HomeMy WebLinkAbout20190230 Ver 7_R-2582A Wetland Impact Summary Sheet_2023.11.28_20231129WETLAND AND SURACE WATER IMPACTS SUMMARY VVETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 34+78 to 42+09 36" RCP -III / Roadway Fill 0.38 0.01 < 0.01 121 10 2 -L- 81+96 to 85+94 Triple 9 X 9 RCBC / Roadway Fill 0.03 0.01 0.03 0.14 0.01 226 35 3 -L- 92+72 to 96+17 Roadway Fill 0.17 0.09 < 0.01 4 -L- 138+79 to 144+44 42" RCP -III / Roadway Fill 2.10 0.28 0.01 < 0.01 252 21 5 -L- 186+64 to 194+68 Roadway Fill 3.39 0.17 0.19 6 -L- 201+68 to 205+06 Double 48" RCP -III / Roadway Fill 3.37 0.08 0.12 0.09 < 0.01 826 9 7 -L- 248+36 to 251+62 84" RCP -IV / Roadway Fill 1.26 0.01 0.08 0.04 < 0.01 549 35 8 -L- 282+72 to 287+92 Triple 8 X 7 RCBC / Roadway Fill 0.14 0.08 0.13 < 0.01 45 9 -L- 381+38 to 390+97 Roadway Fill 0.64 0.19 10 -L- 409+20 to 409+39 Roadway Fill < 0.01 11 -L- 420+24 to 421+45 Roadway Fill < 0.01 < 0.01 12 -L- 150+32 to 151+20 42" RCP -III / Roadway Fill 0.02 < 0.01 209 20 TOTALS': 11.47 0.26 0.11 0.99 0.44 0.03 2665 175 0 'Rounded totals are sum of actual impacts NOTES: Site 6 includes 0.465 acres of fill impact due to the total take of wetland within the proposed roadway loop. Site 3 includes additional 0.09 acres of temp. fill and remove 0.04 of Mechanized Clearing Site 2 includes 20 linear feet of additional channel impacts from bank stabilization Site 8 : additional 30 feet bank stabilization, additional 120 feet of perm. and 16 feet temp. stream impacts for sec. stream SB05B Site 5 includes additional 0.17 acres of temp. wetland fill, convert 0.056 acre from mech. to perm. fill Site 7 includes additional 62 linear feet of stream impact