Loading...
HomeMy WebLinkAboutSW6230601_Supplement-EZ Form_20231206 FORM510ADED tOJECT INFORMATION 1 Project Name inberly 2 Project Area fac) 48.47 3 Coastal Wetland Area ac 4 Surface Water Area ac 3.617 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No )MPLIANCE WITH 02H.4003(4) 7 Width of vegetated setbacks provided feet "'30 8 Will the ve etated setback remain ve etated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003 4 c-d? NIA 0 Is streambank stabilization proposed on this project? No JMBERAND:TYPE OF.SCMs: 1 Infiltration System 0 2 Bioretention Cell 0 3 Wet Pond 1 4 Stormwater Wetland 0 5 Permeable Pavement ...0 6 Sand Filter 0 7 Rainwater Harvesting RWH 0 8 Green Roof 0 9 Level Spreader-Filter Stri (IS-FS 0 '0 Disconnected Impervious Surface(DIS) ...0 1 Treatment Swale 0 2 Dry Pond 0 3 StormFilter 0' .4 Silva Cell 0` 5 13a i[ter 0 '6 Filterra FORMS LOADED :SIGNER CE RTIFI CATION. '7 Name and Title: Carlo Pardo,PE ' .8 Organization: Bowman North Carolina.Ltd. '9 Street address: 4006 Barrett Drive,Suite 104 '0 Ci ,State,Zip: Raleigh,NC 27609 1 Phone number(s): 919-553-6570 ,2 Email: cpardo@bowman:com Certificafion Statement I c e rt ifyj under penalty o. law that this Supplement-EZ fours and all supporting information were prepared under my direction or supervision that the ,.. information provided m the farm is to the best of my knowledge and belief true accurate and complete and;tllatthe engineering plans specifications operation andmnaintenance agreeri tints and other supporting information are consistent with,the information provided here Designer SEAL Sign. re of Designer 051571 y .FNGI�IE�-�•'�O //1Jlllll�ihll U ea! Date rrwr+rrwnvr.., r�r��r►v I Is this a high density project? Yes 2 If so,number of drainage areaslSCMs -`.1 3 Does this project have low density areas? No 1 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED 2AINAGE AREA INFORMATION Entire'Site 1 1 Type of SCM Wet Pond 3 Total drainage area(sq ft 2111526 sf 1336945 3 Onsite drainage area(sq ft >2111526 sf 1312309 7 Offsite drainage area(sq ft 24636 3 Total BUA in project(sq ft 371274 sf 395910 sf New BUA on subdivided lots(subject to permitting) 3 (sg ft 220000 sf 220000 sf New BUA not on subdivided lots(subject to permitting) s 151274 sf .175910 sf 1 Offsite BUA s ft 24636 sf 2 Breakdown of new BUA not on subdivided lots: Parking(sq ft Sidewalk(sq ft 14847 sf 14847 sf Roof(sq ft Roadway s ft 89295 sf 89295 sf Future(sq ft 47132 sf 47132 sf -Other,please specify in the comment box below(sq ft New infiltrating permeable pavement on 3 subdivided lots s ft New infiltrating permeable pavement not on 1 subdivided lots(sq ft Existing BUA that will remain(not subject to 5permitting) s ft 3 Existing BUA that is alreadpermitted-.(s�g..fq. 7 Existing BUA that will be removed(sq ft 3 Percent BUA 17.58% 29.6% 3 Desi n storm inches 1.0 in 3 Design volume of SCM cu ft 100598 of 1 Calcula€ion method for design volume Simple.Method )DITIONAL`1NFORMATION Please use this space to provide any additional information about the 2 drainage areas): e'Future'BUA is 80%of the 58,915 sf lot next to Lot#1:The"off-site BUA 24.636 sf of NCDOT ROW in the drainage area.that was'assu med.100% pervious for the wet pond design.The impervious area forthe mail kiosk ross from Lot#53 is accounted for in`Roadway'.' r V ■ r \i I r V 1 Drainage area number 1 2 Minimum re wired treatment volume cu ft 35264 of NERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM H:V? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered No side slopes_? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes 10- ear storm)? a Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Pump referred 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC 9? Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with N/A General MDC 10? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 151 Is there an O&M Plan that complies with General MDC 12? Yes 16 Does the SCM follow the devices edfc;MDC? Yes 17 Was the SCM desi ned b an NC Licensed rofessional? Yes T POND MDC FROM 02H.1053 18 Sizing method used SAIDA 19 Has a sta etstora a table been 2rovided in the calculations? Yes 20 Elevation of the excavated main pool depth(bottom of sediment 361.00 removal)(fmsl 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 362.00 22 Elevation of the bottom of the ve etated shelf fmsl 366.50 23 Elevation of the permanent pool fmsl 367.00 24 Elevation of the top of the vegetated shelf fmsl 367.50 25 Elevation of the tem orspool fmsl 369,80 26 Surface area of the main permanent eool(square feet) 22010 27 Volume of the main permanent pool cubic feet 86865 of 28 Averse depth of the main pool feet 4.33 ft 29 Averse depth equation used j Equation 3 30 If using equation 3,main pool perimeter feet 700.0 ft 31 if usin2 equation 3,width of submerged veg.shelf feet &0 ft 32 Volume of the foreba cubic feel 14800 c€ 33 Is this 15.20%of the volume in the main ool? Yes 34 Clean-out depth for foreba inches 30 in 35 Design volume of SCM(cu ft) 100598 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice,orifice diameter(inches) 4.00 in 38 If weir,weir height(inches) 39 if weir,weir length inches 40 Drawdown time for the temporary poet(days) 4.39 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes circuiting? 42 Are berms or baffles provided to improve the flow path? Yes 43 Depth of forebay at entrance(inches) 36 in 44 Depth of rebay at exit(inches) 30 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf(feet) 6 ft 47 Slope of vegetated shelf(H:V) 6:1 48 Does the orifice drawdown from below the top surface of the Yes permanentpool?. 49 Does the pond minimize impacts to the receiving channel from the 1- Yes r,24-hr storm? 50 Are fountains proposed?(if Y,please provide documentation that No MDC 9 is met. 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda 54 Hasa planting plan been provided for the vegetated shelf? Yes IDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s):