County: Stokes Project: Belews Creek Corrective Action Plan River basin: Roanoke
Person financially responsible:Duke Energy Carolinas,LLC-Issa J Zarzar,GM Project#: STOKE-2021-001
CCP Project Management
Address: 400 S Tryon St Ste 30C,Charlotte,NC 28202
1. Project Location: Middleton Loop Road,Belews Creek
Pictures: No
2. Weather and soil conditions: 50s,sunny,workable soil Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: November 20,2023
9. Corrective action needed:
10. Comments: The site was inspected on November 16,2023 to facilitate a site closure.All construction and
land disturbing activities have been completed at the site.Temporary measures have been
removed.Permanent ground cover sufficient to restrain erosion has been established.No
additional self-monitoring or self-inspections are required.Project is in compliance and
released under the SPCA.Termination of coverage under the NPDES General Stormwater
Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice
of Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
If you have any questions,please contact the Winston Salem Regional Office or
nate.gainer@deq.nc.gov or 336-776-9660.
Reported by: Nate Gainer Others present:
Date of inspection: November 16,2023 Time arriving on site: 9:30 AM Time leaving site: 9:45 AM
CC: