Loading...
HomeMy WebLinkAboutNCC205753_NOT Closeout Documents (2)_20231201 GREENSBORO NORTH CAROLINA Termination of Grading Permit 12/9/2022 Bishop C. M. Bailey United House of Prayer for All People 1665 North Portal Dr. NW Washington, DC 20012 RE: Project Name: Bailey Village at New Downtown East Address: 900 E. MARKET ST. Greensboro, NC 27401 Grading Permit: 3013 Disturbed Acreage: 13.7 Dear Bishop C. M. Bailey, This office has completed the final inspection on the above referenced project. We found that the requirements of the grading permit have been satisfied and the permit is now closed. No further inspections are required by this office, and the self-inspections required under the NCG010000 permit can cease. If this site was permitted after April 1, 2019, a Notice of Intent should have been filed with the NC Department of Environmental Quality. Please file a Notice of Termination with that Department to close your NCG010000 permit at this time. This can be done online at deq.nc.gov/ncg0l If you have any questions, please feel free to contact me at (336)373-2858. Sincerely, --77/ tAi Mark Cain, Soil Erosion Inspector Sediment and Erosion Control City of Greensboro cc: File PO BOX 3136 • GREENSBORO NC 27402-3136 • WWW.GREENSBORO-NC.GOV • 336-373-CITY (2489) 640