Loading...
HomeMy WebLinkAboutNCC205753_NOT Closeout Documents_20231201 CCITY OF GREENSBORO OM) SEDIMENT AND EROSION CONTROL INSPECTION REPORT GREENSBORO Site Name: Bailey Village at New Downtown East Site Location: 900 E. MARKET ST. Permit Number: 3013 Person(s) Financially Responsible: Apostle R. Price, Ill, United House of Prayer for All People 1665 North Portal Dr. NW Washington, DC 20012 Weather&Soil Conditions: Weather: Overcast, Soil: normal Is site in compliance with City's Erosion Control Ordinance? ✓ Yes No Under NOV Violations/Problems: Site Status: Undisturbed Clearing and grubbing Grading: Rough ✓ Fine Grading without a permit Has off-site sedimentation occurred since last inspection? Yes ✓ No Degree: slight moderate severe Corrective actions needed: Site has removed all temporary erosion measures and is sufficiently stable. This grading permit will now be closed. Delivered to: Apostle R. Price, Ill;Josh Habeger;Jeremey Smith; Gabriel Ortiz; Marcus Coppola Delivered by: hand fax ✓ email mail Inspected by: Mark Cain, (336) 373-2858 Date of inspection: 12/8/2022 Date of reinspection: 1/8/2023 Please see the following page for important information regarding this site report. P.O. Box 3136,Greensboro, North Carolina 27402-3136 SEDIMENT AND EROSION CONTROL INSPECTION REPORT(CONT) TO RECIPIENTS OF THIS INSPECTION REPORT PLEASE READ CAREFULLY AND RESPOND AS NECESSARY. • If corrective actions are listed on the front, a follow-up inspection will be made to see if the corrections have been made and to determine if the are successful. Failure to meet the deadline may result in a Notice of Violation, Stop Work Order, Revocation of the Grading Permit, or other enforcement action against the site. It is the owner/developer's (the person(s)financially responsible for the disturbance) responsibility to have the necessary corrections made and to make arrangements with their engineer, contractor, etc.to have them completed by the deadline. • If the owner/developer, contractor, engineer, or other agents have questions about this inspection report or any corrections listed on the front of this report, contact the Sediment and Erosion Control Section. Do not wait until the deadline to start asking questions. • The person responsible for the land-disturbing activity is reminded that the Erosion Control Ordinance is performance oriented; if it is determined that off-site sedimentation is occurring despite proper implementation and maintenance of the approved erosion control plan, it is the owner/developer's responsibility to provide additional sediment trapping and/or erosion control measures. • The owner/developer is responsible for taking the initiative in inspecting the site to see that the approved erosion control plan is being implemented, that the devices are successful, and that the devices are properly maintained and repaired. Do not wait for erosion control personnel to discover and point out the problems;their function is not to serve as your construction inspector but to spot check the site for compliance with the approved plan. When inspectors discover problems and there has been no initiative on the owner/developer's part to make corrections, you will be expected to make corrections immediately, usually within one or two days. P.O. Box 3136,Greensboro, North Carolina 27402-3136