkeshoro 24-hr S1 10-yr RainfaU=5.33" Prepared by HDR, Inc Printed 4l1712023 HydroCADE)10.10-7c s!n 10126 ©2022 HydroCAD Software Solutions LLC Page 2 Pond 2P: 3.8 MG Tank Hydrograph -_1--a-_i-_4_-1-_J_-�_-♦.__I.. Inflow 12 ,-J--J--1--L--1--J--;--`--L-__ri-14da--`--'--J--'--`--'--=--1--`--`--'-- 1 1 1 1 1 1 1 I 1 I 1 I ®Primary I 1 I 1 I 1 I 1 ' Inflow Area=4D'J 919 sf a17-_i--a-_i-_4_--_J_-1_-♦.-_I--J-- 1 I 1 1 I 1 1 I I 1 I •-" , 1 i 1 i 1 D� -_4--i- .-Elev=962.44' - 8 1 1 I 1 I 1 - I - --- ---I- J-;--4-J- a - --8torage=10.929 of i I i I i I I 1 I I I 1 I 1 I I I I I I I I I I I I I I [1 I I I I I I I I I I I I LL i I 1 i I I I I I I 1 I I I I 1 I I I I I I I I 1 I I 1 1 I 1 ! I 1 ,• 1 1 1 1 1 I 1 i 1 i I I I I I I I I I I I I I 3 1 I 1 I 1 I I I I I I I I i I 1 1 1 1 1 1 1 1 -_I--a-_i-_4_-1-_a_-;_----a--a-_-_4_-1-_a_-i_-4--I_-a--i-_♦--_4_� I I I I I I I I I I I I I I I I 7 1 I 1 1 I 1 1 I I 1 I I 1 I I 1 I 1 1 I 1 1 0 1 2 3 4 5 6 '7 8 9 10 '.1 12 13 14 15 16 17 18 19 20 21 22 23 24 Tlme (hours) Town of Wilkesboro I Cub Creek WWTP Upgrade and Expansion Conclusion ` 9.9 CFS Scenario NC-INdkeshoro 24-hr S1 10-yr RainfaU=5.33" Prepared by HDR, Inc Printed 4l1712023 HydroCAD®10.10-7c s!n 10126 ©2022 HVdroCAD Software Solutions LLC Page 3 Hydrograph for Pond 2P: 3.8 MG Tank Time (hours) Inflow (cfs) Storage (acre-feet) Elevation (feet) Primary (cfs) 0.00 5.30 0.000 950AD 0.00 0.50 5.36 0.221 951.04 0.00 1.00 5.36 0.443 951.27 0.00 1.50 5.37 0.665 951.51 0.00 2.00 5.37 0.887 951.74 0.00 2.50 5.37 1.109 951.98 0.00 3.00 5.37 1.331 952.22 0.00 3.50 5.38 1.553 952A5 0.00 4.00 5.38 1.775 952.69 0.00 4.50 5.38 1.997 952.93 0.00 5.00 5.39 2.220 953.16 0.00 5.50 5.39 2.443 953.40 0.00 6.00 5.40 2.666 953.64 0.00 6.50 5.41 2.889 953.88 0.00 7.00 5.41 3.113 954.11 0.00 7.50 5.42 3.336 954.35 0.00 8.00 5.43 3.561 954.59 0.00 8.50 5.45 3.785 954.83 0.00 9.00 5.46 4.011 955.07 0.00 9.50 5.48 4.237 955.31 0.00 10.D0 5.52 4.464 955.55 OLD 10.50 5.56 4.693 955.80 0.00 11.00 5.65 4.925 956.04 0.00 11.50 5.86 5.163 956,30 0.00 12.00 11.13 5.472 956.63 0.00 12.50 6.41 5.766 956.94 0.00 13.00 5.66 6.005 957.19 0.00 13.50 5.57 6.236 957A4 0.00 14.00 5.52 6.465 957.69 0.00 14.50 5.49 6.692 957.93 0.00 15.00 5.46 6.919 958.17 0.00 15.50 5.45 7.144 958.41 0.00 16.00 5.43 7.369 958.65 0.00 16.50 5.42 7.593 958A9 0.0D 17.00 5.41 7.817 959.12 0.00 17.50 5.41 8,040 959.36 ❑.00 18.00 5.40 8.264 959.60 0.00 18.50 5.39 8.487 959.84 0.00 19.00 5.39 8.709 960.07 0.00 19.50 5.38 8.932 960.31 0.00 20.00 5.38 9.154 960.55 0.00 20.50 5.38 9.377 960.79 0.00 21.00 5.37 9.599 961.02 0.00 21.50 5.37 9.821 961.26 0.00 22.00 5.37 10.043 961 A 0.00 22.50 5.37 10.265 96113 ❑.00 23.D0 5.36 10.486 961.97 0.00 23.50 5.36 10.708 962.20 0.00 24.00 0.00 10.929 962.44 0.00 Town of Wilkesboro I Cub Creek WWTP Upgrade and Expansion Conclusion ` 9.9 CFS Scenario NC-INdkeshoro 24-hr S1 10-yr RainfaU=5.33" Prepared by HDR, Inc Printed 4f17f2023 HydroCAD®10.10-7c s/n 10126 ©2022 HydroCAD Software Solutions LLC Page 1 Summary for Pond 4P: 8.8 MG Tank Inflow Area = 44,400 sf,100.00% Impervious, Inflow Depth �257.52" for 10-yr event Inflow = 17.14 cfs @ 11.97 hrs, Volume= 952,836 cf, Incl. 10.80 cfs Base Flow Outflow = 9.90 cfs @ 0.00 hrs, Volume= 855,716 cf, Atten= 42%, Lag= 0.0 min Primary = 9.90 cfs @ 0.00 hrs, Volume= 855,716 cf Routed to Pond 5P : 0.6 MG Tank Routing by Sim -Route method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Starting Elev= 1,009.00' Surf.Area= 24,789 sf Storage= 407,099 cf Peak Elev= 1,012.79' @ 24.00 hrs Surf.Area= 26,598 sf Storage= 504,572 cf (97,473 cf above start) Plug -Flow detention time= 719.9 min calculated for 448,618 cf (47% of inflow) Center -of -Mass det. time= 0.3 min (720.0 - 719.7 ) Volume Invert Avail.Storage Storage Description #1 989.00' 679,112 cf 82.00'W x 197.35'L x 30.00'H Prismatoid Z=0.7 Device Routing Invert Outlet Devices #1 Device 2 1,000.80' Special & User -Defined Head (feet) 0.00 0.10 30.00 Disch. (cfs) 0.000 9.900 9.900 #2 Primary 1,000.80' 16.0" Round Culvert L= 1,500,0' CMP, square edge headwall, Ke= 0.500 Inlet I Outlet Invert= 1,000.80' f 948.93' S= 0.0346? Cc= 0.900 n= 0.013, Flow Area= 1.40 sf Primary OutFlow Max=9.90 cfs @ 0.00 hrs HW=1,009.00' TW=947.93' (Dynamic Tailwater) L2=Culvert (Passes 9.90 cfs of 14.82 cfs potential flaw) 1=Special & User -Defined (Custom Controls 9.90 cfs) Town of Wilkesboro I Cub Creek WWTP Upgrade and Expansion Conclusion M 9.9 CFS Scenario NC-INdkeshoro 24-hr S1 10-yr RainfaU=5.33" Prepared by HDR, Inc Printed 4l1712023 HydroCAD®10.10-7c s!n 10126 ©2022 HydroCAD Software Solutions LLC Page 2 Pond 4P: 8.8 MG Tank Hydrograph 19 1 1 1 �7-- - - --- F '--I--�--�--�--I--�--*--*--�-�- .�<ae-----I--�--------I-------I-- iPnmary *01OW Ares=44;,400 sf 17' 1 I I 18 ,' I I 1 i I 1 i I I 1 I --r-�--�--r--I--�--T--r--r-r --I--r-pe0k-EW=1,01:2.7�'- 75 I I 1 I I 1 I I I 1 I 14tia-race=504,� -Z d- _,__�__r__I__�__T__r__r_�__ V�i 13 12 - I--- -�--i - i --- --r- � 10 9 I , 4 3 2 1 1 I I 1 1 I 1 1 1 1 1 1 L 5 T 0 1 2 3 4 5 6 7 B 9 10 11 12 13 14 15 18 17 18 19 2U 2, 22 23 24 Time (hours) Town of Wilkesboro I Cub Creek WWTP Upgrade and Expansion Conclusion ` 9.9 CFS Scenario NC-INdkeshoro 24-hr S1 10-yr RainfaU=5.33" Prepared by HDR, Inc Printed 4l1712023 HydroCAD®10.10-7c s!n 10126 ©2022 HydroCAD Software Solutions LLC Page 3 Hydrograph for Pond 4P: 8.8 MG Tank Time Inflow Storage Elevation Primary (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 10.80 407.099 1,009.00 9.90 0.50 10.87 408,834 1,009.07 9.90 1.00 10.87 410,578 1,009.14 9.90 1.50 10.87 412,327 1,009.21 9.90 2.00 10.87 414,079 1,009.28 9.90 2,50 10,88 415.837 1,009.35 9.90 3.00 10.88 417,600 1,009.42 9.90 3.50 10.88 419,368 1,009.49 9.90 4.00 10.89 421,143 1,009.56 9.90 4.50 10.89 422,925 1,009.63 9.90 5.00 10.90 424.715 1,009.71 9.90 5.50 10.90 426,514 1,009.78 9.90 6.00 10.91 428,322 1,009.95 9.90 6.50 10.91 430,143 1,009.92 9.90 7.00 10.92 431,976 1,009.99 9.90 7,50 10.93 433,826 1.010.07 9.90 8.00 10.94 435,694 1,010.14 9.90 8.50 10.96 437,586 1,010.22 9.90 9.00 10.98 439,507 1,010.29 9.90 9.50 11.00 441,466 1,010.37 9.90 10.00 11.03 443.478 1,010.45 9.90 10.50 11.09 445,567 1,010.53 9.90 11.00 11.18 447,787 1,010.62 9.90 11.50 11.41 450,285 1,010.71 9.90 12.00 17.13 456,162 1,010.94 9.90 12.50 12.01 461,362 1,011.15 9.90 13.00 11.19 463,892 1,011.24 9.90 13.50 11.09 466,108 1,011.33 9.90 14.00 11.04 468,196 1,011.41 9.90 14.50 11.00 470,207 1,011.49 9.90 15.00 10.98 472.165 1,011.56 9.90 15.50 10.96 474,085 1,011.64 9.90 16.00 10.94 475,977 1,011.71 9.90 16.50 10.93 477,945 1,011.78 9.90 17.00 10.92 479,694 1,011.85 9.90 17.50 10.92 481,528 1,011.92 9.90 18.00 10.91 483,348 1,011.99 9.90 18.50 10.90 485,156 1,012.06 9.90 19.00 10.90 486,955 1,012.13 9.90 19.50 10.89 488,744 1,012.20 9.90 20.00 10.89 490.526 1,012.26 9.90 20.50 10.88 492,301 1,012.33 9.90 21.00 10.88 494,069 1,012.40 9.90 21.50 10.88 495,832 1,012.46 9.90 22.00 10.88 497,590 1,012.53 9.90 22.50 10,87 499.342 1,012.60 9.90 23.00 10.87 501,090 1,012.66 9.90 23.50 10.87 502,834 1,012.73 9.90 24.00 0.00 504,576 1,012.79 9.90 Town of Wilkesboro I Cub Creek WWTP Upgrade and Expansion Conclusion Appendix B — Town of Wilkesboro P&ID This page intentionally left blank. Town mWilkesboro | Cub Creek vvvvTPUpgrade and Expansion FN 77 L -------------- f"', --------------------------- ---------- ----------- - -------------------- --------- 4r 4 ------------------ ------------- It Fn PRELIMINARY Town of Wilkesbom NOTIFOR Wastewater Treatment Plant GENERAL PROCESS SCHEMATIC LIQUIDS Co..T.-ICTI.. OR Expansion RECORDING This page intentionally left blank. Town of Wilkesboro I Cub Creek WWTP Upgrade and Expansion Conclusion Appendix C — Town of Wilkesboro Proposed Site Plan This page intentionally left blank. Town of Wilkesboro I Cub Creek WWTP Upgrade and Expansion Conclusion z a a v 1 a or:E6rFw`�'['N1R of � \ � RObEiaOE¢,Fa Mt r aiEv.rerod¢ExrEBswuoEww y nx�R ISERiE¢ rn �sExiis *vi Fs Treox i00°¢ �ccxwnr6uRlFrua Y ISExasrn rx�rx rt`B ew�olxa 01C113PL F�2 � uRl lemv:s l91 nrnv FUIPxWTwN �^ 9 �x�b.�Ey 6ERIE6 ri1 �6ER^e�Bi /� isEwlescRlr,E ,ERxo s �� ' ! isERilsmilrFR rw« isiniea,w6rAr� it "T HUF x, nrwxawla��� �sFxiF uifsre N i _— t9[niB9 bl I � / E�ECIMCPI &XLFIN6 r' I — up�ryEglla�f L���I—� Aoea�GWFf 8l /1 FJrJRE.08 SIN �ISR�nesm� ' --r-tlUA w Rax fiuiLn!€R� ielmEaia�Rwuwe � aiRu€ra e1C112PLAN2, wp ISExIF9 mi rseR�ml� Ixmese��ui, .,.r ItlwptlJLLawa�"x BF¢i¢uma M.EirnE GLECI�o m t.caxn� u€�aoea ¢.unza fiat pbulo laL xF+iEw Ba¢ozz aaL muEO Eor<RewEw ®N BITE PLAN NOTES: osR�axusrt.EsitasE`cRrE.owi rwE cr�dv r�i ca�"Lp..�c"i� s wriL"�+o�+�.ixc E�rcREEn MF iuo urFLvpF eNv d6cRlRu¢xs � CE�nEA.ixE¢..NILGR �O l.GE O€GrNBurv�E¢LOrIERW®E rxl xuwtluu asrwlcE eFrwFFx AixB Ix TNF wK6o Er�NeLL vmcnirEq��s �Ess. wEias mNEmweE iw""cnriB ov r� ¢irE ! Iyµ sHEE,6 s�Hvc3NilBcoxui aRwosFo suILNllca w rnxm e r�vre sxnuee rxurcwRiwnwrr Eac.E.xB reoENx xFTMFaosa �wREl,¢Rx�cRxF N"usslxLE RER .K6,eRlFRTtB fo un€rclE¢axrnwuel eralB on vEEaewso"Rnov�oeBn oTl��ub��!�ww>uLr€so ro wcLwE L€ sJCN!€eTUREa u umm�iry me �oaec�.n¢�,�Ens�wr"iox"ua slrn �rEo � gurlGW¢rRJCrqu rEGWrR.¢rpR 6�.�L[ �RpcT{ sW�! �caWtEl �oappt �,�.r�r rR c�6 �uFf KMxbml� ovxR"un a16ioE Eilpi E0 9E W En mrN �pPiOA APW+d�L r-THE r. FrtBp�IrtiT9JPFACE MERIAy SxR! gtlE rYPE Bs>e Ei1�NiNf1lNF nE 6uRlus couRs! 11 u. fi�s"EEr 9oorm F girl Erfxoao�srwenocr rclrs"em. SITE PLAN PRELIMINARY Town of Wilkesboro OVERALL KEY PLAN NOT FOR Wastewater Treatment Plant CONSTRUCTION Expansion OR RECORDING =�� r.auy Eaaearac�l¢,owa �* O1Clt0 rw.arEl.w 1W9tla1 ea — 6c..€ �_� c I This page intentionally left blank. y r q ',.��°�_�'.:: W45fifVYATfRTRfpiMfNr �r Town of Wilkesboro I Engineering Calculations Section 2 — Basis of Design Report This page intentionally left blank. Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report Wilkesboro Wastewater Treatment Plant Upgrade and Expansion Town of Wilkesboro, NC November 17. 2023 This page intentionally left blank. Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report Contents 1 Introduction..................................................................................................................................... 1.1 Background.......................................................................................................................... 1.2 Purpose................................................................................................................................ 2 Project Description......................................................................................................................... 2.1 Wastewater Projections........................................................................................................ 2.2 Summary of Existing and New Facilities to Remain in Floodplain....................................... 2.3 Summary of Existing and New Facilities Built Out of the Floodplain................................... 2.4 Site Datum and Flood Elevation........................................................................................... 2.5 Permits and Effluent Quality................................................................................................. 3 Process Design criteria.................................................................................................................. 3.1 Influent Pump Station........................................................................................................... 3.2 Headworks........................................................................................................................... 3.3 Flow Equalization................................................................................................................. 3.4 Influent Buffer Tank.............................................................................................................. 3.5 AGS Influent Pump Station.................................................................................................. 3.6 Aerobic Granular Sludge (AGS) Biological Treatment System ............................................ 3.7 Intermediate and Sludge Buffer Tanks................................................................................. 3.8 Waste Activated Sludge Pump Station................................................................................ 3.9 UV Disinfection..................................................................................................................... 3.10 Effluent Flow Monitoring....................................................................................................... 3.11 Aerobic Digestion................................................................................................................. 3.12 Digested Sludge Pumping.................................................................................................... 3.13 Sludge Dewatering............................................................................................................... Tables Table 2-1. Current effluent flows for the Cub Creek WWTP.................................................................... Table 2.2 Influent wastewater characteristics to the Cub Creek WWTP from 2018-2023 ...................... Table 2.3 Influent wastewater characteristics for the Tyson Foods' DAF Effluent Wastewater from 2018-2021................................................................................................................................... Table 2-4: Town of Wilkesboro Cub Creek WWTP Design criteria......................................................... Table 2-5 Speculative NPDES permit limits #NC0021717...................................................................... Table 3-1 Influent Pump Station Design Criteria...................................................................................... Table 3-2 Headworks Screen Design Criteria.......................................................................................... Table 3-3 Grit Removal Design Criteria (Existing)................................................................................... Table 3-4. Municipal Flow Equalization Facilities.................................................................................... Table 3-5. Tyson Foods Flow Equalization Facilities (Existing)............................................................... Table 3-6 Influent Buffer Tank Design Criteria......................................................................................... Table 3-7 AGS Influent Pump Station Design Criteria............................................................................. Table 3-8 Average Characteristics to the AGS Biological Treatment System ......................................... .1 .1 .1 .1 .1 .3 .4 .4 .5 .6 .6 .7 .8 .9 10 10 13 13 14 16 17 17 18 2 2 .3 .3 .5 .6 .7 .8 .8 .9 .9 10 11 November 17, 2023 1 i Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report Table 3-9 AGS System Design Criteria ......................................... Table 3-10 AGS Blowers Design Criteria ....................................... Table 3-11 Treatment Performance ............................................... Table 3-12 Return flows from AGS Reactor and Sidestreams ...... Table 3-13: Intermediate Tank Design Criteria .............................. Table 3-14 Sludge Buffer Tank Design Criteria ............................. Table 3-15 Waste Activated Sludge Pump Station Design Criteria Table 3-16 UV Disinfection Design Criteria ................................... Table 3-17 Effluent Flow Monitoring Design Criteria ..................... Table 3-18 Parshall Flume Discharge Table .................................. Table 3-19 Aerobic Digestion Design Criteria ................................ Table 3-20 Digester Decant Pump Design Criteria ........................ Table 3-21 Digested Sludge Pump Design Criteria ....................... Table 3-22 Dewatering Polymer Feed System Design Criteria ..... ....................................................... 11 ....................................................... 12 ....................................................... 12 ....................................................... 12 ....................................................... 13 ....................................................... 13 ....................................................... 13 ....................................................... 15 ....................................................... 16 ....................................................... 16 ....................................................... 17 ....................................................... 17 ....................................................... 18 ....................................................... 19 Figures Figure 2-1: FEMA National Flood Hazard Layer (NHFL) map for the Cub Creek WWTP site. Figure3-1 WAS Pump Curve................................................................................................... Appendices Appendix A - Design Basis from Aqua -Aerobic Systems, Inc. Appendix B - Design Calculations for Solids Dewatering Equipment .5 14 ii I November 17, 2023 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report OR 1 INTRODUCTION 1.1 Background The Town of Wilkesboro (Town) owns and operates the Wilkesboro Cub Creek Wastewater Treatment Plant (WWTP), which receives municipal wastewater from the Town and pretreated industrial wastewater from Tyson Foods, Inc. The WWTP has been in operation since 1965 with a permitted capacity of 4.9 MGD. The WWTP currently utilizes a conventional activated sludge process and consists of an influent pump station, a headworks structure for screening and grit removal, an aeration basin, and an ultraviolet (UV) disinfection system. Secondary clarification is provided by four clarifiers. Solids handling facilities consist of three aerobic digesters, and a Huber screw press for dewatering. Dewatered sludge is hauled off -site for landfill disposal. Following disinfection, effluent is discharged to the Yadkin River. The treatment facility is nearing its permitted capacity, therefore the Town retained HDR Engineering, Inc. of the Carolinas to evaluate options for upgrading and expanding the treatment capacity of the WWTP and to prepare a preliminary engineering report (PER). The draft PER was presented to the Owner in June 2021. As part of this evaluation, the Town requested and received speculative effluent permit limits for the WWTP from the North Carolina Department of Environmental Quality (NCDEQ). Included in these speculative effluent permit limits are two new limits that include total nitrogen (TN) and total phosphorus (TP). The current WWTP process is not configured to remove TN or TP. From the process alternatives evaluated as part of the PER, the Town has selected the AquaNereda aerobic granular sludge process (Nereda) to upgrade and expand the WWTP to meet the speculative National Pollutant Discharge Elimination System (NPDES) permit limits received from NC DEQ. The Town has also selected the Construction Manager at Risk (CMAR) delivery method for the construction of the WWTP upgrade and expansion. 1.2 Purpose The purpose of this report is to summarize the conditions, assumptions, calculations, and directions which have directed the designs of the various systems encompassed within the project scope. The report presents goals and objectives, project components, and design criteria of the proposed facilities. 2 PROJECT DESCRIPTION 2.1 Wastewater Projections The annual average, maximum month, and maximum day influent design criteria are shown in Table 2-4. Influent flows are comprised of municipal flows from the Town of Wilkesboro and pretreated industrial wastewater from the Tyson Foods poultry processing plant. Future flows from the Town's collection system were developed based on population projections through 2042, and up to 0.5 mgd has been included for future flows from Tyson, which are used for the design flows. November 17, 2023 1 1 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report Table 2-1 provides the current effluent flows for Cub Creek WWTP. Table 2-1. Current effluent flows for the Cub Creek WWTP. 2017 4.73 5.23 8.29 2018 4.13 IN 4.53 7.64 2019 4.44 5.02 8.26 I ■ 2020 4.77 5.05 8.50 2021 4.21 4.80 6.38 2022 4.19 4.6 6.23 6-Year Average 4.41 4.87 7.55 Influent design criteria were established based on historical influent flows and loads data from the WWTP and from Tyson Foods. Tyson is the county's largest employer and is based in the Town of Wilkesboro. The annual average and maximum month influent characteristics between January 2018 through April 2023 are shown in Table 2.2. Table 2.2 Influent wastewater characteristics to the Cub Creek WWTP from 2018- 2023 Parameter Annual average Flow, mgd 0.9 BODs, mg/L 213.7 TSS, mg/L 208.5 NH3-N, mg/L 12.7 TKN, mg/L 32.8 TP, mg/L 6 BOD = biochemical oxygen demand TKN = total Kjeldahl nitrogen Maximum Annual month average 1.6 2.2 _ 322 244.5 401.4 239.6 22.7 10.3 39.9 21 8.8 9.5 TSS = total dissolved solids TP= total phosphorus Maximum month 2.9 Annual average Maximum month 3.1 4.5 337.9 236 332 398.9 231 400 29.3 11 24 27 60 13.3 52 9 7 NH3-N = ammonia nitrogen For the Wilkesboro upgrade and expansion project, Tyson will change pretreatment operations to only use one of the two pretreatment basins. Based upon a sampling profile of Tyson's pretreatment process, it was determined that Tyson's two 8-million-gallon pretreatment basins were utilizing all of the soluble BOD, negatively impacting Wilkesboro's proposed biological nutrient removal process. Table 2.3 summarizes Tyson's effluent wastewater characteristics. The data is only through 2021 because the supplemental testing performed on Tyson's DAF effluent was during the preliminary engineering phase of the Wilkesboro Upgrade and Expansion project. 2 1 November 17, 2023 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report OR Table 2.3 Influent wastewater characteristics for the Tyson Foods' DAF Effluent Wastewater from 2018-2021 Parameter I Annual average Flow, mgd 3.0 BODs, mg/L 572.4 TSS, mg/L 137.1 NH3-N, mg/L 19.5 TKN, mg/L 40 TP, mg/L 25.5 BOD = biochemical oxygen demand TKN = total Kjeldahl nitrogen Maximum month 3.2 1397 284 41.4 80 41.8 TSS = total dissolved solids TP= total phosphorus NH3-N = ammonia nitrogen Taking into account changes to Tyson's pretreatment operations, Table 2-4 provides the design criteria for the WWTP. Table 2-4: Town of Wilkesboro Cub Creek WWTP Design criteria Parameter Flow, mgd BODs, mg/L TSS, mg/L NH3-N, mg/L TKN, mg/L TP, mg/L Annual average Influent Design Maximum month Criteria Max day Peak hour 6.5 8 16 18.2 367 440 331 335 209 251 188 195 22 22 45 45 24.6 24.8 15 16 30 32 17 17 BOD = biochemical oxygen demand TSS = total dissolved solids NH3-N = ammonia nitrogen TKN = total Kjeldahl nitrogen TP= total phosphorus 2.2 Summary of Existing and New Facilities to Remain in Floodplain Most of the existing Cub Creek WWTP facilities are in the Yadkin River floodplain. For this reason, this project aimed to reduce as much equipment in the floodplain as possible while also being cost efficient. Existing facilities to remain in the floodplain include: • Influent Town pump station (with upgrades) • Headworks system (with upgrades) • Aeration Basin (retrofitted to wet -weather equalization tank) • Secondary Clarifier 4 (retrofitted to influent buffer tank and AGS Pump Station) • Secondary Clarifier 3 (retrofitted to sludge buffer and water level correction tank) • RAS Pump Station (retrofitted to WAS Pump Station) • Aerobic digesters • New digested sludge pumping platform and pumps November 17, 2023 1 3 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report • New elevated platform for Electrical Building #2 2.3 Summary of Existing and New Facilities Built Out of the Floodplain Due to more stringent nutrient limits in the Yadkin River Basin and High Rock Lake Basin, Wilkesboro requires a biological treatment upgrade which will reduce both nitrogen and phosphorus. The following facilities will be built new and out of the regulatory floodplain: • Three Aerobic Granular Sludge (AGS) Tanks • One new intermediate tank to capture initial water level correction and sludge buffer flows. • UV disinfection system • Effluent flow metering system • Sludge dewatering facilities (dewatering screw press) • Electrical building #1 (to supply power to blowers and UV system) • Operations and Control building 2.4 Site Datum and Flood Elevation Most of the Cub Creek WWTP, apart from the solids dewatering area, is located within a Federal Emergency Management Agency (FEMA) flood designated zone. The main influent pump station, screening and grit removal, secondary clarifiers, aerobic digesters, and chemical feed building are in a special flood hazard area, Zone AE Base Flood Elevation (BFE). A BFE is an area in which floodwaters are expected to rise during a base flood event and are likely to experience severe flooding with a one percent chance of occurring in any given year. The aeration basin and administration building are located within FEMA Zone X Non -Special Flood Hazard Area. In non - special flood hazard areas, the risk of flooding is reduced though not eliminated. The solids dewatering area and Tyson Food's pretreatment basins are not located within any floodplain designation. See Figure 2-1 for the FEMA National Flood Hazard Layer (NHFL) Map demonstrating the flood zones on the site. 4 1 November 17, 2023 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report FN 0 250 SOP 1,000 1,500 2,000 aaaemap: USGS National Map: onheimageay: Gate aefrt hed Omi-,, 2020 whneat ease Flees ©evader (RpE) SPECIAL FLDOD MAIM1 OFE pr Oeplh Zen=aF aO. +M, VE 1a HAZARD AREAS Rego) ,y Flr»dway 0.2%Mn 1Chance H2O Ra ,Areas wlXi merege aOMn lass IMin en0 foot or wltA aralnage areas M less Man one square mile za.� r I�Fumm fandl[lans 1%Annual Lbance Flootl Nazartl zonex F/�4 Area wOM1R 1J 1Fbatl Rlsk tlueN GTHER AREAS OF Levee.seeNelaz.— FLDoDHAZARD F�i Ales wlM FlO Rizk sue so Leve1—I uAzd Are a el Minimal Fleatl Aazera Emax Ellec[he LOMAa OTHER AREAS Area of hntleMrmmed Fleed Hawrtl GENERAL ---- CM1annel,CUl_ or Sterrn - STRUCTURES IIIIIII Leree. Dlke, er Fbeawafl Cmea SecllOne e whh 1%Annual C11— da.a water snXace L7evanan --- Coast al Tain — 60GA.Fl W d Et. Ilv0li0n Lin¢ IBFEI LIMIt el Stuay Junstlk0ien Deundary ---- Leastal Taneett Baseline OTHER preNle Resell' r _RES HytlrograpFlc Feature M�nl Dana Avename Ne alghal Data Avallahle d.aP PANELS Vnmeppee OThe pin dlsplayetl en Me map is an approalmale peln[ selected by the user antl does not represent en avMerOative properly lecallan. map eemdles wltl, FEMA's erendarda far Me ux es d4gFpl aeetl maps If h!s net veld as darsedead below_ The besemep sfi0rvn complies wi1M1 FEMA's basemap aawaeyalanmraa The flood M1ezaN information K aedaed diremly imm the auinetl[eilae N FMLwebsery pm dby FEMA.This map ryoNed on 1/2T/2021 al 9 41 AM antl tloes net rlflett CNdngee Br dmendmBMs sabsegn¢nl W tNis dale ona time, iM1e NFHL antl eXec[ve Marmall0n may change ar became raplreeaaa ny new aMa evlrnml. Thb maP image Is role d arc one or more or Ire lollowin8 map b egepndnd.wale 1ba15 d0 . applac baseman imdfiery, ]lode zone IaeeH, lr, maptm RRM date,wmmunhyiaenllpera, FIRM pang u nmber, end FlRM eXecthe sake. Map images Wr mappetl antl anmetlernlzetl emea canner he used ter rogulalory pumoaea Figure 2-1: FEMA National Flood Hazard Layer (NHFL) map for the Cub Creek WWTP site. As a result of the plant's location in the floodplain, the Cub Creek WWTP has periodically experienced severe floods. One example of severe flooding is an event that occurred in October 2020. During that storm event, the area around the existing wastewater treatment units was flooded, which hindered access to the treatment facilities. For the safety of plant staff and for meeting regulatory requirements, this project moves as much equipment from the floodplain practical, given the limitations of the project site. NC Administrative Code 18A.1950 (h) states that wastewater treatment plants shall not be located in areas subject to frequent flooding by a ten-year storm or less. 2.5 Permits and Effluent Quality In May 2020, HDR and the Town had a meeting with representatives from NC DEQ to discuss permitting the Cub Creek WWTP for expansion. In October 2020, the Town received speculative limits from NC DEQ for the proposed expansion of the WWTP. The speculative NPDES permit limits for the plant expansion are presented in Table 2-5. Table 2-5 Speculative NPDES permit limits #NC0021717 Flow (mgd) 8.0 - BOD (mg/L) 24.4 36.6 TSS (mg/L) 30.0 45.0 November 17, 2023 1 5 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report NH3-N (mg/L) TN1 TP2 13.3 205,476 Ibs/yr 109,872 Ibs/yr 35.0 3 PROCESS DESIGN CRITERIA The following subsections contain summaries of the bases of design for the major unit processes of the WWTP upgrade and expansion. 3.1 Influent Pump Station The Influent Pump Station will be retrofitted for a peak hour design flow of 11.8 MGD with one pump out of service. The three existing submersible pumps will be replaced with new pumps based upon the criteria presented in Table 3-1. These improvements include upsizing existing 10" pump discharge piping and valves to 12" piping and valves, replacing the existing primary and secondary ultra -sonic level control system, and installing new pump control panels and VFDs. Table 3-1 Influent Pump Station Design Criteria ParameteM Design Criteria I MA h — Average Design Flow: 5.0 MGD TDH at Average Daily Flow: 55 ft Maximum Design Flow: 11.8 MGD TDH @ Peak Hour Flow 75 ft Minimum Flow 2.5 MGD TDH @ Minimum Flow Type: No. Pumps Power: Maximum Discharge Elevation Maximum Suction Elevation Minimum Suction Elevation Pump Station Header Dia.: Pump Discharge Pipe Dia.: 51 ft Non -clog Submersible Pump 3 pumps (2 operational, 1 standby) 110 HP, 460V 976.13 ft 936.81 ft 926.81 ft 18 in 12 in 6 1 November 17, 2023 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report OR Existing 18" Force Main Length 250 ft 3.2 Headworks Three new perforated plate screens will be installed in the existing headworks screen channels. The design criteria for the screens are presented in Table 3-2. New sluice troughs will convey screenings to a new washer compactor for organics removal and dewatering. The existing grit removal system will remain in place. A new grit pump will be installed to convey grit slurry to a new grit classifier for dewatering and disposal. The design criteria for grit removal are presented in Table 3-3. Table 3-2 Headworks Screen Design Criteria I" Parameter E"Mqrw Design Criteria - Type: Perforated plate Opening Size: No. Screening Units: Unit Capacity: Grit Removal Technology (existing) Screenings Treatment Type: No. Washer Units: Unit Capacity: Peak Hourly Flow Hydraulic Flow through the Screens Hydraulic Flow through Grit Removal Hydraulic Flow through Grit Bypass 6 mm 3 screens (2 duty, 1 standby) 7 MGD/screen (14MGD Firm) Stacked Tray Vortex 95% Removal of Grit < 140 pm Washer/Compactor 1 140 ft3/hr 11.8 MGD 11.8 MGD 7.25 MGD 4.55 MGD November 17, 2023 1 7 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report - Table 3-3 Grit Removal Design Criteria (Existing) Parameter m � No Grit Removal units: Grit Treatment Type Grit Classifier Unit Capacity: 250 gpm 3.3 Flow Equalization Design Criteria As discussed in the Peaking Factor Determination Technical Memorandum (HDR, 2023), the Town's existing aeration basin will be converted to a wet -weather equalization basin to minimize the impact of peak flows during storm events. Municipal wet -weather flow from the Town's collection system will be equalized in a 3.8 million gallon wet -weather basin. The equalization basin will receive flow from the overflow pipe in the new grit bypass channel. A new slide gate will be installed at the channel outlet to the influent buffer tank. In the event of a high water level in the influent buffer tank, the slide gate will automatically close and influent flow will be diverted by gravity to the equalization basin. The wet -weather flow equalization basin is sloped to the center and drains via an 8" gravity line to the influent pump station. There will be a yard hydrant nearby to allow for washdown. The design criteria are presented in Table 3-4 and Table 3-5 Table 3-4. Municipal Flow Equalization Facilities Number of cells Basin Depth, ft Operating Water Depth, ft Embankment Side slope Approximate volume, million gallons Construction Total Storage Time 10 Yr 24-Hour Storm + 1/1 rDesign Criteria bL Concrete -lined, flat bottom, sloped sides to center 24 Hours I 8 1 November 17, 2023 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report OR Table 3-5. Tyson Foods Flow Equalization Facilities (Existing) Paramete No. Basins: Basin Depth, ft Operating Depth, ft Embankment Side slope Total Capacity: Maximum Month Permitted Flow to Equalization Basin: Maximum Outflow to Influent Buffer Tank: Total Storage Time 10 Yr 24-Hour Storm + Tyson Influent 2 33 30 ■ 1:1.5 17.6 MG 3.9 MGD 6.1 MGD 24 Hours 3.4 Influent Buffer Tank Existing Clarifier No. 4 will be repurposed to an influent buffer tank to hold 650,000 gallons. The existing tank is 100-feet diameter, with an operating depth of 14.1 feet. There will be one 40-hp floating mixer included in the tank to maintain solids in suspension. The design criteria are presented in Table 3-6. Table 3-6 Influent Buffer Tank Design Criteria Parameter Design Criteria ■ - No. Tank 1 tank Diameter 100 ft Minimum Water Depth' 3.0 ft Maximum Water Depth2 14.1 ft Maximum Basin Volume 650,000 gal November 17, 2023 1 9 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report Notes: 1. Based on minimum pump submergence. 2. An additional two (2) feet of freeboard is available. 3.5 AGS Influent Pump Station The project involves installing a new submersible pump station to transfer wastewater from the influent buffer tank to the Aerobic Granular Sludge biological process. This pump station includes the installation of three submersible wastewater pumps within the influent buffer tank, associated piping, valves, and pump control panels (with VFDs). The design criteria for this pump station are shown in Table 3-7. Table 3-7 AGS Influent Pump Station Design Criteria Parameter Peak Hour Flow TDH at Peak Hour Flow Number of Pumps Pump Type Maximum Discharge Elevation Maximum Suction Elevation Minimum Suction Elevation Size of Force main Size of Pump Discharge Pipe and Valves Force Main Length '17- Design Criteria ■ ■ 18.2 MGD 83 ft 3 (two duty, one standby) Non -clog Submersible 994.08 ft 962 ft 951 ft 30 in 18" 635 ft 3.6 Aerobic Granular Sludge (AGS) Biological Treatment System To achieve target effluent limits, the Town has chosen to construct a series of sequencing batch reactor (SBR) tanks based on the AquaNereda® (Nereda) aerobic granular sludge (AGS) process. AGS is a naturally growing type of sludge that can grow its microorganisms into spherical granules. The Nereda process combines SBR operation with AGS. There are three main phases of the Nereda cycle, which enables the plant to meet advanced wastewater treatment objectives (Fill/Draw, React, Settling). Due to the unique structure of the granular biomass, anaerobic, anoxic, and aerobic zones can occur internal to the granule thereby causing den itrification, nitrification, and phosphorus removal to occur. Although a newer technology in the United States, Nereda has been installing systems globally since 2000 and has proven effective in treating industrial wastes, such as pork slaughterhouse waste. The 10 1 November 17, 2023 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report OR design criteria are presented in Table 3-9. Additional process design information is included in Appendix A. The average wastewater influent design criteria to the Nereda system are presented in Table 3-8. Table 3-8 Average Characteristics to the AGS Biological Treatment System. Constituent Average Daily Concentration BOD5 431 mg/L TSS 246 mg/L TKN 44 mg/L TP 24 m /L FOG 15 mg/L (average) 45 ma/L (Deak) Table 3-9 AGS System Design Criteria Parameter Design Criteria Max Month Design Flow 8 MGD Peak Day Flow 14.2 MGD Peak Hourly Flow 18.2 MGD No. Reactors 3 Basin Volume 1.29 MG/basin Basin Dimensions 105.5 ft x 78 ft (L x W) Freeboard 3.3 ft Process Water Level 21.0 ft Discharge Water Level 22.8 ft Cycle Duration 4 hrs/cycle F/M Ratio 0.125 Ibs BOD5/lb MLSS-day MLSS Concentration 8,000 mg/L Hydraulic Retention Time 0.48 days Solids Retention Time 13.2 days Estimated Net Sludge Yield 0.58 Ibs WAS/lb BOD5 Estimated Dry Solids Produced 16,706 Ibs WAS/day The new aeration system will include six (6) 200 HP hybrid rotary lobe blowers. Each blower will have a design capacity of 2,529 scfm with a turndown to 810 scfm. There will be 5 duty and 1 standby blowers. The design criteria are presented in Table 3-10. November 17, 2023 1 11 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report Table 3-10 AGS Blowers Design Criteria Flow, MGD Influent BOD, lb/day' Influent TKN, Ib/day1 AGS Process 02 Demand, DO Concentration, mi, rein nnuaI Design Annual Average Average 4.3 6.3 16,228 2,525 27,327 t, 20,600 2,848 33,025 2 Maximum Month 8.0 30,155 3,467 53,850 Peak Hour 18.2 46,415 5,040 73,952 Air Demand, scfm 6,724 8126 13,250 18,197 Flow/Diffuser, scfm3 1.10 1.32 2.16 Notes: 1. Influent BOD and TKN to the AGS system include sidestream recycle flows. 2. Actual oxygen requirements (AOR) for all 3 AGS basins. 3. The total number of diffusers is 6,132. Aqua -Aerobic Systems, Inc. is a licensee of HaskoningDHV Nederland B.V. with respect to the Nereda® Technology and provides a process performance guarantee for effluent discharged from the AGS system. The guaranteed treatment performance of the Nereda process for the Cub Creek WWTP is presented in Table 3-11. Table 3-11 Treatment Performance Parameters AGS Syste%Lgr Effluent (mg/L) BOD 10 or less TSS 10 or less NH3-N 2.0 or less Total Nitrogen 8.5 or less Total Phosphorus 4.5 or less Return flows and concentrations from the AGS biological treatment system to the influent pump station are presented in Table 3-12. These return flows, with an average volume of 1.96 MGD, are released during a 24-hour period from the combined wasting and water level correction steps. These flows and loads include sidestream flows such as the digester decant and dewatering filtrate. Table 3-12 Return flows from AGS Reactor and Sidestreams Constituent Averaae Dailv Flow 7 Concentration 1.96 MGD BOD5 150 m /L TSS 81 m /L TKN 26 mg/L TP 6.3 m /L NO3 7.3 m /L 12 1 November 17, 2023 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report FN 3.7 Intermediate and Sludge Buffer Tanks The intermediate tank receives the combined WAS/WLC flow from the Nereda discharge cycles. The solids waste cycle lasts about 10 minutes. The intermediate tank will serve to equalize the WAS flow to the sludge buffer tank (which was formerly secondary clarifier 3) at a rate that does not exceed the clarifier surface loading rate. The design criteria are presented in Table 3-9. Table 3-13: Intermediate Tank Design Criteria No No. Tanks WAS/WLC Design Flow WAS/WLC Solids Concentration Basin Volume Basin Dimensions Freeboard Maximum Water Depth 1.68 MGD 1,000 mg/L 156,337 gallons 70ftx24ftx21 ft(LxWxD) 2 ft 13.69 ft Equalized WAS/WLC flow from the intermediate tank will flow via gravity in a 12" line to the sludge buffer tank, which was formerly Secondary Clarifier 3. The clarifier mechanism will remain in -place and will serve to thicken the 1,000 mg/L sludge coming from the intermediate tank. The waste activated sludge (WAS) pump station will receive thickened solids from the clarifier well and will then pump thickened solids to the aerobic digesters for digestion. The design criteria are presented in Table 3-17. Table 3-14 Sludge Buffer Tank Design Criteria Parameter Value Diameter, feet 80 Surface Area, ft2 5,027 Available volume, gallons 650,000 Maximum surface overflow rate (gpd/ft2) 745 Volume Required by AASI, gallons 490,000 3.8 Waste Activated Sludge Pump Station The existing return activated sludge (RAS) pump station will be converted to a waste sludge (WAS) pump station. With the AGS process, the RAS pump station is no longer required. There will be 2 new waste sludge pumps (1 duty, 1 standby) that will pump thickened waste sludge (TWAS) through an existing 8-inch force main that reduces to 6-inches before it reaches the digesters. The existing RAS pumps will be removed from the existing wet well and replaced with smaller WAS pumps. The WAS pump station design criteria are presented in Table 3-18. The pump curve is presented in Figure 3-2. Table 3-15 Waste Activated Sludge Pump Station Design Criteria Parameter November 17, 2023 1 13 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report Type Model Number of Pumps Unit Duty Design Flow Rate Duty Total Dynamic Head Operating Speed Influent Pipe Diameter Percent Solids Power Figure 3-1 WAS Pump Curve Submersible 100-253/76XEG-S I E3 1 duty, 1 standby 355 GPM 22.03 ft 1,185 RPM 8 in 2% 3.36 HP Wilkesboro WWTP Expansion - WAS Pumps 60 sn -50 50 150 250 350 450 550 650 750 FLOW RATE (GPM) 3.9 UV Disinfection A new UV Disinfection system will be installed downstream of the AGS process. The proposed UV system will include two parallel channels and is designed for a peak of 18.2 MGD through the 14 1 November 17, 2023 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report FN system. The UV system will be located downstream of the SBR system. The UV system will use low- pressure high output UV lamps, equipped with an automatic sleeve wiping system. This system will meet or exceed the 10 State Standards. Sleeve fouling can cause attenuation of the minimum dose during operation. The designed UV dose shall be based on the fouling factor of 0.8 unless UVSS has a technology -specific fouling factor certified by an independent third party. A fouling factor greater than 0.90 will not be accepted. The UV system will be designed to deliver a minimum UV dose indicated in the design criteria Table 3-19 at peak flow, in an effluent with a UV transmittance of 65% at end of lamp life after reduction of quartz sleeve fouling. A fixed finger weir will be installed in each channel at flow exit as the water level control mechanism. The finger weir will be sized for the Peak Hour flow of 18.2 MGD. The UV lamps will be configured in an inclined array with a minimum of two (2) duty UV banks and one (1) redundant UV bank installed in each channel. All banks shall be installed in series in each channel. Table 3-16 UV Disinfection Design Criteria Parameter Peak Design Flow' No. Channels No. Lamps No. Banks Per Channel AGS process effluent suspended solids AGS effluent BOD5 A- 18.2 MGD Fecal coliform (based on NPDES permit) UV dose (at the end of lamp lifetime) Effluent temperature UV Transmittance at 253.7 nm 2 channels 3 banks/channel 12 lamps/bank (72 lamps total) Design Criteria - 3 banks/channel (2 duty, 1 redundant per channel) 10 mg/L 10 mg/L Less than 200 cfu/100 mL; monthly average Less than 400 cfu/100 mL; weekly average Minimum 30 mJ/cm2 @peak design flow based on MS2 RED Minimum 15 mJ/cm2 @peak design flow based on T1 phage Bioassay 12/26 minimum/maximum °C 65% minimum Effluent Disinfection Standard 200 fecal coliforms/100 mL (30-day geometric mean) 400 fecal coliforms/100 mL (7-day geometric mean) Notes: 1. The UV system is located downstream of an SBR system and will receive an instantaneous flow of 18.2 MGD on a regular basis. November 17, 2023 1 15 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report 3.10 Effluent Flow Monitoring The Town has chosen to use a Parshall Flume for effluent flow measurement. A 30-inch, fiberglass flume will be installed in a new cast -in -place concrete structure. The concrete structure will have an approach channel length of 28' and width of 6'-6". The downstream channel departure will be 5'-6" in length. The flume top of slab elevation is 947.67. The flume vault top of wall elevation will be 3' above the finished grade elevation. A new 30-inch effluent line will exit the flume structure and connect to the existing 30" outfall pipeline to the Yadkin River. The design criteria are presented in Table 3-20 and 3-21. Table 3-17 Effluent Flow Monitoring Design Criteria Description 1�iteria Hydraulic Flow through the Effluent Flow Metering System 18.2 MGD' Peak Design Flow 18.2 MGD' Flume Water Depth at 18.2 MGD 1.94 ft Peak Hour Velocity 1.8 fps System Head 1.95ft Notes: 1. The effluent flow metering system is located downstream of an SBR system and will receive and instantaneous flow of 18.2 MGD on a regular basis. Table 3-18 Parshall Flume Discharge Table LEVEL FEET INCHES CFS GPM MGD 0.48 5.76 3.185 1430 2.059 1.24 14.88 13.98 6276 9.038 1.49 17.88 18.62 8356 12.03 1.93 23.16 27.87 12507 18.01 1.95 23.40 28.32 12709 18.30 16 1 November 17, 2023 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report 3.11 Aerobic Digestion For waste solids treatment, there are three aerobic digesters currently operated in series at the Cub Creek WWTP. The aerobic digesters are with a diffused aeration system. There are four 75 HP blowers for the three digesters. No changes are being made to the digester mechanisms, aeration, or sizing. To provide for a more efficient means of decanting the digesters, digester decant pumps and decanting columns (6-inch piping) are being added as a part of the Cub Creek WWTP expansion project. Floating decant pumps will only be installed in Digester Nos. 1 and 2 and the pump selected is designed to prevent inflow of suspended solids during the digester decanting process. Existing design criteria for the aerobic digestion system is presented in Table 3-22. Table 3-19 Aerobic Digestion Design Criteria Parameter A6L am"6 Number digesters 3 Diameter (each) 80 Sidewater depth (ft) 16 WAS flow rate to digesters (gpm) 284 Thickened solids flow rate to dewatering presses (gpm) 180 Number of blowers 4 Blower flow rate (scfm) 1,804 Digester decant pumps design criteria are presented in Table 3-23. Table 3-20 Digester Decant Pump Design Criteria Pater Pump Type Model Number Capacity, each pump Discharge Diameter Value Tsurumi FHP-Series Floating -Decanter Pump FHP2-15TK Two (2 duty, 0 standby) 210 gpm 3 in Notes: 1. Decanter pumps will only be installed in Digesters 1 and 2. 2. There will be additional 6 inch decant piping with manual valves in the event one of the decant pumps is out of service or greater decant capacity is needed for digester operations. 3.12 Digested Sludge Pumping Following aerobic digestion, digested sludge will be transferred to the Dewatering Building for dewatering and ultimate landfill disposal. A new digested sludge pump station will be included as part of this project, which will replace the pumps currently used to transfer digested sludge for dewatering. The new pump station will include two 15 HP double disc (self -priming) sludge pumps that can pump from either Digester 2 and/or Digester 3, and each pump will have a dedicated 6-inch November 17, 2023 1 17 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report force main to the Dewatering Building. Both the suction and discharge lines have pulsation dampeners to control unexpected pressure increases. The pumps will be installed on a new elevated platform (above the base flood elevation) adjacent to Digester 2 and 3. The pump design criteria are presented below in Table 3-21. Each pump is designed to pump digested sludge at an average rate equal to the dewatering screw press capacity of 90-gpm per unit. The new screw press control panel will control the start/stop operation of the new sludge pumps. Table 3-21 Digested Sludge Pump Design Criteria Parameter Type Model Number of Pumps Unit Duty Design Flow Rate Duty Total Dynamic Head Unit Maximum Design Flow Rate Maximum Total Dynamic Head Operating Speed Inlet Pipe Dia Force main Dia Percent Solids Motor Horsepower 3.13 Sludge Dewatering Design Criteria Penn Valley Double Disc Pump 6DDSX76CNU-MK2 2 90 GPM 125 ft 120 GPM 126 ft 210 RPM 6 in 6 in 2% 15 HP Design calculations for solids dewatering equipment were previously submitted to the NC DEQ Division of Water Infrastructure in a letter dated September 27, 2022. These calculations are included as part of Appendix B. A change from the original calculations submitted involves designating the second dewatering unit as an alternate bid item. A final determination will be made based upon actual bids received and available project funding. In addition to the dewatering equipment summarized in calculations previously submitted, the system design will include new polymer storage and feed equipment. A new 2500-gallon bulk polymer storage tank will be installed adjacent to the dewatering building within a new concrete secondary containment structure, sized for 120% of the tank volume. This bulk tank will allow the Town of Wilkesboro to eliminate the use of chemical totes for polymer delivery. Neat polymer from the bulk tank will be transferred to a new 90-gallon day tank, which will feed the Velodyne polymer blending units. A 20-gpm progressive cavity pump with a 3 HP motor will be used in the transfer of bulk polymer. 18 1 November 17, 2023 Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report FN The dewatering screw presses will be designed with the criteria presented in Table 3-22. Table 3-22 Dewatering Polymer Feed System Design Criteria Polymer F Design Criteria . Neat Polymer Dose 77 Ib/DT Active Polymer Content 44 %w/w Polymer Blending System Type Velodyne Polymer Blending System Model VM-10P-1800 Blended Polymer Dose 34 Ib/DT' Neat Polymer Flow 0.05 GPM Dilution Water Flow 19 GPM Blended Polymer Flow to Screw Press 19.05 GPM Injection Ring Minimum Blended Polymer Retention 45 seconds Time Neat Polymer Bulk Storage Parameters Design Criteria Neat Polymer Bulk Tank Volume 2500 gallons Neat Polymer Transfer Pump Type Progressive Cavity Pump Neat Polymer Transfer Pump Capacity 30 GPM Neat Polymer Transfer Pump Motor 3 HP Notes: 1. The polymer dose is estimated to range between 23-34 lb active polymer/dry ton of sludge by the equipment manufacturer. The upper range of the active polymer dose was used for equipment sizing. November 17, 2023 1 19 This page intentionally left blank. Town of Wilkesboro I Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report ��� Appendix A — Design Basis from Aqua -Aerobic Systems, Inc. AppendixA— Design Basis from Aqua -Aerobic Systems, Inc. This page intentionally left blank. AQUA -AEROBIC SYSTEMS, INC. A Metawater Company Process Design Report WILKESBORO WWTP NC Design# 170014 Option: Plans and Specs Design AquaNereda° Aerobic Granular Sludge Technology August 24, 2023 Designed By: Vedansh Gupta 6306 N. Alpine Rd Loves Park, IL 61111 Nereda° is a registered U.S. trademark of Royal HaskoningDHV (815) 654-2501 www.agua-aerobic.com © 2023 Aqua -Aerobic Systems, Inc Design Notes Project: WILKESBORO WWTP NC Option: Revised Preliminary AGS Design Designed by Vedansh Gupta on Monday, January 9, 2023 Design#: 170014 11alot SYSTEMS, INC. ag.'r '; Upstream Recommendations - 1/4 inch (6 mm) screening (perforated plate -style preferred) and grit removal (95% removal at 140 mesh) is required (by others) ahead of the AquaNereda system. Neutralization is required ahead of the biological system if the pH is expected to fall outside of 6.5-8.5 for significant durations. Elevated concentration of hydrogen sulfide can be detrimental to both civil and mechanical structures. If anaerobic conditions exist in the collection system, steps should be taken to eliminate hydrogen sulfide prior to the treatment system. Flow Considerations - The maximum flow, as shown on the design, has been assumed as an organic maximum that represents an increased organic load. An oxygen peaking factor of 1.16 has been included to accommodate this additional load while maintaining a residual DO concentration of 2 mg/I. Aeration - The aeration system has been designed to provide 1.25 lbs. 02/lb. BOD5 applied and 4.6 lbs. 02/lb. TKN applied at the design average loading conditions, while maintaining a residual DO concentration of 2 mg/l. - A common standby blower will be shared among the biological reactors. - Depending on the actual yard piping from the blowers to the diffuser system and the heat losses associated with the yard piping, additional provisions for cooling of the air (i.e. incorporating heat exchangers) and/or modification of in -basin piping and/or diffuser sleeve material may be required. Aqua -Aerobic Systems, Inc. may need to modify the following equipment offering to ensure compatibility of all in -basin components with actual air temperatures. Process/Site - The anticipated effluent nitrogen requirement is predicated upon an influent waste temperature of 12 °C or greater. While lower temperatures may be acceptable for a short-term duration, nitrification and (if required) denitrification below 10 °C can be unpredictable, requiring special operator attention. - Sufficient alkalinity is required for nitrification, as approximately 7.1 mg alkalinity (as CaCO3) is required for every mg of NH3-N nitrified. If the raw water alkalinity cannot support this consumption, while maintaining a residual concentration of 50 mg/I, supplemental alkalinity shall be provided (by others). - Influent to the biological system is a typical municipal wastewater application. Influent TP shall be either in a particle associated form or in a reactive soluble phosphate form or in a soluble form that can be converted to reactive phosphorus in the biological system. Soluble hydrolyzable and organic phosphates are not removable by chemical precipitation with metal salts. A water quality analysis is required to determine the phosphorus speciation with respect to soluble and insoluble reactive, acid hydrolyzable and total phosphorus at the system Influent, point(s) of chemical addition, and final effluent. - Chemical feed lines (i.e. metal salts) shall be furnished to each reactor, aerobic digester and dewatering supernatant streams as necessary. - pH monitoring in a range of 6.5-8.5 of the biological reactor is required when adding metal salts. - The average and maximum design flow and loading conditions, shown within the report, are based on maximum month average and maximum day conditions, respectively. Equipment Changes in basin geometry may require alterations in the equipment recommendation. The basins are not included and shall be provided by others. The influent enters the basin near the reactor floor. Adequate hydraulic capacity shall be made in the headworks to prevent backflow from one reactor to the other during transition of influent. Printed: 01/10/2023 9:37:06AM Aqua -Aerobic Systems, Inc. CONFIDENTIAL Page 2 of 5 Project ID: 116566 - WILKESBORO WWTP NC / Design#: 170014 Design Notes Project: WILKESBORO WWTP NC Option: Revised Preliminary AGS Design Designed by Vedansh Gupta on Monday, January 9, 2023 Design#: 170014 •_A -AEROBIC SYSTEMS, INC. Scope of supply includes freight, installation supervision and start-up services. Equipment selection is based upon the use of Aqua -Aerobic Systems' standard materials of construction and electrical components, suitable for non -classified electrical environments. - The basin dimensions reported on the design have been assumed based upon the required volumes and assumed basin geometry. Actual basin geometry may be circular, square or rectangular with construction materials including concrete or steel. The control panel does not include motor starters or VFDs, which should be provided in a separate MCC (by others). Provisions should be made, by others, for overflows in each of the recommended basins. - Aqua -Aerobic Systems, Inc. is familiar with various "Buy American" Acts (i.e. AIS, ARRA, Federal FAR 52.225, EXIM Bank, USAid, PA Steel Products Act, etc.). As the project develops Aqua -Aerobic Systems can work with you to ensure full compliance of our goods with various Buy American provisions if they are applicable/required for the project. When applicable, please provide us with the specifics of the project's "Buy American" provisions. Printed: 01/10/2023 9:37:06AM Aqua -Aerobic Systems, Inc. CONFIDENTIAL Page 3 of 5 Project ID: 116566 - WILKESBORO WWTP NC / Design#: 170014 Influent Buffer - Design Summary Design#: 170014 Project: WILKESBORO WWTP NC Option: Plans and Specs Design AQUA -AEROBIC SYSTEMS, INC. Designed by Vedansh Gupta on Monday, January 9, 2023 1&. A Metawater Company INFLUENT BUFFER DESIGN PARAMETERS Avg. Daily Flow: = 8.00 MGD = 30,283 m3/day Max. Daily Flow: = 14.20 MGD = 53,753 m3/day No. of AGS Reactors: =3 INFLUENT BUFFER VOLUME DETERMINATION The volumes determined in this summary reflect the minimum volumes necessary to achieve the desired results based upon the input provided to Aqua. If other hydraulic conditions exist that are not mentioned in this design summary or associated design notes, additional volume may be warranted. INFLUENT BUFFER BASIN DESIGN VALUES No./Basin Geometry: = 1 Circular Basin(s) Diameter of Basin: = 100 ft = 30.5 m Min. Water Depth: = 3.0 ft = 0.9 m Max. Water Depth: = 14.1 ft = 4.29 m Max. Basin Vol. Basin: = 826,166 gallons = (3,127 ml) INFLUENT BUFFER EQUIPMENT CRITERIA Mixing Energy with Mixers: = 10 HP/MG = (2.0 W/m3) Min. Basin HP Recommended = 40 Max. Flow Rate Required Basin: = 12,660 GPM = (2,875 m'/hr) Avg. Power Required: = 1,595 kWhr/day Printed: 01/10/2023 9:37:13AM Aqua -Aerobic Systems, Inc. CONFIDENTIAL Page 4 of 5 Project ID: 116566 - WILKESBORO WWTP NC / Design#: 170014 AquaNereda° - Aerobic Granular Sludge Reactor - Design Summary Design#: 170014 Project: WILKESBORO WWTP NC Option: Revised Preliminary AGS Design AC+UA-AEROBIC SYSTEMS, INC. Designed by Vedansh Gupta on Monday, January 9, 2023 ® A Metawater Company DESIGN INFLUENT CONDITIONS Avg. Design Flow = 8.00 MGD = 30,283 m3/day Max Design Flow = 14.20 MGD = 53,753 m3/day DESIGN PARAMETERS Effluent Influent mg/I Required - mg/I Anticipated - mg/I Bio/Chem Oxygen Demand: BOD5 431 BOD5 10 BOD5 10 Total Suspended Solids: TSS 246 TSS 10 TSS 10 Total Kjeldahl Nitrogen: TKN 44 TKN TKN NH3-N NH3-N 2 NH3-N 2 Total Nitrogen: TN 8.5 TN 8.5 Phosphorus: Total P 24.4 Total P 4.5 Total P 4.5 SITE CONDITIONS Maximum Minimum Elevation (MSL) Ambient Air Temperatures: 100 F 38.0 C 32 F 0.0 C 1,050 ft Influent Waste Temperatures: 79 F 26.0 C 54 F 12.0 C 320.0 m AGS BASIN DESIGN VALUES Water Depth Basin Vol./Basin No./Basin Geometry 3 Rectangular Basin(s) Process Level (PWL) 21.0 ft (6.4 m) 1.29 MG (4,895 m3) Freeboard (from PWL) 3.3 ft (1.0 m) Discharge Level (DWL) 22.8 ft (7.0 m) Length of Basin: 105.5 ft (32.2 m) Width of Basin: 78.0 ft (23.8 m) PROCESS DETAILS Cycle Duration: Food/Mass (F/M) ratio: MLSS Concentration: Hydraulic Retention Time: Solids Retention Time: Est. Net Sludge Yield: Est. Dry Solids Produced: AERATION DETAILS Lbs. 02/lb. BOD5 Lbs. 02/lb. TKN Peak 02 Factor: Actual Oxygen Required: Max. Discharge Pressure: Max. Air Flowrate/Basin: Min. Air Flowrate/Basin: Max. Simultaneous Air: Min. Simultaneous Air: RETURN FLOW ESTIMATES Daily Estimated Return Flow: Max. Instantaneous Return Flow: POWER CONSUMPTION Average Aeration Power Consumption: = 4.0 Hours/Cycle = 0.125 lbs. BOD5/lb. MLSS-Day = 8000 mg/I = 0.48 Days = 13.2 Days = 0.58 Lbs. WAS/lb. BOD5 = 16706.0 lbs. WAS/Day = 1.25 = 4.60 = 1.16 = 57361 lbs./Day = 10.89 PSIG = 7,760 SCFM = 1,940 SCFM = 12,882 SCFM = 4,418 SCFM = 1.91 MGD = 1,326 GPM = 7,524 kWh/day (at 72% design load) = (7577.8 kg/Day) = (26018.8 kg/Day) = (75 KPA) Printed: 01/10/2023 9:37:15AM Aqua -Aerobic Systems, Inc. CONFIDENTIAL Page 5 of 5 Project ID: 116566 - WILKESBORO WWTP NC / Design#: 170014 Town of Wilkesboro I Wilkesboro Cub Creek Wastewater Treatment Plant Basis of Design Report ��� Appendix B — Design Calculations for Solids Dewatering Equipment Appendix B — Design Calculations for Solids Dewatering Equipment This page intentionally left blank. Design Calculations for Solids Dewatering Equipment Wilkesboro Cub Creek WWTP Expansion and Upgrade Wilkesboro, NC September 26, 2022 9�a�Iaaaa HDR Engineering, Inc. of the Carolinas 100 North Main Street, Suite 1500, Winston-Salem, NC 27101 336- 955-8250 NC License F-0116 This page intentionally left blank. FN Memo Date: Monday, September 26, 2022 Project: Wilkesboro Cub Creek WWTP Expansion and Upgrade To: Town of Wilkesboro From: HDR Subject: Design Calculations for Solids Dewatering Equipment Background of Solids Treatment Process For waste solids treatment, the Town of Wilkesboro operates three aerobic digesters, which are operated in series. The aerobic digesters are fitted with a diffused aeration system, with air supplied by four 75 HP blowers. Following digestion, waste sludge is pumped from Digester No. 3 to the dewatering building utilizing a self -priming pump station installed on an elevated platform adjacent to Digester No. 3. The pump station is a duplex configuration using Gorman - Rupp T-4 pumps. One original Huber Technology (Huber) Q-Press® Model 800 screw press is operated for dewatering waste sludge. This unit was purchased used from Huber and had previously been operated by Charlotte Water for demonstration testing. A Velodyne polymer activation system is also operated for sludge conditioning prior to dewatering. The Huber press and Velodyne polymer system are installed in the dewatering building, which has floor space reserved for a future parallel dewatering unit. Dewatered biosolids are disposed of in the Wilkes County landfill. As part of the WWTP upgrade and expansion, two parallel Huber Q-Press® Model 800.2HC units will be installed for sludge dewatering, replacing the existing model 800 unit. The model 800.2HC Q-Press® is a new generation, high -capacity press rated for a maximum flow of 125 GPM (based upon a WAS influent of 1 percent solids). The floor space required for the model 800.2HC unit is nearly the same as the existing press. Design Basis and Calculations Table 1 summarizes the average daily and maximum month design flows. The proposed NPDES permit will be for an 8 MGD facility but proposed improvements to the solids treatment process will be designed and implemented in phases. Table 1. 10-Year Progression of Flows into Wilkesboro Cub Creek WWTP Year Annual Average Flow (MGD) Max Month Flow (MGD) Phase 1 - 2022 4.2 4.6 Phase 2 - 2032 5.8 7.1 Phase 3 - 2042 6.6 8 100 North Main Street, Suite 1500, Winston-Salem, NC 27101-4015 (336) 955-8250 FN Table 2 summarizes the maximum month concentration and associated loads for the Phase 1 (4.2 MGD) through the Phase 3 (8 MGD) solids dewatering expansions. The design concentrations are based on a combination of the Town's municipal flow and Tyson Foods' DAF effluent flow sampling and historic data. Table 2. Proposed Solids Design Concentrations and Loads Parameter BODS TSS MM Concentration, m /L 400 214 MM Load, lb/day (4.6 MGD) 15,346 8,210 MM Load, lb/day 7.1 MGD 23,686 12,672 MM Load, lb/day 8 MGD 26,688 14,279 Based on these design concentrations and loads, HDR recommends the following solids equipment in three phases as indicated in Table 3 assuming that dewatering will be occurring for 16 hours per day 7 days per week. Table 3. Proposed Solids Equipment Phasing Parameter Solids Dewatering Screwpress Required* Solids Disc Thickeners Required* Solids Loading Rate of Units 486 Ib/hr 650 Ib/hr Phase 1 - 2022 2 None Phase 2 - 2032 3 3 Phase 3 - 2042 3 3 *Required equipment accounts for one redundant unit Attachment 1 contains the calculations for Phase 1, Phase 2, and Phase 3. Additionally, Attachments 2 has the dewatering proposal. HDR proposes installing two Huber model 800.2HC Q-Press® units. Two new Penn Valley sludge lift pumps will be used to transfer thickened WAS from the aerobic digesters to the solids dewatering building. These pumps will directly feed the Q-Press units, which will eliminate the need for the existing progressive cavity pumps. Associated calculations and the vendor proposal are in Attachments 3 and 4. 100 North Main Street, Suite 1500, Winston-Salem, NC 27101-4015 (336)955-8250 FN 100 North Main Street, Suite 1500, Winston-Salem, NC 27101-4015 (336) 955-8250 This page intentionally left blank. FN Cub Creek W WTP Solids Stream Tracking Condition Flow rate MGD AA F&L 4.2 MM F&L 4.6 177 214 TSS conc. mg/L SOD conc. mg/L 330 400 11,532 15,346 BOD load Ib/d Yield Ib TSS/lb BOD 0.61 0.69 7,034 10,588 WAS prod. Ib dry TSS/d Ratio dry TSS/MGD 1,679 2,302 5,276 1,759 7,941 2,647 Secondary WAS Volatile lb dry VSS/d Treatment WASS Inerts lb dry SS/d WAS solids % 0.8% 0.82 WAS volume gpd 105,431 158,700 WAS flow rate, continuous basis gpm 73 110 Max WAS pumpoul rate gpm 435 435 Wasting events per day vents 18 18 WAS pumpoul time min per event 13.5 20.3 Operating Volume of Digester gal 601,658 601,658 Number of Digesters (Count) 1 1 Decant volume gpd 30000 60000 Digestate flow rate gpd 75,431 98,700 Percent Flow to Thickener % 0.0% 0.0% Effective TWAS solids % 5.0% 5.0% Flow to Thickener gpd 0 0 Load to Thickener lb dry TSS/d 0 0 Filtrate/Decant volume gpd 30,000 60,000 Digester 1 TWgS volume gpd 0 0 TWAS flow rate, continuous basis gpm 0 0 TWAS TSS load Ib dry TSS/d 0 0 Digester Influent VSS content % of TSS 75% 75% Digester VSS destruction % 15% 15% Digestate output solids % 0.99% 1.14% Digestate TSS load lb dry TSS/d 6,243 9,397 VSS destruction lb dry VSS/d 791 1,191 Oxygen Demand Ib/hr 66 99 Blower Flow Rate scfm Operating Volume of Digester gal 601,658 601,658 Number of Digesters (Count) 1 1 Decant volume gpd 30000 60000 Digestate flow rate gpd 45,431 98,700 HRT, feed flow basis days 8.0 6.1 HRT, digestate flow basis days 8.0 3.8 Digester WAS VSS content % of TSS 72% 72% Digester VSS destruction % 20% 20% Digestate solids % 0.85% 0.98% Digestate TSS load lb dry TSS/d 5,346 8,047 VSS destruction lb dry VSS/d 897 1,350 Oxygen Demand Ib/hr 75 113 Operating Volume of Digester gal 601,658 601,658 Number of Digesters (Count) 1 1 Decant volume gpd 15000 30000 Digestate flow rate gpd 30,431 68,700 HRT, feed flow basis days 13.2 6.1 HRT, digestate flow basis days 13.2 6.1 Digester 3 WAS VSS content Digester VSS destruction Digestate Output solids Digestate TSS load VSS deslmclion Oxygen Demand Blower Flow Rate 72%� 768 � lb dry VSS/d lb/hr� � sofm -- Overall VSS destruction % SRT d 29.2 17.9 Dewatering Unit Hydraulic loading gpm 97 97 486 486 Dewatering Unit Solids Loading Ib/hr Capture Rate % 95 95 12 1 Dewatering Tme hours Dewatering Schedule Days/Wk 7 7 System Solids Loading It, TSS dry/hr 382 431 System Hydraulic Loading gpm Number of Units Needed Out + 1 Standby 42 2 72 2 Phase 1 Solids Calculations Number of Units (Solids limit) Dewatering Number Units Needed (duty only) y #/d #/d 0.78 1 0.89 1 Number of Dewatering Units Dewatering Unit Output Solids % 20% Cake volume gpd 2,681 Filtrate volume gpd 43,500 Dewatering Unit Output Solids Ibs TSS wet/d 16,099 Dewatering Unit Output Solids tons wet/d 8 Dewatering Unit Output Solids Ibs TSS dry/d 3,220 Dewatering Unit Output Solids tons dry/d 2 Dewatering Unit Output Solids tons dry/yr 58811,47 Dewatering Unit Output Flow cyd 22 Effective Weight on Hauling Days Ibs TSS wet/d 1fi,099 40,236 Effective Weight on Hauling Days Ibs TSS dry/d 1 3,2201 8,047 Effective Volume on Hauling Days cy 22 33 Hauling Maximum Volume cy 18 18 Hauling Maximum Weight Ibs 40,000 40,00 Hauling Number Tracks Needed #/d 2 2 Number of bucks (volume limit) #/d Number of tracks (weight limit) #/d 100 North Main Street, Suite 1500, Winston-Salem, NC 27101-4015 (336) 955-8250 FN Cub Creek W WTP Solids Stream Tracking Condition AAFBL MMF&L Phase 2 Solids Calculations Flow rate MGD 5.8 7.1 TSS cone. mg/L 177 214 BOD cone. mg/L 330 400 BOD load b/d 15,963 23,686 Yield It, TSS/Ib SOD 0.61 0.69 WAS prod. Ib dry TSS/d 9,737 16,343 Ratio dry TSS/MGD 1,679 2,302 Secondary WAS Volatile It, dry VSS/d 7,303 12,257 Treatment WASS Inerts Ib dry SS/d 2,434 4,086 WAS solids % 0.8% 0.8°0 WAS wluma gpd 145,943 244,950 WAS flow rate, continuous basis gpm 101 170 Max WAS pumpout rate gpm 435 435 Wasting events per day events 18 18 WAS pumpout time min per event 18.6 31.3 Operating Volume of Digester gal 601,658 601,658 Number of Digesters (Count) 1 1 Decant volume gpd 0 0 Digestate flow rate gpd 145,943 244,950 Percent Flow to Thickener % 60.0% 60.0% Effective TWAS solids % 5.0% 5.0% Flow to Thickener gpd 87,566 146,970 Load to Thickener Ib dry TSS/d 5,842 9,806 First Digester Filtrate/Decant volume gpd 73,555 123,455 and TWAS wlume gpd 14,010 23,515 Thickening TWAS flow rate, continuous basis gpm 10 16 Blend TWAS TSS load It, dry TSS/d 5,842 9,806 Effective Digester Input Solids % 1.61 % 1.61 Digester Influent VSS content %of TSS 75% 75% Digester VSS destruction % 15% 15% Digestate output solids % 1.43% 1.43% Digestate TSS load lb dry TSS/d 8,642 14,504 VSS destruction It, dry VSS/d 1,095 1,839 Oxygen Demand Ib/hr 91 153 Blower Flow Rate sclm Thickening Unit Hydraulic loading gpm 97 97 Thickening Unit Solids Loading Ib/hr 650 650 Capture Rate % 95 95 Thickening Time hours 24 24 Thickening Schedule Days/Wk 7 7 Thickeners System Solids Loading lb TSS dry/hr 243 409 Needed System Hydraulic Loading gpm 61 102 Number of Units Needed Duty+ 1 Standby 2 3 Number of Number of Units (Solids limit) #/d 0.37 0.63 Thickeners Number of Units H dmulic limit #/d 0.63 1.05 umber rats Bede duty only) d Operating Volume of Digester gal 601,658 601,658 Number of Digesters (Count) 1 2 2 Decant volume gpd 0 0 Digestate flow rate gpd 72,387 121,495 HRT, feed flow basis days HRT, digestate flow basis days 16.6 9.9 Aerobic Digestion WAS VSS content %of TSS 72% 72% Digester VSS destmction % 20% 20% Digestate solids % 1.23% TSS load Ib dry TSS/d 7,400 VSS destruction Ib dry VSS/d 1,242 �211,Digestate Oxygen Demand Ib/hr 103 Blower Flow Rate set. Overall VSS destruction % SRT d 24.9 14.9 Dewatenng Unit Hydraulic loading gpm 97 97 Dewatering Unit Solids Loading Ib/hr 486 486 Capture Rate % 95 95 Dewatering Time hours 16 1 Dewatering Schedule Days/Wk 7 7 System Solids Loading It, TSS dry/hr 463 776 System Hydraulic Loading gpm 75 127 Number of Units Needed Duty 1 Standby 2 3 Number of Number of Units (Solids limit) #/d 0.95 1.60 Dewatering Dewatering umber Units Needed (duty only) #/d 1 2 Units Dewatenng Unit Output Solids % 20% 20°7 Cake volume gpd 6,162 10,3421 Filtrate volume gpd 67,951 114,049 Dewatering Unit Output Solids Ibs TSS wet/d 37,002 62,104 Dewatering Unit Output Solids tons wet/d 19 Dewatering Unit Output Solids Ibs TSS dry/d 7,400�Nl' DewateringUnitOutput Solids tons dryld 4Dewatering Unit Output Solids tons drylyr 1,351Dewatering Unit Output Flow cyd 30 Effective Weight on Hauling Days be TSS wet/d 37,002 62,104 Effective Weight on Hauling Days Ibs TSS dry/d 1 7,4001 12,421 Effective Volume on Hauling Days cy 1 301 51 Hauling Maximum Volume cy 18 18 Hauling Maximum Weight be40,000 40,00 Hauling Number Tracks Needed #/d 2 3 Number of trucks (wlume limit) #/d 1.69 2.84 Number of tracks (weight limit) #/d 0.93 1.55 100 North Main Street, Suite 1500, Winston-Salem, NC 27101-4015 (336) 955-8250 FN Cub Creek W WTP Solids Stream Tracking Condition AA F&L MIA F&L Flow rate MGD 6.6 8 TSS cone. mg/L 177 214 BOD cone. mg/L 330 400 BOD load b/d 18,165 26,688 Yield It, TSS/Ib SOD 0.61 0.69 WAS prod. Ib dry TSS/d 11,080 18,415 Ratio dry TSS/MGD 1,679 2,302 Secondary WAS Volatile It, dry VSS/d 81310 13,811 Treatment WASS Inerts Ib dry SS/d 2,770 4,604 WAS solids % 0.8� WAS volume gpd 166,073 276,000 WAS flow rate, continuous basis gpm 115 192 Max WAS pumpout rate gpm 435 435 Wasting events per day events 18 18 WAS pumpout time min per event 21.21 35.2 Operating Volume of Digester gal Number of Digesters (Count) Decant volume gpd Digestate flow rate gpd Percent Flow to Thickener Effective TWAS solids Flow to Thickener Load to Thickener First Digester Filtrate/Decant volume and TWAS volume Thickening TWAS flow rate, continuous basis Blend TWAS TSS load Effective Digester Input Solids Digester Influent VSS content Digester VSS destruction Digeslate output solids Digeslate TSS load VSS destruction Oxygen Demand Blower Flow Rate Thickening Unit Hydraulic loading Thickening Unit Solids Loading Capture Rate Thickening Time Thickening Schedule Thickeners System Solids Loading Needed System Hydraulic Loading Number of Units Needed gpd Ib dry TSS/d gpd gpd gpm It, dry TSS/d % of TSS It, dry TSS/d It, dry VSS/d Ib/hr sctm 611,658 611,658 1 1 0 0 166,073 276,000 60.0% 60.0% 5.0% 5.0% 99,644 165,600 6,648 11,049 83,701 139, 164 15,943 26,496 11 18 6,648 11,049 1.61% 1.61% 75% 75% 15% 15% 1.43% 1.43% 9,834 16,343 1,247 2,072 104 173 gpm 97 97 Ib/hr 650 650 % 95 95 hours 24 24 Days/Wk 7 7 lb TSS dry/hr 277 460 gpm 69 115 Duty +l Standby 2 3 Phase 3 Solids Calculations Number of Number of Units (Solids limit) #/d 0.43 0.71 umber Units Needed(duty only) 1 2 Thickeners #/d Operating Volume of Digester gal 601,658 601,658 Number of Digesters (Count) 1 2 2 Decant volume gpd 0 0 Digeslate flow rate gpd 82,372 136,896 HRT, feed flow basis days HRT, digestate flow basis days 14.6 8.8 Aerobic Digestion WAS VSS content %of TSS 72% 72% Digester VSS destmction % 20% 20% Digest ate solids % 1.23% 1.23% Digestate TSS load Ib dry TSS/d 8,421 13,995 VSS destmction Ib dry VSS/d 1,413 2,348 Oxygen Demand Ib/hr 118 196 Blower Flow Rate set. Overa11 VSS destruction % SRT d 21.9 13.2 Dewatedng Unit Hydraulic loading gpm 97 97 Dewatedng Unit Solids Loading Ib/hr 486 486 Capture Rate % 95 95 Dewatedng Time hours 16 1 Dewatedng Schedule Days/Wk 7 7 System Solids Loading lb TSS dry/hr 526 875 System Hydraulic Loading gpm 86 143 Number of Units Needed Duty + 1 Standby 3 3 Number of Units (Solids limit) #/d 1.08 1.80 Number of Dewatedng 17 Dewate ri n g Units umber U n i Needed (duty only) Wd 2 2 Dewatedng Unit Output Solids % 20 % 20°o Cake volume gpd 7,012 11,65 Filtrate volume gpd 77,323 128,506 Dewaterng Unit Output Solids Ibs TSS wet/d 42,105 69,976 Dewatedng Unit Output Solids tons wet/d 21 35 Dews Unit Output Solids Ibs TSS dry/d 8,421 33,995 Dewatedng Unit Output Solids tons dry/d 4 7 Dewatedng Unit Output Solids tons dry/yr 1,538 2,556 Dewatedng Unit Output Flow cyd 35 5 Effectiw Weight on Hauling Days be TSS wet/d 42,105 69,976 Effective Weight on Hauling Days Ibs TSS dry/d 1 8,4211 13,995 Effective Volume on Hauling Days cy 35 58 Hauling Maximum Volume cy 18 18 Hauling Maximum Weight be 40,000 40,00 Hauling Number Tracks Needed #/d 2 4 Number of tracks (volume limit) #/d 1.03 3.20 Number of tracks (weight limit) Xcl 1.05 1.75 100 North Main Street, Suite 1500, Winston-Salem, NC 27101-4015 (336) 955-8250 This page intentionally left blank. FN 100 North Main Street, Suite 1500, Winston-Salem, NC 27101-4015 (336) 955-8250 This page intentionally left blank. Wilkseboro , " Equipment: HUBER Screw Press Q-PRESS 800.21 Represented by: Premier Water Max Foster (704) 523-4048 max@premier-water.com Regional Sales Director: Steve Frank 704-330-9378 Steve.Frank@hhusa.net Project Number: 468130 Revision: 0 Date: 6/28/2022 HUBER WASTE WATER Solutions Note: This proposal is for budget purposes only and is subject to change based on current and future market conditions. HUBER Technology, Inc. 1009 Airlie Pkwy, Denver, NC 28037 704-949-1010 1 www.huber-technology.com Design Information HUBER ins.. WASTE WATER 5.1,h s Technical Data., Sludge Type Aerobically Digested Granular Sludge Upstream Biological Process Aqua Nereda Upstream Digestion Process Aerobic Digester with 30 day sludge age Design Feed Rate (given) 486 Design Feed Rate (calculated) 79 Feed Sludge Concentration 1.23 Sludge TDS 800 Sludge VSS <64 Sludge pH 7.1 Chloride Concentration 50 Phosphate Concentration 25 Nominal Hydraulic Loading Capacity (per unit) 79 at 1.23% feed solids Nominal Solids Loading Capacity (per unit) 486 at 1.23% feed solids Estimated Cake Solids' 16-20 Capture Rate' >_95 Estimated Polymer Consumption' 23-34 lb active polymer/dry ton of sludge Average Spray Wash Water Requirement' 84 gph at 72.5 psi Spray Water Connection 1.25 Sludge Inlet Diameter 6 Approximate Screw Press Empty Weight 8200 Approximate Screw Press Full Weight 10100 'All performance is estimated based on typical screw press performance. In order to guarantee performance Huber must run a pilot test. 'Wash water cycle runs at approximately 33 gpm for 152 seconds. Typical applications experience 1-2 wash cycles per hour. Equipment Details Quantity Material Basket Material Auger Inclination Support Legs Wiper Material Anchor Bolts Motor Data Spraywash Motor Data Polymer Injection Control Details 2 304L stainless steel construction; pickled and passivated in acid bath Wire mesh; 304L stainless steel 10, 304L stainless steel Wear resistant polyurethane M12, 316L stainless steel 5 hp drive motor, 460 VAC, 60 Hz, 3 ph 0.25 hp spraywash motor, 460 VAC, 60 Hz, 3 ph Polymer injection ring and mixing device (upstream of flocculation reactor) Enclosure NEMA 4X, Stainless Steel PLC Allen Bradley CompactLogix HMI Allen Bradley PanelView 7" Pre-programmed and Factory Tested Ib/hr gpm mg/L SU mg/L mg/L gpm Ib/hr inch inch Ibs Ibs n Page 2 Pricing HUBER WASTE WATER 5.1,h s Equipment HUBER Screw Press HUBER's Standard Polymer Blending System HUBER Control Panel Freight and Startup Services Ancillary Equipment Q-PRESS 800.2® 2 Velodyne VM-3P-600-D 2 HUBER Standard 2 Standard HUBER Start-up Services 6 days, 2 trips TOTAL: HUBER Screw Conveyor (Cake) Ro8T 273, 12 ft length 1 Standard delivery is 26-36 weeks from approval of submittals. Included Included Included Included $890,000.00 $30,000.00 Thank you for your interest in HUBER Technology, Inc. If you have any questions, please do not hesitate to contact our Regional Sales Director or our local sales representative. This proposal has been reviewed for accuracy and approved for issue by: JLH Notes and Technical Clarifications 1. Equipment specification and drawings are available upon request. 2. If there are site -specific hydraulic constraints that must be applied, please consult the manufacturer's representative to ensure compatibility with the proposed system. 3. Electrical disconnects required per local NEC code are not included in this proposal. 4. All electrical interconnections, wirings, junction boxes, and terminations between the equipment and electrical components are to be provided by installing contractor. 5. Huber Technology warrants all components of the system against faulty workmanship and materials for a period of 12 months from date of start-up or 18 months after shipment, whichever occurs first. 6. Budget estimate is based on Huber Technology's standard Terms & Conditions and is quoted in US dollars unless otherwise stated. 7. Equipment recommendations are based on information provided to Huber Technology. Subsequent information which differs from what has been provided may alter the equipment recommendation. g. Any item not specifically listed is not considered part of this scope of supply. Please contact the HUBER Technology representative listed for further clarification. 9. Sludge feed pump and flow meter shall be controlled by the Huber control panel even if provided by others. 10. Pricing shown in this proposal is valid for 30 days from the date shown on this proposal. 11. Blue motor covers are aesthetic only, and have not been included in this budgetary quote. Page 3 This page intentionally left blank. FN 100 North Main Street, Suite 1500, Winston-Salem, NC 27101-4015 (336) 955-8250 This page intentionally left blank. Wilkesboro WWTP Expansion - WAS Pumps CRITERIA VALUE UNITS CRITERIA VALUE UNITS COMMENTS 100 GPM 943.00 FT Bottom of Digester 0.1 MGD 959.00 FT T from Top of Wall 0.2 CFS 0 PSI Open to Atm (wet well) 379 U min 963.50 FT 22,712 UhrICZE 986.67 FT manna= 986.67 FT 35 PSI Set to Required Mixing Pressure CRITERIA VALUE UNITS 200 20.50 FT 150 127.65 4.50 FT E 27.67 FT o loo 43.67 FT ~ 50 loo 80.73 FT 0 100 200 300 400 Soo FLOW RATE (GPM) Pump Suction /Pump Discharge I Sys Discharge: Percent of Flow Rate: % 11 • . 11 • . 11 • . ------------ Flow Rate: gpm 11 11 11 ----------- Flow Rate Conversion (ref���----------- Pipe Diaq�-000------------ - Hazen-Willi�m--------------- Velocity:®®®-----------� - Reynolds Number: Flow T�_���------------ �iinu Crir/inn 1 nccnc hf �- ���------------ 1 1 ® 1 1 • ------------ Other/Artificial L--------------- Clean Water SYSTEM RESULTS Low High jjjjjjU Suction Loss�egl' - Discharge LosM-�® $ysteRl,�- Total Frictio�-�® 1 11 1 11 -�� -MPTPZ�� L Number of Pumps 0 jjk6[otal System Flow: 1 1 Flow per Pump: 1 1 KR Valve/Fitting Low High Coeff. Coeff. Override 15' Mitered Bend ��- 22.5' Mitered Bend - 30o Mitered Bend ��- 45' Mitered Bend ��- 60' Mitered Bend ��- 90o Mitered Bend - 90o Bend, R/D=1 ��- 90' Bend, R/D=2 ��- 90' Bend, RID=4 ��- 45' Standard Bend- 90o Standard Bend ��- 90' Long Radius Bend Return Bend, Standard ��- Angle Valve ��- Ball Valve ��- Butterfly Valve, 150-lb Class ��- Check Valve, Ball ��- Check Valve, Double Door (> 8 IN) - Check Valve, Double Door (10-16 IN) - Check Valve, Globe ��- Check Valve, Slanting Disc ��- Check Valve, Swing ��- Cone Valve Diaphragm/Pinch Valve ��- Gate Valve ��- Gate Valve, Three Quarters Open ��- Gate Valve, Half Open - Gate Valve, One Quarter Open ®®- Gate Valve, Double Disc ��- Gate Valve, Knife Metal Seat ��- Gate Valve, Knife Resilient Seat ��- Gate Valve, Resilient Seat ��- Globe Valve m�- Plug Valve, Ecc. (100 % Open) ��- Plug Valve, Ecc. (80 % Open) ��- Tee, Branch Flow ��- Tee, Line Flow ��- Cross, Branch Flow ��- Cross, Line Flow ��- Wye - Line Flow ��- Wye, Branch Flow ��- Contraction - Conical D2/D1 = 0.20 � Contraction - Conical D2/D1 = 0.50 ��- Contraction - Conical D2/D1 = 0.80 Contraction - Sudden D2/D1 = 0.20 Contraction - Sudden D2/D1 = 0.50 ��- Contraction - Sudden D2/D1 = 0.80 Expansion -Conical D2/D1 = 0.20 Expansion -Conical D2/D1 = 0.50 - Expansion -Conical D2/D1 = 0.80 Expansion - Sudden D2/D1 = 0.20 Expansion - Sudden D2/D1 = 0.50 ��- Expansion - Sudden D2/D1 = 0.80 ��- Entrance, Bell -Mouth ��- Entrance, Square Edged ��- Entrance, Projecting - Entrance, Rounded Exit�1I �10 - A�TTINGS CORRESPONDING TO EACH SECTION OF PIPELINE BELOW 4 5 6 7 8 9 10 11 12 13 14 15 P-Suction P-Discharge P _ __ Not Used Not Used Not Used Not Used Notused Not Usetl Not Used Not Usetl Not Used Not Usetl Not Used I Not Used Wilkesboro WWTP Expansion - WAS Pumps 200 180 160 F 140 LL_ 0 Q 120 W 2 _U Q 100 Z 0 J Q 80 F O F 60 40 20 0 -50 ction iction iction iction 50 150 250 650 750 FLOW RATE (GPM) GRAPH PREFERENCES GRAPH CONDITIONS Q PSI ON/OFF? 0 PUMP ON/OFF? O MGD ON/OFF? Penn Valley_6DDSX78_6_15HP ❑ STATIC HEAD LABEL? - NUMBER OF PUMPS ❑✓ DESIGN POINT ON/OFF? ❑✓ REDUCED SPEED ON/OFF? — ❑ TRIM IMPELLER ON/OFF? CLEANR / DIRTY WATER Q CLEAN WATER I# DIRTY WATER SYSTEM CURVE PREFERENCES ❑� Min. Static Head (Low) ❑� Max Static Head (Low) ❑✓ Min Static Head (High) ❑� Max Static Head (High) ❑ SAFETY FACTOR 3% KR This page intentionally left blank. FN Sludge Lift WAS Pump 100 North Main Street, Suite 1500, Winston-Salem, NC 27101-4015 (336) 955-8250 This page intentionally left blank. Note: This proposal is for budget purposes only and is subject to change based on current and future market conditions. To: Nelson Heringer HDR Date: 5/11/2022 Quote No: 22111 Project: Town of Wilkesboro Quoted by: Trevor Lawson Qty Description Unit Price Total Price Application: WAS to Thickener (2% Solids Duty: Primary: 80GPM @ 99ft TDH (16ft Static head) Max: 120GPM @ 117ft TDH (32ft static Head) Max Duty point for tank drain Suction: Primary: 4.5ft suction lift; Max: 20.5ft lift, 21ft long suction piping, 6" dia suction pi e suggested Proposed E ui ment: 2 6" Model 6DDSX76CNU-MK2 Penn Valley Double Disc PumpTM unit: $30,400.00 $60,800.00 • 6" ASA/ANSI 150# flanged suction and discharge connections • Cast iron housing and neoprene elastomers • Maintain -in -place hinged housing design for ease of maintenance • Two-piece swan neck design with full port rigid clack valve • 15HP, 1160RPM 230-460/3/60 Severe duty, inverter ready motor • 20ORPM Nominal pump speed achieved with V-belt and pulley drive • Suction and Discharge pulsation dampeners \� • 304SS Welded base with OSHA approved guards and covers I • Pump and dampeners coated with industrial primer and topcoat • Per drawing PVD769 Side motor mount Application: Recuperative Thickening (1.5% Solids) Duty: Prima : 65GPM 18ft TDH Max: 130GPM 20ft TDH Suction: 4.5ft Suction lift, 21ft Long, 6" dia suction pipe suggested 1 6" Model 6DDSX76CNU-MK2 Penn Valley Double Disc PumpTM unit: $29,200.00 $29,200.00 • 6" ASA/ANSI 150# flanged suction and discharge connections • Cast iron housing and neoprene elastomers • Maintain -in -place hinged housing design for ease of maintenance • Two-piece swan neck design with full port rigid clack valve • 7.5HP, 1160RPM 230-460/3/60 Severe duty, inverter ready motor • 150RPM Nominal pump speed achieved with V-belt and pulley drive • Suction and Discharge pulsation dampeners • 304SS Welded base with OSHA approved guards and covers • Pump and dampeners coated with industrial primer and topcoat • Per drawing PVD769 Side motor mount 3 Adder for Piggyback Motor Frame per drawing PVD728 (If required) $1,430.00 $4,290.00 3 Model PVP420PS Discharge pressure switch assembly consisting of: 1" NPT SS316 sensor $1,190.00 $3,570.00 w/ EPDM sleeve, NEMA 4X adjustable switch and 4" (0-100psi) SS gauge. Mounts to top of dampen r to protect against over pressurization. Must be wired to pump controls. 1 Days of start-up and training services(one-trip) $1,000.00 $1,000.00 17,77 Estimated transport to site. Estimated weight of shipment is 2,000lbs. 1 $1,500.00 1$1,500.00 Page 1 Penn Valley Pump Co, Inc. - www.pennvalleVpump.com - 1-800-311-3311 World Leader in Free -Disc Pumping Technology Optional: 1 Set of recommended spare parts to include: two (2) discs, two (2) trunnions, one (1) clack valve and one 1 set of gaskets $2,800.00 $2,800.00 Commercial Information: 1. Shipment is 10 - 12 weeks after receipt of purchase order or approved submittals. 2. Submittals, if required, are 2 — 3 weeks after receipt of purchase order. 3. Freight terms are F.O.B. Factory, Warrington, PA with freight allowed to jobsite. 4. Terms are Net 30 days after receipt of invoice. 5. Quotation is valid for 60 days from date of issue. 6. Warranty is two (2) years from date of shipment for manufacturer's defects in materials and workmanship. The following items have not been included: • Installation • Foundations, anchor bolts, grouting and foundation design • Motor starters, Variable Frequency Drives (VFD's) or Controls Ael[ A &MK ANNIVERSARY 1980 To 2020 Page 2 Penn Valley Pump Co, Inc. - www.pennvalleVpump.com - 1-800-311-3311 World Leader in Free -Disc Pumping Technology Design Notes • Suction Piping Design: It is imperative that the application has a properly designed suction piping system based on the hydraulic conditions. The importance of a properly sized system cannot be over emphasized. Most pump operational problems and pump failures are created by improper suction line conditions. The length and diameter of the suction line along with the static suction conditions must be provided to ensure pump(s) are properly sized. The system must be designed for the maximum flow if multiple pumps will operate simultaneously through common suction piping. PVP will run the appropriate calculations and verify the application. Piping_ All piping should be independently supported near the pump so that pipe strain will not be transmitted to the pump. The use of pipe hangers/supports must rigidly support and laterally brace the piping to prevent pipe movement. Adequate support and bracing close the pump is the best method to prevent pipe movement. We do NOT recommend the use of flexible connections/expansion joints on the suction and discharge connections of the pump. Our long-term experience has found these items do not reduce vibration, but rather can allow pipe movement since the connections are not rigid. To maximize the pump's "Maintain -in -Place" design the suction flange should be attached rigidly to the suction piping. The use of slip joints and mechanical pipe joining systems (i.e. Victaulic style) is also highly discouraged. These mechanical systems do not provide the same rigid connections as traditional flanged piping systems. These mechanical systems can be difficult to properly brace leading to pipe vibration issues. If mechanical piping joining systems will be used, the engineer, contractor or owner must ensure the manufacturer's installation method for Ligidp�pe cutting and coupling connections is strictly adhered to. • Check Valves: The use of check valves is required when there are multiple double disc pumps connected to a common discharge line or the pump will be installed on a common discharge line with other styles of pumps. If a check valve is required for the application, we recommend using a lever and spring style. • Low or No Discharge Head: Very low or no discharge pressure applications (negative head, downhill flow) may require the introduction of artificial head to ensure proper pump operation and prevent siphoning. The creation of artificial head can be achieved by: 1) elevating discharge piping above suction source high liquid level elevation and installing anti -siphon valve, 2) installing a back -pressure valve as provided by PVP or 3) installing mechanically/pneumatically actuated pinch valves. PVP will verify the requirement for these devices based upon a review of the hydraulic conditions at time of quotation generation. • Motors: Our standard motor is a Toshiba EQP Severe Duty NEMA Premium efficiency. This motor is inverter rated an exceeds NEMA MG31 Part 31 and suitable for 20:1 constant torque turndown range. Motor is suitable for Cl 1, Div 2 GRP A, B, C, D/Zone. Other motors and accessories are available such as: thermal overload, space heaters and motor shaft grounding rings. Controls: The double disc pump can be operated by a motor starter for constant speed applications or a variable frequency drive (VFD) for variable speed applications. If using a motor starter, we recommend a soft -start feature to allow the pump speed to ramp up to maximum operating speed to minimize start-up pressure spikes. This feature is especially important on long suction and/or discharge lines. If using a VFD (recommended option) the unit must be sized as heavy duty for constant torque applications. This may mean the horsepower of the VFD has to be one size larger than the motor size. A drive that is undersized may experience DC bus issues requiring the addition of dynamic braking resistors. • Vacuum and Pressure Switch/Gauge: You will normally find these items are included in our quotation. The vacuum switch provides indication of a potential clogging issue that can be flushed or cleaned before it is too hard to remove. The discharge pressure switch is required (all positive displacement pumps require one) to prevent pump damage due to over pressurization if the pump is operated against a high pressure line, closed valve or clogged line. Page 3 Penn Valley Pump Co, Inc. - www.pennvalleVpump.com - 1-800-311-3311 This page intentionally left blank. Town of Wilkesboro I Engineering Calculations ��� Section 3 — Hydraulic Profile Hydraulic Profile Town of Wilkesboro I Engineering Calculations Section 3 — Hydraulic Profile This page intentionally left blank. E 3 3 5 � 6 ELEV. 1010 ELEV. 1010 ELEV.1000 ELEV.1000 PK HR 976.30 PK HR 973.53 PK HR 969.67 MAX MNTH 974.25 MAX MNTH 972.09 MAX MNTH 968.76 ELEV.990 ELEV.990 PK HR 937.81 TOC 978.7 MAX MNTH 935.81 WEIR 972.00 GATE - - IE 967.25 ELEV. 980---------------- - - - - -- - - ----------- ELEV.980 IE 974.0 TOC 964.00 ELEV. 970 - ELEV. 960 100 YR FLOOD TOC 972.4 D ELEV 962.50 ELEV. 960 -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ELEV. 960 ELEV. 950 - ELEV. 940 A 30" RAW SEWAGE- IE 939.50 ELEV.930 - - - - - ELEV.920----- � C 1 PTO INFLUENT \ , BUFFER TANK TOC 968.3 ELEV.950 TOC 967.00 24"-DEGRE 18"-RS GATE IE 967.25 IE 969.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ELEV.940 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ELEV.930 - II----------------------------------------- ELEV.920 INFLUENT PUMP SCREENING STATION EL 920.90 GRIT REMOVAL FLOW DIVERSION STRUCTURE KEYNOTES O 1. TOTAL MUNICIPAL INFLUENT FLOWS INCLUDE RECYCLE FLOWS FROM PLANT DRAIN SYSTEM, SLUDGE BUFFER DECANT, AND AEROBIC DIGESTER DECANT. 2. FLOWS TO THE INFLUENT BUFFER TANK INCLUDE MUNICIPAL FLOW, TYSON FOODS' PRETREATMENT EFFLUENT AND RECYCLE FLOWS FROM PLANT DRAIN, SLUDGE BUFFER DECANT, AND AEROBIC DIGESTER DECANT. 3. AGS TANK EFFLUENT IS NOT CONTINUOUS BUT OCCURS IN CYCLES OVER 24-HOUR PERIOD. 4. FLOWS EXCEEDING 7.25 MGD ARE DIVERTED TO FLOW EQUALIZATION OR BYPASS THE GRIT SYSTEM COMPLETELY. S. UV SYSTEM OPERATED AT PEAK HOURLY INSTANTANEOUS FLOW OF 18.2 MGD WITH 1 BANK OUT OF SERVICE. 6. DUE TO THE NATURE OF THE SEQUENCING BATCH SYSTEM, THE EFFLUENT FLOW TO DOWNSTREAM FACILITIES IS EITHER 0 MGD OR 18.2 MGD INSTANTANEOUSLY. THE DESIGN MAXIMUM MONTH IS STILL 8 MGD. n HYDRAULIC SECTION TOTAL PEAK HOUR MAX MONTH NUMBER UNITS IN UNITS IN OF UNITS SERVICE SERVICE INFLUENT PUMP STATION 3 2 3 SCREENS 3 2 3 GRIT REMOVAL 4 1 1 1 AEROBIC GRANULAR 3 2 3 SLUDGE PUMP STATION PUMPS AEROBIC GRANULAR 3 2 3 SLUDGETANKS UV DISINFECTION O 2 2 2 CHANNELS PARSHALL FLUME 1 1 1 n nn A B I C I D I E F I G DESIGN CONDITION MUNICIPAL RECYCLE FLOWS HEADWORKS INFLUENT HEADWORKS EFFLUENT TYSON INFLUENT BUFFER TANK INFLUEUNT1 SECONDARY EFFLUENT PEAK HOUR (MGD) 9.9 1.97 11.8 11.5 6.1 17.6 18.2 MAX MONTH (MGD) 3.8 1.96 5.8 5.5 3.9 9.4 8.0 AVERAGE DAY (MGD) 2.8 1.96 4.8 4.5 3.5 8.0 6.5 ELEV. 1030 ELEV. 1030 ELEV.1020 ELEV.1020 ELEV. 1010- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ELEV. 1010 TOP OF WALL 996.00 PK HR 992.10 TOP OF CHANNEL V-NOTCH EL. 993.80 CONCRETE 996.47 pK HR 985.20 PK HR 984.90 ELEV. 1000--------- ---- -------------- ----- --------------------------------------------- ELEV.1000 TOP OF WALL 987.0 = PK HR 97 N PK HR 977.70 PK HR 967.50 ELEV.990 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ELEV.990 SEE CONTINUATION FLUME NV 975.75 FOR IFK HR 954.80 HYDRAULIC HYDRAULIC PROFILE G - = TOC 980.38 PK HR 953.30 ELEV. 980 - - - - - - - - - - \ - - - - - - - - - - - - - - -- - -- --- RIM_ - --- - - - - - - - - - - - - - - - - - - - - ELEV. 980 30" EFF - G 977.86 - - - PK HR 951.70 MWL BOTTOM OF CHANNEL RIM: PK HR 49.60 ELEV. 970 - 96197 - - = --_ -- - - - - - - - -- 97- _ _ __ _ _ _ __ _ - - - 96717 ------ -- ------------- ELEV. 970 IRK HR 47.50 100 YR FLOOD T/SLAB IE 976.75 IN IE FINGER WEIR OUT IE 30"-UVE IN IE OUT IE ELEV 962.5 a 971.0 , 974.25 EL 984.62 974.00 971.00 971.00 - RIM: RIM: TO FUTURE FILTERS FROM FUTURE FILTERS 30"-EFF 957.02 955.35 = ELEV . 9 6 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ELEV. 960 DEGRE D IN OUT RIM: 951.29 C CIL 951.50 IE 967.57 IE 966.0 -_ RIM: _ 49.40 ELEV.950 - ___ - ELEV. 950 30"-EFF NWL BANK EL 30"-EFF = - = 944.97 46.14�._ E 18"-WLC IN OUT ELEV. 940 16"-PREFF INV 951.50 IE 958.57 IE 957.00 ELEV.940 TYSON TOC 47.93 IN OUT OUT OUT OUT FOODS INF IE 947.00 IE 946.119 IE 94 8 IE 944.68 IE 43.57 INV 951.50 30"-EFF 30"-EFF EU945.2 IE 944.78 G ELEV.930 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - IN - -IN - - - - - - - - - - - - - - ELEV. 930 IE 945.90 IE 45.36 30"-EFF ELEV. 920 ELEV. 920 INFLUENT BUFFER AEROBIC GRANULAR FUTURE DISC FILTER UV DISINFECTION EFFLUENT FLOW MH MH MH MH MH MH OUTFALL TO YADKIN TANK SLUDGE (AGS) SYSTEM METERING S-06 S-05 S-04 S-03 S-02 S-01 RIVER (FORMERLY SC 4) AND AGS INFLUENT PUMP STATION I n HDR Engineering, Inc. of the Carolinas N 440 S. Church Street, Suite 1200 Charlotte, NC 28202 704.338.6700 N.C.B.E.L.S. License Number F-0116 11/2023 100% ISSUED FOR PERMITTING SUBMITTAL 09/2023 100% DESIGN SUBMITTAL 412023 60% ISSUED FOR REVIEW ISSUE DATE DESCRIPTION PROJECT MANAGER WES BRAMLETT, PE DESIGNED BV L. GROTZ CHECKED BY I C. CROTWELL DRAWN BY IT. CASH PROJECT NUMBERI 10336017 PRELIMINARY NOT FOR CONSTRUCTION OR RECORDING oFWI(kFseO Town of Wilkesboro do Po Wastewater Treatment Plant Expansion ycORPORATE�,� LEGEND PUMPED FLOW GRAVITY FLOW LIQUIDS STREAM HYDRAULIC PROFILE 0 1" 2" FILENAME I 10336017-00-G.,t SHEET( SCALE NONE 000O07 ■n ■0 ■" on This page intentionally left blank. Town of Wilkesboro I Engineering Calculations ��� Section 4 — Process Flow Diagrams Section 4 — Process Flow Diagrams Current (Liquids) Proposed (Liquids) Current (Solids) Proposed (Solids) Town of Wilkesboro I Engineering Calculations Section 4 — Process Flow Diagrams This page intentionally left blank. E I 3 � 4 I 0 I I DIGESTER 1 DECANT 6"-DS JUNCTION ' O' BOX 30"-INF INFLUENT PUMP MAGNETIC FLOW STATION METER 2"-RS Q 2"-RS ~ Q 2'-RS ~ Q TYSON FOODS EMERGENCY I CONNECTION I TYSON INFLUENT JUNCTION BOX 12" O 12" FYICTINr TVCr1N O 12" <:::L AERATION BASIN O HEADWORKS FINE SCREENING GRIT REMOVAL PERFORATED PLATE SCREENS GRIT SEPARATION CLASSIFIER L------------iTOLANDFILL 16" TYSON TYSON PRETREATMENT BASIN 1 TYSON PRETREATMENT BASIN 2 CLARIFIER I I INFLUENT BUFFER TANK 18" FLOW 18„ (REPURPOSED SECONDARY SPUTTER 187 CLARIFIER 4) GENERAL NOTES: 1. ONLY KEY, SELECT VALVES ARE SHOWN ON THE PROCESS FLOW DIAGRAM. D 2. EXISTING STRUCTURES ARE SHOWN IN GRAY. NEW STRUCTURES AND EQUIPMENT ARE SHOWN IN BLACK. KEYNOTES 1. IN THE BASE BID, THE EQUALIZATION BASIN WILL BE DRAINED BY GRAVITY VIA AN EXISTING 8" DRAIN LINE. AN ALTERNATE BID ITEM INCLUDES PROVISIONS TO PUMP THE EQUALIZATION BASIN BACK TO THE HEADWORKS. IA LEGEND LIQUIDS MAIN PROCESS ----- SOLIDS --------- AIR Q 0 n HDR Engineering, Inc. of the Carolinas N 440 S. Church Street, Suite 1200 Charlotte, NC 28202 g 704.338.6700 N.C.B.E.L.S. License Number F-0116 PROJECT MANAGER WES BRAMLETT, PE PRELIMINARY NOT FOR CONSTRUCTION OR RECORDING ��oFWI[kFseQ Town of Wilkesboro do Po Wastewater Treatment Plant G� Expansion C" RATE GENERAL PROCESS SCHEMATIC - LIQUIDS EXISTING 0 1„ 2,� FILENAME 10336017-00-G.rvt SHEET SCALE NONE 00GO05A DESIGNED BY L. GROTZ CHECKED BY C.CROTWELL DRAWN BY T.CASH 09/2023 100%DESIGN SUBMITTAL 04/2023 60% ISSUED FOR REVIEW 0612022 30% ISSUED FOR REVIEW ISSUE DATE DESCRIPTION PROJECT NUMBER 10336017 1 2 3 4 5 6 7 8 SBD WLC 24" RECYCLE RETURN INFLUENT PUMP DWR STATION IDS DECANT JUNCTION 12"-RS BOX O 12"-RS I 30"-INF 8" EQ DRAIN FLOW EQUALIZATION SYSTEM (REPURPOSED AERATION BASIN) HEADWORKS FINE SCREENING BYPASS CHANNEL GRIT REMOVAL MAGNETIC FLOW METER ❑M O 18"-RS 18"-RS PERFORATED PLATE O SCREENS I GRIT SEPARATION CLASSIFIER O L — — — — — — — — — — — — PTO LANDFILL TYSON FOODS I I_J EMERGENCY I 16"TYSON CONNECTION I TYSON INFLUENT JUNCTION BOX 12" O 12" O 12" EXISTING TYSON INFLUENT PUMP STATION r---------r---------------------t--- I I I I I I TO SLUDGE BUFFER TANK I I I (REPURPOSED SECONDARY CLARIFIER 3) SEE SOLIDS I I I CONTINUATION I I I NEXT PAGE I I I TYSON PRETREATMENT BASIN 1 I I TYSON PRETREATMENT BASIN 2 REDUCER O O BLOWERS O 30"X20" I__ REDUCER k } } } } O �;t t I I I I B B B B B B col I U �o� U I lob U I I r-----------------n I M 12% AS/WLC I I I I I FUTURE I I EFFLUENT I I DISC FILTERS ERE)E FILTER WASHTOAGS BASIN AGS BASIN AGS BASIN I / / ENT#3 #2 #1R TANK F,'F L(FUTURE) u i i -J''"F -Pi T / u u i J— 3 g c� j L— -- 3 a 3 a 3 a I I ----------------- I 30"-AGE I 18"-WLC 18"-WLC 30"-AGE 18"-WLC y O O O 30"-WLC/VJAS I WLC TO INFLUENT BUFFER TANK I I 0 n HDR Engineering, Inc. of the Carolinas N 440 S. Church Street, Suite 1200 Charlotte, NC 28202 g 704.338.6700 N.C.B.E.L.S. License Number F-0116 09/2023 100% DESIGN SUBMITTAL 04/2023 60% ISSUED FOR REVIEW 0612022 30% ISSUED FOR REVIEW ISSUE DATE DESCRIPTION PROJECT MANAGER WES BRAMLETT, PE DESIGNED BY L. GROTZ CHECKED BY C. CROTWELL DRAWN BY M. MITCHELL PROJECT NUMBERI 10336017 PRELIMINARY NOT FOR CONSTRUCTION OR RECORDING UV DISINFECTION INFLUENT BUFFER TANK (REPURPOSED SECONDARY CLARIFIER 41 EFFLUENT FLOW METERING 30"-UVE 30"-EFF Y °a a OFV111 seO Town of Wilkesboro do Po Wastewater Treatment Plant Expansion ycORPORATE�,� n GENERAL NOTES: 1. ONLY KEY, SELECT VALVES ARE SHOWN ON THE PROCESS FLOW DIAGRAM. D 2. EXISTING STRUCTURES ARE SHOWN IN GRAY. NEW STRUCTURES AND EQUIPMENT ARE SHOWN IN BLACK. KEYNOTES 1. IN THE BASE BID, THE EQUALIZATION BASIN WILL BE DRAINED BY GRAVITY VIA AN EXISTING 8" DRAIN LINE. AN ALTERNATE BID ITEM INCLUDES PROVISIONS TO PUMP THE EQUALIZATION BASIN BACK TO THE HEADWORKS. BYPASS TO RECYCLE RETURN MANHOLE. SEE SHEET 00GO06 FOR CONTINUATION. FROM AGS BASINS LEGEND LIQUIDS MAIN PROCESS ----- SOLIDS --------- AIR mo �17 GENERAL PROCESS SCHEMATIC - LIQUIDS PROPOSED 0 1" 2" FILENAME 10336017-00-G.rvt SHEET SCALE NONE 00GO05B 1 12 3 4 5 6 7 8 DIGESTER 2 AND 3 DECANT TO INFLUENT PUMP STATION DECANT SECONDARY CLARIFIER 4 i6"-RAS Q RETURN ACTIVATED SLUDGE PUMPS 12"-RA: Q M \TJ�J 12"-RA: Q DEWATERING FILTRATE TO LANDFILL 4 O O O FILTRATE TO RAS PUMP STATION TO AERATION BASIN SLUDGE DEWATERING DIGESTER DECANT TO SECONDARY CLARIFIER 2 DECANT GENERAL NOTES: 1. ONLY KEY, SELECT VALVES ARE SHOWN ON THE PROCESS FLOW DIAGRAM. D DECANT AEROBIC DIGESTER AEROBIC AEROBIC 1 p DIGESTER DIGESTER p 2 3 DIGESTED �\ I SLUDGE EFFLUENT 1Y 1 Y t 1 1 1 B B B B DIGESTER BLOWERS Q DIGESTED SLUDGE PUMP STATION 6"-DS QF'�r1�Q Q I IA Q a 0 n HDR Engineering, Inc. of the Carolinas N 440 S. Church Street, Suite 1200 Charlotte, NC 28202 g 704.338.6700 N.C.B.E.L.S. License Number F-0116 PROJECT MANAGER WES BRAMLETT, PE PRELIMINARY NOT FOR CONSTRUCTION OR RECORDING ��oFWI[kFseQ Town of Wilkesboro p P ti o Wastewater Treatment Plant G� Expansion c�RPORATE�,� GENERAL PROCESS SCHEMATIC - SOLIDS EXISTING 0 1„ 2,� FILENAME 10336017-00-G.rvt SHEET SCALE NONE 00GO06A DESIGNED BY L. GROTZ CHECKED BY C.CROTWELL DRAWN BY M. MITCHELL 09/2023 100%DESIGN SUBMITTAL 04/2023 60% ISSUED FOR REVIEW 0612022 30% ISSUED FOR REVIEW ISSUE DATE DESCRIPTION PROJECT NUMBER 10336017 I I I I I FROM AGS WAS/WLC GRIT WASH WATER 6"-GWW FLUME 31RR METERING— ETERING 24"-RR MANHOLE MANHOLE TOINFLUENT PUMP STATION 18"-OVFL INFLUENT BUFFER TANK OVERFLOW TOINFLUENT _ TO LANDFILL 4 FILTRATE TO INFLUENT PUMP STATION DECANT JFFER N TO RETURN M SLUDGE MANHOLE SLUDGE DEWATERING j FUTURE - II I I I DECANT DIGESTER DECANT 3"-DS 3"-DS DECANT DECANT GENERAL NOTES. 1. ONLY KEY, SELECT VALVES ARE SHOWN ON THE PROCESS FLOW DIAGRAM. 2. EXISTING STRUCTURES ARE SHOWN IN GRAY. NEW STRUCTURES AND EQUIPMENT ARE D SHOWN IN BLACK. KEYNOTES 1. ONLY SCREW PRESS #1 WILL BE INSTALLED IN THE BASE BID. THE BID ALTERNATE DESIGN WILL INCLUDE THE ADDITION AND INSTALLATION OF SCREW PRESS#2. 6"-DS DECANT AEROBIC DIGESTER AEROBIC AEROBIC 1 p DIGESTER DIGESTER p 2 3 DIGESTED SLUDGE EFFLUENT � I t 1 1 1 B B B e DIGESTER BLOWERS DIGESTED SLUDGE O PUMP STATION FUTURE irlC— i0 L-- �0 0 Q a 0 n HDR Engineering, Inc. of the Carolinas N 440 S. Church Street, Suite 1200 Charlotte, NC 28202 g 704.338.6700 N.C.B.E.L.S. License Number F-0116 PROJECT MANAGER WES BRAMLETT, PE PRELIMINARY NOT FOR CONSTRUCTION OR RECORDING ��oFWI[kFseQ Town of Wilkesboro p P ti o Wastewater Treatment Plant G� Expansion c�RPOR0TEv GENERAL PROCESS SCHEMATIC - SOLIDS PROPOSED 0 1" 21, FILENAME 10336017-00-G.rvt SHEET SCALE NONE 00GO06B DESIGNED BY L. GROTZ CHECKED BY C.CROTWELL DRAWN BY M. MITCHELL 09/2023 100% DESIGN SUBMITTAL 04/2023 60% ISSUED FOR REVIEW 0612022 30% ISSUED FOR REVIEW ISSUE DATE DESCRIPTION PROJECT NUMBER 10336017 I IA Town of Wilkesboro I Engineering Calculations ��� Section 5 — Pump Hydraulics Section 5 — Pump Hydraulics Influent Pump Station Pump Calculations AGS Influent Pump Station Pump Calculations WAS Pump Station Pump Calculations Digested Sludge Pump Station Pump Calculations Town of Wilkesboro I Engineering Calculations ��� Section 5 — Pump Hydraulics This page intentionally left blank. Town of Wilkesboro I Engineering Calculations ��� Section 5 — Pump Hydraulics Influent Pump Station Pump Calculations Summary The Influent Pump Station will be retrofitted for a peak hour design flow of 11.8 MGD with one pump out of service. The three existing submersible pumps will be replaced with new pumps. These improvements include upsizing existing 10" pump discharge piping and valves to 12" piping and valves, replacing the existing primary and secondary ultra -sonic level control system, and installing new pump control panels and VFDs. Town of Wilkesboro I Engineering Calculations ��� Section 5 — Pump Hydraulics Wilkesboro Wastewater Treatment Plant Upgrades Wilkesboro, NC Influent Pumping Station Sytem Read Curve 1.0 Flow {]errands Pear Hour 11.8 MGD Design Max Month 6.2 MGD Average Daily Flaw 5.0 MGD Minimum Flow 2.5 MGD 2.0 Pumping Reg uire ments Reference: Cameron Hydraulic Data, by Flowserve, 19th Edition, 2002 Maximum Discharge WSL 976,13 ft Maximum Suction WSL 936.81 ft Minimum Suction WSL 926,81 ft Total Maximum Static Head: 49.12 ft Total Minimum Static Head 3932 ft Discharge PlpTng Eg Len Sum 1 5"42" Reducer 30.0 30 ft 29 12" Pipe 1 25 ft 1 12" 90 Deg Bend LR 15.9 15.9 ft 3 12" Pipe 1 3 ft 1 12" Check Valve 49.7 49.7 ft 1 12" Plug Valve 7.96 7.96 ft 12 12" Pipe 1.0 12 ft 1 12" 45 Deg Elbow 15.9 15.9 ft Total Equivalent Length 12 in 159.46 ft 250 18" Pipe 1.0 250 1 18"Through Tee 28.1 28.1 1 18" Branch Tee 84.4 84.4 2 18" 45 Deg Elbow 22.5 45 2 18" Plug Valve 16.9 33.8 2 13" 90 Deg Elbow 42,2 84.4 1 18" Flow Meter 30 30 Total Equivalent Length 18 In 555.7 ft Town of Wilkesboro I Engineering Calculations Section 5 - Pump Hydraulics Wilkesboro Wastewater Treatment Plant Upgrades Wilkesboro, NC Influent Pumping Station Sytem Head Curve 3.0 Puma Selection PartA - Constant Speed Pumping Analysis System Hazen Williams Coefficient C= 130 -T Head and Velocity Analysis Flow, Velocity &Static Head One Pump Operation Two Pump Operation Three Pump Operation Four Pump gperatian Head and Velocity Analysis Flow, Velocity &Static Head One Pump Operation Two Pump Operation Three Pump Operation Four Pump gperatian Flow {gpm} Discharge Pipe Vel {ftJs} Force Main Val (ftfs) Static Head ft Max � } Static Head IN Min Di9charg a Head OIL) Total Head max Max (ft) Total Head Min Discharge Head ; ftI Total Head { ft} Total Head Min Ift} Dixhar Se Head [ft} Total Head { ft} Total Head Min [ft} Disrharg a Head [ft} Total Head I ft } Total Head Min Ift} 4 4.44 0.40 49,3 39.3 4-40 49-32 39.32 4.40 49-32 39,32 4,40 49-32 39,32 0.40 49.32 39.32 540 1.42 0.63 49.3 39.3 0.17 49,49 39.49 4.14 49.46 39.46 0.13 49.45 39.45 0.13 49.45 39.45 1,004 2,84 1,26 49.3 39,3 4,60 49,42 39.92 4,51 49.83 39,83 0,47 49.79 39,79 D,46 49.78 39.78 1,500 4.26 1.89 49.3 39.3 1.28 50.60 40.fi6 1.47 5039 40.39 1.00 50.32 40.32 0.97 50.29 44.29 2,Dtl0 5.68 2.52 49.3 39.3 2.18 51.51) 41-50 1.82 51.14 41.14 1.710 51.02 41.02 1.65 50.97 40.97 21544 7.14 3,15 49,3 39.3 3.29 52.61 42.61 2.76 52.48 42.48 2,57 51.89 41,89 2.49 51.81 41.81 3,044 8.51 3.78 49.3 39.3 4.61 53.93 43.93 3.86 53.18 43.18 3.64 52.92 42.92 3.48 52.80 42.84 3,504 9.93 4.41 49.3 39.3 6.14 55.46 45.46 5.14 54.46 44.46 4.79 54.11 44.11 4.63 53.95 43.95 4,004 11.35 5.05 49.3 39.3 7.86 57.18 47.18 6.57 55.89 45.89 6,14 55.4fi 45,46 5.93 55.25 45.25 4,500 5.69 49.3 39-3 9-77 59-09 49.09 8.17 57.49 47.49 7.63 56.95 46.95 7.3$ 56.7tl 46.70 5,040 6.31 49.3 39.3 11.87 61.19 51.19 9.93 59-25 49.25 9.28 68.64 48.64 8.97 58.29 48.29 5,544 6,94 49.3 39.3 14.16 63.48 53.48 11.85 61.17 51,17 11,46 60.38 54,38 14,69 64.41 54.41 6,044 7.57 49.3 39.3 16.63 65.95 55.95 13.92 63.24 53.24 13.44 62.32 52.32 12.56 61.88 51.88 6,500 8.26 49.3 39.3 1429 68.61 58.61 16.14 65.46 55.46 15.47 64.39 54,39 14,57 63.89 53.89 7,Otl0 8.83 49.3 39.3 22.32 71.44 61.44 18.53 67.83 57_$3 17.28 66.61) 56.64 16.71 66.43 56_03 7,544 9.46 49.3 39.3 25-33 74.45 64.45 21-43 70.35 64.35 19.64 68.96 53.96 18.93 68.34 58.34 8,004 14,09 49.3 39.3 28.32 77.64 67.64 23.74 73.42 63,42 22.13 71.45 61,45 21,39 74.71 64.71 8,544 14.72 49.3 39.3 31.68 81.00 71.00 26.51 75.83 65.83 24.75 74.07 64.07 23.93 73.25 63.25 9,0170 11,35 49.3 39.3 35.22 84.54 74.54 29.47 78.74 68.79 27.52 76.84 66,84 26,64 75.92 55.92 9,5tl0 11,98 49-3 39.3 38.92 89.24 78_24 37.57 81-84 71-89 30.41 79.73 69.73 29.39 78_71 68.71 14,400 12.61 49.3 39.3 42.80 92.12 82.12 35.81 85.13 75.13 33.44 82.76 72.76 32.32 81.54 71.64 Town of Wilkesboro I Engineering Calculations Section 5 — Pump Hydraulics WILKESBORO INFLUENT PUMP STATION SYSTEM HEAD VARIABLE SPEE❑ PUMPING CONDITIONS 150 140 130 120 110 100 90 80 0 a W x 70 60 50 40 30 20 10 0 i 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500 9000 950010000 FLOW (GPM) Max —2 Pump SHC Max —1 Pump SHC Min —2 Pump SHC Min —1 Pump 60 Hz —1 Pump 55 Hz —1 Pump 50 Hz —1 Pump 45 Hz —2 Pump 60 Hz —2 Pump 55 Hz —2 Pump 50 Hz Town of Wilkesboro I Engineering Calculations Section 5 — Pump Hydraulics WILKESBORO INFLUENT PUMPING STATION SYSTEM HEAD CURVE 110 100 90 80 70 E 60 a = 50 40 SYSTEM HEAD CURVE C=130 30 20 10 0 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 FLOW (GPM) —System Head Curve 1 Pump —System Head Curve 2 Pumps Town of Wilkesboro I Engineering Calculations ��� Section 5 — Pump Hydraulics AGS Influent Pump Station Pump Calculations Summary The AGS Influent Pump Station will contain 3 non -clog submersible wastewater pumps which will have a firm capacity of 18.2 MGD. Two pumps will be operational and one will be in standby. These pumps will transfer wastewater from the influent buffer tank to the Aerobic Granular Sludge process at the required fill rate set by Aqua -Aerobic Systems, Inc. Town of Wilkesboro I Engineering Calculations ��� Section 5 — Pump Hydraulics System Suction Suction WSL: - - Min. Suction Head: r Max Suction Head: 1111rDischarge tion Pressure: •.- Min. Static Head Flow Rate Centerline EL: Max Static Head: scharge WSL:scharge WSL: Pressure: PIPE SECTION: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pump Suction / Pump Discharge NORM. Sys Discharge: . - . - Percent of Flow Rate: % r®'. r®'. rr•. rr'. rr•. r�'. --------- Flow Rate: gpm--------- Flow Rate Conversion (ref only): m������--------- Pipe Diameter: in --------- Pipe Pipe Hazen -Williams -�®i--------- Hazen-Williams ---------- Hazen-Williams - Override: m--------------- Pipe Length: ©�����--------- Velocity: Reynolds Numberll-®'r'�--------- Flow Typei-������--------- Pipe Friction Losses, hf (Low)-r--------- Pipe Friction Losses, hf (High)�.--------- Sum of Minor Loss Coeff,-��®i®--------- Minor Losses,r--------- Other/Artificial Losses ---------------- System Head Loss (Low) r r: System Head Lossr'--------- . Dirty Water Multiplier r r r r r System Head Loss (Low): ft--------- System Head Loss (High): ft Sys Head Loss (Low)(w/SafetyFactor): ft Sys Head Loss (High)(w/SafetyFactor): ftr--------- Suction Losse r o r r r r Discharge Losse- System Losse- rrr too Total Friction Losse-�® Number of Pumps Minimum TDHA 72.66 FT Maximum TDH: 72.66 FT 200 160 160 w 120 2 U Q 100 z J 80 Q H 0 60 40 20 0 Town of Wilkesboro I Engineering Calculations ��� Section 5 — Pump Hydraulics Wilkesboro WWTP Expansion - AG5 Influent Pumps 0 5,000 10,000 15,000 20,000 FLOW RATE (GPM) 25,000 Town of Wilkesboro I Engineering Calculations ��� Section 5 — Pump Hydraulics WAS Pump Station Pump Calculations Summary The existing return activated sludge (RAS) pump station will be converted to a waste sludge (WAS) pump station. With the AGS process, the RAS pump station is no longer required. There will be 2 new waste sludge pumps (1 duty, 1 standby) that will pump thickened waste sludge (TWAS) through an existing 8-inch force main that reduces to 6-inches before it reaches the digesters. The existing RAS pumps will be removed from the existing wet well and replaced with smaller WAS pumps. Min. Suction W System im Max Suction W Suction Press Flow RatePump Centerline Min Discharge W Max Discharge W Discharge Press PIPE SECTION: 1 Pump Suction / Pump Discharge / Sys Discharge: Percent of Flow Rate: % r �' Flow Rate: gpm Flow Rate Conversion (ref only): ®' Pipe Diameter: in Pipe Material: -- � Pipe Condition: Hazen -Williams - High:,...� Hazen -Williams - Lowi- r r Hazen -Williams - Override'm_ Pipe Length'-� Velocit Reynolds Number: -- Flow Type: ' Pipe Friction Losses, hf (Low): ft r ' Pipe Friction Losses, hf (High): ft Sum of Minor Loss Coeff, k: - Minor Losses, hm: ft �.+ - Other/Artificial Losses: ft - ;lean Water System Head Loss (Low): ftllll 0.63 System Head Loss (High): It Dirty Water Multiplier_ System Head Loss (Low): ft System Head Loss (High): ft Sys Head Loss (Low)(w/SafetyFactor): ft W. Sys Head Loss (High)(w/SafetyFactor): ft !YSTEM RESULTS Low HigV. Suction Losses: 1.20 Discharge Losses: System Losses: Total Friction Losses: Minimum TDH:,� Maximum TDH: :®'r Min. Suction Head: Max Suction Head: Min. Static Head Max Static Head: Pressure Head: 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Total System Flow per I Wilkesboro WWTP Expansion - WAS Pumps 200 180 160 l .I FeJI Cnaarl 120 100 80 60 40 20 0 -50 Town of Wilkesboro I Engineering Calculations ��� Section 5 — Pump Hydraulics 50 150 250 350 450 550 650 750 FLOW RATE (GPM) Town of Wilkesboro I Engineering Calculations ��� Section 5 — Pump Hydraulics Digested Sludge Pump Station Pump Calculations Summary A new digested sludge pump station will be included as part of this project. The new pump station will include two 15 HP double disc (self -priming) sludge pumps that can pump from either Digester 2 and/or Digester 3, and each pump will have a dedicated 6-inch force main to the Dewatering Building. Both the suction and discharge lines have pulsation dampeners to control unexpected pressure increases. The pumps will be installed on a new elevated platform (above the base flood elevation) adjacent to Digester 2 and 3. Wilkesboro WWTP CRITERIA VALUE UNITS CRITERIA VALUE UNITS COMMENTS 90 GPM 944.06 FT Bottom of Digester System0.1 MGD 961.00 FT 2'from Top of Wall = CFS 0 PSI Open to Atm(wet well) ■ 341 LI min 966.05 FT Penn Valley Pump centerline 20,441 Llhr 986.25 FT Dewatering flocculation pipe 986.25 FT Dewatering flocculation pipe 35 PSI Set to Required Mixing Pressure WAS Town of Wilkesboro I Engineering Calculations Section 5 — Pump Hydraulics Min. Suction Head: Max Suction Head: r Min. Static Head Max Static Head: Pressure Head: :r 200 150 125'6 F i 100 90 ~ So 0 0 1. 2. 1. 1.1. FLOW RATE (GPM) PIPE SECTION: 1"r 2 3 4 5 6 7 8 9 13 M"Mil �I Pump Suction I Pump Discharge I Sys Discharge: ■ ■ ■ ■ ■ ■ Percent of Flow Rate: % rr'. rr'. Ir', rr'. Fr•, rr'. Ir', FI'. ------- Flow Rate: gM1 Flow Rate Conversion (ref only): Pipe Diameter: M�����©��------- Pipe Material: -- �����®��------- Pipe Condition: -- �m��mm��------- Hazen-Williams - High: -- ��������------- Hazen-Williams - Low:------- Hazen-Williams - Override: m--------------- Pipe Length: ft Veloc • r• r• r• r• 4.08 0.64 r• Reynolds Numb- rr Flow Tya7 ------- Pipe Friction Losses, hf Pipe Friction Losses, hf------- Sum of Minor Loss Coeff, ���� r r b�b�-b� •®': ----_-- Minor Losses, hm: ft------- Other/Artificial Losses: It Clean Water System Head Loss (Low): 1®- : r r • r • • r r r • • • ------- System Head Loss (High): �� r r r r• r r r r r r Dirty------- Dirty Water Multiplier ft r ystem Head Loss (Low): �� r • r ��� r r r • • • ------- ystem Head Loss (High): b■ r r ��® r r• r r r ------- PS!sH.ad Loss (LowlfwlSafetvFactori 1 0.93 0.15 0.13 1.11 0.06 0.05 0.05 SYSTEM RESULTS Low High Suction Losses: Discharge Losses: -b� 1.56 System Losses: 0.00 0.00 Total Friction Losses: -2.48 2 '74 Number of PumpsO Minimum TDH: r:® Maximum TDH: - 125.40 12566 Wilkesboro WWTP Expansion - Digested WAS Pumps 200 18( 16[ 14[ 120 100 M 60 40 20 -50 Town of Wilkesboro I Engineering Calculations Section 5 — Pump Hydraulics 50 150 250 350 450 550 650 FLOW RATE (GPM) i. Low Friction i. High Friction x. Low Friction x. High Friction 750 Town of Wilkesboro I Engineering Calculations ��� Section 6 — Buoyancy Calculations Section 6 — Buoyancy Calculations AGS Tanks & Intermediate Tank Parshall Flume Meter 12" WAS/WLC Line Parshall Flume Meter on 12" Plant Drain Line AGS Influent Meter Vault UV Disinfection Structure Effluent Parshall Flume Plant Drain Meter Vault on 20" Drain Line Town of Wilkesboro I Engineering Calculations Section 6 — Buoyancy Calculations This page intentionally left blank. F)2 Buoyancy Calculations Town of Wilkesboro Cub Creek WWTP Expansion and Upgrades Wilkesboro. NC October 18, 2023 ,1`01A CAROZ l• SEAL loins/2023 • AGS Tanks & Intermediate Tank • Parshall Flume Meter 12" WAS/WLC Line • Parshall Flume Meter on 12" Plant Drain Line • AGS Influent Meter Vault • UV Disinfection Structure • Effluent Parshall Flume • Plant Drain Meter Vault on 20" Drain Line Buoyancy Calculations ��� Town of Wilkesboro Cub Creek WWTP This page is intentionally left blank. October 18, 2023 I i Buoyancy Calculations ��� Town of Wilkesboro Cub Creek WWTP 1 Discussion The purpose of this calculation is to verify that the following structures have an adequate factor of safety to resist the buoyant effect of high ground water while meeting the requirements of the NC State Building Code 2012, IBC-09 (Section 1612), and ASCE 7- 05 (Chapter 5). • AGS Tanks & Intermediate Tank • Parshall Flume Meter 12" WAS/WLC Line • Parshall Flume Meter on 12" Plant Drain Line • AGS Influent Meter Vault • UV Disinfection Structure • Effluent Parshall Flume • Plant Drain Meter Vault on 20" Drain Line 2 Floodwater and Groundwater Elevation The FEMA 100-Year flood elevation is 962.50 (NGVD). As referenced in the Geotechnical Report, groundwater was only found in borings 3 and 5 during the geotechnical investigation. Boring 3 was adjacent to the dewatering building and boring 5 was adjacent to where the proposed intermediate tank will be, south of the dewatering building. The groundwater elevation in boring 3 was found at an elevation of 951.5 and in boring 5 was found to be at 947.5. 3 Structure Foundation Elevations The bottom of foundation elevation for each of the structures under consideration is found in the table. In all cases except the 20" Plant Drain Meter Vault the bottom of foundation is above both the 100-year flood elevation and the naturally occurring groundwater table lowest elevation. For conservatism, the water elevation for the buoyancy calculations were simulated either at grade, at the 100 Year Flood elevation, or 3 feet above the slab. Bottom of Above 100 Year WSEL for Structure Foundation Flood Elevation Buoyancy Elevation Calculation AGS Tanks & Intermediate 971 Yes 974.5 Tank Parshall Flume Meter 12" 968.67 Yes 967.71 WAS/WLC Line October 18, 2023 1 1 Buoyancy Calculations Town of Wilkesboro Cub Creek WWTP Structure Bottom of Above 100 Year WSEL for Foundation Flood Elevation Buoyancy Elevation Calculation Parshall Flume Meter on 12" 964.71 Yes 962.50 (100 Plant Drain Line Yr Flood Elev) AGS Influent Meter Vault 968.67 Yes 971.67 UV Disinfection Structure 974 Yes 977 Effluent Parshall Flume 971.17 Yes 974.17 Plant Drain Meter Vault on 947.5 No 956 (Grade 20" Drain Line Elev) 4 Conclusion As the bottom of foundation elevation for all structures (except the 20" plant drain meter vault) is typically near or above both the 100-year flood elevation and groundwater elevation there is minimal if any impact on the structural stability due to the buoyant effect of groundwater. There is some buoyancy effect on the 20" meter vault due to the depth of the structure and at the AGS Tanks due to their large footprint. However, per the attached calculations all structures including the 20" meter vault and the AGS Tanks were determined to have a factor -of -safety exceeding the required minimum of 1.25. 5 References Report of Geotechnical Exploration Services. Wilkesboro WWTP Improvements (2022). S&ME Project No. 216011. 2 1 October 18, 2023 AGS Tanks /Intermediate Tank (20 series DWG) Water Elevation 974.5 Base Slab elev 971.5 edge 971 center Density Concrete 150 pcf Density water 63 pcf Uplift Forces height of water 3.5 ft water elev-slab elev main 29167.5 SF intermediate 2187 SF total volume 109740.8 CF Driving Force F-69136671 lb Resisting Forces footing strips (2'-10") slab (1'-0") wall (2'-6") intermed slab intermed wall channel+walks total volume Resiting Force Resiting / Driving = Safety Factor Factor of Safety 1.55 > 1.25 OK 14378.4108 CF 14112 CF 26007.45 CF 2389.5 CF 6932.5 CF 7720.3392 CF 71540.2 CF 10731030 lb § ,a"P I I sl I J I I I sl I i I maw i � t l i I O paw i zoaaDz EL D,aoo 0�----- .DDLP I I i � uw,.ao .. G L I —JaM, aPl:wuL DE,aL,aoaaaa I D ELDr,.w I ELa�,.w ., G I I � I i I I I I I I I I IEL i o L TI a, TI e+ TILE I L P I e„I J o d I I d d I I I d � L ." ar,lw G I I SEWINeIM --JdM G I I I I l. L ." e„Iw d I G I Ea, IPAE EE ceL � 9VPPdiTa. Siu y-- � GR'O'-UED .,,W P m3w2 M PLAN AT EL. 971.00 UNO ELaaa.Da i EL.am.,a" l .) i i 1�" E aa.,D I Ise I -EL °a°,D i _I i EL as ,D � AEI"PGADI"GA,GPE"I"G""`I- , , SECTION Parshall flume meter 12" WAS/WLC Water Elevation 967.71 Base Slab elev 968.67 Density Concrete Density water Uplift Forces height of water Area Volume Driving Force 150 pcf 63 pcf Resisting Forces 0.04 ft base slab 42.88 64 walls 133.5819 2.56 cap 42.88 161.28 lb Resiting / Driving = Safety Factor Resiting Force 32901.29 Factor of Safety 204.00 > 1.25 OK Parshall flume metering MH 12" plant drain Water Elevation 962.5 Base Slab elev 964.71 Full structure is above water zone no calculation AGS meter vault 30" pipe Water Elevation 967.67 Base Slab elev 968.67 Density Concrete Density water Uplift Forces height of water Area Volume Driving Force 150 pcf 63 pcf Resisting Forces 0 ft base slab 42.88 64 walls 133.5819 0 cap 42.88 M Resiting / Driving = Safety Factor Resiting Force 32901.29 Factor of Safety > 1.25 OK Full structure is above water zone no calculation UV Disinfection (40 Series DWG) Water Elevation 977 Base Slab elev 979.33 flume 974 wells each end Density Concrete 150 pcf Density water 63 pcf Uplift Forces lResisting For height of water 3 ft well slab (1'-0") 247.911 CF water elev-slab elev flume slab (1'-0") 295.737 CF well walls (1'-0") 294.6406 CF Area 247.91 SF flume walls (1'-0") 897.39 CF Volume 743.73 CF Volume 1735.679 CF Driving Force 46855.18 lb Resisting Force 260351.8 lb Q Q Resiting / Driving = Safety Factor Factor of Safety 5.56 > 1.25 OK I I / \\ T- / \\ § _ __C-_-_-_-_-_-__m-_-_ _-_-_-___-_-_-_ /_-_ _ 71 �7 7 PLAN AT EL. 979.33, UNO L 6 SECTION H Effluent Flow Parshall Flume Water Elevation 974.17 Base Slab elev 971.17 end wells 974.67 flume Density Concrete 150 pcf Density water 63 pcf Uplift Forces height of water wells 3 ft height of water flume 0.5 ft Area wells 105.00 SF Volume Wells 315 SF Area Flume 412.13 CF Volume Flume 206.06 CF total Volume 618.19 CF Driving Force 38945.81 lb Resisting Forces well slab (1'-0") 147 CF flume slab (1'-0") 412.125 CF well walls (1'-0") 156.23 CF flume walls (1'-0") 425.395 CF Volume 1140.75 Resiting Force 171112.5 Resiting / Driving = Safety Factor Factor of Safety 4.39 > 1.25 OK — ER A Eo SXaP puWINGs �' E SECT ION Plant Drain Meter Vault (71 Series DWG) Water Elevation 956 Base Slab elev 947.5 Density Concrete 150 pcf Density water 63 pcf Uplift Forces height of water 8.5 ft Area 44.49 SF Volume 378.16 CF Driving Force 23823.81 lb Resisting Forces walls 134.02 CF base 53.73 CF lid 53.7289 CF Volume 241.47 CF Resisting Force 36221.18 lb Resiting / Driving = Safety Factor Factor of Safety 1.52 > 1.25 OK DISMANTLING JOINT (TYP) - METER VAULT 20" MAGNETIC FLOW METER FE-7002 26"-DR — — — — — — — — — 12'-10" SLOPE DEPRESSED 1 1/2" SUMP AREA PUMP DRAIN LADDER METER VAULT LOWER PLAN AT EL 947.50 114" = V-0" 36,x48, FLOODTIGHT FLOOD DOOR \ / TOG, SEE CIVIL TOG _ _ EL 956.00 20• MAGNETIC FLOW METER NON -SHRINK GROUT RT \ /'-� �.' CL 949.05 OPENING (8' MAX) 1� 12' WASHE❑ STONE BASE PIPE SUPPORT DETAIL PER 5MD501 FE-70U2_;.I TOC EL 94750 A SECTION This page intentionally left blank. Town of Wilkesboro I Engineering Calculations ��� Section 7 — Standby Power Calculations Town of Wilkesboro I Engineering Calculations Section 7 — Standby Power Calculations This page intentionally left blank. Town of Wilkesboro I Engineering Calculations ��� Section 7 — Standby Power Calculations Electrical Standby Power Calculations Summary The Cub Creek WWTP has dual power, meaning that two separate electrical feeds from Duke Energy supply power to the treatment plant. Redundancy for operations is provided by having these two separate power feeds routed through a Duke Energy operated transfer switch, and then supplying power to the treatment plant from the load side of the transfer switch. Because of this redundancy, the plant does not have a standby generator. Per North Carolina Administrative Code (NCAC) 15A 02H. 0124(2)(a) power reliability shall be provided by either dual power or standby power, therefore; the Cub Creek WWTP does not require a standby generator. Town of Wilkesboro I Engineering Calculations Section 7 — Standby Power Calculations This page intentionally left blank. Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application G. Residuals Management Plan G. Residuals Management Plan FN Town of Wilkesboro Cub Creek WWTP Expansions and Upgrades I Authorization to Construct Application G. Residuals Management Plan This page intentionally left blank. FYZ Residuals Management Expansion and Wilkesboro, NC December 1, 2023 This page intentionally left blank. Town of Wilkesboro Cub Creek WWTP Expansion and Upgrades I Residuals Management Plan ��� Contents Contents 1 Introduction.......................................................................................................................................... 1 1.1 Wastewater Process................................................................................................................. 1 1.2 Residuals Characteristics.......................................................................................................... 1 1.2.1 Trash, Sediment, and Grit Generation......................................................................... 1 1.2.2 Waste Activated Sludge Generation............................................................................ 2 1.3 Compliance Monitoring.............................................................................................................. 2 1.4 Dewatered Cake Storage.......................................................................................................... 3 1.5 Beneficial Reuse/Disposal......................................................................................................... 3 Tables Table 1-1. Design Screenings and Grit Production Rates for Maximum Month Average Design Flow(8 MGD)................................................................................................................................... 2 Table 1-2. Design Sludge Production Rates for Maximum Month Average Design Flow (8 MGD) ............. 2 Town of Wilkesboro Cub Creek WWTP Expansion and Upgrades I Residuals Management Plan ��� Contents This page intentionally left blank. Town of Wilkesboro Cub Creek WWTP Expansion and Upgrades I Residuals Management Plan ��� Introduction 1 Introduction The Town of Wilkesboro is currently in the process of designing and upgrade and expansion to their liquids and solids treatment processes at the Cub Creek WWTP. With the expansion from 4.9 MGD to 8 MGD will come changes to the residuals management process. The expanded solids treatment train will be similar to their existing process except that the capacity and number of solids treatment equipment will increase. The following plan describes the proposed process, characteristics of solids generated, cake storage, and eventual disposal. 1.1 Wastewater Process The Wilkesboro wastewater treatment plant biological process will be upgraded from a conventional activated sludge system to a more advanced, aerobic granular sludge (AGS) system. Because of this upgrade, finer screening and grit removal processes are required. Additionally, because the biological treatment capacity of the plant is increasing from 4.9 MGD to 8 MGD, more waste activated sludge will be produced. The existing solids treatment process at the facility is sufficient to digest and dewater the design sludge production. A solids mass balance was generated to determine the existing and future volatile solids reduction (VSR) with the existing aerobic digester capacity and expected sludge production. At present, Wilkesboro landfills the digested and dewatered cake. 1.2 Residuals Characteristics The residuals produced as a part of the facility expansion and treatment process modification will include trash, sediment, grit, and biosolids (from waste activated sludge). 1.2.1 Trash, Sediment, Grit Generation, and Oil Capturing The scope of this expansion will include using the existing headworks structure and installing three (3) new perforated plate screens, one (1) screenings washer -compactor unit, and one (1) grit classifier. The perforated plate screens will remove trash, rocks, and other large debris. Screenings will be conveyed to the washer -compactor unit via a sluiceway. The washer - compactor will remove organics and reduce the moisture content of the screenings. Processed screenings will be deposited in a dumpster and ultimately disposed of in a landfill. Grit will be removed via the existing vortex tray separator and collect in the bottom of the concrete channel. A new grit pump will convey settled grit the classifier where organics will be removed, and the grit dewatered. The classifier will convey dewatered grit to a dumpster which will ultimately be transported to a landfill. Untreated poultry wastewater is characterized by high concentrations of oils, grease, and biochemical oxygen demand. Tyson Foods utilizes two treatment processes upstream of discharging to the Town of Wilkesboro. First, is dissolved air flotation (DAF) and second, is an aerated basin. The average effluent fat, oil, and grease (FOG) Town of Wilkesboro Cub Creek WWTP Expansion and Upgrades I Residuals Management Plan ��� Introduction concentration from the aerated basin is approximately 11 mg/L. It is expected therefore that when combined with the municipal flow, the Wilkesboro facility will continue to receive low concentrations of oil and grease. Additionally, the Town has an industrial pretreatment permit for Tyson Foods. This permit (see Attachment A) specifies that the maximum monthly concentration limit of oil and grease to be 30 mg/L. 1.2.2 Waste Activated Sludge Generation After each aerobic granular sludge (AGS) treatment cycle, the system has a brief, but high -volume waste activated sludge (WAS) and water level correction (WLC) step. These wasted solids flow via gravity to an intermediate tank for flow equalization. From there, WAS/WLC flows via a 12" gravity pipeline to the sludge buffer tank (formerly secondary clarifier 3). The sludge buffer tank serves as a thickener and decants liquids from the solids process. From the sludge buffer tank the WAS Pump Station delivers thickened solids primarily to Digester No.1. From Digester 1, sludge is transferred sequentially through each digester. The aerobic digesters provide 41.9 days of residual storage and meet the design requirements per 15A NCAC 02T .0505(o). The new Digested Sludge Pump Station pumps from Digester 3 to the dewatering building. The dewatering process includes two screw presses with accommodations for a third screw press in the future. Polymer is added to aid in solids and liquids separation. From there, dewatered solids are transported to the Wilkes County Landfill for disposal. Landfilling of biosolids is the current mode of biosolids disposal. See Table 1-1 for the design WAS production rates. Table 1-1. Design Sludge Production Rates for Maximum Month Average Design Flow (8 MGD) Sludge Type Sludge Production (lb/day) Primary Sludgea 0 Waste Activated 16,706 Sludge 'No primary sludge is produced because there are no primary clarifiers 1.3 Compliance Monitoring Surface disposal provisions of the Compliance with 40 CFR Part 503 regulations do not apply when biosolids are transported to a Class IV landfill. These regulations are covered instead under 40 CFR Part 258. Per the Biosolids Technology Fact Sheet (EPA, 2018) requirements under 40 CFR Part 258 include: Mixing the biosolids and the municipal waste prior to placement in the landfill Paint filter test to verify solids content > 18% Toxicity characterization leaching procedure (TCLP) to verify the biosolids are nonhazardous. Town of Wilkesboro Cub Creek WWTP Expansion and Upgrades I Residuals Management Plan ��� Attachments 1.4 Beneficial Reuse/Disposal Dewatered solids are conveyed to the Wilkes County Landfill for disposal. Landfilling of biosolids is the current mode of biosolids disposal and is also the preferred mode for the expansion and upgrade of the Wilkesboro WWTP. Because landfill disposal does not require Class A or Class B VSR reduction requirements, this preferred alternative does not have to meet a minimum VSR or HRT in the aerobic digesters. The Wilkes Landfill currently accepts 3 truckloads per day of the WWTP's solids. This equates to approximately 33 dry tons per day. The estimated maximum month solids production (Table 1-1) is 8.3 dry tons per day. The existing agreement with the Wilkes landfill therefore is sufficient for the future solids production (see Attachment B for the agreement). If Wilkesboro needs greater options than landfilling dewatered solids, the Town has a Class B Land Application permit that has lapsed. Utilizing the Class B Land Application permit would require greater compliance monitoring but is an option. 2 Attachments Attachment A - Tyson Foods Industrial User Permit (IUP) Attachment B - Agreement for Disposal of Sludge and Leachate Town of Wilkesboro Cub Creek WWTP Expansion and Upgrades I Residuals Management Plan ��� Attachments This page intentionally left blank. Town of Wilkesboro Cub Creek WWTP Expansion and Upgrades I Residuals Management Plan Attachment A - Tyson Foods Industrial User Permit (IUP) Attachment A -Tyson Foods Industrial User Permit (IUP) Town of Wilkesboro Cub Creek WWTP Expansion and Upgrades I Residuals Management Plan ��� Attachment A - Tyson Foods Industrial User Permit (IUP) This page intentionally left blank. Town of Wilkesboro Control /wltmtyvWUMunopelRy PERMIT Industrial User Pretreatment Permit (IUP) To Discharge Wastewater Under the Industrial Pretreatment Program 1003 N/A IUP Numw 40 CPR Cat p InMpuaMa) In compliance with the provisions of North Carolina General Statute 143-215.1, any applicable federal categorical pretreatment regulations, all other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Control Authority and/or Municipality Sewer Use Ordinance. The following Industry, hereafter referred to by name or as the permittee: IMueW rene, pvmitlee: TYSON FARMS, INC. f=1q 1U—W M a4 to as 704 FACTORY STREET CV WILKESBORO Sm LP NORTH CAROLINA 28697 is hereby authorized to discharge wastewater from the facility located at the above listed address into the sanitary sewer collection system and the wastewater treatment facility of the Control Authority and/or Munici ity listed below: RIP CaXmlN iv x Mu —,ail W Pnine: CUB CREEK WWTP NPOES NumWr. NCO021717 w.vrPPeamee: 701 SNYDER STREET CM. M, .Lp WILKESBORO, N.C. 28697 in accordance with effluent limitations, monitoring requirements, and all other conditions set forth in Parts I, II, and III of this Industrial User Pretreatment Permit (IUP). Eneam aw, mia pem,n .�e m..mwearm m eiewrq. wu eewme elletliwM mmngMw Nb tlele:. ESpIMun eNe, Nie pennil aA Un euNuwim m ehNape ¢lull espin tl mie�ePM mNie Pete: Date: j/7 202� IUP, PART I, Industrial User (IU) Specific Conditions IUP, PART I, OUTLINE: A.) IUP Basic Information B.) IUP Modification History C.) Authorization Statement D.) Description of Discharges E.) Schematic and Monitoring Locations F.) Effluent Limits & Monitoring Requirements G.) Definitions and Limit Page(s) notes A. IUP Basic Information: Receiving Coatral Authority &. WWTPname: POTW NPDESM: CUB CREEK W WTP NCO021717 IUP Name: IUP Number: TYSON FARMS, INC. 1003 IUP Mom dek : Pipe Numbers, list all rcgulated pipes: OCTOBER 31, 2019 01 IUP Expiration dek : IUP 40 CFR d ofapplicable), or N/A: OCTOBER 30, 2024 N/A B. IUP Modification History: Date Originally Issued December 5 1987 Rcnon for & Descnpfion ofmodifications. Original Permit November 1,1999 Permit Renewal November 3, 1999 Change Name on Permit to Mark Welborn November 1, 2004 Permit Renewal March 24, 2005 Added Column Monitoring Frequency POTW March 10,2008 Flow changed to 2,000,000 gdp 4170 lbs.per day on BOD and 4170 lbs.per day on TSS June 30, 2009 Flow changed to 2,500,000 gdp 5733.75 lbs.per day on HOD and 5733.75 lbs.per day on TSS November 1, 2009 PERMIT RENEWAL June 1, 2011 Flow changed to 3.0 MGD 6255lbs. per day of HOD and 6255 lbs. per day of TSS August 31,2011 Change Wording on Flow- 3 MGD 7 day average not to exceed a 3.0 MGD 7 days equalized flow from Sunday to Saturday August 1, 2014 Permit Renewal and Name Change to Tyson Farms, Inc. Industrial User Pretreatment Permit (IUP) PART II General Conditions May 1, 2017 Manager Change and add Tyson Farms, Inc. Plant II - Kirk Church replaced Bob Johnson as Complex Manager. Added Tyson Farms, Inc. Plant Il (formally known as Cook Products which was closed 04-25-2008) back to Industrial User Pretreatment Permit Pipe #001. October 31, 2019 Permit Renewal — Kevin Taylor replaced Kirk Church as Complex Manager March 12, 2020 Changed Oil & Grease monitoring for Tyson to once per month instead of twice per month. Added NER equipment to ]UP Treatment Units A Complctc remit modification History is nquimd. C.) Authorization Statement: 1.) The Permittee is hereby authorized to discharge wastewater in accordance with the effluent limitations, monitoring requirements, and all other conditions set forth in this Industrial User Pretreatment Permit (IUP) into the sewer collection system and wastewater treatment facility of the Control Authority and/or Municipality. 2.) The Permittee is hereby authorized to continue operation of and discharge wastewater from the following treatment or pretreatment facilities. These facilities must correspond to the treatment units listed on both the application and inspection forms. Industrial User Pretreatment Permit (IUP) IU Treatment Units At Facility on Factory Street: Flocculent Tank Grease Trap Grit Removal pH adjustment Screening Wet Well Coagulation Tank Four Dissolved Air floatation Cells Spill Protection Natural Energy Recovery (NER) equipment: Two circular DAF unit. One Ozone generator Two Secondary Poultry Nutrients (SPN) process tanks One Centrifuge for removing oil, solids and water One Wet well One Finish Poultry oil tank At Secondary Facility beside Cub Creek W WTP on old Hwy 421: Wet Well Lift Station 2 7.5 million gallon aeration basin located beside Cub Creek WV 3.) The Permitter: is hereby authorized to, if required by the Control Authority and/or Municipality and after receiving Authorization to Construct (A to C) from the Control Authority and/or Municipality, construct and operate additional pretreatment units as needed to meet final effluent limitations. D.) Description of IUP Discharge(s): 1. Describe the discharge(s) from all regulated pipes. Industrial User Pretreatment Permit (IUP) PART II General Conditions e # 001 , Description of Discharge: All process water from Fresh Plant, Food Service Plant and Plant II (formally Cook Products) Storm water runoff from Live Receiving Area Cooling tower water Boiling Cooler tower water E.) Schematic and Monitoring Locations: The facility schematic and description of monitoring location(s) given below must show enough detail such that someone unfamiliar with the facility could readily find and identify the monitoring location(s) and connection to the sewer. Include and identify all regulated pipes. See Following Pages for Schematic and Monitoring Locations Flow Chart Waste Water Plant II (formally Cock 'rod'ets) Reopen In March 201 Wet Well S—pgng Poi. Foo0s Service Screen y Offal Feather Son Processing Plant Offal Meat Reels On Foods Services Cp Meat S Feather Screeds Meats Side Feather Side (5) Reels 314hp (2) Reels 314hp Wet Well 60,000/gal Mixing & Pumps 3hp Mixers (3) 50hp Pumps Acidulation Tank Gtdodne Replacemnet PH 4.0-45 H2 Sea 93% 87,0001 gal (1)10hp mixer Page 4-C Tanker truck loading Page 4-C gravity flow Aerators ]Slip Mixer 60Np 251ip fi0hp , Mi er 251, Mlz, Bypass 25hp v.Ive No Mixer Eff.to Town of Wilkesboro P.O.T.W 10hp 60ho 70hp Final EH Sample point E_eator VYw Xa EFF Fine Effluent Flow Meter S sampling Point Note Valve Symbols NC Normally Close NO Normally Open Page 4-C \ � u,ououo=ou: ))}}k)}kr . /) 4!*> § {\{\{{\\{\! )±!!!!!f;! _ \//\\/\\ ! I )] ) )f;°, \ ) ]\!)' j k\ � ) !!!«;,�! !)§/m (//kali2,l=¥ G H a 3 0 ao m c '3 L m .c 3 0 k. `o 0 U Industrial User Pretreatment Permit PART II General Conditions G.) Definitions and Limit Page(s) notes: In addition to the definitions in the Town of Wilkesboro Sewer Use Ordinance the following definitions apply: 1. Composite Sample: Unless defined differently below, a composite sample for the monitoring requirements of this IUP, is defined as the automatic or manual collection of one grab sample of constant volume, not less than 100 ml, collected every hour during the entire discharge period on the sampling day. Sampling day shall be a Typical production, and discharge day. 2. Daily Monitoring Frequency Daily Monitoring Frequency as specified in this IUP shall mean each working day. 3. Grab Sample Grob sample for the monitoring requirements of this IUP, is defined as a single "dip and take" sample collected at a representative point in the discharge stream. 4. Instantaneous measurement An Instantaneous measurement for the monitoring requirements of this IUP is defined as a single reading, observation, or measurement. 5. Monitoring and Reporting All Monitoring shall be performed by a state certified laboratory by standard methods. All data shall be reported to the Division as specified in Part II, 2 of this permit, note that violations shall be reported within 24 hours, and that all sampling (even if done more frequently than required) shall be summarized on forms approved by the Division and sent to the following addresses: Control Authority Town of Wilkesboro Address 203 West Main Street City, State, Zip Wilkesboro, NC 28697 6. Notice to Permittees Permince is subject to the thirty (30) general conditions attached, found in Part Il of this permit. Industrial User Pretreatment Permit (IUP PART II General Conditions Outline of PART II, 1. Representative Sampling 16. Federal and/or State Laws 2. Reporting 17. Penalties 3. Test Procedures 18. Need to Halt or Reduce 4. Additional Monitoring by 19. Transferability Permittee 5. Duty to comply 20. Property Rights 6. Duty to Mitigate 21. Severability 7. Facilities Operation, Bypass 22. Modification, Revocation, Termination 8. Removed substances 23. Reapplication 9. Upset Conditions 24. Dilution Prohibition 10. Right of Entry 25. Reports of Changed Conditions 11. Availability of Records 26. Construction of pretreatment facilities 12. Duty to provide information 27. Reopener 13. Signatory Requirements 28. Categorical Reopener 14. Toxic Pollutants 29. General Prohibitive Standards 15. Civil and Criminal Liability 30. Reports of Potential Problems 1. Representative Sampling Samples and measurements taken as required herein shall be representative of the volume and nature of the monitored discharge. All samples shall be taken at the monitoring points specified in this permit and, unless otherwise specified, before the effluent joins or is diluted by any other wastestream, body of water, or substance. Monitoring points shall not be changed without notification to, and approval by, the permit issuing authority. 2. Reporting a.) Monitoring results obtained by the permittee shall be reported on forms specified by the Town of Wilkesboro, postmarked no later than the twentieth day of the month following the month in which the samples were taken. If no discharge occurs during a reporting period (herein defined as each calendar month) in which a sampling event was to have occurred, a forth with the phrase "no discharge" shall be submitted. Copies of these and all other reports required herein shall be submitted to the Control Authority and/or Municipality and shall be sent to the following address: Amber Garwood Pretreatment Coordinator Town of Wilkesboro - Cub Creek W WTP PO Box 1056 Wilkesboro, NC 28697 b.) If the sampling performed by the permittee indicates a violation, the permittee shall notify the Control Authority and/or Municipality within 24 hours of becoming aware of the violation. The pennittee shall also repeat the sampling and analysis and submit the results of the repeat analysis to the Control Authority and/or Municipality within 30 days after becoming aware of the violation. Industrial User Pretreatment Permit PART II General Conditions 3. Test Procedures Test procedures for the analysis of pollutants shall be performed in accordance with the techniques prescribed in 40 CFR part 136 and amendments thereto unless specified otherwise in the monitoring conditions of this permit. 4. Additional Monitoring by Permittee If the permittee monitors any pollutant at the location(s) designated herein more frequently than required by this permit, using approved analytical methods as specified above, the results of such monitoring shall be submitted to the Control Authority and/or Municipality. The Control Authority and/or Municipality may require more frequent monitoring or the monitoring of other pollutants not required in this permit by written notification. 5. Duty to Comply The permittee must comply with all conditions of this permit. Any permit noncompliance constitutes a violation of the Control Authority and/or Municipality Sewer Use Ordinance and is grounds for possible enforcement action. 6. Duty to Mitigate - Prevention of Adverse Impact The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this permit which has a reasonable likelihood of adversely affecting human health, the POTW, the waters receiving the POT W's discharge, or the environment. 7. Facilities Operation, Bypass The permittee shall at all times maintain in good working order and operate as efficiently as possible, all control facilities or systems installed or used by the permittee to achieve compliance with the terms and conditions of this permit. Bypass of treatment facilities is prohibited except when approved in advance by the Control Authority and/or Municipality. Bypass approval shall be given only when such bypass is in compliance with 40 CFR 403.17. 8. Removed Substances Solids, sludges, filter backwash, or other pollutants removed in the course of treatment or control of wastewaters shall be disposed of in a manner such as to prevent any pollutants from such materials from entering the sewer system. The permittee is responsible for assuring its compliance with my requirements regarding the generation, treatment, storage, and/or disposal of "Hazardous waste" as defined under the Federal Resource Conservation and Recovery Act. 9. Upset Conditions An "upset" means an exceptional incident in which there is an unintentional and temporary noncompliance with Pretreatment Standards because of factors beyond the reasonable control of the permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed or inadequate treatment facilities, lack of preventative maintenance, or careless or improper operations. An upset may constitute an affirmative defense for action brought for the noncompliance. The permittee has the burden of proof to provide evidence and demonstrate that none of the factors specifically listed above were responsible for the noncompliance. 10. RightofEntry The permittee shall allow the staff of the State of North Carolina Department of Environmental Quality, Division of Water Resources, the Regional Administrator of the Environmental Protection Agency, the Control Authority and/or Municipality, and/or their authorized representatives, upon the presentation of credentials: Industrial User Pretreatment Permit (IUP) PART II General Conditions 1. To enter upon the permittee's premises where a real or potential discharge is located or in which records are required to be kept under the terms and conditions of this permit; and 2. At reasonable times to have access to and copy records required to be kept under the terms and conditions of this permit; to inspect any monitoring equipment or monitoring method required in this permf ; and to sample any discharge of pollutants. 11. Availability of Records and Reports The permittee shall retain records of all monitoring information, including all calibration and maintenance records m well as copies of reports and information used to complete the application for this permit for at least three years. All records that pertain to matters that are subject many type of enforcement action shall be retained and preserved by the permittee until all enforcement activities have concluded and all periods of limitation with respect to any and all appeals have expired. Except for data determined to be confidential under the Sewer Use Ordinance, all reports prepared in accordance with terms of this permit shall be available for public inspection at the Control Authority and/or Municipality. As required by the Sewer Use Ordinance, effluent data shall not be considered confidential. 12. Duty to Provide Information The permittee shall furnish to the Director of Public Works or his/her designees, within a reasonable time, any information which the Director, his/her designee, or the Division of Water Resources may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this permit or to determine compliance with this permit. The permittee shall also furnish, upon request, copies of records required to be kept by this permit. 13. Signatory Requirements All reports or information submitted pursuant to the requirements of this permit must be signed and certified by the Authorized Representative as defined under the Sewer Use Ordinance. If the designation of an Authorized Representative is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, or overall responsibility for environmental matters for the company, a new authorization satisfying the requirements of this section must be submitted to [POT W Director] prior to or together with any reports to be signed by an authorized representative. 14. Toxic Pollutants If a toxic effluent standard or prohibition (including any schedule of compliance specified in such effluent standard or prohibition) is established under Section 307(a) of the Federal Clean Water Act for a toxic pollutant which is present in the discharge and such standard or prohibition is more stringent than any limitation for such pollutant in this permit, this permit may be revised or modified in accordance with the toxic effluent standard or prohibition and the permittee so notified. 15. Civil and Criminal Liability Nothing in this permit shall be construed to relieve the permittee from civil or criminal penalties for noncompliance. 16. Federal and/or State Laws Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, or penalties established pursuant to any applicable Federal and/or State law or regulation. 17. Penalties The Sewer Use Ordinance of the Control Authority and/or Municipality provides that any person who violates a permit condition is subject to a civil penalty not to exceed $25,000 dollars per day of such violation. 10 Industrial User Pretreatment Permit PART Il General Conditions Under state law, (NCGS 143-215.613), under certain circumstances it is a crime to violate terms, conditions, or requirements of pretreatment permits. It is a crime to knowingly make any false statement, representation, or certification in any record or other document submitted or required to be maintained under this permit, including monitoring reports or reports of compliance or noncompliance. These crimes we enforced at the prosecutorial discretion of the local District Attorney. 18. Need to Halt or Reduce not a Defense It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity to maintain compliance with the conditions of the permit. 19. Transferability This permit shall not be reassigned or transferred or sold to a new owner, new user, different premises, or a new or changed operation without approval of the Town. 20. Property Rights This permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Federal, State or local laws or regulations. 21. Severability The provisions of this permit me severable and, if any provision of this permit or the application of any provision of this permit to any circumstance is held invalid, the application of such provision to other circumstances and the remainder of this permit shall not be affected thereby. 22. Permit Modification, Revocation, Termination This permit may be modified, revoked and reissued or terminated with cause in accordance to the requirements of the Control Authority and/or Municipality Sewer Use Ordinance and North Carolina General Statute or implementing regulations. 23. Re -Application for Permit Renewal The permittee is responsible for filing an application for reissuance of this permit at least 180 days prior to its expiration date. 24. Dilution Prohibition The permittee shall not increase the use of potable or process water or in any other way attempt to dilute the discharge as a partial or complete substitute for adequate treatment to achieve compliance with the limitations contained in this permit. 25. Reports of Changed Conditions The permittee shall give notice to the Control Authority and/or Municipality of any planned significant changes to the permittee's operations or system which might alter the nature, quality, or volume of its wastewater at least 180 days before the change. The permittee shall not begin the changes until receiving written approval from the Control Authority and/or Municipality. Also see Part II, 30 below for additional reporting requirements for spill/slug issues. 26. Construction No construction of pretreatment facilities or additions thereto shall be begun until Final Plans and Specifications have been submitted to the Control Authority and/or Municipality and written approval and an Authorization to Construct (A to C) have been issued. 11 Industrial User Pretreatment Permit (IUP) PART II General Conditions 27. Reopener The permit shall be modified or, alternatively, revoked and reissued to comply with any applicable effluent standard or limitation for the control of any pollutant shown to contribute to toxicity of the W WTP effluent or any pollutant that is otherwise limited by the POTW discharge permit. The permit as modified or reissued under this paragraph may also contain my other requirements of State or Federal pretreatment regulations then applicable. 28. General Prohibitive Standards The permittee shall comply with the general prohibitive discharge standards in 40 CFR 403.5 (a) and (b) of the Federal pretreatment regulations. 30. Potential Problems The permittee shall provide protection from accidental and slug discharges of prohibited materials and other substances regulated by this permit. The permittee shall also notify the POTW immediately of my changes at its facility affecting the potential for spills and other accidental discharge, discharge of a non - routine, episodic nature, a non -customary batch discharge, or a slug load as defined in the Sewer Use Ordinance. Additionally, the permittee shall notify by telephone the Control Authority and/or Municipality immediately of all discharges that could cause problems to the POTW including my slug loadings as defined in the Sewer Use Ordinance. If the permittee experiences such a discharge, they shall inform the Control Authority and/or Municipality immediately upon the fast awareness of the commencement of the discharge. Notification shall include location of the discharge, type of waste, concentration and volume if (mown and corrective actions taken by the permittee. A written follow-up report thereof shall be filed by the permittee within five (5) days, unless waived by the Control Authority and/or Municipality. 12 Industrial User Pretreatment Permit (IUP) PART III Specific Conditions In addition to the requirements in Part 11, 30, the Permittee shall complete installation and/or commence implementation, operation, and/or maintenance of the following specific protection Measures, Activities, Plans. Etc. (Items without specific completion dates, or marked as "Continuous." must be performed for the entire duration of the permit): Required Completion/ Implementation Description of Measure, Activity, Plan, etc. Date Continue to follow the POTW Approved Spill Control and Continuous Response Plan This plan shall be updated annually and a copy given to the November of POTW Pretreatment Coordinator to keep on file at Cub Each year Creek W WTP The pernittee shall provide updates to the Control Authority as required by Part II, 30, of this IUP. Modifications to the measures shall be approved by the Control Authority prior to installation/implementation. If a measure fails, the Control Authority shall be notified within 24 hours. 2. Sludge Management Plan Ninety days prior to the initial disposal of sludge generated by any pretreatment facility, the permittee shall submit a sludge management plan to the Control Authority. 3. Flow Measurement Requirements (For SIUs with discharge flow meters) The permittee shall maintain appropriate discharge flow measurement devices and methods consistent with approved scientific practices to ensure the accuracy and reliability of measurements of the volume of monitored discharges. Devices installed shall be a continuous recording flow meter capable of measuring flows with a maximum deviation of less than 10% from true discharge rates throughout the range of expected discharge volumes. The devices shall be installed, calibrated, and maintained to ensure accuracy. At the time of issuance of the permit, this method consists of Venturi Meter. The meter shall be calibrated every year. Modifications to the flow metering equipment shall be approved by the Control Authority prior to installation. If a required flow measurement device fails, the Control Authority shall be notified within 24 hours. 4. Certified Laboratory Analysis Pollutant analysis shall be performed by a North Carolina Division of Water Resources Certified Laboratory that is certified in the analysis of the pollutant in wastewater. Certified Operator Pursuant to Chapter 90A-44 of North Carolina General Statutes, and upon classification of the facility by the Certification Commission, the permittee shall employ a certified 13 Industrial User Pretreatment Permit (IUP) PART III Specific Conditions wastewater pretreatment plant operator in responsible charge (ORC) of the wastewater treatment facilities. Such operator must hold a certification of the type and grade equivalent to, or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The permittee must also employ a certified backup operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8G .0200. The ORC of the facility must visit the wastewater facility as required; must properly manage and document daily operation and maintenance of the facility; and must comply with all other conditions of Title 15A, Chapter 8G .0200. The permittee shall submit a letter designating the operator in responsible charge to the Certification Commission or their designee within thirty days after facility classification. 14 IUP Synopsis A. IUP Basic Information: Rcmiving Control Authority&WWIP namc: POTW NPDES M: CUB CREEK WWTP NCO021717 IUP Name : IUP Number TYSON FARMS, INC. 1003 IUP E@ctivc dart: Pipe Numbers, list ell mg.l.t d pipes: October 31, 2019 01 IUP Expin ion date : IUP 40 CFR d (ifapplicable), or N/A: OCTOBER 30, 2024 N/A B. IU Survey & Application form A completed copy of the Industrial User Wastewater Survey & Application Form (see appendix 6-A) should be attached to this synopsis. C. IU Inspection form A copy of an Industrial User Inspection Form (see chapter 7) completed by the Control Authority and/or Municipality before discharge begins should be attached to this synopsis. D. RATIONALE FOR LIMITATIONS: as listed on the IUP Limits Page(s), PART 1, Section F of the IUP. ALL Parameter Limits are calculated to protect the POTW from pass through and inhibition and to allow the beneficial use of biosolids generated by the W WTP. These limits do not result in over allocation of the POTW'S treatment capacity. Limits are achievable with standard technology. wI UfAxw Scan Log E-mail Sent Date: 01-28-2020-051209 To: agarwood®wilkesboronc.org Cc: From: wwtp2391@gmail.com Subject: Message: Attachments: image01-28-2020-051209.pdf- q�-n pg.� Town of Wilkesboro Cub Creek WWTP Expansion and Upgrades I Residuals Management Plan ��� Attachment B - Agreement for Disposal of Sludge and Leachate Attachment B - Agreement for Disposal of Sludge and Leachate Town of Wilkesboro Cub Creek WWTP Expansion and Upgrades I Residuals Management Plan ��� Attachment B - Agreement for Disposal of Sludge and Leachate This page intentionally left blank. NORTH CAROLINA WILKES COUNTY AGREEMENT FOR DISPOSAL OF SLUDGE AND LEACHATE THIS AGREEMENT FOR DISPOSAL OF SLUDGE AND LEACHATE (hereinafter "Agreement") is made and entered into effective the l't day of July, 2014, by and between the Town of Wilkesboro (hereinafter "the Town"), a municipal corporation and body politic located in the County, State of North Carolina, and the County of Wilkes (hereinafter "the County"), a body politic and political subdivision of the State of North Carolina; WITNESSETH: THAT WHEREAS, the Town owns and operates both a water treatment plant and a wastewater treatment plant; and WHEREAS, the operation of said plants produces both water treatment sludge and wastewater treatment sludge (hereinafter collectively referred to as "sludge") which requires disposal in compliance with applicable law; and WHEREAS, the County owns and operates a lined landfill, Permit #97-04, located in Roaring River, Wilkes County, North Carolina (hereinafter referred to as "the Landfill"); and WHEREAS, the operation of the Landfill produces water that has been in contact with solid waste, which water (hereinafter referred to as "leachate") requires disposal or treatment in compliance with applicable law; and WHEREAS, the Town desires to dispose of all sludge produced through the operations of its water treatment plant and wastewater treatment plant by depositing the same at the Landfill on a periodic basis, after said sludge has been de -watered by the Town as required hereunder; and WHEREAS, the County desires to dispose of all leachate produced at the Landfill by discharging the same into the Town's wastewater treatment plant pursuant to a discharge permit to be issued by the Town; and WHEREAS, the parties have agreed to the terms and conditions which shall govern the foregoing, and desire to set forth said terms and conditions in this Agreement; NOW, THEREFORE, for and in consideration of the recitals set forth above and the premises and mutually beneficial covenants and agreements as hereinafter set forth hereinafter, both parties do hereby contract and agree as follows: 1 ARTICLE I DISPOSAL OF SLUDGE 1. Disposal. The County agrees to accept for disposal at the Landfill all sludge produced at the Town's water treatment plant and wastewater treatment plant, subject to the terms of this Article I. 2. De -watering. Notwithstanding paragraph 1 above, the County shall not be required to accept sludge from the Town for disposal at the Landfill unless said sludge has been de -watered by the Town. Sludge shall be considered to have been sufficiently de -watered in compliance with the requirements of this paragraph 2 if it contains no free liquids and can be confined, compacted, and covered in accordance with all applicable federal, state, and local laws, rules, regulations, and ordinances governing the acceptance and disposal of sludge at a landfill permitted in North Carolina. 3. Hauling. The Town agrees to be responsible for hauling all sludge to the Landfill under this Agreement and for paying all expenses in connection therewith. The Landfill will accept a maximum of three (3) loads of sludge per day. 4. Rates. For each ton (or portion thereof) of sludge disposed of at the Landfill under this Agreement, the rate to be charged by County and paid by the Town for each fiscal year (or portion thereof) this Agreement remains in effect shall be fifty percent (50%) of the Landfill tipping fee as established for said fiscal year in the County budget for the same, beginning with fiscal year 2014-15 and continuing throughout the term hereof. The parties acknowledge and agree that said Landfill tipping fee may be adjusted by the County effective July 1 of each fiscal year, and the parties further acknowledge and agree that the rate to be paid by the Town under this paragraph 4 shall be fifty percent (50%) of said Landfill tipping fee as the same may be adjusted for each fiscal year; provided, that the rate under this paragraph 4 for each fiscal year hereunder, once established by the County in its annual budget for the same, may not be changed prior to the beginning of the following fiscal year. The County shall give notice to the Town as soon as possible prior to the beginning of each fiscal year as to the Landfill tipping fee that will be effective during the same, but in no event shall said notice be given later than the date the annual budget is adopted. 5. Sludge Used as Cover Dirt. Notwithstanding any other provision of this Article I, there shall be no charge by the County for sludge disposed of at the Landfill under this Agreement that meets all federal and/or state requirements for cover dirt at the Landfill and that can reasonably be used by the County for this purpose, as determined by the County in its discretion. Said sludge is hereinafter referred to as "cover sludge." 6. Billing. For all sludge disposed of at the Landfill under this Agreement except for cover sludge, the County shall weigh the same at the time it is delivered to the Landfill by the Town in order to determine its weight. The County shall then invoice the Town monthly for each ton (or portion thereof) of sludge so weighed, at the rate established under paragraph 4 above. Payment shall be made by the Town within thirty 2 (30) days of the date of such invoice. The County shall maintain a record of all sludge delivered to the Landfill for disposal under this Agreement, including cover sludge, and shall, upon request, provide a periodic report to the Town accounting for the County's daily determination as to what qualifies for cover sludge. ARTICLE II DISPOSAL OF LEACHATE 1. Disposal. The Town agrees to accept for disposal at its wastewater treatment plant all leachate produced at the Landfill up to those maximum amounts specified in paragraph 2 below, subject to the terms of this Article II. 2. Discharge Permit. The Town agrees to issue to the County a permit to discharge leachate from the Landfill into the Town's wastewater treatment plant, up to a maximum amount of one hundred thousand (100,000) gallons per day, which amounts to three million (3,000,000) gallons per month and thirty-six million (36,000,000) gallons per year. All leachate discharged to the Town under this Agreement shall be in compliance with the terms and conditions as set forth in the Wilkes County Landfill Industrial User Pretreatment Permit (IUP), identified as Permit No. 1004-1. 3. Hauling. The County agrees to be responsible for hauling all leachate to the Town's wastewater treatment plant under this Agreement and for paying all expenses in connection therewith. 4. Rates. For each gallon (or portion thereof) of leachate disposed of at the Town's wastewater treatment plant under this Agreement, the rate to be charged by the Town and paid by the County for each fiscal year (or portion thereof) this Agreement remains in effect shall be fifty percent (50%) of the Town's schedule of fees for treating leachate at said wastewater treatment plant as established for said fiscal year in the Town budget for the same, beginning with fiscal year 2014-15 and continuing throughout the term hereof. The parties acknowledge and agree that said schedule of fees may be adjusted by the Town effective July 1 of each fiscal year, and the parties further acknowledge and agree that the rate to be paid by the County under this paragraph 4 shall be fifty percent (50%) of said schedule of fees as the same may be adjusted for each fiscal year; provided, that the rate under this paragraph 4 for each fiscal year hereunder, once established by the Town in its annual budget for the same, may not be changed prior to the beginning of the following fiscal year. The Town shall give notice to the County as soon as possible prior to the beginning of each fiscal year as to the applicable schedule of fees that will be effective during the same, but in no event shall said notice be given later than the date the annual budget is adopted. [NOTE: Sam Call was to provide some language for this paragraph -- need to check with Sam on this.] 5. Surcharge for Ammonia Content. The Town shall be authorized to charge the County, and the County agrees to reimburse the Town for, any surcharge that 3 may be incurred by the Town for ammonia content that exceeds the limits allowed by applicable federal or state law with respect to the leachate disposed of at the Town's wastewater treatment plant under this Agreement. 6. Monitoring, Testing, and Reporting. The Town shall be responsible for complying with all monitoring, testing and reporting requirements as imposed by the North Carolina Division of Environmental Management, or any successor agency thereto, and the Town Sewer Use Ordinance; provided, that the County may elect to be responsible for complying with all such requirements if the County so chooses. To the extent the Town exercises responsibility for compliance with said requirements, the Town shall be authorized to charge the County, and the County agrees to reimburse the Town for, all costs incurred by the Town with respect to the same. 7. Billing. For all leachate disposed of at the Town's wastewater treatment plant under this Agreement, the Town shall invoice the County as the same is received for disposal, at the rate established under paragraph 4 above. The Town shall also invoice the County for any surcharges incurred by the Town under paragraph 5 above and for any charges incurred by the Town under paragraph 6 above. Payment shall be made by the County within thirty (30) days of the date of such invoice. ARTICLE III GENERAL PROVISIONS 1. Reporting Requirements. In addition to any other reporting requirements that may be imposed on either party under Article I or Article II above, each party agrees to provide such records or documentation as may reasonably be requested by the other party in order to verify compliance with the parties' obligations under this Agreement. 2. Compliance with Laws, Rules, and Regulations. Each of the parties hereto covenants and agrees to comply at all times with such laws, rules, regulations, and ordinances as have been or may be prescribed by any governing authority with respect to the subject matter of this Agreement. 3. Term and Termination. The initial term of this Agreement shall be for a period of five (5) years, from July 1, 2014 through June 30, 2019. Thereafter, this Agreement shall automatically continue to renew for successive one (1) year terms unless either party shall, no less than one (1) year prior to the end of the initial or any renewal term, give written notice to the other party that the Agreement will be considered terminated upon the expiration of said tern. Notwithstanding the foregoing, upon either party's breach of any of the provisions of this Agreement, the other party may provide written notice to the breaching party specifying the nature of the breach and allowing thirty (30) days to cure the same, and, upon failure of the breaching party to timely cure, may terminate this Agreement. n 4. Assignment. Neither party may assign or transfer any portion of this Agreement, or any of its rights or obligations hereunder, without the prior written consent of the other party. 5. Notice. Whenever under the terms of this Agreement either party shall be required or permitted to give notice to the other, such notice shall be in writing and shall be delivered either by First Class U.S. Mail or by hand -delivering the same to the other party. Notice shall be deemed given when mailed or when hand -delivered. 6. Administration. Each party may designate any official, employee, office, or department within that party's organizational structure to administer this Agreement on behalf of said party. 7. Previous Agreements Void. This Agreement shall supersede all previous contracts or agreements, whether oral or written, between the parties in connection with or incident to the subject matter hereof. From and after the effective date of this Agreement, all such previous contracts or agreements shall be deemed void and of no further force or effect. 8. Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of North Carolina. 9. Entire Agreement. This Agreement contains the entire agreement and understanding between the parties. There are no oral understandings, terms, or conditions, and neither party has relied upon any representation, express or implied, not contained in this Agreement. All prior understandings, terms, or conditions are deemed merged in this Contact and the same may not be changed orally, but only by an amendment in writing signed by both parties. IN WITNESS THEREOF, the parties have set the hands and official seals as of the day and year above first written. [Signatures on following pages] 5 This page intentionally left blank. 100 North Main Street, Suite 1500 Winston-Salem, NC 27101-4015 336.955.8250 NCBELS License F0116 hdrinc.com © 2023 HDR, Inc., all rights reserved